2016-071 Issuance of the Cert. of Substantial Completion and Acceptance (Municipal Underground Services) for Bachly Investments Inc., Plan 51M-1079The Corporation of the Township of Oro-Medonte
By-law No. 2016-071
A By-law to Authorize the Issuance of the Certificate of Substantial Completion
and Acceptance (Municipal Underground Services) for Bachly Investments Inc.,
Plan 51 M-1079
Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13,
as amended, provides that municipalities may enter into agreements imposed as a
condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
And Whereas Council for the Corporation of the Township of Oro-Medonte entered into
a Subdivision Agreement with Bachly Investments Inc. in August 2015 for eighteen (18)
residential lots on Breanna Boulevard.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
underground works have now been met;
Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows:
1. That the Certificate of Substantial Completion and Acceptance (Municipal
Underground Services) for Bachly Investments Inc., Plan 51 M-1079 may now be
issued by the Township Engineers (AECOM) in compliance with the Subdivision
Agreement between the Corporation of the Township of Oro-Medonte and Bachly
Investments Inc.
2. That the attached Schedule "A", Certificate of Substantial Completion and
Acceptance (Municipal Underground Services) shall form part of this By -Law.
3. This by-law shall take effect on the final passing thereof.
By-law read a First, Second and Third time, and Passed this 4th day of May, 2016.
The Corporation of the Township of Oro-Medonte
Z_A&� )V
Mayor, H.S. H 16hes
De uty Clerk, Janette Teeter
Schedule "A"
to By-law No. 2016-071 for
The Corporation of the Township of Oro-Medonte
F
CERTIFICATE OF
MUNICIPALITY
PROJECT
DEVELOPER
FILE NO.
Description of the Works:
AECOM
55 Ced» Powe Drim. Sulk 620 7057219222 tel
Bartie.ON.Camda IAN510 7057310764 from
"Macaontieom
TOWNSHIP ENGINEERING CONSULTANTS
SUBSTANTIAL COMPLETION AND ACCEPTANCE
(MUNICIPAL UNDERGROUND SERVICES)
Township of Uro-Medonte
TURTLE RIVER SUBDIVISION
Plan BIM -1079
Bachly investments Inc.
0011810%(4&2030443) f43 -T-930031
• Storm Sewers and Sub -drain Works In the Turtle River Subdivision on. Brenna Boulevard, Vine.
Street and BLOCK 21;
• Storm Water Management Basin. and Outfall in the Turtle River Subdivision In BLOCK 22.
We, AECOM, notify the Municipality that the above mentioned works were inspected on April 25, 2016 and to
the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement
except for the deficiencies below:
• Items listed In AECOM Construction Status Report dated Apra 25, 2016.
We hereby accept these works for use and operation by the Munidpality subject to the rectification of the
above noted deficiencies and to the rectification of any further deficiencies that may become apparent during
the maintenance period and to the maintenance that is require by the Subdivision Agreement and its
Amendment.
The date of Substantial Completion and Acceptance (Municipal Underground Services) is established by the
Certificate as of April 25, 2016.
Date:Jam' Signature: J'_
yr
K980118109 (0030443Jt80118109S. C. and A.Undeigro"x t
Township of Oro-Medonte
tiUbdivislon: Turtle River Subdivision
File Number: 130118109
nd Stanton limited
Contractor, Morris Shelawaii and Sons
r�
018
START OF UNDERGROUND WORKS
istorm Sewer
1} pipe installed _
_ P_ike6eddn 'summer/acceptance rrt _
backBli test summarVacceptance report,
4} 4malntenance tales inspectedtapproval
-_ berfahing inspected _..
top of precast 0.3m below finish grade
7} video irupectlon submitted for review
8} rvideo lns_�ecti_ai ieview�l/approved
Watennain
1} installed _.
2} pipe bedding acceptance report
3} 'backfill testirxl acceptance report_.
bypass Installed and inspected
5} pressure testing confirmed by Up.
system chlorinated b wp-_ ..
7} potable water samples results received by AECOMi%wnship
Inspectors Name:
Q) 14101`3 Project Manager. At
Yes I No JDate Com eted and Comments
Station Controls
1)
sift fence installed and maintained
2J
;rock Bieck dims inetalted and maintained
1 e
Fond earth works completed _
C leted in November 2014.
?Z.
storm inletioutiail works completed
Completed in November 2014.
31
''access road constnlctl
5)
!pond topsoil / seeding
m
landscapir°o_ E�eted .._
X
7)
pond Survey submitted to AECOM
✓
_ $�
ypond volume calculations submitted'to AECOM
�
_ .?Z
_P!IYei"s�!�.__ _ . _.._:.__ _..~
Individual. Septic Systems
pipebeddings mmary/acceptance rep ort
-
�.
(ball test summa f ce rt
��'_ac __
.tan_.:
Imaintenanceholes inspectedlapproved
_ .
69
benching inspected
6
top of oiic t 0.3m below finish grade
7y
Ivideo inspection submitted forreview�
8)
video inspection revlewedlap car ed
istorm Sewer
1} pipe installed _
_ P_ike6eddn 'summer/acceptance rrt _
backBli test summarVacceptance report,
4} 4malntenance tales inspectedtapproval
-_ berfahing inspected _..
top of precast 0.3m below finish grade
7} video irupectlon submitted for review
8} rvideo lns_�ecti_ai ieview�l/approved
Watennain
1} installed _.
2} pipe bedding acceptance report
3} 'backfill testirxl acceptance report_.
bypass Installed and inspected
5} pressure testing confirmed by Up.
system chlorinated b wp-_ ..
7} potable water samples results received by AECOMi%wnship
Inspectors Name:
Q) 14101`3 Project Manager. At
Township of Oro-Medonte
>. _ _ File Number 60118109
.. -�_, ..........__..1._...... _.. __ ... _ _
._....._ .n_L1 `._� _ .... -....a. .. .� ...__ _— .. ..... ... _.
lin trier Dearden and Stanton Limited+ iContractor. Mortis Shelswell and Sons
Daft:,�pr112fi, 20!6 _. _. �. __.. _ -__. _Registered Ptan fi1M•107t! _ .._
START OF UNDERGROUND WORKS
Storm $ewer _
1) 'flushing of sewer X
2� vides ins_pecUon submitted for review X
_._
3) video Inspection reviewedfapproved X
1 curb stop inspection by,AECOM
2) valve & hydrant inspection by AECOM
CerBticate of M & F A. (Municipal l Underground Services) Issued
Inspectors Name:
2 of 3 Project Manager:
Fl +amass removed
_
, . tracer wrre -attached to hydrantflange --
- Contin
_.
10)
test
hy_dront water flow chats submitted
, end nted
- barrels to Twp
-
A painted
markers installed
F.ri sneer g curb box in_pecdon certification
�
12 2
_.._��..__...
a.En weer s valveYd & h rant inspection certification
.
- _tU
tit tet s__.
. h rocrossings Corr paled✓
_
2
bell works completed
✓
hydro works completed
_. ✓
_.
4j�sUeell�tsInstalled_...--
-
streetlights eneroked
t%j
icertification DESA) from electrical consultant
✓
See HVarWs email dated March 22. 2016.
gas works Com toted
✓
_ -
^as -constructed information by electrical consuilan -
As -Constructed (Underground Works)
1)
as -constructed information submitted
✓
_
�X
2}
as-constn'cled drawings approved by AECOM
Certificate of S C & A. (Municipal Underground Services) Issued
Issued APrii 25, 2016
END OF MAINTENANCE PERIOD FOR UNDERGROUND WORKS
Yes I No Date Completed and Comments
{SVYN Pand
_.?)
*dean out�rror to end of maintenance
11
flushing of sewer .. _. _
3)
:video inspection submitted for review
videoLnR�ctionreviemi! lM proved
Storm $ewer _
1) 'flushing of sewer X
2� vides ins_pecUon submitted for review X
_._
3) video Inspection reviewedfapproved X
1 curb stop inspection by,AECOM
2) valve & hydrant inspection by AECOM
CerBticate of M & F A. (Municipal l Underground Services) Issued
Inspectors Name:
2 of 3 Project Manager:
Township of Oro-Medonte
File Number. 60116109
_
En freer. Dearden and Sianton Limited
9
+__ _ Contractor: Morris Shelswell and Sons
Date:
April 25, 2016
Registered Plan 51M-1078
X
START OF ABOVEGROUND WORKS
6}
Road works
X
Yes I No Date Completed and Comments
7}
;valve & t"ranQqion by AECOM
subgrade proof roil witness by AEctxd _
_.._
✓ tlom tared in r4ovember 2o1a
2}
.__ _ . _
subgrade elevetbns confirmed b� Engineer
. _: � - --�..
See Dearden and Stanton letter dated`June . 20�15.
__;s,
utrdrains.instadl�ed-sub�grade..
-transformers
X
- under curb
_. _
- utttiV boxes
_
-ditch
lop lift asphalt Inspection b AECOM
curb ins tion AEC M
X
X
_ 4}
0r�mctar tested by Soils. Consuitdnt
See ersiajl - Oearde-n and Sianldn dated Aust 17, 2015
F 7",X
�Rnular 6 co paction reports to AECOM
email by DeardenDearden andand Stanton dated A ust i7, 2015
62
granular A compaction reports to AECOM
_ . _ _ _ _ _ _
5� email bpi Dearden and Stantondated ;August 17, 2015
?}
concrete curbs c ornpleied
.
..
concrete tested Soils Consultantbase
asphalt placedsignage-
;,ge—e
street Identification
Installed In June 2015.installed
in June20S'5road
not assumed
Installed in June2015.
no exitdead-end
barricades ands na e
12
driveway aprons paved
131
.boulevard and ddchestopsoil and soddedlseeded
base MOM imp actedbyAECOM,prior to top ldt asphalt..top
lilt as�hafl ram�leled..
Miscellanies Works
_
_?Z
walkways corrileted_...
2)
park works completed _
..,fencing
com ted _- boundary _
..... _.._....
- walkway_s
_.
-park
8oundar Merker Post ....._ _ .. . _
✓ Installed abng SW M Pond access mad:
As-Constructed-(Aboyearound Workka►
1}
as-eanjNcled Information submitted and
WovedbyAECOIM__...
Certificate of S. C & A. (Aboveground Services) Issued
f TX
JE -0 IRAINTENAN E PERIOD
FOR A13QWGROUND WORKS
Yea I No
Date Complated'and Comments
;General Works
i
_?}
.'tree piantirqlnboulevard
2) 'pond landscaping inspection by AECOM
4
final lot grading cerbficatlon
X
5} _
OLS certification for monuments
X
6}
curb box Inspection bi4ECOM _
X
7}
;valve & t"ranQqion by AECOM
X
t3}
finalinspection. -light standards
X
-transformers
X
_. _
- utttiV boxes
X
9}
10
lop lift asphalt Inspection b AECOM
curb ins tion AEC M
X
X
_ _
_ 111
_ _
boulevards/ditches Inspection by AECOM
F 7",X
Cerffi6te of M. IF, A Aboveground Services' Issued
X�j_
Inspectors Name: 3 of 3 Project Manager.,