Loading...
1994-133 To Authorize the entering into of an agreement between Monica Interior Design Ltd, 767984 Ontario Ltd., 850892 Ontario Ltd. and Indian Park Association for intersection changes to County Road 22 and II " ~ II II THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE BY-LAW NO. 94-133 BEING A BY-LAW TO AUTHORIZE THE ENTERING INTO OF AN AGREEMENT BETWEEN MONICA INTERIOR DESIGN LTD, 767987 ONTARIO LIMITED, 850892 ONTARIO LIMITED AND INDIAN PARK ASSOCIATION FOR INTERSECTION CHANGES TO COUNTY ROAD 22 AND INTERNAL ROADWAY CONFIGURATIONS ON REGISTERED PLANS OF SUBDIVISIONS AND PROPOSED DEVELOPMENTS WITHIN LOTS 1-3, CONCESSIONS 6 AND 7. WHEREAS the corporation of the Township of Oro-Medonte and the County of Simcoe have requested certain changes to existing and proposed accesses from certain developments onto County Road 22. AND WHEREAS the parties have agreed to the proposed works and estimated costs to affect such changes. NOW THEREFORE be it resolved that the Council of the corporation of the Township of Oro-Medonte enact as follows: 1. That the Mayor and Clerk be authorized to execute the Agreement, attached hereto as "Appendix 1" and forming part of this By-law. 2. That the Township Solicitor be directed to action to fulfil the requirements of contained in the Agreement. take the necessary the municipality 3. That this By-law come into full force and effect on its final passing thereof. BY-LAW READ A FIRST AND SECOND TIME THIS 7TH DAY OF SEPTEMBER, 1994. BY-LAW READ A THIRD TIME AND FINALLY PASSED THIS 7TH DAY OF SEPTEMBER, 1994. . , II II II I :1 THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE L.e (~ /11.. 'j y )/ ".: ..~~.. ~" ~t/".e:~ MAY~ ROBERT E. DRURy."LJ A1u /~P/. J .ni?..6I~Q~; 'CLERK, DARLENE SHOEBRIDGE /~~'I I r"'j f" 1:-::;; II q :, II " . . . APPENDIX 1 TillS AGREEMENT made this 6th day of September, 1994. BETWEEN: THE CORPORATION OF THE TOWNSHW OF ORO . MEDONTE (hereinafter called the "Township") OF THE FIRST PART - and- MONICA INTERIOR DESIGN LTD. (hereinafter called "Sugarbush") OF THE SECOND PART - and- 767987 ONTARIO LIMITED (hereinafter called "Sabiston") OF THE THIRD PART -and- 850892 ONTARIO LIMITED (hereinafter called "Valdoro") OF THE FOURTH PART - and- INDIAN PARK ASSOCIATION (hereinafter called "Indian Park") OF THE FIFrH PART WHEREAS Sugarbush, the party of the second part, is the owner and developer of a residential development in the Township of Oro-Medonte on the lands described in Schedule "A" and hereinafter referred to as the Sugarbush development; WHEREAS Sabiston, the party of the third part, is the owner of a proposed development in the Township of Oro-Medonte on the lands described in Schedule "A" hereinafter referred to as the Sabiston development; AND WHEREAS Valdoro, the party ofthe fourth part, is the owner of a proposed development in the Township of Oro-Medonte on the lands described in Schedule "B" hereinafter referred to as the Valdoro development; AND WHEREAS Sugarbush, Sabiston and Valdoro shall bE> referred to collectively hereinafter as the I1Developers't; AND WHEREAS Indian Park the party of the fifth part is the owner of certain land in Oro- Medonte described in Schedule "A" hereinafter referred to as the Indian Park Lands; AND WHEREAS the Township and the County of Simcoe have requested certain changes to the existing and proposed access from the developments onto County Road 22 which hereinafter are referred to as "the 6th Line Deviation" and the "Sabiston link" and have also requested certain improvements be made to County Road 22, hereinafter referred to as the "County Road right-turn lane", and being collectively referred as the "road work", more specifically described in the drawings and specifications referred to on Schedule "B" attached hereto; AND WHEREAS the parties of the second, third, and fourth part have agreed on the estimated cost of the proposed road work set out on Schedule "B" hereto and have agreed to share that cost as set out on Schedule "C" attached hereto; NOW THEREFORE TIDS AGREEMENT WITNESSETH that in consideration of the sum of One ($1.00) Dollar and other good and valuable consideration, the parties hereto covenant and agree with each other as follows: 1. and in fact. The parties hereto acknowledge and confirm that the foregoing recitals are true in substance 2. Upon the execution of this Agreement, Sugarbush shall pay cash to the Township or place with the Township a letter of credit in the form satisfactory to the Township in the amount equal to its share of the estimated cost of the road work as set out on Schedule "C" attached hereto; ...2 . -2- 3. The Township and Sugarbush covenant and agree that Ironwood Trail as shown on Registered Plan 51M-367 will be terminated at the north end with a cul-de-sac partially located on the Township's 6th Line road ailowance rather than connecting with direct access to County Road 22. The construction, engineering, and design work required for the Ironwood Trail cul-de-sac shall be paid by Sugar bush. . 4. The Township and Sugarbush covenant and agree to take all steps and to do all things necessary, including the exchange of lands, to provide for the construction of the cul-de-sac and to close the necessary portion of the 6th Line to allow the development of the Ironwood Trail cul-de-sac to proceed expeditiously. The Township agrees to process the engineering drawings for the Ironwood Trail cul-de-sac as soon as possible on basis of the foregoing. Sugarbush agrees to transfer to the Township such portions of Lots 60, 61, and 62 as may be required to complete the cul-de-sac, together with such lands as may be required for a .3 metre reserve if required by the Township. Sugarbush also agrees to transfer to Indian Park that portion of Lot 21, Registered Plan 51M-367 that is required for a 6 metre wide extension of the open space area to the north of Block 86. 5. The Township, Sabiston and Valdoro covenant and agree that the draft plan approvals from the Ministry of Municipal Affairs for the Sabiston and Valdoro developments will contain a condition that requires the Developer to pay to the Township or to place with the Township Letters of Credit in a form satisfactory to the Township in amounts equal to their share of the estimated road work as set out in Schedule "C". This payment to the Township or Letters of Credit shall be placed with the Township by Sabiston and Valdoro prior to registration of each respective Plan of Subdivision. 6. The Township, Sabiston, and Valdoro covenant and agree that the draft plan approvals from Ministry of Municipal Affairs for the Sabiston and Valdoro developments shall contain a condition that the Township may review the draft plan approvals after five (5) years and if appropriate request the Ministry of Municipal Affairs to withdraw or revoke such approvals and Sabiston and Valdoro will not object to such request. 7. The construction, engineering, and design work required by this agreement for the Sabiston link to be constructed on the Sabiston lands shall be completed by Sabiston , at Sabiston's cost at the time of the development of the Sabiston Subdivision. 8. The balance of the road work required by this agreement shall be completed by the Township in a manner and at a timing which shall be in the sole discretion of the Township. 9. In the event, neither Sabiston nor Valdoro obtain draft plan approval within five (5) years from the date of this agreement, then the Township may use the funds provided by Sugarbush to construct the County Road right-turn lane at the existing Sugarbush entrance. 10. In the event one but not both of Sabiston and Valdoro obtain draft plan approval within five (5) years of this Agreement, then the road work to be constructed shall be determined by the Township in its absolute and sole discretion. 11. In the event that Sabiston does not obtain draft plan approval within 5 years of this Agreement, Sabiston, upon receipt of reasonable compensation of the lands required for the Sabiston Link, shall convey the said lands to the Township subject to retaining a right of way for access to and from the remainder of the Sabiston lands. In the event reasonable compensation cannot be agreed upon between Sabiston and the Township, the Township may expropriate the lands necessary for the Sabiston Link and in such event Sabiston shall consent to such expropriation, such consent to expropriate by Sabiston shall not in any way be deemed to waive his right to the determination of such compensation. 12. All engineering cost required for the County Road right-turn lane shall be paid by the Township or the County of Simcoe and shall not be included in the cost of the road work set out in Schedule "C". 13., All planning, engineering, legal and surveying costs required for the 6th Line Deviation shall be paid by the Township. 14. Each of the parties hereto shall be responsible for its own legal and consulting costs in COIUlection with the negotiation and preparation of this Agreement. . 15. Immediately upon the execution of this Agreement the Township shall convey to Sugarbush, or as it may direct at no cost to Sugarbush that portion of the closed road allowance identified as Parts 1 to 8 inclusive on Reference Plan 51R-17872 pursuant to the authorization contained in By-Law 90-100 of formerly the Township of Oro which By-Law was registered in the Registry Office on the June 28, 1992 as Instrument No. 01191331. 16. Indian v 0 the Township free and clear of all encumbrances at no cost to the Township. change for parkland and lot allocation hat part of the Indian Park lands necessary for the 6th Line Deviation as s own on c ' J ...3 fJwt.\r1:s; C~'e ,<j C" c{ '<A.., -3- 17. Valdoro and Sabiston agree to relocate at their cost the Indian Park kiosk to such location as requested by Indian Park on Indian Park lands subject to the approval of the Township. 18. The Township agrees to close and convey that portion of the 6th Line necessary to provide Lots 43 to 48 with public road frontage on the 6th Line Deviation. . 19. The Township agrees that the value of any Development Charges Act related work within the original 6th Line road allowance (Road Section No. 1000) will be credited to Sabiston and Valdoro. The credit will be avallable after the completion of the road work and upon request for building permits. The credit will be based on a credit per lot of the road portion of the Development Charges Act levy. 20. Any notice required or permitted to be given for the purpose of this Agreement shall be in writing and shall be sufficiently given if personally delivered to any officer of any party of sent by facsimile. courier or registered letter, postage prepaid and addressed to: THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Box 100 Oro, Ontario LOL 2X0 MONICA INTERlOR DESIGN LTD. 1950 Hwy #7 Building C, Unit 1 Concord, Ontario UK 1W5 767987 ONTARIO LIMITED c/o James Sabiston Limited R.R. #2 StoufIville, Ontario L4A 7X3 850892 ONTARIO LIMITED c/o Patrick Capobianco 110 Oxford Street, Richmond Hill, Ontario UC 4L7 INDIAN PARK ASSOCIATION R.R.#4 Coldwater, Ontario LOK 1EO and such notice shall be deemed to have been given on the day following if it was personally delivered, facsimiled or on the 4th business day following which it was mailed. Any party may from time to time change its address for the purpose of receiving the said notice by giving notice in writing of such change to the other parties in the manner above described. 20. This Agreement shall enure to the benefit of and be binding upon the parties hereto their respective successors and assigns. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE MONICA INTERIOR DESIGN LTD. Per: Per: Name: Title: Robert Drury, Mayor Per: Per: Name: Title: Darlene Shoebridge, Clerk 767987 ONTARIO LIMITED 850892 ONTARIO LIMITED Per: Per: Name: Title: Name: Title: Per: Per: Name: Title: It Name: Title: INDIAN PARK ASSOCIATION Per: Name: Title: Per: Name: Title: sugarbush.roa . e SCHEDULE "A" Monica Interior Design Ltd. Part of Lot 2 and 3, Concession 6, and Part of Lots 1, 2 and 3, Concession 6, Township of Oro-Medonte, County of Simcoe 767987 Ontario Limited Part of Lots 1 and 2, Concession 7, Township of Oro-Medonte , County of Simcoe 850892 Ontario Limited Part of Lot 3, Concession 7 Township of Oro-Medonte, County of Simcoe Indian Park Association Block 86 and Part of Block 88, Registered Plan 51M-367 Township of Oro-Medonte, County of Simcoe ROAD WORK ...... 1:::'::1 """ = ~ m _ ~..i: --- WI'oE _ -11101""'" ! I I ! COUNTY ROAD No. 22 ___J b----=--=----=--=--=--==--=----=--==--=----=-==--==-==-=---::::.:=~==__=____=__=____=__=____=__=____=__=_-:=::=:==_.:.___==___=____=___=___=__=_...:..._=_...:..._.::::::====--=---==:==:=:~:===:=::====:========:====_- _::- -- ~_______ _----..____ ~....LF~~ 10Urn WJmCW. CUM! ...... .....,. - F= , - .....,.--- !101fT LNE ro~~ (19.1Jm RAn.) ---------;r-'-r--'7 . / 01 /' . . . / / /' . . / eo / / . , / / 1541 , , / ,/ IIl.Oa<81 I!I..OQ(88 &1 . ~ Q !i3 u 00 '-, <13 '----- 42 . -----------' -J:~~-=---_ 7fj- / --~ ------ f-____ - ------- 20 . -~ ---- / / ------ 113 , 19 -1 17 I -----10 1f- I- ' , 10 iJIr H ~-~_~_ / ---__ 1.1 J.:~ . /' 18! / PI- IS2 I / I I ------- . i i 111 i COUH1Y ROAD RIGHT lURH LANE SABISTUN UN!( 8th IJHE DE)lAl1OH IR<>>IWOOO TRAIL OJL-DE-SAC i I IO.Qm WJt'1KW.. a.JIM: . I ''\ ~ \ \, -, ''\ , i ' I . II I . . -1.1a1 - H!JIE:. RIGHT lURN LANE IIIPROVEIoIENlS BASED ON I{!O CRIlERIA FOR 80 km/hr DESIGN SPEED GRAPIDC SCALE IN J.IETRES "" 0 .. Ioo..~_-\.....""'" OIl . 7S . lOll . ''''' I RG RoBINSON ~.... JIO) '1"1'"""_ (IIDm) L'I'D _ l' ........... .... ..... .............. ",.,., m--. REAlIGNED 8th UNE OF ORO AT COUNTY ROAD No. 22- OPilON-B -- .... ad: "oIU" 0I~7-11O DWG. NG 2 of f5 SCHEDULE "C" Estimated Cost or Road Works County Road Right Turn Lane............................................................. . Realigned 6th Line and associated roads............................................... Estimated Construction Costs.................................... $ 52,457.28 $230.737.80 $283,195.0a Sabiston Link Portion (359m@$275.34/m)......................................... Remaining 6th Line Deviation Costs..................................................... Equal share of 6th Line Deviation......................................................... $ 98,847.06 $184,348.02 $ 61,449.34 Cost Sharin\! County of Simcoe: to provide all engineering services required for improvements to County Road 22. Township ofOro-Medonte to provide engineering and legal cost for 6th Line Deviation work. Moncia Interior Design Ltd. $ 61,449.34 767987 Ontario Limited $160,296.40 (98,847.06 + 61,449.34) 850892 Ontario Limited $61,449.34 Indian Parks Association convey ftee and clear of all encwnbrances such portions of Block 86 and 88 (part I) ofSIM-367 necessary for the 6th Line Deviation Road and exchange for parkland and lot allocation as per Schedule "B". II