Loading...
2016-088 Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Reid Equipment Solutions Plan 51M-1047The Corporation of the Township of Oro-Medonte By-law No. 2016-088 A By-law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Reid Equipment Solutions, Plan 51 M-1047 Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; And Whereas Council for the Corporation of the Township of Oro-Medonte entered into a Subdivision Agreement with Reid Equipment Solutions in March 2015 for a thirteen (13) residential lots on Reid's Ridge. AND WHEREAS the requirements of this Subdivision Agreement with respect to the underground works have now been met; Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows: That the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Reid Equipment Solutions, Plan 51 M-1047 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro- Medonte and 2353970 ONTARIO INC. (Reid Equipment Solutions). 2. That the attached Schedule "A", Certificate of Substantial Completion and Acceptance (Municipal Underground Services) shall form part of this By -Law. 3. This by-law shall take effect on the final passing thereof. By-law read a First, Second and Third time, and Passed this 1St day of June, 2016. The Corporation of the Township of Oro-Medonte Mayor, H.S._ H4bhes f 1 Dd`jj,ty Clerk, Janette Teeter Schedule "A" to By-law No. 2016-088 for The Corporation of the Township of Oro-Medonte CERTIFICATE OF MUNICIPALITY PROJECT DEVELOPER FILE NO. Description of the Works: AECOM 55 Cede Pointe Drive, Suite 620 705 721 9222 tel Baine, ON, Canada UN 5R7 705 734 0764 fax w WAMomeom TOWNSHIP ENGINEERS SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) Township of Oro-Medonte REID RIDGE RESIDENTIAL SUBDIVISION Plan 51M4047 Reid Equipment Solutions 60118250 (440-04007-50) 12004 -SUB -021 • Watermain Works in the Reid Ridge Subdivision on Reid's Ridge from County Road No. 19 [Moonstone Road East] southerly and then westerly to the cul-de-sac (240 metres); and then north- westerly through an easement between lots 8 and 9 [#12 and #10 Reid's Ridge] to County Road No. 19 [Moonstone Road East] (132 m); • Storm Sewers the Reid Ridge Subdivision on Reid's Ridge including sub -drains and storm sewers; • Stormwater Management Pond in the Reid Ridge Subdivision at Block 15; We, AECOM, notify the Municipality that the above mentioned works were inspected on May 18, 2016 and to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement except for the deficiencies below: • Items listed in AECOM Construction Status Report dated May 20, 2016. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its Amendment. The date of Substantial Completion and Acceptance (Municipal Underground Services) Is established by the Certificate as of May 20, 2016. Date: Zd Z0I1 b Signature: -QPM K150118250 i04007-5QDCe0cateMS. C. and A.Undetgrounddoc M1 Township of Oro-Medonte Construction Status Report File Number: 60118250 _ ._ ser: Jo ...... .._... ._.. _. i... -__..t. _......—.___._ .. loser. Jones Consulting Group Ltd. Contractor: Black Rock Services te. May 20, 2016 + Registered Plan 51M-1047 START`OF UNDERGROUND WORKS' Yes No 1DWto —Completed and Comments iS I WRControls Wit fence installed and maintained _ ✓ Siltation fences being maintained as needed. L,rook check dams installed andmaintained ✓ ,SWM Pond Z pond earth works completed _ _..._.. _ ✓ ____ 1storm inletfoutfall works completed -_ ✓ access road constructed ✓ 1 pnd rift completed with gate ✓ See site photos dated April 14, 2016 Z and topsoil / seeding X Some growth established landscaping completed _. _ .. _ X Z pnd sumsubmitted to AECOM ✓ Received on April 7,2016 [ACCEPTABLE] L nd volume calculatlons submitted to AECOM ✓ . Jones Consulting letter dated April 6 2016 - _. Z mond certlfiqdlon by "mer ✓ Jones Consulting letter dated April 6, 2016[ACCEPTABLE i a installed Individual Septic Systems Ilpipe beddln9 summary/acceptance report - ,backfill test summary/acceptance report _ L_�mafntenance holes inspected/approved '.._ benching Inspected � ,top of precast 0.3m belowfinish�de. --- _ mmar�/acceptance report unary/acceptance reeart ofprecast 0.3m bebw finish grade so lnspecton submitted for review_ - inspection rewewed/approved i ermain e Installed e bedding acceptance reQort_ Mill testing acceptance report pass installed and inspected ssure testtMconfirmed by Twp. tem chlorinated -by Tw_p. -- -- — -- able water samples results received by AECOM/Township Inspectors Name: x�1 cf 3 Project Manager. vt2014. _ Township of Oro-Medonte a File Number: 60118250 Enginear. Jones ConeuitinkpLo rContractor Bieck Rock Services Date lMay 20, 2016 _ ..._ _.. _.._ _ Registered Plan 51M-1047 STARTOF:ABOVEGROUND.WORKS Yes No Date Completed and Comments rRoad Works - 2) rsubgrede proof roll witness byAECOM ✓ Witnessed by AECOM September 24 2014 sub rade elevations confirmed b En meer ✓ p �.___._ -- 4 - - Y _ �- _. 3� sub -drains installed -sub-grade - under curb _ ditch ✓ 4) granulartestedby .SoilsConsukant 5) ranular 8 coin actron r its to AECOM X 6 ranular "A" gC-- g _ , _ compaction reports to AECOM X - 71ncrete curbs completed _ -- - ✓ 8� concrete tested by Solls Consultant X 9� ' base a�halt�laced � _ jq_,.pignage - street identification d road not assumed ✓ l-) dead-end barricades and signage 12) driveway aprons_paved X 13) }bouleva q and ditches topsoil and sodded/seeded X 141 }base asphalt inspected by AECOM prior to top lift asphalt X 15) top lift asphalt completed X Miscellanies Works 1). +walkways completed _ 2) dark works completed _. 3�. fencingcompleted -boundary _ - walkways .'.Perk - __.. 4� T___4p_ ry Marker Post As Constructed (Aboveground Works 1)j has constructed infonnabon submitted and approved by AECOM X 2service record sheets 'a _rdficate of S C & A. (Aboveground Services) Issued END OF MAINTENANCE PERIOD FORA90VEGROUND WORKS - Yes No Date Completed and Comments General Works Inspectors Name: /1 /-4�� 3 of 3 Proiect tree_p X _...- 2) pond landscaping inspection byAECOM X 3) fencing inspection - - AECOM _ - X 4) fnal lot gredingcertification X 5) OLS certification for monuments X 6) curb box inspection ,by AECOM X 71 _valve &hydrant inspection ,byAECOM X 8) final inspection -light standards: X - transformers _ __ ____ . X utllityboxes - X 9) top lift asphalt inspection by AECOM X 10)_ curb inspecbon byAECOM X 11) !boulevards/ditches inspection by AECOM X - -- :ertiflcate of M & F A. (Aboveground Senilces) Issued 1 Inspectors Name: /1 /-4�� 3 of 3 Proiect