2013-158 Certificate of Substantial Completion - Diamond Valley Estates Phase 2THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE BY -LAW NO. 2013 -158 Being a By -Law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for 2008628 Ontario Ltd. (Diamond Valley Estates Phase 2), Plan 51 M -957 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that, municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered into a Subdivision Agreement with 2008628 Ontario Ltd. (Diamond Valley Estates Subdivision) in March 2010 for one hundred and twenty eight (128) residential lots on Diamond Valley Drive, Emerald Terrace, Topaz Court, Opal Court, Ruby Ridge, and Sapphire Way. AND WHEREAS the requirements of this Subdivision Agreement with respect to the underground works for Phase 2 comprised of 18 residential lots (Lots 100 -117) on Emerald Terrace have now been met; NOW THEREFORE the Corporation of the Township of Oro - Medonte hereby enacts as follows: That the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Diamond Valley Estates (2008628 Ontario Ltd.), Plan 51 M -957 Phase 2 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and 2008628 Ontario Ltd.. 2. That the attached Schedule "A ", Certificate of Substantial Completion and Acceptance (Municipal Underground Services) shall form part of this By -Law. 3. That this By -law shall come into force and take effect on the final date of passing thereof. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 11 T" DAY OF SEPTEMBER, 2013. THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE r, H.5'ljpbhes ClevW. DouWas Irwin =MOM SCHEDULE "A" AECOM 55 Cedar Pointe Drive, Snite 620 Barrie, ON, Cennda IAN 5R7 \tM1Maec(fln.coln TOWNSHIP ENGINEERS CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) MUNICIPALITY PROJECT DEVELOPER FILE NO. Description of the Works: Township of Oro- Medonte Diamond Valley Estates Phase 2 Plan 51M -957 2008628 Ontario Ltd. 60118278 (12- 89235 -50) (43 -T- 930191 705 721 9222 W 705 734 0764 fax • Watermain Works in the Diamond Valley Estates Phase 2 on Emerald Terrace from the intersection of Diamond Valley Drive west to 6t" Line then north on 6'h Line to Diamond Valley Drive (540 metres); • Drainage Works consisting of road crossing culvert and ditches in the Diamond Valley Estates Phase 2 on Emerald Terrace from the cul -de -sac to the intersection of Diamond Valley Drive (318 metres); We, AECOM, notify the Municipality that the above mentioned works were inspected on September 4, 2013 and to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement except for the deficiencies below: • Items listed in AECOM Construction Status Report dated September 4 „2013. • Letter of intent by the Developer to the Township to complete the road drainage works within a specified time frame. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its Amendment. The date of Substantial Completion and Acceptance (Munic' ec es} is established by the Certificate as of September 10, 2013. Date: 0 �0 Signature: � KA00013- 521CedificateMS. C. and A.Underground.doc