Loading...
2015-030 Issuance of Cert. of Substantial Completion and acceptance (Homire)The Corporation of the Township of Oro - Medonte By -law No. 2015 -030 A By -law to Authorize the Issuance of the Certificate of Substantial Completion and acceptance (Municipal Aboveground Services) for 2063334 Ontario Inc. - Homire Subdivision (Warminster), Registered Plan 51 M -947 Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; And Whereas Council for the Corporation of the Township of Oro - Medonte entered into a Subdivision Agreement with 2063334 Ontario Inc. ( Homire Subdivision- Warminster) in December 2009 for twenty eight (28) residential lots on Galrich Court and Merrington Avenue. And Whereas the requirements of this Subdivision Agreement with respect to the municipal aboveground services have now been met; Now Therefore the Council of the Township of Oro - Medonte hereby enacts as follows: That the Certificate of Substantial Completion and Acceptance (Municipal Aboveground Services) for Homire Subdivision — Warminster (2063334 Ontario Inc.), Plan 51 M -947 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and 2063334 Ontario Inc. 2. That the attached Schedule "A ", Certificate of Substantial Completion and Acceptance (Municipal Underground Services) shall form part of this By -Law. 3. That this By -law shall come into force and take effect on the final date of passing thereof. By -law read a First, Second and Third time, and Passed this 28th day of January, 2015. The Corporation of the Township of Oro - Medonte Mayor, H.S., L(Wies Cl�rk, ,%,15opglas Irwin Schedule "A" to By -law No. 2015 -030 for The Corporation of the Township of Oro - Medonte A_COM AECOM 55 Cedar Pointe Drive, Suite 620 705 721 9222 tel Barre, ON, Canada L4N 5R7 705 734 0764 raz N w Aecom.com. TOWNSHIP ENGINEERS CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL ABOVEGROUND SERVICES) MUNICIPALITY Township of Oro - Medonte PROJECT Homire Subdivision - Warminster Plan 51M -947 DEVELOPER 2063334 Ontario Limited FILE NO. 60118148 (43T- 90046) Description of the Works: Roadways in the Homire Subdivision consisting of: • Merrinnton Avenue from Townline west to cul -de -sac; a distance of 649 metres (2,129 feet); • Gairich Court from Warminster Sideroad to Merrington Avenue; a distance of 201 metres (659 feet); We, AECOM notify the Municipality that the above mentioned works were inspected on November 5, 2014, and to the best of our knowledge and judgment, are complete in accordance with the Subdivision Agreement except for the deficiencies below: • As per the attached Construction Status Report dated January 12, 2015. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is required by the Subdivision Agreement. The date of Substantial Completion and Acceptance (Abov d Services) is established by the Certificate as of January 12, 21015. Date:— 2 Z 5 Signature: AbmwmWSC B.A.D. _ Township of Oro- Medonte Construction Status Report Subdivision. Homire Subdivision -- nmeer. C C Tatham &Associates Ltd. i File Number: 60118149 Co_n_tractor A_knor Construction Date Janua 12,2015 __ Registered Plan 51M -947 - -- START OF UNDERGROUND WORKS T I Date Completed and Comments - Yes No jSiltation Controls 1) silt fence installed and maintained 2 rock check dams installed and maintained ✓ SWM Pond pond nd earth_works comfeted T ✓ 2 storm outfall works completed __ 3) access road constructed � 4J pond fencing complete( with ate ✓ ✓ —' - - — X Fence along south side to be completed by South Shore Homes. 5) ( pond topsoil / seedin X 6 ,landscaping completed X ' To be completed bySouth Shore Homes. _ 8j pon( survey submitted X * To be completed by South Shore Homes. 9) d volume calculations submitted _ X - — * To be completed by South Shore Homes. 10) ';pond certification by Engineer X To be completed by South. Shore Homes �Sahit�� a�Sawer_ - -- 1) .pip. installed Individualstpticsystems.__ -. _.._._ _. - - -._. . - ...._.... - - -- - _ - 2 i i e bedding summarlacceptance report 3 backfiii test summarylacceptance report 4) jmaintenance holes inspected /approved 5) benching Inspected — _ 6�u top of,precast 0.3m below finish grade �..._ y) ✓ideo Inspection submitted for review 8) Mcleo inspection reviewed !approved_ 9) ;flushing of sewer for final acceptance - - -- - -- 10 'service record sheets Storm Sewer -- —installed — -- - -- -_— _._ ._ _ 1) ;pipe _._.._ - -, 2) :pipe bedding summary lacceptance report___ -_ 3) `backfilftesfsummarylacceptanee report 44 maintenance holes inspectedlapprovai - 5 benching ins ected 6) Itop of precast 0.3m below finish grade 7) ); video inspection submitted for review 8) ,video inspection reviewedlapproved 9 flushing of sewer for final ;service record sheets — 11) road crossin culverts installed - --..- _ - -- - - _ _....__ -- — - - - - -- - - -------- - - -- - - -- - - - -- -- - -- - -- '----- - --' "- Inspectors Name: l 1 Project Manage F, IWi7i Tnwnshin of nrn_Marinnf. mm- �r�il ®il Construction Status Report Subdivision: Homire bdivi Susion File Number: 60118149 Engineer. C. C. Tatham & Associates Ltd. Contractor: Aknor Construction - Date: January 12, 2015 Registered Plan 51 M -947 START OF UNDERGROUND WORKS Yes No Date Completed and Comments Watermain 1 pipe installed 2) pipe bedding acceptance report ✓ See letter dated CCTA January 27, 2010. 3) backfili testing acceetance report ✓ See letter dated CCTA January 27, 2010. 4) by-pass installed and inspected ✓ - - -- 5). pressuretestin confirmed by AECOM ✓ -- - 6)_ 1 system chlorinated ✓ 7) potable water samples received by AECOM ✓ -- - - - - - -' 9 . bypass removed ✓ - _.... _ -_ ,tracer wire -attached to hydrant flan e ✓ See CCTA letter December 19, 2014. - - - continuity test ✓ Completed Tierra Geomatic Services Inc. dated November 15, 2013. 10) hydrant -water flowcharts submitted ✓ -by Completed by Orillia Hydrant &Mechanical Services Inc. dated November 14, -end caps painted ✓ _2013. __ Hydrant caps painted orange. -- __ - barrels painted to Twp spec. - ✓ See CCTA letter December 19, 2014. - -- - markers installed ✓ See CCTA letter December 19, 2014. 11) sample stations inspection completed ✓ Confirmed with Twp. April 30, 2010. - 12) 13) - � Engineer's curb box inspection certification En ineer'svalve &hydrant inspection_ cerhficatw_ n _ ✓ - - - - -- See CCTA certificate November 13, 2013 ✓ See CCTA certificate November 13, 2013. 14 service record sheets ✓ Received December 19, 2014. jutilities 1 hydro crossings completed ✓ letter dated January 27, 2010-- . see--CCTA - - - - -- - -- - 2 bell works completed -- ✓ I See CCTA letter dated Janua 27, 2010. 3 hydro works completed - ✓ - -- See CCTA letter dated January 27, 2010. 4 streetfi hts installed _ 9 ✓ _ See CCTA letter dated Janua 27, 2010 5) streetlights energized ✓ - - See CCTA letter dated January 27, 2010 -- 6) ESA certification from electrical consultant ✓ See CCTA letter dated January 27 2010. 7) gasworks completed ✓ See CCTA letter dated January 27, 2010. - as- constructed information by electrical consultant As- Constructed (Underground worksl� -�- as-constructed information submitted and ✓ - - - 1 Received December 19, 2014. approved by AECOM - - -- . - `- - - - - -- Oertificate of S. C. & A. Underground Issued ✓ February 4, 2010 END OF MAINTENANCE PERIOD FOR UNDERGROUND WORKS Yes No Date Completed and Comments _ SWM Pond -- 1) clean out prior to end of maintenance X -To be completed by South Shore Homes. Sanitary 1T 2 3)_ flushing of sewer _._ video inspection submitted for review_ video inspection reviewed /approved - -- .._._. - -- _ -- -------- - - - - -- -- --- " - - - -- - - -- - -- -- - - -� 1) 2 Storm Sewer flushing of sewer - video inspection submitted for review - - - -- - ---- -_.__. - -- -- - 3 video inspection reviewed /approved - - -- — 1) curb stp­ns ect on by_AECQM -_ ✓ See CCTA certificate November 13 2013. - __?L_I valve &hydrant inspection by AECOM ✓ -- See CCTA certificate Noveer -Mb 13,.2013. Certificate of M. & F. A. Underground Issued ✓ _ January 12, 2015 Inspectors Name: /4�L, Project Manager: ►,P=A Townshin of Construction Status Report Subdivision: Homire Subdivision _ File Number: 60118149 En Ineer. C. C: Tatham &Associates Ltd. -- - — Contractor: Aknor Construction Date: Janua 12, 2015 _ Registered Plan 51M -947 START OF ABOVEGROUND WORKS Yes I No I Date Completed and Comments Road Works 1 sub grade proof rolled by AECOM ✓ Inspected on August 5, 2009. 2 subgrade elevations confirmed by Engineer ✓ - -- - - 3) sub- drains installed - sub -grade ___ _ -- - - - - - -- - -- -under curb - -- ditch _ _ _ __ ___ g ✓ Advised by Township staff by email dated Sept. 18, 2013 that sub - drains not required. 4) adular tested by Soils Consultant -- ✓ Testing results received on December 19, 2014. 5) granular "B° compaction reports to AECOM ✓ - Testing results received on December 19, 2014. 6) granular "A" com action reports to AECOM ✓ Testing results received on December 19, 2014. 7) h dro crossings installed ✓ - 8) concrete curbs completed ✓ --- Completed on November 7, 2013. 9) curbs inspected prior to top lift asphalt ✓ Review curb completed on May 22, 2014. 10 concrete tested by Soils Consultant ✓ Testing results received on December 19 2014. 11 base asphalt placed ✓ -- - - -- _ - - -- -- - - 12) 1 signage - street Identification ✓ - __. _._- stop ✓ - -- - road not assumed ✓ - no exit ✓ - — - - -- - - -- 13) 14) 15 __L6L dead -end barricades and si nage driveway aprons paved sidewalks completed sidewalks inspected by AECOM - - - - - -- - 17 boulevard topsoil and sodded /seeded ✓ - -- 18 base asphalt inspected by AECOM I Review on base asphalt completed on May 22, 2014. 19) top lift asphalt completed JCompl eted on June 2, 2014. As half reinforcement not installed as per requirements. Miscellanies Works 1) _walkways completed 2) _ park works completed 3 fencing completed - boundary X walkways 4) Boundary Marker Post ertificate of 5. C. & A Aboveground Issued ✓ ..: -- - - - - - -- -- Post & wrre fence - rear of Lot 25 and part of sideyard of Lot 26; rear of Lots 11 to 23. - January 12, 2015 END OF MAINTENANCE PERIOD FOR ABOVEGROUND WORKS - -- - -- Yes No Date Completed and Comments General Works _1) tree planting in boulevard X * Developer to review with Township as per CCTA letter December -19,2014. _2) _ and landscaping inspection by AECOM X * To be completed by South Shore Homes. 3) pond fencing inspection by AECOM_ _ __ X * To be completed b South Shore Homes. 4 final lot grading certification _ X 5) OLS certification for monuments X _ 6 ) curb box inspection by AECOM X _ 7) Ivalve & hydrant inspection by AECOM X 8) Ifinal inspection - light standards X transformers X utility boxes X 9) 1 top lift asphalt inspection by AECOM X Extra maintenance period required as Developer did not lace asphalt reinforcement. 10j I curb inspection by AECOM X "11) sidewalk inspection byAECOM _ 12) (ditches inspection by AECOM 13) as- constructed information submitted and X by AECOM ------.__—.--------.___---- lapproved Certificate of M. & R A. Aboveground Issued X Inspectors Name: Project Manager: 'A?)