2016-071 Issuance of the Cert. of Substantial Completion and Acceptance (Municipal Underground Services) for Bachly Investments Inc., Plan 51M-1079The Corporation of the Township of Oro-Medonte By-law No. 2016-071 A By-law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Bachly Investments Inc., Plan 51 M-1079 Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; And Whereas Council for the Corporation of the Township of Oro-Medonte entered into a Subdivision Agreement with Bachly Investments Inc. in August 2015 for eighteen (18) residential lots on Breanna Boulevard. AND WHEREAS the requirements of this Subdivision Agreement with respect to the underground works have now been met; Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows: 1. That the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Bachly Investments Inc., Plan 51 M-1079 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro-Medonte and Bachly Investments Inc. 2. That the attached Schedule "A", Certificate of Substantial Completion and Acceptance (Municipal Underground Services) shall form part of this By -Law. 3. This by-law shall take effect on the final passing thereof. By-law read a First, Second and Third time, and Passed this 4th day of May, 2016. The Corporation of the Township of Oro-Medonte Z_A&� )V Mayor, H.S. H 16hes De uty Clerk, Janette Teeter Schedule "A" to By-law No. 2016-071 for The Corporation of the Township of Oro-Medonte F CERTIFICATE OF MUNICIPALITY PROJECT DEVELOPER FILE NO. Description of the Works: AECOM 55 Ced» Powe Drim. Sulk 620 7057219222 tel Bartie.ON.Camda IAN510 7057310764 from "Macaontieom TOWNSHIP ENGINEERING CONSULTANTS SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) Township of Uro-Medonte TURTLE RIVER SUBDIVISION Plan BIM -1079 Bachly investments Inc. 0011810%(4&2030443) f43 -T-930031 • Storm Sewers and Sub -drain Works In the Turtle River Subdivision on. Brenna Boulevard, Vine. Street and BLOCK 21; • Storm Water Management Basin. and Outfall in the Turtle River Subdivision In BLOCK 22. We, AECOM, notify the Municipality that the above mentioned works were inspected on April 25, 2016 and to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement except for the deficiencies below: • Items listed In AECOM Construction Status Report dated Apra 25, 2016. We hereby accept these works for use and operation by the Munidpality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its Amendment. The date of Substantial Completion and Acceptance (Municipal Underground Services) is established by the Certificate as of April 25, 2016. Date:Jam' Signature: J'_ yr K980118109 (0030443Jt80118109S. C. and A.Undeigro"x t Township of Oro-Medonte tiUbdivislon: Turtle River Subdivision File Number: 130118109 nd Stanton limited Contractor, Morris Shelawaii and Sons r� 018 START OF UNDERGROUND WORKS istorm Sewer 1} pipe installed _ _ P_ike6eddn 'summer/acceptance rrt _ backBli test summarVacceptance report, 4} 4malntenance tales inspectedtapproval -_ berfahing inspected _.. top of precast 0.3m below finish grade 7} video irupectlon submitted for review 8} rvideo lns_�ecti_ai ieview�l/approved Watennain 1} installed _. 2} pipe bedding acceptance report 3} 'backfill testirxl acceptance report_. bypass Installed and inspected 5} pressure testing confirmed by Up. system chlorinated b wp-_ .. 7} potable water samples results received by AECOMi%wnship Inspectors Name: Q) 14101`3 Project Manager. At Yes I No JDate Com eted and Comments Station Controls 1) sift fence installed and maintained 2J ;rock Bieck dims inetalted and maintained 1 e Fond earth works completed _ C leted in November 2014. ?Z. storm inletioutiail works completed Completed in November 2014. 31 ''access road constnlctl 5) !pond topsoil / seeding m landscapir°o_ E�eted .._ X 7) pond Survey submitted to AECOM ✓ _ $� ypond volume calculations submitted'to AECOM � _ .?Z _P!IYei"s�!�.__ _ . _.._:.__ _..~ Individual. Septic Systems pipebeddings mmary/acceptance rep ort - �. (ball test summa f ce rt ��'_ac __ .tan_.: Imaintenanceholes inspectedlapproved _ . 69 benching inspected 6 top of oiic t 0.3m below finish grade 7y Ivideo inspection submitted forreview� 8) video inspection revlewedlap car ed istorm Sewer 1} pipe installed _ _ P_ike6eddn 'summer/acceptance rrt _ backBli test summarVacceptance report, 4} 4malntenance tales inspectedtapproval -_ berfahing inspected _.. top of precast 0.3m below finish grade 7} video irupectlon submitted for review 8} rvideo lns_�ecti_ai ieview�l/approved Watennain 1} installed _. 2} pipe bedding acceptance report 3} 'backfill testirxl acceptance report_. bypass Installed and inspected 5} pressure testing confirmed by Up. system chlorinated b wp-_ .. 7} potable water samples results received by AECOMi%wnship Inspectors Name: Q) 14101`3 Project Manager. At Township of Oro-Medonte >. _ _ File Number 60118109 .. -�_, ..........__..1._...... _.. __ ... _ _ ._....._ .n_L1 `._� _ .... -....a. .. .� ...__ _— .. ..... ... _. lin trier Dearden and Stanton Limited+ iContractor. Mortis Shelswell and Sons Daft:,�pr112fi, 20!6 _. _. �. __.. _ -__. _Registered Ptan fi1M•107t! _ .._ START OF UNDERGROUND WORKS Storm $ewer _ 1) 'flushing of sewer X 2� vides ins_pecUon submitted for review X _._ 3) video Inspection reviewedfapproved X 1 curb stop inspection by,AECOM 2) valve & hydrant inspection by AECOM CerBticate of M & F A. (Municipal l Underground Services) Issued Inspectors Name: 2 of 3 Project Manager: Fl +amass removed _ , . tracer wrre -attached to hydrantflange -- - Contin _. 10) test hy_dront water flow chats submitted , end nted - barrels to Twp - A painted markers installed F.ri sneer g curb box in_pecdon certification � 12 2 _.._��..__... a.En weer s valveYd & h rant inspection certification . - _tU tit tet s__. . h rocrossings Corr paled✓ _ 2 bell works completed ✓ hydro works completed _. ✓ _. 4j�sUeell�tsInstalled_...-- - streetlights eneroked t%j icertification DESA) from electrical consultant ✓ See HVarWs email dated March 22. 2016. gas works Com toted ✓ _ - ^as -constructed information by electrical consuilan - As -Constructed (Underground Works) 1) as -constructed information submitted ✓ _ �X 2} as-constn'cled drawings approved by AECOM Certificate of S C & A. (Municipal Underground Services) Issued Issued APrii 25, 2016 END OF MAINTENANCE PERIOD FOR UNDERGROUND WORKS Yes I No Date Completed and Comments {SVYN Pand _.?) *dean out�rror to end of maintenance 11 flushing of sewer .. _. _ 3) :video inspection submitted for review videoLnR�ctionreviemi! lM proved Storm $ewer _ 1) 'flushing of sewer X 2� vides ins_pecUon submitted for review X _._ 3) video Inspection reviewedfapproved X 1 curb stop inspection by,AECOM 2) valve & hydrant inspection by AECOM CerBticate of M & F A. (Municipal l Underground Services) Issued Inspectors Name: 2 of 3 Project Manager: Township of Oro-Medonte File Number. 60116109 _ En freer. Dearden and Sianton Limited 9 +__ _ Contractor: Morris Shelswell and Sons Date: April 25, 2016 Registered Plan 51M-1078 X START OF ABOVEGROUND WORKS 6} Road works X Yes I No Date Completed and Comments 7} ;valve & t"ranQqion by AECOM subgrade proof roil witness by AEctxd _ _.._ ✓ tlom tared in r4ovember 2o1a 2} .__ _ . _ subgrade elevetbns confirmed b� Engineer . _: � - --�.. See Dearden and Stanton letter dated`June . 20�15. __;s, utrdrains.instadl�ed-sub�grade.. -transformers X - under curb _. _ - utttiV boxes _ -ditch lop lift asphalt Inspection b AECOM curb ins tion AEC M X X _ 4} 0r�mctar tested by Soils. Consuitdnt See ersiajl - Oearde-n and Sianldn dated Aust 17, 2015 F 7",X �Rnular 6 co paction reports to AECOM email by DeardenDearden andand Stanton dated A ust i7, 2015 62 granular A compaction reports to AECOM _ . _ _ _ _ _ _ 5� email bpi Dearden and Stantondated ;August 17, 2015 ?} concrete curbs c ornpleied . .. concrete tested Soils Consultantbase asphalt placedsignage- ;,ge—e street Identification Installed In June 2015.installed in June20S'5road not assumed Installed in June2015. no exitdead-end barricades ands na e 12 driveway aprons paved 131 .boulevard and ddchestopsoil and soddedlseeded base MOM imp actedbyAECOM,prior to top ldt asphalt..top lilt as�hafl ram�leled.. Miscellanies Works _ _?Z walkways corrileted_... 2) park works completed _ ..,fencing com ted _- boundary _ ..... _.._.... - walkway_s _. -park 8oundar Merker Post ....._ _ .. . _ ✓ Installed abng SW M Pond access mad: As-Constructed-(Aboyearound Workka► 1} as-eanjNcled Information submitted and WovedbyAECOIM__... Certificate of S. C & A. (Aboveground Services) Issued f TX JE -0 IRAINTENAN E PERIOD FOR A13QWGROUND WORKS Yea I No Date Complated'and Comments ;General Works i _?} .'tree piantirqlnboulevard 2) 'pond landscaping inspection by AECOM 4 final lot grading cerbficatlon X 5} _ OLS certification for monuments X 6} curb box Inspection bi4ECOM _ X 7} ;valve & t"ranQqion by AECOM X t3} finalinspection. -light standards X -transformers X _. _ - utttiV boxes X 9} 10 lop lift asphalt Inspection b AECOM curb ins tion AEC M X X _ _ _ 111 _ _ boulevards/ditches Inspection by AECOM F 7",X Cerffi6te of M. IF, A Aboveground Services' Issued X�j_ Inspectors Name: 3 of 3 Project Manager.,