2013-140 Issuance of Cert. of Substantial Completion and Acceptance - South Shore IsabellaTHE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
BY -LAW NO. 2013 -140
Being a By -Law to Authorize the Issuance of the Certificate of
Substantial Completion and Acceptance (Municipal Underground Services)
for South Shore Isabella Estates Inc., Plan 51M-1015
WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter
P. 13, as amended, provides that municipalities may enter into agreements imposed as
a condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered
into a Subdivision Agreement with South Shore Isabella Estates Inc. in July 2013 for
twenty two (22) residential lots on Merrington Avenue.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
underground works have now been met;
NOW THEREFORE the Corporation of the Township of Oro - Medonte hereby enacts as
follows:
1. That the Certificate of Substantial Completion and Acceptance (Municipal
Underground Services) for South Shore Isabella Estates Inc., Plan 51 M -1015
may now be issued by the Township Engineers (AECOM) in compliance with the
Subdivision Agreement between the Corporation of the Township of Oro -
Medonte and South Shore Isabella Estates Inc.
2. That the attached Schedule "A ", Certificate of Substantial Completion and
Acceptance (Municipal Underground Services) shall form part of this By -Law.
3. That this By -law shall come into force and take effect on the final date of passing
thereof.
BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 14TH
DAY OF AUGUST, 2013.
THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
, H.S.
J. Wou4lds Irwin
e
CERTIFICATE OF
MUNICIPALITY
PROJECT
DEVELOPER
FILE NO.
Description of the Works:
SCHEDULE "A"
AHCOM
55 Cedar Pointe Drive, Suite 620
Hanie,ON,Cwutda L414SR7.
TOWNSHIP ENGINEERS
SUBSTANTIAL COMPLETION AND ACCEPTANCE
(MUNICIPAL UNDERGROUND SERVICES)
Township of Oro- Medonte
Isabella Estates
Plan SIM -1016
South Shore Isabella Estates Inc.
60118176 (440 - 0030730) 'r2008- SUB -011
7057219222 id
705 734 0764 fax
• Watermain Works in the Isabella Estates Subdivision on Merrington Avenue from the cul- de-sac
east (330 metres) to the Homire Subdivision and including along the west side of Lot 14 (87 m);
We, AECOM, notify the Municipality that the above mentioned works were inspected on May 24, 2013 and to
the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement
except for the deficiencies below:
• Items listed in AECOM Construction Status Report dated August 1, 2013.
We hereby accept these works for use and operation by the Municipality subject to the rectification of the
above noted deficiencies and to the rectification of any further deficiencies that may become apparent during
the maintenance period and to the maintenance that is require by the Subdivision Agreement and its
Amendment,
The date of Substantial Completion and Acceptance (Munici al .underground Services) is established by the
Certificate as of March 13, 2013.
Date; a< Z03 Signature:
1060118176 [0030730]1CeilificateSAS. C. and A.Underground.dw
Township of Oro - Medonte
,led
Oh gate -
of S. C. & A. (Municipal Underground Services) Issued
tary Sewer
Installed
bedding summarytacceptance
fill test summarylacceptanca report
tenance holes inspected /approved
hing inspected
fprecast 0.3m below finish grade
inspection submitted for review
inspection reviewed /approved
n Sewer
installed
bedding summary /acceptance report
fil1 . test summarylacceptance _repoft
tenance holes inspected /approval
hang inspected __ _
fprecast 0.3m below finish grade
inspection submitted for review
inspection reyiewedlapproved
Inspectors Name:
Contractor: Rumble Construction
Re istered Pian 61M -1015
)OP MLZKS —_
Date Completed and Comments
i works under separate certificate as per S.A. Section 7.94
Expansion of the Homire Subdivision - SWM'Pond
Fence along south side, next to farm field.
Individual Septic Systems
Open ditch.
i of 3 Project Manager
�uonst
Subdi
rra .....__
En Meer: C.C. Tatham & Associates Ltd.
..... File Numl
Date
_. ... —.....
August 9 2013
-.
Lt-lrli n Controls
START
,led
Oh gate -
of S. C. & A. (Municipal Underground Services) Issued
tary Sewer
Installed
bedding summarytacceptance
fill test summarylacceptanca report
tenance holes inspected /approved
hing inspected
fprecast 0.3m below finish grade
inspection submitted for review
inspection reviewed /approved
n Sewer
installed
bedding summary /acceptance report
fil1 . test summarylacceptance _repoft
tenance holes inspected /approval
hang inspected __ _
fprecast 0.3m below finish grade
inspection submitted for review
inspection reyiewedlapproved
Inspectors Name:
Contractor: Rumble Construction
Re istered Pian 61M -1015
)OP MLZKS —_
Date Completed and Comments
i works under separate certificate as per S.A. Section 7.94
Expansion of the Homire Subdivision - SWM'Pond
Fence along south side, next to farm field.
Individual Septic Systems
Open ditch.
i of 3 Project Manager
Township of Oro- Medonte
Subdivision:
File Number:
Engineer: C.C. Tatham &Associates Ltd.
Isabella
Estates
0030730)
Contractor: Rumble Cohst_r_u_cNan_
60116176(440.
A. August 1, 2013
START OF
_ Watermain
�)_ Aipainstalled_ _ _ ._ _
_
2} pipe, bedding. acceptance report
3 backfiil testing acceptance report —
4), b -ass installed and inspected
Re lstered Plan 61M 1015
9
UNDERGROUNDWDRK5
--
Yes
No
Date Completed and Comments
_ _ _. _
- -. -- -
Received in email from C.C. Tatham data Dec 6, 2012.
✓
✓
✓
Received m email from G.C. Tatham date Dec 6, 2012.
_ _
✓
5)
6
pressure testing confrmed by AECOM
s ter chlorinated —
✓
Completed October 4, 2012 (Report #005)
Com leted_October 9, 2012 (Report #007)
✓
7).._
8)
potable water samples received b AECOM
by -pass removed
tracer wire - attached to hydrant flange___ —
'-
- conflnuity test _
itydrant water flowcharts submitted
-end caps painted
barrels painted to. Twp spec.
- .markers installed _
Hydrant Auto Flusher
_
sample stations inspection completed
25 mmwater service to Legion
En ing eer's curb box inspection certification
✓
Con pieted November 9, 2012.
7o be campleted.by August 16, 2013 {Tatham email of July 31, 2013).
✓
9
X
10)
X
..
To be completed by August 16t 2013 (Tatham email of July 31 20-
X
To be completed after Warminster FireStorage Reservoiris on line.
To be corn leted after Warminster Fire Storage Reservoiris, on line,.
C.C. Tatham letter dated May 9, 2013.
Not as ,per Township spectfications.
-`
—
Located near front west lot corner of Lot 14.
X
✓
✓
X
11)
12
✓
✓
Confirmed in —Tat ham's emai10 f July 31, 2013.
C.C. Tatham letter dated May 9, 2013.
13
✓
14)
Engineer's valve &hydrant inspection certification
Utilitles --
bell works completed
hydro works completed
streetlights installed
'strewth hts energized
certification (ESA) from e_lectrlcai consui_tant
gas works completed
constructed information by electrical consultant
✓
C.C. Tatham letter dated May 9, 2013.
- -- "— '
C.C. Ta tham letter dated May 9, 2013,
C.C. Tatham letter dated May 9, 2013.
_1)fiydrocrossingscompleted
2
✓
✓
3) _
4
✓
✓ C C!Tatham letterdated May 9, 2013.
✓ C.C, Tatham letter dated May 9, 2013...
✓ C.C. Tatham letter dated May 9, 2013_ (certificate dated May 6, 20 13)
X Proposed start date is end of May 2013,
X -
" --
✓ Received by AECOM on May 10/13 comment sent to Eng. May 24113.
X Under review by AECOM July 31, 2013.
✓ August 1, 2013,
PERIOD FOR UNDERGROUND WORKS
5
6j
7
8) ,as-
As- Constructed Under round Works
_ . -
1 as- constructer( information submitted and
ap roved by AECOM
Certificate of S. C. & A, (Municipal Underground Services) Issued4"
END OF MAINTENANCE
SWM Pond _ -
--
1) clean out prior to end of maintenance
Certificate of M. & F, A. (Municipal Underground Services) Issued
Sanitary Sewer _
1 flushing of sewer -
2) ,video inspection submitted for review
3j video inspection reviewed /approved
Storm Sewer
2 video inspection submitted for review
3 video inspection re
Watermain
1) ,cutbs{o ins ac 'o
2 valve & hydrant inspection by AECOM
—_
_ - —
Certificate of M. & F. A. (Municipal Underground'Servlces) Issued
Yes
No Date Cam feted and Comments
SWM Pond works under separate certificate asp er S.A. Section 7.14
X
X —
" -
--
_
X —` - ' - - - -�
X _.
X
Inspectors Name:---Z — 2 of 3 Project Manager. t!
Township of Oro- Medonte
Subdivision; Isabella estates
File Number: 60118176
(440_0030730) —
Engineer, C C Tatham &Associates Ltd.
Date: (August 1, 2013
Contractor: Rumble Construction
�Reglstered P1an 51M -1015
-
START OF ABOVEGROUND
WORKS
—
es No Date Completed and Comments
d or ks
I
1)
2
subgrade roof lolled by AECOM
sub grade elevations confirmed by Engineer
✓
J
Completed Oct. 5, 2012 R art #006 —
Completed Oct, 5, 2012 (Report 6006)
_3)
sub- drains installed -sub -grade
under curb
ditch
- -- -
X To be_determined prior to and of maintenance period.
4
ranular tested b Solis Consultant
Sea Eng email_dated December 5, 2012:
5
ranular "B" compaction reports to AECOM
✓
See En . emall dated December 5, 2012.
6)
7
granular "A" compaction reports to AECOM
concrete curbs com leted
X - --
- — -- - -
8)
_
Icurbs inspected prior to top lift asphalt
9)
10)
icoricrete tested by Soils Consultant
i base asphalt placed
_.._._
Com lets November 19, 2012 (Report #666j.
— _- -._, - -_
✓
✓
11 )
psi na a - street identification
--
- raadnotassumed
�- --- -- -- -_ --
X
12)
13
dead-end barricades and signage
drivewa a roes aved `. _
— - -
--
X
_..L41_
151_
16)
sidewalkscompleted
sidewalks inspected by AECOM
iboulevard and ditches topsoil and sodded /seeded
17)
18
base asphalt inspected by AECOM _ _ _
top lift asphalt com feted
X
X -
I
1
Miscellanies Works
walkways completed (Block 25)
—
X
-
2)
park works completed
3)
fencing completed - bound_ary Lots RA 13)
walkways Block 25) ,
X
X
park
Boundary Marker Post
4
As- Constructed Above round Works
as- constructed Information submitted and
( -
X --
1
approved by AECOM
X - - --
X
Certificate of St C, & A. (Aboveground Services) Issued
END OF MAINTEN4 E
PERIOD
FOR ABOVEGROUND WORKS
Yes
No Date Com feted and Comments
1
General Works
tree planting in boulevard
l
X
2
and landscap nR inspection by AECOM i
3)
4
fencing Inspection by AECOM
final lot grading certification
_ . -.
X
X
X
5
OLS certification for monuments
6) !curb,
7) rvalve
box inspection by AECOM
& hydrant inspection by AECOM
inspection - li ht standards
X
X
X
8 (final
—
transformers
_ -.- _ _ - -- -
X
-utild boxes
y
top lift asphalt inspection by AECOM
X — ......,._.
- -'-
9)_
_10)
11)_
12)
curb inspection by AECOM __,
sidewalk Inspection by AECOM
boulevards /ditches inspection b AECOM
X
13)
as- constructed information submitted and
approved by AECOM _ —
X
X
X
Certificate
of M. & F. A. Aboveground Services) Issued
InspectorsName:_-,'� 3of3 ProjectManag