Loading...
2022-004 By-law to Authorize the Execution of a Pre-Servicng Agreement with Oro Medonte Estates Inc. Plan 51R-31425The Corporation of the Township of Oro-Medonte By-law No. 2022-004 A By-law to Authorize the Execution of a Pre -Servicing Agreement with Oro Medonte Estates Inc. for: Part of Lot 1, Concession 7 and part of the East Half of the West Half of Lot 2, Concession 7 (Oro) and designated as Part 1, Plan 5111-31425; Township of Oro- Medonte; PIN 58533-0019(LT) Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P.13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; And Whereas the Council of the Township of Oro-Medonte deems it advisable to enter into a Pre -Servicing Agreement with Oro Medonte Estates Inc. for the following lands: Part of Lot 1, Concession 7 and part of the East Half of the West Half of Lot 2, Concession 7 (Oro) and designated as Part 1, Plan 51 R-31425; Township of Oro- Medonte; PIN 58533-0019(LT) Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows: That the Mayor and Clerk are hereby authorized to execute, on behalf of the Township of Oro-Medonte, a Pre -Servicing Agreement, a copy of which is attached hereto and forms part of this By-law as Schedule 'A'. 2. That the Township of Oro-Medonte shall be entitled to enforce the provisions of the Pre -Servicing Agreement against the owners of the land; 3. This by-law shall take effect on the final passing thereof. By-law read a First, Second and Third time, and Passed this 12th day of January, 2022. The Corporation of the Township of Oro-Medonte Mayor, H.S. 44ghes Cler Yvonne_Aubichon i �To� f Proud Heritage, Exciting Future PRE -SERVICING AGREEMENT - between - ORO MEDONTE ESTATES INC. -and- THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Part of Lot 1, Concession 7 and part of the East Half of the West Half of Lot 2, Concession 7 (Oro) and designated as Part 1, Plan 51 R-31425; Township of Oro- Medonte; PIN 58533-0019(LT) TOWNSHIP OF ORO-MEDONTE COUNTY OF SIMCOE January 12, 2022 By -Law No. 2022-004 PRE -SERVICING AGREEMENT THIS AGREEMENT MADE BETWEEN: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE - and - ORO MEDONTE ESTATES INC. (hereinafter called the "Township") (hereinafter called the "Developer") WHEREAS the Developer is the registered owner of the lands described in Schedule "A" attached (the "Subdivision Lands"); AND WHEREAS the Developer desires to commence installing municipal services within the Subdivision Lands, prior to the registration of the Plan of Subdivision and the execution of the Subdivision Agreement with the Township; NOW THEREFORE THE PARTIES HERETO AGREE AS FOLLOWS: ASSUMPTION OF RISK BY DEVELOPER 1.1 The Developer agrees to assume all risk in commencing installation of Township services, as defined in Article 1.4 hereof, on the Subdivision Lands, prior to the execution of a Subdivision Agreement with the Township and the registration of the Plan of Subdivision. The Developer hereby releases the Township, its agents, servants and employees from and against all actions, suits, claims and demands whatsoever, which may arise either directly or indirectly as a result of the installation of Township services by the Developer. 1.2 The Developer acknowledges and agrees that, in the event that a Subdivision Agreement with the Township is not finalized for any reason and the Plan of Subdivision is not registered as a result, pre -servicing of the Subdivision Lands shall cease immediately. 1.3 The Developer acknowledges and agrees that Engineering design plans and specification for the Township services to be installed by the Developer, as submitted to the Township, in accordance with the terms of this Agreement, may require further amendment as a result of requirements imposed by the Township under the terms of the Subdivision Agreement to be entered into for the Subdivision Lands. The Developer covenants and agrees to assume all risk and responsibility for the cost of required revisions to the Engineering design drawings and specifications for the Township services, together with the costs of modifying, reconstructing, removing and/or replacing the Township services installed by the Developer, pursuant to the terms of this Agreement, in order to satisfy the requirements finally imposed by the Township at the time that the Subdivision Agreement is entered into. The Engineering Design plans are as follows: PEARSON ENGINEERING LTD (Project No. 17090) • DRAWINGS LIST AS PER APPROVED SUBMISSION TITLE PAGE GENERAL NOTES General Servicing Plan GN-1 General Servicinq Plans General Servicing Plan GS-1 General Servicing Plan GS-2 Storm Drainaqe Plans Storm Drainage Plan STM-1 Storm Drainage Plan STM-2 Post -Development Storm Catchment Plan STM-3 Storm Sewer Design Sheets PD-1 Lane Markinq Plan Lane Marking Plan LM-1 Water Svstem Watermain Plan WM-1 Watermain Plan WM-2 Lot Gradinq Plans Lot Grading Plan LG-1 Lot Grading Plan LG-2 Lot Grading Plan LG-3 Lot Grading Plan LG-4 Lot Grading Plan LG-5 Lot Grading Plan LG-6 Lot Grading Plan LG-7 Lot Grading Plan LG-8 Lot Grading Plan LG-9 Plan and Profile Drawinqs Ruby Ridge Road 'STA 0+000 To 0+260 PP-1 Ruby Ridge Road STA 0+260 To 0+500 PP-2 Ruby Ridge Road STA 0+500 To 0+720 PP-3 Ruby Ridge Road STA 0+720 To 1+025 PP-4 Ruby Ridge Road 'STA 1+025 To 1+265 PP-5 Ruby Ridge Road STA 1+265 To 1+367.21 PP-6 James Cooke Place STA 0+000 To 0+243.22 PP-7 Forest Heights Court STA 0+000 To 0+171.27 PP-8 Future Line 6 North Realignment STA 0+000 To 0+300 PP-9 Future Line 6 North Realignment STA 0+300 To 0+540 PP-10 Future Hickory Lane STA 0+300 To 0+247 PP-11 County Road 22 STA 0+000 To 0+220 PP-12 County Road 22 STA 0+220 To 0+460 PP-13 Section Details County Road 22 SEC-1 Section Details Line 6 North Realignment & Hickory Lane SEC-2 Stormwater Manaaement Plan North Pond Plan View SWM-1 North Pond Cross -Sections SWM-2 North Pond Outlet Details SWM-3 South Pond Plan View SWM-4 South Pond Cross -Sections SWM-5 South Pond Outlet Details SWM-6 South Pond Inlet Details SWM-7 Flood Plain Mapping Plan FLP-1 Siltation and Erosion Control Erosion and Sediment Control Plan ESCP-1 7 Erosion and Sediment Control Plan ESCP-2 Erosion and Sediment Control Plan ESCP-3 Desiqns Standards Drawinqs Notes and Details ND-1 Notes and Details ND-2 Notes and Details ND-3 Notes and Details ND-4 Notes and Details ND-5 Notes and Details ND-6 DRAFT LEGAL PLAN M-Plan (Guido Papa Surveying) 51 M- Utilities Hydro Plan (Hydro One Networks Inc.) 00340-18-049 Hydro Plan (Hydro One Networks Inc.) 0340-18-049-1 Hydro Plan (Hydro One Networks Inc.) 0340-18-049-2 Streetlight System (RTG Systems Inc.) SL-1 Streetlight System (RTG Systems Inc.) SL-2 Accepted for Construction on behalf of the Township by The Jones Consulting Group Ltd. on August 19, 2019 1.4 The Developer acknowledges and agrees that this Agreement relates to and permits the installation of the following Township services on the Subdivision Lands: 1. Site preparation (clearing and grubbing, strip, load, transport off -site and stockpile on -site topsoil); 2. Earthworks (on -site grading and excavation, importing and placing fill); 3. Road works; 4. Installation of watermain; and 5. Drainage works, storm sewers and stormwater management works. Table 1: Timing of Commencement of Works — Phase 2 Description Timing of Commencement of Works P1 I Immediately. 1.5 The Developer acknowledges and agrees that no work shall be carried out on any existing Township right-of-way, and that there shall be no connection to services on any Township right-of-way. 1.6 The Developer acknowledges and agrees that no work shall be carried out on lands not owned by the Developer, without the written consent of the owner to be filed with and approved by the Township. 1.7 The Developer acknowledges and agrees that all Servicing Plans must comply with Federal, Provincial and Township laws, By-laws, standards and policies. 2. REQUIREMENTS PRIOR TO THE COMMENCEMENT OF WORK 2.1 The Developer agrees to submit the following to the Township, in a form satisfactory to the Township, prior to the commencement of the installation of Township services on the Subdivision Lands: a) A letter from a qualified Engineer experienced in the field of Township services confirming: Retainer - That their firm has been retained by the Developers to act as Consulting Engineers for Oro Medonte Estates Inc.. 2. Terms of Retainer - The terms of their retainer with the Developer as follows: a) Plans and Specifications -Prepare plans and specifications for the construction of Township services; b) Cost Estimates - Prepare cost estimates for the Township services to be constructed from the drawings; c) Approvals - Obtain all necessary approvals to construct; d) Co-ordination - Co-ordinate the installation of Township services to avoid conflicts with regards to telephone, cable T.V., and Township services; e) On -Site Inspections - Ensure that all on -site inspections of Township service installations are conducted by the Developer's Consulting Engineers at all times during construction; f) As -Constructed Drawings - Submit certified "as -constructed" drawings after acceptance of the Township services; g) Change in Retainer — If at any time during the project: i) The terms of their retainer are changed by the Developer, or; ii) If they become aware that they will not be able to provide "as constructed" drawings, they will notify the Township within twenty-four (24) hours; h) Erosion and Siltation Control - Ensure all necessary precautions are taken to prevent erosion and sedimentation of sewers, ditches, culverts, slopes, etc., both within the subdivision and downstream, prior to and during construction. b) Confirmation letters are to be filed with the Township Clerk, confirming the following: 1) The Township Engineering Consultant has no objection to the pre - servicing; 2) The Planning Division has no objection to the pre -servicing; 3) The Nottawasaga Valley Conservation Authority has no objection to the pre -servicing; and 4) The Township Solicitor has no legal objections to the pre -servicing. c) Payment of cash or certified cheque required to cover the cost of the Township's lawyer and Planner for all costs involved in processing the Pre - Servicing Agreement, and for all the Township Engineering Consultant for checking of plans, specifications and inspection on behalf of the Township for the sum of Ten Thousand Dollars ($10,000) as per Schedule `C' attached. As accounts are received from the Township Planner, lawyer, and Engineering Consultant, they will be paid by the Township and then submitted to the Developer for reimbursement within thirty (30) days. In the event that the deposit is drawn down to a level of Five Thousand Dollars ($5,000) or less, and the Developer does not pay the accounts within thirty (30) days, it is hereby understood and agreed that the Developer is in default of this Agreement and all work must cease; d) A Letter of Credit, as per Schedule "E", in the amount set out in Schedule "D", attached, as security to ensure the due completion of the Township services to be constructed by the Developer, and as security to be held by the Township for the warranty periods to be more particularly described in the Subdivision Agreement for the Subdivision Lands. The said Letter of Credit shall provide that if in the sole opinion of the Township, default under the terms of this Agreement has taken place, the said Letter of Credit may thereupon be drawn upon in whole or in part; e) A certified copy of an insurance policy, or a certificate of insurance, confirming comprehensive general liability in the amount of Five Million Dollars ($5,000,000.00), naming the Township and The Jones Consulting Group Ltd. as co-insured, and containing the following additional provisions or endorsements: 1) Products/Completed Operations provisions; 2) Cross -liability clause; 3) Notice of Cancellation - a provision that the insurance company agrees to notify the Township within fifteen (15) days, in advance, of any cancellation or expiry of the said insurance policy. f) All Servicing Plans shall be submitted to and accepted by the Township Engineering Consultant. INSPECTION BY THE TOWNSHIP 3.1 The Developer agrees to permit unrestricted access to the Subdivision Lands to the Township and its agents for the purpose of inspection of the Township services to be installed by the Developer. Notwithstanding that inspections may be conducted by the Township or its agents, the Developer shall bear sole responsibility for the soundness of the Engineering design of the Township services, and for ensuring that the Township services to be installed will function, as intended, and will be compatible with the final Plan of Subdivision when and if such Plan of Subdivision is approved. 3.2 If, in the opinion of the Township, there is an emergency situation as a result of any work undertaken by the Developer or its servants, or agents, which requires immediate attention to avoid damage to private or public property or services owned by the Township or to eliminate a potential hazard to persons, such work may be done immediately by the Township at the expense of the Developer, but notice shall be given to the Developer at the earliest possible time. 4. APPLICATION OF SECURITY 4.1 In the event of default by the Developer under the terms of this Agreement, or if the Township is required to enter onto the Subdivision Lands or the abutting Township lands to conduct any work on the Township services or the connection of the Township services to facilities due to an emergency, the Township shall be entitled to draw upon the security posted by the Developer pursuant to the terms of this Agreement, in whole or in part, to cover the costs incurred by the Township in remedying the default on the part of the Developer, or in addressing the emergency situation. NO REDUCTION OF SECURITY 5.1 The Developer acknowledges and agrees that no reduction in the amount of security filed by the Developer with the Township, in accordance with the terms of this Agreement, shall be permitted until such time as the Developer has entered into the Subdivision Agreement for the Subdivision Lands with the Township. Thereafter, any reductions in the security posted by the Developer shall be completed in accordance with the terms of the said Subdivision Agreement. 6. NO ASSUMPTION OF TOWNSHIP SERVICES 6.1 The Developer acknowledges and agrees that the Township shall not be required to assume the Township services to be constructed by the Developer, pursuant to the terms of this Agreement, until such time as the Developer has entered into a Subdivision Agreement with the Township for the Subdivision Lands, and the Township services have been completed, inspected, and approved. 7. NOTICE 7.1 Any notice required to be given pursuant to this Agreement may be given by prepaid registered post to the Developer at the following address: Oro Medonte Estates Inc. 155 Romania Drive Concord, Ontario L4K 4Z9 and such notice shall be deemed to have been given and received on the third day after mailing. 8. NO ASSIGNMENT 8.1 The Developer shall not assign or otherwise transfer the benefit of this Agreement without the written consent of the Township, which may be unreasonably withheld. IN WITNESS WHEREOF the Developer has hereunto set its hands and seals this 5ch day of JANUARY, 2022. ORO MEDONTE ESTATES INC. l Per: (sign t Name: GRAZIANO PALUMBO Position: I have authority to bind the corporation ENZO PALUMBO (print) (print) IN WITNESS WHEREOF the Township has hereunto sets its hands and seals this 12TH day of JANUARY , 2022. THE Per: Per: OF THE TOWNSHIP OF ORO-MEDONTE H.S. Hughes, Mayor Yvonne Aubichon, Clerk s SCHEDULE "A" DESCRIPTION OF LANDS: Part of Lot 1, Concession 7 and part of the East Half of the West Half of Lot 2, Concession 7 (Oro) and designated as Part 1, Plan 51 R-31425; Township of Oro- Medonte; PIN 58533-0019(LT) PROPOSED M-PLAN: 4'I i ��'135j Y1 v tl SCHEDULE"B" io+mev�vart ' LIM rp ,rlo.wwr'omomiivaanz � .m.-=�_�—' Ej (� ,f ,'I I• �pd apt �i®_ J PHASE 2 DESIGN PLAN: �, '. �• 11-;'�, �„-tee—> �F PEARSON �11 ENGIN6E0.1NG. ¢s�vswo- uY x63 � Its] SCHEDULE"C" CASH DEPOSITS TO BE FILED WITH THE TOWNSHIP: Township's lawyer and Planner for all costs involved in processing the Pre - Servicing Agreement, and for all the Township's Engineers for checking of plans, specifications and inspection on behalf of the Township. $10,000 TOTAL CASH DEPOSITS TO THE TOWNSHIP $10,000 A Letter of Credit as security to ensure the due completion of the Township services to be constructed by the Developer, and as security to be held by the Township for the warranty periods to be more particularly described in the Subdivision Agreement for the Subdivision Lands. The following are Summaries of the Engineering Cost Estimates for Phase 1, Connection Option A, and Connection Option B, as per the detailed Engineering Cost Estimates prepared by Pearson Engineering Ltd. dated August 15, 2019 and included in the Accepted for Construction document and drawing submission August 19, 2019. The following Tables and attached spreadsheets summarize the pre -servicing cost estimate amounts and respective Township Securities for Phase 1, Connection Option A and Connection Option B: PRE -SERVICING SECURITIES TO BE DEPOSITED WITH THE TOWNSHIP: Phase 2 = $1,315,741.60 * As Per SCHEDULE "D" I SCHEDULE xxDaa ESTIMATE PEARS O N (COST Forest Helgtas Estates, Towmhhp of Oro44edonte PHASE 2 ENGINEERING LTD. ITEM I I DESCRIPTION NO. II [Part 1 Site Preparation and Earthwosia 1.1 Maintain sediment control fence 1.2 Suppy, instal and maintain sedimenl control fence 1.3 Supply, instal and maintain double sediment control fence around stockpiles 1.4 Supply, imlal and maintain 3.Om x 30.0m x 150mm mud mat 1.5 Hydro seed topsoil stock pile 1.6 Supply. Instal rock check dams as per Plosion and Sediment Control Plans 1.7 Supply, Instal temporary sediment prods dwhkkeabottoms 1.8 Suppy, Instal and maintain 300mm temporary damage culverts 1.9 Supply, [rate] retaintng walls at South side of charnel ' 1.10 SuonN. instal relaintm wall East c(Lot 45 a _-_.._ ......._ Sub -Total Part 1 Site Preaaratlon and Earthworks Pat 2 Stamrvater Management Works 2.1 Supply, [rate] 300mm diem PVC storm sewer pipe 22 Supply, hand 375mm clam PVC stem sewer pipe 2.3 Suppy, insta1450mm diem PVC storm sewer ppe 2A Supply, Instal 600mm diem ceic. sloth sewer pipe 2.5 Supply, lotal 1500mm dam Precast concrete manhole 2.6 Supply, Instal 1500mm dam Precast concrete calchbash manhole 2.7 Supply, Insta11500mm dam Precast concrete double catchoadnmanhole 2.8 Supply. Insta11500mm do OGS 2.9 Supply, instal Single inlet calchbashn 600mmx600mm chV300mm lead 2.10 Supply, Ir dal Double inlet catchbash 1200mmx6OOmm chv 375mm lead 2.11 Supply. ]rate[ Ditch hint calchbasin 600mmx600mm chv300mm lead 2.12 Supply, ]rate[ 1000mmx4000mm concrete box culvert 2.13 Comed Into existing Phase 1 STM manhole, Uvall restorations 2.14 Suppy, Instal Ndex reinforcement mals In channel 2.15 Supply. Instal 450mm dim FUPE cuWd al existing nrdesac. Stomxvater Managerent Pond 216 Excavale and shape SWM pond to pre grade elevalions 2.17 Fine grade SIAM pond dd 150mm fopsol and seed 2.18 Supply, instal 1800mm da control manhole at pond hill 2.19 Supply, Imlal critics plates w9Nn control maintenance hole 220 Supply, Instal concrete headwall as per OPSD- 8D4.030, regrade as necessary 2.21 Supply, Instal C035 cable mat at headwals, as per drarmgs 222 Construct 10.Om emergency spihvaycompete win CG35 cable mad 2.23 Comimct forebaysplhsaycomplete with CC-35 cable mat Z24 Construct overland Dam rode chamel, cAV CG35 cable mi Pond Access Road 225.1 a)Supply, Place and compact 200mm ofGranlar'R 2252 b) Supply, place and compact 150mm of Grarxdar'A' 225.3 c) Supply, place and compact 50nm of 1-11.3 asphalt 2.26 Simply and Install4.5m smote s%inq one Sub -Total Pant momff MamgemetWorks Part3 Watenmin and Appurtenances (Watettaln Includes al ten, Crosses, herds, reducers, restraints, bedding, etc) 3.1 Connect to existing 250mm dam. Walermain in Rally Ridge Road cNlrestorations 3.2 Supply, Instal 250mm dlam PVC wadarrain 3.3 Supply Instal 250mm clam gale valve and box 3.4 Supply, istal fire hydrant clw 150mm dam lead, valve, anchor tee and [trust Nockng 3.5 Supply, Install 19mm diem mmkipex water service(bng) MY curb stop and trace %ire 3.6 SuonN.instal 19mm Gam munkinex water service(short) chv cub stop and two %ire Sub -Total Part 3 Watemein and Appurtenances Ilion: 4 Road and Surface Works 4.1 Shape, compact to Pregrade elevations RubV MO RoadUanws Cooke Plate 4.2A a) Supply, place and compact 300mm of Grandar'& 42.2 b) Supply. place and compact 150mm of Grarrdar'N 423 c) Suppy, place and compact 50mm ofHLB asphalt 4.3 Supply, Instal 150mm dla subdraln Asphalt Shoulde 4.AA a) Sppy, place and compact 150mm of GraNaf'A' 4.5 Supply; Instal concrete rolover curb 4.5 Supply, Instal street light coopdele with power supply 4.7 Suc,�N. Instal quard rail al on retaking walls Pat4Road rtl Surta 8Inkrks ISub-Total Part( SAe Preparationand Earthworks !Sub -Total Part2 StomWeter MamgmwtWOrks jSub-Total Part 3 YValenmki and Appurtenances jPart4 Road and Sudace Works Total Copy of Cost Estimate- Phase 2-PSA- Dec 172021 2021-12-17 PROJECT NO.17090 UNIT EST. ' WIT TOTAL SECURITY SECURITY QLANT PRICE AMOUNT PERCENTAGE TOTAL Is 1 S2,500.00 $2,500.00 1DO% $2.500.00 in 1,964 $19.00 $37,126.00 100% $37,126.00 in 783 $38.00 $29,754.00 100% $29,754.00 Ba 1 $4.500.00 $4,50020 100% $4.500.00 m2 8.150 $0.50 $4,075.00 100% $4,075.00 a 11 $150.00 $1,650.00 100% $1.650.00 m 3 $10,OOD.00 $30,000.00 100% $30,000.00 RI 5 $2,50D.00 $12,500.00 100% $12,500.00 m2 284 $500.00 $142,DDO.00 50% $71.006.60 m2 120 $5W.00 $60.000.00 50% $30.000.00 $324,105.00 5229,105001 m 658 $250.00 $164500.06 50% $82.250.0, I m 193 $300.D0 $57.810.00 50% $28,905.011 in 45 $350.00 $15,750.00 50% $7,875.0r 1 Is 190 $600.00 $114.00.00 50% $57,000.0,1 a 12 $10.500.00 $126,000.00 50% MAMA- I se 11 $10,500.00 $115,500.00 50% $57,750.00 we 1 $10,50D.00 $10500.00 50% $5,250.u0r we 1 $32,000.00 $32000.00 50% $16,000.0i 1 W 14 $4250.00 $59,500.00 50% $29.750.011 ea 2 S6,500.00 $13,000.00 50% $6,500.0ni as 2 $4,250.00 $8,500.00 5D% $4,250.00 m 45 $2,500.00 $112,500.00 50% $56,250.Dri N 1 $2,500.00 $2,500.00 50% $1,260A01 m2 4,385 $25.00 $1D9,625.00 50% $54.8125C' In 9 $250.00 $2,250.00 5D% $1,125.00 111' 1,053 $4.90 $5,159.70 50% $2,579.%- m2 5,500 $8.00 $44,000.00 50% $22000.00 1 $11.000.00 $11,000.00 5D% $5,500.00- m 3 $500.00 $1,500.00 50% $750.0Dr ea 4 $6,000.00 $24,000.00 50% $12,000.00 m2 15 $275.00 $4,125.00 50% $2,ontic Is 1 $17,000.00 $17.000.00 50% $8.500.00• Is 1 $4,500.00 $4.500.00 50% $2,250.00 Is 1 $3,500.00 $3,500.00 50% $1,750.00 11112 673 $12.00 a076.00 60% $4,0380C m2 673 $9.50 $6.393.50 50% $3,196.75 t2 673 $11.00 $7,403.00 56% $3,701.50 ea 2 $1,750.00 $3500.00 50% $1.750.00 �$1,094,09220 $54284LID Is 1 $8,500.00 $8150020 50% $4,250.00 in 1,333 $225.00 $299.926.00 50% $149.96150 on 4 $3,300.00 $13.200.00 50% $6,600.00 ee 8 S6,500.00 $52,DDO.00 50% $26,000.00 ea 22 $2.500.00 $55,000.DO 50% $27,500.00 Be 32 S2.000.00 $64.000.00 50% $32.000.00 I $492,625.00 $240,31250 m2 10.670 SUO $16,005.D0 50% $8,002.50 m2 10,670 $11.00 $117,370.00 50% $58,685.00 m2 10.670 $9.50 $101,365.00 5D% $50,682.50 in 7.630 $11.00 $83.930.00 50% $41,955.00 in 2,100 $24.00 $50,400.00 50% $25,200.00 m2 1,658 $9.50 $15,761.00 50% $7,875.50 In 2,169 $65.00 $140.985.00 50% $70,492.50 W 7 $5,000.00 $35,0D020 50% $17.500.00 an 191 $250.DO $47v750.00 50% $$23.875.00 S60&556.00 $309,27400 $324,105.00 S223,105,00 $1,084,09220 $542,046.10 -- - $492,625.00 _$608.556.00 _ $246,312.50 $304.278. - - $2,509,378.20 $1,315,741.10� 12 SCHEDULE "E" PRE -SERVICING AGREEMENT - STANDARD FOR THE TOWNSHIP "STANDBY" LETTER OF CREDIT IRREVOCABLE LETTER OF CREDIT DATE OF ISSUE: NAME OF BANK: ADDRESS OF BANK: LETTER OF CREDIT NO.: AMOUNT: $ 1,315,741.60 Except as otherwise expressly stated, this Letter of Credit is issued subject to the Uniform Customs and Practices for Documentary Credits (1993 Revision), being ICC Publication No. UCP 500. TO: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE P.O. Box 100, Oro Ontario, LOL 2X0 We hereby authorize you to draw on the Bank of Ontario, , for the account of up to an aggregate amount of ($$$$$$$$$$$) which is available on demand. Pursuant to the request of our said customer, we, the Bank of Ontario, hereby establish and give to you an Irrevocable Letter of Credit in your favour, in the above amount, which may be drawn on by you at any time and from time to time, upon written demand for payment made upon us by you which demand we shall honour without enquiring whether you have the right as between yourself and our said customer to make such demand and without recognizing any claim of our said customer or objection by them to payment by us. Demand shall be by way of a letter signed by an authorized signing officer of the Corporation of the Township of Oro-Medonte. The original Letter of Credit must be presented to us at : Bank of , , Ontario, . The Letter of Credit, we understand, relates to a Pre -Servicing Aqreement between our said customer and the Corporation of the Township of Oro-Medonte, with Mortaaae Companv, as a third party, regarding subdivision of (property description) The amount of this Letter of Credit may be reduced from time to time, as advised by notice in writing, given to us by an authorized signing officer of the Corporation of the Township of Oro- Medonte. Partial drawings shall be permitted. We hereby agree that partial drawings under this Letter of Credit will be duly honoured upon demand. This Letter of Credit will continue in force for a period of one year, but shall be subject to the condition hereinafter set forth. It is a condition of this Letter of Credit that it shall be deemed to be automatically extended without amendment from year to year, from the present or any future expiration date hereof, unless at least thirty (30) days prior to the present, or any future expiration date, we notify you in writing by registered mail that we elect not to consider this Letter of Credit to be renewable for any additional period. Dated at Authorized Signature Bank of Ontario, this day of Authorized Signature 20 13