Loading...
2013-140 Issuance of Cert. of Substantial Completion and Acceptance - South Shore IsabellaTHE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE BY -LAW NO. 2013 -140 Being a By -Law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for South Shore Isabella Estates Inc., Plan 51M-1015 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered into a Subdivision Agreement with South Shore Isabella Estates Inc. in July 2013 for twenty two (22) residential lots on Merrington Avenue. AND WHEREAS the requirements of this Subdivision Agreement with respect to the underground works have now been met; NOW THEREFORE the Corporation of the Township of Oro - Medonte hereby enacts as follows: 1. That the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for South Shore Isabella Estates Inc., Plan 51 M -1015 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and South Shore Isabella Estates Inc. 2. That the attached Schedule "A ", Certificate of Substantial Completion and Acceptance (Municipal Underground Services) shall form part of this By -Law. 3. That this By -law shall come into force and take effect on the final date of passing thereof. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 14TH DAY OF AUGUST, 2013. THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE , H.S. J. Wou4lds Irwin e CERTIFICATE OF MUNICIPALITY PROJECT DEVELOPER FILE NO. Description of the Works: SCHEDULE "A" AHCOM 55 Cedar Pointe Drive, Suite 620 Hanie,ON,Cwutda L414SR7. TOWNSHIP ENGINEERS SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) Township of Oro- Medonte Isabella Estates Plan SIM -1016 South Shore Isabella Estates Inc. 60118176 (440 - 0030730) 'r2008- SUB -011 7057219222 id 705 734 0764 fax • Watermain Works in the Isabella Estates Subdivision on Merrington Avenue from the cul- de-sac east (330 metres) to the Homire Subdivision and including along the west side of Lot 14 (87 m); We, AECOM, notify the Municipality that the above mentioned works were inspected on May 24, 2013 and to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement except for the deficiencies below: • Items listed in AECOM Construction Status Report dated August 1, 2013. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its Amendment, The date of Substantial Completion and Acceptance (Munici al .underground Services) is established by the Certificate as of March 13, 2013. Date; a< Z03 Signature: 1060118176 [0030730]1CeilificateSAS. C. and A.Underground.dw Township of Oro - Medonte ,led Oh gate - of S. C. & A. (Municipal Underground Services) Issued tary Sewer Installed bedding summarytacceptance fill test summarylacceptanca report tenance holes inspected /approved hing inspected fprecast 0.3m below finish grade inspection submitted for review inspection reviewed /approved n Sewer installed bedding summary /acceptance report fil1 . test summarylacceptance _repoft tenance holes inspected /approval hang inspected __ _ fprecast 0.3m below finish grade inspection submitted for review inspection reyiewedlapproved Inspectors Name: Contractor: Rumble Construction Re istered Pian 61M -1015 )OP MLZKS —_ Date Completed and Comments i works under separate certificate as per S.A. Section 7.94 Expansion of the Homire Subdivision - SWM'Pond Fence along south side, next to farm field. Individual Septic Systems Open ditch. i of 3 Project Manager �uonst Subdi rra .....__ En Meer: C.C. Tatham & Associates Ltd. ..... File Numl Date _. ... —..... August 9 2013 -. Lt-lrli n Controls START ,led Oh gate - of S. C. & A. (Municipal Underground Services) Issued tary Sewer Installed bedding summarytacceptance fill test summarylacceptanca report tenance holes inspected /approved hing inspected fprecast 0.3m below finish grade inspection submitted for review inspection reviewed /approved n Sewer installed bedding summary /acceptance report fil1 . test summarylacceptance _repoft tenance holes inspected /approval hang inspected __ _ fprecast 0.3m below finish grade inspection submitted for review inspection reyiewedlapproved Inspectors Name: Contractor: Rumble Construction Re istered Pian 61M -1015 )OP MLZKS —_ Date Completed and Comments i works under separate certificate as per S.A. Section 7.94 Expansion of the Homire Subdivision - SWM'Pond Fence along south side, next to farm field. Individual Septic Systems Open ditch. i of 3 Project Manager Township of Oro- Medonte Subdivision: File Number: Engineer: C.C. Tatham &Associates Ltd. Isabella Estates 0030730) Contractor: Rumble Cohst_r_u_cNan_ 60116176(440. A. August 1, 2013 START OF _ Watermain �)_ Aipainstalled_ _ _ ._ _ _ 2} pipe, bedding. acceptance report 3 backfiil testing acceptance report — 4), b -ass installed and inspected Re lstered Plan 61M 1015 9 UNDERGROUNDWDRK5 -- Yes No Date Completed and Comments _ _ _. _ - -. -- - Received in email from C.C. Tatham data Dec 6, 2012. ✓ ✓ ✓ Received m email from G.C. Tatham date Dec 6, 2012. _ _ ✓ 5) 6 pressure testing confrmed by AECOM s ter chlorinated — ✓ Completed October 4, 2012 (Report #005) Com leted_October 9, 2012 (Report #007) ✓ 7).._ 8) potable water samples received b AECOM by -pass removed tracer wire - attached to hydrant flange___ — '- - conflnuity test _ itydrant water flowcharts submitted -end caps painted barrels painted to. Twp spec. - .markers installed _ Hydrant Auto Flusher _ sample stations inspection completed 25 mmwater service to Legion En ing eer's curb box inspection certification ✓ Con pieted November 9, 2012. 7o be campleted.by August 16, 2013 {Tatham email of July 31, 2013). ✓ 9 X 10) X .. To be completed by August 16t 2013 (Tatham email of July 31 20- X To be completed after Warminster FireStorage Reservoiris on line. To be corn leted after Warminster Fire Storage Reservoiris, on line,. C.C. Tatham letter dated May 9, 2013. Not as ,per Township spectfications. -` — Located near front west lot corner of Lot 14. X ✓ ✓ X 11) 12 ✓ ✓ Confirmed in —Tat ham's emai10 f July 31, 2013. C.C. Tatham letter dated May 9, 2013. 13 ✓ 14) Engineer's valve &hydrant inspection certification Utilitles -- bell works completed hydro works completed streetlights installed 'strewth hts energized certification (ESA) from e_lectrlcai consui_tant gas works completed constructed information by electrical consultant ✓ C.C. Tatham letter dated May 9, 2013. - -- "— ' C.C. Ta tham letter dated May 9, 2013, C.C. Tatham letter dated May 9, 2013. _1)fiydrocrossingscompleted 2 ✓ ✓ 3) _ 4 ✓ ✓ C C!Tatham letterdated May 9, 2013. ✓ C.C, Tatham letter dated May 9, 2013... ✓ C.C. Tatham letter dated May 9, 2013_ (certificate dated May 6, 20 13) X Proposed start date is end of May 2013, X - " -- ✓ Received by AECOM on May 10/13 comment sent to Eng. May 24113. X Under review by AECOM July 31, 2013. ✓ August 1, 2013, PERIOD FOR UNDERGROUND WORKS 5 6j 7 8) ,as- As- Constructed Under round Works _ . - 1 as- constructer( information submitted and ap roved by AECOM Certificate of S. C. & A, (Municipal Underground Services) Issued4" END OF MAINTENANCE SWM Pond _ - -- 1) clean out prior to end of maintenance Certificate of M. & F, A. (Municipal Underground Services) Issued Sanitary Sewer _ 1 flushing of sewer - 2) ,video inspection submitted for review 3j video inspection reviewed /approved Storm Sewer 2 video inspection submitted for review 3 video inspection re Watermain 1) ,cutbs{o ins ac 'o 2 valve & hydrant inspection by AECOM —_ _ - — Certificate of M. & F. A. (Municipal Underground'Servlces) Issued Yes No Date Cam feted and Comments SWM Pond works under separate certificate asp er S.A. Section 7.14 X X — " - -- _ X —` - ' - - - -� X _. X Inspectors Name:---Z — 2 of 3 Project Manager. t! Township of Oro- Medonte Subdivision; Isabella estates File Number: 60118176 (440_0030730) — Engineer, C C Tatham &Associates Ltd. Date: (August 1, 2013 Contractor: Rumble Construction �Reglstered P1an 51M -1015 - START OF ABOVEGROUND WORKS — es No Date Completed and Comments d or ks I 1) 2 subgrade roof lolled by AECOM sub grade elevations confirmed by Engineer ✓ J Completed Oct. 5, 2012 R art #006 — Completed Oct, 5, 2012 (Report 6006) _3) sub- drains installed -sub -grade under curb ditch - -- - X To be_determined prior to and of maintenance period. 4 ranular tested b Solis Consultant Sea Eng email_dated December 5, 2012: 5 ranular "B" compaction reports to AECOM ✓ See En . emall dated December 5, 2012. 6) 7 granular "A" compaction reports to AECOM concrete curbs com leted X - -- - — -- - - 8) _ Icurbs inspected prior to top lift asphalt 9) 10) icoricrete tested by Soils Consultant i base asphalt placed _.._._ Com lets November 19, 2012 (Report #666j. — _- -._, - -_ ✓ ✓ 11 ) psi na a - street identification -- - raadnotassumed �- --- -- -- -_ -- X 12) 13 dead-end barricades and signage drivewa a roes aved `. _ — - - -- X _..L41_ 151_ 16) sidewalkscompleted sidewalks inspected by AECOM iboulevard and ditches topsoil and sodded /seeded 17) 18 base asphalt inspected by AECOM _ _ _ top lift asphalt com feted X X - I 1 Miscellanies Works walkways completed (Block 25) — X - 2) park works completed 3) fencing completed - bound_ary Lots RA 13) walkways Block 25) , X X park Boundary Marker Post 4 As- Constructed Above round Works as- constructed Information submitted and ( - X -- 1 approved by AECOM X - - -- X Certificate of St C, & A. (Aboveground Services) Issued END OF MAINTEN4 E PERIOD FOR ABOVEGROUND WORKS Yes No Date Com feted and Comments 1 General Works tree planting in boulevard l X 2 and landscap nR inspection by AECOM i 3) 4 fencing Inspection by AECOM final lot grading certification _ . -. X X X 5 OLS certification for monuments 6) !curb, 7) rvalve box inspection by AECOM & hydrant inspection by AECOM inspection - li ht standards X X X 8 (final — transformers _ -.- _ _ - -- - X -utild boxes y top lift asphalt inspection by AECOM X — ......,._. - -'- 9)_ _10) 11)_ 12) curb inspection by AECOM __, sidewalk Inspection by AECOM boulevards /ditches inspection b AECOM X 13) as- constructed information submitted and approved by AECOM _ — X X X Certificate of M. & F. A. Aboveground Services) Issued InspectorsName:_-,'� 3of3 ProjectManag