2016-143 Authorize the issuance of the certificate of substantial completion and acceptance (municipal aboveground services) Diamond Valley Estates Phase 1The Corporation of the Township of Oro-Medonte
By-law No. 2016-143
A By-law to Authorize the Issuance of the Certificate of Substantial Completion
and Acceptance (Municipal Aboveground Services) for Diamond Valley Estates
Phase 1, Plan 51 M-957
Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13,
as amended, provides that municipalities may enter into agreements imposed as a
condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
And Whereas Council for the Corporation of the Township of Oro-Medonte entered into
a Subdivision Agreement with 2008628 Ontario Ltd. in March 2010 for one hundred and
twenty-eight (128) residential lots in the Diamond Valley Estates subdivision on Line 6
North, Diamond Valley Drive, Emerald Terrace, Topaz Court, Opal Court, Ruby Ridge,
and Sapphire Way.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
aboveground works have now been met;
Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows:
That the Certificate of Substantial Completion and Acceptance (Municipal
Aboveground Services) for Diamond Valley Estates Phase 1, Plan 51 M-957 may
now be issued by the Township Engineers (AECOM) in compliance with the
Subdivision Agreement between the Corporation of the Township of Oro-
Medonte and 2008628 Ontario Ltd.
2. That the attached Schedule "A", Certificate of Substantial Completion and
Acceptance (Municipal Aboveground Services) shall form part of this By -Law.
3. This by-law shall take effect on the final passing thereof.
By-law read a First, Second and Third time, and Passed this 5th day of October,
2016.
The Corporation of the Township of Oro-Medonte
Clerk, Janette Teeter
Schedule "A"
to By-law No. 2016-143 for
The Corporation of the Township of Oro-Medonte
Ae_` 55 OM COM
ECOM Cedar Pointe Drive, Suite 620 705 721 9222 tel
Barrie, ON, Canada IAN SR7 705 734 0764 rax
www.aecomeona
TOWNSHIP ENGINEERING CONSULTANT
CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE
(MUNICIPAL ABOVEGROUND SERVICES)
MUNICIPALITY Township of Oro-Medonte
PROJECT Diamond Valley Estates — Phase 1
Plan 51M-957
DEVELOPER 2008628 Ontario Ltd.
FILE NO. 60118235 (43T-93019)
Description of the Works:
Roadways in the Diamond Valley Estates Subdivision — Phase 1 consisting of:
• Oro-Medonte Line 6 North from the Line 6 North/Huron Woods Drive/ Monica Court intersection
southerly to Diamond Valley Drive, a distance of 114.7 metres (376 feet);
• Diamond Valley Drive from the extension of the aforementioned Oro-Medonte Line 6 North
easterly to just east of Topaz Court, a distance of 700 metres (2,297 feet);
We, AECOM notify the Municipality that the above mentioned works were inspected on August 8, 2016,
and to the best of our knowledge and judgment, are complete in accordance with the Subdivision
Agreement except for the deficiencies below:
a As per the attached Construction Status Report dated August 11, 2016.
We hereby accept these works for use and operation by the Municipality subject to the rectification of
the above noted deficiencies and to the rectification of any further deficiencies that may become
apparent during the maintenance period and to the maintenance that is required by the Subdivision
Agreement.
The date of Substantial Completion and Acceptance (A eground Services) is established by the
Certificate as of August 11, 2016.
Date: Xtw&A i Z61 6 Signature: