2020-089 By-law to Authorize the Execution of a Subdivision Agreement between the Corporation of the Township of Oro-Medonte and Braestone Development CorporationThe Corporation of the Township of Oro-Medonte
By -Law No. 2020-089
A By-law to Authorize the Execution of a Subdivision Agreement between the
Corporation of the Township of Oro-Medonte and Braestone Development
Corporation
Whereas, Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P.13,
as amended, provides that municipalities may enter into agreements imposed as a
condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies being:
PCL 2-1 Sec 51-Oro-9; LT 3 Con 9 Oro Being the E'/2 & W'/z; Lt 2; Con 9 Oro being
the E'/2 & W '/z; Pt. 1, 51 R-21804, except Pt 1, 51 R-28741 & Except Plan 51 M1070,
51 M1113 & 51 M1181; Township of Oro-Medonte, County of Simcoe
Now Therefore the Council of the Corporation of the Township of Oro-Medonte hereby
enacts as follows:
That the Mayor and Clerk are hereby authorized to execute, on behalf of the
Township of Oro-Medonte, a Subdivision Agreement, a copy of which is attached
hereto and forms part of this By-law as Schedule "A";
2. That the Subdivision Agreement, a copy of which is attached hereto and forms
part of this By-law as Schedule "A", be registered on title against the lands
described therein;
3. That the Township of Oro-Medonte shall be entitled to enforce the provisions of
the Subdivision Agreement against the owners and any and all subsequent
owners of the land;
4. That this By -Law shall come into effect upon the date of passage hereof, subject
to the provisions of the Planning Act, as amended.
By -Law read a First, Second and Third time, and Passed this 12th Day Of August,
2020.
The Corporation of the Township of Oro-Medonte
M yor, H.S. H es
Cie Yvonne Aubichon
JNACOBYARKELL
PRO FES SIC'
Via Courier
December 22, 2020
Township of Oro-Medonte
148 Line 7 South
ORO-MEDONTE ON LOL 2E0
Attention: Ms. Andria Leigh
Director, Development Services
Dear Ms. Leigh:
KLAUS N. JACOBY
Infog,)acobylow.ca
TRACY S. ARKELL
Tracyg)acobylaw cc
REG: °E®
JAN 0 7 2021
ORO-MEDONTE
TOWNSHIP
RE: BRAESTONE DEVELOPMENT CORPORATION (Phase 2B, Group E) SUBDIVISION
Part of East and West Halves Lot 2, Concession 9 Oro,
Township of Oro-Medonte
Part of Property Identifier No. 58532-0303 LT
Registered Plan 51 M-1191
I am pleased to report that Plan of Subdivision as surveyed by Paul R. Thomsen dated
September 9, 2020 was registered December 2, 2020 as Plan 51 M-1191 laying out
16 residential Lots and 6 Blocks, all of which have now been assigned their own Property
Identifier Number (PIN) as set out in the enclosed Property Identifier Number Correlation List
with the remnant lands being assigned PIN 58532-0305.
Notice of Subdivision Aareement
Notice of Subdivision Agreement entered into between the Township and Braestone
Development Corporation was registered December 3, 2020 as Instrument No. SC1735261
and forms a good and valid First Charge against the lands free and clear of all liens and
encumbrances.
I would advise that a subsearch of title to the subdivision lands prior to the registration of
the Plan revealed same being subject to two Charges, both in favour of The Toronto -
Dominion Bank, together with Assignments of Rents thereunder. As The Toronto -Dominion
Bank was not made party to the Subdivision Agreement, I would confirm having seen to the
registration of Postponements of both Charges to the Subdivision Agreement, registered as
Instruments No. SC1735316 and SC1735317 and thereby ensuring priority to the
Township's Agreement.
EWA
34 CLAPPERTON STREET, BARRIE, ONTARIO L4M 3E7
TEL:(705)726-0238 FAX:(705)726-9197
Township of Oro-Medonte -2- December 22, 2020
RE: Braestone Development
Corporation (Phase 2B, Group E) Subdivision
Pursuant to Schedule "C" of the Subdivision Agreement, enclosed are the following
Transfers and Transfer Easement, copies with registration particulars as noted thereon being
enclosed and all registered in full compliance with Inhibiting Order registered by us on behalf
of the Township on December 2, 2020 to ensure no dealings with the lands pending all
required registrations. Application to Delete the Inhibiting Order was subsequently
registered December 16, 2020 as Instrument No. SC1739573. I would confirm that
Postponements of the Charges held by The Toronto -Dominion Bank to the Easements,
including the Subdivision Agreement, and Partial Discharges releasing the lands conveyed
to the Township were obtained and registered to ensure priority of these Transfers and
Transfer Easements over the Mortgages.
Transfer - Block 28. Plan 51 M-1 191 (Ooen Soace Block
Transfer registered December 3, 2020 as Instrument No. SC1735318 conveying unto The
Corporation of the Township of Oro-Medonte in fee simple, Block 28 as open space.
Transfer - Blocks 29. 30 and 31 (Drainaae and Watermain Blocks)
Transfer registered December 3, 2020 as Instrument No. SC1735321 conveying unto The
Corporation of the Township of Oro-Medonte Blocks 29, 30 and 31 as Drainage and
Watermain Blocks.
Transfer Easement - Part Lots 18 and 19- Plan 51 M-1191
Transfer Easement over Part of Lots 18 and 19, Plan 51 M-1191 designated as Parts 1 and
2 on Reference Plan 51 R-42731 registered December 16, 2020 as Instrument No.
SC1739380 as a 6 metre drainage and maintenance easement, the terms of user being
embodied in Schedule attached to the Transfer Easement.
Transfer Easement -
Part East Half and West Half Lot 2. Concession 9 Oro and Part East Half Lot 3. Concession.
9 Oro designated as Part 1 on Plan 51 R-42732.
Transfer Easement in favour of the Township registered December 16, 2020 as Instrument
No. SC1739421 being the extensin of Georgian Grande Drive as shown on Plan 51 M-1070
to the Road Allowance between Concessions 8 and 9. Attached as Schedule thereto are
the terms and conditions relating thereto. Note that the lands affected thereby lie outside
the boundaries of Plan 51 M-1 191.
....3
Township of Oro-Medonte - 3 - December 22, 2020
RE: Braestone Development
Corporation (Phase 2B, Group E) Subdivision
Deletion of Inhibitina Order
Although the Plan of Subdivision itself was registered December 2, 2020, by reason of the
registration of the Inhibiting Order, no dealings could be had with the Lots as laid out on the
Plan by the Developer until such time as the foregoing documents, together with to required
Postponements and Partial Discharges, as the case may be, were registered by the
Developer's solicitor which was completed by his office on December 16, 2020, with an
Application to Delete Inhibiting Order being registered that date as Instrument No.
SC1739573.
As this would appear to conclude my involvement with this Phase of the Braestone
Development, I enclose a copy of my Statement of Account which I trust you will find
satisfactory, the original of which having been forwarded to the Township's central
accounts payable email address. Should you have any questions, or if I can be of any
further assistance, please do not hesitate to contact me.
Thank you again for allowing me the opportunity of being of service to the Township.
Yours vq(y truly
n
Klaus N. Jacoby
KNJ:jI
Enclosures
PROFESSIONAL CORPORATION
WiNCOBYARKELL
PROFESSIONAL CORPORATION
December 22, 2020
Township of Oro-Medonte
148 Line 7 South
ORO-MEDONTE ON LOL 2EO
Attention: Ms. Andria Leigh
Director, Development Services
KLAUS N. JACOBY
infoCjacobylaw cc
TRACY S. ARKELL
tracy,&)acobylaw ca
RE: BRAESTONE DEVELOPMENT CORPORATION (PHASE 26, GROUP E) Subdivision
Part of East and West Halves Lot 2, Concession 9 Oro,
Township of Oro-Medonte
Part of Property Identifier No. 58532-0303 LT
Registered Plan 51M-1191
Statement of Account
TO MY FEE in connection with all professional services rendered in
connection with the foregoing Subdivision, including, to receiving your
instructions of October 9, 2020 that I represent the Township in
seeing to the registration of the Plan 51M-1191; to receiving and
reviewing draft Subdivision Agreement for submission for registration;
to conducting search of title and advising solicitor for Developer as to
registration requirements; to correspondence with representative of
Kitchener Land Titles Office; to review status of Block 66, Plan 51 M-
1070 (0,3 metre reserve Oldenburg Court) with Ms. Andria Leigh and
subsequently receiving copy of amended Schedule "C" to delete
reconveyance of Block 66 therefrom as Plan 51 M-1070 not yet
assumed; to conducting further subsearches of title to subdivision
lands to identify Postponements and Partial Discharges of Mortgages
required to fulfill terms of Subdivision Agreement to ensure priority; to
seeing to amendments to documents as submitted by Developer's
solicitor; to providing Developer's solicitor with preferred order of
registration; to confirm delivery of mylars and Plan Document to Land
Registry Office; to seeing to preparation, execution and registration of
Inhibiting Order and Application deleting entry thereof; to all
correspondence with solicitor for Developer and advising you
throughout and to reporting to you herein,
MY FEE IN ALL, carried forward $ 6,000.00
34 CLAPPERTON STREET, eARRIE, ONTARIO 1-4M 3E7
TEL.(705)726-0238 FAx:(705)726-9197 2
Township of Oro-Medonte - 2 - December 22, 2020
RE: Braestone Development
Corporation (Phase 2B, Group E) Subdivision
MY FEE IN ALL, brought forward $6,000.00
Disbursements
Paid to conduct search of title
$218 .00
Paid for execution certificate
39.00
Paid for registration of Application for
Inhibiting Order
76.20
Paid for registration of Transfer to
Township of Block 28
76.20
Paid for registration of Application to
Delete Inhibiting Order
76.20
Paid Law Society transaction levy
65.00
Paid to administrative disbursements
60.00
TOTAL DISBURSEMENTS 610.60
HARMONIZED SALES TAX
(HST # 831 194360RT0001)
On fee herein $780.00
On applicable disbursements 53.91 833.91
TOTAL FEES, DISBURSEMENTS AND
HARMONIZED SALES TAX owing herein $7,444.51
THIS IS 0
Klaus N. Jacoby
KNJ:jl
E. & 0. E.
HEREIN
NAL CORPORATION
/'�
po 1
CLOSING DOCUMENTS
BRAESTONE DEVELOPMENT CORPORATION (Phase 213, Group E) Subdivision
Part East and West Halves Lot 2, Concession 9 Oro,
Township of Oro-Medonte
Part of Property Identifier No. 58532-0303 LT
Registered Plan 51 M-1191
1. Subdivision Plan 51 M-1191 PIN Correlation List;
2. Plan Document registered December 2, 2020 as Instrument No. SC1735066;
3. Notice of Subdivision Agreement registered December 3, 2020 as Instrument No.
SC1735261;
4. Application for Inhibiting Order registered December 2, 2020 as Instrument No.
SC1735076;
5. Transfer Block 28, Plan 51 M-1 191 registered December 3, 2020 as Instrument No.
SC1735318;
6. Transfer for Blocks 29. 30 and 31, Plan 51 M-1 191 as Drainage and Watermain Blocks
registered as Instrument No. SC1735321;
7. Transfer Easement over Part Lots 18 and 19, Plan 51 M-1 191 registered December 16,
2020 as Instrument No. SC1739380;
8. Transfer Easement over Part East Half and West Half Lot 2, Concession 9 Oro and Part
East Half Lot 3, Concession 9 Oro being Part 1 on Plan 51 R-42732 registered
December 16, 2020 as Instrument No. SC1739421;
9. Registered Plan 51 M-1 191 and Reference Plans 51 R-42731 and 51 R-42732;
10. Application to Delete Inhibiting Order registered December 16, 2020 as Instrument No.
SC1739573;
11. Copy of my Statement of Account, the original of which has been forwarded to the
Township's central accounts payable email address.
A
C
Subdivision/PIN Description Correlation List
58532-0306
LOT 1, PLAN 51M1191
58532-0307
LOT 2, PLAN 51M1191
58532-0308
LOT 3, PLAN 51M1191
58532-0309
LOT 4, PLAN 51 M1191
58532-0310
LOT 5, PLAN 51 M1191
58532-0311
LOT 6, PLAN 51 M1191
58532-0312
LOT 7, PLAN 51 M1191
58532-0313
LOT 8, PLAN 51M1191
58532-0314
LOT9, PLAN 51M1191
58532-0315
LOT 10, PLAN 51M1191
58532-0316
LOT 11, PLAN 51M1191
58532-0317
LOT 12, PLAN 51M1191
58532-0318
LOT 13, PLAN 51M1191
58532-0319
LOT 14, PLAN 51 M 1191
58532-0320
LOT 15, PLAN 51 M 1191
58532-0321
LOT 16, PLAN 51 M 1191
58532-0322
LOT 17, PLAN 51M1191
58532-0323
LOT 18, PLAN 51 M1 191
58532-0324
LOT 19, PLAN 51M1191
58532-0325
LOT 20, PLAN 51M1191
58532-0326
LOT 21, PLAN 51 M1 191
58532-0327
LOT 22, PLAN 51M1191
58532-0328
LOT 23, PLAN 51 M1191
58532-0329
LOT 24, PLAN 51M1191
58532-0330
LOT 25, PLAN 51M1191
58532-0331
LOT 26, PLAN 51M1191
58532-0332
LOT 27, PLAN 51M1191
58532-0333
BLOCK 28, PLAN 51 M1191
58532-0334
BLOCK29, PLAN 51M1191
58532-0335
BLOCK30, PLAN 51M1191
58532-0336
BLOCK31, PLAN 51M1191
58532-0337
BLOCK 32, PLAN 51M1191
58532-0338
OLDENBERG COURT, PLAN 51M1191
58532-0339
CLEVELAND COURT, PLAN 51M1191
LRO # 51 Plan Document
eo'1
Receipted as SC1735066 on 2020 12 02 at 13:34
The applicant(s) hereby applies to the Land Registrar.
IProperties
PIN 58532 - 0303 LT
Description PT E1/2 & PT W1/2 LOT 2 CONCESSION 9 ORO; SAVING AND RESERVING FROM
THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND MINERALS, WHETHER SOLID,
LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST WITHIN, UPON OR UNDER
SUCH LANDS; T/W FULL POWER TO WORK THE SAME AND FOR THIS PURPOSE TO
ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO MUCH THEREOF AND
TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL WORKING AND
EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078; SUBJECT TO
AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO, PART 1
PLAN 51R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER SCP460
AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS IN
SC1631380;; TOWNSHIP OF ORO-MEDONTE
Address ORO
IApplicant(s)
Name BRAESTONE DEVELOPMENT CORPORATION
Address for Service 85 Bayfield Street, Suite 500, Barrie ON.
L4M 3A7
I, J. David Bunston, Treasurer, have the authority to bind the corporation.
This document is not authorized under Power of Attorney by this party.
yyyy mm dd Pagel of 3
F✓ Remove S/T interest
IStatements
The applicant applies to register a plan of subdivision of the land prepared by Paul R. Thomsen dated 2020/09/09
All the chargee(s) consents required have been obtained See Schedules.
Signed By
Kenneth Edward Bailey
Tel 705-792-9279
Fax 705-730-1059
85 Bayfield Street Suite 500 acting for
Barrie Applicant(s)
L4M 3A7
I have the authority to sign and register the document on behalf of the Applicant(s).
Submitted By
Kenneth E. Bailey Professional Corporation
Tel 705-792-9279
Fax 705-730-1059
IFees/Taxes/Payment
Statutory Registration Fee
Total Paid
IFile Number
Applicant Client File Number
2020-184
85 Bayfield Street Suite 500
Barrie
L4M 3A7
$0.00
$0.00
I
Signed 2020 1202
I
2020 1202
?01
CONSENT OF CHARGEE
IN THE MATTER OF a Plan of Subdivision of:
PT E1/2 & PT W1/2 LOT 2 CONCESSION 9 ORO; SAVING AND RESERVING FROM THE E1/2 LOT 2
CONCESSION 9, ALL MINES AND MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY
BE FOUND TO EXIST WITHIN, UPON OR UNDER SUCH LANDS; T/W FULL POWER TO WORK THE
SAME AND FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPYTHE SAID LANDS OR SO MUCH
THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL WORKING AND
EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN OR017078; SUBJECT TO AN EASEMENT
IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO, PART 1 PLAN 511140262 AS IN SC1266952;
TOGETHER WITH AN EASEMENT OVER SCP460 AS IN SC1S95230; TOGETHER WITH AN EASEMENT
OVER SCP465 AS IN SC1631380; TOWNSHIP OF ORO-MEDONTE;
prepared by Paul R. Thomsen, Ontario Land Surveyor, dated the 91h day of September, 2020.
THE TORONTO-DOMINION BANK, the Chargee under a Charge registered as Instrument No.
SC1644210 hereby consents to the registration of the above -mentioned Plan of Subdivision.
71
DATED at Mississauga, Ontario this day of November, 2020.
THE TORONTO-DOMINIO
Per:
Name: iolsee Samaye
Title: Commercial Operations Lead
Commercial Roal Estate
have the aufMgtHtRP M(fmr iro,d0on.
Bind The Corporation
Wh
CONSENT OF CHARGEE
IN THE MATTER OF a Plan of Subdivision of:
PT E1/2 & PT W1/2 LOT 2 CONCESSION 9 ORO; SAVING AND RESERVING FROM THE E1/2 LOT 2
CONCESSION 9, ALL MINES AND MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY
BE FOUND TO EXIST WITHIN, UPON OR UNDER SUCH LANDS; T/W FULL POWER TO WORK THE
SAME AND FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPYTHE SAID LANDS OR SO MUCH
THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL WORKING AND
EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078; SUBJECT TO AN EASEMENT
IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO, PART 1 PLAN 51R40262 AS IN SC1266952;
TOGETHER WITH AN EASEMENT OVER SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT
OVER SCP465 AS IN SC1631380; TOWNSHIP OF ORO-MEDONTE;
prepared by Paul R. Thomsen, Ontario Land Surveyor, dated the 91h day of September, 2020.
THE TORONTO-DOMINION BANK, the Chargee under a Charge registered as Instrument No.
SC1661081 hereby consents to the registration of the above -mentioned Plan of Subdivision.
,, 7'"
DATED at Mississauga, Ontario this 1v`day of November, 2020.
THE
Per:
LiI3
Name: Toisee Samaye
Title: Commercia; Operations Lead
Commarcial RealEstate
1 have the ab,t � �}. _. V1 rppftt a0tion.
e*1
LRO # 51 Notice Of Subdivision Agreement
The applicant(s) hereby applies to the Land Registrar.
Properties
Receipted as SC1735261 on 2020 12 03 at 08:32
yyyy mm old Page 1 of 58
PIN 58532 - 0303 LT 0
Description LOTS 1 TO 27 INCLUSIVE, BLOCKS 28 TO 32 INCLUSIVE, PLAN 51M1191;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND
MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST
WITHIN, UPON OR UNDER SUCH LANDS; TNV FULL POWER TO WORK THE SAME AND
FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO
MUCH THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078;
SUBJECT TO AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO,
PART 1 PLAN 51R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS IN
SC1631380; TOWNSHIP OF ORO-MEDONTE
Address ORO
I Applicant(s)
The notice is based on or affects a valid and existing estate, right, interest or equity in land.
Affects Part of Prop
Name THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
Address for Service 148 Line 7 South
Oro-Medonle ON LOL 2E0
This document is not authorized under Power of Attorney by this party.
This document is being authorized by a municipal corporation by its Director of Development Services, Andria Leigh.
I Party To(s) Capacity
Name BRAESTONE DEVELOPMENT CORPORATION
Address for Service 500-85 Bayfield Street
Barrie ON L4M 3A7
Statements
This notice is for an indeterminate period
Schedule: See Schedules
The registration of this document is not prohibited by registration SC1735076 registered on 2020/12/02.
1 Signed By
Klaus Nick Jacoby 34 Clapperton St. acting for
Barrie Applicant(s)
L4M 3E7
Tel 705-726-0238
Fax 705-726-9197
1 have the authority to sign and register the document on behalf of the Applicant(s).
Kenneth Edward Bailey 85 Bayfield Street Suite 500 acting for
Barrie Party To(s)
LAM 3A7
Tel 705-792-9279
Fax 705-730-1059
1 have the authority to sign and register the document on behalf of the Party To(s).
I Submitted By
Kenneth E. Bailey Professional Corporation
Tel 705-792-9279
Fax 705-730-1059
IFees/Taxes/Payment
85 Bayfield Street Suite 500
Barrie
L4M 3A7
Statutory Registration Fee $65.30
Total Paid $65.30
Share
Signed
Signed
2020 12 02
2020 1202
1
2020 1203
LRO # 51 Notice Of Subdivision Agreement
Receipted as SC1735261 on 2020 12 03 at 08:32
The applicant(s) hereby applies to the Land Registrar.
IFile Number
Applicant Client File Number: JK-25918
yyyy mm dd Page 2 of 58
r^
T imship of
Proud Heritkge, Exciting Future
SUBDIVISION AGREEMENT
Pursuant to Sections 51(26) and 51 (27) of the Planning Act. R.S.O. 1990 c. P. 13
- between -
BRAESTONE DEVELOPMENT CORPORATION
-and -
THE CORPORATION OF THE TOWNSHIP OF ORO—MEDONTE
DESCRIPTION OF LANDS
PCL 2-1 SEC 51-ORO-9; LOT 3 CONCESSION 9 ORO BEING THE E1/2 & W1/2; LOT 2
CONCESSION 9 ORO BEING THE E1/2 & W1/2; PART 1 PLAN 51R21804, EXCEPT PART
1 PLAN 51R28741 & EXCEPT PLAN 51M1070, 51 M1 113 & 51MA181; SAVING AND
RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND MINERALS,
WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST WITHIN,
UPON OR UNDER SUCH LANDS; TM FULL POWER TO WORK THE SAME AND FOR
THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO MUCH
THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN OR017078;
SUBJECT TO AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO,
PART 1 PLAN 51R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOWNSHIP OF ORO-MEDONTE, COUNTY OF SIMCOE
AS IN SC1615649 BEING ALL OF PIN 58532-0303 LT
August 12, 2020
By -Law No. 2020-089
r'' e'1
TOWNSHIP OF ORO-MEDONTE
SUBDIVISION AGREEMENT
TABLE OF CONTENTS
Part 1
General Requirements
Part 2
The Lands, Plans and Representations
Part 3
Pre -Construction Requirements
Part 4
Financial Requirements
Part 5
Phasing of the Subdivision
Part 6
Construction Requirements
Part 7
Building Permits and Occupancy
Part 8
Substantial Completion and Maintenance, and
Acceptance and Final Assumption
Part 9
Default Provisions
SCHEDULES
Schedule "A" -
Description of Lands Affected by this Agreement
Schedule "B" -
Plan of Subdivision
Schedule "C" -
Deeds and Easements to be Conveyed
Schedule "D" -
Development Charges
Schedule "E" -
Standard Township Letter of Credit (Irrevocable)
Schedule "F" -
Parkland Dedication / Cash in Lieu
Schedule "G" -
Servicing Works to be Constructed
Schedule "H" -
Itemized Cost Estimate of Servicing Works
Schedule "I" -
Declarations of Progress and Completion
Schedule "J" -
Winter Road Maintenance
Schedule "K" -
Master Monitoring Document
Schedule "L" -
List of Lots Requiring Special Attention
Schedule "M" -
Form of No Occupancy Agreement
01
r^
wo
TOWNSHIP OF ORO-MEDONTE
THIS AGREEMENT made as of the 12th day of August, 2020.
BETWEEN: BRAESTONE DEVELOPMENT CORPORATION
(hereinafter called the "Developer")
AND: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
(hereinafter called the "Township")
WHEREAS the lands affected by this Agreement are the lands described in Schedule "A"
hereto annexed, and are also shown on the Plan of Subdivision attached to and forming part
of this Agreement as Schedule "B" and collectively are herein referred to as the "said lands';
AND WHEREAS a Draft Plan with Conditions (43T-91031) have been issued for the
proposed subdivision, which requires that the Developer must satisfy all the requirements,
financial and otherwise, of the Township, including the provisions of certain Municipal
Services;
NOW THEREFORE THIS AGREEMENT WITNESSETH that in consideration of the premises
and for other good and valuable consideration and the sum of TWO DOLLARS ($2.00) of
lawful money of Canada now paid by the Township to the Developer (the receipt whereof is
hereby acknowledged), THE DEVELOPER AND THE TOWNSHIP HEREBY COVENANT
AND AGREE WITH ONE ANOTHER AS FOLLOWS:
M
W
PART-1
GENERAL REQUIREMENTS
1.1 REQUIREMENTS PRIOR TO EXECUTION OF AGREEMENT
Prior to the execution of this Subdivision Agreement the Developer shall:
1.1.1 Land Ownership - be the registered owner in fee simple of the lands
described in Schedule "A" and that there will be no encumbrances registered
against the said lands.
1.1.2 Taxes -have paid all Township tax bills issued / outstanding against said lands.
1.1.3 Deeds and Easements - have delivered to the Township all transfers/deeds,
discharges and easements or other documents required by Schedule "C", as
well as Certification from the Developer's solicitor that the Transfer/Deeds and
Easements shall provide the Township with good title, free and clear from all
encumbrances.
1.1.4 Cash Deposits. Development Charaes and Securitv - have paid to the
Township all cash deposits, development charges and security required by
Schedules "D", "F" and "H".
1.1.5 Insurance Certificate - have filed with the Township Clerk, an insurance
certificate confirming those coverages specifically set out hereafter.
1.1.6 Postponement Mortaaae/Charge —have filed with the Township's Solicitor, for
their approval, a postponement of Mortgage/Charge document.
1.1.7 Developer's Consultina Enaineer— Letter of Retention - ensure that each
Consulting Engineer (who must be experienced in the field of Municipal
Services) for the Developer, file with the Township, a letter confirming the terms
of his retainer, and which letter shall be in draft format supplied by the
Township.
1.1.8 Lot Sizes — have filed with the Township, a certificate from an Ontario Land
Surveyor confirming that the frontage and area of each lot meets the minimum
requirements of the Township Zoning By-law.
1.1.9 Enaineerina Plans, Details and Specifications - have supplied to the Township,
those Plans and Specifications necessary to identify the engineering design
aspects of the proposed development, found in the Township of Oro-Medonte
Development Engineering Policies, Process and Design Standards, and have
received an acknowledgment of conformity with design concepts from the
Township.
1.1.10 Mvlar Drawinas - provided for registration, Mylar Drawings of all M Plans.
1.1.11 Electrical Distribution Utilitv - have supplied to the Township for approval, those
plans necessary to identify the electrical distribution system, power supply to
each lot, building or unit and street lighting requirements, as per the Township
of Oro-Medonte Development Engineering Policies, Process and Design
Standards and the cable Electrical Distribution Utility write a letter to the
Township Clerk confirming that:
1.1.11.1 They have been informed of the project and have seen the
development plans.
1.1.11.2 Satisfactory arrangements have been made with them for servicing
the subdivision without expense or obligation on the part of the
Township.
1.1.11.3 Easement requirements, if any.
4
e')
1.1.12 Telephone. Natural Gas and Cable TV Utilities Suppliers— have arranged for
Bell Telephone, the Natural Gas Utility, and the cable T.V. utility write a letter to
the Township Clerk confirming that:
1.1.12.1 They have been informed of the project and have seen the
development plans.
1.1.12.2 Satisfactory arrangements have been made with them for servicing
the subdivision without expense or obligation on the part of the
Township.
1.1.12.3 Easement requirements, if any.
1.1.13 Canada Post / Community Mail Boxes — have arranged for Canada Post to
write a letter to the Township Clerk confirming that:
1.1.13.1 They have been informed of the project and have seen the
development plans.
1.1.13.2 They have filed with the Township, a Plan showing the location of,
and access to, community mail boxes to their satisfaction and
satisfactory arrangements have been made without expense or
obligation on the part of the Township.
1.1.13.3 Easement requirements, if any.
1.1.14 Nottawasaga Vallev Conservation Authoritv - have filed with the Township, a
certificate from the Nottawasaga Valley Conservation Authority that the
Developer shall carry out all the servicing works and recommendations
approved in all the reports required by the Nottawasaga Valley Conservation
Authority.
1.1.15 Fire Chief Approval — have obtained approval from the Fire Chief of
the Township confirming and approving of the proposed plans for fire
protection, and specifying any hydrants, or other equipment, or
appurtenances required.
1.1.16 Approvals — have obtained and filed with the Township, confirmation of
approvals from the following:
1.1.16.1
Ontario Ministry of the Environment, Conservation and Parks
1.1.16.2
Ontario Ministry of Natural Resources and Forestry
1.1.16.3
Ontario Ministry of Tourism, Culture and Sport
1.1.16.4
Township of Oro-Medonte
1.1.16.5
County of Simcoe
1.1.16.6
Simcoe County District School Board
1.1.16.7
Simcoe Muskoka Catholic District School Board
1.1.16.8
Electrical Distribution Authority (Hydro One)
1.1.16.9
Nottawasaga Valley Conservation Authority
1.2 DEVELOPER'S CONSULTING ENGINEER
The Developer shall employ a Professional Engineer (P.Eng), licensed by and be in
good standing with the Association of Professional Engineers of Ontario (PEO). The
Engineer or Engineering Consulting firm shall have a Certificate of Authorization
(C of A) to provide professional engineering services to the public:
A Letter of Retention from a qualified Professional Engineer (P.Eng.) experienced in
the field of Municipal Engineering Servicing Design confirming that their Engineering
Consulting firm has been retained by the Developer to act as Consulting
Engineers for Braestone Development Corporation.
1.2.1 Terms of Retainer - The terms of the Engineering Consulting retainer with
the Developer shall be as follows:
r'1
i. Contract Administration and Representation - To prepare the
necessary contract(s) and provide contract administration on behalf
of the Developer and to act as the Developer's representative in all
matters pertaining to the subdivision;
ii. Design Drawings, Details and Specifications - Prepare and furnish all
required design drawings, details and specifications in accordance with
the Township of Oro-Medonte Development Engineering Policies,
Process and Design (April 2016);
iii) Cost Estimates - Prepare cost estimates for the Township services
to be constructed in accordance with the design drawings, details
and specifications;
iv) Approvals - Obtain all necessary approvals in conjunction with the
Township, from the Township of Oro-Medonte water and sewage
approval authority, Ministry of the Environment and Climate Change,
Simcoe County District School Board and Simcoe Muskoka Catholic
District School Board, Nottawasaga Valley Conservation Authority,
Canada Post, Electricity and Natural Gas utility companies, and all other
agencies (as required)
v) Erosion and Siltation Control - Ensure all necessary precautions
and maintenance actions are taken to prevent erosion and sedimentation
of sewers, ditches, culverts, slopes, etc., both within the subdivision and
downstream, prior to and during construction in accordance with the
Township of Oro-Medonte Development Engineering Policies, Process
and Design (April 2016);
vi On -Site Supervision and Inspections - Provide supervision and all on -site
inspections at all times during the construction of Township service
installations to ensure that the work involved in construction of the
services is carried out by construction methods conforming to acceptable
engineering and construction practices;
vii) Schedulinq - Ensure scheduling complies with the timing provisions of
this Agreement and the requirements of the Township's Engineering
Consultant and/or Manager, Development Engineering, for all the
servicing works specified in this Agreement;
viii) Co-ordination - Co-ordinate the installation of Township services to avoid
conflicts with regards to telephone, cable T.V., and Township services;
ix) Records Maintenance - Maintain records of all construction
inspections and certifications and make available for inspection or
copy by the Township and/or the Townships Engineering
Consultant;
x) As -Constructed Drawinqs - Prepare and submit certified final "As -
Constructed" drawings which shall include the following with regard to
provision of a digital Plan of Subdivision after the acceptance of the
Township services.
Chanoe in Retainer — If at any time during the project:
i) The terms of the Engineering Consulting retainer are changed by the
Developer, or;
ii) If they become aware that the Consulting Engineer will not be able to
provide "As -Constructed" drawings,
the Developer's Engineering Consultant shall notify the Township within
twenty-four (24) hours.
("IN 101
1.2.2 Diaital Submission of Enaineerina Drawings
Completed digital Plan of Subdivision engineering drawings must be prepared
using the Township of Oro-Medonte Standard CAD format and shall use the
Township's Standard Symbol, Line Type, Line Thickness and Layering Scheme
shall be followed for all Drawings.
The lines, which describe the boundary of all properties created within the Plan
of Subdivision, will be isolated on a unique layer/level. In certain cases, some
of the line segments will coincide with the location of concession lot lines,
registered plan data, open roads, rivers, and lakes.
PLAN OF SUB LAYER will outline the property boundaries in the form of
enclosed polygons.
LAYER
PLAN OF SUB
LINE TYPE
CONTINUOUS
COLOUR
YELLOW (2)
The text, which describes the property lot numbers for the Plan of Subdivision,
will be isolated on a unique layer/level. The lot number will be inserted as
descriptive text.
LAYER
PL LT TEXT
FONT
MONOTEXT
COLOUR
YELLOW (2)
The digital files should contain enough site data as to allow for horizontal and
vertical positioning within the existing base mapping. A minimum of two road
intersections located outside the Plan of Subdivision must be shown in the
drawing.
All line data depicting property boundaries must be mathematically closed to
form polygons.
It is not necessary that the digital data be in Universal Transverse Mercator
(UTM) co-ordinates since the registration process will automatically convert any
unit grid to the "Ontario Base Mapping UTM Co-ordinate System".
Two (2) copies of each digital Plan of Subdivision design set are required on
separate CDs or DVDs in both AutoCAD drawing format in an AutoCAD version
acceptable to the Township and in PDF format. Each CD ROM or DVD must be
labeled identifying the legal property description, developer's name, file name,
and date delivered.
It is the Developer's responsibility to ensure that all drawing changes occurring
throughout the approval process are incorporated into the digital submission.
1.2.3 Lot Grading Certification
The Developer's Consulting Engineer shall furnish the Township with the
following Letters of Certification:
a) A letter to the Manager of Development Engineering for each Engineered Lot
Grading Plan (with respect to each lot or building block for which a Building
Permit application is made) - certifying that the proposed construction is in
conformity with the Lot Grading Plan or with an approved variation;
b) A letter to the Chief Building Official - certifying that the elevation of the
underside of the footing, and then the top of the constructed wall of the
building is in conformity to the elevation shown on the individual site plan,
and complies with the Overall Lot Grading Plan. Any variance shall require
the approval of the Township and/or the Township's Engineering Consultant;
W
c) A letter certifying the final grade elevation and Lot Development Plan, for
each lot or block within the plan indicating that the property has been
developed in conformity with the Engineered Lot Grading Plan or with an
approved variation;
NOTE: That a Professional Engineer, Ontario Land Surveyor or Certified Engineering
Technologist could also be retained to provide the aforementioned 1.1.3 a), b), or c).
Any cost incurred by the Township will be the responsibility of the Developer or
individual lot owner.
NOTE: In the case of lots built on after the sale or transfer by the Developer, the
Township reserves the right to request a similar Certificate as required under 1.1.3 a),
b), or c), which may be provided by a Professional Engineer, Ontario Land Surveyor or
Certified Engineering Technologist other than the Developer's Consulting Engineer,
however if the Township's Engineering Consultant prepares the Certificate, the cost of
the work will be deducted from the final occupancy and lot grading deposit and will
become the responsibility of the individual lot owner.
1.3 LEGAL NOTICE TO DEVELOPER
Any notice required to be given hereunder may be given by registered mail addressed
to the Developer at his principal place of business and shall be effective as of the date
of the deposit thereof in the post office, as follows:
Braestone Development Corporation
85 Bayfield Street, Suite 500
Barrie, Ontario
L4M 3A7
Or by Facsimile Transmission to: (705) 730-1059
In which case, notice shall be effective as of the time and date of successful
transmission thereof.
The Developer shall be responsible for notifying the Township Clerk, in writing, of any
change(s) in his principal place of business.
1.4 REGISTRATION
The Developer consents to the registration of the Subdivision Agreement by the
Township and at the sole discretion of the Township upon the title of the lands, the
registration expenses shall be included as a legal expense to the Developer.
1.5 VOIDING AGREEMENT
In the event that the Plan is not registered within one year from the date of signing this
Agreement, the Township may, at its option, declare this Agreement to be null and
void.
1.6 MORTGAGEE BECOMING DEVELOPER
The mortgagee(s) hereby agrees that in the event the mortgagee(s) becomes the
Developer(s) of the lands under his/their mortgage by way of foreclosure, purchase or
otherwise, either beneficially or in trust, then the mortgage(s) shall be deemed to be
postponed to this Agreement and any lands registered in the name of the Township
shall be free of the mortgage(s), and the mortgagee(s) agrees to register a discharge
of the mortgage(s) on those lands if called upon by the Township, to do so, and the
mortgagee(s) shall be subject to the terms of the Agreement as though the
mortgagee(s) had executed this Agreement in the capacity of the Developer.
1.7 ASSIGNMENT OR TRANSFER OF MORTGAGE.
The mortgagee(s) agrees that in the event of their assigning or transferring the
mortgage(s) on the lands, the assignment(s) or transfer(s) shall be subject to the terms
W
hereof, in the same manner as if the assignee or transferor has executed this
Agreement.
1.8 LANDS FOR MUNICIPAL PURPOSES
The Developer agrees to grant good title in fee simple free and clear from all
encumbrances unto the Township, lands for municipal purposes other than roads,
which shall be mutually agreed upon by the Developer and the Township or to make a
cash payment in lieu thereof, as provided by Section 51.1 of the Plannino Act. R.S.O.
1990. c.P.13 and required by the Township of Oro-Medonte.
The Developer also agrees to certify good title to lands by the Developer's solicitor.
The deeds for the said lands are to be approved by the Township's Solicitor and
thereafter, forthwith, registered and deposited with the Township Clerk.
The Developer shall pay the cost for preparation and registration of the said deed.
The Developer shall provide to the Township's Solicitor, certification of good title, free
and clear from all encumbrances.
1.9 EASEMENTS
1.9.1 The Developer agrees to grant, at his expense, all such easements,
rights -of -ways and access or servicing blocks as may be required for the
installation and supply of Municipal Services to the subdivision or provide
Emergency Service Access (Fire, Police, Ambulance) and to deed lands to the
Township, as set out in Schedule "C".
The Developer also agrees to certify good title to easements, rights -of -ways
and access or servicing blocks by the Developer's solicitor. Prior to executing
this Agreement, all known easements, rights -of -ways and access or servicing
blocks shall be filed with the Township in a form approved by the Township's
Solicitor.
A list of easements, rights -of -ways and access or servicing blocks shall be set
out in Schedule "C" of this Agreement. The Township agrees to transfer
easement(s) on lands it owns following the registration of this subdivision plan
to the authority requiring the easement(s). All cost of the above noted
registration to be borne by the Developer.
1.10 ELECTRICAL, NATURAL GAS. TELEPHONE and CABLE TV UTILITIES
Prior to the Township releasing this proposed Plan for registration, the Developer shall
provide the Township with a letter from the electrical utility supplier, natural gas utility
supplier, telephone utility supplier and cable utility supplier, stating that the Developer
has entered into satisfactory arrangements with the electrical utility supplier, natural
gas utility supplier and the telephone utility supplier with respect to the costs of
installing underground wiring and financial contributions in this regard.
The cost of any relocations or revisions to existing private companies' plant and
equipment, which are necessary to accommodate this subdivision, shall be borne by
the Developer.
1.11 SIMCOE COUNTY BOARDS OF EDUCATION ADVISEMENT
The Developer agrees to advise all prospective purchasers, renters and lessees that
there are no schools planned within this subdivision, or within walking distance of it,
and that enrolment within the designated Public and Catholic school sites in the
community is not guaranteed, and that pupils may be transported to/accommodated in
temporary facilities out of the neighbourhood schools' area.
The Developer agrees to advise all prospective purchasers, renters and lessees that
school busses will not enter cul-de-sacs and that pick up points will generally be
located on through streets, suitable to the Board. Additional pick-up points will not be
located within the subdivision until major construction activity has been completed.
These clauses are to be placed in any Offer or Agreement of Purchase and Sale
entered into with respect to any lots on this Plan of Subdivision. The clause should
remain in perpetuity as lots may not be sold or built upon for some time.
1.12 CANADA POST
The Developer agrees to construct mailbox laybys as detailed on the engineering
drawings as per Section 3.11 Utility Coordination (3.11.1.1 Canada Post), a site, if
required, to the specifications and standards of Canada Post and the Township, as
required for the construction of mailboxes by Canada Post.
1.13 PRIVATE SEWAGE DISPOSAL SYSTEMS
The Developer and each individual lot owner, acknowledges that each owner shall be
responsible for the installation and maintenance of a subsurface sewage disposal
system in accordance with Part 8 of the Ontario Building Code.
1.14 MINISTRY OF ENVIRONMENT. CONSERVATION AND PARKS
1.14.1 The Developer and each individual lot owner, agrees to comply with the
requirements and recommendations of the Hydrogeologist's Report, July
1990, Buffalo Spring Hydrologic Site Assessment, Henderson Padden &
Associates Limited and a Supplement Hydrologic Investigation Ground Water
Quality and Nitrate Impact Assessment, Jagger Hims Limited, March 1992.
1.14.2 The Developer and the Township agrees to comply with the recommendations
of the Water Supply report entitled, "Application for Permit To Take Water -
Communal Water Supply Wells", Jagger Hims Limited, May 2008 (File 04-
91340.03) and Ministry of Environment Permit to take Water No.4076-7HFJB6
dated August 22, 2008.
1.14.3 The Developer agrees to restricting the maximum sewage flow for the
proposed Recreation Centre to 4,500 litres per day to the satisfaction of the
Township and the Ministry of Environment.
1.15 ENVIRONNMENTAL LONG-TERM MONITORING
1.15.1 The Developer shall carry out any monitoring required, as set out in the "2008
Master Monitoring Document Buffalo Springs Property prepared by Michalski
Nielsen dated Revised July 2009", and the "2013 Master Monitoring Report
Braestone project" prepared by Beacon Environmental dated December 2013
and Revised April 2014, attached to this Agreement as Schedule'W'.
1.15.2 The Developer will guarantee the operation and funding of the monitoring
program, to the fixed amount of $225.00 per lot, upon the sale of each lot,
until two years after the completion of the subdivision works and until such
time as 50 percent of the lots are developed. The Developer will guarantee
the operation and funding of the monitoring program by providing an amount
of $225.00 per lot upon the sale of each lot to the Treasurer of the Township
of Oro-Medonte and that such money will be held in a special fund to be
available for monitoring and for any remedial works which are required to
protect the wetlands from impacts generated from the development.
1.15.3 The Developer agrees to advise all prospective purchasers that a
"Homeowner's Environmental Stewardship Guide", dated February 25, 2008
from Stantec Consulting Limited has been prepared for their consideration.
The Developer further agrees to attach the "Homeowner's Environmental
Stewardship Guide' to each Offer of Purchase and Sale. The "Homeowner's
Environmental Stewardship Guide" will be available for review at the
Township of Oro-Medonte Administration Centre.
10
r'1
1.15.4 The Developer agrees to collecting, analyzing and interpreting baseline data
adjacent to the environmentally sensitive lands, as referenced in Schedule
"K", in accordance with the Master Monitoring Document. The monitoring
program will continue until two years after the completion of the subdivision
servicing works and until such time as 70% (seventy per cent) of the lots are
developed.
1.16 SAVE HARMLESS
The Developer covenants and agrees with the Township, on behalf of itself, its
successors and assigns, to indemnify and save harmless the Township, its servants
and agents from and against any and all actions, suits, claims and demands
whatsoever, which may arise either directly or indirectly by reason of any work
performed by the provisions of this Agreement.
The Developer further covenants and agrees to release and forever discharge the
Township from and against all claims, demands, causes of actions, of every nature and
type whatsoever that may arise either as a result of the failure of the Township to carry
out any of its obligations under this Agreement, or, as a result of the Township
performing any municipal work on the said lands or the adjacent properties which may
damage or interfere with the works of the Developer, provided that such default, failure
or neglect was not caused as a result of negligence on the part of the Township, its
servants or agents.
1.17 ENUREMENT
This Agreement shall enure to the benefit of and be binding upon the parties and their
heirs, executors, administrators, successors and assigns.
11
r^
eo1
PART-2
THE LANDS, PLANS AND REPRESENTATIONS
2.1 SCOPE OF AGREEMENT
2.2 DESCRIPTION OF LANDS
The lands affected by this Agreement are the lands described in Schedule "A" hereto.
2.3 PLAN REFERENCE
For the purpose of this Agreement, references are made to the Plan of Subdivision,
attached hereto, as Schedule "B". Any further changes in the said Plan, or any
changes in the Conditions of Draft Approval, may necessitate a change in the
provisions of this Agreement.
2.4 CONFORMITY WITH AGREEMENT
The Developer agrees to satisfy all the requirements, financial and otherwise, of the
Township concerning the provision of roads; the installation of services and drainage.
The Developer covenants and agrees that no work shall be performed on the said
lands except in conformity with:
2.4.1 The provisions of this Agreement, including the Schedules herein after referred
to.
2.4.2 The Plans and Specifications submitted to and accepted by the Township as
being within the Township of Oro-Medonte Development Engineering Policies,
Process and Design Standards including, without limiting the generality of the
foregoing, the Drawings listed in Schedule "G" of this Agreement, along with the
Final Stormwater Management Report dated November 11, 2019, prepared by
C. C. Tatham & Associates Ltd; and stamped "Accepted for Construction" by
the Township's Engineering Consultant, on January 9, 2020.
The Enaineerina Desian Drawinas (as a minimum) are as follows:
Description
• Title Page / List of Drawings
• Proposed Legal Plan for Registration
- showing all lot, block and proposed easement numbering and dimensions
• General Servicing Plan(s)
• Composite Utility Plan(s)
• Overall Site Grading Plan(s)
• Preliminary Lot Grading Plan(s)
• Stormwater Drainage Design
• Stormwater Retention Pond Design
• Sanitary Collection Design
• Water Distribution Design
• Plan and Profile Drawings
• Electrical Design and Streetlighting Plan(s)
• Erosion Sediment and Silt Control Plan and Detail Drawings
• Standard and Special Details Drawings
• Landscape and Streetscape Plan(s)
• Parkland Development Plan(s)
• Grading Plan(s) for Park and / or School Blocks
Refer to Schedule "G" for a complete list of Drawings
12
Ara
e' )
2.5
2.6
2.7
2.4.3 All Plans and Specifications submitted to and accepted by:
2.4.3.1 Ministry of the Environment, Conservation and Parks
2.4.3.2 Electrical Distribution Utility
2.4.3.3 Township of Oro-Medonte
2.4.3.4 Ministry of Natural Resources and Forestry
2.4.3.5 County of Simcoe
2.4.3.6 Nottawasaga Valley Conservation Authority
2.4.4 All applicable Township By -Laws, including any applicable Site Plan Control
By-laws.
2.4.5 All applicable Provincial and Federal Legislation and also including the Federal
Fisheries Act.
RELIANCE UPON REPRESENTATIONS
The Developer acknowledges that:
2.5.1 It has made representation to the Township that it will complete all municipal
and other servicing works required herein, in accordance with the Plans filed
and accepted by the Township and others, and;
2.5.2 The Township has entered into this Agreement in reliance upon
those representations.
SCHEDULES ATTACHED
The following Schedules are attached to and form part of this Agreement:
Schedule "A" -
Description of Lands Affected by this Agreement
Schedule "B" -
Plan of Subdivision
Schedule "C" -
Deeds and Easements to be Conveyed
Schedule "D" -
Development Charges
Schedule "E" -
Standard Township Letter of Credit (Irrevocable)
Schedule "F" -
Parkland Dedication / Cash in Lieu
Schedule "G" -
Servicing Works to be Constructed
Schedule "H" -
Itemized Cost Estimate of Servicing Works
Schedule "I" -
Declarations of Progress and Completion
Schedule "J" -
Winter Road Maintenance
Schedule "K" -
Master Monitoring Document
Schedule "L" -
List of Lots Requiring Special Attention
SUBDIVISION CHANGES
There shall be no changes in the Schedules attached hereto, or in any Plan accepted
by the Township or others, unless such proposed changes have been submitted to,
and approved by, the Township and the Township's Engineering Consultant.
13
r^ t'1
PART-3
PRE -CONSTRUCTION REQUIREMENTS
3.1 PRIOR TO STARTING CONSTRUCTION
Prior to starting construction of the subdivision servicing works, the Developer shall:
3.1.1 Pre -Servicing
Obtain a Pre -Servicing Agreement, if necessary, prior to registration of the Plan
of Subdivision.
3.1.2 Plan Registration
Obtain final approval of the Plan from the Township of Oro-Medonte and obtain
registration of the Plan.
3.1.3 ADoroval of Enaineerina Design Drawinqs
The Developer and the Developer's Engineering Consultant(s) shall have the
Engineer Design Drawings Details and Specifications for the servicing works
approved by the Township's Engineering Consultant and/or Manager,
Development Engineering prior to construction and the originals must be
stamped as accepted by the Township's Engineering Consultant.
3.1.4 Environmental Compliance Approval
Submit to the Township, the Ministry of the Environment, Conservation and
Parks, Environmental Compliance Certificate for Water Distribution servicing
works (Number 32020-7MCRQM) and Storm Sewer works and Stormwater
Management Facilities (Number 3211-B9YS7J, dated June 24, 2019).
3.1.5 Contractors and Sub -Contractors
The said services shall be installed by a contractor or contractors retained by
the Developer and approved, in writing, by the Township's Engineering
Consultant and/or Manager, Development Engineering. The Township and the
Township's Engineering Consultant are to be provided with the names and
phone numbers of personnel responsible for the servicing works, including
emergency phone numbers.
3.1.6 Schedule of Servicinq Works
Prior to the start of construction, the Developer shall supply for the Township's
Engineering Consultant and/or Manager, Development Engineering, approval of
a Schedule of Servicing Works, setting out the order in which the various
sections of the servicing works within the Plan of Subdivision will be built. The
Township's Engineering Consultant and/or Manager, Development Engineering
may amend this Schedule and the Developer shall construct, install or perform
the servicing works as the Township's Engineering Consultant and/or Manager,
Development Engineering, from time to time, may direct. In any event the
Schedule, or amended Schedule, as the case may be, shall conform to the
requirements of Clause 3.1.10.
3.1.7 Stormwater Manaaement
A stormwater management report shall be prepared by the Developer's
Consulting Engineer for approval by the Township's Engineering Consultant
and/or Manager, Development Engineering and the Nottawasaga Valley
Conservation which details the means whereby stormwater drainage will be
accommodated and how erosion and siltation will be contained on site both
during and following construction.
14
r4l ''A
This report must deal with post development stormwater quantity and quality
and shall conform to Ministry of Environment Interim Stormwater Quality
Guidelines.
3.1.8 Erosion and Siltation Control
The Developer shall take all necessary precautions to prevent erosion and
sedimentation of ditches, culverts, slopes, etc., both within the subdivision and
downstream prior to and during construction and upon completion of servicing
of the subdivision. Failing adequate precautions being taken, the Developer
shall be responsible for correcting any damage and paying all maintenance
costs resulting there from.
A Storm Drainage and Siltation Control Plan shall be prepared by the
Developer's Consulting Engineer for approval by the Township's Engineering
Consultant and/or Manager, Development Engineering and the Nottawasaga
Valley Conservation Authority / Lake Simcoe Region Conservation Authority.
Prior to any earth works, grading or construction commencing on the site or
final approval and registration of the subdivision, the Developer's Consulting
Engineer shall submit the Plan for approval by the Township's Engineering
Consultant and/or Manager, Development Engineering and the Nottawasaga
Valley Conservation Authority.
The Plan shall detail the means whereby erosion and siltation and their effects
will be minimized on the site during and after the construction period. The Plan
must deal with post development stormwater quality and shall conform to the
Ministry of Environment and Climate Change / Ministry of Natural Resources
and Forestry Interim Stormwater Quality Guidelines.
The Developer agrees to carry out, or cause to be carried out, the work
approved in the Plan, and such work will be certified, in writing, by the
Developer's Consulting Engineer and provided to the Township's Engineering
Consultant and/or Manager, Development Engineering and the Nottawasaga
Valley Conservation Authority. The Developer agrees to maintain all erosion
and siltation control devices in good repair during construction and until such
time as the Subdivision is Assumed by the Township.
3.1.9 Signs
Signs at least 1.2 metres by 1.8 metres shall be provided and erected by the
Developer at each entrance to the subdivision, at a location approved by the
Township's Engineering Consultant and/or Manager, Development Engineering,
and the signs shall read as follows:
1. ROADS NOT ASSUMED BY TOWNSHIP - USE AT YOUR OWN RISK
The signs shall be painted either orange or yellow with black lettering. These
signs shall be installed prior to the commencement of construction and be
removed after the issuance of the Certificate of Acceptance and Final
Assumption.
2. PROJECT NAME,
DEVELOPER'S NAME and PHONE #,
DEVELOPER'S ENGINEERING CONSULTANT'S NAME and PHONE #
DEVELOPER'S GENERAL CONTRACTOR'S NAME and PHONE #
These signs shall be installed prior to the commencement of construction and
be removed after the issuance of the Certificate of Acceptance and Final
Assumption.
15
3.1.10 Notification of Commencement and Completion
The Developer shall not commence the construction of any of the servicing
works until the Developer has provided forty-eight (48) hours written notice to
the Township's Engineering Consultant and/or Manager, Development
Engineering, of his intent to commence work.
The Developer shall complete the municipal servicing works expeditiously and
continuously for the first phase and all underground services shall be installed
within one year of the day of registration of this Agreement.
All municipal services shall be installed in accordance with the Declaration of
Progress and Completion, as required under Clause 6.12 of this Agreement, but
no longer than two years from the date of registration of this Agreement, unless
extended by the Township's Engineering Consultant and/or Manager,
Development Engineering.
Subsequent phases shall be completed within a one (1) year time frame for
underground services and two (2) years for aboveground services from date of
commencement. Should for any reason there be a cessation or interruption of
construction, the Developer shall provide forty-eight (48) hours written notice to
the Township's Engineering Consultant and/or Manager, Development
Engineering before work is resumed;
If the municipal services to be constructed by the Developer under this
Agreement are not completed and accepted by the Township within the above
time frame, the Township may either:
1. Issue a Stop Work Order to the Developer to stop work on the said
municipal services and to provide that no further work shall be done with
respect to such services, until an amending Agreement, incorporating the
standards, specifications and financial requirements of the Township, in
effect as of that date, is executed by all parties; or
2. Issue a Stop Work Order to the Developer to stop work on the municipal
services and inform the Developer that the Township proposes to realize on
its security and proceed with the completion of construction in accordance
with the provisions of the Plans filed with the Township.
3.2 ESTABLISHMENT OF A CORPORATION
The Developer shall establish a Resident's Corporation to which wetland blocks (Block
32) be conveyed to said corporation. Initially shares in the Corporation shall be held
by the Developer and shares shall be transferred to each lot owner upon closure of the
lot sale. The lot owners, through the Resident's Corporation are thereafter responsible
for the management and protection of the wetlands in its possession under the
supervision of the Ministry of Natural Resources. The Corporation shall ensure that
the wetlands are utilized for those purposes expressively permitted in the
implementing Zoning By-law.
The appropriate common elements condominium plan shall be registered after the
registration of the required M-Plan of the subdivision. No Occupancy Certificate for a
building permit shall be issued in accordance with Section 8.6 of this Agreement until
such time as the Resident's Corporation has been established and the required
Common Elements Condominium Plan has been registered.
The Developer shall convey the wetland blocks to the Resident's Corporation
established in the first phase of registration or a conservancy or similar land
stewardship interest (public or private) as approved by the Township.
3.3 BREACH OF CONTRACT
If the Developer commences or causes construction of the servicing works prior to
satisfying the requirement of this Agreement, it shall be subject to the penalties
identified in Part 9 of this Agreement.
18
r^
PART-4
FINANCIAL REQUIREMENTS
4.1 DEVELOPER'S EXPENSE
Every provision of this Agreement, by which the Developer is obligated in any way,
shall be deemed to include the words "at the expense of the Developer" unless
specifically stated otherwise.
4.2 TOWNSHIP'S LEGAL. PLANNING AND ENGINEERING COSTS
The Developer agrees to pay to the Township, the cost of the Township's lawyer and
Planner for all costs involved in processing the subdivision and of the Township's
Engineering Consultant for engineering design review of plans and specifications and
inspection on behalf of the Township. The inspection by the Township will depend on
the type of construction and the amount provided will be deemed necessary by the
Township. In this regard, the Developer agrees to pay to the Township, the sum of
TEN THOUSAND DOLLARS ($10,000.00) upon submitting a Plan to the Township for
consideration to be applied to account of such costs. As accounts are received from
the Township Planner, lawyer and Township's Engineering Consultant, they will be
paid by the Township and then submitted to the Developer for reimbursement within
thirty (30) days, so that the initial deposit will again be built up to enable the Township
to pay the next accounts as they are received. In the event that the deposit is drawn
down to a level of FIVE THOUSAND DOLLARS ($5,000.00), or less, and the
Developer does not pay the accounts within thirty (30) days, it is hereby understood
and agreed that the Developer would be in default of this Agreement and the
Township may, without notice, invoke default provisions as set out in this Agreement.
4.3 DEVELOPER'S LIABILITIES
Until the Township has issued the Certificate of Acceptance and Final Assumption for
the servicing works, the Developer shall indemnify the Township against all actions,
causes of action, suits, claims and demands whatsoever which may arise either
directly or indirectly by reason of the Developer undertaking the Plan, and the
Township shall not be deemed to be the Developer.
4.4 UTILITY COSTS AND CHARGES
The Developer shall deal directly with all Utility companies. The Developer or their
Consulting Engineer shall obtain all approvals and permits and pay all fees and utility
charges directly to the Utility until the Certificate of Acceptance and Final Assumption
are issued.
If an additional electrical service is required for Township purposes, the Developer
shall include the cost of installation and maintenance of the service.
4.5 DEVELOPMENT CHARGES. REAL PROPERTY TAXES AND OTHER LEVIES AND,
IMPOSTS
a) Development charges and education development charges shall be payable on
a per -lot basis prior to the issuance of the first Building Permit with respect to
the particular lot.
b) The Developer agrees to pay for all arrears of taxes or other Township or
provincial charges, taxes or levies outstanding against the property herein
described before the approval of the said Plan is obtained. The Developer
further undertakes and agrees to pay taxes levied on the said lands, on the
basis and in accordance with assessment and collector's roll entries until such
time as the lands herein being subdivided have been assessed and entered on
the Collector's Roll according to the Registered Plan.
17
r
ra
c) Before the Plan is approved, the Developer agrees to commute and pay the
Township's share of any charges made under the Drainaae Act and the
Municipal Act, 2001, S.O. 2001, c.25 at present serving this property and
assessed against it.
These charges are set out in Schedule "D" of this Agreement.
NOTE: In addition to the Municipal Development Charges, the lots may be subject to
County of Simcoe development charges, Simcoe County Boards of Education
development charges and applicable development charges of any Public
Utility.
4.6 SECURITIES
Prior to signing the Subdivision Agreement, the Developer will deposit with the
Treasurer of the Township to cover the faithful performance of the contract for the
installation of the said services and the payment of all obligations arising thereunder,
the following securities:
a) Cash in the amount of one -hundred percent (100%) of the estimated cost of the
said work as approved by the Township's Engineering Consultant and/or
Manager, Development Engineering and Township Council, or:
b) An irrevocable Letter of Credit from a Chartered Bank, issued in accordance
with the requirements of Schedule "D" with an automatic renewal clause, in the
amount of one hundred percent (100%) of the estimated costs of the said
servicing works, as set out in Schedule "H" and as approved by the Township's
Engineering Consultant and/or Manager, Development Engineering. The Letter
of Credit shall be for a minimum guaranteed period of one (1) year, or such time
as the Township decides, and shall be renewed automatically, as necessary,
three (3) months prior to expiration. Unless the Letter of Credit is renewed as
noted above, the Township shall have the absolute right to refuse to issue
Building Permits and to prohibit occupancy of homes, whether partially or fully
completed, from the said date, three (3) months prior to the expiration of the
Letter of Credit, or the Township may cash the Letter of Credit until a
satisfactory Letter(s) of Credit is received by the Township.
c) Notwithstanding the provisions of subparagraphs (a) and (b) above, the
estimated cost of the servicing works, as set out in Schedule "H", will be
reviewed and updated by the Township's Engineering Consultant and/or
Manager, Development Engineering on each anniversary of the date of
execution of this Agreement. In the event of an increase, the Developer shall
provide additional security, as required by the Township's Engineering
Consultant and/or Manager, Development Engineering, within thirty (30) days of
notice, by registered mail, from the Township.
In the event that the Developer fails to deliver to the Township the additional
security as required by the Township's Engineering Consultant and/or Manager,
Development Engineering, it is hereby understood and agreed that the
Developer be deemed to be in default of this Agreement and the Township
may, without notice, invoke default provisions as set out in this Agreement.
The Township reserves the right to accept or reject any of these alternative
methods of providing securities. Prior to depositing the securities, the
Developer's Consulting Engineer shall submit an estimate of the cost of the
servicing works to the Township's Engineering Consultant and/or Manager,
Development Engineering for approval. When the cost estimate has been
approved, it will be set out in Schedule "H" of this Agreement and will become
the basis for the limits of the securities.
In the event that the tendered contract price for the Township services set out in
Schedule "H" is greater by 10% than the estimates in the said Schedules, then
the security provided for above shall be increased to an amount equal to the
tendered contract price.
18
� r"1
d) Application — any Letter of Credit or security filed with the Township is based upon
the estimated cost of completing the various matters prescribed by this
Agreement. However, all Letters of Credit and security received by the Township
may be used as security for any item or any other matter, which under the terms
of this Agreement, is the responsibility of the Developer, including, without limiting
the generality of the foregoing, payment of Engineering, legal, Planning, and
Development Charges, or other costs incurred by the Township, which are the
responsibility of the Developer under the terms of this Subdivision Agreement, as
well as development charges and costs to acquire lands or interest therein.
e) Default — if, in the event of default of the Developer under any of the provisions of
this Agreement, it becomes necessary for the Township to realize on its security
or deposits, then the Township (its servants, agents or sub -contractors) shall, if
the Township so elects, have the right and privilege at all times to enter upon the
said lands for the purpose of repairing or completing any work or services required
to be completed by the Developer under this Agreement.
f) Exceedino Cost Estimates — if the cost of completing such work or service
exceeds the amount of security held by the Township, such excess shall be paid
by the Developer to the Township, thirty (30) days after invoicing by the Township.
All overdue accounts shall bear interest at the rate of 12% per annum.
g) Save Harmless — the Developer, on behalf of itself, its successors and assigns,
agrees to indemnify and save harmless the Township from and against any and
all claims, suits, actions and demands whatsoever which may arise either directly
or indirectly by reason of any work or service performed by the Township, its
servants or sub -contractors in order to complete the work or services required to
be completed under this Agreement, provided the subject matter of such action,
suits, claims or demands was not caused intentionally or through gross
negligence on the part of the Township, its servants or agents or sub -contractors.
h) Construction Act — if the Township becomes obligated to make any payments, or
pay any costs under the provisions of Section 17(4) of the Construction Act, this
will constitute a default and entitle the Township to realize upon its security.
Surplus Funds — in the event that the Township cashes a Letter of Credit to
complete Township services or satisfy any obligations under this Agreement, any
surplus monies that remain after this work is completed shall, upon full compliance
by the Developer with the terms of this Agreement (including all maintenance and
warranty periods), be returned to the issuing financial institution for transmission to
that party that took out the original Letter of Credit.
4.7 DISCHARGE OF SECURITIES
4.7.1 Estimated Cost of Servicing Works - after 70% (seventy per cent) of the servicing
works being completed, based on the total estimated cost of the servicing works
for the subdivision or in the approved phase of the subdivision, and provided the
Developer is in compliance with all aspects of the Subdivision Agreement, the
Developer shall, as the work further proceeds to completion, have the privilege, on
application to the Township and upon certification of the Township's Engineering
Consultant and/or Manager, Development Engineering, to obtain reductions of
the cash or Letter of Credit deposited for the installation of servicing works, in
increments of not less than ten percent (10%).
Upon application for reduction of the securities, the Developer's Consulting
Engineer shall provide an estimate of the cost to complete the servicing works.
The Township's Engineering Consultant and/or Manager, Development
Engineering will review the submitted estimate, and then make a
recommendation as to the amount to be retained to the Director of Development
Services for approval. The amount of servicing works not completed shall be
retained along with twenty percent (20%) of the completed servicing works
estimate with the remainder being released.
19
/"\
A further ten percent (10%) of the completed servicing works estimate will be
released upon satisfactory assurance to the Township that there are no liens
pursuant to the Construction Act affecting lands conveyed or to be conveyed to
the Township within the Plan of Subdivision, pursuant to the terms of this
Subdivision Agreement.
4.7.2 Final Occupancv and Lot Gradino Deposit - the Developer or Individual Lot Owner
shall deposit with the Township, the required Final Occupancy and Lot Grading
Deposit at a rate applicable at the time of the issuance of Building Permits. Upon
certification of final grade elevations indicating that the property has been
developed in conformity with the Engineered Lot Grading Plan and approved by
the Manager, Development Engineering or Township's Engineering Consultant,
the balance of the deposit shall be returned.
4.8 STATUTORY DECLARATION OF ACCOUNTS PAID
The Developer agrees that upon applying for a Discharge of Securities or for a
Certificate of Substantial Completion and Maintenance or for a Certificate of
Acceptance and Final Assumption for the services within the subdivision, or upon
applying for prior acceptance of the municipal underground services, he shall supply
the Township with a Statutory Declaration that all accounts for work and materials for
said services have been paid and that the Construction Act has been complied with
and that no liens thereunder have or can be registered, except normal guarantee
holdbacks, and that there are or will be no claims for liens or otherwise in connection
with such work done or materials supplied for or on behalf of the Developer in
connection with the subdivision.
4.9 PLEDGE OF TITLE TO LANDS
The Developer hereby charges and pledges as security for all costs, charges, expenses
or obligations of the Developer under the provisions of this Subdivision Agreement all of
its right, title and interest in the said lands, and consents to the registration of this
Subdivision Agreement against title to the said lands.
4.10 INSURANCE CERTIFICATE AND POLICY
4.10.1 Insurance Policv - the Developer shall lodge with the Township, on or prior to
the execution of the Agreement, an insurance certificate with an insurance
company satisfactory to the Township, (which said approval shall not be
unreasonably withheld or delayed), and insuring for the joint benefit of the
Developer, their agents and the Township and their agents, against any
liability that may arise out of the construction or installation of any work to be
performed pursuant to this Agreement and for a period of one (1) year after
completion and acceptance of the Township services to be constructed herein.
4.10.2 Comprehensive General Liabilitv/Environmental Impairment - such policy
shall carry limits of liability in the amount to be specified by the Township, but
in no event shall it be less than FIVE MILLION DOLLARS ($5,000,000.00)
inclusive comprehensive general liability, environmental impairment liability in
an amount not less than FIVE MILLION DOLLARS ($5,000,000.00), and such
policy shall contain:
a) a cross -liability clause;
b) product/completed operation coverage;
c) shall not have an exclusion pertaining to blasting, provided that any
blasting required shall be undertaken by an independent contractor;
d) shall include the following names as insured's:
(i) THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
(ii) OTHERS "As Applicable"
4.10.3 Notice of Cancellation -a provision that the insurance company agrees to
notify the Township within fifteen (15) days in advance of any cancellation or
expiry of the said insurance policy.
20
4.10.4 Certificate of Coveraoe - any certificate of coverage filed with the Township
Clerk shall specifically contain their confirmation that coverage includes (a),
(b), (c) and (d) above and are in effect.
4.10.5 Confirmation of Premium Pavment - the Developer shall, from time to time as
required by the Township, provide confirmation that all premiums on such
policy or policies insurance have been paid, and that the insurance is in full
force and effect. The Developer shall see that a copy of the policy is filed with
the Township annually.
4.10.6 Claim in Excess of Policv Limits - the issuance of such policy of insurance shall
not be construed as relieving the Developer from responsibility for other or
larger claims, if any, and for which it may be held responsible.
21
PART-5
5.1 PHASING
The Township, at its sole discretion, may instruct the Developer to construct the
services in particular phases suitable to the Township, and the Developer must
comply on terms to be agreed to by the Township.
If the Township does not so instruct, the Developer, before commencement of any
work, may request the Township's permission to divide the area of the subdivision into
convenient phases. If the work is thus phased, as approved by the Township, then in
lieu of furnishing cash payment or Letter of Credit, all as set out in Clause 4.6 for one
hundred percent (100%) of the estimated costs, as approved by the Township's
Engineering Consultant and/or Manager, Development Engineering, the Developer
shall deposit security for part of the services the Township has approved.
Before proceeding with an additional phase, the Developer shall obtain the written
approval of the Township and no service will be permitted to be installed and no
Building Permits issued until this approval has been received and additional securities
deposited.
When 70% (seventy per cent) of the lots of the subdivision or phases of the
subdivision have been built upon and all the services have not been completed and
approved by the Township's Engineering Consultant and/or Manager, Development
Engineering, the Township reserves the right to refuse commencement of the next
phase until all services have been installed and approved.
In no event will further subdivisions of the Developer or phases of subdivisions of the
Developer be approved if all services of the active phase approved by the Township's
Engineering Consultant and/or Manager, Development Engineering have not obtained
the Certificate of Substantial Completion and Maintenance within a two (2) year period
after registration of this Agreement.
Notwithstanding anything hereinafter set out, the Township shall not be obligated to
assume the responsibility for and take over the subdivision services until at least 70%
(seventy per cent) of the lots on the subdivision or phase of the subdivision have
completed dwellings erected therein and Final Certificate of Occupancy have been
issued. The Developer shall be responsible for the maintenance and all repairs of the
services, in this case.
The subdivision is to be developed in the following Phases:
Phase 2 Group E Lots 1 to 27, Plan 51 M-
M
PART-6
CONSTRUCTION REQUIREMENTS
6.1 SERVICING WORKS TO BE INSTALLED
The servicing works to be installed are set out in Schedule "G" to this Agreement. This
Schedule is to set out the servicing works in general terms only and shall not be
construed as covering all items in detail.
The servicing works are to be designed and constructed in accordance with the
current Township of Oro-Medonte Development Engineering Policies Process and
Design Standards adopted by By-law at the time of signing of the Subdivision
Agreement. A copy of these standards are available at the Municipal Office and at
www.oro-medonte.ca.
If at any time, and from time to time during the development of the subdivision, the
Township's Engineering Consultant and/or Manager, Development Engineering is of
the opinion that additional servicing works are necessary to adequately provide any of
the public services required by the Plan of Subdivision, the Developer shall construct,
install or perform such additional servicing works at the request of the Township's
Engineering Consultant and/or Manager, Development Engineering.
6.2 CONSTRUCTION OF SERVICING WORKS
Following the registration of this Agreement, the Developer shall cause to be
constructed, all requisite servicing works in order to provide services to the lots and
buildings blocks within the Phase.
6.3 ELECTRICAL. NATURAL GAS. TELEPHONE and CABLE TV UTILITIES
6.3.1 Any development in conjunction with the subdivision must not block vehicular
access to any Hydro One, Natural Gas, Bell Telephone and Cable TV plant
located on the right-of-way.
6.3.2 The Developer shall make arrangements satisfactory to Hydro One, Bell
Telephone and Cable TV for the crossing of the Hydro One, Bell Telephone and
Cable TV right-of-way by the proposed roads. A separate proposal shall be
submitted to Hydro One, Natural Gas, Bell Telephone and Cable TV area
offices for these future road crossings.
6.3.3 The cost of any relocations or revisions to Hydro One, Natural Gas, Bell
Telephone and Cable TV plant which are necessary to accommodate this
subdivision will be borne by the developer.
6.3.4 The easement rights of Hydro One, Natural Gas, Bell Telephone and Cable TV
are to be protected and maintained.
6.4 PRESERVATION AND PLANTING OF TREES
6.4.1 The Developer shall preserve all healthy trees within the limits of the
subdivision, where possible and supply a Tree Preservation Plan as
appropriate. If, in the opinion of the Township's Engineering Consultant and/or
Manager, Development Engineering, indiscriminate removal of trees takes
place within the limits of the Plan of Subdivision, including road allowances,
parkland and individual lots, the Township shall have the option of issuing a
Stop Work Order on construction of the services and/or building on a particular
lot where the removal is taking place. Work will not be allowed to proceed until
the Township is satisfied that the practice shall not continue and the
Developer/Builder agrees to carry out remedial work required by the Township.
The Developer agrees to provide a copy of this clause to each and every
prospective builder/prospective purchaser.
f07cl
r�l r'1
6.4.2 The Developer shall prepare and implement a vegetation plan/tree planting plan
that outlines where and how the vegetation buffer will be enhanced with trees
and shrub planting to protect the wetland and fisheries resources where natural
vegetation on the buffer does not exist or is insufficient to provide an adequate
vegetation buffer for approval by the Township and the Ministry of Natural
Resources and Forestry. In addition, the tree planting plan shall require planting
of up to three 2.4 metre or taller hardwood trees on those lots not having any
tree cover.
6.4.3 Prior to grading of any lot or the Township giving its release for registration, the
Developer shall prepare a Tree Preservation Plan for the lot to the satisfaction
of the Township and the Ministry of Natural Resources and Forestry.
6.4.4 The Developer shall plant two (2) 2.4 metre, or taller, hardwood trees of a
minimum of 50mm caliper on each lot having less than three (3) trees in the
front yard(s), if required by the Township. A minimum of 2 trees shall be placed
along the flankage side of each corner lot. The type of trees must be
satisfactory to the Township.
6.4.5 In addition, the Developer shall plant trees with the above specifications at 15
metre intervals around the perimeter of the park, if one is to be located within
the plan, in areas where there is not sufficient growth of trees.
6.5 ADDITION OR REMOVAL OF FILL
The Developer covenants and agrees that the Developer shall not add, nor permit to
be added, any fill or debris on, nor shall the Developer remove or permit to be
removed, any fill, topsoil, trees or shrubs from any public or Municipal lands, without
the written consent of the Township.
6.6 BLASTING
Before any blasting is proceeded with by the Developer, the Developer shall obtain
from the Township's Engineering Consultant and/or Manager, Development
Engineering or Township Operations Department Official, written permission for
carrying out the blasting operation, and show proof of insurance for all damage or
claims for damage resulting from the blasting operation.
Regardless of whether the blasting is carried out by a subcontractor, the Developer, in
any event, shall be responsible for any such claims.
6.7 ACCESS ROADS
All access roads must be maintained by the Developer in good repair acceptable to
the Township's Engineering Consultant and/or Manager, Development Engineering
and the Township Operations Department during the time of construction, including
dust control and the removal of any mud or debris tracked from the subdivision, and no
roadway outside the limits of the proposed subdivision may be closed without the
written consent of the Township Operations Department. For the purpose of obtaining
such consent, the Developer shall advise the Township Operations Department and
the Township Clerk of the date and time they wish to close a roadway. The Township
reserves the right to limit or prohibit the use of any existing access road by the
Developer.
6.8 DAMAGE TO EXISTING PLANT
The Developer shall repair any damages caused to an existing road, road allowance
or existing structure or plant located on the road allowance as a result of the
subdivision development and shall pay for any costs involved in the relocation of
existing services, such as hydrants, telephone poles, etc., which may become
necessary because of the development of the subdivision. In this regard, the
Developer's Consulting Engineer shall arrange for an inspection with the Township
Operations Department and Township's Engineering Consultant and/or Manager,
Development Engineering for the purpose of compiling an inventory of existing
24
conditions prior to work on the subdivision. Otherwise, the Township Operations
Department's assessment of conditions prior to construction will be final.
6.9 DUST / MUD CONTROL AND ROAD SURFACE CLEANING
Until the Certificate Acceptance and Final Assumption has been issued, the Developer
shall apply calcium or other Ministry of the Environment and Climate Change approved
dust suppressant to those roads within the subdivision and/or utilized by construction
traffic, that have not had asphalt surfaces applied, in quantities sufficient to prevent
any dust problem to traffic or home occupants, to the satisfaction of the Township.
Until the Certificate Acceptance and Final Assumption has been issued, the Developer
shall undertake water flushing and mechanical sweeping and cleaning to those roads
within the subdivision and/or utilized by construction traffic, that have asphalt surfaces
applied, sufficient to prevent any dust problem or mud tracking to traffic or home
occupants, to the satisfaction of the Township.
If the Developer has not taken remedial action within twenty-four (24) hours of
receiving a written notification (via facsimile and /or email) from the Township and/or
Township's Engineering Consultant and/or Manager, Development Engineering
regarding a dust control problem, then the Township and/or Township's Engineering
Consultant, at their sole discretion, shall employ outside forces to implement, at the
Developer's expense, a suitable measure of dust control.
6.10 CONSTRUCTION REFUSE
All construction refuse, garbage and debris from the subdivision must be disposed of
in an orderly and sanitary fashion by the Developer, off the site of the subdivision, at a
licensed landfill site. The Township shall not be responsible for the removal or
disposal of any construction refuse, garbage and debris. Open air burning is not
permitted by the Township. The Developer agrees to deliver a copy of this clause to
each and every builder applying for a Building Permit for any lot or part of a lot within
the said Plan of Subdivision.
6.11 INSPECTION OF THE CONSTRUCTION OF MUNICIPAL SERVICING WORKS.
During the construction of all Municipal Servicing Works, the Developer's Engineering
Consultant shall be responsible for all inspections and certifications of the construction
of all Municipal Servicing Works. The Township may inspect the work in hand at such
times and with such duration and frequency as the nature of the type of construction
may dictate.
Subject to the obligations of the Township's Engineering Consultant and/or Manager,
Development Engineering and to protect the interests of the Township through such
inspections, every effort will be made to keep duplication of engineering services on
site to a minimum. If, during such inspections, the Township's Engineering Consultant
and/or Manager, Development Engineering perceives that construction, whether by
method or otherwise, constitutes an immediate danger to life or property, or
construction does not conform to acceptable practice in order to meet the approved
installation of servicing works, the Township's Engineering Consultant and/or
Manager, Development Engineering will have the authority to cease construction
operations by verbal notice to the contractor and/or the Developer's Consulting
Engineer.
Such notice shall be confirmed, in writing, as soon as possible, thereafter. A copy of
this clause shall be delivered by the Developer to each and every contractor engaged
in construction of services for the subdivision.
6.12 DECLARATION OF PROGRESS AND COMPLETION
6.12.1 Prior to the approval or acceptance of any Municipal Servicing Works by the
Township, the Developer shall provide the Township's Engineering Consultant
and/or Manager, Development Engineering with an undertaking for the
completion dates of all remaining Municipal servicing Works required by this
25
r'1
Agreement and in a form similar to that attached to this Agreement as Schedule
"I", the Declaration of Progress and Completion, for approval by the Township's
Engineering Consultant. The Township reserves the right to alter the completion
dates, if the timelines are considered to be inappropriate, and the Developer
agrees to complete the Municipal Servicing within the revised completion dates.
6.12.2 It is understood and agreed that should the Developer fail to construct the
remaining services, as stipulated, and by such dates as provided in the
Declaration, the Developer shall pay to the Township, as pre -determined
liquidated damages, the sum of TWO HUNDRED DOLLARS ($200.00) for
each and every day the said services are behind schedule of construction, and
NO FURTHER BUILDING PERMITS SHALL BE ISSUED.
12.3 The Developer recognizes that top lift of asphalt shall not be placed until 70%
(seventy per cent) of the lots have been fully developed and completed and
dwellings have been issued a Certificate of Final Occupancy.
6.13 PROGRESS OF MUNICIPAL SERVICING WORKS
The water main and associated servicing works (as required) shall be constructed,
inspected and approved in accordance with the wording contained in this Agreement
prior to the completion of the other Municipal Servicing Works, including roads,
sanitary sewers, storm sewer systems, boulevards, utilities and street lighting.
The sanitary sewers and associated servicing works (as required) shall be
constructed, inspected and approved in accordance with the wording contained in this
Agreement prior to the completion of the other Municipal Servicing Works, including
roads, storm sewers systems, boulevards, utilities and street lighting.
The storm sewer system and stormwater servicing works will be constructed,
inspected and approved in accordance with the wording contained in this Agreement.
After the completion of Municipal Servicing Works, the Developer shall complete the
Declaration of Progress and Completion for the approval of the Township's
Engineering Consultant and/or Manager, Development Engineering and from that
date, the said Declaration shall apply and take precedence over Clause 6.12. Prior to
signing the Declaration of Progress and Completion, the Developer shall install all
servicing works in accordance with the Schedule of Servicing Works or as directed by
the Township's Engineering Consultant and/or Manager, Development Engineering.
Should the Developer fail to adhere to the scheduling provisions outlined in the
Schedule of Servicing Works or the Declaration of Progress; or having commenced to
install the aforesaid servicing works, fails or neglects to proceed with reasonable
speed; or in the event that the aforesaid servicing works are not being installed in the
manner required by the Township's Engineering Consultant and/or Manager,
Development Engineering: the Township's Engineering Consultant and/or Manager,
Development Engineering giving seven (7) days written notice by prepaid registered
mail to the Developer may, without further notice, enter upon the said land and
proceed to supply all materials and to do all necessary servicing works in connection
with the installation of the said servicing works, including the repair or reconstruction of
faulty works and the replacement of materials not in accordance with the
specifications.
The Township's Engineering Consultant and/or Manager, Development Engineering
shall charge the costs thereof, together with an Engineering fee of ten percent (10%)
of the cost of such materials and servicing works to the Developer who shall forthwith
pay the same upon demand.
If the Developer fails to pay the Township within thirty (30) days of the date on the bill,
the money owing shall be deducted from the cash deposit or Letters of Credit. It is
understood and agreed between the parties hereto that such entry upon the land shall
be as agent for the Developer, and shall not be deemed for any purpose whatsoever,
as an Acceptance or Assumption of the said Municipal Servicing Works by the
Township.
26
The Township may refuse to issue Building Permits until such Municipal Servicing
Works are installed in accordance with the Township of Oro-Medonte Development
Engineering Policies, Process and Design Standards and to the satisfaction of the
Township's Engineering Consultant and/or Manager, Development Engineering. It is
agreed that a copy of this clause be delivered by the Developer to each and every
Builder obtaining a Building Permit for any lot or part of a lot on the said Plan.
Note: Building Permits shall not be issued until the Township's Engineering
Consultant and/or Manager, Development Engineering has given the Certificate of
Substantial Completion and maintenance.
6.14 EMERGENCY REPAIRS
Employees or agents of the Township may enter onto the lands at any time, or from
time to time for the purpose of making emergency repairs to any of the servicing
works. Such entry and repair shall not be deemed an acceptance of the servicing
works by the Township or any assumption by the Township of any liability in
connection therewith, or a release of the Developer from any of his obligations under
this Agreement.
6.15 USE OF SERVICING WORKS BY TOWNSHIP
The Developer agrees that:
I. The servicing works may be used prior to acceptance by the Township or other
authorized persons for the purpose for which such servicing works are designed.
II. Such use shall not be deemed an acceptance of the servicing works by the
Township, and;
III. Such use shall not in any way relieve the Developer of his obligations in respect of
the construction and maintenance of the servicing works so used.
6.16 DRAINAGE AND LOT GRADING
Generally, the drainage facilities will consist of curb and gutters, and storm sewers, to
provide a satisfactory drainage outlet, and will be in accordance with the Storm Sewer
Drainage Plans STM-1 and STM-2, Stormwater Management Plans, Section and
Details SWM-1, SWM-2, SWM-3 and SWM-4 by C.C. Tatham & Associates Ltd. and
approved by the Township's Engineering Consultant and the Township.
All lots and blocks within the Plan and all lands abutting the Plan shall be graded to
drain in accordance with the Lot Grading Plans LG-2 to LG-5 prepared by C.C.
Tatham & Associates Ltd. and approved by the Township's Engineering Consultant
and the Township. Some fill and re -grading of lots may be necessary during or after
building construction. The Grading Plan shall show all existing and final grades on lot
corners, as well as mid -lot elevations, where deemed necessary by the Township's
Engineering Consultant and/or Manager, Development Engineering.
It is understood and agreed by the parties hereto that drainage of surface water on the
lots and blocks on the Plan is the sole responsibility of the respective lot owners (or
any subsequent lot purchasers / owners) once the required drainage servicing works
have been constructed by the Developer.
Drainage swales shall be landscaped and maintained by all subsequent lot owners.
The purpose of the storm swales is to accommodate storm drainage waters from the
subject lot and adjacent lands. No lot owner in the subdivision shall encumber or
impede storm drainage in any manner whatsoever.
In the event that the Developer, or any subsequent lot owner, obstructs, impedes, or
interferes with the storm drainage flow through any part of the drainage swale, or
interferes with the acceptance of water from any connecting drainage swales, then the
Township shall have the right, if it so elects, to enter upon the subject lands to rectify
such problems so that the drainage swales can serve their original purpose.
27
(01�1 r'1
The Developer, and any subsequent lot owner, shall not construct any servicing works,
remove, or permit to be removed, any soil from the said drainage swale, excavate,
drill, install, erect, or permit to be excavated, drilled, installed or erected in, over, upon,
under or through the said drainage swale any fence, well, foundation, pavement,
building or other structure or other installation.
The lot owner of any lot in the subdivision upon which the Township elects to enter for
the purpose of rectifying the said work, hereby agrees to indemnify and release the
Township from and against all claims, demands, actions or causes of action
whatsoever arising as a result of the Township or of its servants or agents entering
upon the lands for the purpose of correcting drainage problems. The cost of such
work will be for the account of the lot owner. Any invoices not paid within thirty (30)
days after the due date, shall be added to the tax roll and collected in a like manner as
realty taxes, as per Section 446 of the Municipal Act, 2001.
The Developer agrees to deliver a copy of this clause to each and every prospective
purchaser and/or builder obtaining a Building Permit for any lot or part of a lot on the
said Plan of Subdivision as part of the Purchaser's Manual.
6.17 LANDSCAPING
All Landscaping Works shall be completed to the satisfaction of the Township in
accordance with Section 3.16 — Landscaping of the Township of Oro-Medonte
Development Engineering Policies, Process and Design Standards and as
represented on the Landscape Design Drawings included in Schedule "G".
Certificate(s) of Final Occupancy require the completion of Landscaping Works.
All Landscaping Works shall be completed prior to the issuance of the Certificate of
Acceptance and Final Assumption. (Typically when 70% (seventy per cent) of the total
Building Permits allowed for in the subdivision have been completed.)
Maintenance of Landscape Plantings shall extend for a minimum of 12 (twelve)
months past the issuance of the Certificate of Acceptance and Final Assumption.
6.18 PARKLAND SERVICING WORKS
All Parkland Servicing Works (SWM and grading, water servicing, sanitary sewer
servicing, electrical servicing and lighting, walkways and trails, etc. as required) and
Open Space Blocks are to be constructed in accordance with Section 3.17 — Parkland
Development of the Township of Oro-Medonte Development Engineering Policies,
Process and Design Standards and as represented on the Parkland Services Design
Drawings included in Schedule "G".
Municipal Servicing Works required in the Parkland Services Design Drawings (as
required) shall be installed to the property line, earth works and rough grading, and
any interim SWM works (as may required) shall be completed prior to the Certificate of
Substantial and Maintenance being issued.
All Parkland Servicing Works (as required) must be completed to the satisfaction of the
Township prior to the issuance of the Certificate of Acceptance and Final Assumption.
(Typically when 70% (seventy per cent) of the total Building Permits allowed for in the
subdivision have been completed and the Certificate(s) of Final Occupancy has been
issued.)
Maintenance of Parkland Plantings shall extend for a minimum of 12 (twelve) months
past the issuance of the Certificate of Acceptance and Final Assumption.
m
IJ-1Gi2w/
BUILDING AND SEWAGE SYSTEM PERMITS AND OCCUPANCY
7.1 OVERALL LOT DEVELOPMENT PLAN & INDIVIDUAL SITE PLANS
7.1.1 The Developer further agrees that he or any person, persons, or Corporation
claiming title through the Developer, will not apply for a Building or Sewage
System Permit for any part or portion of the said lands or on any lot therein, and
no Building or Sewage Permit shall be issued until a Certificate of Substantial
Completion and Maintenance has been issued.
7.1.2 The Developer's Engineer shall prepare an overall Lot Development Plan for
approval by the Township, Township Engineer and the Nottawasaga Valley
Conservation Authority as a further requirement to Clause 2.4. The Plan shall
include the following:
a) envelopes for the proposed house and any adjacent structures on each lot.
b) existing and proposed grades of the disturbed area of lot after building,
drainage and sewage servicing works have been completed.
c) existing and proposed grades on lot corners and mid -lot elevation.
d) location and type of proposed water supply and sanitary sewer
supply/connection.
7.1.3 The Developer agrees to advise all prospective lot Purchasers that prior to a
Building or Sewage System permit being issued a detailed individual site plan
including methods of stormwater storage and sewage effluent disposal shall be
prepared for each lot by the Developer's Consulting Engineer and approved by
the Township and/or the Township's Engineering Consultant. The individual
site plan shall show the building and tile bed location (if applicable) and
elevations, all exterior lot grading and drainage servicing works complete with
elevations and landscaping.
7.1.4 Individual Lot Purchasers will be required to obtain the services of a qualified
professional consultant to prepare the Individual Site Plan to the satisfaction of
the Township prior to the issuance of a building or sewage system permit. Lots
10-27 are subject to Site Plan Control under Section 41 of the Planning Act and
that no development will be permitted on the lot until a Site Plan Agreement has
been entered into between the municipality and the owner of the lot. Further,
the Developer agrees to include a statement advising that Lots 10-27 are
subject to Site Plan Control under Section 41 of the Planning, R.S.O. 1990 in all
offers to purchase and Agreements of Purchase and sale for said lots and
blocks.
The Engineered Lot Grading Plan shall include, at a minimum:
• Signature / Seal of Applicants Lot Grading Designer
• Design Date and Submission number
• North Arrow and Key Plan
• Metric Scale of Drawing — of a typical engineering scale
• Geodetic Benchmark - location and elevation
• Dimensioned Property Limits / Boundaries and Lot Corner Elevations
• Typical Silt and Sediment Control Measures
• Location of Silt and Sediment Control Measures
• Typical Swale Cross Section(s) — side yard / mid -yard / cut-off (as required)
• Location, Elevation, Flow Direction and % Grade of all Swales
• Location of Engineered Fill
• Location of Environmentally Protected Areas / Waterbodies / Shoreline
• Location of Existing Trees to be Retained
• Location and Type of Utility Services (Natural Gas, Bell, Hydro, Cable T.V.,
etc.)
• Location of Municipal Water Service
29
Ph
• Location of Private Sewage System — Septic Bed, Tank and Grade
Elevations
• Location and Dimension of Municipal / Utility / Drainage Easements
• Driveway - location, proposed % grade, width and curb cut locations
• Driveway Culvert — location, size, length, material, elevations and % grade
• Elevations of Road Grade (edge of road and centre line) adjacent to Lot
Line(s)
• Elevations of and % grade of Road Side Ditches adjacent to Lot Lines
• Street Furniture / ROW Features — hydrants, streetlights, Bell / Cable
pedestals, Hydro transformers / poles, catch basins, curbs, sidewalks,
retaining walls, etc.
• Building(s) Location: lot line setback distances and building corner
elevations
• House and Lot Type: rear to front /split lot / walk -out basement, etc.
• Location of Internal Catch Basins / Soak Away Pits - grate and invert
elevations
• Location of Sump Pump discharge (not discharging to driveway or septic
tank)
• Location of all Rainwater Leaders / Downspouts (not discharging onto
driveway)
• Finished First Floor elevation (F.F.F.)
• Top of Foundation Wall elevation (T.F.W.)
• Finished Basement Floor elevation (F.B.F.)
• Underside of Footings elevation (U.S.F.)
• Finished Garage Floor elevation (F.G.F.)
• Underside of Footings Garage elevation (U.S.F.G.)
• Location and Elevation of all Entrances including # of Risers
• Location and Elevation of all Walkways, Patios, Deck and Porches
• Location and Elevations (Top and @ Grade) of Retaining Walls
7.1.5 The Developer further agrees to construct all servicing works required under
Clause 2.4, and as shown on the approved General Servicing Plan GS-2 and
GP-6, Storm Drainage Plans STM-1 to STM-2, Notes, Details and Standards D-
1 to D-7, Water Distribution and Swabbing Plan WAT-1 and WAT-2, Lot
Grading Plans LG-2 to LG-5, Plan and Profile Drawings PP-4, PP-11 to PP-14,
PP-17, and PP-19, Stormwater Management drawings SWMA to SWM-4,
Siltation and Erosion Control Plans SCA, SC-2 and SC-7, and Tree Protection
and Compensation Plans LP-2 and Landscape Details LD-1, to the satisfaction
of the Township and the Township's Engineering Consultant.
7.1.6 The Developer further agrees to advise all prospective lot Purchasers of the
requirements that it may be necessary for the sewage system to be installed
prior to construction of the home, subsequent to the issuance of a Sewage
System Permit.
7.1.7 The Developer shall install a reasonably permanent marking or monument
system clearly identifying the location of the wetland buffer on each lot or block
affected, prior to occupancy of any such residential lot or block. Further, the
developer agrees to include a statement advising of the marking system
requirement in all offers to purchase and Agreements of Purchase and sale for
said lots and blocks.
7.1.8 Model Homes
Notwithstanding Section 8.1 (Substantial Completion of Underground services)
and Section 7.2 (Requirements for Building Permits), the Township agrees,
after registration of the plan, that the Developer, once making Building permit
application and receiving approval from the Development Services Committee
for a model(s) home, the Township shall issue model home permit(s) for such
lots and locations as are acceptable to the Township subject to the plans being
in conformity with the Ontario Building Code, and the Developer not being in
default of any of the terms in this Agreement. The Developer agrees that none
of the model home(s) shall be occupied until a Provisional Certificate of
30
W
occupancy has been issued for each model home in accordance with the
normal occupancy provisions of this agreement.
In the event the Developer wishes to erect a model home(s) prior to the
registration of the Plan, the Developer shall be subject to the requirements
(Separate site plan agreement) of the Township, and these requirements shall
not supersede or in any way relieve the Developer of its responsibilities as set
out in this Agreement.
7.2 REQUIREMENTS FOR BUILDING PERMITS
The Developer acknowledges and agrees that final approval or registration of the Plan
of Subdivision approval by the Township, or the acceptance by the Township of the
servicing works set out in this Agreement shall not be deemed to give any assurance
that Building Permits, when applied for, will be issued in respect of the lots or blocks
shown on the Plan of Subdivision.
The Township reserves the right to withhold building permits until the requirements of
this Agreement, and all other requirements of all relevant agencies, have been
completed to the satisfaction of each agency, and the Township has been notified in
writing of satisfaction of these items by the relevant agency in addition to the
completion of commissioning of the water and sewage servicing works for the Plan of
Subdivision.
The Developer and Township agree that no building permits shall be applied for nor
issued by the Township for permitted uses as set out in the Township of Oro-Medonte
Zoning By-law 97-95, as amended, until the Township is satisfied that acceptable road
access, water supply, sanitary sewage and stormwater drainage facilities are available
to service the Plan of Subdivision in addition to all other requirements set out in
Section 7 herein.
Despite the foregoing and despite the provisions of the Building code Act, R.S.O.
1990, c.B.13, the Developer understands and agrees that no building permits will be
issued until all of the requirements of this Agreement and specifically this Section,
have been met. For the purposes of the Building Code Act, R.S.O. 1990, c.B.13, the
Parties hereby agree that the requirements of this Agreement, including specifically
this Section, shall constitute "applicable law".
Notwithstanding the foregoing, no Building Permits will be given and the Chief Building
Official may refuse any application until:
(i) The submission of all provincial and municipal approvals;
(ii) Lots that are subject to Site Plan Control under Section 41 of the Planning Act
will not be issued a building permit until a Site Plan Agreement has been
entered into between the municipality and the owner of the lot.
(iii) Sewage system allocation/ or approval has been obtained and submitted to the
Township.
(iv) The Certificate of Substantial Completion and Maintenance for Municipal
Servicing Works has been issued by the Township for the water supply and
distribution system, sanitary sewer system, storm sewer system, the road(s)
have been constructed up to an including base coarse asphalt, providing
access to the lot in accordance with the Township's Development Engineering
Policies, Process and Design Standards to the satisfaction of the Township's
Engineering Consultant and/or Manager, Development Engineering, and the
submission of the completed Declaration of Progress and Completion as per
Schedule "I".
(v) The required Composite Utility Plan has been approved by the Township and
the underground services such as Bell Telephone, Electricity, Cable TV and
Natural Gas have been installed to the property line of the lot.
31
W
(vii) Approval of the Township's Engineering Consultant and/or Manager,
Development Engineering has been obtained for the construction of any
buildings to be erected on lots or blocks listed in Schedule "L" hereto.
(viii) Signs denoting "ROAD NOT ASSUMED BY TOWNSHIP — USE AT YOUR
OWN RISK" and information as to the SUBDIVISION NAME, DEVELOPER,
GENERAL CONTRACTOR and ENGINEERING CONSULTANT have been
installed at the entrances to the subdivision in a location acceptable to the
Township, in accordance with Clause 3.1.9.
(ix) An Engineered Lot Grading Plan has been prepared the Developer's Consulting
Engineer acknowledging that the building to be erected on any lot or block
within the Plan of Subdivision, for which a Building Permit has been applied for,
is in conformity with the Overall Lot Grading Plans.
In the case where another recognised design professional (P.Eng., OLS,
C.E.T.) prepares an Engineered Lot Grading Plan, for which a Building
Permit has been applied for, proof of review and affirmation of conformance
within the Plan of Subdivision and the Overall Lot Grading Plans by the
Developer's Consulting Engineered shall be required.
The Engineered Lot Grading Plan shall be approved by the Township and/or
Township's Engineering Consultant prior to the issuance of a Building Permit.
(x) Arrangements have been made and approved by the Township for Municipal
Address System numbering, as set out in Clause 7.7.
(xi) The Traffic and Street Name signs have been installed and approved by the
Township.
(xii) Payment of Development Charges Fees and other applicable levies.
(xiii) Certification by the Township and/or Township's Engineering Consultant if the
subdivision is being constructed in phases that the preceding phase meets all
requirements for occupancy as set out in Clause 7.1
(xiv) Payment of lot grading deposit of one thousand dollars ($1000.00) per lot.
7.3 LOTS UNSUITABLE FOR BUILDING OR LOTS REQUIRING SPECIAL ATTENTION.
Any lot, which will require special attention in order to be serviced, will be listed on
Schedule "L" of this Agreement. Examples of conditions requiring special attention
may be, but are not limited too: degree of slope, soils stability, environmental
restrictions, waterfrontage, Species at Risk, Engineered Fill, etc.
Prior to the issuance of a Building Permit for any lot listed in Schedule "L", the
Developer's Consulting Engineer must submit a letter to the Township's Engineering
Consultant and/or Manager, Development Engineering outlining the measures to be
taken to correct the problems on the lot. This proposal must be approved prior to
applying for a Building Permit.
7.4 SPECIAL BUILDING PERMITS
7.4.1 No Occuoancv Agreement
Building permits cannot be obtained or issued until certain vital services listed in
Section 8.1 are installed and accepted by the Township's Engineering Consultant and
the Township. The Township agrees that if the Developer or a builder wishes to obtain
a building permit prior to the installation of vital services listed in Section 8.1, a building
permit may be issued provided the Developer or builder has executed a "No
Occupancy Agreement" in the form set out in Schedule M" and has deposited the sum
of $7,000.00 in bond per lot or unit with the Township as a guarantee that no building
32
� r'1
that no building or structure will be occupied and subject to the registration on title of
the "No Occupancy Agreement." The Owner agrees to be liable to pay all costs
related to the preparation, registration and release of the "No Occupancy Agreement".
7.6 CONFORMITY WITH GRADING
Prior to issuance of a building permit for any lot on the Plan, an Engineered Lot
Grading Plan is required to be approved by the Township in accordance with Section
7.1. The Engineered Lot Grading Plan will indicate the proposed building and lot,
municipal address, and elevation of the top of foundation wall and shall be in
compliance with the Overall Lot Grading Plan for the subdivision. Any variance to the
Overall Lot Grading Plan by more than 0.15m in elevation must receive approval from
the Township.
The Developer agrees that each building permit will be issued on the condition that no
construction of any building will proceed beyond the completion of the footing and then
the foundation wall until the Developer has provided the Township's Chief Building
Official with a certificate from the Developer's Consulting Engineer, Professional
Engineer, Ontario Land Surveyor or Certified Engineering Technologist certifying that
the elevation of the underside of the footings and then the top of the constructed
foundation wall of the building conforms to the elevation shown on the Individual Site
Plan and complies with the Overall Lot Grading Plan. Any variance shall require the
approval of the Township and/or Township's Engineering Consultant.
7.7 MUNICIPAL ADDRESS SYSTEM
The Developer's Consulting Engineer shall be responsible for obtaining the municipal
address system numbers for each and every lot from the Municipal Office and
including on the final approved engineering drawings. As a further requirement, in
order to obtain a Provisional Certificate of Occupancy, the Developer and/or builder or
lot owner, shall install the aforementioned number at a location approved by the
Township. The Developer agrees to provide a copy of this clause to each and every
builder or lot owner in advance of the sale of such lot(s).
7.8 REQUIREMENTS FOR OCCUPANCY
7.8.1 Occupancy Certificate means a report issued to allow occupancy of a
building. No buildings erected on the lots or blocks within the Plan shall be
occupied until an Occupancy Certificate has been issued by the Township's
Building Department in accordance with the Township's Building By -Law and
the Ontario Building Code — Division C, Articles 1.3.3.1 and 1.3.3.4 and the
Building Code Act II(1).
Notwithstanding requirements of the Township's Building By-law and the
Ontario Building Code, an Occupancy Certificate shall not be issued until:
(i) The requirements for the issuance of a Building Permit — Section 7.2 anc
the issuance of a Certificate of Substantial Completion and Maintenance
— Section 8.1 have been met.
(ii) A driveway culvert (as required) has been provided to the satisfaction of
the Township, in accordance with the Township of Oro-Medonte
Development Engineering Policies, Process and Design Standards.
7.8.2 Final Inspection means a report issued when all outstanding items on an
Occupancy Certificate, including grading, have been completed and there is
compliance with the Ontario Building Code.
Notwithstanding requirements of the Township's Building By-law and the
Ontario Building Code, a Final Inspection Report shall not be issued until:
(iii) A Lot Grading Certification Letter has been provided by the Developer's
Consulting Engineer, or a Professional Engineer, Ontario Land Surveyor
or Certified Engineering Technologist, indicating that the final grading of
33
the lot or block for the building constructed, is in conformity with the
Engineered Lot Grading Plan or such variance there from has been
approved by the Manager, Development Engineering or Township's
Engineering Consultant.
(iv) Any deficiencies on an Occupancy Certificate have been complied
with. It is agreed that a copy of Part 8 shall be delivered by the
Developer to each and every builder obtaining a Builder's Permit or any
prospective purchaser of the dwelling for any lot or part of a lot on the
said Plan.
7.9 REQUIREMENTS FOR WINTER OCCUPANCY
Should the Developer require Occupancy between October 1 and April 15, the final lot
grading and the application of sod / seed shall be completed by the following
September 30 (following year) from Provisional Occupancy.
Should the Developer require Occupancy between April 16 and October 1, the final lot
grading and the application of sod / seed shall be completed by the following June 30
(following year) from Provisional Occupancy.
In addition, if the Final Lot Grading is not completed prior to Occupancy, the
Developer's Consulting Engineer shall provide the certification that the lots requesting
Occupancy have a base grade, swales, driveway culverts (as required) and all slopes
are graded to conform to the Overall Lot Grading Plan and minimum engineering
design standards.
The Developer agrees that if the final lot grading has not been completed within the
aforementioned time lines, the Township may immediately proceed to have the final lot
grading completed at the Developer's expense.
Further, it is agreed by the Developer that the lot grading security deposit will not be
reduced until the Township and/or Township's Engineering Consultant is satisfied
having received a Letter of Certification for Lot Grading Completion from the
Developer's Consulting Engineer and by having completed a site inspection.
7.10 OCCUPANCY LIQUIDATED DAMAGES
Notwithstanding the above, if for any reason whatsoever, occupancy of any building
occurs before the vital services listed in Clause 8.1 are installed to the home occupied
to the satisfaction of the Township's Engineering Consultant and/or Manager,
Development Engineering, then the Developer agrees to pay to the Township,
liquidated damages in the amount of TWO HUNDRED DOLLARS ($200.00), per
dwelling, per day, to cover the additional costs of administration, inspection and fire
protection, etc. The liquidated damages to commence at and include the date of
occupancy and end when the Developer obtains a certificate from the Township's
Engineering Consultant and/or Manager, Development Engineering that the vital
services are satisfactorily installed. If the Developer fails to pay to the Township,
monies owing under this clause within thirty (30) days of the date of the bill, the money
may be deducted from the cash deposit or Letter of Credit or other deposited security.
34
r^
71AIM:3
SUBSTANTIAL COMPLETION AND MAINTENANCE
AND
ACCEPTANCE AND FINAL ASSUMPTION
C7N
MUNICIPAL SERVICES
8.1 SUBSTANTIAL COMPLETION and MAINTENANCE OF MUNICIPAL
SERVICING WORKS
Certificate of Substantial Completion and Maintenance shall mean a Certificate
issued by the Township upon the recommendation of the Township's Engineering
Consultant and/or Manager, Development Engineering confirming the Municipal
Servicing Works installed by the Developer under the provisions of this Agreement
have been substantially completed in accordance with plans and specifications
reviewed and accepted by the Township's Engineering Consultant and/or Manager,
Development Engineering. The issuance of a Certificate of Substantial Completion and
Maintenance shall not constitute an assumption of the Municipal Servicing Works by
the Township.
Works completed and certified to obtain a Certificate of Substantial Completion and
Maintenance shall include (but not limited to) the following:
i) Sanitary Sewers, Pumping Stations, Appurtenances and Service Laterals
ii) Storm Sewers, Appurtenances, and Stormwater Management Facilities
iii) Watermain, Appurtenances and Service Laterals
iv) Other Utilities Servicing (Gas, Hydro, Bell, Cable TV, etc.)
v) Traffic Signage (temporary as applicable)
vi) Streetlighting (erected and energized)
vii) Granular Base Course and Granular Surface Course
viii) Base Course Asphalt
ix) Roadside Ditches and Shoulders
x) Curbs and Gutters
The Township's Engineering Consultant and/or Manager, Development Engineering
shall issue a Certificate of Substantial Completion and Maintenance of Municipal
Services when the Municipal Servicing Works have been inspected and certified as
being constructed in accordance with Township Standards and this Agreement.
This Certificate may contain a list of minor deficiencies, which have to be corrected by
the Developer, but which are not considered of sufficient importance to delay the
issuance of the Certificate and the acceptance of the services by the Township.
The minimum two (2) year maintenance period will commence from the date the
Township approves the issuance of the Certificate of Acceptance and Maintenance.
The Developer shall be responsible for the all maintenance and repairs of the
Municipal Servicing Works. Refer to 8.2
The Developer shall also be responsible for the operation costs until the Township has
issued a Certificate of Acceptance and Final Assumption for the Municipal Servicing
Works Refer to 8.3
8.2 MAINTENANCE OF MUNICIPAL SERVICING WORKS
The Developer will be responsible for the repair and maintenance of all the Municipal
Servicing Works until the expiry of a minimum period of two (2) years from the date the
Township approves the Certificate of Substantial Completion and Maintenance. The
minimum period shall be called the Maintenance Period.
35
� r'1
During the Maintenance Period, maintenance of the Municipal Servicing Works shall
include, but not be limited to:
• Maintaining road surfaces, curbing, ditches, sidewalks / trails, fencing, signage
and all other above ground Municipal Servicing Works
• Sweeping, flushing and the removal of dirt and debris from road surfaces
• Winter Maintenance Operations (snow plowing, sanding, salting, snow removal,
etc.) — Refer to Schedule "J"
• Maintaining and mowing of grass within the road allowances, as well as the
parkland and naturalized areas (as may be required).
• Maintaining ALL underground Municipal Servicing Works infrastructure storm
sewers, sanitary sewers, water main, etc.
• Maintaining street lighting infrastructure including all hydro electricity charges
incurred
• Maintaining stormwater management facilities and any appurtenances
associated with same
If, during the Maintenance Period, the Developer fails to carry out maintenance work
within forty-eight (48) hours after receipt of notice for the works to be undertaken from
the Township, then the Township may, without further notice, arrange for others to
undertake such maintenance work and the total cost of such work, including
Engineering fees, shall be borne by the Developer.
If the Developer fails to pay the Township within thirty (30) days of the date of billing,
then the money owing may be deducted from the cash deposit or Letter of Credit.
During the maintenance period, ten percent (10%) of the original estimated cost of the
servicing works shall be retained by the Township.
Towards the end of the maintenance period, the Developer shall make written request
to the Township for a final inspection to be made and notwithstanding the two (2) year
period noted above, the maintenance period will continue for the original two (2) years,
or for thirty (30) days after the receipt of the Developer's written request for a final
inspection, whichever period of time is the greater.
Note: Should, over the time of the Maintenance Period, extensive repairs to or
replacement of any of the Municipal Servicing Works have been required, the
Maintenance Period may be extended to accommodate said repairs or replacement, at
the sole discretion of the Township.
Assumption. Roads: Upon the expiry of the Maintenance Period for the pavement
structure of roads within the plan (excluding the top course of asphalt) and where
necessary the rectification of any noted defects or the realization upon security for
such purposes, the Municipality shall assume the road pursuant to section 31(4) of the
Municipal Act, 2001 through adoption of an "assumption by-law".
8.3 ACCEPTANCE and FINAL ASSUMPTION of MUNICIPAL SERVICES
Certificate of Acceptance and Final Assumption shall mean a Certificate issued by
the Township upon the recommendation of the Township's Engineering Consultant
and/or Manager, Development Engineering confirming the ALL of the Municipal
Servicing Works (identified in Schedule "G") installed by the Developer under the
provisions of this Agreement have been completed in accordance with plans and
specifications reviewed and accepted by the Township's Engineering Consultant
and/or Manager, Development Engineering.
Works completed and certified to obtain a Certificate of Substantial Completion and
Maintenance shall include (but not limited to) the following:
i) All Municipal Servicing Works identified in Section 8.1 and having passed a
2 (two) year maintenance period as per Section 8.2
In addition, the following Municipal Servicing Works shall include and having passed a
2 (two) year maintenance period as per Section 8.2
(^N
r'1
ii) Surface (Top) Course of Asphalt
iii) Asphalt in Driveway Aprons / Driveway Paving
iv) Boulevard Grading Topsoil, Sod or Seed
v) Fencing of Ponds, Walkways and Perimeter / Boundaries (as applicable)
vi) Parkland Grading Topsoil, Sod or Seed and Equipment and Fencing
vii) Permanent Signage and Pavement Markings.
viii) Sidewalks and Walkways (where applicable)
On receipt of the Developer's request for a final inspection of the municipal services,
the Township's Engineering Consultant and/or Manager, Development Engineering
shall undertake an inspection to ensure that the Township will accept the municipal
servicing works in accordance with this Agreement for the subdivision or for a
particular phase. (The Surface Lift of Asphalt for the subdivision roads cannot be
placed until 70% (seventy per cent) of the lots have completed dwellings and have
been issued a Certificate of Final Occupancy).
Should the Township's Engineering Consultant and/or Manager, Development
Engineering be satisfied, the Director of Development Services will recommend to the
Township that the Municipal Servicing Works be Accepted and that the Council of the
Township pass the appropriate by-law to Assume ALL of the Municipal Servicing
Works included within this agreement.
Notwithstanding anything hereinafter set out, the Township shall not be obligated to
assume the responsibility for or take over any of the subdivision servicing works until
at least seventy per cent (70%) of the lots on the subdivision or phase of the
subdivision have completed dwellings erected and therein and the Certificate(s) of
Final Occupancy have been issued.
Note: Security for all Landscaping Works shall be held by the Township for twelve
(12) additional months following the issuance of the Certificate of Final Acceptance
and Assumption.
8.4 REPLACEMENT OF SURVEY BARS
Prior to the final assumption of the subdivision by the Township, the Developer agrees
to supply a statement from an Ontario Land Surveyor approved by the Township that
after the completion of the subdivision work, he has found or replaced all survey
monuments, standard iron bars and iron bars shown on the registered plan. The
statement must be dated within two months of the date of acceptance.
8.5 RELEASE OF LAND
The Developer, when not in default of the Subdivision Agreement to provide the
requisite public services to the lands, shall be entitled to an effective release in a form
suitable for registration in the Land Registry Office for each lot or block, which is in
conformity with the overall Grading Plan for the lands or such variance there from as
has been approved by the Township's Engineering Consultant and/or Manager,
Development Engineering.
Every such release shall operate as a discharge of all levies hereunder by the
Township in respect to each lot or block described in the release, with the exception of
the responsibility for drainage as outlined in Clause 8.6 and the completion and
maintenance of the services.
8.6 DRAINAGE — RESPONSIBILITY OF DEVELOPER AND SUBSEQUENT OWNERS
It is understood and agreed that the drainage of surface waters upon and from the said
lands shall remain the sole responsibility of the Developer and once assumed the
subsequent owners, from time to time, of the lots or blocks within the Plan of Subdivision.
The Developer and then subsequent owners of the lots or blocks within the Plan of
Subdivision, from time to time, shall provide and maintain adequate drainage of surface
waters across and from the said lands in accordance with the provisions of Clause 8.3 of
this Subdivision Agreement. The Developer agrees to provide a copy of Clause 8.6 to
37
r�' /0�)
each and every prospective builder/prospective purchaser of a lot or block within the Plan
of Subdivision.
The Developer and then subsequent owners, from time to time, of any lot or block within
the Plan of Subdivision upon which the Township elects to enter for the purpose of
rectifying the said work, hereby agrees to indemnify and release the Township from and
against all claims, demands, actions or causes of action whatsoever arising as a result of
the Township or of its servants or agents entering upon the lands for the purpose of
correcting drainage problems. The cost of such work will be for the account of the
Developer and then subsequent lot owner(s). Any invoices not paid within thirty (30)
days after due date, shall be added to the tax roll and collected in a like manner as realty
taxes as per Section 446 of the Municipal Act, 2001.
2-1ZI ]
DEFAULT PROVISIONS
9.1 RIGHT TO REALIZE UPON ANY SECURITIES
Notwithstanding anything herein before contained in this Subdivision Agreement, and in
addition to any other remedies, when the Developer is deemed by the Township to be in
default of this Agreement, the Township reserves the right to realize upon any securities
deposited on or on behalf of the Developer to recover costs incurred by the Township, in
accordance with the provisions of Section 4.6 of this Subdivision Agreement, and/or to
restrict or refuse issuance of Building Permits and/or the Certificate of Final Occupancy,
and the Developer agrees not to apply for any Building Permits or the Certificate of Final
Occupancy for lots or blocks within the Plan of Subdivision, until such time as the
Developer is in full compliance with the provisions of this Subdivision Agreement.
9.2 SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon and enure to the benefit of the parties hereto and
their respective heirs, executors, administrators and assigns.
9.3 SUBSTITUTION FOR APPROVALS
Wherein this Agreement reference is made to any named Ministry of the Province,
Township of Oro-Medonte or other public body, such reference where the same requires
their approval, is deemed to be a reference to any other Ministry or body as may be
substituted by legislative change or policy of the Provincial Government or of the
Township.
9.4 CHARGES OR EXPENSES INCURRED BY THE TOWNSHIP,
The Developer further agrees that all costs, charges or expenses incurred by the
Township in satisfying the obligations of the Developer in the event of default of the
Developer under the terms of this Subdivision Agreement, together with any costs,
charges or expenses incurred by the Township in enforcing the obligations of the
Developer under this Agreement, shall be a first charge or lien against the said lands in
accordance with the provisions of Section 446 of the Municipal Act. 2001.
38
t')
IN WITNESS WHEREOF the parties hereto have executed this Agreement and have
hereunto caused to be affixed the corporate seals, duly attested to by the proper signing
officers.
SIGNED, SEALED AND DELIVERED this 12th day of August, 2020.
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTEI
Per Per (��X/L�'✓l�`
H Ires ubichon
Title Mavor Title Clerk
BRAESTON MENT CORPOBATI&
Per SD�'
J. David Bunston
I have authority to bind the Corporation
Title Treasurer
39
SCHEDULE"A"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
DESCRIPTION OF LANDS AFFECTED BY THIS AGREEMENT
ALL AND SINGULAR, that certain parcel or tract of premises, situate, lying, and being in the
Township of Oro-Medonte, in the County of Simcoe, and being composed of the whole of the
lands described as follows:
PCL 2-1 SEC 51-ORO-9; LOT 3 CONCESSION 9 ORO BEING THE E1/2 & W1/2; LOT 2
CONCESSION 9 ORO BEING THE E1/2 & W1/2; PART 1 PLAN 51R21804, EXCEPT PART
1 PLAN 51 R28741 & EXCEPT PLAN 51 M1070,51 M1113 & 51 M1181; SAVING AND
RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND MINERALS,
WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST WITHIN,
UPON OR UNDER SUCH LANDS; TM FULL POWER TO WORK THE SAME AND FOR
THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO MUCH
THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN OR017078;
SUBJECT TO AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO,
PART 1 PLAN 51 R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOWNSHIP OF ORO-MEDONTE, COUNTY OF SIMCOE
AS IN SC1615649 BEING ALL OF PIN 58532-0303 LT
m
i'1
SCHEDULE"B"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
PLAN OF SUBDIVISION
Phase 2 Group E Lots 1 to 27
PLAN OF SUBDIVISION
51-M
41
SCHEDULE"C"
NOTE: It is understood and agreed that this Schedule forms part of the
Subdivision Agreement between the TOWNSHIP OF ORO-MEDONTE
AND BRAESTONE DEVELOPMENT CORPORATION
DEEDS AND EASEMENTS TO BE CONVEYED
All title documents shall be properly drawn and executed by the parties, with the
appropriate Lot or Block Number inserted in the description of the document, and the
registered Plan Number shall be left blank, to be inserted by the solicitors for the parties
after the Plan is registered and a Plan Number assigned.
The consideration for all conveyances shall be the sum of TWO DOLLARS ($2.00) and
the cost of preparation, execution and registration thereof, shall be borne by the
Developer.
All documents to be registered shall be prior approved by the solicitor for the Township.
The following land and easements shall be conveyed as Part of Phase 2 Group E:
• Block 28 to be deeded to the Township of Oro-Medonte as an Open Space
Block
• Blocks 29, 30, and 31 to be deeded to the Township of Oro-Medonte as
drainage and watermain blocks
• Part(s) 1 and 2 of Plan 51 R- to be granted to the Township of Oro-
Medonte as a 6.0 metre drainage and maintenance easement over Lots 18 and
19.
SCHEDULE"D"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
DEVELOPMENT CHARGES
The Developer acknowledges and agrees that the following development charges are
payable on a per -lot basis prior to the issuance of a Building Permit for each lot, unless
alternative arrangements with the body enacting the By -Law relating to development charges
or education development charges, which arrangements have been brought to the attention
of the Chief Building Official, all charges are payable by cash or certified cheque in Canadian
funds to the Chief Building Official of the Township:
(i) Development charges in accordance with the Township of Oro-Medonte's By -Law at
the rate applicable, upon the issuance of the first Building Permit for each lot upon
which charges are payable.
(ii) Educational development charges in accordance with the Simcoe-Muskoka Catholic
District School Board at the rate that applies upon the issuance of the first Building
Permit with respect to each lot upon which educational development charges are
payable; and
(iii) Educational development charges in accordance with the Simcoe County District
School Board at the rate that applies upon the issuance of the first Building Permit with
respect to each lot upon which educational development charges are payable.
Please also be advised that specific rates applicable to each lot in the Plan of Subdivision
can be obtained by contacting, for the Township of Oro-Medonte, the Treasurer; for the
Simcoe-Muskoka Catholic District School Board, the Associate Director of Education; for the
Simcoe County District School Board, the Superintendent of Facility Services; and in the case
of the County of Simcoe, the County Clerk.
Also, please be advised that the above -referenced By -Laws enacted pursuant to the
Development Charaes Act. 1997 and Section 257.53 of the Education Act, R.S.O. 1990,
c.E.2, may be amended or superseded by subsequent By -Laws enacted in accordance with
the respective legislation.
(iv) Development Charges in accordance with the County of Simcoe's By-law at the rate
applicable, upon the issuance of the first building permit for each lot upon which
charges are payable.
[x7
fl 1
SCHEDULE"Ell
NOTE: It is understood and agreed that this Schedule forms part of the
Agreement between the TOWNSHIP OF ORO-MEDONTE AND
DEVELOPMENT CORPORATION
STANDARD TOWNSHIP LETTER of CREDIT (IRREVOCABLE)
DATE OF ISSUE:
NAME OF BANK:
ADDRESS OF BANK:
LETTER OF CREDIT NO.:
AMOUNT: $ 924,821.98
Subdivision
BRAESTONE
Except as otherwise expressly stated, this Letter of Credit is issued subject to the Uniform Customs
and Practices for Documentary Credits (1993 Revision), being ICC Publication No. UCP 500.
TO: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
P.O. Box 100, Oro-Medonte Ontario, LOL 2X0
We hereby authorize you to draw on the Bank of
Ontario, for the account of
up to an aggregate amount of ($$$$$$$$)
which is available on demand.
Pursuant to the request of our said customer, , we, the Bank of
, Ontario, , hereby establish and give to
you an Irrevocable Letter of Credit in your favour, in the above amount, which may be drawn on by
you at any time and from time to time, upon written demand for payment made upon us by you which
demand we shall honour without enquiring whether you have the right as between yourself and our
said customer to make such demand and without recognizing any claim of our said customer or
objection by them to payment by us.
Demand shall be by way of a letter signed by an authorized signing officer of the Corporation of the
Township of Oro-Medonte. The original Letter of Credit must be presented to us at: Bank of
Ontario, . The Letter of Credit, we understand,
relates to a Subdivision Aoreement between our said customer and the Corporation of the Township
of Oro-Medonte, with Mortaaae Comoanv. as a third party, regarding subdivision of
(property description)
The amount of this Letter of Credit may be reduced from time to time, as advised by notice in writing,
given to us by an authorized signing officer of the Corporation of the Township of Oro-Medonte.
44
e' )
Partial drawings shall be permitted. We hereby agree that partial drawings under this Letter of Credit
will be duly honoured upon demand.
This Letter of Credit will continue in force for a period of one year, but shall be subject to the condition
hereinafter set forth. It is a condition of this Letter of Credit that it shall be deemed to be automatically
extended without amendment from year to year, from the present or any future expiration date hereof,
unless at least thirty (30) days prior to the present, or any future expiration date, we notify you in
writing by registered mail that we elect not to consider this Letter of Credit to be renewable for any
additional period.
Dated at , Ontario, this day of 2020.
Authorized Signature
Bank of
Authorized Signature
45
Ara
eo'1
SCHEDULE "F"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
71 71 A_1.I»:19110711yo[e]
N/A
46
e' )
SCHEDULE"G"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION -
SERVICING WORKS TO BE CONSTRUCTED
Construction of storm sewers and appurtenances, watermain and appurtenances, including
service connections, all road works, including curbs and gutters in accordance with the
approved Engineering Drawings to service the Braestone Subdivision (Phase 2 Group E) in
the Township of Oro-Medonte.
C.C. Tatham & Associates Ltd.
INDEX
Dwg.No.
Description
TITLE PAGE
INDEX SHEET
1103059-7-PH-1
PHASING PLAN
1 51 M-
LEGAL PLAN
I
1103059-7-GS-1
GENERAL SERVICING PLAN
1103059-7-CS-2
GENERAL SERVICING PLAN
SILTATION AND EROSION CONTROL
103059-7-SC-2
SILTATION AND EROSION CONTROL
I
I103059-7-SC-1
103059-7-SC-7
SILTATION AND EROSION CONTROL DETAILS
1
103059-7-STM-1
STORM SEWER DRAINAGE PLAN
1
1103059-7-STM-2
STORM SEWER DRAINAGE PLAN
STORMWATER MANAGEMENT PLAN AND SECTIONS
I103059-7-SWM-1
103059-7-SWM-2
STORMWATER MANAGEMENT PLAN AND SECTIONS
103059-7-SWM-3
STORMWATER MANAGEMENT SECTIONS AND DETAILS
1103059-7-LG-2
LOT GRADING PLAN
1103059-7-LG-3
LOT GRADING PLAN
1103059-7-LG-4
LOT GRADING PLAN
1103059-7-LG-5
LOT GRADING PLAN
1103059-7-PP-11
PLAN AND PROFILE OLDENBURG COURT STA. 0+000 TO STA.
0+2601
1103059-7-PP-12
PLAN AND PROFILE OLDENBURG COURT STA 0+260 TO STA.
0+5261
PLAN AND PROFILE CLEVELAND COURT STA 0+000 TO STA,
0+181
I103059-7-PP-13
PLAN AND PROFILE CLEVELAND COURT EASEMENT
STA. 0+000 TO STA. 0+100
1
1103059-7-PP-17
PLAN AND PROFILE EASEMENT FRIESIAN COURT - OLDENBURG COURT 1
STA. 0+260 TO STA. 0+440
I103059-7-PP-19
PLAN AND PROFILE EASEMENT OLDENBURG COURT
STA 0+900 TO STA. 1+140
1103059-7-D-1
NOTES AND DErAILS
1103059-7-D-2
TOWNSHIP DETAILS
1103059-7-D-3
TOWNSHIP DETAILS
1103059-7-D-4
ONTARIO STANDARDS AND TOWNSHIP DETAILS
1103059-7-D-5
ONTARIO STANDARDS AND TOWNSHIP DETAILS
1
I103059-7-D-6
ONTARIO STANDARDS AND TOWNSHIP DETAILS
,
103059-7-WAT-1
WATER DISTRIBUTION AND SWABBING PLAN
1103059-7-WAT-2
WATER DISTRIBUTION AND SWABBING PLAN
jl
ILP-0
KEY PLAN
1
TREE PROTECTION AND COMPENSATION PLAN
1
ILP-2
LD-1
LANDSCAPE DErAILS
Note: The aforementioned drawings were stamped "Accepted for Construction" by the
Township's Engineering Consultant on January 9, 2020.
47
i,
SCHEDULE"H"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
ITEMIZED COST ESTIMATE OF SERVICING WORKS
The following list summarizes the cost estimate of the major servicing works, but is not
necessarily inclusive:
9RAP9T0lESOBDWLgON
Pfll4E2G�W ECOlG1RIIOIICN
faRstlib 100Gm
RFA1
SCOeJ�Y
dllanf 8 p1ftl
EsnIMTEG
sECLMY
sEC1Rltt
w.
DlscwlmoN
IBST
GUPNRIY
unrpwcE
AM31NT %coaelr=Te
AwuNr%
Aw�wr
atnHrstane couRrAz�D c+r=wwn carat
1As11EWOPoC
tat
SNyeNmw GWy9n �
tIm
SAW
sW.mw
0%
tm%
sb,mom
GmIYeHmwI1M501rYRe CM'SU.IMBd4
t93
ADm
39.65Ilm
afi
tm%
s9.8'am
IM
1.m
Tanpvar/SOaxBaetM1eQNm
tl
9
Sm
5f,350m
tm%
i1,35aW
t.a
fA.O Abt
m
t
nMmOW
5]mam
M Dx
tm%
ST,mOm
tW
ESmnlbno%GmO,g
R
Isms
SSm
St¢fi92`.A
o%
tm%
TSbdq%TmIDW
d SueR�Tq%o3
b)
m'
1S
5aW
�r.15]so
0%
fm%
s'f1.5AW
W.WM
d EmwdN16
m'
7
IAmT
S4m
Sta5.136m
Mi
1m16
if00
J)5[ogVlle SvpYn EaMOd
m'
d,511
559�5:
B13�m
O%
tm%
,MM
II611350
�
$Ilgdtld5lbwnb
SSr].]120a
3A RDPD'NCYiK
201
10amnaa SOa'an
t.am
Slim
515.3mm
a%
tm%
s
2m
GraYm13 "mmm)
m'
],+m
$IdW
51029mm
Ms
lm%
5ln1023mm
2m
Grs4N'A' (+mwn)
m'
5,190
39m
SSr,2nm
a%
tm%
SS;mlm
20s
l'mvHx ORaap GNg
m
I,Om
SM,m01a1
0%
lm%
Aam4m
2m
Rm(]xuseAyO.Yltli tmmml
m'
S.110
stS
Mi
tm%
S IMIX
Sufda CousaPsgMK-3 (e0nm)
m'
5,110
wom
Stow
W1.1mm
55f 1mm
0%
lm%
551,tmm
Z07
ear
A91Y4ta SpitdaA
2
SZW-%
Si5Gm
0%
fm%
SlSam
zm
Gmae,Tmlamesm llmsersa
m
7.60
nca
o%
tm%
�z 3>sma]sm
smlIXa o+RRawIXa
10 WATErUWN
101
150mm LLV F'YCWJmn90
m
m5
mftm
slm
a%
1m
stm.550m
3W
150mm61Ctlb
m
3
MNA
sl+.tm.m
MA
tm%
5++.+mm
3m
HyEmfl,vOSBdtlL
d
atmm
SA.b
0%
I"
sza"M
3W
H%1'ilL viMitllsgOlv6ROrce
m
1
vmm
54maM
0%
tm%
545mm
3m
19nm Gn aeMre
m
S20mm
55l
0%
tOMs
SSt.000W
3m
RSNab TNO%IhY
m
1
St 0t1I0
52500m
MS
1m%
0M
3l1]
AubmlYcFldl%r
m
t
55imW
SSSmm
0%
tm%
54. sffim
suRnwawNdman svIXa3
s2TaMam
s27a5sDm
dSEWER
441
d1)t
3mfR116y5Gm^aa
m
1m
SJm.m
S4r,W000
M6
i1r,W000
6a9
m
]85
s315m
3fl9.mfl35
0%
IIffi%"
tm%
4M
lm
pn
4 CSPCIfm1
d03
S3lim
ROAM
0%
tW%
r
ad
Btl%ntxfi00mn CiHIbY11
X
m
3
3
Si.S➢Om
5171 3
G%
w
s+amaW
;0.
d.M
Bmmmxtd4amn Doke GYttldln
3
ES]m00
Sffl
OIL
1m
tm%
$1r, m
dm
1a0ommav cltrMtsneLnwle
5
s46W00
SujSnm
Mn
tm%
5332mm
dn]
tm4mm dp.IYt.Ise�fAVDNe
m
a
sta Roam
SdNMM IXSYnn SewvWdb
S)31As1]5
5]XOs]5
50N9f1QR3
EASOAENr(YEVHANOfdIRT LOT,P11
SA1
15amm Tar0xm
rtT
tm
Stcm
s5,ffim
0%
tm%
545mm
Sm
+AlIA01TRMd3ssmlKticfaml.Y1
mt
+m
slsm
x.sonao
a%
tm%
sd,m0m
S.m
3.OmM sfnb
m
1
32500W
SrmDm
0%
tm%
sl,5mm
OIDFI@IIRG
COUTT LDT 1 PR
5M
RSOLt. Simm Smer
m
Ssmm
S+S,Smm
0%
lm%
51s0mm
5W
Hm3m3LOx Glde
m
1
ES,W5A
S
M6
s
5m
15OnmT s A
52 Mffl
0%
tm%
IW%
1ffi
5A]
LvmolTRMd35byntiv<c FaxoAbl
m'
I
1M
S15.m
UM
w
53.302m
0%
1m%
sam2m
$%X2
S.M
30m Actas CUY
1
S2m0.m
52,m0.m
0%
tm%
SLm4m
Sm
30x00m-2mmm as RgRi
m'
24
Slam
5T20.m
0%
tm%
Sr1Ilm
DLDETbtRlG
cotrar 1a2P21
tm%
510
U"Yltl WltlimsN
t
Si w
2 mtm
a%
tm%
ASmm
Stt
Im% WT wm0�
I
SIMM
Sr3.t00.00
0%
IM%
SA.tmm
5.12
15 .To
A3
535m
Sr.105m
O%
1M16
A.10W
5.13
limJk TRMd353mNRICHLI016t
mx
dt
5 m
31,& w
Ms
tm%
31M&
514
3Om KmLS 0010
m
1
$ffim
7-2
SWtdYd BaenblN6
SiOAJSm
OSm
60M T"�4`:ED
6M
k'
SKtVStt¢NSkK
m'
3
SYIlm
SI.MOm
V6
tm%
S1.MDm
6m
SOeRiblis
3
SS.WOW
51Smam
0%
tm%
m
Bm
DRem-0'Fiw.slm ClW CJVHI
m
8
Stymm
0%
tm%
S1Admm
$KS
401
SOeetTmc
m'
2r
SCi00
""A w
S,f.dr5m
a%
im%
S1t drSm
51Etdtl aCil30111N1b
511.12Sm
fdS92im
SIEroW 11s
s+x5mc2s
s,x5Dm2s
fo%manlwl r
sfxusn
sf3asaan
115TNf%
s134da1s
s114seaes
TOYI
SyT21,82tz
51.TH.SJr.+2
LETIER OF LAH%r
REdIHI®
9dmp1(lm%tlesblYlmov%)
51.3fl5,09Li5
PIia
CVHga y110%)
SllB.504N
Rusl6r113%)
319C0646s
{g
Pma.c WSmvHmH GYTOYNYp
SA 14
TOTA RE IREDSMtMIES
MR111R
MVWAGREE
SSr1.s2m
Wh
r'1
LETTER OF CREDIT REQUIRED
Subtotal (100% of estimated costs)
Plus contingency (10%)
Plus HST (13%)
Less pre -servicing securities held by Township
TOTAL REQUIRED SECURITIES
FOR SUBDIVISION AGREEMENT
$ 1,385,098.25
138,509.83
198,069.05
796,855.14
$ 924,821.98
W
W
��d:I�Zq��HYi
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
DECLARATION OF PROGRESS AND COMPLETION
SUBDIVISION
DEVELOPER
CONSULTING ENGINEER
As required by the Agreement between the CORPORATION OF THE TOWNSHIP OF ORO-
MEDONTE AND BRAESTONE DEVELOPMENT CORPORATION
The Developer(s) dated
The Developer hereby agrees and undertakes to complete the construction of the
Municipal Servicing Works as required by the above -mentioned Agreement in
accordance with the time schedule for the completion of services as approved by the
Township's Engineering Consultant and/or Manager, Development Engineering and
more specifically in accordance with the following schedule and conditions:
Note: Before any building erected on the lots or blocks in the Plan are occupied all the
Requirements for Occupancy, as set out in Clause 7.1, shall be complied with.
On or Before
a) Sanitary Sewers and Lateral Service Connections
b) Water Main and Servicing Connections
c) Stormwater Management Pond
d) Storm Sewers / Ditches / Basins
e) Road Base - Granular "B" and Granular "A"
f) Base Lift of Asphalt on or before
g) Installation and Energization of Streetlighting
h) Black Vinyl Chain Link Fencina
Landscaping / Street Trees
j) Parkland Servicing
2. The Developer further agrees that the Township is hereby authorized to carry out, at
his expense, any of the work set out in this Declaration not finished on or before the
completion dates, to be commenced not sooner than one week following such
completion date, it being understood and agreed that the Township's authorization is
limited only to that work required under the Declaration;
50
r�l i'1
The Developer further agrees to shall apply calcium or other Ministry of the
Environment and Climate Change approved dust suppressant to those roads within
the subdivision and/or utilized by construction traffic, that have not had asphalt
surfaces applied, in quantities sufficient to prevent any dust problem to traffic or home
occupants, and further to undertake water flushing and mechanical sweeping and
cleaning to those roads within the subdivision and/or utilized by construction traffic,
that have had asphalt surfaces applied, sufficient to prevent any dust problem or mud
tracking to traffic or home occupants, to the satisfaction of the Township until the
Certificate of Final Acceptance and Assumption has been issued.
4. The Developer further agrees and the Township is hereby authorized to undertake any
of the maintenance work as set out under Item 3 hereof, not completed by the
Developer within 24 hours after receipt of such request for maintenance, at his
expense, and without limiting the generality of the foregoing, the Township's cost shall
be the cost of materials, equipment rental, labour, payroll burden, plus 20% for
overhead;
5. It is understood and agreed that should the Developer fail to construct the remaining
services to carry out the requirements of Item 3 as stipulated, and by such dates and
within such time limits as provided by this undertaking, the Developer, notwithstanding
the costs noted in Section 4, shall pay to the Township, as predetermined liquidated
damages, the sum of TWO HUNDRED DOLLARS ($200.00) for each and every
calendar day the said services are behind schedule of construction provided such
delay is not caused by strikes or acts of God or additional work being required by the
Township.
BRAESTONE tt
ORPORATION
Per
J. David Bunston
Title Treasurer
I have authority to bind the Corporation
Seal or Witness Date
51
i'1
SCHEDULE "J"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
WINTER ROAD MAINTENANCE
Winter Road Maintenance shall include; snow plowing, sanding, salting, snow removal
and any other winter maintenance operations, undertaken in a time frame and at the
appropriate service level to ensure safe use of the public highway and, at a minimum,
in the same manner as the Municipality removes snow and ice from its public
highways.
Winter Road Maintenance shall only be carried out by the Township:
1. At times deemed by the Township to be an emergency under authority of section
6.14 ("emergency works"); or
2. Under the terms of a separate agreement whereby the Township is contracted to
undertake such maintenance as the Developer's agent (an "Unassumed
Subdivision Road Winter Maintenance Agreement").
The Developer agrees that it shall pay the Municipality for undertaking such
emergency work at the rates articulated in the "Unassumed Subdivision Road Winter
Maintenance Agreement" and such amounts shall be paid by the Developer within
thirty (30) days of the date of billing. Payment for non -emergency work shall be in
accordance with the terms of an Unassumed Subdivision Road Winter Maintenance
Agreement).
The Developer agrees that failure to pay for such emergency work or work conducted
under an Unassumed Subdivision Road Winter Maintenance Agreement shall entitle
the Municipality to realize upon any cash deposits or security lodged under this
Agreement in accordance with the procedures outlined in Parts 4 and 9 of this
Agreement and/or such Unassumed Subdivision Road Winter Maintenance
Agreement.
It is agreed by the Developer that should damage or interference with the municipal
servicing works of the Developer by the Township undertaking emergency winter road
maintenance, the Developer will make no claims against the Township for such
interference or damage, providing the work is carried out in a normal and reasonable
manner.
Where the Township undertakes Winter Road Maintenance under an Unassumed
Subdivision Road Winter Maintenance Agreement the Municipality's liability for
damage to municipal servicing works of the Developer shall be identified therein.
It is agreed by the Developer that emergency winter control operations or work under
an Unassumed Subdivision Road Winter Maintenance ent shall not prejudice
the Township's rights to enforce the maintenance ro s an Substantial
Completion and Maintenance or Final Acceptanc an As p ' provisions in this
agreement.
Per
J. David Bunston
Title Treasurer
I have authority to bind the Corporation
Seal or Witness Date
52
SCHEDULE"K"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
MASTER MONITORING DOCUMENT
The Developer shall collect baseline data respecting groundwater and surface water in
accordance with the "Master Monitoring Document Buffalo Springs Property" prepared by
Michalski Nielsen Associates Limited, dated January 2006.
The Developer shall develop a long term monitoring program to the satisfaction of the
Ministry of Natural Resources to be administered by an Environmental Committee and
prepared in accordance with the "Monitoring Program — Environmental Impact Study
SabistonNaldoro and Buffalo Springs Development' prepared by Michael Michalski
associates on October 11, 1994.
The Developer has obtained approval from the Ministry of Natural Resources by their letter
dated July 16, 2009, in which the Ministry has approved the 2008 Master Monitoring
Document dated December 2008 (Revised July 2009), which fulfills the Ontario Municipal
Board condition and in which the developer shall comply with.
53
rAd
r•1
SCHEDULE"L"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
LIST OF LOTS REQUIRING SPECIAL ATTENTION
1.0 Septic tile beds are not to be constructed within the steep slope limits (slopes
greater than 15%), as indicated on the Engineering Drawings.
2.0 The following lots adjacent to wetland areas may require mantles: Lots 10-27.
3.0 The limits of the 20 metre buffer from the wetland and limit of tree protection on
Lots 10-27 with no development being permitted within these limits, and that these
Lots be subject to Site Plan Control under Section 41 of the Plannina Act.
Permanent markers will be placed at the intersection of the side lot line and/or near
lot line and the line denoting the limits of the wetland buffer or limit of tree
protection, whichever is the greater, as per approved Landscape Plans (Dwg. LP-2
by EnvisionTatham as Approved for Construction by the Township's Engineering
Consultant on January 9, 2020).
4.0 Site Plans for Lots 10-27 shall be submitted to the Township and MNR for approval
showing the following information:
• The location of building envelopes;
• The location of primary and reserve tile fields;
• The location of laneways and parking areas;
• The location of lands which have a slope greater than 15%;
• The location of swimming pools and tennis courts, or any other proposed
structure or facility;
• The location of the wetland buffer;
• The extent of forest cover to be maintained on the lot;
• The location of the marker or monument identifying the limits of the wetland
buffer or limit of tree protection, whichever is the greater; and
Any Offer of Purchase and Sale for Lots listed above shall contain a clause which
states that the Lots are subject to Site Plan Control under Section 41 of the
Plannina Act. and that development will not be permitted on the Lots until a Site
Plan Agreement has been entered into between the municipality and the Owner of
the Lot.
54
r'1
SCHEDULE"M"
NOTE: It is understood and agreed that this Schedule forms part of the Subdivision
Agreement between the TOWNSHIP OF ORO-MEDONTE AND BRAESTONE
DEVELOPMENT CORPORATION
FORM OF NO OCCUPANCY AGREEMENT
THIS AGREEMENT made in duplicate this _ day of 2020
BETWEEN:
(hereinafter called the "Owner")
OF THE FIRST PART
AND: THE CORPORATION OF THE TOWNSHIP OF ORO
-MEDONTE
(hereinafter called the "Township")
OF THE SECOND PART
WHEREAS the Owner represents that it is the owner of the lands hereinafter described (under
an agreement to purchase the lands from by reasons of an agreement dated the day of
, 2020.).
AND WHEREAS the lands hereinafter described form part of a Plan of Subdivision (Plan No.
51M- ) covered by a Subdivision Agreement between (Owner) and the Township, dated
12020.
AND WHEREAS the said Subdivision Agreement provides that the building permits may be
issued prior to roads and other municipal services being fully completed in accordance with the
terms of the Subdivision Agreement upon certain conditions.
NOW THEREFORE THIS AGREEMENT WITNESSETH that in consideration of the Township
issuing a building permit for the completion of a dwelling on Lot as shown on a plan
registered in the Registry Office for the Registry Division of the County of Simcoe as Number
or as shown on Plan files in the Land Titles Office of the County of Simcoe at Barrie as Parcel
Number , the Owner for itself, its heirs, executors, administrators and assigns, hereby
convenants and agrees that it will not occupy or permit anyone else to occupy the said dwelling
or any part thereof until all the Underground Services and roads as required in the Subdivision
Agreement, have been constructed, installed and provided, and have been accepted by the
Township and its Engineer, and the travelled surface has been constructed to the satisfaction
of the Township's Engineer, and the travelled surface has been constructed to the satisfaction
of the Township's Engineering Consultant and/or Manager, Development Engineering
pursuant to the Subdivision Agreement and adequate provisions have been made to provide
for surface drainage and a satisfactory dust preventative has been applied.
The Owner further covenants that it is the owner of the lands hereinbefore referred to.
The Owner convenants that this Agreement may be registered against the said lands.
The Owner further covenants to pay a cash or bond deposit to the ownership upon execution
of this Agreement which will be forfeited to the Township if occupancy is allowed by the
Owner in contravention of this Agreement or the Subdivision agreement and the Owner
agrees to pay the cost of registration and to pay the Township for discharge of this
Agreement.
W
n
IN WITNESS WHEREOF the parties hereto have executed this Agreement and have
hereunto caused to be affixed the corporate seals, duly attested to by the proper signing
officers. _ �,Q,
SIGNED, SEALED AND DELIVERED this �� ay of dwl--,I �"" `2020.
v
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
Per
AMavorhs
Title
Per
ubichon
Title Clerk
BRAEST N D E ENT CORPORATION
Per
J. David Bunston
Title Treasurer
I have the Authority to bind the Corporation
56
LRO # 51 Application For Inhibiting Order -Land
The applicant(s) hereby applies to the Land Registrar.
Properties
Receipted as SC1735076 on 2020 12 02 at 13:49
yyyy mm dd Page 1 of 2
PIN 58532 - 0303 LT ✓� Redescription
Description LOTS 1 TO 27 INCLUSIVE AND BLOCKS 28 TO 32 INCLUSIVE, PLAN 51M1191;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND
MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST
WITHIN, UPON OR UNDER SUCH LANDS; T/W FULL POWER TO WORK THE SAME AND
FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO
MUCH THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078;
SUBJECT TO AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO,
PART 1 PLAN 5IR40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS IN
SC1631380; TOWNSHIP OF ORO-MEDONTE
Address ORO
IApplicant(s)
Name THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
Address for Service 148 Line 7 South
Oro-Medonte ON LOL 2E0
This document is being authorized by a municipal corporation by its Director of Development Services, Andria Leigh.
This document is not authorized under Power of Attorney by this party.
Statements
The Municipality/applicant applies for an entry inhibiting any dealing with the property until the following Until the documents set out in
Schedule A attached hereto have been registered.
Schedule: See Schedules
I Signed By
Klaus Nick Jacoby 34 Clapperton St. acting for Signed 2020 12 02
Barrie Applicant(s)
L4M 3E7
Tel 705-726-0238
Fax 705-726-9197
1 have the authority to sign and register the document on behalf of the Applicant(s).
ISubmitted By
Jacoby Arkell Professional Corporation
Tel 705-726-0238
Fax 705-726-9197
IFees/Taxes/Payment
Statutory Registration Fee
Total Paid
IFile Number
Applicant Client File Number
JK-25918
34 Clapperton St.
Barrie
L4M 3E7
$65.30
$65.30
I
2020 12 02
THE LAND TITLES ACT
Section 23 of the Act
APPLICATION BY A MUNICIPALITY FOR INHIBITING ORDER
To: The Land Registrar for the Land Titles Division of Simcoe (No. 51)
I, ANDRIA LEIGH, Director of Development Services of The Corporation of the Township of
Oro-Medonte, hereby certify that BRAESTONE DEVELOPMENT CORPORATION, the registered
owner of Part of East and West Halves Lot 2, Concession 9 Oro, Oro-Medonte
being the land laid out by a plan of subdivision prepared by Paul R. Thomsen, an Ontario Land
Surveyor, dated September 9, 2020 and being Part of PIN 58532-0303 LT, Township of Oro-
Medonte, County of Simcoe
has not executed and is not under any obligation to execute any Transfer of Land or Transfer
of Easement or any agreement affecting the title to the said land in favour of The Corporation
of the Township of Oro-Medonte which has not been registered at the date thereof, except
the following:
Notice of Subdivision Agreement in favour of The Corporation of the Township of Oro-
Medonte relating to Lots 1 to 27 inclusive and Blocks 28 to 32 inclusive;
Postponement of Interest of Charge No. SC1644210 and related Notice No. SC1644211 to
the said Notice of Subdivision Agreement as to Lots 1 to 27 inclusive and Blocks 28 to 32
inclusive;
Postponement of Interest of Charge No. SC1661081 and related Notice No. SC1661082 to
the said Notice of Subdivision Agreement as to Lots 1 to 27 inclusive and Blocks 28 to 32
inclusive;
Transfer in fee simple in favour of The Corporation of the Township of Oro-Medonte of
Block 28;
Partial Discharge of Charge No. SC1644210 and related Notice No. SC1644211, releasing
Block 28;
Partial Discharge of Charge No. SC1661081 and related Notice No. SC1661082, releasing
Block 28;
Transfer in fee simple in favour of The Corporation of the Township of Oro-Medonte of
Blocks 29 to 31 inclusive;
Partial Discharge of Charge No. SC1644210 and related Notice No. SC1644211, releasing
Blocks 29 to 31 inclusive;
Partial Discharge of Charge No. SC1661081 and related Notice No. SC1661082, releasing
Blocks 29 to 31 inclusive;
Transfer Easement in favour of The Corporation of the Township of Oro-Medonte over Lots
18 and 19;
Postponement of Interest of Charge No. SC1644210 and related Notice No. SC1644211, to
the said Transfer Easement over Lots 18 and 19.
Postponement of Interest of Charge No. SC1661081 and related Notice No. SC1661082 to
the said Transfer Easement over Lots 18 and 19.
Lots 1 to 27 inclusive and Blocks 28 to 32 inclusive referred to above are all according to
Registered Plan 51M1191.
And as to the Lots and Blocks mentioned above, The Corporation of the Township of Oro-
Medonte hereby requests you to issue an Order or make an entry under Section 23 of the
Land Titles Act inhibiting any dealing with those Lots and Blocks until the instruments
mentioned above have been registered.
rid
LRO If 51 Transfer
w
Receipted as SC1735318 on 2020 12 03 at 10:02
The applicant(s) hereby applies to the Land Registrar.
IFees/Taxes/Payment
Statutory Registration Fee $65.30
Provincial Land Transfer Tax $0.00
Total Paid $65.30
( File Number
Transferee Client File Number: JK-25918
yyyy mm dd Page 2 of 4
r'` 100*�
LAND TRANSFER TAX STATEMENTS
In the matter of the conveyance of: 58532-0303 BLOCK 28, PLAN 51 M1191;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES
AND MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE
FOUND TO EXIST WITHIN, UPON OR UNDER SUCH LANDS; T/W FULL POWER
TO WORK THE SAME AND FOR THIS PURPOSE TO ENTER UPON, USE AND
OCCUPY THE SAID LANDS OR SO MUCH THEREOF AND TO SUCH EXTENT AS
MAY BE NECESSARY FOR THE EFFECTUAL WORKING AND EXTRACTING OF
THE SAID MINERALS, AS DESCRIBED IN ORO17078; SUBJECT TO AN
EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO, PART 1
PLAN 51 R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS
IN SC1631380; TOWNSHIP OF ORO-MEDONTE
BY: BRAESTONE DEVELOPMENT CORPORATION
TO: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Registered Owner
1. ANDRIA LEIGH
lam
❑ (a) A person in trust for whom the land conveyed in the above -described conveyance is being conveyed;
❑ (b) A trustee named in the above -described conveyance to whom the land is being conveyed;
❑ (c) A transferee named in the above -described conveyance;
(d) The authorized agent or solicitor acting in this transaction for THE CORPORATION OF THE TOWNSHIP
OF ORO-MEDONTE described in paragraph(s) (c) above.
❑ (e) The President, Vice -President, Manager, Secretary, Director, or Treasurer authorized to act for
described in paragraph(s) L) above.
❑ (f) A transferee described in paragraph (_) and am making these statements on my own behalf and on behalf
of who is my spouse described in paragraph (_) and as such, I have personal knowledge of the facts
herein deposed to.
3. The total consideration for this transaction is allocated as follows:
4.
(a) Monies paid or to be paid in cash
$2.00
(b) Mortgages (i) assumed (show principal and interest to be credited against purchase price)
$0.00
(ii) Given Back to Vendor
$0.00
(c) Property transferred in exchange (detail below)
$0.00
(d) Fair market value of the land(s)
$0.00
(a) Liens, legacies, annuities and maintenance charges to which transfer is subject
$0.00
(f) Other valuable consideration subject to land transfer tax (detail below)
$0.00
(g) Value of land, building, fixtures and goodwill subject to land transfer tax (total of (a) to (f))
$2.00
(h) VALUE OF ALL CHATTELS -items of tangible personal property
$0.00
(i) Other considerations for transaction not included in (g) or (h) above
$0.00
0) Total consideration
$2.00
Explanation for nominal considerations:
g) Transfer to a municipality pursuant to subdivision or development agreement, condominium approval or other municipal
purposes: Transfer Block 28 to Township as an Open Space Block
5. The land is subject to encumbrance
6. Other remarks and explanations, if necessary.
1. The information prescribed for purposes of section 5.0.1 of the Land Transfer Tax Act is not required to be provided for this
conveyance.
2. The transferee(s) has read and considered the definitions of "designated land", "foreign corporation", "foreign entity", "foreign
national', "specified region' and "taxable trustee" as set out in subsection 1(1) of the Land Transfer Tax Act. The transferee(s)
declare that this conveyance is not subject to additional tax as set out in subsection 2(2.1) of the Act because:
3. (b) This is not a conveyance of "designated land".
4. The transferee(s) declare that they will keep at their place of residence in Ontario (or at their principal place of business in
Ontario) such documents, records and accounts in such form and containing such information as will enable an accurate
determination of the taxes payable under the Land Transfer Tax Act for a period of at least seven years.
5. The transferee(s) agree that they or the designated custodian will provide such documents, records and accounts in such form
and containing such information as will enable an accurate determination of the taxes payable under the Land Transfer Tax Act, to
the Ministry of Finance upon request.
PROPERTY Information Record
A. Nature of Instrument: Transfer
LRO 51 Registration No. SC1735318 Date: 2020/12/03
B. Property(s): PIN 58532 - 0303 Address ORO Assessment -
Roll No
C. Address for Service: 148 Line 7 South
Oro-Medonte ON LOL 2EO
D. (i) Last Conveyance(s): PIN 58532 - 0303 Registration No. SC1671532
(ii) Legal Description for Property Conveyed: Same as in last conveyance? Yes ❑ No ✓❑ Not known 0
r^
LAND TRANSFER TAX STATEMENTS
w
E. Tax Statements Prepared By: Klaus Nick Jacoby
34 Clapperton St.
Barrie 1-41VI 3E7
LRO # 51 Transfer
Receipted as SC1735321 on 2020 12 03 at 10:02
The applicant(s) hereby applies to the Land Registrar.
yyyy mm dd Page 1 of 4
IProperties
PIN 58532 - 0303 LT InteresUEstate Fee Simple W Split
Description BLOCKS 29,30 AND 31, PLAN 51M1191;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND
MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST
WITHIN, UPON OR UNDER SUCH LANDS; T/W FULL POWER TO WORK THE SAME AND
FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO
MUCH THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078;
SUBJECT TO AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO,
PART 1 PLAN 5IR40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS IN
SC1631380; TOWNSHIP OF ORO-MEDONTE
Address ORO
IConsideration
Consideration $2.00
Transferor(s)
The transferor(s) hereby transfers the land to the transferee(s).
Name BRAESTONE DEVELOPMENT CORPORATION
Address for Service 500-85 Bayfield Street
Barrie ON L4M 3A7
I, J. David Bunston, Treasurer, have the authority to bind the corporation.
This document is not authorized under Power of Attorney by this party.
ITransferee(s) Capacity
Name THE CORPORATION OF THE TOWNSHIP OF ORC- Registered Owner
MEDONTE
Address for Service 148 Line 7 South
Oro-Medonte ON LOL 2E0
IStatements
The registration of this document is not prohibited by registration SC1735076 registered on 2020/12/02.
I Signed By
Kenneth Edward Bailey 85 Bayfield Street Suite 500 acting for
Barrie Transferor(s)
L4M 3A7
Share
I
Signed 2020 12 03
Tel 705-792-9279
Fax 705-730-1059
1 am the solicitor for the transferor(s) and I am not one and the same as the solicitor for the transferee(s).
I have the authority to sign and register the document on behalf of the Transferor(s).
Klaus Nick Jacoby 34 Clapperton St. acting for Signed 2020 12 02
Barrie Transferee(s)
L4M 3E7
Tel 705-726-0238
Fax 705-726-9197
1 am the solicitor for the transferee(s) and I am not one and the same as the solicitor for the transferor(s).
I have the authority to sign and register the document on behalf of the Transferee(s).
I Submitted By
Kenneth E. Bailey Professional Corporation
Tel 705-792-9279
Fax 705-730-1059
85 Bayfield Street Suite 500
Barrie
L4M 3A7
1
2020 12 03
LRO # 51 Transfer
i'1
Receipted as SC1735321 on 2020 12 03 at 10:02
The applicant(s) hereby applies to the Land Registrar.
Fees/Taxes/Payment
Statutory Registration Fee $65.30
Provincial Land Transfer Tax $0.00
Total Paid $65.30
IFile Number
Transferee Client File Number: JK-25918
yyyy mm dd Page 2 of 4
W
LAND TRANSFER TAX STATEMENTS
In the matter of the conveyance of: 58532-0303
BLOCKS 29, 30 AND 31, PLAN 51 M1191;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES
AND MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE
FOUND TO EXIST WITHIN, UPON OR UNDER SUCH LANDS; T/W FULL POWER
TO WORK THE SAME AND FOR THIS PURPOSE TO ENTER UPON, USE AND
OCCUPY THE SAID LANDS OR SO MUCH THEREOF AND TO SUCH EXTENT AS
MAY BE NECESSARY FOR THE EFFECTUAL WORKING AND EXTRACTING OF
THE SAID MINERALS, AS DESCRIBED IN ORO17078; SUBJECT TO AN
EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO, PART 1
PLAN 51R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS
IN SC1631380; TOWNSHIP OF ORO-MEDONTE
BY: BRAESTONE DEVELOPMENT CORPORATION
TO: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Registered Owner
1. ANDRIA LEIGH
lam
❑ (a) A person in trust for whom the land conveyed in the above -described conveyance is being conveyed;
❑ (b) A trustee named in the above -described conveyance to whom the land is being conveyed;
❑ (c) A transferee named in the above -described conveyance;
✓❑ (d) The authorized agent or solicitor acting in this transaction for THE CORPORATION OF THE TOWNSHIP
OF ORO-MEDONTE described in paragraph(s) (c) above.
❑ (a) The President, Vice -President, Manager, Secretary, Director, or Treasurer authorized to act for
described in paragraph(s) (_) above.
❑ (f) A transferee described in paragraph (_) and am making these statements on my own behalf and on behalf
of who is my spouse described in paragraph U and as such, I have personal knowledge of the facts
herein deposed to.
3. The total consideration for this transaction is allocated as follows:
4.
(a) Monies paid or to be paid in cash
$2.00
(b) Mortgages (i) assumed (show principal and interest to be credited against purchase price)
$0.00
(it) Given Back to Vendor
$0.00
(c) Property transferred in exchange (detail below)
$0.00
(d) Fair market value of the land(s)
$0.00
(a) Liens, legacies, annuities and maintenance charges to which transfer is subject
$0.00
(f) Other valuable consideration subject to land transfer tax (detail below)
$0.00
(g) Value of land, building, fixtures and goodwill subject to land transfer tax (total of (a) to (f))
$2.00
(h) VALUE OF ALL CHATTELS -items of tangible personal property
$0.00
(i) Other considerations for transaction not included in (g) or (h) above
$0.00
Q) Total consideration
$2.00
Explanation for nominal considerations:
g) Transfer to a municipality pursuant to subdivision or development agreement, condominium approval or other municipal
purposes: Transfer Blocks 29, 30 and 31 to Township as Drainage and Watermain Blocks
5. The land is subject to encumbrance
6. Other remarks and explanations, if necessary.
1. The information prescribed for purposes of section 5.0.1 of the Land Transfer Tax Act is not required to be provided for this
conveyance.
2. The transferee(s) has read and considered the definitions of "designated land" "foreign corporation", "foreign entity", "foreign
national", "specified region" and "taxable trustee" as set out in subsection 1(1) of the Land Transfer Tax Act. The transferee(s)
declare that this conveyance is not subject to additional tax as set out in subsection 2(2.1) of the Act because:
3. (b) This is not a conveyance of "designated land".
4. The transferee(s) declare that they will keep at their place of residence in Ontario (or at their principal place of business in
Ontario) such documents, records and accounts in such form and containing such information as will enable an accurate
determination of the taxes payable under the Land Transfer Tax Act for a period of at least seven years.
5. The transferee(s) agree that they or the designated custodian will provide such documents, records and accounts in such form
and containing such information as will enable an accurate determination of the taxes payable under the Land Transfer Tax Act, to
the Ministry of Finance upon request.
PROPERTY Information Record
A. Nature of Instrument: Transfer
LRO 51 Registration No. SC1735321 Date: 2020/12/03
B. Property(s): PIN 58532 - 0303 Address ORO Assessment -
Roll No
C. Address for Service: 148 Line 7 South
Oro-Medonte ON LOL 2E0
D. (i) Last Conveyance(s): PIN 58532 - 0303 Registration No. SC1671532
(ii) Legal Description for Property Conveyed: Same as in last conveyance? Yes ❑ No ✓❑ Not known ❑
w
LAND TRANSFER TAX STATEMENTS
E. Tax Statements Prepared By: Klaus Nick Jacoby
34 Clapperton St.
Barrie L4M 3E7
LRO # 51 Transfer Easement
The applicent(s) hereby applies to the Land Registrar.
11 1
Receipted as S� 1739380 on 2020 12 16 at 13:44
yyyy mm dd Pagel of 5
1 Properties
PIN 58532 - 0303 LT Interest/Estate Easement ✓❑ Add Easement
Description PT LOTS 18 & 19, PLAN 51 Ml191 BEING PTS 1 & 2 ON PL 51 R-42731;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND
MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST
WITHIN, UPON OR UNDER SUCH LANDS; T/W FULL POWER TO WORK THE SAME AND
FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO
MUCH THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078;
SUBJECT TO AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO,
PART 1 PLAN 51 R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS IN
SC1631380; TOWNSHIP OF ORO-MEDONTE
Address ORO
iConsideration
Consideration $2.00
Transferor(s)
The transferors) hereby transfers the easement to the transferee(s).
Name BRAESTONE DEVELOPMENT CORPORATION
Address for Service 500-85 Bayfield Street
Barrie ON L4M 3A7
I, J. David Bunston, Treasurer, have the authority to bind the corporation.
This document is not authorized under Power of Attorney by this party.
ITransferee(s)
Capacity
Name
THE CORPORATION OF THE TOWNSHIP OF ORO-
MEDONTE
Address for Service
148 Line 7 South
Oro-Medonte ON LOL 2E0
Statements
Schedule: See Schedules
The registration of this document is not prohibited by registration SC1735076 registered on 2020/12/02.
1 Signed By
Kenneth Edward Bailey 85 Bayfield Street Suite 500 acting for
Barrie Transferor(s)
L4M 3A7
Tel 705-792-9279
Fax 705-730-1059
1 have the authority to sign and register the document on behalf of the Transferor(s).
Klaus Nick Jacoby 34 Clapperton St. acting for
Barrie Transferee(s)
L4M 3E7
Tel 705-726-0238
Fax 705-726-9197
1 have the authority to sign and register the document on behalf of the Transferee(s).
1 Submitted By
Kenneth E. Bailey Professional Corporation
Tel 705-792-9279
Fax 705-730-1059
IFees/Taxes/Payment
85 Bayfield Street Suite 500
Barrie
L4M 3A7
Signed
Signed
Share
1
2020 12 16
2020 12 16
1
2020 12 16
Statutory Registration Fee $65.30
r^
LRO # 51 Transfer Easement
The applicant(s) hereby applies to the Land Registrar.
r'1
Receipted as Si.1739380 on 2020 12 16 at 13:44
yyyy mm dd Page 2 of 5
IFees/Taxes/Payment
Provincial Land Transfer Tax
Total Paid
IFile Number
Transferee Client File Number: JK-25918
$0.00
$65.30
LAND TRANSFER TAX STATEMEK _
In the matter of the conveyance of: 58532-0303 PT LOTS 18 & 19, PLAN 51 M1191 BEING PTS 1 & 2 ON PL 51 R-42731;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES
AND MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE
FOUND TO EXIST WITHIN, UPON OR UNDER SUCH LANDS; TM/ FULL POWER
TO WORK THE SAME AND FOR THIS PURPOSE TO ENTER UPON, USE AND
OCCUPY THE SAID LANDS OR SO MUCH THEREOF AND TO SUCH EXTENT AS
MAY BE NECESSARY FOR THE EFFECTUAL WORKING AND EXTRACTING OF
THE SAID MINERALS, AS DESCRIBED IN ORO17078; SUBJECT TO AN
EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO, PART 1
PLAN 51 R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS
IN SC1631380; TOWNSHIP OF ORO-MEDONTE
BY: BRAESTONE DEVELOPMENT CORPORATION
TO: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
1. ANDRIA LEIGH
lam
❑ (a) A person in trust for whom the land conveyed in the above -described conveyance is being conveyed;
❑ (b) A trustee named in the above -described conveyance to whom the land is being conveyed;
❑ (c) A transferee named in the above -described conveyance;
❑.i (d) The authorized agent or solicitor acting in this transaction for THE CORPORATION OF THE TOWNSHIP
OF ORO-MEDONTE described in paragraph(s) (c) above.
❑ (a) The President, Vice -President, Manager, Secretary, Director, or Treasurer authorized to act for
described in paragraph(s) (_) above.
❑ (f) A transferee described in paragraph (_) and am making these statements on my own behalf and on behalf
of _ who is my spouse described in paragraph (_) and as such, I have personal knowledge of the facts
herein deposed to.
3. The total consideration for this transaction is allocated as follows:
4.
(a) Monies paid or to be paid in cash
$2.00
(b) Mortgages (i) assumed (show principal and interest to be credited against purchase price)
$0.00
(ii) Given Back to Vendor
$0.00
(c) Property transferred in exchange (detail below)
$0.00
(d) Fair market value of the land(s)
$0.00
(a) Liens, legacies, annuities and maintenance charges to which transfer is subject
$0.00
(f) Other valuable consideration subject to land transfer tax (detail below)
$0.00
(g) Value of land, building, fixtures and goodwill subject to land transfer tax (total of (a) to (f))
$2.00
(h) VALUE OF ALL CHATTELS -items of tangible personal property
$0.00
(i) Other considerations for transaction not included in (g) or (h) above
$0.00
0) Total consideration
$2.00
Explanation for nominal considerations:
o) Transfer of easement or right of way for no consideration.
5. The land is subject to encumbrance
6. Other remarks and explanations, if necessary.
1. The information prescribed for purposes of section 5.0.1 of the Land Transfer Tax Act is not required to be provided for this
conveyance.
2. The transferee(s) has read and considered the definitions of "designated land", "foreign corporation", "foreign entity', "foreign
national', "specified region" and "taxable trustee" as set out in subsection 1(1) of the Land Transfer Tax Act. The transferee(s)
declare that this conveyance is not subject to additional tax as set out in subsection 2(2.1) of the Act because:
3. (b) This is not a conveyance of "designated land".
4. The transferee(s) declare that they will keep at their place of residence in Ontario (or at their principal place of business in
Ontario) such documents, records and accounts in such form and containing such information as will enable an accurate
determination of the taxes payable under the Land Transfer Tax Act for a period of at least seven years.
5. The transferee(s) agree that they or the designated custodian will provide such documents, records and accounts in such form
and containing such information as will enable an accurate determination of the taxes payable under the Land Transfer Tax Act, to
the Ministry of Finance upon request.
PROPERTY Information Record
A. Nature of Instrument: Transfer Easement
LRO 51 Registration No. SC1739380 Date: 2020/12/16
B. Property(s): PIN 58532 - 0303 Address ORO Assessment -
Roll No
C. Address for Service: 148 Line 7 South
Oro-Medonte ON LOL 2EO
D. (i) Last Conveyance(s): PIN 58532 - 0303 Registration No. SC1735321
(it) Legal Description for Property Conveyed: Same as in last conveyance? Yes ❑ No ✓❑ Not known ❑
E. Tax Statements Prepared By: Klaus Nick Jacoby
LAND TRANSFER TAX STATEME& _
34 Clapperton St.
Barrie L4M 3E7
. . 1 r1 i'\
SCHEDULE
4. Transfer of Easement over Part Lots 18 and 19, Plan 51M-1191 beinq Parts 1 and 2 on Plan
51 R-42731
The Transferor hereby transfers unto the Transferee, the right and easement in gross and in
perpetuity in, over, along, upon, under and through Part of Lots 18 and 19, Plan 51M-1191
being Parts 1 and 2 on Plan 5113-42731, Township of Oro-Medonte (the "Easement Lands")
to construct, maintain, inspect, test, alter, remove, replace stormdrain(s) and all appurtenances
thereto, including catch basins with grates, tees, ditches, culverts and pipes for stormwater
drainage as may be required by the Transferee.
5. Right of Access and Eqress
Together with the right, access and egress over the Easement Lands for itself, its servants,
agents, contractors, sub -contractors with or without vehicles, machinery and equipment for all
purposes in connection with or incidental to the exercise of the right and easement herein
transferred as and from the date hereof and continuing in perpetuity.
6. Terms and Conditions
The aforesaid right and Easement is herein granted and transferred on the following terms:
(a) Rights of Transferor
The Transferor shall have the right fully to use and enjoy the Easement Lands provided
however that without the prior written consent of the Transferee, the Transferor shall not
alter, remove or permit to be removed, any soil from the Easement Lands, nor shall the
Transferor excavate, drill, install, erect or permit to be excavated, drilled, installed or
erected in, over, upon, under or through the Easement Lands, any pit, well, foundation,
pavement, building, or other structure.
(b) Transferee's Rights Not to be Interrupted
The Transferee in performing and observing the covenants and conditions on its part shall
and may peaceably hold and enjoy the right and easement herein granted without
hindrance, molestation or interruption on the part of the Transferor or of any person
claiming by, through, under or in trust for the Transferor.
(c) Restoration
The Transferee agrees after it has performed any work on the Easement Lands to restore
the surface as far as practicable to that prior to commencement of construction, with the
finished grade to match the existing grade.
(d) Additional Documents
The Transferor will, if so requested by the Transferee, execute such further and other
documents of title and assurances in respect of the Easement Lands as may be required
and such documents shall be prepared at the expense of the Transferee.
(a) Burdened and Benefited Lands
This is an Easement in Gross.
LRO # 51 Transfer Easement / Receipted as S^ 39421 on 2020 12 16 at 14:25
The applicant(s) hereby applies to the Land Registrar.
yyyy mm did Pagel of 4
1 Properties
PIN 58532 - 0303 LT Interest/Estate Easement ✓0 Add Easement
Description PT E1/2 & W1/2 LOT 2 CONCESSION 9 ORO AND PT E1/2 LOT 3 CONCESSION 9 ORO,
BEING PT 1 ON PL 51 R42732;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND
MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST
WITHIN, UPON OR UNDER SUCH LANDS; TM FULL POWER TO WORK THE SAME AND
FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO
MUCH THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078;
ORO-MEDONTE
Address ORO
Consideration
Consideration $2.00
1 Transferor(s)
The transferor(s) hereby transfers the easement to the transferee(s).
Name BRAESTONE DEVELOPMENT CORPORATION
Address for Service 500-85 Bayfield Street
Barrie ON L4M 3A7
I, J. David Bunston, Treasurer, have the authority to bind the corporation.
This document is not authorized under Power of Attorney by this party.
1 Transferee(s)
Capacity
Name
THE CORPORATION OF THE TOWNSHIP OF ORO-
MEDONTE
Address for Service
148 Line 7 South
Oro-Medonte ON LOL 2E0
Statements
Schedule: See Schedules
The registration of this document is not prohibited by registration SC1735076 registered on 2020/12102.
1 Signed By
Kenneth Edward Bailey 85 Bayfeld Street Suite 500 acting for
Barrie Transferor(s)
L4M 3A7
Tel 705-792-9279
Fax 705-730-1059
1 have the authority to sign and register the document on behalf of the Transferor(s).
Klaus Nick Jacoby 34 Clapperton St. acting for
Barrie Transferee(s)
L4M 3E7
Tel 705-726-0238
Fax 705-726-9197
1 have the authority to sign and register the document on behalf of the Transferee(s).
1 Submitted By
Kenneth E. Bailey Professional Corporation
Tel 705-792-9279
Fax 705-730-1059
Fees/Taxes/Payment
Statutory Registration Fee
Provincial Land Transfer Tax
85 Bayfield Street Suite 500
Barrie
L4M 3A7
$65.30
$0.00
Share
1
Signed 20201216
Signed
2020 12 16
1
2020 12 16
1 r*�, eo1
LRO # 51 Transfer Easement Receipted as S�1739421 on 2020 12 16 at 14:25
The applicant(s) hereby applies to the Land Registrar. yyyy mm dd Page 2 of 4
IFees/Taxes/Payment
Total Paid $65.30
IFile Number
Transferee Client File Number: JK-25918
r*. #-%
' LAN]b TRANSFER TAX STATEMEK _ i
In the matter of the conveyance of: 58532 - 0303 PT E1/2 & W1/2 LOT 2 CONCESSION 9 ORO AND PT E1/2 LOT 3 CONCESSION 9
ORO, BEING PT 1 ON PL 51 R42732;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES
AND MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE
FOUND TO EXIST WITHIN, UPON OR UNDER SUCH LANDS; TM FULL POWER
TO WORK THE SAME AND FOR THIS PURPOSE TO ENTER UPON, USE AND
OCCUPY THE SAID LANDS OR SO MUCH THEREOF AND TO SUCH EXTENT AS
MAY BE NECESSARY FOR THE EFFECTUAL WORKING AND EXTRACTING OF
THE SAID MINERALS, AS DESCRIBED IN ORO17078; ORO-MEDONTE
BY: BRAESTONE DEVELOPMENT CORPORATION
TO: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
1. ANDRIA LEIGH
lam
❑ (a) A person in trust for whom the land conveyed in the above -described conveyance is being conveyed;
❑ (b) A trustee named in the above -described conveyance to whom the land is being conveyed;
❑ (c) A transferee named in the above -described conveyance;
(d) The authorized agent or solicitor acting in this transaction for THE CORPORATION OF THE TOWNSHIP
OF ORO-MEDONTE described in paragraph(s) (c) above.
❑ (a) The President, Vice -President, Manager, Secretary, Director, or Treasurer authorized to act for
described in paragraph(s) U above.
❑ (f) A transferee described in paragraph (_) and am making these statements on my own behalf and on behalf
of _ who is my spouse described in paragraph U and as such, I have personal knowledge of the facts
herein deposed to.
3. The total consideration for this transaction is allocated as follows:
4.
(a) Monies paid or to be paid in cash
$2.00
(b) Mortgages (i) assumed (show principal and interest to be credited against purchase price)
$0.00
(it) Given Back to Vendor
$0.00
(c) Property transferred in exchange (detail below)
$0.00
(d) Fair market value of the land(s)
$0.00
(a) Liens, legacies, annuities and maintenance charges to which transfer is subject
$0.00
(f) Other valuable consideration subject to land transfer tax (detail below)
$0.00
(g) Value of land, building, fixtures and goodwill subject to land transfer tax (total of (a) to (f))
$2.00
(h) VALUE OF ALL CHATTELS -items of tangible personal property
$0.00
(i) Other considerations for transaction not included in (g) or (h) above
$0.00
G) Total consideration
$2.00
Explanation for nominal considerations:
o) Transfer of easement or right of way for no consideration.
5. The land is subject to encumbrance
6. Other remarks and explanations, if necessary.
1. The information prescribed for purposes of section 5.0.1 of the Land Transfer Tax Act is not required to be provided for this
conveyance.
2. The transferee(s) has read and considered the definitions of "designated land", "foreign corporation", "foreign entity", "foreign
national', "specified region" and "taxable trustee" as set out in subsection 1(1) of the Land Transfer Tax Act. The transferee(s)
declare that this conveyance is not subject to additional tax as set out in subsection 2(2.1) of the Act because:
3. (b) This is not a conveyance of "designated land".
4. The transferee(s) declare that they will keep at their place of residence in Ontario (or at their principal place of business in
Ontario) such documents, records and accounts in such form and containing such information as will enable an accurate
determination of the taxes payable under the Land Transfer Tax Act for a period of at least seven years.
5. The transferee(s) agree that they or the designated custodian will provide such documents, records and accounts in such form
and containing such information as will enable an accurate determination of the taxes payable under the Land Transfer Tax Act, to
the Ministry of Finance upon request.
PROPERTY Information Record
A. Nature of Instrument: Transfer Easement
LRO 51 Registration No. SC1739421 Date: 2020/12/16
B.Property(s): PIN 58532-0303 Address ORO Assessment -
Roll No
C. Address for Service: 148 Line 7 South
Oro-Medonte ON LOL 2E0
D. (i) Last Conveyance(s): PIN 58532 - 0303 Registration No. SC1739380
(ii) Legal Description for Property Conveyed: Same as in last conveyance? Yes ❑ No ❑✓ Not known ❑
E. Tax Statements Prepared By: Klaus Nick Jacoby
34 Clapperton St.
Barrie L4M 3E7
SCHEDULE
Transfer of Easement:
The Transferor does hereby transfer unto the Transferee, its successors and assigns,
and those which may become entitled thereto, a non-exclusive, free, uninterrupted and
unobstructed right and Easement in perpetuity over, along and upon the lands more
particularly described in this Transfer Easement (herein referred to as "Easement
Lands") as an emergency access route allowing for ingress and egress to and from the
Road Allowance between Concessions 8 and 9 Oro for itself, its servants, agents and
contractors with or without vehicles, machinery and equipment for all purposes in
connection with or incidental to the exercise of the right or easement herein
transferred.
2. Terms and Conditions:
(i) The Transferor at all material times shall be required to keep the Easement
Lands completely unobstructed, free and clear of all brush and vegetation and
shall keep same clear of snow, ensuring the Easement Lands are passable and
are unobstructed at all times.
III) The Transferor shall have the full right to use and enjoy the Easement Lands
as a service road subject always to and so as not to interfere with the right and
easement granted to the Transferee.
3. Right to Convey
The Transferor covenants with the Transferee that it has the right to convey the
easement herein set out to the Transferee notwithstanding any act of the Transferor
and further covenants that the Transferor or its successors and assigns will execute
such further assurances and do such other acts as may be reasonably required to vest
in the Transferee the rights hereby transferred.
4. Burdened and Benefitted Lands:
This is an Easement In Gross.
e
y4$
'u
8\ry
}e etl�
�n"a
a f�S
a�s
`
-�� •WYu
Y 3�
-
q�='�
lat
.e
3Yc
J S8
v€ m
a
uy
_
tE
—
S15 01 ONtl 5
SNO15530N00 N33M138
30NYMOlItl
QIVU IYWOH0
591NJO1�1
`T
-
{ 101
s\�un3nnr�sv.emvnz
4
�: Y
F�rtnoasv
� �
I
I
: van0 ss= i
21 10l w
�P i1 I
j
xIF
1
1
v
• T
n
"
a'
m bl 10l
OL01-\d\5'de-4
—
f
r ISI
— IOl �
`�
vano •w
\
91 iOlol
x
i .R59s me /
,16Lt
101
O
•sw wx..i t
m
G�
\
K
i's
N i
ar— ,a
x0 `
N \
m
�O£M0010 8�
wo
L I�Ix
y
ou
I•� �i
I' I
r- 5
O
l:if':•N
�I
r5m,21
r�l
k\�
Z
/
\
: ""'an
�
&!\\
\
/l//
�Y 6 °a W ° 4 :: • yy• 5 3 i Y
in iVViiyy �Si � Y ya"a o o W : � � p' qqY e a .9Y a S.�T e
.Ya s x,q�."i i'a?d' g2 d : a Y"• �a 39SadY
N}o?s ��' =a��a X l• ,. .d 6§i ba § 4 yde ga
.a
=r iS..s3 a`ns oYi `z =kF q,ar3? i?: d9 SEFi:B?d.`. 5 E P'p si i`a z•"{'
v=, 4 ei::4 aa'. '}"u 8-• 3:::es '•a--:--""---' -i••W of-aF
s-§ gIsan:ddadaI ------------------------
- e s :i f��f3 cPa �fF�'9iPi e,?Oe:ls:, i; .�j: � ; j., �",6 F•p!
Y}
�� 01 ONY 6 SNOISS3ONOO N33M130 3ONVMOIIY OYON IYNIOINO
r^
LRO # 51 Application To Delete Inhibi,aig Order
The applicant(s) hereby applies to the Land Registrar.
Receipted as S%; 1739573 on 2020 12 16 at 16:32
yyyy mm did Page 1 of 1
IProperties
PIN 58532 - 0303 LT ❑�
Description LOTS 1 TO 27 INCLUSIVE AND BLOCKS 28 TO 32 INCLUSIVE, PLAN 51 M-1191;
SAVING AND RESERVING FROM THE E1/2 LOT 2 CONCESSION 9, ALL MINES AND
MINERALS, WHETHER SOLID, LIQUID OR GASEOUS, WHICH MAY BE FOUND TO EXIST
WITHIN, UPON OR UNDER SUCH LANDS; TM FULL POWER TO WORK THE SAME AND
FOR THIS PURPOSE TO ENTER UPON, USE AND OCCUPY THE SAID LANDS OR SO
MUCH THEREOF AND TO SUCH EXTENT AS MAY BE NECESSARY FOR THE EFFECTUAL
WORKING AND EXTRACTING OF THE SAID MINERALS, AS DESCRIBED IN ORO17078;
SUBJECT TO AN EASEMENT IN GROSS OVER PART E1/2 LOT 2 CONCESSION 9 ORO,
PART 1 PLAN 51R40262 AS IN SC1266952; TOGETHER WITH AN EASEMENT OVER
SCP460 AS IN SC1595230; TOGETHER WITH AN EASEMENT OVER SCP465 AS IN
SC1631380; TOWNSHIP OF ORO-MEDONTE
Address ORO
ISource Instruments
Registration No. Date
SC1735076 202012 02
1 Applicant(s)
Type of Instrument
Application For Inhibiting Order -Land
f
Affects Part of Prop
Name THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
Address for Service 148 Line 7 South
ORO-MEDONTE ON LOL 2E0
This document is not authorized under Power of Attorney by this party.
This document is being authorized by a municipal corporation by its Director of Development Services, Andria Leigh.
IStatements
All the conditions under the Inhibiting Order have been dealt with and the Inhibiting Order can now be deleted.
ISigned By
Klaus Nick Jacoby
Tel 705-726-0238
Fax 705-726-9197
34 Clapperton St.
Barrie
L4M 3E7
I have the authority to sign and register the document on behalf of the Applicant(s).
ISubmitted By
Jacoby Arkell Professional Corporation
Tel 705-726-0238
Fax 705-726-9197
IFees/Taxes/Payment
Statutory Registration Fee
Total Paid
IFile Number
Applicant Client File Number
JK-25918
34 Clapperton St.
Barrie
L4M 3E7
$65.30
$65.30
acting for
Applicant(s)
I
Signed 20201216
1
2020 12 16
— —1
f_, I
CZ
ZED,'
� ICJ
V•.,.
BLOCK 30ILD
BLOCK 31 .;
N
N
ro.'•
/..__r•.+...a.
_tli \={ BLOCCK
319, ,.I
ysec�-1 vnv, oon
I
/,,,"
Nne�
'1 N
not N vo'/
r
0
n
� F
_.. N
e 9N�
sn¢OE cmnev muo0xn. FEAR
1 nuun nrvo. ads
Sf 9J \
-^
IN
—
SEE DETAIL ^- J
[\\\\\S\\
El
BLOCK 30
T/'D E
CE
If
• mA1 ^+
o
xJr, s nN Fo+I^
Z1
N
ale
up
-
a
Ir
.is„•SJ�sy
.•
.uiEVE OU
CLVELAND COURT
a r0*
` � "'' ^IT
;-,?
,,,, t
J m s)JVe 61.10
•'^1�Ic N
TQ
\Id
_
If z`.uz __
I. x:z••s a'. ma
]J - — rgx•rvzs . n.co
I' xsS'Js 21
diI
N
S
e1 r
_
.,.'..
-� L0; TT
F
\\ �•\
rm LOt 16
Eds::-n 19'u1
1 m m
m
A LOT 15
•x�'�
I Flry s65JPC 1➢rLll
-
51v.Jna
ZJ
n
v
H.P�.OT11/IGOTO
LOT 14
-
Irm
U
as=ss-o n61Lu�.,
e
to
I�--.._.i.a
LOT Id
1
r PI`1 ifs:-0155rLi1
A
n
LOT 12
to
m
BLOCK 52
rr: snrz-o."ITT,
•c EOi 11
1
'
nl
�ssez-olr]x�iLx6a�
9
i
LOT
I
-
ORIGINAL ROAD ALLOWANCE BETWEEN CONCESSIONS 9 AND x10�
..000
A
x am
oAA
^c _
h
m�
y9
N
0
_ _
AA
y
n - 0o
r
Y
o
0
n I
0
O
r
z
�n
o
z
IS
v'zomo
m
_ Czi T
•- K . n
m r
1/1 V1
ti C
o „ N O
m
Aa--1
nv
m o � o
oZNOy�
z
��..
n m^ m
f o
o v o
m z
m o
m
x
n
r
YAD
_
9
''
A,
-S
�
-A,
WEST HALF OF LOT 2
PART I , 51R-21804
PM 58532 - 0303M)
REGISTERED PLAN
PIN 58532 - 03031E T7
Cl
5IM-1191
D
D
A
�
�
�
r
O
N
_
�
r
O
L
0
r
o
r
�
O
r
1
_
�
0
C7
O
C
z
0
o om
z
y
y
m
(/,
o zo
A
a
n o w
e
Jcn=o.rn
rn O
067
m
N
m
T O
"O
LA
O
o
F P- —I
frl
"D
o o
noz n
-mow
m
m
mnA
a-1 _
TI
O�,D N
m
^
gma
^
m
A
V�
p T
w a
O
CZl ®
c O 'a
Z
m
w
$ o e
m .00 D
-U
n
n Ul
m
i
r7l
Qd
Z '-.
D
Z
n
z
npm
`s
_
Lo
-n
W
8
a
I
i
I
I
I
....... ... ..........� .,�....��.. ,. _..____._.._ _ "VD 9
I€
I�
I
L01 17
LlrT � I
LIT_
1oT n m
-;' Lm .
mz �I
1
^
ORIGINAL ROAD ALLOWANCE BETWEEN CONCESSIONS 9 AND „10 -
-tea
.b
.9
.•.� -N Ty
y0C
sr
_