Loading...
09 06 2013 SpCommittee of Adjustment AgendaPage CWiv;iub.../..lumshipof -42)44411111111111111116 Proud Heritage, Exciting Future 1. OPENING OF MEETING: 2. ADOPTION OF THE AGENDA: a) Motion to Adopt the Agenda. THE TOWNSHIP OF ORO- MEDONTE SPECIAL COMMITTEE OF ADJUSTMENT MEETING AGENDA COUNCIL CHAMBERS Friday, September 6, 2013 TIME: 10:00 a.m. 3. DISCLOSURE OF PECUNIARY INTEREST: 4. PUBLIC MEETINGS: 2 - 24 a) 2013 -A -39 (Democrat Maplewood Ltd), Emerald Terrace, (51M-957 Lots 100 -2, 104, 107 -8, 112, 116), Request for relief from Model home for the sale of dwelling units located on lands within the limits of the Township. 5. NEXT MEETING DATE: Thursday, September 19, 2013 at 10:00 a.m. 6. ADJOURNMENT: a) Motion to Adjourn. Page 1 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 77rn shi,a� Proud Heritage, @wi ling Amire TOWNSHIP OF ORO- MEDONTE REPORT Application No: 2013 -A -39 To: Committee of Adjustment Prepared By: Derek Witlib, Manager Development Services Meeting Date: September 6, 2013 Subject: Variance Application (Democrat Maplewood Ltd.) Lots 100 -102, 104, 107, 108, 112 & 116, Registered Plan 51M-957 (Former Township of Oro) Motion # Roll #: 4346 -010- 003 - 26600, 26601, 26602, 26604, 26607, 26608, 26612 & 26616 R.M.S. File #: D13 -46468 REQUIRED CONDITIONS: N/A BACKGROUND: The applicant is proposing to construct eight model homes within a development known as Phase 2 of Diamond Valley Estates. Phase 2 consists of 18 lots within an overall 128 lot plan of subdivision. ANALYSIS: Section 5.36 of Zoning By -law contains provisions regarding "Temporary Construction and Sales Uses" and, specifically, Subsection b) states that "Nothing in this By -law shall prevent the use of land for ... a model home for the sale of dwelling units .., on lands within the limits of the Township ... ". Therefore, the applicant is requesting relief from the following provision of Zoning By -law 97 -95: Section 5.36 - Temporary Construction and Sales Uses b) Model home for the sale of dwelling units located on lands within the limits of the Township Maximum Permitted 1 model home Proposed 8 model homes FINANCIAL: Potential financial and legal implications should the decision of the Committee of Adjustment be appealed to the Ontario Municipal Board and Council chooses to defend the Committee's decision. Development Services Application No. 2013 -A -39 Meeting Date: September 6, 2013 Page 1 of 12 Page 2 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... IPOLICIES /LEGISLATION: Do the variances conform to the general intent of the Official Plan? Pursuant to Schedule "A" to the Official Plan, the lands subject to this application are designated Residential and are located in the Sugar Bush settlement area. Permitted uses in this designation include single detached dwelling and /or model homes. The lands subject to this application, form part of a registered plan of subdivision in which the developer (2008625 Ontario Ltd.) is currently working towards the substantial completion of primary services (e.g. roads, ditches, culverts, utilities). The developer is obligated by the terms of a registered subdivision agreement to obtain from the Township a Certificate of Substantial Completion once the required services have been installed, inspected and properly documented. The Certificate of Substantial Completion is required before the Town will consider removing the Holding (H) provisions from the zoning of the lots and the issuance of building permits. As of the preparation of this report, the developer has not yet satisfied the requirements for the Certificate of Substantial Completion. Therefore, the lands are only eligible for one model home at this time. In order to expedite the construction of homes that have already been conditionally sold, the builder (Democrat Maplewood Ltd.) is seeking relief from the Zoning By -law in order to construct eight homes. Since the lands are within a registered residential plan of subdivision, the proposal is considered to conform to the general intent of the Official Plan. Do the variances meet the general intent of the Zoning By -law, and are the variances appropriate for the desirable development of the lot? The subject lands consist of eight separate registered lots that are all zoned Residential One Holding (R1(H)) Zone. The Holding (H) provision was placed on the zoning of the lands to ensure that development related matters, including the completion of primary services, are addressed to the satisfaction of the Township before the "H" is removed and building permits are issued. Section 5.36 of the Zoning By -law allows for the construction of a maximum of one model home within a development, in advance of the completion of other development related matters. The model home is intended to allow the builder to showcase the product being offered, as well as function as a sales centre for the development. In the past the Committee of Adjustment has approved variances in other developments for up to 3 model homes to allow the builders to showcase different home designs being offered. The number of model homes and /or sales offices to be constructed in an area is limited for various reasons, including: to limit the extent to which the character of a residential area is changed by the existence of buildings not being used as residences, to limit the amount of traffic generated in an area by such non - residential uses, and to ensure that the necessary functional services (e.g. roads, services, grading, stormwater management) are in place and properly constructed before any significant amount of development is permitted to take place. The intent of this variance request in this case is to allow the builder to proceed with the construction of eight single detached dwellings for immediate sale and not for the purposes of model homes. Development Services Meeting Date: September 6, 2013 Application No. 2013 -A -39 Page 2 of 12 Page 3 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... Instead, the builder has requested the variance in order to meet sales commitments that may be jeopardized by delays related to the developer not yet satisfying the requirements for obtaining the Certificate of Substantial Completion. Since the proposed single detached dwellings are not intended to be used as model homes, Planning Staff is of the opinion that the requested variance does not meet the purpose and intent of the Zoning By -law. The establishment of homes on 8 lots within the subdivision in advance of certification that preliminary servicing has been substantially completed is not desirable for the development and could result in complications in the event that the homes are sold or occupied while the preliminary services are not adequately completed or not functioning property. Are the variances minor? The requested relief from the Zoning By -law's model home provisions is not considered minor by Planning Staff, for the reason's that 8 model homes represents a disproportionately large number of homes within a relatively small development comprising 18 lots. The number of model homes requested cannot be justified in terms of the reasonable need for promotional and display and sales purposes. ICONSULTATIONS: Transportation — Building — Environmental Services — IATTACHMENTS: Schedule 1: Location Map Schedule 2: Sketches for Proposed Minor Variance ICONCLUSION: In the opinion of the Planning Department, the proposal by Democrat Maplewood Ltd. in Variance Application 2013 -A -39, specifically, to permit the construction of 8 additional model homes on Lots 100 -102, 104, 107, 108, 112 & 116 in Diamond Valley Estates Phase 2 does not meet 3 of the four tests set out in the Planning Act. Therefore, Planning Services Staff recommends that the application be refused. Respectfully submitted: erek Witlib, MCIP, RPP Manager, Planning Services Development Services Application No. 2013 -A -39 Meeting Date: September 6, 2013 Page 3 of 12 Page 4 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... SCHEDULE 1: LOCATION MAP 2013 -A -39 (Democrat Maplewood Ltd.) Development Services Meeting Date: September 6, 2013 Application No. 2013 -A -39 Page 4 of 12 Page 5 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... SCHEDULE 2: SKETCHES FOR PROPOSED MINOR VARIANCE 2013 -A -39 (Democrat Maplewood Ltd.) a o, TOPO SURVEY NOIF ]` mn ua =NUMB re�e� OM '. array 7 ANTS NCNB NOTES: 1. SUM 1.1.11 019,41.16 AMA. MASSA 2 LAMM MN MAMBO ,ear ,rat ON mE BY 5411. eeCLE 04.21110 0.6.40 air..—AREA 13UU11.DMG ARFA (GFAI Aauxo w axYCen worm .1 217 .B. IBM Ram l tam .ax wn.1 em mA+am l mce wn IBM jlI I nINC SFIRACIK1 NMI "MD RCM IMO NMI. SOL Ns. r.sm l aN an l e.«4 Um l Am a1 amn Irw.a. I Zit. CDNSUI TANTS (YR1IFlr:ATF 1 WA NAM, IFUM E[ CAM oN @11114 Nam 5012 MAM1.0 PIIMPINA °a vtteaa7�.vo i rexmr tamry 1rw. e way VA DATE: JULY RN 2013- LDOR FNCINFFlNNNJI -49 BLOCK 4 (OPEN SPACE) `� 4 DIAMOND VALLEY ESTATES MwxNm VPLOOR ENGINEERING INC. cvmAhg e191reNa- hclecrm nopea LOT 100 51V -957 1 EMERALD TERRACE PZ 8 APR 2013 :MOO I ' 09115 LOT-100 Development Services Meeting Date: September 6, 2013 Application No. 2013 -A -39 Page 5 of 12 Page 6 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... REVISMNS ammo BMW VSY P. S.IG,i.RlMTOS NOTES. OFOOMIaarlaN6 ON ME ON ME MI DOOM 4. 7149 LOT %OVA0,�, 5 00 .02 ON NAM �P, swmt'�ma E ��edrmax mmIFMn 70NING LIMAS AREA mr.0 w... I uA3sa ,,.R I OM m.. MIMING NING AREA (GFAI YON .12111 Pumq zs.m.VmI vn pn CAP TOM 1,001774Nr ZDIERAIIE Ja III MNG SFIFIAGKC. MONT IN. .s. I a.5. ,T.o. 37 NY ,s. I z.3N m 1 n amw*.00x2 a 0I NM. ONTro In OONSI 11 TANT'S CFRTIFK:ATF mtWiO r ran ne ABUTINNOON TD D wi( MD I Tommy moon. L. rot PP:CROWD WAD. No NTNNTTNNTrt ME PROD= OWN. IS OMNI./ MTN INC DATE: JUNE ii. 00r". VAL00R FNO2NFFRING INC DIAMOND VALLEY ESTATES LOT 101 512 -957 3 EMERALD 101A¢ P� ODT BLOC K (OPEN SPACE) r °°° ®....®......3.. 63 -..W o.o..- WLI■- MANN BY CIO. BY P.Z VAIDOR ENGINEERING INC. CCuwAmg Isar -PmNcn Mammon Vszliza 0/11, LAM a PPR 2013 SaLE 1:30o 09115 w` LOT -101 Development Services Meeting Date: September 6, 2013 Application No. 2013 -A -39 Page 6 of 12 Page 7 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... B e a REVISIONS NOTES: SL El3,.So . a. EY FM BALD TERRACE* PU651404 fllo"w." \ Poll.11 SENTC LICA„�T >nm 6 TGI R POTENT. RPTC ura (YIN. Usm MAY 6NLONC) TOR NO), l - • 2 EJECTOR ;SNP BEMIRED a PER REOIN1070011.5*' gra WE 61 Solt RgE6Tt • DRS 1.07 %WWI TO 511E RAH CON71101. AND 4:6P[ 010/26 UMW. CONCEPT PASEO w 6WZ W .. F of TR summon nonaeR. =E - RI - SRaE DCVO., MUNRO CITF AREA 2.000.66 *cox 1 219346 sc. 1 0..20 aw pINI ING AREA (GFA1 Au can+°, FLOOR 3is:°'^. min via . (6 OFR ) 2.16 vim. 1 26.3 vi+t. mime vin ram MP.. 30106 mm. 13Pn vile EMEI GE SUIIDING SETBACK PROVCCO fRNfr mm Rua rE.T >m1RO.YL s.. I000R 33m l evr 14020 1 .Sac 3o9Nm 1 0.4(0 ISCin I 3.6." I It. iSI S TANYS CFRTIFl A I RCA REAMED THE uEO r¢ �INR) m EC SR.. im()63um MEW censr nur: COOLY nmi SOUND wNclx� PRINCIPLES. ' INC PROPOSED DRUM IS CONPADDIE WON 7,15 IRE PROPOSED OWEN N COMA. WI INC *OZONE PIAII APT= 111194.31,1901 ARO DATE: ANT 16. 2013 g + VALDOR ENGINEERING INC. 6610 (PO SPac )34 DIAMOND VALLEY ESTATES I_ ®T it ®2 516 -957 5 EMERALD TERRACE DRAWN 61 H.N. 9.0. ERIE 9 APR 7013 6NEN =MORN VALDOR ENGINEERING INC. Catmill4G EnCFUea - PON, Managers Rom,. mWmrn Nwaroman+Maamn 09115 "` LOT -102 Development Services Application No. 2013 -A -39 Meeting Date: September 6, 2013 Page 7 of 12 Page 8 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 0E9131095 EMBED MUSE SW 11385 TOPO SURVFY NOW COMPS MORN ME m „11D m7, m11m. EDmrEaun EMS FEBRIANY M cols MONO FUND Ors*DRD3O TO SURD. MOW. S. MICR RAD RED'.BNER MEMOS TO REST ON ORBS. LINETSMRSED =WO DREI VD IS colpm wlosBOAR u aimu 030003? ado 03 wme+� AS DEN nEH MMI ENO ∎09 scam., or ME wewrowx RestoTorr. ZONING RI - SINGLE DEINDIED 2.000.20 aa.m.1 S1A34.06 SEA I ace aces 9011 rIING ARFA LGFAI e:VEREO ::: .mom. i W-4 MX TEA SOSO w.m. I SEEM MN. (ucw0rw Wroa0 o. cAmor WAS min 193 MU. arm. 1 7,11311117, COVFRAr•F rasa BUILDING SETBACKS DESOESSION RELSMISS OmcnED NIEMEN DOE TARO ual VAN SAN IMAI BBB I Sac 0020 1 3000 1 S10a me aim E NN 3321,. 21.7N. CONSULTANTS CI72nIMAX %Ammo> TO BE 09.ArAcno MBE MM., ME STE ANN GRADINS PUN FOR TF£ LmLe„Oa MD I HEREBY CMOs DL.n EMSTEERIND MAD. NARRONTO FOR Ms BMWS. AND 3. ME PROPDSLO BUNDING COMPATINE MT ME GATE: JULY 24, 2013 VALDOR ENGINEERING INC (C r AR EI MOULDER EM ALD TERRACE a„, „E, „ ,,.NS,°NE MONAD. (S70. LS. OD -ONT mx 0) A`w'ed BUILDIETO Top 7 Bm.as BLO _-_�- 4 (OPEN SPACE) DIAMOND VALLEY ESTATES LOT 004 51M -95V 9 EMERALD TERRACE ORAVN BY CND. BY N.N. P.Z. IIATE 4 JULY 2013 ; am ammo + `"""r 09115 "'LOT-104 Development Services Application No. 2013 -A -39 Meeting Date: September 6, 2013 Page 8 of 12 Page 9 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... REVSIONS arscemmu R30Sm MOUSE MANNIKINS. 9714 TOPO SURVEY NOTE =TIM MAE- snicvn 0sw+tee++ NOTF310.' 2. OEM. PUMP MOWED MOMS 19 REA OM WW1 xomuwEO ORONO ME 1..40.V HOE,a0 WtrOTISaR. Mika - MOE DETACHED MUM .11E s AFq . I msss.m an Ian ,-.. BDILDING AREA (GFA) "'I'000 TOM 017, Im)II w.-. 1 1000 aa.R OE/WO6 ON m.I m IL ODOORPO vm w.. I2m ton Ste_ BAGS ,MJNG SEBACKS OESEO Cx ROIR 10 2ADA 11..BA 02.mm 1 74.20. WAR 17.0) a3 .1 1 2370. a.nm 12rAa emwue sm qm. 2.300 I nxn. .sem 1.21,m. seem 1 12.28 CONSI II TAN'S C.FRTIFIOATF I NOE AND. TIE ME MO MUM. Mil FOR m=-192 NO II 3M�R0>mr �mnC°tlS1ilui: De +.c 01621110 NO= 00.160E saws nxlY.eam xa lor =mom " of DATE: JNIT 2e. 2013 VA(DOR ENGINEERING INC. 311,3, 11.40 isE eNWtDER s# 312 -- ]1230 -- I! EMERALD B6 ' (sN, 31NVn E'aT SHOWER \ ■1111' 8B1''1 I _TERRACE 20029 0 W' RW4- _ _ ACT • PEN SPAE) D h,MOND VALLEY (ESTATES Lti ®M_957 3 17 EMERALD TERRACE 2DiID • or P.L UWE 13 CAIN 2013 1 2260 VALDOR ENGINEERING INC. CuuuY2N E gneav Rvlx Ncrio.en 09115 I`"" L0T -107 Development Services Meeting Date: September 6, 2013 Application No. 2013 -A -39 Page 9 of 12 Page 10 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... REVISIONS olsveivnGN 10 NOTES: 1. SUM IIIMW piSEXMOM TO OMM. WOWS. • IMAIT M O mm ONr�ve+ m a awPem MOUND ZONINA 511E AREA 7.7,77 w . 121.». ...n- IOM .w— JAI W GINS AREA (GFAI 770x10 1U wm. 'iw wx M• UM. 0.1401 ,..m q.m. 1m0 .q sow a W AS FON.. COVERAGE 10.7. 777 .ym. 1 2300 M. RIA1111NG SEIBACKS oESmmnGN TOONE TIM PEAR TOAD 011.471 TOO 0.500 1 MO. 7.50m 1 24.05 1.san 1 am MOM 1 01.011 27.0740 I WAR 0a:m I Iaaa. 7aewl CONSULTANTS rVRTIFlCAT€ OM LOOS N. irt7mr�rmir nunnw ra C>N PROPI\ID•'Art a 74127:1,67,71 ix[ E GATE: JUNE 13, 20(3 VAIDOR FNGINEERING INC MULLEN RA�\1 RP 55 • 3b DIAMOND VALLEY ESTATES LT 106 519 -957 19 EMERALD TERRACE o Si OWEIN et H.M. G.. SY PZ 13 J.IN 2013 VALDOR ENGINEERING INC. ,. oats:Airy Ergeleem -kaKeI M0n00e® 1:200 — 09115 LOT-1 08 Development Services Application No. 2013 -A -39 Meeting Date: September 6, 2013 Page 10 of 12 Page 11 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... REVISIONS EVESCRIPTOR 09/611.221.5 I 4 1L_ 12,7 111 TOPO SURVEY NOTE CONWORS MOWN APE AS PER 9.061.01 OWNWERINO asum0 Plus DORM =YAWN SHOTS AWNS PROPER. 203 NO REORJARY 9.013 $OYES I. SOW PNAP DEIC.R4110 TO SURFACE RECUNED • POW REWIRED • ` "2 �oa sI� CROW RECONODOSSONS ON s MOW. ▪ Was 0E6Pa113 OWELIWO SITE AREA 1]4.56 AAA, I 1 +208:09 salt I OF, Av. EUILDING AREA (WA), "144 'T'14:'„1: I IV qa 10TPalma NONOG UM MOM. COVFRACF RIENt 90 t. 26 ¢f s.m l R YR i mN. ISO .on 268.41 Ions I SW soft. ELNLOIND SETEACNS PESCISPTIDN FOR TARO PROW. SIN YARD PEOURED PRONENO limn I n22 v!Cm 12aak CCNSUI TANTM CFRTIFICATF 9.../Pca) m OE CCKSTRu0N0 FOB FOR PROPOSED 1� Nit. . PPmusEO GROIN :1 arPrONV r 9 RASOSE 9aa91r2 mm 9w31N6 PROPOSED AMMO FOR MS SS ION NO LL ADVERSELY AFFE. ADJACENT LAMS. PROPOEED caaaTiLE ww 16E PROMO, ORONO DATE AUGUST 2. 2013 VALDOR ENGINEERING N. DIAMOND VALLEY ESTATES LOT 192 5114 -957 15 GERALD TEIMACE DINAR BY CFO. BY H.M. P.2. DATE 24 JUN 2012 VALDOR ENGINEERING INC. CORSUIrV.10.6011,1*Ct M01102.9 rn ,== rasomAnN 1:250 09115 LOT -112 Development Services Application No. 2013 -A -39 Meeting Date: September 6, 2013 Page 11 of 12 Page 12 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 0 REN510N5 96010,00 SEAM. 1.132 11.21 GtE 01,2„2013 31200 2 11 =5 7 "GPO FI IRVFY NO1F 7 so 0 m F r - , ON unx min 1013 o. J oTFS. O POW M... TO sMNCrt Rpn 2. MTN MP MOM MD MT MVO 70 Of WM= 1574.131(1.014.5 2(12 Or PC 50tt 0.120 1112 LOT 5 910(1201 10 .(01101 AND RPM 111.." evrco 'mss° 21.. .2 zoo 0(nli 0c„mu0 � a me 0,,000 •mmiR.r. op At xs 51TF ARFQ 12..mr w. I moo a ;WILDING AREA (CFA). m l ylwwx 07. 6A IaplgMO 011+09 10511 m,. 11I. wx .a+• 1 410 .,x MI5 .w. 1 100 , MOAK BUILDING SETBACKS MOM SUE WO zrx 12.en. 2m B msn 1 WAx 1100*, 111.M Pao, Imm CONSULTANTS CERTFICATE TOE ORM. Wei F. 1111 wsi .01 0REFIr GERM nw: GWEI PL. 74:1 1x2 PROPOSED 2111 .0 6 COWIru 0m 1NE Pxamsm •,.DATE: JULY N. 2013 VALOUR ENGNIEERING INC, 31699 _ M99TpE FN99NL (515 320-0. rnt b) _ _ _ 37.30m 13. 1.00 x 5095 _ _m+10LU.z Row _ 'EMERALD TERRACE o. — — DIAMOND VALLEY ESTATES LOT 116 5112 -951 10 EMERALD TERRACE mm P.Z. VALOOj2 E•GINE0ING INC. IMTE 9 APR 2013 i 1:230 09115 LOT -116 Development Services Meeting Date: September 6, 2013 Application No. 2013 -A -39 Page 12 of 12 Page 13 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... Page 20 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... Page 21 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... Brissette, Marie cat �t-ha. To: Subject: Brissette, Marie RE: Correspondence for Sept. 6 C of A From: Todd Robinson [mailto: ] Sent: Wednesday, September4, 2013 8:59 PM To: Coutanche, Mel Cc: Leigh, Andria; Witlib, Derek; Hughes, Harry; Dunn, Robin Subject: Re: New to Oro - Medonte / MC 2 RTR / update Sep 4, 2013 Thank you for your timely response Councillor Coutanche. Please feel free to share this letter at the Sept. 6 2013 meeting with Council and City Staff. According to the information that Democrat has given me, the point of contention is the driveway culverts and retaining walls, which are the responsibility of the developer. Apparently lack of this detail was not an issue worthy of posting "Stop Work orders" with phase one and the house construction proceeded without delay. Now in phase 2 it is a problem. This is not the first home that my wife and 1 have bought from a builder, so we have witnessed some interesting unforeseen circumstances that sometimes delay construction. I truly do not believe that either the builder or the developer made a deliberate or conscious decision to try and "side step" any responsibilities to the township's process. The inspection process is in place for a reason and I think everyone involved has full respect for it. But sometimes we need to step back and review the process, even adapt a little bit when no harm is being done. I see the need for the culverts to be in place for safe movement of people, equipment and supplies on and off the lots. But in my opinion the culvert decorative retaining walls should be part of the final grading process, after the structure is built. It doesn't make any sense to me to construct these decorative walls that will likely get damaged by the movement of heavy machinery during the construction process. So, also in my opinion, the "Stop Work orders" are a very extreme measure taken by the City Staff. Let alone holding up the issuing of building permits to Democrat until this issue is resolved. It is my understanding that even when this gets resolved, the building permits will only then resume the approval process? At the other end of this bureaucratic red tape are at least 20 families, anxiously awaiting their new homes in Oro - Medonte (future rate payers). Families that have also made large financial and time commitments on their current residences; that have probably been sold to other families (a very unpleasant and stressful domino effect). Families that could be put unnecessarily into hotels with doubled up moving expenses on account of some decorative retaining walls. A minor detail that will get done before the Township releases the final grading approval. In the meantime, mother nature waits for no one. The colder months are approaching quicker than we like. I do not like the idea that our home is going to be built by trades with frozen appendages. I have witnessed that the finished product of a home built in winter is never as sound as one that, at least the envelope, was constructed before the first frost. I can not describe the anxiety and emotions I am feeling, knowing that our new home may get built in the worst season on account of Bureaucrats. Unlike other unforeseen circumstances (weather, labour strikes, supplies, etc...), this "stop work order" situation was preventable, if not questionably necessary. t Page 22 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... Regards, Todd Robinson 2 Page 23 of 24 4.a) 2013 -A -39 (Democrat Maplewood Ltd),Emerald Terrace, (51... Brissette, Marie Subject: RE: 2013 -A -39 (Democrat Maplewood Ltd), Contact: All members of Council, CAO and Clerk Regarding: THE TOWNSHIP OF ORO- MEDONTE SPECIAL COMMITTEE OF ADJUSTMENT MEETING AGENDA COUNCIL CHAMBERS Friday, September 6, 2013 TIME: 10:00 a.m. From: Todd Robinson, purchaser of Lot 114, Emerald Terrace. Future Rate Payer to Oro Medonte Township. As I am unable to get time off work to attend in person, please see that the following letter is read before council. This letter has already been sent to Councillor Coutanche, but I want to make sure that all the families impacted by this "situation" are heard. Thank you... According to the information that Democrat has given me, the point of contention (Stop work orders) is the driveway culverts and retaining walls, which are the responsibility of the developer. Apparently lack of this detail was not an issue worthy of posting "Stop Work orders" with phase one and the house construction proceeded without delay. Now in phase 2 it is a problem. This is not the first home that my wife and I have bought from a builder, so we have witnessed some interesting unforeseen circumstances that sometimes delay construction. I truly do not believe that either the builder or the developer made a deliberate or conscious decision to try and "side step" any responsibilities to the township's process. The inspection process is in place for a reason and I think everyone involved has full respect for it. But sometimes we need to step back and review the process, even adapt a little bit when no harm is being done. I see the need for the culverts to be in place for safe movement of people, equipment and supplies on and off the lots. But in my opinion the culvert decorative retaining walls should be part of the final grading process, after the structure is built. It doesn't make any sense to me to construct these decorative walls that will likely get damaged by the movement of heavy machinery during the construction process. So, also in my opinion, the "Stop Work orders" are a very extreme measure taken by the City Staff. Let alone holding up the issuing of building permits to Democrat until this issue is resolved. It is my understanding that even when this gets resolved, the building permits will only then resume the approval process? At the other end of this bureaucratic red tape are at least 20 families, anxiously awaiting their new homes in Oro - Medonte (future rate payers). Families that have also made large financial and time commitments on their current residences; that have probably been sold to other families (a very unpleasant and stressful domino effect). Families that could be put unnecessarily into hotels with doubled up moving expenses on account of some decorative retaining walls. A minor detail that will get done before the Township releases the final grading approval. In the meantime, mother nature waits for no one. The colder months are approaching quicker than we like. I do not like the idea that our home is going to be built by trades with frozen appendages. I have witnessed that the fmished product of a home built in winter is never as sound as one that, at least the envelope, was constructed before the first frost. I can not describe the anxiety and emotions I am feeling, knowing that our new home may get built in the worst season on account of Bureaucrats. Unlike other unforeseen circumstances (weather, labour strikes, supplies, etc...), this "stop work order" situation was preventable, if not questionably necessary. Regards, Todd Robinson Name: Todd Robinson E -mail Address: Phone Number: i Page 24 of 24