2013-158 Certificate of Substantial Completion - Diamond Valley Estates Phase 2THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
BY -LAW NO. 2013 -158
Being a By -Law to Authorize the Issuance of the Certificate of
Substantial Completion and Acceptance (Municipal Underground Services)
for 2008628 Ontario Ltd. (Diamond Valley Estates Phase 2), Plan 51 M -957
WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter
P. 13, as amended, provides that, municipalities may enter into agreements imposed as
a condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered
into a Subdivision Agreement with 2008628 Ontario Ltd. (Diamond Valley Estates
Subdivision) in March 2010 for one hundred and twenty eight (128) residential lots on
Diamond Valley Drive, Emerald Terrace, Topaz Court, Opal Court, Ruby Ridge, and
Sapphire Way.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
underground works for Phase 2 comprised of 18 residential lots (Lots 100 -117) on
Emerald Terrace have now been met;
NOW THEREFORE the Corporation of the Township of Oro - Medonte hereby enacts as
follows:
That the Certificate of Substantial Completion and Acceptance (Municipal
Underground Services) for Diamond Valley Estates (2008628 Ontario Ltd.), Plan
51 M -957 Phase 2 may now be issued by the Township Engineers (AECOM) in
compliance with the Subdivision Agreement between the Corporation of the
Township of Oro - Medonte and 2008628 Ontario Ltd..
2. That the attached Schedule "A ", Certificate of Substantial Completion and
Acceptance (Municipal Underground Services) shall form part of this By -Law.
3. That this By -law shall come into force and take effect on the final date of passing
thereof.
BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 11 T"
DAY OF SEPTEMBER, 2013.
THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
r, H.5'ljpbhes
ClevW. DouWas Irwin
=MOM
SCHEDULE "A"
AECOM
55 Cedar Pointe Drive, Snite 620
Barrie, ON, Cennda IAN 5R7
\tM1Maec(fln.coln
TOWNSHIP ENGINEERS
CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE
(MUNICIPAL UNDERGROUND SERVICES)
MUNICIPALITY
PROJECT
DEVELOPER
FILE NO.
Description of the Works:
Township of Oro- Medonte
Diamond Valley Estates Phase 2
Plan 51M -957
2008628 Ontario Ltd.
60118278 (12- 89235 -50) (43 -T- 930191
705 721 9222 W
705 734 0764 fax
• Watermain Works in the Diamond Valley Estates Phase 2 on Emerald Terrace from the intersection
of Diamond Valley Drive west to 6t" Line then north on 6'h Line to Diamond Valley Drive (540 metres);
• Drainage Works consisting of road crossing culvert and ditches in the Diamond Valley Estates
Phase 2 on Emerald Terrace from the cul -de -sac to the intersection of Diamond Valley Drive (318
metres);
We, AECOM, notify the Municipality that the above mentioned works were inspected on September 4, 2013
and to the best of our knowledge and judgement, are complete in accordance with the Subdivision
Agreement except for the deficiencies below:
• Items listed in AECOM Construction Status Report dated September 4 „2013.
• Letter of intent by the Developer to the Township to complete the road drainage works within a
specified time frame.
We hereby accept these works for use and operation by the Municipality subject to the rectification of the
above noted deficiencies and to the rectification of any further deficiencies that may become apparent during
the maintenance period and to the maintenance that is require by the Subdivision Agreement and its
Amendment.
The date of Substantial Completion and Acceptance (Munic' ec es} is established by the
Certificate as of September 10, 2013. Date: 0 �0 Signature: �