Loading...
1997-054 To Authorize the Issuance of a Certificate of Substantial Completion and Acceptance above Ground works (Craighurst Estates) - e , .. . THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE BY-LAW NO. 97- 54 Being a By-Law to Authorize the Issuance of a Certificate of Substantial Completion and Acceptance Above Ground Works (Craighurst Estates) WHEREAS Council for the Corporation of the Township of Flos entered into a Subdivision Agreement for Craighurst Estates; AND WHEREAS Bill 51, An Act respecting the Restructuring of the County of Simcoe was passed December 14, 1993 and amalgamating that portion of land upon which Craighurst Estates; AND WHEREAS the requirements of this Subdivision Agreement have now been met; NOW THEREFORE the Corporation of the Township of Oro-Medonte hereby enacts as follows: 1. That the Certificate of Substantial Completion and Acceptance for Craighurst Estates may now be issued by the Township Engineer (R. G. Robinson & Associates) in compliance with the Subdivision Agreement between the Corporation of the Township of Flos and Leo Procee Construction Limited. 2. That this By-law shall come into force and take effect on the final date of passing thereof. READ a first and second time this 18th day of June, 1997. READ a third time and finally passed this 18th day of June, 1997. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE .. 1 I ~~, /f:ALf Mayor, Ian ear JUN 02 '97 12:14PM R.G. ROBINSON & RSSOC P.l/! ,- , ~ R.G. ROBINSON AND ASSOCIATES (BARRIE) LTD. CONSUL TING ENGINEERS ,. CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (ABOVE GROUND WORKS) MUNICIPALITY Township of Oro-Medonte (formerlv Township of Flos) PROJECT Craie:hurst Estates Subdivision. Plan SlM-510 DEVELOPER The Hedbern DeveloDment CorDoranon FILE NO. 12.94014-50 eMMA 43T-88066) DescriDtion of the Works: Roadways in the Craighurst Estates Subdivision consisting of: . Procee Circle from Simcoe COWlt}" Road. No. 22, north, then east, then south and then west back to Procee Circle, a distance of988.23 metres (3,242.22 feet); . Heacock Road from Simcoe County Road No. 22, north to Procee Circle, a distance of 112.24 metres (368.24 feet). We, RG. Robinson and Associates (Barrie) Ltd., notify the Municipality that the above mentioned works were inspected by us on October 3 L 1996, and to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement except for the deficiencies below: - Refer to Site Meeting Minutes of October 31, 1996, which outlines minor deficiencies. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is required by the Subdi~ision Agreement. The date of Substantial Completion and Acceptance is established by the Certificate as Date: Signature: 940141101 Post.it''" Fax Note 7671E Dale C1 ~ '40f . I fvn.L. pages To Jt~ tlu&,w, Fro'" r9/YJ~ . CO.lDepl Co. Phone # PhDne 11 Fax # Fax # If ~ RG. ROBINSON AND ASSOCIATES (BARRIE) LTD. TOWNSIDP ENGINEERS - CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (ABOVEGROUND WORKS) MUNICIPALITY Township of Oro-Medonte PROJECT Crai2hurst Estates Plan 51M-510 DEVELOPER The Hedbern Development Corporation FILE NO. 12-94014-50 (MMA&H 43T-88066) Description of the Works: Roadways in the Craighurst Estates Subdivision consisting of: . Procee Circle from Simcoe County Road No. 22, northerly, then easterly, then southerly and then westerly to Procee Circle; a distance of 988.23 metres (3,242.22 feet). . Beacock Road from Simcoe County Road No. 22, northerly to Procee Circle; a distance of 112.24 metres (368.24 feet). We, R.G. Robinson and Associates (Barrie) Ltd., notify the Municipality that the above mentioned works were inspected by us on May 26, 1997, and to the best of our knowledge and judgment, are complete in accordance with the Subdivision Agreement except for the deficiencies below: 1. Completion of culvert end protection on driveways. 2. Rectify drainage outlet erosion at Lot 5/6 and 14/15. 3. Placement of trees in lots. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is required by the Subdivision Agreement. The date of Substantial Completion and Accep~Rertificate as June 18, 1997. DS},,",,,"" Z-4fr7- Signature: .., '<Ai File #12- 14-50#1