2016-088 Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Reid Equipment Solutions Plan 51M-1047The Corporation of the Township of Oro-Medonte
By-law No. 2016-088
A By-law to Authorize the Issuance of the Certificate of Substantial Completion
and Acceptance (Municipal Underground Services) for Reid Equipment Solutions,
Plan 51 M-1047
Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13,
as amended, provides that municipalities may enter into agreements imposed as a
condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
And Whereas Council for the Corporation of the Township of Oro-Medonte entered into
a Subdivision Agreement with Reid Equipment Solutions in March 2015 for a thirteen
(13) residential lots on Reid's Ridge.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
underground works have now been met;
Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows:
That the Certificate of Substantial Completion and Acceptance (Municipal
Underground Services) for Reid Equipment Solutions, Plan 51 M-1047 may now
be issued by the Township Engineers (AECOM) in compliance with the
Subdivision Agreement between the Corporation of the Township of Oro-
Medonte and 2353970 ONTARIO INC. (Reid Equipment Solutions).
2. That the attached Schedule "A", Certificate of Substantial Completion and
Acceptance (Municipal Underground Services) shall form part of this By -Law.
3. This by-law shall take effect on the final passing thereof.
By-law read a First, Second and Third time, and Passed this 1St day of June, 2016.
The Corporation of the Township of Oro-Medonte
Mayor, H.S._ H4bhes
f
1
Dd`jj,ty Clerk, Janette Teeter
Schedule "A"
to By-law No. 2016-088 for
The Corporation of the Township of Oro-Medonte
CERTIFICATE OF
MUNICIPALITY
PROJECT
DEVELOPER
FILE NO.
Description of the Works:
AECOM
55 Cede Pointe Drive, Suite 620 705 721 9222 tel
Baine, ON, Canada UN 5R7 705 734 0764 fax
w WAMomeom
TOWNSHIP ENGINEERS
SUBSTANTIAL COMPLETION AND ACCEPTANCE
(MUNICIPAL UNDERGROUND SERVICES)
Township of Oro-Medonte
REID RIDGE RESIDENTIAL SUBDIVISION
Plan 51M4047
Reid Equipment Solutions
60118250 (440-04007-50) 12004 -SUB -021
• Watermain Works in the Reid Ridge Subdivision on Reid's Ridge from County Road No. 19
[Moonstone Road East] southerly and then westerly to the cul-de-sac (240 metres); and then north-
westerly through an easement between lots 8 and 9 [#12 and #10 Reid's Ridge] to County Road No.
19 [Moonstone Road East] (132 m);
• Storm Sewers the Reid Ridge Subdivision on Reid's Ridge including sub -drains and storm sewers;
• Stormwater Management Pond in the Reid Ridge Subdivision at Block 15;
We, AECOM, notify the Municipality that the above mentioned works were inspected on May 18, 2016 and to
the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement
except for the deficiencies below:
• Items listed in AECOM Construction Status Report dated May 20, 2016.
We hereby accept these works for use and operation by the Municipality subject to the rectification of the
above noted deficiencies and to the rectification of any further deficiencies that may become apparent during
the maintenance period and to the maintenance that is require by the Subdivision Agreement and its
Amendment.
The date of Substantial Completion and Acceptance (Municipal Underground Services) Is established by the
Certificate as of May 20, 2016.
Date: Zd Z0I1
b Signature: -QPM
K150118250 i04007-5QDCe0cateMS. C. and A.Undetgrounddoc
M1
Township of Oro-Medonte
Construction Status Report
File Number: 60118250 _
._ ser: Jo ...... .._... ._.. _. i... -__..t. _......—.___._ ..
loser. Jones Consulting Group Ltd. Contractor: Black Rock Services
te. May 20, 2016 + Registered Plan 51M-1047
START`OF UNDERGROUND WORKS'
Yes No 1DWto —Completed and Comments
iS I WRControls
Wit fence installed and maintained _ ✓ Siltation fences being maintained as needed.
L,rook check dams installed andmaintained ✓
,SWM Pond
Z pond earth works completed _ _..._.. _ ✓ ____
1storm inletfoutfall works completed -_ ✓
access road constructed ✓
1 pnd rift completed with gate ✓ See site photos dated April 14, 2016
Z and topsoil / seeding X Some growth established
landscaping completed _. _ .. _ X
Z pnd sumsubmitted to AECOM ✓ Received on April 7,2016 [ACCEPTABLE]
L nd volume calculatlons submitted to AECOM ✓ . Jones Consulting letter dated April 6 2016 -
_.
Z mond certlfiqdlon by "mer ✓ Jones Consulting letter dated April 6, 2016[ACCEPTABLE
i a installed Individual Septic Systems
Ilpipe beddln9 summary/acceptance report -
,backfill test summary/acceptance report _
L_�mafntenance holes inspected/approved '.._
benching Inspected
� ,top of precast 0.3m belowfinish�de. --- _
mmar�/acceptance report
unary/acceptance reeart
ofprecast 0.3m bebw finish grade
so lnspecton submitted for review_
- inspection rewewed/approved
i ermain
e Installed
e bedding acceptance reQort_
Mill testing acceptance report
pass installed and inspected
ssure testtMconfirmed by Twp.
tem chlorinated -by Tw_p. -- -- — --
able water samples results received by AECOM/Township
Inspectors Name: x�1 cf 3 Project Manager.
vt2014. _
Township of Oro-Medonte
a File Number: 60118250
Enginear. Jones ConeuitinkpLo rContractor Bieck Rock Services
Date lMay 20, 2016 _ ..._ _.. _.._ _ Registered Plan 51M-1047
STARTOF:ABOVEGROUND.WORKS
Yes No Date Completed and Comments
rRoad Works -
2) rsubgrede proof roll witness byAECOM ✓ Witnessed by AECOM September 24 2014
sub rade elevations confirmed b En meer ✓ p
�.___._ --
4
- - Y _ �-
_.
3� sub -drains installed -sub-grade
- under curb _
ditch ✓
4) granulartestedby .SoilsConsukant
5) ranular 8 coin actron r its to AECOM X
6 ranular "A" gC--
g _ , _ compaction reports to AECOM X -
71ncrete curbs completed _ -- - ✓
8� concrete tested by Solls Consultant X
9� ' base a�halt�laced � _
jq_,.pignage - street identification d
road not assumed ✓
l-) dead-end barricades and signage
12) driveway aprons_paved X
13) }bouleva q and ditches topsoil and sodded/seeded X
141 }base asphalt inspected by AECOM prior to top lift asphalt X
15) top lift asphalt completed X
Miscellanies Works
1). +walkways completed _
2) dark works completed _.
3�. fencingcompleted -boundary
_ - walkways
.'.Perk
- __..
4� T___4p_ ry Marker Post
As Constructed (Aboveground Works
1)j has constructed infonnabon submitted and
approved by AECOM X
2service record sheets
'a
_rdficate of S C & A. (Aboveground Services) Issued
END OF MAINTENANCE PERIOD FORA90VEGROUND WORKS
- Yes No Date Completed and Comments
General Works
Inspectors Name: /1 /-4�� 3 of 3 Proiect
tree_p
X
_...-
2)
pond landscaping inspection byAECOM
X
3)
fencing inspection - - AECOM _
-
X
4)
fnal lot gredingcertification
X
5)
OLS certification for monuments
X
6)
curb box inspection ,by AECOM
X
71
_valve &hydrant inspection ,byAECOM
X
8)
final inspection -light standards:
X
- transformers
_ __ ____ .
X
utllityboxes -
X
9)
top lift asphalt inspection by AECOM
X
10)_
curb inspecbon byAECOM
X
11)
!boulevards/ditches inspection by AECOM
X
- --
:ertiflcate of M & F A. (Aboveground Senilces) Issued
1
Inspectors Name: /1 /-4�� 3 of 3 Proiect