2013-213 Certificate of Maintenance and Final Acceptance - HoubenTHE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
BY -LAW NO. 2013 -213
A By -law to Authorize the Issuance of the Certificate of
Maintenance and Final Acceptance (Municipal Underground Services)
for 2189952 Ontario Limited (Houben), Plan 51 M -952, Phase 1
WHEREAS Section 51, Subsection (26) of the Planning Act, R.S:O. 1990, Chapter
P. 13, as amended, provides that municipalities may enter into agreements imposed as
a condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered
into a Subdivision Agreement with 2189952 Ontario Limited (Houben Subdivision) in
February 2010 for twenty five (25) residential lots on Houben Crescent and Key Court.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
aboveground services have now been met;
NOW THEREFORE the Council of the Corporation of the Township of Oro - Medonte
hereby enacts as follows:
That the Certificate of Maintenance and Final Acceptance (Municipal
Underground Services) for 2189952 Ontario Limited (Houben), Registered Plan
M -952, Phase 1, may now be issued by the Township Engineers (AECOM) in
compliance with the Subdivision Agreement between the Corporation of the
Township of Oro - Medonte and 2189952 Ontario Limited (Houben).
2. That the attached Schedule "A ", Certificate of Maintenance and Final Acceptance
(Municipal Underground Services) shall form part of this By -Law.
3. This by -law shall take effect on the final passing thereof.
BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 4T" DAY
OF DECEMBER, 2013.
THE COJfIPORATION OF THE TOWNSHIP OF ORO- MEDONTE
, H._% H
rk; 4Z9,6dlas Irwin
Schedule "A"
to By -law No. 2013 -213 for
The Corporation of the Township of Oro - Medonte
X®M AECOM
55 Cedar Pointe Drive, Suite 620
Sanie, ON, Canada UN 5R7
"Maecom.cam
TOWNSHIP ENGINEERS
CERTIFICATE OF
MAiINTENANCE AND FINAL ACCEPTANCE
(MUNICIPAL UNDERGROUND SERVICES)
MUNICIPALITY
Township? of Oro- Medonte
PROJECT
Houben Subdivision Phase 1
Plan 51M - 952
DEVELOPER
2189952 Ontario Limited
FILE NO.
80118283(12- 91022- 50)f43T- 940031
705 7219222 (el
705 734 0764 fax
Description of the Works:
* SWM Facility in Block 29 including drainage ditches in the Houben Subdivision Phase 1;
We, AECOM, notify the Municipality that the above mentioned works were inspected on November 1, 2013,
and to the best of our knowledge and judgement are complete in accordance with the Subdivision
Agreement, except for the deficiencies below:
NIL
We, AECOM, notify the Municipality that to the best of our knowledge and judgment:
1. The Developer named herein has completed the required maintenance work, has rectified known
deficiencies and has fulfilled the other terms of the Subdivision Agreement,
2. The period of maintenance of this Subdivision ement expires on the issuance of this Certificate.
Dater i( I g I< u 13 Signature: -4,
VMM .UM M6 f.A A.
Schedule "A" to By -law No. 2013 -213
Subdivision: Houben SA—division. Phase 1
Engineer G (. Tatham & Associates Ltd. (705) 325 1
hate_ November 1. 2013
ST
Siltation &ontrcJs
1) (silt fence Installed and maintained
2) rock check dams installed and maintained
1) 1 1pe installed
2} jpipe bedding summa !acceptance report
3) 'backfll test summarylacceptance report
4) maintenance holes inspected /approved
5} benching inspected
8} top of precast 0.3m below fnisfii _E _
7 video inspection submitted for review
8) video inspection reviewed/approved_ _
9)- hushing of sewer for final acceptance
10 .service record sheets
Storm Sewer
1) ppe installed
2) pipe bedding summarylacceptance report
_._
3 backfill test summary /acceptance report
4) maintenance holes inspected /approval _
5] benching inspected
6) top of precast 0.3m below fin, ish grade
7) video inspection submitted for review —
8) video nspection reviewed /approved
9 flushing of sewer for final acceptance _...
10) service record sheets
11) road crossing culverts installed
Inspectors Name: Z? 1-4 72
ownship of Oro- Mectonte
Construction Status Retport
--
_ F61e Number. 60118283 (12 91022 60) i
3 '
Contractor: Rumbail Excavation
- -- —
_._
Registered Plan 51M -952
stalled Apr O, 2010.
)mpieted in May 2010.
ibmitted by C.C. Tatham &Associates on November 5, 2013.
rbmitted by C.C. Tatham & Associates on November 12.2o13.
1 Project Manag 1ti .t2_
Schedule "A" to By -law No. 2013 -213
Schedule "A" to By -law No. 2013 -012