Loading...
2015-029 Issuance of Cert. of Maintenance and Final Acceptance (Homire)The Corporation of the Township of Oro - Medonte By -law No. 2015 -029 A By -law to Authorize the Issuance of the Certificate of Maintenance and Final Acceptance (Municipal Underground Services) for 2063334 Ontario Inc. (Homire), Plan 51 M -947 Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; And Whereas Council for the Corporation of the Township of Oro - Medonte entered into a Subdivision Agreement with into a Subdivision Agreement with 2063334 Ontario Inc. (Homire Subdivision- Warminster) in December 2009 for twenty eight (28) residential lots on Galrich Court and Merrington Avenue. And Whereas the requirements of this Subdivision Agreement with respect to the aboveground services have now been met; Now Therefore the Council of the Township of Oro - Medonte hereby enacts as follows: 1. That the Certificate of Maintenance and Final Acceptance (Municipal Underground Services) for 2063334 Ontario Inc. (Homire), Registered Plan M- 947, may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and 2063334 Ontario Inc. (Homire). 2. That the attached Schedule "A ", Certificate of Maintenance and Final Acceptance (Municipal Underground Services) shall form part of this By -Law. 3. This by -law shall take effect on the final passing thereof. By -law read a First, Second and Third time, and Passed this 28th day of January, 2015. The Corporation of the Township of Oro - Medonte Mayor, H.S H�jghes Irwin Schedule "A" to By -law No. 2015 -029 for The Corporation of the Township of Oro - Medonte C AECOM 55 Cedar Pointe Drive, Suite 820 Barrie, ON, Canada L4N 5117 www.aecom.00m TOWNSHIP ENGINEERS CERTIFICATE OF MAINTENANCE AND FINAL ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) MUNICIPALITY Township of Oro- Medonte PROJECT Homire Subdivision - Warminster Plan 51 M - 947 DEVELOPER 2463334 Ontario Limited FILE NO. 64118149 f43T- 900461 Description of the Works: 705 721 9222 tat 705 734 0784 fax • Watermain Works in the Homire Subdivision on Gairich Court from Warminster Sideroad to Merrington Avenue, Merrington Avenue from Townline west to cul-de -sac, Townline from Warminster Sideroad to Merrington Avenue; • SWM Facility in Block 29 including drainage ditches in the Homire Subdivision. The SWM Pond fencing, landscaping, pond survey/volume calculations and certification works is to be complete under the neighboring subdivision, Isabella Estates, Subdivision Agreement and securities; We, AECOM, notify the Municipality that the above mentioned works were inspected on November 5, 2014, and to the best of our knowledge and judgement are complete in accordance with the Subdivision Agreement, except for the deficiencies below: • See Construction Status Report dated January 12, 2015. We, AECOM, notify the Municipality that to the best of our knowledge and judgment: 1. The Developer named herein has completed the required maintenance work, has rectified known deficiencies and has fulfilled the other terms of the Subdivision Agreement. 2. The period of maintenance of this Subdivision A ent expires on the issuance of this Certificate. Date: Z Z�' 15 Signature: Lk dM,..d M 6 F.A. Au. i MMAU Township of Oro-Medonte Construction Status Report ubdivision: Homire Subdivision File Number: 60118149 n ineer., C.,C. Tatham & Associates Ltd, Contractor: Aknor Construction ate: Janva 12, Plan 51M -947 START OF UNDERGROUND WORKS Yes No Date Completed and Comments on Controls 1) silt fence Installed maintained maIFC —maintained—. 2) Lock check dams Installed and ✓ SWM Pond 1) 1 pond earthworks completed _?)_ ;storm outfall works completed ✓ 3) access road constructed I/ 4) i pond fencinq completed with gate X *Fence aionq south side tobe completed by South Shor Homes 3_ p and topsoil/ seeding X 6) landscaping completed X To be co— leted by South Shore Homes. 8) and survey submitted x To be completed by South Shore Homes. ,9) pond volume calculations submitted X To be completed by South Shore Homes. 1%_ pond certification by Engineer X To be completed by South Shore Homes. 2) 3) San! pipe installed pipe bedding SLImmarylacceptance report__ backfill test summary /acceptance report individual. septic systems.— �11_ :benching 6) 9) 1 maintenance holes Ledlapproved inspected top of precast 0.3m below finish grade I wavideo inspection —sut ed —f0L E Z — Inspection reviewed/approved flushing of sewerfor final acceptance . ..... 10) 1 service record sheets Storm Sewer 1) pipe pipe bedding summarylacceptance —repon: backfill test summaryfaccepta ice report D_ 3) ...... maintenance holes lnspeded/�proyal benching inspected to of precast 0.3m below finish grade video inspection submitted for review video inspection reviewed/approved flushin2 of sewer for final acceptance service record sheets 6) 7) 8) 9) IJO_ 11) road crossing culverts installed ✓ ---- --- Inspectors Name: /Zt�21 I Project Manager ;�z MRA®/ Township of Oro- Medonte 1��aVi[i Construction Status Report ubdivision: Homire Subdivision File Number: 60118149 ngineer. C. C. Tatham & Associates Ltd. Contractor: Aknor Construction ate: January 12, 2015 Registered Plan 51 M -947 START OF UNDERGROUND WORKS Yes No Date Completed and Comments Watermain 1 p1 a Installed ✓ 2 pipe bedding acceptance report ✓ See letter dated CCTA January 27, 2010. 3 backfill testing acceptance report ✓ _ See letterdated CCTA January 27, 2010. _1L_ by-pass installed and inspected 5 pressure testing confirmed by AECOM _ ✓ 6) system chlorinated 7 potable water samples received by AECOM ✓ 8 by -pass removed ✓ 9 tracer wire - attached to hydrant flange I See CCTA letter December 19, 2014. - continuity test I Completed by Tierra Geomatic Services Inc. dated November 15, 2013. 10 hydrant - waterflow charts submitted ✓ Completed by Orillia Hydrant & Mechanical Services Inc. dated November 14 2013. end caps painted ✓ Hydrant caps painted orange. barrels painted to Twp spec. ✓ See CCTA letter December 19, 2014. - markers installed ✓ See CCTA letter December 19, 2014. 11) sample stations inspection completed ✓ Confirmed with Twp. April 30, 2010. 12) Engineer's curb box inspection certification ✓ See CCTA certificate November 13, 2013. 13 Engineer's valve & hydrant inspection certification ✓ See CCTA certificate November 13, 2013. 14) service record sheets ✓ Received December 19, 2014. Utilities 1 hydro crossincJs completed ✓ See CCTA letter dated January 27, 2010. 2) bell works completed ✓ _ See CCTA letter dated January 27, 2010. 3) hydro works completed ✓ _ See CCTA letter dated January 27, 2010. 4 streetlights installed ✓ See CCTA letter dated January 27, 2010. 5) streetlights energized ✓ See CCTA letter dated January 27, 2010, 6) ESA certification from electrical consultant ✓ See CCTA letter dated January 27, 2010. 7) gas works completed ✓ See CCTA letter dated January 27, 2010. 8 as- constructed information by electrical consultant As- Constructed (Underground Works 1 ) as- constructed information submitted and ✓ Received December 19, 2014. approved by AECOM I _ ertificate of S. C. &A. Underground Issued ✓ February 4, 2010 END OF MAINTENANCE PERIOD FOR UNDERGROUND WORKS �W�P Yes No Date Completed and Comments — I 1) I clean out prior to end of maintenance X * To be completed by South Shore Homes. Sanitary Sewer 1 flushin of sewer ____ 2) 3 video inspection submitted for review _ video inspection reviewed/approved Storm Sewer 1 2 3) flushing of sewer _ video inspection submitted for review video inspection reviewed/approved Watermain _ v 1) curb stop inspection by AECOM ✓ See CCTA certificate November 13, 2013. 2) valve & hydrant inspection by AECOM ✓ See CCTA certificate November 13, 2013. — I artiflcate of M. & F. A. Underground Issued ✓ January 12, 2015 I Inspectors Name: 110L 2 Project Manager: i MMIA Townshin of Oro- Merinnte �iry ®'1 Construction Status Report subdivision: Homire Subdivision JFlleNu mber: 60118149 in ineer: C.. C. Tatham & Associates Ltd. Contractor: Aknor Construction ate: January 12, 2015 Re Istered Plan 51 M -947 START OF ABOVEGROUND WORKS Yes No Date Completed and Comments Road Works 1) sub rade proof rolled b AECOM ✓ Inspected on August 5, 2009. 2) sub grade elevations confirmed b En ineer ✓ 3) ' sub- drains installed - sub -grade _ under curb -ditch ✓ Advised by Township staff by email dated Sept. 18, 2013 that sub - drains not required. 4 granular tested b Soils Consultant ✓ Testing results received on December 19; 2014. 5) granular "B" compaction reports to AECOM ✓ _ Testing results received on December 19, 2014. — 6) granular "A" compaction reports to AECOM ✓ Testing results received on December 19, 2014. 7) hydro crossings installed ✓ 8 concrete curbs completed ✓ Completed on November 7, 2013. 9) curbs inspected prior to top lift asphalt_ ✓ Review curb completed on May 22, 2014. 10) concrete tested by Soils Consultant ✓ Testing results received on December 19, 2014. 11) base asphalt placed _ ✓ J, si nage - street identification ✓ sto ✓ - — -._._ -road not assumed ✓ no exit ✓ 13) 14 15 end barricades and signage driveway aprons paved alks completed 16 alks inspected b AECOM - — 17) vard topsoil and soddediseeded ✓ 18) asphalt inspected b AECOM ✓ Review on base asphalt completed on May 22, 2014. 19) asphalt completed ✓ Completed on June 2, 2014. Asphalt reinforcementnof installed as per requirements. Mg llanies Works 1 2) a s completed orks completed - -- - - -- 3) g completed - boundary _ X Post & wire fence - rear of Lot 25 and part of sideyard of Lot 26; rear of Cots 11 to 23. walkways park 4) ary Marker Post - -- -- ertificate of S. C. & A. Aboveground Issued ✓ January 12, 2015 END OF MAINTENANCE PERIOD FOR ABOVEGROUND WORKS Yes No Date Completed and Comments General Works 1 tree planting in boulevard X * Developer to review with Township as per CCTA letter December 19, 2014. 2) pond landscaping inspection by AECOM X * To be completed by South Shore Homes. 3) pond fencing inspection by AECOM X * To be completed by South Shore Homes. 4) final lot grading certification X 5) OLS certification for monuments _ X 6) curb box inspection by AECOM X 7 valve &hydrant inspection by AECOM X 8 final inspection - light standards X transformers X utility boxes X _ top lift asphalt Inspection by AECOM X Extra maintenance period required as Developer did not place asphalt reinforcement. 10 curb inspection b y AECOM X 11) 12) sidewalk inspection by AECOM ditches inspection by AECOM X 13) as- constructed information submitted and X _ approved by AECOM -- - -- ertificate of M. & F. A. Aboveground Issued X Inspectors Name: 2.- 3 Project Manager: (A?X2