Loading...
2016-125 Authorize the execution of a pre-servicing agreement with Braestone Development Corporation - Draft plan of subdivision (Phases 1B and 1C)The Corporation of the Township of Oro-Medonte By-law No. 2016-125 A By-law to Authorize the Execution of a Pre -Servicing Agreement with Braestone Development Corporation — Draft Plan of Subdivision (Phases 1 B and 1 C) for Part of Lots 2 and 3, CON 9, ORO, RP 51 R-21804, PT Part 1, and RP 51 R-36508 PT Part 1, save and except PT 1, 51 R-28741; Being Part of PIN # 58532-0089 (LT), Township of Oro-Medonte, County of Simcoe, ROLL # 43-46-010-004-04003 Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; And Whereas the Council of the Township of Oro-Medonte deems it advisable to enter into a Pre -Servicing Agreement with Braestone Development Corporation for the following lands: Draft Plan of Subdivision of — Draft Plan of Subdivision (Phases 1 B and 1 C) for PCL 2-1 SEC 51—ORO-9; LT 3, CON 9, ORO, being the E 1/2 & W 1/2; LT 2, CON 9, ORO, being the E 1/2 & W 1/2 ; PT 1, 51 R-21804, except PT 1, 51 R-28741; being all of PIN # 58532-0089 (LT), Township of Oro-Medonte, County of Simcoe Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows: 1. That the Mayor and Clerk are hereby authorized to execute, on behalf of the Township of Oro-Medonte, a Pre -Servicing Agreement, a copy of which is attached hereto and forms part of this By-law as Schedule `A'. 2. That the Township of Oro-Medonte shall be entitled to enforce the provisions of the Pre -Servicing Agreement against the owners of the land; 3. This by-law shall take effect on the final passing thereof. By-law read a First, Second and Third time, and Passed this 22nd day of August, 2016. The Co ,Iporation of„the Township of Oro-Medonte , H.S. Clerk J. lloumlbs rWin Tmvnship of i/T�Cedonte, Proud Heritage, Exciting Future PRE -SERVICING AGREEMENT - between - BRAESTONE DEVELOPMENT CORPORATION - and - THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE PART OF LOTS 2 AND 3, CON 9, ORO, RP 51R-21804, PT PART 1, AND RP 51 R- 36508 PT PART 1, SAVE AND EXCEPT PT 1, 51R-28741; BEING PART OF PIN # 58532-0089 (LT), TOWNSHIP OF ORO-MEDONTE, COUNTY OF SIMCOE ROLL # 43-46-010-004-04003 TOWNSHIP OF ORO-MEDONTE COUNTY OF SIMCOE August 22, 2016 By -Law No. 2016-125 PRE -SERVICING AGREEMENT THIS AGREEMENT MADE BETWEEN: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE (hereinafter called the "Township") - and - BRAESTONE DEVELOPMENT CORPORATION (hereinafter called the "Developer") WHEREAS the Developer is the registered owner of the lands described in Schedule "A" attached (the "Subdivision Lands"); AND WHEREAS the Developer desires to commence installing municipal services within the Subdivision Lands, prior to the registration of the Plan of Subdivision and the execution of the Subdivision Agreement with the Township; NOW THEREFORE THE PARTIES HERETO AGREE AS FOLLOWS: 1. ASSUMPTION OF RISK BY DEVELOPER 1.1 The Developer agrees to assume all risk in commencing installation of Township services, as defined in Article 1.4 hereof, on the Subdivision Lands, prior to the execution of a Subdivision Agreement with the Township and the registration of the Plan of Subdivision. The Developer hereby releases the Township, its agents, servants and employees from and against all actions, suits, claims and demands whatsoever, which may arise either directly or indirectly as a result of the installation of Township services by the Developer. 1.2 The Developer acknowledges and agrees that, in the event that a Subdivision Agreement with the Township is not finalized for any reason and the Plan of Subdivision is not registered as a result, pre -servicing of the Subdivision Lands shall cease immediately. 1.3 The Developer acknowledges and agrees that Engineering design plans and specification for the Township services to be installed by the Developer, as submitted to the Township, in accordance with the terms of this Agreement, may require further amendment as a result of requirements imposed by the Township under the terms of the Subdivision Agreement to be entered into for the Subdivision Lands. The Developer covenants and agrees to assume all risk and responsibility for the cost of required revisions to the Engineering design drawings and specifications for the Township services, together with the costs of modifying, reconstructing, removing and/or replacing the Township services installed by the Developer, pursuant to the terms of this Agreement, in order to satisfy the requirements finally imposed by the Township at the time that the Subdivision Agreement is entered into. The Engineering Design plans are as follows: C.C. Tatham & Associates Ltd (Contract No. 103059) Drawing No. Phasina Plan PH-1 Legal Plan 51M - General Servicina Plans General Servicing Plan GS-3 General Servicing Plan GS-4 2 Siltation and Erosion Control Siltation and Erosion Control SC-3 Siltation and Erosion Control SC-4 Siltation and Erosion Control Details SC-5 Drainage Plans Pre -Development Drainage Plan DP-1 Overall Post Development Drainage Plan ODP-2 Storm Sewer Drainage Plan STM-1 Storm Sewer Drainage Plan STM-3 Storm Sewer Drainage Plan STM-4 Stormwater Management Plans Stormwater Management Plan and Sections SWM-1 Stormwater Management Sections and Details SWM-2 Stormwater Management Sections and Details SWM-3 Lot Grading Plans Lot Grading Plan LG-1 Lot Grading Plan LG-2 Lot Grading Plan LG-3 Lot Grading Plan LG-4 Lot Grading Plan LG-5 Lot Grading Plan LG-6 Lot Grading Plan LG-7 Lot Grading Plan LG-8 Lot Grading Plan LG-9 Lot Grading Plan LG-10 Lot Grading Plan LG-11 Lot Grading Plan LG-12 Lot Grading Plan LG-13 Plan and Profile Drawings Plan and Profile Thoroughbred Drive Sta. 0+400 to Sta. 0+640 PP-10 Plan and•Proflle Thoroughbred Drive Sta. 0+640 to Sta. 0+880 PP-11 Plan and Profile Thoroughbred Drive Sta. 0+880 to Sta. 1+120 PP-12 Plan and Profile Thoroughbred Drive Sta. 1+120 to Sta. 1+300 PP-13 Plan and Profile Morgan Drive Sta. 0+000 to Sta. 0+240 PP-16 Plan and Profile Morgan Drive Sta. 0+240 to Sta. 0+530.75 PP-17 Plan and Profile Gelderland Crescent Sta. -0+010 to Sta. 0+200 PP-18 Plan and Profile Gelderland Crescent Sta. 0+200 to Sta. 0+440 PP-19 Plan and Profile Gelderland Crescent Sta. 0+440 to Sta. 0+600 PP-20 Plan and Profile Thoroughbred Drive — Outlet; and Easement Gelderland Crescent — Line 9 North PP-21 Plan and Profile Recreation Centre Storm Sewer PP-23 Desians Standards Drawings Notes and Details D-1 Ontario Standards and Township Details D-2 Ontario Standards and Township Details D-3 Ontario Standards and Township Details D-4 Ontario Standards and Township Details D-5 3 Ontario Standards and Township Details Water Distribution and Swabbing Plan D-6 WAT-1 Accepted for Construction for Pre -Servicing Only by AECOM on August 11, 2016 1.4 The Developer acknowledges and agrees that this Agreement relates to and permits the installation of the following Township services on the Subdivision Lands: 1. Site preparation (clearing and grubbing, strip, load, transport and stockpile topsoil); 2. Earthworks (site grading and excavation); 3. Road works (Thoroughbred Drive, Morgan Drive, Gelderland Crescent, Emergency Access Road); 4. Installation of Watermains; 5. Drainage Works, storm sewers and stormwater management works; 1.5 The Developer acknowledges and agrees that no work shall be carried out on any existing Township right-of-way, and that there shall be no connection to services on any Township right-of-way. 1.6 The Developer acknowledges and agrees that no work shall be carried out on lands not owned by the Developer, without the written consent of the owner to be filed with and approved by the Township. 1.7 The Developer acknowledges and agrees that all Servicing Plans must comply with Federal, Provincial and Township laws, By-laws, standards and policies. 2. REQUIREMENTS PRIOR TO THE COMMENCEMENT OF WORK 2.1 The Developer agrees to submit the following to the Township, in a form satisfactory to the Township, prior to the commencement of the installation of Township services on the Subdivision Lands: a) A letter from a qualified Engineer experienced in the field of Township services confirming: 1. Retainer - That their firm has been retained by the Developers to act as Consulting Engineers for Braestone Development Corp. 2. Terms of Retainer - The terms of their retainer with the Developer as follows: a) Plans and Specifications - Prepare plans and specifications for the construction of Township services; b) Cost Estimates - Prepare cost estimates for the Township services to be constructed from the drawings; c) Approvals - Obtain all necessary approvals to construct; d) Co-ordination - Co-ordinate the installation of Township services to avoid conflicts with regards to telephone, cable T.V., and Township services; e) On -Site Inspections - Ensure that all on -site inspections of Township service installations are conducted by the Developer's Consulting Engineers at all times during construction; f) As -Constructed Drawings - Submit certified "as -constructed" drawings after acceptance of the Township services; g) Chanae in Retainer — If at any time during the project: 4 i) The terms of their retainer are changed by the Developer, or; ii) If they become aware that they will not be able to provide "as constructed" drawings, they will notify the Township within twenty-four (24) hours; h) Erosion and Siltation Control - Ensure all necessary precautions are taken to prevent erosion and sedimentation of sewers, ditches, culverts, slopes, etc., both within the subdivision and downstream, prior to and during construction. b) Confirmation letters are to be filed with the Township Clerk, confirming the following: 1) The Township Engineering Consultant has no objection to the pre - servicing; 2) The Planning Division has no objection to the pre -servicing; 3) The NVCA has no objection to the pre -servicing. 4) The Township Solicitor has no legal objections to the pre -servicing. c) Payment of cash or certified cheque required to cover the cost of the Township's lawyer and Planner for all costs involved in processing the Pre - Servicing Agreement, and for all the Township Engineering Consultant for checking of plans, specifications and inspection on behalf of the Township for the sum of Ten Thousand Dollars ($10,000). As accounts are received from the Township Planner, lawyer, and Engineering Consultant, they will be paid by the Township and then submitted to the Developer for reimbursement within thirty (30) days. In the event that the deposit is drawn down to a level of Five Thousand Dollars ($5, 000) or less, and the Developer does not pay the accounts within thirty (30) days, it is hereby understood and agreed that the Developer is in default of this Agreement and all work must cease; d) A Letter of Credit, as per Schedule "C", in the amount set out in Schedule "B", attached, as security to ensure the due completion of the Township services to be constructed by the Developer, and as security to be held by the Township for the warranty periods to be more particularly described in the Subdivision Agreement for the Subdivision Lands. The said Letter of Credit shall provide that if in the sole opinion of the Township, default under the terms of this Agreement has taken place, the said Letter of Credit may thereupon be drawn upon in whole or in part; e) A certified copy of an insurance policy, or a certificate of insurance, confirming comprehensive general liability in the amount of Five Million Dollars ($5,000,000.00), naming the Township as co-insured, and containing the following additional provisions or endorsements: 1) Products/Completed Operations provisions; 2) Cross -liability clause; 3) Blasting included, only if done by an independent contractor; 4) Notice of Cancellation - a provision that the insurance company agrees to notify the Township within fifteen (15) days, in advance, of any cancellation or expiry of the said insurance policy. f) All Servicing Plans shall be submitted to and accepted by the Township Engineering Consultant; g) The Ministry of the Environment and Energy has given technical approval to the Servicing Plans: Certificate of Approval for Municipal Drinking Water Systems — Water Treatment Plant — Number 320-7MCRQM, Certificate of Approval for Municipal Drinking Water Systems - Watermains — Number 6431 -7P4MDP, Certificate of Approval for Municipal and Private Sewage Works — 5 Number 1315-7P4MC24. (h) The Nottawasaga Valley Conservation Authority has given approval to the site grading, road and utility construction, stormwater management works, and home construction associated with Phase 1 B and 1 C in accordance with Permit 2016-19400. 3. INSPECTION BY THE TOWNSHIP 3.1 The Developer agrees to permit unrestricted access to the Subdivision Lands to the Township and its agents for the purpose of inspection of the Township services to be installed by the Developer. Notwithstanding that inspections may be conducted by the Township or its agents, the Developer shall bear sole responsibility for the soundness of the Engineering design of the Township services, and for ensuring that the Township services to be installed will function, as intended, and will be compatible with the final Plan of Subdivision when and if such Plan of Subdivision is approved. 3.2 If, in the opinion of the Township, there is an emergency situation as a result of any work undertaken by the Developer or its servants, or agents, which requires immediate attention to avoid damage to private or public property or services owned by the Township or to eliminate a potential hazard to persons, such work may be done immediately by the Township at the expense of the Developer, but notice shall be given to the Developer at the earliest possible time. 4. APPLICATION OF SECURITY 4.1 In the event of default by the Developer under the terms of this Agreement, or if the Township is required to enter onto the Subdivision Lands or the abutting Township lands to conduct any work on the Township services or the connection of the Township services to facilities due to an emergency, the Township shall be entitled to draw upon the security posted by the Developer pursuant to the terms of this Agreement, in whole or in part, to cover the costs incurred by the Township in remedying the default on the part of the Developer, or in addressing the emergency situation. 5. NO REDUCTION OF SECURITY 5.1 The Developer acknowledges and agrees that no reduction in the amount of security filed by the Developer with the Township, in accordance with the terms of this Agreement, shall be permitted until such time as the Developer has entered into the Subdivision Agreement for the Subdivision Lands with the Township. Thereafter, any reductions in the security posted by the Developer shall be completed in accordance with the terms of the said Subdivision Agreement. 6. NO ASSUMPTION OF TOWNSHIP SERVICES 6.1 The Developer acknowledges and agrees that the Township shall not be required to assume the Township services to be constructed by the Developer, pursuant to the terms of this Agreement, until such time as the Developer has entered into a Subdivision Agreement with the Township for the Subdivision Lands, and the Township services have been completed, inspected, and approved. 7. NOTICE 7.1 Any notice required to be given pursuant to this Agreement may be given by prepaid registered post to the Developer at the following address: Braestone Development Corporation 85 Bayfield Street, Suite 500 Barrie, Ontario L4M 3A7 Or by Facsimile Transmission to: (705) 730-1059 6 and such notice shall be deemed to have been given and received on the third day after mailing. 8. NO ASSIGNMENT 8.1 The Developer shall not assign or otherwise transfer the benefit of this Agreement without the written consent of the Township, which may be unreasonably withheld. IN WITNESS WHEREOF Developer has hereunto set its hands and seals this 22nd day of BRAESTOIJ� pEVEP NT CORRORATION Per: �X\ Braestone Development Corporation J. David Bunston, Treasurer IN WITNESS WHEREOF the Township has hereunto sets its hands and seals this 22nd day of August, 2016. TI e N OF THE,TOWNSHIP OF ORO-MEDONTE H.S. Hughes, Mayor J. Douglas Irwin, Clerk SCHEDULE"A" DESCRIPTION OF LANDS: PART OF LOTS 2 AND 3, CON 9, ORO, RP 51R-21804, PT PART 1, AND RP 51R- 36508 PT PART 1, SAVE AND EXCEPT PT 1, 51 R-28741; BEING PART OF PIN # 58532-0089 (LT), TOWNSHIP OF ORO-MEDONTE, COUNTY OF SIMCOE ROLL # 43-46-010-004-04003 8 SCHEDULE"B" CASH DEPOSITS TO BE FILED WITH THE TOWNSHIP: 1. Township's lawyer and Planner for all costs involved in processing the Pre - Servicing Agreement, and for all the Township's Engineers for checking of plans, specifications and inspection on behalf of the Township. $10,000 TOTAL CASH DEPOSITS TO THE TOWNSHIP $10,000 2. A Letter of Credit as security to ensure the due completion of the Township services to be constructed by the Developer, and as security to be held by the Township for the warranty periods to be more particularly described in the Subdivision Agreement for the Subdivision Lands. SECURITY TO BE DEPOSITED WITH THE TOWNSHIP $ 772,006.76 9 hem N0. 1.0 1.01 102 1.03 104 205 100 107 1➢0 1.09 2➢ 201 202 203 2G4 205 2➢6 207 208 209 2.10 SCHEDULE e1Bf1 3-1 TOWNSHIP OF ORD.MEOONTE BRAESTONE SUBDIVISION PHASES 113 s 1000NSTRUCTION Schedule of unn Pria, SP Description Site Pnpanikn 2 Meanest BGmbbir0 3 Mott ONV S01 Fuze 3 Heavy Dub50Fellm 3 'Straw Bale Cfed Dam 3 block Chad Dam 3 'Entrance Slone Mud Mal 4 ISawqoeap] aioppss wl IUGmn9eed anti macfiail 5 Slab3habon 6 IEacavabon and GrWdo loiEarth WWII Ib)Nalive Earth Engineered AI cI LOaq nma9anend 0157Yd 002160l 61ec0Wad PhaselATopanl Subtotal -Site Preparation 1273,26g2)piue 10%Con6Eno plus 13%115T ,cured undersepmb EARTHWORKS Agreement IThar0u0hbred Drive I8o)CWQM11 7 'Granular '0' I400mml 6 IGranular'A' 1160mm) 9 'Granular 'A' Shouldering (50 mm) 0 Base Course Asphalt HL4 (60mm) 11 Canasta Curb and Gullet (0P5D 60011303 12 I I50mm dla. Pe0omted Sadiron de Eller Sock 10 I50mm HL4 Pried Shoulder (Dim wide) 11 ICpnlale Curb 0Wel 10 'Asphalt Spleves 14 IGmde. Tapsod and Sod Bwdevard 6912016 90.E-5ERVICPG AGRE0SIEMI E,Ilmalq SECURITY Unit Quantity Unit Price Con SECU0Ef % AMOUNT ha 375 5 15,00000 5 56250.00 0% SOW m 250 5 1200 5 375000 0% 50.00 m 2.020 5 1900 5 3835003 0% 1000 Ea 3 5 5000 5 15000 0% 5000 Ea 9 5 42500 5 382500 0% 5000 Ea I 2 5 3.100.00 5 6 600 00 0% 50➢0 m' I 33.741 S 320 5 12821580 0% 3000 m' I 41.405 5 5.95 5 240359.75 0% 5000 m' 1233.866 5 380 5 888.69080 0% 50.00I 00' 35.605 6 505 5 17980525 0% SO WI m 47.870 S 405 S 193.873.50 0% 50001 S 1,746,100.10 S0 110 ma 6.250 5 900 5 56250.00 30% S15.875.001 m 5700 5 025 5 35.625500 30% 510687.501 ma 355 $ 400 5 1.460.00 30% 5438001 0' 2905 5 950 5 22357.50 _ 30% 13.07.25 m 1.020 5 6700 5 68.340 00 30% 520.50200 no 1.020 5 3250 5 33.15000 30% 59945.001 04' 495 5 1750 5 0.662.50 30% 52.59875 Ea 2 5 28000 5 56000 3014 516800 Ea 2 5 25000 5 50002 30% 5150,00 on. 6.940 5 5.25 5 36.435,00 30% 510.93050 10 219I 220 1 2211 222 1 16 1500mm D1a DIM Inlet Maintenance Hole 223 16 Dash Inlet CelGlbasln 214 17 Camels Cable Mal 2]5 1 10 300mm DiaSlom Sewer 226I 18 375mmDla Storm Sew 222 18 525mm OM Storm Sewer 228 1 16 600mm Dla Sion Sewer 229 1 13 IM2baaan%erN 230 10 'Clean OW 1 1 IMIer0laIeous Works 231 1 20 IBOeetSgm 132 1 21 IEntranta Rallomi clw Colveo 1 100 Hydro Translarmer 1 IbINm Hydrant 213 22 'Dead EMOankade Subtotal •Tho_roughbred Drive Wodel 8A0015 211I212 213 1 214 215 218 1 SCHEDULE "B" SP Dea11Pu0n Wtemmo 15 200mm GM. PVC Walemal 15 200mm Ow Gale Valve 15 Hydrant Valve and lead 15 15mmDIa Service 15 Ply!, TMUMNock andaatll 15 Conned to Eol*o WnWmain Slmm3ewer 2.171 16 1500mmbl CalMbash Malnlenance Hole 1 Ea 1 3 5 6.500.0015 2.181 16 1500mm ON Double CalanSmIn Maintenance Hole 1 Ea 1 6 5 7..000.0013 42000 00 1 30% 1500mm DMDoutle Ca0cIbasNMoNmnanov Has tyw 16 InlonalDmo SNWure Ea 1 5 1050000IS 16 600mmv 600mm C0tolba5M I Ea 2 5 1.900.0015 16 e0Mm a 1200.mn00He Calmbesn 1 Ea 4 5 34000015 1 5 3.2 TOWNSHIP OF 0RNIEo0NTE BRAESTONE SOBDNISION PHASES le 8IC CONSTRUCTION Schedule or Unit Polcn Unit 00lmaled Quantity m 702 Ea 0 Ea 5 Ea 20 Ea 1 Ea 1 UnIIPtlee I Cool 1 5 1210015 $ 133300IS S 55000015 5 7250015 5 1.1500015 $ 3.50000IS PRESERVIC NG AGREESIEMI SECVRITV SECUOITY% hNOYNT 8454200 30% 7..99000 30% 27500 W 30% 14300 00 1 30% 1.150001 30% 3500 0 1 30% Ea ma m m Ea Ea Ea Ea 10 24 249 207 60 60 340 6 1 2 1 0.500.001f i 2000005 S 25000 5 3 1350015 5 1500015 $ 200001S 5 350 00 15 $ 19000 5 4250015 1 I S 2800015 2.d0000IS 2.00000IS 1250.0015 If 19„500.001 30% 10500 WI 3 800 00 13.60000 850000 mow 00 600000 33.615.00 31 050 00 12000.00 21.00000 84500.00 85000 1.60000 240000 4.00000 1.250.00 705.075.001 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 3014 30% 30% 30% 525482.60 S239940 58250001 54350 rot 534500 SI050.00 55.050.00 512.600W S3.15000 $1.14000 34.08000 52550.00 55,000.00 5100000 510.084.50 59315.00 53.600.00 55.300.00 51938000 S25500 650400 572000 51.4000 537500 f 211.82250 Item No. SP ascripllon SCHEDULE EIBf1 34 TOWNSHIP OF ORMIRI0NTE BRAESTONE SUBDIVISION PHASES 1E1S10 C0N5TRUCTION Schoule el Unit Paces Estimated Unit Quality 3.0 Moan 0riva Road Works 301 7 Granular F 1400mm1 me 3950 302 8 Granular A' 1150mml m 4445 303 9 Base CourseAnomll HL-0150mm3 m2 3495 304 11 Condole Curb and Guiles 10P506000901 I m 1 060 305 12 150mmdb Perforated Subdaln Mr Mier Sock _ _ 1,060 306 10 50mmHL3 Paved Shoulder (05m Wdel Ina 505 307 13 CoaM° Sidewalk in2 127 308 14 IGtade. TCoso0 all Sad BOdmald m 5.155 309 310 311 312 313 1314 1315 1318 317 3.18 3.19 320 IWalennaln 15 I20Omm Ob PVCwalemaln 15 1200mn DO. Gale Valve 15 'Hesitant Valve all lead 15 I19mm0b. Sella 15 'Conned le Erk0m WalemaN I$I➢_moSswer 18 I1500mm OM ColoMml Malnleneoce Hob 18 1500mm DM Oahe Celcbbaso MalnOnance Hob 16 6Wnm 0600mm CnbMisl 16 I6011n5na 1200mm Doable CNCMwn 18 300mm Ola Storm Sea 18 375mm Oia Mon Sewer 18 IIn04a5on Trend 321 18 'Clean Cut 322 I I Ea Ea Ea Ea Ea Ea Ea Ea 504 2 3 15 4 3 2180 124 180 I=gaseous Works 21 MUIMS Levey Ee 1 ISubtmal• Moman Drive Works' 1 890016 Unit Price Cost 900 $ 35550.00 625 5 27751.25 9.50 5 33.202,50 57.00 5 n.p%1.00 3250 $ 34,450.00 1750 $ 0.037.50 13040 $ 1651000 525 $ 27.11625 12100 $ 1 333 00 $ 5.500,00 5 72500 5 35000E 5 I 6.50000IS TOM 00 5 19W00I5 3.400 W I5 13500Is 15000 $ 19E00IS 425WI5 60,98400 256800 163WW 11,600.00 3.500.00 26 000 00 210WW 7.500 00 1020000 35.1WW 18.6WW 34.20000 2.12500 IPRESERVICING ACtREE61ENE1 SECRRITV AMOUNT LCIIRTN% 5 2,00000 $ 2p0000 S 500.54250 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 51066509 50.334.35 59.960 75 521206.00 510.33500 52,651.25 54.95300 581M88 515,29520 579950 54.9500E 53.40000 51.05000 57.600 Of, 55200.00 52.26004 53050.00 5105300f 5550000 51026001I 563T50 I � 30% 5500.00I 1 151962.751 12 ream H0. SP Description SCHEDULE "B1f 34 TOWNSHIP OFCR041EDOMIE BRAESTONE SUBDIVISION PHASES1891C CONSTRUCTION Schedule of Unit Prins 4A Gald01and Crescent Rnod Waves 4.01 7 Granular 'B' 1400mm1 402 8 Granular 'AI (1504411 403 9 Sass Course AeolMIHLA 150nun) 4.04 11 Canasta Curb and Gutter 0PDD 600 030i 405 12 1s0mm Ma Peroratedsub:reN env Filler Sock 4.00 10 50nn H W Pam Shoulder 103m wide) 407 14 (Grade. Tom] and sod Bolnard 4 os 409 41I 411 IWaNanaln 15 I200nn 0a. PVC WZNmidn 15 200men DIaGata Valve 15 IHwrard. Volvo anti Lead 15 I19mm OM. Service I$lalm$0400 4.12 16 I I500mm Dle. Cokhbuln Maintenance Hole 4.13 16 11500mm Dla Double Cal0Fbnln Maintenance Hale 414 18 I800mm o 600mm Calc4bnln 4.15 18 I600mma 12UOmm Double CaWbaeln I Ea 416 16 200mm Dim Storm Snow I m 417 18 375mm OM Slorm Sewn 4,18 18 I450mnDiaSto,Sower I m 4.19 1 18 IMOYIonirent 1 m 420I IS on Out Ea 1 Masten 9m WOM 421 23 Mailbox lintyr L5 1 Subtotal - Gelderland Crescent Works $9R016 E,OmMld Unit 0nnllb mr Ea Ea Ea Unil Edo Cost PRESERI'ICINC ACREEOIERp SECUa1TY SECURITY n AMOUNT 4325 S 9.00 $ 30.925.00 30% 411.677.50 4.840 $ 825I1 30250.00 3000 19.07500 3785 5 950 S 35.957.50 30% 510 MT25 1.140 $ 630016 76.19000 30% 522 914 00 1,140 $ 3230 IS 3705000 30% 511,115 W 570 $ 1730 $ 9.975.00 30% 5299250 6.215 $ 52511 3262875 30% 9978863 576 S 1210013 6969600 30% 520.008..80 3 $ 1.333001S 399900 3000 $1.19970 5 S 5500,00 IS 27.50000 30% $8250.00 24 $ 72500 15 17.40000 30% 55220.00 Fe 3 S 6.500,00 5 19.50000 3200 6585000 Ea 7 5 7.000.00 S 49 000 00 30% 51470000 3 $ 1.90000 $ 570000 30% 51.710.00 7 S 340100 $ 23E0000 30% 07,14000 323 $ 13540 5 43.60502 30% 513.081.50 137 5 050,00 IS 24550,00 30% 56.16500 16 5 I6000 15 6.480.00 30% 5194400 108 S 2250011 4230000 30% 512,69000 8 $ 42500 15 255000 30% $705.00 5 2,000.00 0 2 000 00 30% 5000A0 3 595245.25 $ 118,93.88 13 Item No. 5A 901 902 9.03 904 9.05 EP !Description IEesemenle O to ooe Swl9219li913 14 TOmol. Seed end Meth 14 I0iIe ReWacemenl IBI0446_s 14 0m0D9e Swale _ 14 Toni. Seedd4 MJch 3 'Slew Bale Check Dams SCHEDULE 13" 15 TOWNSHIP OF 000'ME0ONTE BRAESTONE SUBDIVISION PHASES IS & 1C CONSTRUCTION Schedule al Una Prices B1ak65 905 14 Tooso6. Seed end Mulch 19 250.150mm Dia, NPP0O the 270% niter Fabric 900I 20 80mi 2.0m E06m Leml&weeder 909' 27 1.2m Hktl Pat and Wm Fence 9.10I 19 Oddl Reinforcement _- III 010,63-FmemeT0 Ar*50 Read 9.11 1 15 150Omm Cla Slone Maintenance Hole 9.12 18 375mm DIa. Storm Sewer 913 18 450mnn Die Slwm Seer 914 18 %lerm01n. Slerm Sneer 915 B Granular 'A' 1150rnm1 9.16 10 'Surface Course Asphalt H W U0mn1 9.17 1 14 'Grade. Topco8 end Sod 910 25 IPS. Gate 9.19 26 Sttd Beam Guide Pao 920 I 26 Sled Beam Gultle Rol End Treebnenl 921 123 111m Hloh Pal and Wire Fence 922 1 19 1250 -150mm wa. Rip -Rep the 270R Alter Fabric IJ O'9Y2016 Estimated Unit Own* UnitPtln Cart PRES.SERY ICING AGREEMENT' SECNVTY SECURITY% AMOUNT me 450 $ 250 5 1.12500 30% 533750 me 160 5 3500 $ 5.60000 30% 51.60000 m 200 5 5500 5 11 0(0 00 30% 55,30000 ma 450 5 230 5 1.125.00 30% 5337.50 Ee 3 $ 500015 15000 30% 54500 ma 235 5 250 5 68750 30% 517635 me 10 S 5050 S 500.00 30% 5150.00 15 1 S 33000015 3300.00 30% S99000 60 S 5500IS 3300.00 30% 599000 m2 45 S 350015 1375.00 30% 547250 Ea 2 S 65000015 1300000 30% 33.900 WI m 9.0 S 1500015 135000 30% 540500 m 943 5 1800016 16.974.00 30% 55092201 96 S 3800015 3646.00 3000 S1094.401 m 585 S 70015 4095.00 30% 51220501 mi 455 5 12.00 I 5550.00 30% $3524.00 m 660 5 525 5 3.06500 30% 51A30..501 EB 2 S 195000 5 7..90000 30% 42370DOI 17 5 2500015 4.25000 30% 5127500 Ea 2 S 25000010 5000.00 30% 51.50000 m 204 5 550015 1122000 30% 53366001 m9 5 5o00'S 1 350 00 30% 5405,010 1 14 Item No. 6P Dea6dpllon 923 914 925 Bk 921 928 939 930 931 SCHEDULE 1iBaa bred omo 10 IO, W INN Mal/enema Hoe 10 0AW INN Calabash 10 450mm 0M. Storm Sewer 18 Inlillaton l'rem0 29 Wats MarMewre Platform 24 BM8N, 27 1.2m H0I Past od Wn Fence 14 Toosoo and Seed and Match 14 DIkh RNnlomemenl 38 TOWNSHIP OF OROMEOONTE BRAESTONE SUBDIVISION PHASES is A 11 CONSTRUCTION Schedule of unit Ma. _ 7jptk¢1,_ReceaLbrt0KKk 932 16 OCI IN el Malnlerem Hole menan0enaeuwtnrzmammp 9.33 16 Structure 01Ih Inlet Maintenance Hole cAv IMem0 Omp 9.34 16 SIrudre W Safeh Platform 935 1 16 600mm a 600mm Cakhbasln 936 16 300mm0M Stein Sewer I I 5072016 unit EQnated Quantity unit Pace I Coot Ea 1 Ea 1 m 105 m 61 LS 1 Ea 2 m 190 50 a 1 160 I I L_ Subtotal -Easements' OVERALL SUB.TOTALI f0% Allmxnne forEnoineednol SUB-TOTALI 13% HST) Ea 1 Ea 1 Ea 1 Ea 2 m iW 5 8510.0015 $ 3/A000IS 5 10000ls 5 625001$ 5 6000.00 I $ 3000IS 5 320I$ 5 250 S 350014 8500 OD 100010 1.09000 50625.00 fi00000 60000 60B000 1,125W 5.600W PRESENVICINC A0000MEM_1 SECURITY SECURITY 3 AMOUNT 3m% 30% 30% 30% 30% 30% 30% 30% 30% $ 10,00300 5 10,000.00 30% S 19.50000 $ 19.50000 30% $ 18.000.00 $ 18 000.00 1 30% $ 1300 00 5 380900 wx S 13500 $ 21.60000 30% $ 262,1450 $ 381637835 1$ 301.637.84 IS 1.19001619 IS 545742.10 TOTAL SECURITIES' I $ 4,743,758.29 52.550001 290000 556700 515.10750 51.00000 510003 51.02400 $33750 31.630.00 13.000.00 $505100 $5.40000 s1a10001 5640000 I I I$ 78.721 35 1 1$ 621A83.181 Is 62100351 IS 683191/21 IS 85.014.941 $ 772,006.76I 15