03 20 2013 2013-SUB-01 2013-ZBA-01 (2150505) Ontario Inc.(Ii�caf:l�flollae
NOTICE OF PUBLIC MEETING
FOR PROPOSED
AMENDMENT TO THE ZONING BY -LAW AND
DRAFT PLAN OF SUBDIVISION
IN THE TOWNSHIP OF ORO- MEDONTE
2013- SUB -01
2013- ZBA -01
(2150505 Ontario Inc.)
TAKE NOTICE that the Council of the Corporation of the Township of Oro - Medonte will hold a Public
Meeting on Wednesday, March 20th, 2013, at 7:30 p.m. in the Municipal Council Chambers. The purpose
of the Public Meeting is to obtain public comments on a proposed amendment to the Zoning By -law and a
Draft Plan of Subdivision, under Sections 34 and 51 of the Planning Act, R.S.O. 1990 c. P. 13.
THE PURPOSE of Application 2013 - ZBA -01 is to consider a proposal to amend the Zoning By -law for
the lands proposed to be developed for the 106 lot residential subdivision. The applicant has applied to
rezone the lands from Institutional (1) and Agricultural /Rural (A/RU) to the Residential One (R1), Rural
Residential Two (RUR2), and Open Space (OS) Zones.
THE PURPOSE of Application 2013 - SUB -01 is to consider a proposal for a Draft Plan of Subdivision
comprised of 106 residential lots. The lots are proposed to have a range of lot frontages to comply with
the R1 and RUR2 zone provisions. Each of the proposed lots would have access to and frontage on a
new internal road network.
THE SUBJECT LANDS, and applicable portions thereof, for Applications 2013 - ZBA -01 and 2013 -SUB-
01 being the lands described as Part of Lot 5, Concessions 3 and 4 (within the former Township of Oro),
located north of the Bass Lake Side Road and west of Line 3 North.
A KEY MAP illustrating the location of the subject lands, and portions thereof to which applications 2013 -
ZBA-01 and 2013 - SUB -01 respectively apply, is provided on the opposite side of this Notice, in addition to
a map showing the proposed Draft Plan of Subdivision.
ANY PERSON may attend the public meeting and /or make written or verbal representation either in
support of or in opposition to the proposed Applications. If a person or public body that files an appeal of a
decision of the Township of Oro - Medonte in respect of the proposed Applications does not make oral
submission at the public meeting or make written submissions to the Township before the proposed
Amendment is adopted, the Ontario Municipal Board may dismiss all or part of the appeal.
If you wish to be notified of the decision of the Township of Oro - Medonte in respect to the proposed Zoning
By -law Amendment and /or Draft Plan of Subdivision Applications, you must make a written request to the
address below.
WRITTEN SUBMISSIONS should be directed to: Township of Oro - Medonte
148 Line 7 South
P.O. Box 100, Oro, Ontario LOL 2X0
Attn: J. Douglas Irwin, Clerk
ADDITIONAL INFORMATION relating to the proposed Zoning By -law Amendment and Plan of Subdivision
applications are available for inspection between 8:30 a.m. and 4:30 p.m. at the Township of Oro - Medonte
Administration Building. For further information, contact the Planning Department at 705 -487 -2171.
DATED at the Township of Oro - Medonte this 28th day of February, 2013.
Andria Leigh, MCIP, RP
Director of Development Services
2013-ZBA-01 and 2013-SUB-01
(2150505 Ontario Inc.)
15-1
SYBJECT PROPERT� (1552 Bass Lake Sile Road West)
DRAFT PLAN OF SUBDIVISION (2013-SUB-01)
it I
_j
If
AL -- -
- - - -- -
f
- - --
EDGAR CENTRE DEVELOPMENT
TOWNSHIP
OF ORO-MEDONTE
Teeter, Janette
From: Irwin, Doug
Sent: Friday, March 15, 2013 8:39 AM
To: Leigh, Andria; Teeter, Janette; Witlib, Derek
Subject: FW: RE:1552 Bass Lake Side Rd W - 2013 - SUB -01
Doug Irwin
Director Corporate Services /Clerk
Township of Oro - Medonte
From: jsanchez @uniongas.com [mailto:jsanchez @uniongas.comj
Sent: Thursday, March 14, 2013 4:52 PM
To: Irwin, Doug
Subject: RE:1552 Bass Lake Side Rd W - 2013 - SUB -01
Contact: Doug Irwin
Hello, Union Gas has existing distribution main installed in 1984 at the site called Edgar Adult Occupational
Facility. Based on the information provided, the existing road allowances are completely different to the
proprosed road allowance plan, this will most likely require a complete retirement/relocation for the existing
Union Gas plant in that area. Please contact me once the final design of the proposed subdivision is complete as
there could be associated costs to retire our main. I can email you a copy of our as -built drawings for that area.
Johanna Sanchez - Northeast Construction Project Manager
Name: Johanna Sanchez (Union Gas Ltd)
E -mail Address: isanchez@Liniongas.com
Phone Number: 705 845 1530
i CA "r% j IA
Leigh, Andria
From: Schlecht, Christina (ENE) <Christina.Schlecht @ontario.ca>
Sent: Monday, March 4, 2013 10:30 AM
To: Chisholm, Kory
Cc: Patti Young
Subject: RE: Edgar Subdivision - 1552 Bass Lake Side Road W, Oro - Medonte
Hi Kory,
I have completed a cursory review of the documents provided and we do have some technical concerns with the Sewage
Works as proposed; however, this project will need to follow the Class Environmental Assessment process where the
sewage works options will be discussed and assessed in more detail. I trust these issues will be sorted out at that time
prior to the submission of any applications for environmental approvals.
I do, however, recommend a pre - consultation prior to the submission of any Environmental Compliance Approval
applications to our ministry.
Should you have any further questions, please do not hesitate to contact me at 705 - 739 -1617.
Sincerely,
Christina Schlecht
Senior Environmental Officer
Barrie District Office
Ministry of the Environment
54 Cedar Pointe Drive, Unit 1201
Barrie ON L4N 5R7
Phone: 705 - 739 -1617
Fax: 705 - 739 -6441
Email: christina.schlecht @ontario.ca
`'Please consider the environment before printing this e -mail note.
PF
VNID" - �-0 , D_( \ahr
�Oa'T"-M 1A(_ `
_3 C`
Simcoe County District School Board
1170 Highway 26 West
Midhurst, Ontario
LOL 1 XO
February 4, 2013
Mr.Kory Chisholm
Planner
Township of Oro - Medonte
148 Line 7 South
P.O. Box 100
Oro, Ontario
LOL 2X0
Dear Mr. Chisholm:
Phone: (705) 7287570
Fax: (705) 728 -2265
www.scdsb.on.ca
DRAFT PLAN OF SUBDIVISION 2012- SUB -01
2150505 ONTARIO INC.
PLAN OF SUBDIVISION
1552 BASS LAKE SIDE ROAD WEST
FORMER EDGAR SITE
TOWNSHIP OF ORO- MEDONTE
Thank you for circulating a copy of the above -noted draft plan of subdivision
to this office for review. The draft plan proposes 106 lots for single family
detached dwelling units on piped communal water and sewers. The proposed
plan of subdivision is located in the former Edgar Adult Occupational Centre.
Elementary pupils who may reside in this subdivision may attend W.R. Best
Memorial Public School and secondary pupils may attend Eastview
Secondary School.
Planning staff have no objections to this development but request that the following
standard conditions be incorporated into the Conditions of Draft Plan Approval:
That the owner agrees to include in all offers of purchase and sale a statement
that advises the prospective purchaser that the public schools on designated
sites in the community are not guaranteed. Attendance at schools in the area yet
to be constructed is also not guaranteed. Pupils maybe accommodated in
temporary facilities and /or be directed to schools outside of the area.
• That the owner agrees to include in all offers of purchase and sale a statement
that advises the prospective purchaser that school busses will not enter cul de
sacs and pick up points will generally be located on through streets convenient to
the Board. Additional pick up points will not be located within the subdivision until
major construction activity has been completed.
Should you require additional information, please do not hesitate to contact this
office.
Yours truly,
, 4Y4��-
Holly Spacek, MCIP, RPP
Senior Planner
cc: David Parks, Director of Planning,
Development & Tourism
County of Simcoe
2
March 11, 2013 C'
Township of Oro - Medonte
P.O. Box 100
Oro, Ontario LOL 2X0
Attn: Kory Chisholm
Re: Zoning By -Law Amendment and Draft Plan of Subdivision
2013- ZBA -01 and 2013 - SUB -01
Member 1552 Bass Lake Side Road West Part of Lot 5, Concessions 3 and 4
Municipalities (2150505 Ontario Inc.)
"dlala'Tosuru` iiu NVCA staff has received the above noted applications which serve to facilitate a
Amaranth 106 lot plan of subdivision of detached residential dwellings to be served by a
t,zirr e communal system. The subject property was previously the Edgar Occupational
. ;IL,Q Centre and the majority of the buildings associated with that use have been
demolished. The land is subject to the Edgar Centre Special Policy Area and Oro
Moraine sections of the Township Official Plan.
The subject property falls within the Oro Moraine and is surrounded by mature
forest and is designated Oro Moraine Potential Re- vegetation and Enhancement
on Schedule B of the Township Official Plan. The property is within the
headwater area of the Willow Creek and serves as a recharge area for this
subwatershed. The subject property is not regulated pursuant to Ontario
Regulation 172/06, the Authority's Regulation of Development, interference with
• Wetlands and Alterations to Shorelines and Watercourses Regulation.
Muimu
ENGINEERING
NVCA staff has reviewed the information presented in Dillon Consulting Limited
terlonce
Letter Brief Edgar Centre Development — Stormwater Management Conceptual
Shelnumne,
Options dated December 18, 2012. Review of this submission was based on
Springwater
requirements and guidelines set out in the Ministry of Environment 2003
;. asa ,Beach
Stormwater Management Planning and Design Manual, the Ministry of Natural
Resources Natural Hazards Technical Guidelines, and current NVCA guidelines
available on the website, www.nvca.on.ca.
Watershed
Counties
NVCA staff notes that the following criteria will be applied to this development
..
with respect to the stormwater management:
a Post development to pre development quantity control for the 2 to 100 year
" L
events, both Chicago and SCS for the entire property prior to discharge from
the property.
a Enhanced water quality for all runoff from the site.
Member at
a Safe conveyance of the Regulatory Storm through the site to a sufficient
outlet. Celebrating 50 fears in Conservation 1960-2010
NOTTAWASAGA VALLEY CONSERVATION AUTHORITY Centre for Conservation Page I of 3
Conservation
ONTARIO
John Hix Conservation Administration Centre Tiffin Conservation Area 8195 8th Line Utopia, On LOM 1T0
Telephone: 705.424.1479 Fax: 705.424.2115 Web: www.nvca.on.ca Email: admin@nvca.on.ca
March 11, 2013
Re: Zoning By-Law Amendment and Draft Plan of Subdivision 2013 -ZBA -01 and 2013 - SUB -01
1552 Bass Lake Side Road West Part of Lot 5, Concessions 3 and 4
(2150545 Ontario Inc.)
NVCA staff noted the following outstanding issues with this most recent submission:
L Please find attached the NVCA guidelines related to infiltration. Please demonstrate how
winter operational conditions and the two times the volume requirement for infiltration
storage in a winter condition will be addressed.
2. Please have a geotechnical engineer review the conceptual design and provide a
preliminary geotechnical report that assures that the conceptual design is feasible from a
geotechnical perspective. As low impact development (LID) measures are proposed, in-
situ testing of the soils and monitoring of the seasonably high groundwater table will be
required prior to draft plan approval of the development to assess the feasibility of the
proposed stormwater management proposal.
3. Please confirm in writing from the Ministry of Environment (MOE) that they are willing
to allow for the dual usage of a stormwater management facility within the existing
sewage lagoon.
4. Please provide a preliminary stormwater management report as per NVCA guidelines for
the proposed development. This report should include: pre and post development
drainage plans, investigation of any external flows that may enter into the site, catchment
input calculations, stormwater management pond sizing details, and hydrologic
modelling.
ECOLOGY
NVCA staff reviewed the report Environmental Impact Study Edgar Brownfield Redevelopment
prepared by Dillon Consulting Limited dated November 2011. Field work has been undertaken
as per the terms of reference agreed to during pre - consultation and is considered complete.
NVCA notes that the large mature deciduous forest blocks have been severed from the original
lot and donated to the Township.
5. Approximately 15.79 ha of wooded area including 7.23 ha of forest are proposed for
removal as part of proposed redevelopment. While most of this forest cover consists of
cultural/disturbed/fragmented forest units within the existing development footprint, the
Township Official Plan contains environmental policies specific to the Oro Moraine and
the following comments are based on those policies.
Mitigation and Enhancement
6. Mitigation recommendations in the report are generally good and should be carried
through and implemented during the remainder of the planning and construction process.
7. NVCA recommends directional lighting be used for all street areas/non - residential areas
backing onto the Oro Moraine Core and Potential Re- vegetation/Enhancement Areas.
8. The proposed development appears to intensify existing development footprint in this
area. Please advise how Official Plan Policy B 1.1 d) will be met, in particular how the
health, diversity, size and connectivity of significant natural heritage and hydrologically
sensitive features and functions will be maintained, improved and restored. In addition
please advise on how policy B 1.6.2 will be met, in particular how the quality and quantity
of groundwater and surface water will be maintained, improved and restored.
9. The report notes that 2.17 ha of Oro Moraine Core Area would be removed as part of
proposed development, but it is unclear on where this clearing would occur or the details
Page 2 of 3
March 11, 2013
Re: Zoning By -Law Amendment and Draft Plan of Subdivision 2013- ZBA -01 and 2013- SUB -01
1552 Bass Lake Side Road West Part of Lot 5, Concessions 3 and 4
(2150505 Ontario Inc.)
of restoration/enhancement. Please provide more information on this and how Official
Plan Policies B1.10.1 and 131.10.2 are being addressed, in particular how the spatial
extent of the natural core, corridor and Enhancement Area and corridor area is being re-
vegetated and linkages are being improved and restored.
Suggested Restoration
10. NVCA staff have provided three potential enhancement areas on the attached figure to
assist with meeting the above ecology comments. NVCA understands that Area B is an
existing sewage lagoon, and using this facility for stormwater management is proposed.
Please consider this area for enhancement, as per the discussion below if this area
becomes free in the future.
11. Restoration planning in Areas A and B would be focused on re- establishing forest cover
to ultimately bolster core forest and associated habitat connections in this portion of the
Oro Moraine. Pre - treatment of soils may be required in areas that have undergone
significant disturbance in the past.
12. Area C would also be a good fit for reforestation. Has the applicant considered a forested
dry pond facility built using low impact development design as a stormwater facility? As
the Oro Moraine is one of the major groundwater recharge areas in the County of Simcoe,
this could compliment Official Plan Policy 135.1.1.3a) as a dry pond could possibly
improve groundwater recharge.
In general, the soils on the subject property appear to provide significant opportunity for Low
Impact Development stormwater management methods, which could enhance the hydrology of
the area by promoting infiltration of runoff.
Conclusion
NVCA requires additional information in order to complete our review, in particular relating to
stormwater management, and detailed restoration planning to meet Township policies in the
Potential Re- vegetation /Enhancement Areas. Integration of these outstanding items appears to
be possible on this site through use of Low Impact Development methods. We trust this is of
assistance. If you have any questions or concerns, please do not hesitate to contact the
undersigned or the appropriate technical staff member.
Kindest regards,
P46�4
Patti Young, MCIP, P
Senior Planner
c: Christina Schlecht, Ministry of Environment Barrie District Office
Tony Windsor, David Restivo, Dillon Consulting Ltd. 235 Yorkland Blvd. Suite 800, Toronto, ON M2J 4Y8
Brandi Clement, Jones Consulting
Attachments: NVCA infiltration guidelines
Potential Enhancement Opportunities
DF/KN /PY
Page 3 of 3
a r..
I � r
=�y
r _
M
�I
'f
Infiltration Guidelines - modified by AVCA from Stormwater Management Planning and
Design Manual - Ministry of Environment (2003)
The NVCA promotes the use of infiltration systems to promote the natural hydrologic cycle for
stormwater runoff from the site. This helps maintain groundwater recharge, provides additional water
quality treatment and reduces the volume of runoff from the site that may cause erosion downstream. The
following guidelines outline some of the key design considerations for developing and effective
infiltration system as part of the stormwater quality treatment train. Additional information is available
from the MOE SWM Planning & Design Manual.
Infiltration -based controls include:
• reduced grading to allow greater ponding of stormwater and natural infiltration;
• directing roof leaders to rear yard ponding areas, soak away pits, or to cisterns or rain
• barrels;
• sump pumping foundation drains to rear yard ponding areas;
• infiltration trenches;
• grassed swales;
• pervious pipe systems;
• vegetated filter strips, and
• stream and valley corridor buffer strips.
Concentrated infiltration of stormwater collected from larger areas will not match the characteristics of
distributed infiltration which occurred under pre - development conditions. The natural hydrologic cycle
can be maintained to the greatest extent possible by lot level infiltration controls.
Infiltration technologies can achieve water quality enhancement; however, stormwater containing high
concentrations of suspended solids will tend to clog these controls. Further, infiltration of contaminated
water can impair groundwater quality. Therefore, these measures are ideally suited to the infiltration of
relatively clear stormwater, such as stormwater from rooftops which contains only atmospheric
contaminants or foundation drainage. If the quality of the stormwater is such that there may be a problem
with clogging in the system or degradation of groundwater quality, pre - treatment is required.
Infiltration controls are not appropriate for applications with the potential for highly contaminated
stormwater (e.g., industrial land uses).
Infiltration systems that operate at the surface such as vegetated filter strips, surface infiltration trenches,
wet swales and enhanced grass swales are primarily effective for stormwater quality treatment and should
not be designed to provide quantity control due to winter frozen ground conditions.
Infiltration systems that operate below the frost level such as pervious pipe systems, subsurface
infiltration trenches and pervious catch basins are effective for stormwater quality and quantity control.
These systems continue to operate all year round.
Design of infiltration systems should be based on the criteria outlined on the MOE SWM Planning &
Design Manual including the longevity factor as per the MOE manual to account for future clogging with
fine sediments in the stormwater runoff. Permeability of site soils should be determined by in -situ testing
by a geotechnical engineer.
Leigh, Andria ops
From: Hamelin, Rachelle <Rachelle.Hamelin @simcoe.ca>
Sent: Friday, March 15, 2013 2:41 PM
To: Chisholm, Kory
Cc: bclement @jonesconsulting.com; Hoppe, Bruce; Pickett, Kimberley; Milligan, Brian
Subject: 2013 - SUB -01 & 2013- ZBA -01 1552 Bass Lake Sideroad West
RE: Edgar Centre Development
Part of Lot 5, Concessions 3 & 4
Former Township of Oro,
Now Township of Oro - Medonte
Hi Kory,
Thank you for circulating the draft plan of subdivision, associated Zoning By -law Amendment and studies to the County
of Simcoe for review.
The subject property is located within 500 metres of a private inactive waste disposal site #709 identified on Schedule
5.6.2 of the County of Simcoe Adopted Official Plan. A study based on the Ministry of Environment's Guideline D -4 — Land
Use On or Near Landfills and Dumps was recommended be completed to the Township's satisfaction. It is understood the
Township is satisfied with the degree of site investigation that has already been conducted, therefore the County has no
further comment regarding the proposed development on the subject lands.
If you require additional information, do not hesitate to contact me.
Sincerely,
Rachelle Hamelin
Planner III
County of Simcoe, Planning Department
1110 Highway 26, Midhurst, ON LOL 1 XO
Phone: (705) 726 -9300 ext.1315
Fax: (705) 726 -9832
Email: rachelle.hamelin @simcoe.ca
PUBLIC MEETING
FOR PROPOSED AMENDMENT TO
THE TOWNSHIP'S ZONING BY -LAW
97 -95 AND PLAN OF SUBDIVISION
ZONING BY -LAW AMENDMENT APPLICATION
AND PLAN OF SUBDIVISION APPLICATION
2013- ZBA -01 & 2013 - SUB -01
Part of Lot 5, Concessions 3 and 4
Township of Oro- Medonte
2013-ZBA-01 & 2013 - SUB -03
Public Meeting
March 20, 2013
o Purpose of Meeting - To obtain public
comments on a proposed amendment to the
Township's Zoning By -law 97 -95, as amended,
and a proposed plan of subdivision
o Proposed Zoning By -law Amendment and Plan
of Subdivision would apply to lands described
as Part of Lot 5, Concessions 3 and 4, located on
the Bass Lake Side Road, west of its
intersection with Line 4 North.
2013-ZBA-01 & 2013- SUB -03
N
March 20, 2013
Location Map
El
(1552 Bass Lake Sipe Road West)
2013-ZBA-1 0 & 2013-SUB-01
Public Meeting
March 20, 2013
o Official Plan — Official Plan — the lands subject to these
applications are designated Edgar Centre Special
Policy Area, Oro Moraine Core - Corridor Area, and Oro
Moraine Enhancement Area in the Township's Official
Plan
a Section C16 of the Official Plan recognizes the ability to
re- develop the property for residential purposes and
outlines the criteria for assessing any re- development
applications to be considered by Council.
2013-ZBA-1 0 & 2013-SUB-01
Public Meeting
March 20, 2013
o Zoning By -law 97 -95 - Institutional (I) &
Agricultural/ Rural (A /RU) Zones
o Zoning By -law Amendment application 2013- ZBA -01
proposes to rezone the lands to the Residential One
(R1) and a Site Specific Rural Residential Two (RUR2)
Zone.
o The site specific exception would recognize a
minimum lot area of 0.2 hectares.
o Draft Plan of Subdivision application 2013- SUB -01
proposes a 106 lot residential development with
varying lot frontage and areas.
2013-ZBA-01 & 2013-SUB-01
Public Meeting
March Z0, 2013
Draft Plan
i
AL
M
9 11rMY
4�Rr
IEI
i
EDGAR CENTRE DEVELOPMENT
-TOWNSHIP OF ORO- MEDONTE
am"n
a..... �R'n, ._
M ]I
MW s✓Y.raVW
CDOnRGlMREOMLOMAENF
Aq.Fr %AN p LUIOFVISKY!
2013-ZBA-01 & 2013-SUB-01
Public Meeting
March 20, 2013
2013-ZBA-01 & 2013-SUB-01
Public Meeting
March 20, 2013
2013-ZBA-01 & 2013-SUB-01
Public Meeting
March 20, 2013
2013-ZBA-01 & 2013-SUB-01
Public Meeting
March 20, 2013
The applicant's submission for these applications has
included:
• Planning Justification Report
• Preliminary Servicing Assessment
• Stormwater Management Conceptual Options
• Traffic Impact Study
• Archeology Report -Stage 1 and 2
• Environmental Impact Study
■ Environmental Site Assessment Study Phase 1 & 2
2013-ZBA-01 & 2013-SUB-01
Public Meeting
March 20, 2013
o This provides an overview of the Planning context and
summary of proposed site specific amendment to the
Township's Zoning By -law and Draft Plan of
Subdivision for a 106 lot residential development
o Applicant's consultant, Brandi Clement, now has a
presentation which expands on the proposal and the
technical studies completed in support of their
submission
o Questions or comments from the Public and Members
of Council can be answered at that time
Statuto
Public Meeting
Edgar Subdivision
Zoning By -law Amendment
Plan of Subdivision
2150505 Ontario Inc.
Township of Oro- Medonte
March 20th, 2013
y
IF-1 I
Presentation by: Brandi L. Clement, AICP, MCIP, RPP, Partner
0 i�V The Jones Consulting Group Ltd.
Background
• Site was occupied in the early 1950's by the Royal Canadian Air Force (RCAF) for a radar
base termed "Base Edgar ".
-RCAF created a self - sufficient community with 84 housing units, group housing building
for loo men and separate building for 105 women, two office buildings, recreational hall,
food services complex, hospital, church, school, vocational buildings, underground services,
sewage treatment system, water cistern, potable water supply, storage facilities for
maintenance and supply ordinance, and a communications tower.
• At one time population of site was approximately 350 people.
Vacated by RCAF in 1964.
Background Continued
• Site was then purchased by Ministry of Community and Social Services as a residential
and occupational centre for adults with developmental disabilities for the provision of
rehabilitative and vocational training.
-This facility was closed in 1999 leaving the site abandoned.
•2150505 Ontario Inc. purchased the lands in 2010.
-Most of the buildings remained until recently when they were demolished during the
Environmental Site Assessment (ESA) and general clean up of the lands. Completed an EIS,
Phase 1 and 2 ESA, and after completing demolition and site remediation, received a
Record of Site Condition (RSC) to generic residential standards.
-The former church building, road network and all site servicing infrastructure remain.
Former Edgar Lands
}.1•' cie+?.ui Y:ea SYn {r- Hr Oi - c1y.°e.y Y
• MaI oHnwE /gRRNI .1- 8.69a - I}
. yam} +MV{1. Iv1I. �<• Yarvf IP
� �� •- }NIP qq N"Ilat arreRR ee- a.. a+ �eA4wRaN.xiP.
,°. w +M Y+r_s�ed•/,.,y ..._ ' °.. nr NnrnmR.
�-.�.M w1t9 I"6N 9occx rr
� • ao .+rent' I.. N.e+c
- �C, MM wlV gll:e{r,1 IviL
��+1.p,� • �. H.r! +wr.p ataa `IM.'4..'o wt
Na/at Ak1tt
' ``i `� \ �. } /Rfl `RILL. [PMQI .. w<w <•
a,� �� •` ��� ~``\ ` ta Yp•' I /YeeaJeawl�i'M1 W4 D- RgaCa R090 :nt.s,.t
?.I /� /�, .�' L1 - YNJ• rA•O I -i tiI - Iaa.Yllgi
q u; Wei Uw "M
1! •�' � "I � ``7 -� ac- Y9t� WR1Fn -.i N /M.'+t IfYJ'J I+[]
11 t a w- wNYP .csrsva w
ii • o +w e
f� j a. + nwa eNt$x rP•rc
i t1 V f _ : �` Acv J : • �wRn e..a
1 ..� f /1{I J•t �I a/ . ( M _ 'RIwRa(: p.y
I �•�,. {y Ii+ � T.I 19
1' �uu +7� �� � � � -�1 -` I 4- w M wYwa YYMat Cis +•
11 -0 t El- (3n
CT_ rP. w•Ln clr.c low-
I.� I1I •1• Meea
^y I!\ .CPS
NOTE
9!P. I,,II rdm w00906
I ADULT OCCUPATIONAL CENTRE
. c uc .aP :tc•
llle ru
p perC y: SSpeciNCef lyloceted3ndlBTCwnShipo( Ot0fdedonte, approlamatelyltmfrornHtuSeSnaPVIIIPy .711 @RtUmfipalaKldreSS is
r!-
6 ti:Fw 6 E Srf N'
15,52 Bass Lake Sideroad and the prorerty description is East Half and Part of West HON of Lot S. Concessior13 and Part of Lot;: Concession A
and Harr of road allowance between Conussions 3:and 4, lownship of Oro Medcalle; County of Simcrr® 1mn>edrate adjaceclt la1 Ws are .rittw`
I — used fnr agricultural purposes m remain in foresteo conciitiorm
Site Characteristics
._............
• Property is located on north side of
Bass Lake Side Road between Line 3
North and Line 2 North
•971m of frontage along Bass Lake
Side Road
• 214m of frontage along Line 3 North
-Smaller frontage to the west along
Line 2 North of 15m
• Property is irregular in shape and is
approximately 45.77ha (113ac) in area
0 N L
Horseshoe Valley �
aaa�
r°g
�n
ti
P
`7
2
Surrounding Land Uses
p
• North: EP lands owned by Township
that were originally part of the subject
lands but purchased by Township in
20io. Further north are Open Space
lands that are vacant.
• East: Rural Residential. Lands are
treed and for the most part
undeveloped. Horseshoe Valley
Settlement Area is located to the
northeast.
• South: Mix of Open Space forested
lands and Rural Residential.
• West: A few Rural Residential
dwellings with various accessory
buildings. Also, a large forested area.
ON ES
Rural
Residential
s ..w
Environmental
Protection ,
Open >pac(<
V�- Rural
Residential Residential
o
Rural
Residential
Open Spa,,
Rural
Residential
Environmental
Protection
Open Space
Residential
Rural
Residential
Development Concept
i
jl
EDGAR CENTRE DEVEE.
TOWNSHIP OF ORO —MBE
-f
a oroaneeonce
Simcos
a
n
. . . . . . . . . . . . ...... - - - - -
-Applications are for Zoning By -law Amendment and Plan of Subdivision.
-Plan of Subdivision for 1o6 lots.
•Lots will range in size from 45m to 30m frontages; 1 acre, 3/4 acres, and 1/2 acre lots.
•0.75ha park block located in middle of site which includes and focuses on the former church building that
will be retained for a presentation /community centre.
Devel4
opment Conce
-Site ,CvHl U serviced through existing communal infrastructure on property including a water treatment plant
and sewage treatment plant with upgrades necessary.
-Existing road network will be replaced with new asphalt and designed to current standards.
-Two points of ingress and egress are proposed. Primary entrance off Bass Lake Side Road which has been
moved to the east from original entrance to improve site lines for oncoming traffic. Secondary access off Line
6 3 North approximately 68m north of intersection.
+H4+ -The proposal is a redevelopment of an existing brownfield site. Brownfield Site is defined in PPS as
"undeveloped or previously developed properties that may be contaminated. They are usually, but not
exclusively, former industrial or commercial properties that may be underutilized, derelict or vacant ".
Submitted
ateri
Submitted Reports in Support of the Development Include:
• Planning Justification Report
• Traffic Impact Study
• Servicing Report
• Stormwater Management Brief
• Phase 1 and 2 Environmental Site Assessment
• Record of Site Condition
• Stage 1 and 2 Archaeological Assessment
• Environmental Impact Study
ME
O
Provincial Policy Analysis
Ontario
Provincial
•
Policy
Statement
JTT
r�.
ON ES
Places to Grow and Provincial Policy Statement
• Redevelopment rights for the site are recognized in the Township's Official Plan and
were considered in Township land budget
• Official Plan designates lands for growth
• Efficient use of land by utilizing existing communal infrastructure without the need
for expansion
• Classic example of the redevelopment of a Brownfield property
• Wise use and management of resources has been considered to ensure natural and
cultural heritage resources are respected
• Redevelopment of the property provides an opportunity for a development that is a
much higher quality development than what originally existed, which is more
complementary and consistent with the uses already existing in the area
• Conforms with intensification targets as defined by the Places to Grow Growth Plan
• Provides a new supply of housing for current and future residents
• Provides an opportunity to redevelop a site that has been abandoned since 1999
• Development provides additional recreational opportunities and protects views and
vistas
County of Simcoe Official Plan
U"% •
OA
A
+ Airports Legend
Railway
+ +4 A', r* ned Railway
- -- Hydro Corridor
✓!1!J Niagara Escarpment Plan Boundary
(Refer To Schedule 5.3.9 For Details)
Oak Ridges Moraine Conservation Plan Area
(Refer To Schedule 5.3.2 For Designations)
Greenland
- Potential Greenland Linkage
Rural & Agricultural
XSpecial Development
0 Settlement
OSettlement Non Decision
- Major Rivers
Provincial Highways
— County Roads
Local Roads
Municipal Boundaries
'0 wp1`.
-The County Official Plan designates the lands Rural & Agricultural. Lands are not considered to be within a prime
agricultural area. Rural designation provides for development opportunities.
i
-
- No portion of the site is within County Greenlands designation nor are there any wetlands or ANSIs present.
-{ -Development does not impact prime agricultural lands.
(,j •Redevelopment of a site that was previously utilized for an intensive community development since the 1950s.
Township Official Plan
1
0N E''_�
•.r:.
Rural
Agricultural
Residential
Rural Settlement Area
Rural Residential
Restricted Rural
Industrial
Commercial
Shoreline
Recreational
Major Open Space
Environmental Protection One
Environmental Protection Two
Oro Moraine Core /Corridor Area
Oro Moraine Enhancement Area
Mineral Aggregate Resources - Licenced
Mineral Aggregate Resources - Potential
Airport
ML SL Louis Moonstone
Hawkestone Expansion Area
Hawkestone Residential Area
Edgar Centre Special Policy Area
Special Purpose Community Area
Eighth Line Special Policy Area
Open Waste Disposal Area
Closed Waste Disposal Site
Oro Moraine Boundary
Oro Moraine Planning Area
i'
d
K
• The subject lands are currently
designated Edgar Centre Special Policy
Area, Oro Moraine Core /Corridor Area 0
and Oro Moraine Enhancement Area.
-The existing designation recognizes the
existence of a property with a substantial
=
amount of buildings and infrastructure
that is potentially capable of being adapted
to a number of uses.
-Permitted uses not requiring an Official
Plan Amendment include institutional
uses, low and medium density residential
uses, recreational uses, and an adult
lifestyle community.
1
0N E''_�
•.r:.
Rural
Agricultural
Residential
Rural Settlement Area
Rural Residential
Restricted Rural
Industrial
Commercial
Shoreline
Recreational
Major Open Space
Environmental Protection One
Environmental Protection Two
Oro Moraine Core /Corridor Area
Oro Moraine Enhancement Area
Mineral Aggregate Resources - Licenced
Mineral Aggregate Resources - Potential
Airport
ML SL Louis Moonstone
Hawkestone Expansion Area
Hawkestone Residential Area
Edgar Centre Special Policy Area
Special Purpose Community Area
Eighth Line Special Policy Area
Open Waste Disposal Area
Closed Waste Disposal Site
Oro Moraine Boundary
Oro Moraine Planning Area
i'
d
K
Md
?r..,_,
17�
�l Township Official Plan
Rural
•Intent of Plan is that any
Agricuftural
residential use on the site be
®
Residential
-
Rural SetilementAm
planned on a comprehensive basis
Rural Residential
to be self - contained with accessory
Restricted Rural
uses that are primarily utilized by
-
Indnseal
the residents.
�
Commercial
J
Shoreline
Recreational
-Any orm of development which
Y P
®
Major Open Space
�
Environmental Protection One
necessitates the expansion of the
j
Environmental Protection Two
existing on -site servicing capacity
®
Oro Moraine Core/Corridor Area
will be subject to an Official Plan
J
Oro Moraine Enhancement Area
Mineral Aggregate Resources - Licenced
Amendment.
Mineral Aggregate Resources - Potential
Airport
-The communal servicing on the siteEM
Mt. SL Louis Moonstone
Hawkestone Expansion Area
has the capacity to meet the
®
Hawkestone Residential Area
proposed development needs.
Edgar Centre Special Policy Area
Special Purpose Community Area
Eighth Line Special Policy Area
-No Official Plan Amendment
BE
Open Waste Disposal Area
required.
!`��
Closed Waste Disposal Site
Oro Moraine Boundary
Oro Moraine Planning Area
Zoning By -law 1997 -95
r 2�
MARZ — Mineral Aaresate
Resource rwo
• The subject lands are currently zoned Institutional (I) and Agricultural /Rural (A/RU) to
recognize past uses on property.
f`
-Per Section C16 of the Official Plan, the redevelopment of this property anticipated a
Zoning By -law Amendment.
Zoning By -law Amendment
l�
"NEW) 9
Lands Subject to Zoning By-law Amendment Lands to be Zoned Residential One (RI) T.D id
iuM'/ Ldntla f0 be Zoned Rural Rasbentia€ Two XX (RUR2'XX) Lands m be Zoned Open Space (OS) ��I
^ jon�Es
a-LPF i8wg
-Zoning By -law Amendment to Residential One (Ri), Rural Residential Two XX (RUR *XX) and Open
Space (OS)
-Zoning Amendment will allow for the redevelopment of the lands for 1o6 lots with various frontages
and areas, and the recognition of a park and communal services blocks
• Special exception is requested for a 0.2 ha minimum lot area in the RUR2 Zone where 0.4ha is
required.
Summar y Reports of
-Site will be serviced by communal water and sanitary sewer services that are existing on the
lands but will need minor modifications and upgrades to facilitate the redevelopment. This
was one of the selection criteria for this site by the client so as to avoid any negative impacts
to the County and /or Township services.
-Existing lagoon facility on site can be used for stormwater management with improvements.
• Site is currently serviced with gas and hydro. Other secondary utilities will be provided to
the site where available (i.e. cable, satellite, phone).
-Traffic Impact Study concluded that the site will be adequately serviced by Bass Lake Side
Road and Line 3 North with no improvements required.
-Environmental Impact Study concludes that there will be no negative impacts to the natural
features surrounding the property.
•A Record of Site Condition was issued by the Ministry of the Environment in November
2012 confirming their acceptance of the standards achieved in the Environmental Site
Assessment, and the subsequent remediation to clean the site to the most stringent Ministry
of Environment standards, which are more than suitable for the proposed residential land
- use.
-Archaeological Assessment concluded that there are no cultural heritage concerns on the
property.
Conclusions
• The redevelopment of the property was recognized in 1999 in the Official Plan to
allow for residential development. Municipality envisioned and planned for
redevelopment in this area.
-Section C16 of the Official Plan has been complied with in terms of policy
requirements that must be addressed for residential redevelopment of the property.
• The proposed Zoning By -law Amendment and Plan of Subdivision applications
will allow for the successful redevelopment of a former Brownfield site that had
been operating as a self - contained community since the 1950s.
*Growth Plan and PPS support rural development in areas outside of Settlement
boundaries where municipal services do not exist and the use is considered
appropriate and to scale.
-Development represents an excellent example of redevelopment of a brownfield
site for a use that complements the area.
-Redevelopment efficiently utilizes an existing communal servicing system.
n
ONhS
Conclusions
• There will be no negative impacts on the surrounding neighbourhood.
-All reports prepared and accompanying the submission support the
redevelopment.
-Redevelopment conforms to all relevant policies of the Places to Grow
Growth Plan, is consistent with the relevant policies of the Provincial Policy
Statement and conforms to the County of Simcoe and Township of Oro
Medonte Official Plans.
• The proposed Zoning By -law Amendment and Plan of Subdivision
Applications represent good and desirable planning.