Loading...
1997-064 To Authorize the Execution of a Subdivision Agreement (White) \. I ., THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE BY-LAW NO. 97- 64 Being a By-Law to Authorize the Execution of a Subdivision Agreement (White) WHEREAS draft approval for a registered plan of Subdivision on West Part of Lot 20, Concession 5, Township of Oro-Medonte, County of Simcoe (Oro), known as the White Subdivision has been obtained from the Ministry of Municipal Affairs and Housing; AND WHEREAS pursuant to Section 51(26) of The Planning Act, 1990, it is deemed desirable for the Township to enter into Subdivision Agreement with the Owner and have the Subdivision Agreement registered against the title of the said lands; NOW THEREFORE the Council for The Corporation of the Township of Oro-Medonte hereby enacts as follows: 1. That the Mayor and Clerk are hereby authorized to execute on behalf of The Corporation of the Township of Oro-Medonte a Subdivision Agreement dated the 20th day of August, 1997, a copy of which is attached hereto and forms part of this By- law as Schedule "Au. 2. That the Municipality shall be entitled to enforce the provisions of the Subdivision Agreement against the owners and any and all subsequent owners of the land. READ a first and second time this 23rd. day of August, 1997. READ a third time and finally passed this 23rd' day of August , 1997. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE 4 4~ 1:-...1:-, /:3<:: Mayor, Ian Be rd ';J. It! Province of . 0 ntarlo Document General Form 4 -- Land Registration Reform Act D Block Property Additional: ~ Schedule >- -I Z o co ro (1) Registry 0 3) Properly Identifier(s) Land Titles ~ (2) Page 1 of pages ,-'" '-- 'f"'""='f 4) Nature of Document APPLICATION TO REGISTER NOTICE OF SUBDIVISION AGREEMENT t"- a C"':) (5) Consideration C": r-;' Nil------------------------lTollars:li 00.00 (6) Description crJ ::r- c::> ~. q' -t Parcel 20-7, Section 51-0ro-5, Township of Oro-Medonte (formerly Township of Oro), County of Simcoe, being part of the west half of Lot 20, Concession 5, designated as Part 1, Plan 51R-4545. Save and except Parts 1 and 2 on Plan 51R-12186, Part 1 on Plan 51R-15498 and Part 1 on Plan 51R-25056. New Property Identifiers Additional: &Je Schedule o Executions o (7) This Document Contains: (a) Redescription New Easement Plan/Sketch (b) Schedule For: Additional: &Je Schedule M Additional D r.:l o Description ~ Parties Other ~ (8) This Document provides as follows: Subdivision Agreement attached. Continued on Schedule 0 (9) This Document relates to instrument numberts) Per: . . . . ~ . . - . . . . . . . - . . . - . ! . - . - - . - . ~ . . . . . . . . (10) Party(ies) (Set out Status or Interest) Name(s) Signature (s) ...............-..........-......---..................................... THE CORPORATION OF THE TOWNSHIP Ian Beard, Mayor ............--............-...-.............-............................ OF ORO-MEDONTE (Municipality) Per: ;1997 : ..._0..................................................................... ......... "'.""" -. Lynda Aiken, Clerk (11) Address for service P.O. Box 100, Oro, Ontario, LOL 2XO (12) Party(ieS) (Set out Status or Interest) Name(s) Slgnature(s) D ate of Signature Y M D ..............................-......................................... ...................................................:.........:..... . . . . . . ..............................---.................,............... . . . . . .7.7.14.2.2.. ONTARlo.. .INC..... (.O.evelQpe.r.)............. "................ .............................................. . . ..............--....-...-............................-""".-"" . . . . . . . . . . for service P.O. Box 1055, Barrie, Ontario, L4M 5E1 (14) Municipal Address of Property (15) Document Prepared by: Not assigned 'WILLIAM S. KOUGHAN RUSSELL, CHRISTIE, MILLER. KOUGHAN . BARRISTERS & SOLICITORS 1'0'< 1 n,. 76 COLD WATER STREET EAST OHilll!\. ONTARIO L3V 6J3 (705) 325-I.o2G r.'.X(705)327-1811 >- -I ~ Registration Fee LU '" :::J LU o 0- w.. o a: o w.. Fees and Tax Total '1 }~ii . ~ Ontario Schedule Amended NOV. 1992 Form 5 - Land Registration Reform Act s Page Additional Property Identifier(s) and/or Other Information FORM 16 APPLICATION TO REGISTER NOTICE OF AN UNREGISTERED ESTATE, RIGHT, INTEREST OR EQUITY t1 TO: The Land Registrar for the Land Titles Division of the County of Simcoe (No. 51) THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE has an 'unregistered estate, right, interest or equity in the land registered in the name of 771422 ONTARIO INC. in respect of the land registered as: Parcel 20-7, Section 51-0ro-5, Township of Oro-Medonte (formerly Township of Oro) , County of Simcoe, being part of the west half of Lot 20, Concession 5, designated as Part 1, Plan 51R-4545. Save and except Parts 1 and 2 on Plan 51R-12186, Part 1 on Plan 51R-15498 and Part 1 on Plan 51R-25056. AND hereby applies under Section 71 of the Land Titles Act for the entry of a Notice of Agreement in the Register for the said parcel. Dated the 29th day of August, 1997. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE PER: The address of the applicant for service is: The Corporation of the Township of Oro-Medonte P.O. Box 100 Oro, Ontario LOL 2XO UJ>- 2--1 LLZ ~o a:UJ oUJ LL=> r .: 1 . SUBDIVISION AGREEMENT - between - 771422 ONTARIO INC. - and - THE CORPORATION OF THE TOWNSHIP OF ORO - MEDONTE DESCRIPTION OF LANDS Parcel 20-5, Section 51-0RO-5 Part Lot 20, Concession 5 TOWNSHIP OF ORO-MEDONTE (formerly Township of Oro) COUNTY OF SIMCOE MMA 43- T -93023 JUl1c,1997 #12-89139-52 -:' ( TOWNSHIP OF ORO-MEDONTE SUBDIVISION AGREEMENT 1 Part I Part 2 Part 3 Part 4 Part 5 Part 6 Part 7 Part R Part 9 Part 10 TABLE OF CONTENTS General Requirements Lands, Plans And Representatives Requirements Prior to Execution of the Agreement Pre-Construction Requirements Financial Requirements Staging or Phasing Construction Requirements Building Pennits and Occupancy Maintenance and Acceptance Default Provisions SCHEDULES Schedule "A" - Description of Lands Being Subdivided Schedule "B" - Plan of Subdivision Schedule "C" - Works to be Constructed Schedule "0" - Itemized Estimate of Cost of Construction of Each Part of the Works Schedule "E" - List of Lots Unsuitable for Building Purposes and/or Requiring Special Attention Schedule "F" - Cash Deposits, Development Charges and Security Schedule "G" - Deeds and Easements to be Conveyed Schedule "H" - Parkland Schedule "I" - Declaration of Progress and Completion Schedule "J" - General Location and Lot Grading Plans . 2 e,' \ t II TOWNSIUI) OF ORO-MEDONTE TIllS A(;UEEMENT made as of the , 1997. day of BETWEEN: 771422 ONTARIO INC. (hereinafler called the "Developer") OF THE FIRST PART AND THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE (hereinafler called the "Township") OF THE SECOND PART WHEREAS the lands affected by this Agreement are the lands described in Schedule "A" hereto annexed, and are also shown on the Plan of Subdivision attached to and forming part of this Agreement as Schedule "B" and collectively are herein referred to as the "said lands"; AND WHEREAS a Drafl Plan with Conditions (43-1'-93023) has been issued for the proposed subdivision, which requires that the Developer must satisfY all the requirements financial and otherwise of the Township including the provisions of certain Municipal Services; NOW THEREFORE THIS AGREEMENT WITNESSETH that in consideration of the premises and for other good and valuable consideration and the sum of Two Dollars ($2.00) of lawful money of Canada now paid by the Township to the Developer (the receipt whereof is hereby acknowledged), TI-IE DEVELOPER AND THE TOWNSHIP HEREBY COVENANT AND AGREE WITH ONE ANOTHER AS FOLLOWS: 3 e.,' , " PART -1 GENERAL REQUIREMENTS I. I. DEVELOPER'S CONSULTING ENGINEERS 11le Developer shall employ engineers registered and in good standing with the Association of Professional Engineers of Ontario: a) to prepare designs, in accordance with the Township of Oro-Medonte Engineering . Standards and Drawings (dated June, 1997); b) to prepare and furnish all required drawings and specifications; c) to prepare the necessary contract(s) and provide contract administration; d) to obtain the necessary approvals in conjunction with the Township, from the Ministry of the Environment and Energy, the Ministry of Natural Resources, the Ministry of Transportation - Ontario, the Simcoe County District Health Unit and utility companies; e) to act as the Developer's representative in all matters pertaining to the subdivision; f) to provide co-ordination in scheduling to comply with the timing provisions of this Agreement and the requirements of the Township Engineer, for all the work specified in this Agreement; g) to provide supervision during construction of all the services; h) to ensure that the work involved in construction of the services is carried out by construction methods confonning to acceptable engineering practice; i) to maintain records of construction which shall be available for inspection or copy by the Township; j) to prepare final "as constructed" mylar drawings which will include the following .with regards to provision of a digital Plan of Subdivision: "completed digital Plan of Subdivisions must be in AutoCAD 12 drawing fonnat or DXF and be delivered on a 1.44 MB floppy diskette. Two copies of each Plan of Subdivision are required on separate diskettes. Each diskette must be labelled identitying the legal property description, developer's name, file name, and date delivered. PKZIP Release 2.04G may be used to perform file compression if required. It is the Developer's responsibility to ensure that all drawing changes occurring throughout the approvals process are incorporated into the digital submission. All line data depicting property boundaries must be mathematically closed to form polygons. The lines which describe the boundary of all properties created within the Plan of Subdivision wiJI be isolated on a unique layer/level. In certain cases, some of the line segments will coincide with the location of concession lot lines, registered plan data, open roads, rivers, and lakes. The file may contain duplicate line work, however, when all other layers are turned otf, the PLAN OF SUB layer/level will outline the property boundaries in the form of enclosed polygons. LA YERJLEVEL PLAN OF SUB LINE TYPE CONTIGUOUS COLOUR YELLOW (2) The text which describe the property lot numbers for the Plan of Subdivision will be isolated on a unique layer/level. The lot number will be inserted as descriptive text. 4 e: t " LA YERlLEVEL PL LTTEXT FONT MONOTEXT COLOUR YELLOW (2) The digital files should contain enough site data as to allow fQr horizontal and vertical positioning within the existing base mapping. A minimum of two road intersections located outside the Plan of Subdivision must be shown in the drawing. It is not necessary that the digital data be in Universal Transverse Mercator (UTM) co~ ordinates since the registration process will automatically convert any unit grid to the Ontario Base Mapping UTM co-ordinate system"; k) to furnish the Township with a certificate with respect to each lot or building block for which a Building Permit application is made, certitying that the proposed construction is in conformity with the General Location and Lot Grading plan or with an approved variation; (Note: that a professional engineer could also be retained to provide the aforementioned and any cost incurred by the Township will be the responsibility of the Developer or individual lot owner); I) to prepare and provide the Township, for each lot or block within the plan, a certificate of final grade elevation, indicating that the property has been developed in conformity with the General Location and Lot Grading plan or with an approved variation (Note that a professional engineer could also be retained to provide the aforementioned and any costs incurred by the Township will be the responsibility of the Developer or individual lot owner) ; NOTE: In the case of lots built on at a later date, the Township reserves the right to request a similar certificate as required under (k) and (I), but it may be provided by a Professional Engineer, other than the Developer's Consulting Engineer. If the Township has their Engineer prepare the Certificate, the cost of the work will be added to the cost of the Building Permit. 1.2 LEGAL NOTICE TO DEVELOPER Any notice required to be given hereunder may be given by registered mail addressed to the Developer at his principal place of business and shall be effective as of the date of the deposit thereof in the post office, as follows: 771422 ONTARIO INC. 70 Eugenia Street. Barrie, ON L4M lRl The Developer shall be responsible for notifying the Township Clerk in writing of any change(s) in his principal place of business. 1.3 REGISTRATION The Developer consents to the registration of the Subdivision agreement by the Township and at the sole discretion of the Township upon the title of the lands, the registration expenses shall be included as a legal expense to the Developer.. 1.4 VOIDING AGREEMENT In the event that the Plan is not registered within one year from the date of signing this Agreement the Township may at its option, declare this Agreement to be null and void. 1.5 MORTGAGEE BECOMING DEVELOPER The mortgagee(s) hereby agrees that in the event of him/they becoming the Developer(s) of the lands under his/their mortgage by way of foreclosure, purchase or otherwise, either beneficially or in trust, then the mortgage(s) shall be deemed to be postponed to this Agreement and any lands registered in the name of the Township shall be free of the mortgage(s), and the mortgagee(s) agrees to register a discharge of the mortgage(s) on those lands if called upon by the Township, to do so, and he/they shall be subject to the tenns of the Agreement as though he/they had executed this Agreement in the capacity of the Developer, provided that the mortgagee shall not be obligated to expend monies on the completion of the subdivision work contemplated by this agreement. 1.6 ASSIGNMENT OR TRANSFER OF MORTGAGE 5 e: t - 1.14 The mortgagee(s) agrees that in the event of him assigning or transferring the mortgage(s) on the lands, the assignment(s) or transfer(s) shall be subject to the terms hereof, in the same manner as if the assignee or transferrer has executed this Agreement. , 1.7 LANDS FOR MUNICIPAL PURPOSES The Developer agrees to grant in fee simple unto the Township, lands for municipal purposes other than roads, which shall be mutually agreed upon by the Developer and the Township or to make a cash payment in Jieu thereof, as provided by the Planning Act and also convey to the Township in fee simple, the 0.3 metre reserves required by the Ministry of Municipal Affairs and I-lousing. The deeds for the said lands are to be approved by the Township's Solicitor and thereafter, forthwith, registered and deposited with the Township Clerk. The cost for preparation and registration of the said deeds shall be paid by the Developer. 1.8 EASEMENTS The Developer agrees to grant at his expense all such easements atld rights-of-ways as may be required for the installation and supply of services to the subdivision and to deed lands to the Township, as set out in Schedule "0". Prior to executing this agreement, all known easements shall be filcd with the Township in a form approved by the Township's Solicitor. A list of easements and rights-of-way shall be set out in Schedule "0" of this Agreement. 1.9 ONTARIO HYDRO AND BELL CANADA Prior to the Township releasing this proposed Plan for registration, the Developer shall provide the Township with a letter from Ontario Hydro and from Bell Canada, stating that the Developer has entered into a satisfactory agreement with them with respect to the costs of installing underground wiring and financial contributions in this regard. The cost of any relocations or revisions to Ontario Hydro and/or Bell Canada which are necessary to accommodate this subdivision shall be borne by the Developer. 1.10 SIMCOE COUNTY BOARDS OF EDUCA nON W ARNINO The Developer agrees to advise all prospective purchasers that enrolment within the designated public school sites in the community is not guaranteed and that pupils may be accommodated in temporary facilities and/or be directed to facilities outside of the area. This clause is to be placed in any agreement of purchase and sale entered into with respect to any lots on this plan of subdivision. The clause should remain in perpetuity as lots may not be sold or built upon for some time. 1.11 CANADA POST The Developer agrees to construct a site to the specifications and standards of Canada Post and the Township, as requirt(d for the construction of mail boxes by Canada Post. I. 12 WARNING TO PROSPECTIVE LOT DEVELOPERS The Developer shall provide copies of Clauses, 1.10, 1.11,7.3,7.9,7.16,8.1,8.2,8.3,8.4,8.5, and 9.8, to each prospective purchaser ofa lot(s). 1.13 SAVE HARMLESS The Developer covenants and agrees with the Township, on behalf of itself, its successors and as'signs, to indemnifY and save hannless the Township, its servants and agents from and against any and all actions, suits, claims and demands whatsoever, which may arise either directly or indirectly by reason of any work performed by the provisions of this Agreement. The Developer further covenants and agrees to release and forever discharge the Township from and against aU claims, demands, causes of actions, of every nature and type whatsoever that may arise either as a result of the failure of the Township to carry out any of its obligations under this Agreement, or, as a result of the Township performing any municipal work on the said lands or the aqjacent properties which may damage or interfere with the works of the Developer, provided that such default, failure or neglect was not caused as a result of negligence on the part of the Township, its serVants or agents. ENUREMENT This agreement shall endure to the benefit of and be binding upon the parties and their heirs, executors, administrators, successors and assigns. 6 e,' 2.0 , 2.1 2.2 PART 2 THE LANDS. PLANS. AND REPRESENTATIONS SCOPE OF AGREEMENT DESCRIPTION OF LANDS - The lands affected by this Agreement are the lands described in Schedule "A" hereto. PLAN REFERENCE - For the purpose of this Agreement, references are made to the Plan of Subdivision attached hereto as Schedule "B". Any further changes in the said Plan, or any changes in the. Conditions of Draft Approval, issued by the Ministry of Municipal Affairs and Housing, may necessitate a change in the provisions of this Agreement. 2.3 CONFORM lIT WITH AGREEMENT - The Developer covenants and agrees that no work shall be perfonned on the said lands except in confonnity with: 2.3.1) the provisions of this Agreement, including the Schedules hereinafter referred to; 2.3.2) the Plans and Specifications submitted to and accepted by the Township as being within its design criteria including, without limiting the generality of the foregoing, the following: Drawin!! No. Description E-671-1 General Location and Lot Grading Plan (Lots 1-6) General Location and Lot Grading Plan (Lots 7-13) Utility Coordination Plan Storm Drainage Area Plan Plan and Profile - Melville Court 0+000 to 0+240 Plan and Profile - Melville Court 0+240 to 0+480 I)lan and Profile - Melville Court 0+480 to 0+677.63 Detention Pond Details Erosion Control Plan General Details; E-671-2 E-671-3 E-671-4 E-671-5 E-671-6 E-671-7 E-671-8 E-671-9 E-671-10 2.3.3) all Plans and Specifications submitted to and accepted by: (I) The Ministry of the Environment and Energy (MOEE); (2) Ontario Hydro; (3) Simcoe County District Health Unit (lIealth Unit); and (4) Ministry of Transportation (MTO); 2.3.4) all applicable Township By-laws - including any applicable Site Plan Control By-laws; 2.3.5) all applicable Provincial and Federal Lcgislation. 2.4 RELIANCE UPON REPRESENT A nONS -TIle Developer acknowledges that: - 2.4.1) it has made representation to the Township that it will complete all municipal and other works required herein, in accordance with the Plans filed and accepted by the Township and others, and; 2.4.2) the Township has entered into this Agreement in reliance upon those representations. 7 e: , - 2.5 SCHEDULES ATTACHED - The following schedules are attached to and fonn part of this Agreement: Schedule "A" Schedule "B" Schedule "c" Schedule "0" Description of Lands Being Subdivided Plan of Subdivision Works to be Constructed Itemized Estimate of Cost of Construction of Each, Part of the Works List of Lots Unsuitable for Building Purposes and/or Requiring Special Attention Cash Deposits, Development Charges & Securities Deeds and Easements to be Conveyed Parkland Declaration of Progress and Completion General Location and Lot Grading Plans, Drawings E-671-1 (Lots 1-6) and E-671-2 (Lots 7-13) Schedule "E" Schedule "F" Schedule "G" Schedule "H" Schedule "I" Schedule "J" 2.6 Subdivision Changes There shall be no changes in the Schedules attached hereto, or in any Plan accepted by the Township or others, unless such proposed changes have been submitted to, and approved by, the Township and/or the Township Engineer, or his authorized represent~tive. 8 r e: , - I)ART - 3 REQUIREMENTS PRIOR TO EXECUTION OF AGREEMENT 3.1 Prior to the execution of this Subdivision Agreement by the Township, the Developer shall: 3.1.1) Taxes - have paid all Township tax bills issued and outstanding against the said lands, 3.) .2) Deeds and Easements - have delivered to the Township all transfers/deeds, discharges and easements or other documents including 0.3 metre reserves required by Schedule "0", 3.1.3) Postponement Mortgage/Charge - file with the Township Solicitor, for his approval, a postponement of Mortgage/Charge document as required by Schedule "0" 3.1.4) Cash Deposits. Development Charges & Security - have paid to the Township all cash deposits, development charges and security required by Schedule "D" & "F", 3.1.5) Construction/Engineering Plans & Specifications - have supplied to the Township those Plans and Specifications necessary to identify the construction/engineering aspects of the proposed development, and have received from the Township an acknowledgment of confonnity with general design concepts of the Township, , 3.1.6) lIydro - have supplied to Ontario Hydro, and received their approval of, those plans necessary to identify the electrical distribution system, lighting requirements, and power supply to each lot or building or unit, as the case may be, and these are to be to the required Township standards which includes underground wiring, 3. 1.7) Insurance Certificate - file with the Township Solicitor an insurance certificate confinning those coverages specifically set out hereafter, 3.1.8) Consulting Engineer's Letter - ensure that each Consulting Engineer (who must be experienced in the field of municipal services) for the Developer, file with the Township, a letter confinning the tenns of his retainer, and which letter shall be in draft fonnat supplied by the Township, 3.1.9) Utilities and Canada Post Confirmation - arrange for Hydro, Bell Telephone, the Natural Oas Utility, Cable T.V. and Canada Post, to write a letter to the Township Clerk confinning: 3.1. 9.1) that they have been infonned of the project, and have seen the development plans, 3.1.9.2) that satisfactory arrangements have been made with them for servicing the subdivision without expense or obligation on the part of the Township. 3.1.9.3) casement requirements, if any, 3. I .10) Land Ownership- be the registered owner in fee simple of the lands described in Schedule "A", and that there will be no encumbrances registered against the said lands. 3.1.11) Ministry etc. Approvals - obtain and file with the Township confinnation approvals from the following: 3.1.11.1) 3.1.11.2) 3.1.11.3) 3.1.11.4) MOEE; Ontario Hydro; Health Unit; MTO, 3.1.12) Lot Sizes - file with the Township a certificate from an Ontario Land Surveyor confirming that the frontage and area of each lot meets the minimum requirements of the Township zoning By-law, 9 ... 3.1.13) Community Mail Boxes - file with the Township a Plan showing the location of, and access to, community mail boxes, 3.1.(4) Mylars - provide for registration, mylars of all Plans incorporated into this Agreement as Schedules, , 3.1.15) Fire Chief Approval-obtain an Approval from the Fire Chief of the Township confioning and approving of the proposed plans for fire protection, and specifYing any hydrants, or other equipment or appurtenances required. . to e.' , . PART - 4 PRE-CONSTRUCTION REQUIREMENTS, 4.1 Prior to Starting Constmction of the Subdivision Works, the Developer shall: 4.1.1 J>lan Registration Obtain final'approval of the Plan from the Ministry of Municipal Affairs and Housing and obtain registration of the Plan; 4.1.2 Approval Of Plans The Developer and the Engineers employed by him shall have the plans and specifications tor the works approved by the Township Engineer prior to constmction and the originals must be stamped as accepted by the Township Engineer. Submit and obtain the Township Engineer's approval of the following, all to be in accordance with the Township's approved Engineering standards; i) the drainage plan; ii) the lot grading plan; iii) the service layout plan for Hydro, Telephone and Gas; iv) the road and sewer plans and profiles. 4.1.3 Certificate Of Approval Submit to the Township, the Ministry of the Environment and Energy's Certificate of Approval for Stonn Sewers and detention pond; 4.1.4. Contractor The said services shall be installed by a contractor or contractors retained by the Developer and approved in writing by the Township Engineer. The Township and Township Engineer are to be provided with the names and phone numbers of personnel responsible for the Works, including emergency phone numbers. 4.1.5 Scheduling Of Works Prior to the start of constmction, the Developer shaH supply, for the Township Engineer's, approval, of a Schedule of Works, setting out the order in which he considers the various sections of the works within the Plan will be built. The Township Engineer may amend this Schedule and the Developer shall constmct, install or perform the works as the Township Engineer from time to time may direct. In any event, the Schedule, or amended Schedule, as the case may be, shall conform to the requirements of Clause 4.1.8. 4.1.6 Erosion And Siltation Control The Developer must take all necessary precautions to prevent erosion and sedimentation of sewers, ditches, culverts, slopes, etc. both within the Subdivision and downstream prior to and during constmction and upon completion of servicing of the Subdivision. Failing adequate precautions being taken the Developer shaH be responsible for correcting any damage and paying all maintenance costs resulting therefrom. A Storm Drainage and Siltation Control Plan shall be prepared by the Developer's Engineer for approval by the Township Engineer. Prior to any grading or eonstmction commencing on the site or final approval and registration of Subdivision, the Developer's Engineer shall submit the plan for approval by the Township Engineer. TIle plan shaH detail the means whereby erosion and siltation and their effects will be minimized on the site during and after the constmction period. The Developer agrees to carry out or cause to be carried out the work approved in the Plan, and such work will be certified in writing by the Developer's Engineer. TIle Developer agrees to maintain all erosion and siltation control devices in good repair during constmction. 11 ~e.' 4.1.7. Signs , Signs at least 1.2 meters by 1.8 meters shall be provided and erected by the Developer at each entrance to the subdivision at a location approved by the Township Engineer and the signs shall read as follows: "Roads Not Assumed by Township - Use at Your Own Risk". The signs shall be painted either orange or yellow with black lettering. These signs shall be installed prior to the commencement of constmction and be removed after the issuance of the Certificate of Substantial Completion and Acceptance (Above ground Services). 4.1.8 Notification Of Commencement And Completion The Developer shall not commence thc constmction of any of the works until the Developer has provided forty-eight (48) hours written notice to the Township Engineer, of his intent to commence work. The Developer shall complete the works expeditiously and continuously, and all underground services shall be installed within one year of the day of registration of this Agreement, and all above-ground services shall be installed in accordance with the Declaration of Progress and Completion as required under Clause 7.11 of this Agreement, but no longer than two years from the date of registration of this Agreement, unless extended by the Township Engineer. Should for any reason there be a cessation or intermption of constmction, the Developer shalJ provide forty-eight (48) hours written notice to the Township Engineer before work is resumed. If the Municipal Services to be constmcted by the Developer under this Agreement arc not completed and accepted by the Township within the above time frame, the Township may either: (a) give notice to the Developer to stop work on the said Municipal Services and to provide that no further work shall be done with respect to such services until an Amending Agrcement, incorporating the Standards, Specifications and financial requirements of the Township, in effect as of that date, is executed by all parties; or (b) give notice to the Developer to stop work on the Municipal Services and inform the Developer that the Township proposes to realize on its security and proceed with the completion of constmction in accordance with the provisions of the Plans filed with the Township. 4.2 BREACH OF AGREEMENT If the Developer commences or causes constmction of the works prior to satisfying the requirement of this Agreement it shall be subject to the penalties identified in Part 10. . 12 e: PART - 5 FINANCIAL REQUIREMENTS 5.1 DEVELOPER'S EXPENSE Every provision of this Agreement by which the Developer is obligated in any way shall be deemed to include the words "at the expense of the Developer" unless specifically stated otherwise. , 5.2. TOWNSHIP'S LEGAL. PLANNING AND ENGINEERING COSTS The Developer agrees to pay to the Township, the cost of the Township's lawyer and planner for all costs involved in processing the subdivision and of the Township's Engineer for checking of plans and specifications and inspection on behalf of the Township. The inspection by the Township will depend on the type of construction and the amount provided wiU be deemed necessary by the Township. In this regard, the Developer agrees to pay to the Township, the sum of Seven Thousand Dollars ($7,000.00) upon submitting a Plan to the Township for consideration to be applied to account of such costs. As accounts are received from the Township planner, lawyer, and engineer, they will be paid by the Township and then submitted to the Developer for reimbursement within thirty (30) days so that the initial deposit will again be built up to enable the Township to pay the next accounts as they are received. The charges for the Township Engineer will be based on payroll costs, times a factor of two, plus properly incurred expenses. In the event that the deposit is drawn down to a level of Five Thousand Dollars ($5,000.00) or less, and the Developer does not pay the accounts within thirty (30) days, it is hereby understood and agreed that the Developer would be in default of this Agreement and the Township may, without notice, invoke default provisions as set out in this Agreement. 5.3 DEVELOPER'S LIABILITIES Until the Township has issued the Certificate of Maintenance and Final Acceptance for the works, the Developer shall indenmify the Township against all actions, causes of action, suits, claims and demands whatsoever which may arise either directly or indirectly by reason of the Developer undertaking the Plan and the Township shall not be deemed to be the Developer. 5.4 UTILITY COSTS AND CHARGES The Developer shall deal directly with the Hydro Commission and all other Utility commissions and companies. He or his Consulting Engineer, shall obtain all approvals and permits and pay all fees and utility charges directly to the Utility until the Certificate of Maintenance and Final Acceptance (Underground Services) is issued. If an additional hydro service is required for Township purposes, the Developer shall include the cost of installation and maintenance of the service. 5.5 DEVELOPMENT CHARGES, ACT LEVIES AND DRAINAGE AND LOCAL IMPROVEMENT CHARGES a) The Developer, as a capital contribution towards other Township services, will pay to the Township in addition to all other monies required to be paid by the Developer under this Agreement the Development Charges Act Levy in an amount required by the Township's Development Charges By-Law, on the date the payment is received by the Township at the Municipal Office. The Development Charges Act Levy in place at the time of the execution of this Agreement is Five Thousand, two hundred and twenty-five dollars ($5,225.00) per dwelling unit. . b) An amount equal to or greater than the hard services portion of the total Development Charges Act Levies for all the lots, must be paid at the time of execution of the Subdivision Agreement. Prior to issuance of a building pennit the remainder of the Development Charges Act Levy is to be paid on a per lot basis, until levies have been paid for all lots. The Developer agrees to pay for all arrears of taxes or other Township or provincial charges, taxes or levies outstanding against the property herein described before the approval of the said plan is obtained. The Developer further undertakes and agrees to pay taxes levied on the said lands on the basis and in accordance with assessment and collector's roll entries until such time as the lands herein being subdivided have been assessed and entered on the Collector's Roll according to the Registered Plan. c) Before the plan is approved, the Developer agrees to commute and pay the Township's share of any charges made under the Drainage Act 1975 and Local Improvements at present serving this property and assessed against it. These charges arc set out in Schedule "F" of this Agreement. 13 ... 5.6 SECURITIES , Prior to signing the subdivision agreement, the Developer will deposit with the Treasurer of the Township to cover the faithful performance of the contract for the installation of the said services and the payment of all obligations arising thereunder the following securities: a) Cash in the amount of one-hundred percent (100%) of the estimated cost of the said work as approved by the Township Engineer and Township Council, or b) An irrevocable Letter of Credit from a chartered Bank, issued in accordance with the requirements of the Township Solicitor with an automatic renewal clause, in the amount of one hundred percent (100%) ofthe estimated costs of the said works as set out in Schedule "0" and as approved by the Township Engineer. The Letter of Credit shall be for a minimum guaranteed period of one (I) year or such time as the Township decides and shall be renewed automatically as necessary three (3) months prior to expiration. Unless the Letter of Credit is renewed as noted above, the Township shall have the absolute right to refilse to issue building permits and to prohibit occupancy of homes, whether partially or fully completed, from the said date three (3) months prior to the expiration of the Letter of Credit, or the Township may cash the Letter of Credit until a satisfactory Letter(s) of Credit is received by the Township. c) Notwithstanding the provisions of subparagraphs (a) and (b) above, the estimated cost of the Works as set out in Schedule "0" will be reviewed and updated by the Township Engineer on each anniversary of the date of execution of this Agreement. In the event of an increase, the Developer shall provide additional security as required by the Township Engineer within thirty (30) days of notice by registered mail from the Township Engineer. In the event that the Developer fails to deliver to the Township the additional security as required by the Township Engineer, it is hereby understood and agreed that the Developer be .deemed to be in default of this Agreement and the Township may, without notice, invoke default provisions as set out in this Agreement. The Township reserves the right to accept or reject any of these altemative methods of providing securities. Prior to depositing the securities, the Developer's Engineer shall submit an estimate of the cost of the works to the Township Engineer for approval. When the cost estimate has been approved it will be set out in Schedule "D" of this Agreement and will become the basis for the limits of the securities. In the event that the Contract price for the Township Services set out in Schedule "D" is greater by I 0% than the estimates in the said Schedules, then the security provided for above shall be increased to an amount equal to the tendered contract price. d) Application - Any Letter of Credit or security filed with the Township is based upon tJIC estimated cost of completing the various matters prescribed by this Agreement. However, all Letters of Credit and Security received by the Township may be used as security for any item or any other matter which under tJle terms of this Agreement is the responsibility of the Developer, including without limiting the generality of the foregoing, payment of engineering, legal, planning or other costs incurred by tJle Township which are the responsibility of the Developer under tJle terms of this Subdivision Agreement. c) Default - If, in the event of default of the Developer under any of tJle provisions of this Agreement, it becomes necessary for tJle Township to realize on its security or deposits, then the Township (its servants, agents or sub-contractors) shall, if tJIe Township so elects, have the right and privilege at all times to enter upon the said lands for the purpose of repairing or completing any work or services required to be completed by the Developer under this Agreement. f) . g) Exceeding Cost Estimates - If the costs of completing such work or service, exceeds tJle anl0tUlt of security held by the Township, such excess shall be paid by tJle Developer to tJIe Township thirty (30) days after invoicing by the Township. All overdue accounts shall bear interest at the rate of 12% per annum. Save HannJess - TIle Developer on behalf of itself, its successors and assigns agrees to indemnifY and save hannless the Township rrom and against any and all claims, suits, actions and demands whatsoever which may arise either directly or indirectly by reason of any work or service perfonned by the Township, its servants or sub-contraetors in order to complete the work or services required to be completed under this Agreement, provided the subject matter of such action, suits, claims or demands was not caused intentionally or through gross negligence on the part of the Township, its servants or agents orsub-contra~ors. 14 e 11) TIle Construction Lien Act - Ifthe Township becomes obligated to make any payments, or pay any costs, under the provisions of Section 17(4) ofthe Construction Lien Act, R.S.O. 1990, c.C.30, this will constitute a default and entitle the Township to realize upon its security. i) Surplus Funds - In the event that the Township cashes a Letter of Credit to complete Township services, any surplus monies that remain after this work is completed shall, upon full compliance by the Developer with the tenns of this Agreement, be returned to the issuing financial institution for transmission to that party that took out the original Letter of Credit. . 5.7 DISCHARGE OF SECURITIES After the completion of fifty percent (50%) of the services based on the total Estimated cost of Works in the subdivision or in an approved stage of the subdivision and provided the Developer is in compliance Witll all aspects of the Subdivision Agreement tlle Developer shall, as the work further proceeds to completion, have the privilege, on application to the Township and upon Certification of tlle Township Engineer, of obtaining reductions of tlle cash or Letter of Credit deposited for the installation of the services, in increments of not less than ten percent (10%). Upon application for reduction of the securities, the Developer's Engineer shall provide an estimate of tlle cost to complete the work. This amount when approved by the Township Engineer shall be retained along with twenty percent (20%) of the original estimate and the remainder released. A furtJler ten percent (10%) oftlle original estimate will be released upon satisfactory assurance to the Township that tllere are no liens pursuant to the Construction Lien Act affecting lands conveyed or to be conveyed to tlle Township Witllin tlle Plan of Subdivision pursuant to tlle tenns of this Subdivision Agreement. 5.8. STATUTORY DECLARATION OF ACCOUNTS PAID The Developer agrees that upon applying for a Discharge of Securities, or for a Certificate of Substantial Complefion and Acceptance, or for a Certificate of Maintenance and Final Acceptance for the services within the subdivision, or upon applying for prior acceptance of the underground services, he shall supply the Township with a Statutory Declaration that aU accounts for work and materials for said services have been paid and that the construction Lien Act has been complied with and that no liens thereunder have or can be registered except normal guarantee holdbacks and that there are or will be no claims for liens or otherwise in connection with such work done or ,materials supplied for or on behalf of the Developer in connection with the subdivision. 5.9 PLEDGE OF TITLE TO LANDS TIle Developer hereby charges and pledges as security for aU costs, charges, expenses or obligations of tlle Developer under the provisions of this Subdivision Agreement aU of its right, title and interest in the said lands, and consents to the registration of this Subdivision Agreement against title to the said lands. TIle Developer furtJler agrees that all costs, charges or expenses incurred by the Township in satisfYing the obligations of the Developer in the event of default of tlle Developer under the tenns of tllis Subdivision Agreement, together with any costs, charges or expenses incurred by the Township in enforcing the obligations of the Developer under tllis Agreement, shall be a first charge or lien against the said lands in accordance with the provisions of Section 326 of the Municipal Act, R.S.O. 1990, c.M.45. 5.10. It-/SURANCE CERTIFICATE 1\.tlP POLICY 5.1 (}.I Policy of Insurance - The Developer shall lodge with the Township, on or prior to the execution of the Agreement, an insurance certificate with an Insurance Company satisfactory to the Township, (which said approval shall not be unreasonably withheld or delayed), and insuring for the joint benefit of the Developer and the Township, against any liability that may arise out of the construction or installation of any work to be performed pursuant to this Agreement and for a period of one (I) year after completion and acceptance of the Township Services to be constructed herein. . 5.1 (}.2 Comprehensive General Liability - Such policy shall carry limits of JiabiJity in the amount to be specified by the Township, but in no event shall it be less than Five Million Dollars ($5,000,000.00) inclusive comprehensive general liability and such poJicy shall contain: (a) a cross-liability clause; (b) product/completed operation coverage; (c) shall not have an exclusion pertaining to blasting, provided that any blasting required to be done shall be done by an independent contractor duly qualified to do such work; (d) shall include the following names as insureds: (i) THE CORPORATION OF TI-IE TOWNSHIP OF ORO-MEDONTE 15 e. , , PART - 6 STAGING OR PHASING 6. I STAGING OR PHASING The Township, in its sole discretion, may instruct the Developer to construct the services in particular stages or phases suitable to the Township and the Developer must comply, on temlS to be agreed to by the Township. If the Township does not so instruct, the Developer, before commencement of any work, may request the Township's pennission to divide the area of the subdivision into convenient stages. If the work is thus staged, as approved by the Township, then in lieu of filmishing' cash payment or letter of credit all as set out in Clause 5.6 for one hundred percent (100%) of the estimated costs, as approved by the Township Engineer, the Developer shall deposit security for part of the services the Township has approved. Before proceeding with an additional stage the Developer shall obtain the written approval of the Township and no service will be permitted to be installed and no building permits issued until this approval has been received and additional securities deposited. When fifty (50%) of the lots of the subdivision or stages of the subdivision have been built upon and all the services have not been completed and approved by the Township Engineer, the Township reserves the right to refuse commencement of the next stage until all services have been installed and approved. In no event will further subdivisions of the Developer or stages of subdivisions of the Developer be approved if all services of the active stage approved by the Township Engineer have not been completed within a two (2) year period after registration of this Agreement. Notwithstanding anything hereinafter set out, the Township shall not be obligated to assume the responsibility for and take over the subdivision services until at least fifty percent (50%) of the lots on the subdivision or stage of the subdivision have completed dwellings erected therein and Final Certificate of Occupancy has been issued. The Developer shall be responsible for the maintenance of the services in this case until the Township has assumed the responsibility ofthe services. I7 re. , I 7.1 PART -7 CONSTRUCTION REQUIREMENTS WORKS TO BE INSTALLED The works to be installed are set out in Schedule "C" to this Agreement. This schedule is to set out the works in general tenns only and shall not be construed as covering all items in detail. The works are to be designed and constructed in accordance with the ,current Engineering standards adopted by-law by the Township at the time of signing of the Subdivision Agreement. A copy of these standards is available at the Municipal Oftice. If at any time and from time to time during the development of the subdivision, the Township Engineer is of the opinion that additional works are necessary to provide adequately any of the public services required by the Plan, the Developer shall construct, install or perfoml such additional works at the request of the Township Engineer. 7.2. CONSTRUCTION OF WORKS FoUowing the registration of this Agreement, the Developer shall cause to be constructed all requisite works, in order to provide services to the lots and buildings blocks within the Phase. 7.3. PRESERVATION AND PLANTING OF TREES 7.3.1 TIle Developer must preserve all healthy trees within the limits of the subdivision where possible. If, in the opinion of the Township Engineer, indiscriminate removal of trees takes place within the limits of the Plan of Subdivision including road allowances, parkland, and individual lots, the Township shall have the option of having a stop work order on construction of the services and/or building on a particular lot where the removal is taking place. Work will not be allowed to proceed until the Township is satisfied that the practice will not continue and the Developer/Builder agrees to carry out remedial work requested by the Township. The Developer agrees to provide a copy of this clause to each and every prospective builder/ prospective purchaser. 7.3.2 The Developer shall plant two 2.4 metre or taller hardwood trees of a minimum of 50mm calliper on each lot having less than three trees in the front yard(s) if required by the Township. The type of trees must be satisfactory to the Township. 7.3.3 In addition, the Developer shall plant trees with the above specifications at I5-metre intervals around the perimeter of the park. 7.4 MOVEMENT OF FILL The Developer covenants and agrees that he shall not dump nor permit to be dumped any fill or debris on, nor shall he remove or pennit to be removed any fill, topsoil, trees or shrubs from any public or municipal lands, without the written consent ofthe Township Engineer. 7.5 BLASTING 7.6 Before any blasting is proceeded with by the Developer, the Developer shall obtain from the Township Engineer or Township Public Works Ofticial, written pennission, for carrying out the blasting operation, and shall obtain the blasting penn it and show proof of insurance for aU damage or claims for damage resulting from the blasting operation. The Developer in any event shall be responsible for any such claims. ACCESS ROADS All access roads must be maintained by the Developer in good repair acceptable to the Township Engineer and Township Public Works Ofticial during the time of construction, including dust control and the removal of any mud or debris tracked from the subdivision, and no roadway outside the limits of the proposed subdivision may be closed without the written consent of the Township Public Works Ofticial. For the purpose of getting such consent, the Developer shall advise the Township Public Works Official and the Township Clerk ofthe date and time they wish to close a roadway. The Township reserves the right to limit or prohibit the use of any existing access road by the Developer. 18 .' , , 7.7 DAMAGE TO EXISTING PLANT The Developer shall repair any damages caused to an existing road, Road Allowance or existing structure or plant located on the Road Allowance as a result of the subdivision development and shall pay for any costs involved in the relocation of existing services, such as hydrants, telephone poles, etc., which may become necessary because of the development of the subdivision. In this regard the Developer's Engineer shall arrange for an inspection with the Township Public Works Official and Township Engineer for the purpose of compiling an inventory of existing conditions prior to work on the subdivision. Otherwise the Township Public Works Official's assessment of conditions prior to construction will be final. 7.8 DUST CONTROL Until the Certificate of Substantial Completion and Acceptance (Aboveground Works) has been issued, the Developer shall apply calcium to the roads within the S'ubdivision and/or utilized by construction traffic, in quantities sufficient to prevent any dust problem to traffic or home occupants, to the satisfaction of the Township Engineers. If the Developer has not taken remedial action within twenty-four (24) hours of receiving a written notification (via facsimile) from the Township's Engineer regarding a dust control problem, then the Township's Engineer, at their sole discretion, shall employ outside forces to implement, at the Developer's expense, a suitable measure of dust control. 7.9 CONSTRUCTION REFUSE All construction refuse, garbage and debris from the subdivision must be disposed of in an orderly and sanitary fashion by the Developer, off the site of the subdivision, at a licensed landfill site. The Township is not responsible for the removal or disposal of refuse, garbage and debris. Open air burning is not pennitted by the Township. TIle Developer agrees to deliver a copy of this Clause to each and every builder obtaining a building permit for any lot or part of a lot on the said .plan of subdivision. 7.10 INSPECTION OF CONSTRUCTION OF SERVICES During construction of the services, the Township may inspect the work in hand at such times and with such duration and frequency as the nature of the type of construction may dictate. Su~ject to the obligations of the Township Engineer to protect the interests of the Township through such inspections, every effort will be made to keep duplication of engineering services on site to a minimum. If during such inspections the Township Engineer perceives that construction, whether by method or otherwise, constitutes an immediate danger to life or property, or construction does not confonn to acceptable practice in order to meet the requirements for services, he will have the authority to cease construction operations by verbal notice to the contractor and/or the Developer's Engineer, such notice to be confinned in writing as soon as possible thereafter. A copy of this Clause shall be delivered by the Developer to each and every contractor engaged in construction of services for the Subdivision. 7.11 DECLARATION OF PROGRESS AND COMPLETION a) Prior to the approval of the underground services, the Developer shall provide the Township Engineer with an undertaking for the completion dates of all remaining works required by this Agreement and in a fonn similar to that attached to this Agreement as Schedule "I", the Declaration of Progress and Completion for approval of the Township Engineer. The Township reserves the right to alter the completion dates as it sees fit and the Developer agrees to complete the services. b) It is understood and agreed that should the Developer fail to construct the remaining services, as stipulated, and by such dates as provided in the Declaration, the Developer shall pay to the Township as predetennined liquidated damages, the sum of Fifty Dollars ($50.00) for each and every day the said services ;:ire behind schedule of construction, and NO FURTHER BUILDING PERMITS SHALL BE ISSUED. 19 Ie' , t 7.13. 7.12 PROGRESS OF WORKS After the completion of the underground services the Developer shall complete the Declaration of Progress and Completion for the approval of the Township Engineer and trom that date the said Declaration shall apply and take precedence over Clause 4.1.5. Prior to signing the Declaration of Progress and Completion the Developer shall install all works in accordance with the Schedule of Works or as directed by the Township Engineer. If he fails to adhere to the scheduling provisions outlined in the Schedule of Works or the Declaration, or, having commenced to install the aforesaid works, fails or neglects to proceed with reasonable speed, or in the event that the aforesaid works are not being installed in the manner required by the Township Engineer, then upon the Township Engineer giving seven (7) days written notice by prepaid registered mail to the Developer, the Township Engineer may without further notiee enter upon the said land and proceed to supply all materials and to do all necessary works in connection with the installation of the said works, including the. repair or reconstruction of faulty work and the replacement of materials not in accordance with the specifications, and to charge the costs thereof together with an engineering fee of ten percent (10%) of the cost of such materials and works to the Developer who shall forthwith pay the same upon demand. If the Developer fails to pay the Township within thirty (30) days of the date on the bill, the money owing may be deducted from the cash deposit or Letters of Credit. It is understood and agreed between the parties hereto that such entry upon the land shall be as agent for the Developer, and shall not be deemed for any purpose whatsoever, as an acceptance or assumption of the said works by the Township. The Township, in addition to all other remedies it may have, may refuse to issue building permits until such works are completely installed in accordance with the requirements of the Township Engineer. It is agreed that a copy of this clause be delivered by the Developer to each and every builder obtaining a building permit for any lot or part of a lot on the said plan. ' SUBSTANTIAL COMPLETION OF UNDERGROUND SERVICES It is intended that the hydro and street lighting, sewer system and detention pond will be constructed, inspected and approved prior to the completion of the other Works. Building penn its will not be issued until the Township Engineer has given the Certificate of Substantial Completion and Acceptance (Underground Services). The two (2) year maintenance l)eriod for the underground services will commence when this Certificate is issued. . During the maintenance period, the Developer shall be responsible for the nonnal operation and maintenance, and all. repairs for the services noted in the Certificate. I f, during the two year maintenance period, the Developer fails to carry out rectification and/or repair work as requested by the Township, then the Township may carry out the work and be reimbursed the cost of the work from the Developer's securities as set out under Clause 9.3. Notwithstanding anything hereinafter set out, the Township shall not be obligated to assume the responsibility for and take over the subdivision services until fifty percent (50%) of the lots on the subdivision or stage of the subdivision have completed dwellings erected therein and Final Certificate of Occupancy has been issued. The Developer shall be responsible for the normal operation, maintenance, and all repairs of the services in this case until the Township has assumed the responsibility of the services. 7.14. EMERGENCY REPAIRS 7.15 Employees or agents of the Township may enter onto the Lands at any time or from ti~~ to time for the purpose of making emergency repairs to any of the works. Such entry and repairing shall not be deemed an acceptance of the works by the Township or any assumption ~y th~ T~wnship of any liability in connection therewith or a release of the Developer from any of hJS obhgatlons under this Agreement. USE OF WORKS BY TOWNSHIP: The Developer agrees that: a) The works may be used prior to acceptance, by the Township or other authorized persons for the purpose for which such works are designed. b) Such use shall not be deemed an acceptance ofthe works by the Township, and c) Such use shall not in any way relieve the Developer of his obligations in respect of the construction and maintenance of the works so used. . 20 'e' 7.16 DRAINAGE AND LOT GRADING All lots and blocks within the Plan and all lands abutting the Plan shall be graded to drain in accordance with the overall grading plan to be prepared by the Developer's Engineer for approval by the Township Engineer and the Simcoe County District Health Unit. Some fill and regrading of lots may be necessary during or after building construction. The grading Plan shall show all existing and final grades on lot corners as well as mid lot elevations where deemed necessary by the Township Engineer. . It is understood and agreed by the parties hereto that drainage of surface water on the lots and blocks on the plan is the sole responsibility of the respective lot owners once the required drainage works have been constructed by the Developer. 111e stonn swales shall be landscaped and maintained by all subsequent lot owners. 111e purpose of the storm swales is to accommodate storm drainage waters from the subject lot and adjacent lands. No lot owner in the Subdivision shall encumber or impede storm drainage in any manner whatsoever. In the event that the Developer, or any subsequent lot owner , obstructs, impedes, or interferes with the storm drainage flow through any part of the storm swale, or interferes with the acceptance of water from any connecting swales, then the Township shall have the right, if it so elects, to enter upon the subject lands to rectifY such problems so that the swales can serve their original purpose. Within the swale area, the Developer, and any subsequent lot owner, shall not, construct any works, remove or permit to be removed any soil from the said swale/easement, excavate, drill, install, erect or penn it to be excavated, drilled, installed or erected in, over, upon, under or through the said swale/easement any fence, well, foundation, pavement, building or other structure or other installation. The lot owner of any lot in the Subdivision upon which the Township elects to enter for the purpose of rectifYing the said work, hereby agrees to indemnifY and release the Township from and against all claims, demands, actions or causes of action whatsoever arising as a result of the Township' or of its servants or agents entering upon the lands for the purpose of correcting drainage problems. 111e cost of such work will' be for the account of the lot owner. Any invoices not paid within thirty (30) days after due date, shall be added to the tax roll and collected in a like manner as realty taxes. The Developer agrees to deliver a copy of this Clause to each and every prospective purchaser and/or builder obtaining a building penn it for any Jot or part of a lot on the said Plan of Subdivision. The Developer's Engineer shall prepare a drainage plan for the site for the approval of the Township Engineer and the Simcoe County District Health Unit. Generally, the drainage facilities will consist of open ditches within the subdivision or stonn sewers in certain locations to provide a satisfactory drainage outlet. The plan will show how water will be controlled on and off the site and will include swales and/or casements where necessary. 7.17 PARKLAND WORKS All parkland works indicated on the Park Development Plan arc to be construction in accordance with Section 14 - Park Requirements of the Township of Oro-Medonte Engineering Standards and Drawings. The parkland must be completed to the satisfaction of the Township prior to issuance of 25% ofthe total building permits allowed in the subdivision. 7.18 DEFINITIONS For the purposes of this Subdivision Agreement (a) The tenn "Underground Services" shall mean the stonn drainage works (including culverts, stonn sewer and detention pond), underground eleetrical distribution system and streetlighting serving the Plan of Subdivision, as more particularly described in Schedule "C" to this Subdivision Agreement; . 21 e' (b) TIle tenn "Certificate of Substantial Completion and Acceptance (Underground Services)" shan mean a Certificate issued by the Township upon the recommendation of the Township Engineer continning that the Underground Services to be installed by the Developer under the provisions of this Subdivision Agreement, as more particularly identified in Schedule "C", have been substantially completed in accordance with plans and specifications reviewed and accepted by the Township Engineer. The issuance of a Certificate of Substantial Completion and Acceptance (Underground Services) shall not constitute an assumption of the Underground Services by the Township; , (c) The tenn "Certificate of Maintenance and Final Acceptance (Underground Services)" shall mean a Certificate issued by the Township upon the recommendation of tIle Township Engineer confinning tIlat tIle Underground Services constructed by the Developer in accordance with tIle tenns of this Subdivision Agreement, and as more particularly identified in Schedule "C" have been satisfactorily completed and maintained by the Developer during the two-year maintenance period, and issuance of the said Certificate shall constitute final acceptance and assumption of the Underground Services by tIle Township; (d) TIle tenn "Aboveground Services" shall mean all municipal services to be constructed by the Developer pursuant to the tenns of tIlis Subdivision Agreement, as more particularly identified in Schedule "C", excluding Underground Services; (e) The tenn "Certificate of Substantial Completion and Acceptance (Aboveground Services)" shall mean a Certificate issued by the Township upon the recommendation of the Township Engineer continuing that tIle Aboveground Services to be installed by the Developer under the provisions of tIlis Subdivision Agreement, as more particularly identified in Schedule "C", have been substantially completed in accordance with plans and specifications reviewed and accepted by the Township Engineer. TIle issuance of a Certificate of Substantial Completion and Acceptance (Aboveground Services) shall constitute an assumption of the Aboveground Services by the Township for winter maintenance only; (t) The tenn "Certificate of Maintenance and Final Acceptance (Aboveground Services)" shall mean a Certificate issued by the Township upon the recommendation of tIle Township Engineer confinning that the Aboveground Services constructed by tIle Developer in accordance with tIle tenns of this Subdivision Agreement, and as more particularly identified in Schedule "C", have been satisfactorily completed and maintained by tIle Developer during the two-year maintenance period, and issuance of the said Certificate shall constitute final acceptance and assumption of the Aboveground Services by tIle Township; (g) TIle tenn "Certificate of Substantial Completion and Acceptance" means a Certificate of Substantial Completion and Acceptance (Underground Services) or a Certificate of Substantial Completion and Acceptance (Aboveground Services), as the provisions of this Subdivision Agreement require; (h) The tenn "Certificate of Maintenance and Final Acceptance" means a Certificate of Maintenance and Final Acceptance (Underground Services) or a Certificate of Maintenance and Final Acceptance (Aboveground Services), as tIle provisions of tIlis Subdivision Agreement reqUIre. . 22 e' . . PART - 8 BUILDING PERMITS AND OCCUPANCY 8.1 SIMCOE COUNTY DISTRICT HEALTH UNIT APPROVAL 11\e Developer further agrees that he or any person, persons, or Corporation claiming title through the Developer, will not apply for a Building Permit for any part or portion of the said lands or on any lot therein, and no Building Pennit shall be issued until Simcoe County District Health Unit Approval has been received for the land in question. The Developer's Engineer shall prepare an overall lot development plan for approval by the Simcoe County District Health Unit and the Township Engineer as a further requirement to Clause 7.16. The plan shall include the following: (a) envelopes for the proposed house and any adjacent structures on each lot; (b) an envelope' showing the location, size and elevation of the subsurface sewage system on each lot and all pertinent engineering design criteria; (c) existing and proposed grades of the disturbed area of lot after building, drainage and sewage works have been completed; (d) existing and proposed grades on lot corners and mid lot elevation; ( e) location and type of proposed water well. The Developer agrees to advise all prospective lot Developers that a detailed site development plan for each lot will be required to be prepared by a Professional Engineer registered with the Association of Professional Engineers of Ontario, for approval by the Simcoe County District Health Unit and the Township Engineer prior to the issuance of a Building Pennit for each respective lot. Site development plans which confonn to the overall lot development plan at an approved metric scale using metric dimensions and elevations, shall include the following: (a) the location, dimensions and elevations of the proposed dwelling and any structures to be located on the lot as well as any adjacent structures on the adjacent Jot(s); , (b) the location, size and elevation of the sewage system and all engineering design criteria and standards pertaining thereto; (c) (d) the location and type of water well including the water service line to the dwelling; the existing and proposed grades of the disturbed area on the lot after building, drainage and sewage works have been completed; the location and grades of any proposed drainage swales; the professional engineer will be required to check the elevations of the footings of the buildings prior to further construction to ensure confonnity with the approved plans noted above; (e) (t) (g) the professional engineer will be required, prior to the issuance of a Use Permit, to certity to the Simcoe County District Health Unit in writing that the foregoing works have been carried out in accordance with the approved plans noted above. The Developer further agrees to construct all works required under Clause 7.16 and as shown on the approved General Location and Lot Grading Plans (Drawings E-671-1 and E-671-2), Storm Drainage Area Plan (Drawing E-67 1-4) and Erosion Control Plan (Drawing E-671-9) all prepared by Dearden and Stanton Limited to the satisfaction of the Simcoe County District Health Unit and Township Engineer. The Developer furth,er agrees to advise all prospective lot owners of the requirement that it may be necessary for the sewage system to be installed prior to construction of the home subsequent to the issuance of a Certificate of Approval. 23 'e' . . 8.2 REQUIREMENTS FOR BUILDING PERMITS The approval of the plan by the Township or the acceptance by the Township of the works shall not be deemed to give any assurance that the municipal building permits, when applied for, will be issued in respect of the lots or blocks shown on the plan. Notwithstanding the foregoing, no building pemlits will be given and the Township may refuse any application until: a) All Simcoe County District Health Unit and Ministry of the Environment and Energy approvals have been obtained and submitted to the Township. Simcoe County District Health Unit,requirements are set out in Clauses 7.16 and 8.1.' b) The storm sewer systems have been installed, tested and approved by the Township Engineer and he has issued his Certificate of Substantial Completion and Acceptance (Underground Services). c) Plans for remaining underground services such as Bell Telephone, Hydro or Natural Gas have been approved. d) A "Builders" road consisting of the grading, curb and gutter or ditch shaping and full depth of Granular "B" sub-base has been constmcted on the road providing access to the lot. c) Approval of the Township Engineer has bccn obtaincd for the constmction of any buildings to bc erected on lots or blocks listed in Schcdule "E" hereto. f) Signs denoting "Unassumed Roads" have been installed at the entrances to the subdivision in a location acceptable to the Township in accordance with Clause 4.1.7. g) A Certificate Letter and Lot Development Plan has been given by the Developer's Consulting Engineer or a Professional Engineer registered with the Association of Professional Engineers of Ontario, that the building to be erected on any lot or block within the plan, for which a Building Permit has been applied for, is in conformity with the General Location and Lot Grading Plans or has received the approval of the Township Engineer with respect to any variance to the grading plan. The individual Lot Development Plan must be approved by the Township Engineer prior to issuance of a Building Permit. . h) All dead trees within the limit of the plan have been removed. i) Arrangements have been made and approved by the Township for emergency municipal address numbering as set out in Clause 8.4. j) TIle parkland must be completed to the satisfaction of the Township prior to the issuance of 25 % of the total building permits allowed in the development. k) The Traffic and Street Name signs have been installed and approved by the Township Engineer. 8.3 LOTS UNSUITABLE FOR BUILDING OR LOTS REQUIRING SPECIAL ATfENTION Any lot which will require special attention in order to be serviced will be listed on Schedule "E" of this Agreement. Prior to the issuance of a building permit for any lot listed in Schedule "E", the Developer's Engineer must submit a letter to the Township Engineer outlining the measures to be taken to correct the problems on the lot. This proposal must be approved prior to applying for a building permit. 8.4 EMERGENCY MUNICIPAL ADDRESS NUMBERING The Developer shall be responsible for obtaining the emergency municipal address numbers. for each and every lot from the Municipal Office. As a further requirement, in order to obta1l1 a Provisional Certificate of Occupancy, the Developer and/or builder, or lot owner, shall install the aforementioned number at a location approved by the Township. The Developer agrees to provide a copy of this clause to each and every builder or lot owner in advance of the sale of such lot(s). 8.5 REQUIREMENTS FOR OCCUPANCY 8.5. I No buildings erected on the lots or blocks within the plan shall be occupied until a PROVISIONAL CERTIFICATE OF OCCUPANCY has been issued by the Township in accordance with the Township Building and Plumbing By-Law. PROVISIONAL CERTIFICATE OF OCCUPANCY means a permit issued to allow occupancy of a building. 24 e,' 8.5.2 A FINAL CERTIFICATE OF OCCUPANCY wjIJ not be issued until: a) The roadway has received the granular roadbase materials full depth and the base cou'rse of asphalt provided asphalt is commercially available. b) The underground hydro, telephone lines, gas mains and street lights have been installed and approved by the Township Engineer. . c) A Certificate Letter and individual Lot Development Plan has been given by the Developer's Consulting Engineer, or a Professional Engineer registered with the Association of Professional Engineers of Ontario, that the building constructed and the final grading of the lot or block is in conformity with the General Location and Lot Grading Plans or such variance therefrom has been approved by the Township Engineer. The final grading on the individual Lot Devclopment Plan must be approved by the Township Engineer prior to issuance of a FINAL CERTIFICATE OF OCCUPANCY. FINAL CERTIFICATE OF OCCUPANCY means a pennit issued when all outstanding items on a Provisional Certificate of Occupancy including grading have becn complcted. e) Driveway culvert and cnd protection havc bccn provided to the satisfaction of thc Township in accordance with the Township's Road Occupancy Permit. t) The trees have been planted on the lot by the Developer in accordance with Clause 7.3. g) Any deficiencies on a Provisional Certificate of Occupancy has been complied with. It is agreed that a copy of Part 8 shall be delivered by the Developer to each and every builder obtaining a builder's pennit or any prospective purchaser of the dwelling for any lot or part of a lot on the said plan. 8.6. OCCUPANCY LIQUIDATED DAMAGES Notwithstanding the above, if for any reason whatsoever, occupancy of any building occurs before the vital services listed in Clause 8.5 are installed to the home occupied to the satisfaction of the Township Engineer then the Developer agrees to pay to the Township, liquidated damages in the amount of One Hundred Dollars ($100.00) per dwelling per day to cover the additional costs of administration, inspection and fire protection, etc. The liquidated damages to commence at and include the date of occupancy and end when the Developer obtains a certificate from the Township Engineer that the vital services are satisfactorily installed. If the Developer fails to pay to the Township monies owing under this clause within thirty (30) days of the date of the bill the money may be deducted from the cash deposit or Letter of Credit or other deposited security. . 25 e, . 9.4 . IJART - 9 MAINTENANCE AND ACCEPTANCE 9. ] FINAL ACCEPTANCE OF UNDERGROUND SERVICES On receipt of the Developer's request for a final inspection of the underground sertices, the Township Engineer will again inspect the work and if satisfied will recommend to the Township that the Certificate of Maintenance and Final Acceptance (Underground Services) be issued. It should be noted that the Certificate of Maintenance and Final Acceptance (Underground Services) can be applied for by the Developer two (2) years after the receipt of the Certificate of Substantial Completion and Acceptance (Underground Services). Notwithstanding anything hereinafter set out, the Township shall not be obligated to assume the responsibility for and take over the subdivision services until fifty percent (50%) of the lots on the subdivision or stage of the subdivision have completed dwellings erected therein and the Final Certificate of Occupancy has been issued. The Developer shaH be responsible for the normal operation, maintenance, and all repairs of the services in this case until the Township has assumed the responsibility of the services. 9.2 SUBSTANTIAL COMPLETION OF ABOVEGROUND SERVICES When all of the services have been completed including the surface lift of asphalt, in accordance with this Agreement or in a particular stage, the Township Engineer and Public Works Official shall make an inspection to ensure that the Township will accept the road system. The Township Engineer shall issue a Certificate of Substantial Completion and Acceptance (Aboveground Services) when the Works are accepted by the Township. This Certificate may contain a list of minor deficiencies which have to be corrected by the Developer but which are not considered of sufficient importance to delay the issuance of the Certificate and the acceptance of the services by the Township. TIle two (2) year maintenance period will commence when the Township Council approves the issuance of the Certificate. 9.3. MAINTENANCE OF WORKS The Developer will be responsible for the repair and maintenance of all the subdivision services for it period of two (2) years from the date the Township Council approves the Certificate of Substantial Completion and Acceptance. This shall be called the Maintenance Period. The maintenance shaH include the maintaining and mowing of grass within the road allowances as well as the parkland area and detention pond on a regular basis. If the Township is requested to carry out this maintenance, the Developer shall pay all charges to the Township. If during this period the Developer fails to carry out maintenance work within forty-eight (48) hours after receipt of a request from the Township, then the Township Engineer may, without further notice, undertake such maintenance work and the total cost of such work including engineering fees shall be borne by the Developer. If the Developer fails to pay the Township within thirty (30) days of the date of billing then the money owing may be deducted from the cash deposit or Letter of Credit. During the maintenance period ten percent (10%) of the original estimated cost of the works shall be retained by the Township. Towards the end of the maintenance period, the Developer shall make written request to the Township for a final inspection to be made and notwithstanding the two (2) year period noted above, the maintenance period will continue for the original two (2) years or for thirty (30) days after the receipt of the Developer's written request for a final inspection, whichever period of time is the greater. Notwithstanding anything hereinafter set out, the Township shall not be obligated to assume the responsibility for and take over the subdivision services until fifty percent (50%) of the lots on the subdivision or stage of the subdivision have completed dwellings erected therein and Final Certificate of Occupancy has been issued. The Developer shaH be responsible for the maintenance of the services in this case until the Township has assumed the responsibility of services. WINTER ROAD MAINTENANCE An exception to the liability of the Developer for all maintenance and repair of the services during the two (2) year maintenance period will be winter control which operation will be the Township's responsibility after the issuance of the Certificate of Substantial Completion and Acceptance (Above ground Services). Winter control shall include snow ploughing, sanding and any other winter maintenance operations. It is agreed by the Developer that the winter control operations shall not prejudice the Township's rights to enforce the maintenance provisions. Prior to the issuance of the Certificate of Substantial Completion and Acceptaqce (Above ground Services) however, the Developer shall be responsible for the winter control also. In the event that proper vehicular access or winter control is not provided by the Developer, the Township through its servants, contractors, or agents may provide without notice to the Developer. Such winter control shall be only carried out at times deemed to be an emergency by the Public Works Official. All costs of such work shall be paid by the Developer within thirty (30) days of the date of billing or otherwise may be deducted from the cash deposit or Letter of Credit. 26 e.' I: . The cost of such works to be at the following rates: Machinery/Equipment Labour Mixed Sand and Salt Payroll Burden - 4] % Administration - 7% G.S.T. - 7% $28.00 /hr $15.00 /hr $12.00 /m rnle Developer further agrees that any work done hy the Township pursuant to this agreement before the roads are accepted by the Township shall not be deemed in anyway to be an acceptance by the Township of the roads in the said subdivision upon which such work is done. The Developer acknowledges that the Township whilst providing winter control may damage or interfere with the works of the Developer and covenants that he wilt make no claims against the Township for such interference or damage, providing the work is carried out in a normal and reasonable manner. 9.5 REPLACEMENT OF SURVEY BARS Prior to the final acceptance of the subdivision by the Township, the Developer agrees to supply a statement from an Ontario Land Surveyor approved by the Township that after the completion of the subdivision work, he has found or replaced all survey monuments and standard iron bars shown on the registered plan. The statement must be dated within two months of the date of acceptance. 9.6 FINAL ACCEPTANCE OF ABOVEGROUND SERVICES On receipt of the Developer's request for a final inspection of the Aboveground Services, the Township Engineer will again inspect the work and if satisfied will recommend to the Township that the Certificate of Maintenance and Final Acceptance be issued. Notwithstanding anything hereinafter set out, the Township shall not be obligated to assume the responsibility for and take over the subdivision services untit fifty percent (50%) of the lots on the subdivision or stage of the subdivision have completed dwellings erected therein and the Final Certificate of Occupancy has been issued. TIle Developer shall be responsible for the maintenance of the services in thi,s case until the Township has assumed the responsibility of the services. 9.7. 'RELEASE OF LAND The Developer, when not in default of the subdivision agreement to provide the requisite public services to the lands, shall be entitled to an effective release in a form suitable for registration in the County Registry Office for each lot or block which is in conformity with the overall grading plan for the lands or such variance therefrom as has been approved by the Township Engineer. Every such release shall operate as a discharge of all levies hereunder by the Township in respect to each lot or block described in the release with the exception of the responsibility for drainage as outlined in Clause 9.8 and the completion and maintenance of the services. 9.8 DRAINAGE - RESPONSIBILITY OF DEVELOPER AND SUBSEQUENT OWNERS It is understood and agreed that the drainage of surface waters upon and from the said lands shall remain the sole responsibility of the Developer and the subsequent owners from time to time of the lots or blocks within the Plan of Subdivision. The Developer and subsequent owners or the lots or blocks within the Platl of Subdivision from time to time shall provide and maintain adequate drainage of surface waters across atld from tile said lands in accordance with the provisions of Section 7.16 of this Subdivision Agreement. The Developer agrees to provide a copy of this Section 9.8 and Section 7.16 to each and every prospective builder/prospective purchaser of a lot or block within tile Plan of Subdivision. TIle Developer and the owner from time to time of any lot or block within the Plan of Subdivision upon which tile Township elects to enter for the purpose of rectifYing the said work, hereby agrees to indemnifY and release the Township from and against all claims, demands, actions or causes of action whatsoever arising as a result of tile Township or of its servants or agents entering upon tile lands for tile purpose of correcting drainage problems. TIle cost of such work will be for the account of the Developer and/or subsequent lot owner. Any invoices not paid witllin thirty (30) days after due date, shall be added to the tax roll and collected in a like manner as really taxes. 27 .. . . PART - 10 DEFAULT PROVISIONS 10.1. DEFAULT PROVISIONS Notwithstanding anything herein before contained in this Subdivision Agreement, when the Developer is deemed by the Township to be in default of tillS Agreement, the Township reserves the right to realize upon securities deposited by tile Developer to recover costs incurred by the Township, in accordance with the provisions of Section 5.6 of this Subdivision Agreement, and/or to restrict or refuse issuance of building and/or occupancy permits for lots or blocks Witllin the Plan of Subdivision, until such time as tile Developer is in full compliance Witll the provisions ofthis Subdivision Agreement. 10.2 SUCCESSORS AND ASSIGNS TIlls Agreement shall be binding upon and enure to tile benefit of tile parties hereto and tlleir respective heirs, executors, administrators and assigns. IN WITNESS WHEREOF the parties hereto have executed this Agreement and have hereunto caused to be affixed the corporate seals, duly attested to by the proper signing officers. SIGNED, SEALED AND DELIVERED this A.D. 1997. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Per KobeRT <Jh;T~ Per Title 5 e.... <: t< € TAR V Title 28 .. , . SCHEDULE "A" NOTE: It is understood and agreed that this Schedule forms part of the Subdivision Agreement between the Township of Oro- Medonte and 771422 Ontario Inc. DESCRIPTION OF LANDS AFFECTED BY THIS AGREEMENT Parcel 20-7, Section 51-0ro-5, Township of Oro-Medonte (formerly Township of Oro) , County of Simcoe, being part of the west half of Lot 20, Concession 5, designated as Part 1, Plan 51R-4545. Save and except Parts 1 and 2 on Plan 51R-12186, Part 1 on Plan 51R- 15498 and Part 1 on Plan 51R-25056. F or Large Map Schedule "B" see file . e. ~ -- NOTE: SCHEDULE "C" It is understood and agreed that this Schedule forms part of the Subdivision Agreement between the Township ofOro-Medonte and 771422 Ontario Inc. WORKS TO BE CONSTRUCTED Complete roadway constmction including excavation, granular roadbed materials, two lifts of asphalt, topsoil and seeded boulevards with erosion control measures as required; Storm drainage works including culverts, storm sewer and detention pond; Street and traffic signs; Underground hydro and telephone, and street lighting; Parkland All of the above works are incorporated on to the following engineering drawings prepared by Dearden and Stanton Limited, Project No. E-671, Municipal Affairs No. 43-T-93023. Drawing Number Description E-671-1 E-67 1-2 E-671-3 E-671-4 E-67 1-5 E-67 1-6 E-67 1-7 E-67 1-8 E-671-9 E-67\-1O General Location and Lot Grading Plan (Lots 1-6) General Location and Lot Grading Plan (Lots 7-13) Utility Coordination Plan Storm Drainage Area Plan Plan and Profile - Melville Court 0+000 to 0+240 Plan and Profile - Melville Court 0+240 to 0+480 Plan and Profile - Melville Court 0+480 to 0+677.63 Detention Pond Details Erosion Control Plan General Details The above referenced drawings were stamped as accepted by the Township Engineers, R.G. Robinson and Associates (Barrie) Ltd., on 19 3\ e. ~ .~. SCHEDULE "0" NOTE: It is understood and agreed that this Schedule fOnTIS part of the Subdivision Agreement between the Township ofOro-Medonte and 771422 Ontario Inc. ITEMIZED ESTIMATE OF COST OF CONSTRUCTION OF EACH PART OF THE WORKS The following list summarizes the cost estimate of the major works but is not necessarily inclusive: A) Roadway construction complete including clearing and grubbing, excavation, granular road base materials and two lifts ofasphalt........................................................... $179,300.00 B) Storm Drainage works complete including storm sewer, ditch inlet catchbasin, culverts, detention pond, topsoil, seed and mulch, sod, ditching and siltation and erosion control devices. .................. ........ ....... .......... ........ ............... .......... $71,980.00 C) Miscellaneous Items such as street name and regulatory signs... ... ............. ...... .............. ...................... .......... ....... ........... $ 750.00 D) Electrical Supply including street lights, control panels and duct crossings................ ............... ...... ........ ................ $17,000.00 E) Parkland works including grading, trees, fence and park sign ... .... ......... ........... ............. ................ ....... .... ..... .................. $14,375.00 F) Final Occupancy/Lot Grading Deposit ..................................................... $26,000.00 G) Allowance for Engineering and supervision. ............................................. $22,675.00 SUB-TOTAL $332,080.00 $23.245.00 7% G.S.T. TOTAL ESTIMATED CQST $355,325.00 32 e ft . NOTE: SCHEDULE "E" It is understood and agreed that this Schedule fonns part of the Subdivision Agreement between the Township ofOro-Medonte and 771422 Ontario Inc. LIST OF LOTS UNSUITABLE FOR BUILDING PURPOSES & LIST OF LOTS REQUIRING SPECIAL ATTENTION See Clause 8.1 which sets out specific requirements for all lots on the Plan in order to obtain a building permit for each and every lot. 33 -- .~ 6 SCHEDULE "F" NOTE: It is understood and agreed that this Schedule forms part of the Subdivision Agreement between the Township of Oro-Medonte and 771422 Ontario Inc. Cash Deposits. Development Charges and Securities The Developer, as a capital contribution towards other Township services, will pay to the Township in addition to all other monies required to be paid by the Developer under this Agreement the Development Charges Act Levy in an amount required by the Township's Development Charges By-Law on the date the payment is received by the Township at the Municipal Office. The Development Charges Act Levy in place at the time of the execution of this Agreement is $5,225.00 per dwelling unit. An amount equal to or greater than the hard services portion of the total Development Charges Act Levies for all the lots must be paid at the time of execution of the Subdivision Agreement. Prior to issuance of a building permit the remainder of the Development Charges Act levy is to be paid on a per lot basis, until levies have been paid for all lots. Development Charges Act Levies Breakdown Total Levies Due 13 lots at $5,225.00 $67,925.00 = Prepayment for Hard Services Portion of Levies 13 lots at 43.9% of$5,225.00 = Equivalent hard services portion of levy for 13 lots = $29,822.00 $ 2,294.00/10t Remainder of Levies Due Prior to Issuance of Building Permits 13 lots at 56.1% of$5,225.00 Equivalent remainder of levy for 13 lots = $38,103.00 $ 2,931.00/10t Note: I) The hard services portion of levy (43.9%) was derived from Table C-2 of Township ofOro's Development Charge Policy Report. 2) This breakdown is based on the current levy. 34 . ~ . SCHEDULE "G" NOTE: It is understood and agreed that this Schedule forms part of the Subdivision Agreement between the Township of Oro-Medonte and 771422 Ontario Inc. DEEDS AND EASEMENTS TO BE CONVEYED All title documents shall be properly drawn and executed by the parties, with the appropriate Lot or Block Number inserted in the description of the document, and the registered Plan Number shall be left blank, to be inserted by the solicitors for the parties after the Plan is registered and a Plan Number assigned. The consideration for all conveyances shall be the sum of Two dollars ($2.00) and the cost of preparation, execution and registration thereof shall be borne by the Developer. All documents to be registered, shall he prior approved by the Solicitor for the Township. The following land and easement shall be eonveyed: 1.0 LANDS TO BE CONVEYED TO THE TOWNSHIP a) Parkland h) Detention Pond c) 0.3 Metre Reserves - Block 14, Plan 51 M- Block 15, Plan 5 I M- Block 16, Plan 51 M- Block 17, Plan 51M- 2.0 DRAINAGE EASEMENTS TO BE CONVEYED TO THE TOWNSHIP . 7.5 metre wide across the rear of Lot II of Plan 51 M - , Designated as Part I on Plan 51R . 7.5 metre wide across the rear of Lot 12 of Plan 51 M- , Designated as Part 2 on Plan 51 R 35 e' ~ . ~ -' NOTE: PARKLAND SCHEDULE "H" It is understood and agreed that this Schedule fonns part of the Subdivision Agreement between the Township of Oro-Medonte and 771422 Ontario Inc. Block 14, Plan 51M- 36 4 e e , SCHEDULE "I" TOWNSHIP OF ORO~MEDONTE DECLARATION OF PROGRESS AND COMPLETION SUBDIVISION DEVELOPER 771422 ONTARIO INC. CONSULTING ENGINEER DEARDEN AND STANTON LIMITED As required by the Agreement between the Corporation of the Township ofOro~Medonte and 771422 Ontario Inc. The Developer(s) dated 1. The Developer hereby agrees and undertakes to complete the construction of the Works as required by the above-mentioned agreement in accordance with the time schedule for the completion of services as approved by the Township Engineer and more specifically in accordance with the following schedule and conditions: a) Before any building erected on the lots or blocks in the Plan are occupied all the Requirements for Occupancy as set out in Clause 8.5 shall be complied with. b) Granular "B" and Granular "A" on or before c) Grading, topsoiling and seeding of private blocks and parks on or before d) Boulevard sodding on all roads on or before e) Hot asphalt on or before f) Planting of trees on or before 2. The Developer further agrees that the Township is hereby authorized to carry out, at his expense, any of the work set out in this Declaration not finished on or before the completion dates, to be commenced not sooner than one week following such completion date, it being understood and agreed that the Township's authorization is limited only to that work required under the Declaration. 3. The Developer undertakes to properly maintain the gravel road base at all times and to keep all roads in a mud~free and dust-free condition until such times as the roads, including boulevards, have been completed. 4. The Developer further agrees and the Township is hereby authorized to undertake any of the maintenance work as set out under Item 3 hereof, not completed by him within 24 hours after receipt of such request for maintenance, at his expense, and without limiting the generality of the foregoing, the Township's cost shall be the cost of materials, equipment rental, labour, payroll burden, plus 20% for overhead. 37 ,.. e e . > . . 5. It is understood and agreed that should the Developer fail to construct the remaining services to carry out the requirements of Item 3 as stipulated, and by such dates and within such time limits as provided by this undertaking the Developer notwithstanding the costs noted in Section 4, shall pay to the Township, as predetermined liquidated damages, the sum of fifty Dollars ($50.00) for each and every calendar day the said services are behind schedule of construction provided such delay is not caused by strikes or acts of God or additional work being required by the Township. 771422 Ontario Inc., per: J~J20& Signed Developer Robert Vincent White Secretary - J ~ 2-{, (997 Date . Seal or Witness 38 e ~ e ... , SCHEDULE "J" NOTE: It is understood and agreed that this Schedule fonus part of the Subdivision Agreement between the Township ofOro-Medonte and 771422 Ontario Inc. GENERAL LOCATION AND LOT GRADING PLANS PROCEDURE After the General Location and Lot Grading Plan have been approved by the Township, then: a) six copies to be delivered to the Solicitor for the Township; b) six copies to be delivered to the Township; c) mylars for e8ch Plan incorporated into the Subdivision Agreement shall be delivered to the Solicitor for the Township. 39