2017-047 Certificate of Substantial Completion and Acceptance (Municipal Underground Services) Diamon Valley Estates Phase 4The Corporation of the Township of Oro-Medonte
By-law No. 2017-047
A By-law to Authorize the Issuance of the Certificate of
Substantial Completion and Acceptance (Municipal Underground Services)
for 2008628 Ontario Ltd. (Diamond Valley Estates Phase 4), Plan 51 M-957
Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13,
as amended, provides that municipalities may enter into agreements imposed as a
condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
And Whereas Council for the Corporation of the Township of Oro-Medonte entered into
a Subdivision Agreement with 2008628 Ontario Ltd. (Diamond Valley Estates
Subdivision) in March 2010 for one hundred and twenty eight (128) residential lots on
Diamond Valley Drive, Emerald Terrace, Topaz Court, Opal Court, Ruby Ridge, and
Sapphire Way.
And Whereas the requirements of this Subdivision Agreement with respect to the
underground works for Phase 4 comprised of 32 residential lots (Lots 27-32, 45-64, and
79-84 (Diamond Valley Drive) have now been met;
Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows:
That the Certificate of Substantial Completion and Acceptance (Municipal
Underground Services) for Diamond Valley Estates (2008628 Ontario Ltd.), Plan
51 M-957 Phase 4 may now be issued by the Township Engineers (AECOM) in
compliance with the Subdivision Agreement between the Corporation of the
Township of Oro-Medonte and 2008628 Ontario Ltd..
2. That the attached Schedule "A", Certificate of Substantial Completion and
Acceptance (Municipal Underground Services) shall form part of this By -Law.
3. This by-law shall take effect on the final passing thereof.
By-law read a First, Second and Third time, and Passed this 12th day of April,
2017.
The Coqporation opthe Township of Oro-Medonte
HiM .w
las Irwin
Schedule "A"
to By-law No. 2017-047 for
The Corporation of the Township of Oro-Medonte
Eco I ■ AECDM
y SS Cedar Pointe Drnx, Suite 620 705 7219222 Tel
B•nie, ON, Qruds LIN 5R7 705 734 0763 ra<
www.aecuacom
TOWNSHIP ENGINEERS
CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE
(MUNICIPAL UNDERGROUND SERVICES)
MUNICIPALITY Township of Oro-Medonte
PROJECT Diamond Valley Estates - Phase 4
Pian 51M-957
DEVELOPER 2008628 Ontario Ltd.
FILE NO. 60118278 r43 -T-930191
Description of the Works:
• Watermain Works in the Diamond Valley Estates Phase 4 on Diamond Valley Drive from the
intersection of Opal Drive easterly to 7"' Line North (920 metres);
• Drainage Works consisting of road crossing culvert and ditches in the Diamond Valley Estates
Phase 4 on Diamond Valley Drive from the intersection of Opal Drive easterly to 7t' Line North
• SWM Pond and Access at Block 139 consisting of the Stormwater Management Pond and Inlet
channel and access road, complete with site fencing and access gate.
We, AECDM, notify the Municipality that the above mentioned works were inspected on February 22, 2017
and to the best of our knowledge and judgement, are complete in accordance with the Subdivision
Agreement except for the deficiencies below:
• Items listed in AECOM Construction Status Report dated February 22, 2017.
• Note that the street lights are now operational effective February 22, 2017.
We hereby accept these works for use and operation by the Municipality subject to the rectification of the
above noted deficiencies and to the rectification of any further deficiencies that may become apparent during
the maintenance period and to the maintenance that is require by the Subdivision Agreement and its
Amendment.
The date of Substantial Completion and Acceptance (Municipal rgro d Services) is a ablished by the
Certificate as of February 23, 2017.
Date: Z3 Signature: