Loading...
2014-077 Amend By-law 2010-059 - Subdivision AgreementThe Corporation of the Township of Oro-Medonte By -Law No. 2014-077 A By-law to Amend By-law 2010-059, "A By-law to Authorize the Execution of an Subdivision Agreement between the Corporation of the Township of Oro-Medonte and 2008628 Ontario Ltd." Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies being Phase 2 of the Diamond Valley Estates Development (Plan 51 M-957), Township of Oro-Medonte, County of Simcoe. And Whereas Council of the Corporation of the Township of Oro-Medonte authorized the execution of a Subdivision Agreement with 2008628 Ontario Ltd. by By-law 2010- 059 in March 2010; And Whereas Council of the Corporation of the Township of Oro-Medonte authorized an amendment to the Subdivision Agreement with 2008628 Ontario Ltd. by By-law 2013-100 in June 2013 for the required works identified for Phase 2 of the Diamond Valley Estates Development; And Whereas Council deems it necessary to amend Schedule "D" of By-law 2010-059 to itemize the cost for the required works identified for Phase 3 of the Diamond Valley Estates Development; Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows: 1. That Schedule "D" to By-law 2010-059 be deleted and replaced with Schedule "A" entitled "Schedule D — the Amended Subdivision Agreement", a copy of which is attached hereto and forms part of this By-law as Schedule "A", be registered on title against the lands described therein; 2. That Section 6.1 of the Amended Subdivision Agreement be amended by deleting paragraph 4 which begins with "The subdivision is to be developed in the following Phases:" and replaced with the following: "The subdivision is to be developed in Phases as follows: Phase 1 Total of 29 Lots Lots 1-15 Diamond Valley Drive Lots 97-99 Diamond Valley Drive Lots 118-128 Diamond Valley Drive Phase 2 Total of 18 Lots Lots 100-117 Emerald Terrace Phase 3 Total of 20 Lots Lots 16-24 Topaz Court Lots 25-26 Diamond Valley Drive Lots 85-92 Opal Court Lot 93 Diamond Valley Drive All future phases to be the subject of review and approval by the Township of Oro-Medonte and additional amendments to Section 6.1 and Schedule "D" of the Subdivision Agreement." 3. That the Township of Oro-Medonte shall be entitled to enforce the provisions of the Amended Subdivision Agreement against the owners and any and all subsequent owners of the land; 4. This by-law shall take effect on the final passing thereof. By-law read a First, Second and Third time, and Passed this 28th day of May, 2014. The Corporation of the Township of Oro-Medonte Mayor, H. . H ghes Dep ty Clerk, Janette Teeter Schedule "A" to By-law No. 2014-077 for The Corporation of the Township of Oro-Medonte SCHEDULE "D" to By-law 2010-059 NOTE: It is understood and agreed that this Schedule forms part of the Subdivision Agreement between the TOWNSHIP OF ORO-MEDONTE AND 2008628 ONTARIO LTD. LETTER OF CREDIT VALUE FOR DIAMOND VALLEY ESTATES - PHASE 3 (LOTS 16 TO 26 & 85 TO 93) TOWNSHIP OF ORO-MEDONTE ITEMIZED ESTIMATE OF COST OF CONSTRUCTION OF EACH PART OF THE WORKS: The following list summarizes the cost estimate of the major works but is not necessarily inclusive: LETTER OF CREDIT RETAINED n Remaining Outstanding Work $573,657.27 D 10% of Completed Work $0.00 RETAINED BY TOWNSHIP $5— 73;657.27 60118278 Original Remaining Completed Outstanding Work Work A) Roadway Works including clearing and grubbing, excavation, granular road base material, and two lifts of asphalt .............................................. $194,731.90 194,731.90 $0.00 B) Storm Drainage Works complete including driveway culverts, topsoil and sod ditches, topsoil, seed and mulch boulevards and siltation and erosion control devices ........................................ $124,688.38 124,688.38 $0.00 C) Water Works including watermains, valves, hydrants and valves, water services,.... ..... ........... $129,490.00 129,490.00 $0.00 D) Miscellaneous items such as street name regulatory signs ................................................. $1,600.00 1,600.00 $0.00 E) Electrical Supply including street lights, control panels and duct crossings ......................... $11,000.00 11,000.00 $0.00 SUB -TOTAL $461,610.28 $461,510.28 $0.00 F) 10% Allowance for Engineering and Supervision $46,151.03 $46,151.03 $0.00 TOTAL $507,661.30 $507,661.30 $0.00 13% HST $65,995.97 $65,995.97 $0.00 TOTAL COST $573,657.27 $573,657.27 $0.00 LETTER OF CREDIT RETAINED n Remaining Outstanding Work $573,657.27 D 10% of Completed Work $0.00 RETAINED BY TOWNSHIP $5— 73;657.27 60118278 TOWNSHIP OF ORO -ME DONTE DIAMOND VALLEY ESTATES -PHASE 3 (LOTS 16 TO 26 & 85 TO 93) SECURIT'Y SUMMARY SHEET 60118278 > Cf) Z CL CL 0 00 0 (D > 00 00(a 0 -n CL CD Z 3CD --1 > CD M = Cr CD CL (D CD CD =r CD W CD Fn' -q Cn 00 =r CD Z0- Cn s! X CD 0 03 n cn -0 M 90, m3 CD 0 Z -q m (n 0 x m a C r - m 0 0 Lri cc 0 0 0 r* r* 0 0 o -k (D Z -4 0 0 U) fh =r '4 0 -4 -k -k 0 0 1 9 0 m 0. 0 r* m o "AN SECTION "A" SITE WORKS 1.051 fCat /hill Removal Topufmitt 5,575 M3 $4.50 $25,087,50 0 1 o 0 82507.50 1 $0,00 0% ROAD 1110AKS-IrO BASE COU11SEASPRALT L, ijo grodc and lihope boulevards and ditches and c2Wasub grade. 1.002 12' Diamond floy Drive ond V 635 $1.00 0 0 0�T. , 'i, - 1-560 ;1,560.00 0 1 0 0 1,560.00 $0 1.004 10pal Court 1,890 $1.00 $1,800.00 0 1 0 1 0 SI,ROOAO S0.00 0"/0 L 'in ov "'o '' idth of flic pavement and shouldels. l c I Diamond Iy D r i v c 635 m2 $1.00 $635.00 0 0 0 $635.00 $OE00 91 1.006 JToptrz Court 1.970 $1.00 1 $1,970.00 1 0 L170 11 0 0� $0.00 0 0, 0% 1.007 10pal Curt 1,800 e I 51.00 1 $1,800.00 1 0 1 0 1 0 1 1800.00+ $0.00 1 0% SUDDIvand viacc45Ommcompaulodibic4oicaiofUrariularB' 1.009 Diamond V.11- Drive 05 $13.00 $8255.00 058,255,00 00 0 1.009 Court 1,970 00 0 f--� 0 $25.610.00 16 6 N 6�7. 1.010 0 al Court 1,800 m2 $13.00 1 $23,400.00 0 0 j 0 1 S23.400.OD 1 $0.00 1 0% supply slid place 150 TnTn compacted thickness of Granular A' , 1.011 IDiumond VaHey Drive 6111 57.00 $4,445.00 1 0 o I o 14.41512 1 10.10 1 0% 1.012 Topucouri 1970, 1 $7.00 513,790.00 1 0 2 $0.00 1 0%1.013 1,800 1 M' 1 $7�00 1 $12,600.00 1 0 0 1 $12600.00 $0,00 1 0% S2Wlam 50 min compacted thickness ofl-RA 1111.8 mawolljvAlloyDtive 635 1 s9.00 1 $5.715.00 1 o I o o 00 1 0% 1.015 1'1'opazCourt fl, 70 00 o o 1,970.00 $omo 5'v-. 1.016 Opal Colin $si'31,29 30.00 0 0 0 N13,230.00 I $ S 0.00 00/0 suppyand lace 50 mill colo pacted ibickness of0ana1ar'A' 1.017 Diamond Valle 111,6 m $4,50 1 $502.20 1 0 1 o o $502.20$0.00 0% 1.018 ITopueolill 1 350 m $4.50 1 $1,575.001 0 1 0 0 $1,575.001 $0.00 0% 1.019 opalCourt .. 1 490 1 nj= I $4M 1 $2X5,00 1 0 1 0 0 $2,205.00 1 50.00 1 0% ROAD IVOR - Y - TO FIN,4L COURSE ASPWALT Cleau WHIR includiog:avec ping and f1lishing. 1.02011D) aomd Voiley Drive 635 m $US $158.75 0 0 0 $158.75 1 50.00 1 0% 1.021 .021 Jfopaz Cont 1,330 m11 $0.25 ji 0 0 $332,501 2 1,022 lopill Court 1,470 1 f $025 1 $367.50 1 0 1 0 0 $367,50 1 50.00 09 1;upplyand apply tack coal to base asphalt. 1.023 IDiamoud Valloy Drive --...-635 .... 19 I 1 0 $476.25 1 $0.00 0% 1,024 Topaz Court 1.330 $0.75 $52� ,�32� 0 I 0 I 1.025 0 :d Court 1,470 fle 0 1.0 0 at Provide I $1,95uo 1 $1.950-00 1 0 1 0 0 $1,950.00 1 $0.001 0% d 9111c. 40 nun alicknesN TH-3. -L 1.07.7 Diammtd Va11e Drive 635 $8.00 1 'o."o 0 o o 1 $5,080.00 1 i.02R 'Po nz Court 1,330 $8.00 10,611.01 0 0 0 $10,640.00 1 $0,00 0% 1.029 alCnux( 1,470 m= $8.00 1 $11,760.00 0 0 1 0 1 $11,760.00 1 $0.001 0% 60118278 > Cf) Z CL CL 0 00 0 (D > 00 00(a 0 -n CL CD Z 3CD --1 > CD M = Cr CD CL (D CD CD =r CD W CD Fn' -q Cn 00 =r CD Z0- Cn s! X CD 0 03 n cn -0 M 90, m3 CD 0 Z -q m (n 0 x m a C r - m 0 0 Lri cc 0 0 0 r* r* 0 0 o -k (D Z -4 0 0 U) fh =r '4 0 -4 -k -k 0 0 1 9 0 m 0. 0 r* m TOWNSHIP OF ORO-TNM4 DONTE DL4-MOND VALLEY ESTATES -PHASE 3 (LOTS 16 TO 26 & 85 TO93) srCURITY sVmAkRV crrvrr 11 f,h1 .. ..... ...... I 1 andp18 cc4UnluiGrniiiiiarA'RoiidSlit)tilticrr, Al 18... "01 1.030 Dia od Valley Drive 111.6 1 -2 S4.i() $502.20 0 0 0 1 $502.20 $0.00 1.031 To az Court 1.032 0-1 A 350 490 $4.50 $4.50 $1,575.00 $2,205.00 0 1 0 I .1, 5.00 5.00 I. ; 00 I s0.00- 50.00 0% OV. 1,0 3 Permanent stop bars 2 ca 1 $400.00 12) 6 D.00 'A so.W 0% SUWTOTAL- Section "A"" $194,731.90 S0.00 � � BC TION 9V JULTATIONAND BROSION CONTROL MOAKS 1.034 lSupplv and inmalIndiment confrol fcnce on constitictionlitnim. 559 to $12.50 1 $6987.50 0 0 0 $6,997.50 $0.00 0% 1,035 1Install rock check dom. 2 ca $250.00 $500 0 0 0 $500.00 $0.00 0 Place 100 Dim to soil ( front pioJect stwkpilel hydrosced and mulch Blvd. 117037 036 Diamatd Va4c Drive 555.75 $6.50 $3.612.38 0 0 0 $3,612.38 $0.00 1 0% Topaz Court 690 1132 $6,50 $4,420.00 0 0 0 $4 420.00 $0.00 01/. 1.038 Opal Court 820 oil $5.50 $4,510.00 0 0 0 $4,510.00 $0.00 oly. Phicc NO mm to sol (front ditches. Diamond VallciDrive 93m2 $883.50 1 0 1 IF, 1.040 To az Court.039 1 820 1-1 $9.50 $7,790.00 0 $7.790.0 IN.-Ilul i �01 1.041 10palCourt STO)WMAINAGh"WORKS 840 1 ]n' 59.00 57,560.00 0 0 0 57,Sf U.UO $0.00 1 0% Install 3m Nvide geogrid/ gcomb access road aspa daud K, 1.042 Block 133 245 m2 S 125,00 $30 625.00 0 $30,62.5,00 $0.00 1 0% SMlyandinstnll400mmDia.CSPdriveNuy culvert, iucL cod walls. 1.043 IDiamond Valloy Drive $2,500.00 $7,500.00 0 0 0 0% L044 Mow Court ]V W. 1 0% 1.045 10palCourt H--01$0.00 15,000m I 0 11 $0.00 1 0% dm ats, haeladin licadwau& 1.047 m diamter 1 4 on. 1 $1950.00 $7,800,001 0 1 0 1 0 57,800,00 1 1 0% Serlion"B" Sf246RR,3R $124,688.38 1 -$0.00 -50.001 SJ,',Cl'JQN "C" ) IA TER W01M 25Umin "m a.I'.V'C.NVTo »z Court 175 m $190.00 $ 0 1 0 533,250.00 I 1.049 f0palCourt 220 m $190.00 $4l R00.ntl $41,800.00 60118278 > U) Z CL C: Z :3 (D CO 0 0 00 > 0 (a CL 0 @ w Z (D -J3 > CD W M =) (a cr (D CL (D CD CD =r CD W CD (0 00 =r (D ZCL Cn s - CD --.h 0 1 03 n c/) 0-0 m 90 m -I- =r m 0 (D 0 Z --I m Cn 0 m 0 C rl m O O O -f =r CD 0 0 1 V 0 0 0 0 =r m Z 0 -q 0 O L CO 4;- :r 6 mB*�4 0 -4 --k --k 0 I01% n 0 CD CL 0 cn CL C - ig TOWNSHM OF ORO-MEDONTE DIAMOND VALLEY ESTATES -PHASE 3 (LOTS 16 TO 26 & 85 TO 93) R VC1 TR rrV JR11 I MAIA RV 04 V rT 11 s%lm.itg inchiding Valve & Box - 1.050 Tolme Court I Iat. $4,300.00 I $4300.00 I n 1 0 1 A I 54.300.00 50.00 0% - 1.051 Opel Court I I ca. 1 $1300,00 1 $1.300.001 0 1 0 1 o 1 $1,300.00 woo a% - 1.052 Provide Temporary Covinw6mis to existing watermains 2 1 to 1 $3,000.00 sti,000m 00 0 $6,000.00 $0,00 0% 1.053 Provide tem to blow offs. 2 0011 0 11 0 1 5 +_$4,000.00 $0.00 0% 1.054 Connection to W/M'I*opaz 0xin I I Ls $1.000.0 $3,000.00 $0.00 0% _1.05.5 c).11lection 10 w/m Opal Court Ls $3,000,00 1 $3,000,00 0 0 0 $3,000.00 $0.00 0% uppIv/6tsta1120mn,Dia.Palyclitcleric (8-160)wa1c"crviccs 1.056 ITupoz Cout 9 elf. Vooloo 1 $8,100.00 1 0 0 o 1 0 1 0% 1.057 10palCourt 8 $70.000.00 1.058 Pressure Test Swab Flask chlorinate and sum ptin it waterimin. SUB-TOTAL-Sceftno 'If" S129.490.001 I $129,490.00 I s0.00 I S6: 1'10N I'D" MISCELLANEOUS Sinn 1.059 IS(opsigns 2 ca. 5350.00 1 $700.00 0- -0 0 0 $700.00 $0. 1.06QJSlivll �N oi,5,- $9Q0.00 0 1 0 $900.00 $o. i,-Iwou 0 0 U u,760.0u 50.00 0% I SUIT -TOTAL -Section "D" 51,600.00 1 1 $1 6110,00 1 SOHO ISE.C.110 "P111, JELECTRICAL 1 1.062 0 0 $11,000.001 SUB -TOTAL - Sectiou EE 11 I so.00 I t000.09 S1MAJARY .q]CrION "A" SECTION "B" SECTION 11c. SECTION "D" SECTION "E" SUBTOTAL 10% ALLOWANCE FOR ENGINEERING SUBTOTAL. 13% H.S.T. TOTAL $194,731.90 5124,688.38 $129,490,00 $1,600.00 $11,000.00 5461,510.28 $46,151.03 $507,661.30 S65,99S.97 $573,66717— $194,731.90 5124,638.38 $129,490.00 $1,600.00 S1I-1000-00so.00 $461,510.211 546.151.03 $507,661.30 $65,995.97 $673,657.27 8a.00 so. 00 $0.00 50.00 50.00 $4,00 $0.66' $0.00 $0.00 60118278 Z 0 q M > cf) Z c: cr (n CL c: 0 CL 0 (D 00 0 K) > 0 0 00(a CL Om w Z CD = > --13 CL CD CD CD CD CL CD =r (D 0 Er CD co 00 x CD Z CL cn c CD 0 n O3 -n 0 0-0 90 m a CD 0 z q m cl) 0 m m 0 ca IV cn 0 :r m CL a Q