Loading...
01 02 2019 2018-ZBA-17 Davtech Industries Ltd.Notice of Receipt of a Complete Application Notice of Particulars and Public Access ✓�-6001W Notice of Public Meeting for .� F. Proposed Amendment to the Zoning By-law of the Township of Oro-Medonte 2018-ZBA-17 (Davtech Industries Ltd.) Take notice that the Township of Oro-Medonte deemed the following application to amend Zoning By-law 97-95, as amended, a "Complete" Application pursuant to the Planning Act on the 28'h day of September, 2018. Take notice that the Development Services Committee of the Township of Oro- Medonte will hold a Public Meeting on Wednesday, January 2, 2019 at 5:30 p.m. in the Municipal Council Chambers. The purpose of the Public Meeting is to notify the public and to obtain public comments on a proposed Amendment to the Zoning By- law. The subject lands are described as Part of Lot 21, Concession 7, municipally known as 2907 Highway 11 North. A key map illustrating the location of the subject lands, and a copy of the applicants site plan including the lands to be rezoned are included with this notice. The purpose and effect of the proposed Zoning By-law Amendment is to rezone the subject lands from General Commercial Exception 32 (GC*32) Zone to General Commercial Exception (GC*##) Zone and Environmental Protection (EP) Zone to permit an addition to the main building on the property. Any person may attend the public meeting and/or make written or verbal representation either in support of, or in opposition to, the proposed Zoning By-law Amendment. Written comments by any person unable to attend the meeting should be mailed/faxed/e-mailed to the Director, Development Services, The Corporation of the Township of Oro- Medonte to be received no later than 12:00 p.m. noon on Wednesday January 2, 2019. Please ensure that you include your name and address so that you may be contacted if necessary. If a person or public body does not make oral submissions at the public meeting or make written submissions to the Director, Development Services, The Corporation of the Township of Oro-Medonte before the proposed Zoning By-law Amendment is passed or refused, the person or public body is not entitled to appeal the decision of the Council of the Township of Oro-Medonte to the Local Planning Appeal Tribunal and may not be added as a party to the hearing of an appeal before the Local Planning Appeal Tribunal unless, in the opinion of the Tribunal, there are reasonable grounds to do so. The application is part of the public record and is available to the public for viewing/inspection between 8:30 a.m. and 4:30 p.m, at the Township of Oro-Medonte Administration Building and available on the Township's website www.oro- medonte.ca. Any person wishing further information or clarification with regard to the application or to arrange to inspect the application should contact the Planning Division at 705-487-2171. Individuals who submit letters and other information to Council and its advisory bodies should be aware that all information, including contact information, contained within their communications may became part of the public record and may be made available through the agenda process which includes publication on the Township's website. If you wish to be notified of the decision of the Township of Oro-Medonte in respect to the proposed Zoning By-law Amendment, you must make a written request. Written submissions should be directed to: Township of Oro-Medonte 148 Line 7 South Oro-Medonte, Ontario LOL 2E0 Attn: Andria Leigh, Director, Development Services planning @ o ro- m ed o n te. ca Dated at the Township of Oro-Medonte this 25'h day of October, 2018. Location Map suoha Lak! Applicant's Site Plan 1 LEGEND WWDIAND RaG <xnx unk Rxce --- cuEXcexrn une lu rea ncm weiu.XD 1.10) ftAkeO Mu 2. Er refs. luxe u. mlo ' JJ ���J���]�� WILLXIAD rA0iKT10M SON! EIGXIFlCMIT4ROYNDWARP �/� LJ_3�I�3J a[CIµX6EAVA IXNEOXXII?aL laOiICtIDX ZDA G[il[MLCg1MEXLIAL SOME N10 MYOW iOt! From: Metras, Justin Sent: Thursday, October 25, 2018 8:48 AM To: Falconi, Teresa <tfalconi@oro-medonte.ca> Subject: RE: Request for comments - Zoning By-law Amendment Application 2018-ZBA-17 (Davtech Industries Ltd) Teresa Operations has no objections to this application. Justin Justin Metras Manager, Infrastructure and Capital Projects Township of Oro-Medonte DRINKING WATER � ytn 8040 SOURCE PROTECTION` 0 ACT FOR CLEAN WATER Iup Gape WL 2lrc earn aewe nR111 pn,w HnLap, Ea mug Furvrc October 25, 2018 Andy Karaiskakis, Senior Planner The Corporation of the Township of Oro-Medonte 148 Line 7 South Oro-Medonte, ON LOL 2EO Dear Mr. Karaiskakis, RE: Zoning By -Law Amendment Application 2018-ZBA-17 at 2907 Highway 11 North, ARN: 434601000901600, Township of Oro-Medonte, County of Simcoe. Risk management staff of the Severn Sound Environmental Association (SSEA) has reviewed the files [Circulation Memo.pdf, Key Map.pdf, Planning Justification Report.pdf, and the Site Plan.pdfj sent via email on October 25th, 2018 pertaining to the Zoning By -Law Amendment Application 2018-ZBA-17 at 2907 Highway 11 North (the property). The following comments relevant to drinking water source protection are offered. It is the SSEAs understanding that the Zoning By-law Amendment Application is to rezone the property from General Commercial Exception 32 (GC'32) Zone, to a split General Commercial (GC) Zone and Environmental Protection (EP) Zone in order to allow for a proposed addition to an existing building. The property is located partially within the Wellhead Protection Area C (WHPA-C) of the Canterbury water system with a vulnerability score of 4. Water quality policies in the South Georgian Bay Lake Simcoe Source Protection Plan (SPP) (approved: January 26; amended: May 14, 2015; effective: July 1, 2015) may apply. The SSEA has no objections to the Zoning By -Law Amendment as it pertains to the Drinking Water Source Protection program. It is recommended that the Risk Management Official for the Township of Oro-Medonte be circulated on all subsequent planning applications for this property as a Clean Water Act, Section 59 (2)(a) notice to proceed will be needed, at the building permit stage of this application, before the building permit can be approved. Based on the proposed site plan, it appears the proposed building addition will be located outside of the WHPA-C and the existing frame and metal clad building currently located in the WHPA-C is to be removed. If this proposed site plan remains, it is not anticipated that any policies in the SPP would apply to this application. 489 Finlayson St ♦ PO Box 460 ♦ Port McNicoll ON LOK 1RO ♦ Tel: 705-534-7283 • Fax: 705-534-7459 www.severnsound.ca DRINKING WATER oeTn SO� SOURCE PROTECTION ®��� ACT FOR CLEAN WATER 0.tlNuwyn Wtxu a`sw wroareucoanMWon i nmud li.k. F.rlr�. r�m.rc M. d If you have any questions, please contact the undersigned. Yours truly, T+- j C.------T.._ Melissa Carruthers, Risk Management Official / Inspector for the Township of Oro-Medonte Severn Sound Environmental Association mcarrutherst@severnsound.ca CC: Andria Leigh, Township of Oro-Medonte Julie Cayley, Severn Sound Environmental Association 489 Finlayson St • PO Box 460 ♦ Port McNicoll ON LOK 1RO ♦ Tel: 705-534-7283 & Fax: 705-534-7459 www.severnsound.ca ENBRIDGE November 1. 2018 Andy Karaiskakis, RPP Senior Planner Township of Oro-Medonte Planning Department 148 Line 7 South Oro-Medonte, ON LOL 2EO Dear Andy, Re: Zoning By-law Amendment Davtech Industries Ltd. 2907 Highway 11 North Township of Oro-Medonte File No.: 2018-ZBA-17 Enbridge Gas Distribution does not object to the proposed application(s). Enbridge Gas Distribution 500 Consumers Road North York. Ontario M2J 1 Pe Canada Enbridge Gas Distribution reserves the right to amend or remove development conditions. Sincerely, Alice Coleman Municipal Planning Coordinator Long Range Distribution Planning ENBRIDGE GAS DISTRIBUTION TEL: 416-495-5386 Mun icioal Planni norl�enbridce. com 500 Consumers Rd, North York, ON, M2J 1 P8 enbridaeaas.com Integrity. Safety. Respect. AC/j h November 5, 2018 Mr. Andy Karaiskakis, RPP — Senior Planner Planning Services Development Services Department Township of Oro-Medonte Township o� Proud Heritage, Exciting Future Zoning By-law Amendment Submission Re: Zoning By-law Amendment 2018-ZBA-17 Applicant: Davtech Industries Ltd. 2907 Highway 11 North Township of Oro-Medonte Development Engineering is supportive of the Zoning By-law Amendment Application. Having reviewed the Zoning By-law Amendment Submission / Report set for the above noted Zoning By-law Amendment, the following comments are applicable. As per the Planning Justification Report (Morgan Planning & Development Inc.), Section 5.2 — Site Plan Application identifies the following supporting documents required for Development Engineering review at the time of Site Plan Application: 1. A Site Servicing and Grading Plan 2. An Erosion and Sediment Control Plan 3. A Stormwater Management Brief " 4. An Engineering Cost Estimate for works addressing modifying the existing site. 5. Construction Notes and Details Sheet 6. An Exterior Lighting Plan Please Note: ' Site Servicing and Grading and Erosion and Sediment Control Plans maybe combined, provided detail is legible — or the Grading and Erosion Control(s) may be combined allowing for Site Servicing and other detail to be set out on one plan. Please Note: " A Stormwater Management Brief outlining the capture and control of additional run-off shall be required due to the additional roof surface and Site modification (Post to Pre Development drainage conditions based). David Saunders, B.E.S., C.E.T. Manager, Development Engineering 148 Line 7 South P: (705) 487-2171 Oro-Medonte, ON LOL 2EO F: (705) 487-0133 NVM/M/.oro-medonte.ca From: Akhtar, Usman (MTO) <Usman.Akhtar@ontario.ca> Sent: Wednesday, November 14, 201811:16 AM To: Falconi, Teresa <tfaIcon i@oro-medonte.ca> Cc: Witlib, Derek <dwitlib@oro-medonte.ca>; Karaiskakis, Andy <aKaraiskakis@oro-medonte.ca>; Weatherell, Todd <teatherell@oro-medonte.ca> Subject: RE: Request for comments - Zoning By-law Amendment Application 2018-ZBA-17 (Davtech Industries Ltd) Hi Andy/Teresa, In response to your circulation dated October 25, 2018, the ministry has completed its review of the above zoning by-law amendment to zone the subject lands from GC*32 Zone to GC*## and EP Zone to permit an addition to the main building. The application has been considered and reviewed in accordance with the requirements of our access management policies and the Public Transportation and Highway Improvement Act(Ontario). In principle, the ministry does not object to the zoning by-law amendment. MTO access policies only permit a single access connection to an existing lot of record. The building addition appears to be minor. A traffic brief/letter should be submitted to confirm the proposal is minor and will not adversely affect capacity or the safety on the highway network. The owner should be aware that MTO building and land Use, sign and encroachment permits are required for the development of the site. We would appreciate receiving a copy of council's decision on this application. Please circulate any future applications(site plans etc.) to the MTO for review and comments. Additional MTO comments, including MTO setback requirements(14m) will be provided. If you have any questions or concerns let me know. Usman Usman Akhtar Corridor Management Officer Ministry of Transportation 416-235-3509 Lake Simcoe Region conservation authority www. LSRCA.on.ca Sent by email: aKaraiskakis@oro-medonte.ca November 16, 2018 File No: 2018-ZBA-17 IMS File No: ZO-134143-102918 Mr. Andy Karaiskakis Senior Planner Township of Oro-Medonte 148 Line 7 South Oro-Medonte, ON LOL 2E0 Dear Mr. Karaiskakis: Re: Application for Zoning By-law Amendment 2907 Highway 11 North Township of Oro-Medonte, County of Simcoe Thank you for circulating the above captioned application to Lake Simcoe Region Conservation Authority (LSRCA). It is our understanding that the purpose and effect of this application is to re -zone the subject lands from General Commercial Exception 32 (GC*32) Zone to General Commercial Exception (GC*##) Zone and Environmental Protection (EP) Zone to permit an addition to the main building. We are reviewing this application in the context of the following: • The Provincial Policy Statement (PPS); • The Lake Simcoe Protection Plan (LSPP); • The Growth Plan for the Greater Golden Horseshoe (Growth Plan); and, • Ontario Regulation 179/06 made under the Conservation Authorities Act. Current environmental mapping indicates that the property is within an area governed by Ontario Regulation 179/06 under the Conservation Authorities Act for flooding and erosion hazards, unevaluated wetlands and lands adjacent to wetlands. Further, the property is identified within the Natural Heritage System of the Growth Plan and contains key natural heritage features and key hydrologic features as per the Growth Plan and the LSPP. The property is also within an Ecologically Significant Groundwater Recharge Area as per the LSPP. A Planning Justification Report and Natural Heritage Evaluation have been submitted to our office and circulated to our technical staff for review. In accordance with our current fees policy, our review fee for this application is $500 and remains outstanding. As such, we recommend that any adoption of this amendment be deferred until the following matters are addressed: • That LSRCA review fees be provided in accordance with our current fees policy; and, • That the LSRCA and the Township be satisfied with the Natural Heritage Evaluation including any related natural heritage requirements such as planting plans. 120 Bayview Parkway T 905.895.1281 Newmarket, Ontario UY 3W3 F 905.853,5881 Member of Conservation Ontario TF 1,800.465,0437 Lake Simcoe Region conservation authority Page 2 of 2 Please note that as part of our review of the subsequent Site Plan Application, the following will be required: • A Stormwater Management Report in accordance with designated policy 4.8 to 4.11 of the LSPP and in accordance with the LSRCA Stormwater Management Submission Guidelines. • A Hydrogeological Assessment in accordance with designated policies 4.8 and 6.40 of the LSPP and Conservation Authority Guidelines for Hydrogeological Assessment Submissions. • A Phosphorus Budget in accordance with designated policy 4.8 of the LSPP and LSRCA Phosphorus Offsetting Policy (2018). • Geotechnical Report to adequately address the erosion hazard in accordance with MNRF Technical Guidelines. • LSRCA review fees in accordance with our fee policy at the time of submission. If you have any questions please contact the undersigned. Sincerely, Michelle Bates Development Planner Copy: Chris Currie, Environmental Regulations Analyst, LSRCA Jessica Chan, Natural Heritage Ecologist, LSRCA S:\Planning and Development Services\Planning Services\Planning Act\Oro-Medonte\134143_2907 Highway 11\2018-ZBA-17 Lake Simcoe Region conservation authority www. LSRCA. on, ca Sent by email: aKaraiskakis@oro-medonte.ca December 13, 2018 File No: 2018-ZBA-17 IMS File No: ZO-134143-102918 Mr. Andy Karaiskakis Senior Planner Township of Oro-Medonte 148 Line 7 South Oro-Medonte, ON LOL 2E0 Dear Mr. Karaiskakis: Re: Application for Zoning By-law Amendment 2907 Highway 11 North Township of Oro-Medonte, County of Simcoe This correspondence is further to our previous letter dated November 16, 2018. The LSRCA has completed a review of the materials submitted with this application and our comments to be addressed are provided below. Document/ Drawing 1. NHE A consistent 15 m setback should be provided from the top of bank as 7 28 per section 4.0.3 of LSRCA's Watershed Development Guideline as adequate space exists to provide the full 15 m setback. 2. Ensure all Endangered Species Act requirements are in conformity with 4.5.3 23 Ministry of Natural Resources and Forestry policy with regards to ensuring SAR bats are not using the existing buildings proposed for removal. 3. General Remove the word "Draft" from the figures and footnotes in the NHE. 4. Restoration a. Planting Zone 1 should be expanded to the area between the top of Planting Plan bank buffer and the top of bank limit to provide a connected VPZ (Appendix A 4.1 4 with Planting Zone 2. in NHE) b. Planting Zone 2 should be expanded further east as the Frame & Metal Clad Building is proposed for removal. 5. 4.2 5 It is recommended that shrubs be planted 1m on center in order to provide a denser vegetative buffer to the natural heritage features. 6. a. All proposed tree plantings should have a caliper size of 4 to 6 cm. 4.3 5 b. A native seed mix and cover crop should be applied to both Planting Zone 1 and 2. 30 cm of topsoil should be provided in all areas that have been disturbed (i.e. graveled lot) and plantings are proposed. 7. a. Additional tree and shrub plantings should be proposed in Planting Figure B Zone 2 in order to provide an effective VPZ to the adjacent natural heritage features. 120 Bayview Parkway T 905.895.1281 Newmarket, Ontario BY 3W3 F 905.853.5881 Member of Conservation Ontario TF 1.800.465,0437 Lake Simcoe Region conservation authority Page 2 of 2 D. Drawing Section Page # LSRCA Comments: b. Ensure the native seed mix and cover crop proposed in Section 4.3 of the Restoration Planting Plan is included in Figure B: Planting Zone Details. Provide the list of species in the proposed seed mix to ensure they are all native species to the watershed. 8. S.01 a. It is unclear whether the existing storage containers located south of Shelswell's Creek will remain or be removed from the property as part of the proposed development. Provide a recent aerial photo with the existing development and proposed development overlaid on top. b. Delineate the location of the proposed silt fencing on the site plan as per the recommendations in the NHE (Palmer Environmental Consulting Group Inc., September 2018). c. Ensure all grading activities are proposed outside of the top of bank 15 m buffer. A letter outlining how each comment has been addressed shall be provided with the next submission. Should you have any questions regarding these comments, please contact the following technical staff and copy the undersigned: - Jessica Chan, Natural Heritage Ecologist (j.chan@lsrca.on.ca / x 132) Accordingly, as there are outstanding comments to be addressed we recommend that any approval of this application be deferred at this time. Sincerely, Michelle Bates Development Planner Copy: Jessica Chan, Natural Heritage Ecologist, LSRCA Josh Morgan, Morgan Planning & Development Inc. (imorean@morganolannin¢.ca) S:\Planning and Development Services\Planning Services\Planning Act\Ora-Medonte\134143_2907 Highway 11\2018-ZBA-17