2013-028 Issuance of Certificate of Completion - Ridgewood CourtTHE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE BY -LAW NO. 2013 -028 Being a By -Law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Horseshoe Valley Lands Limited (Ridgewood Court), Plan 51 M -1004 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered into a Subdivision Agreement with Horseshoe Valley Lands Limited (Ridgewood Court) in January 2013 for fifteen (15) residential lots on Ridgewood Court. AND WHEREAS the requirements of this Subdivision Agreement with respect to the underground works have now been met; NOW THEREFORE the Corporation of the Township of Oro - Medonte hereby enacts as follows: That the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Ridgewood Court (Horseshoe Valley Lands Limited), Plan 51 M -1004 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and Horseshoe Valley Lands Limited. 2. That the attached Schedule "A ", Certificate of Substantial Completion and Acceptance (Municipal Underground Services) shall form part of this By -Law. 3. That this By -law shall come into force and take effect on the final date of passing thereof. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 20TH DAY OF MARCH, 2013. THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE , H.S. Kt[ghes Cie 'COM CERTIFICATE OF MUNICIPALITY PROJECT DEVELOPER FILE NO. Description of the Works: SCHEDULE "A" AECOM 55 Cedm Paude Drive, Suite 620 Barre, ON, Cneada 1AN 5R7 MIV'aecoin.eom TOWNSHIP ENGINEERS 7057219222 tel 705 734 0764 fax SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) Township of Oro- Medoente Ridgewood Court Plan 51M -1004 Horseshoe Valley Lands Ltd. and Romspen Investment Corporation 601/8051 (12- 00013 -52) 143 -OM- 200011 • Watermain Works in the Ridgewood Court Subdivision on Ridgewood Court from the intersection of Nordic Trail east (218 metres) to the cul -de -sac; • Storm Works in the Ridgewood Court Subdivision on Ridgewood Court from the intersection of Nordic Trail east (218 metres) to the cul-de-sac including outlet pipe to Existing Storm Pond #5E at the end of the cul-de-sac; We, AECOM, notify the Municipality that the above mentioned works were inspected on March 12, 2013 and to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement except for the deficiencies below: • Items listed in AECOM Construction Status Report dated March 12, 2013. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its Amendment. The date of Substantial Completion and Acceptance (Municipal Underground Services) is established by the Certificate as of March 13, 2013. Date: f i 13 Zd 0 Signature: o KA00013- 52\CerUffcates \S. C. and A.Underground,doc Township of Oro - Medonte Construction Status Report Subdivision: Ridtewood Court rs Pile Number 60118061 T02 (12. 00013.52) Contractor: Mascon Registered Plan 51M -1004 WORKS I Date Completed and Comments Engineer Pearson Engineering Ltd, Data +March 12, 2013 _ START OF UNDERGROUND Yes No Siltation Controls 4 silt fence installed and maintained _ . ✓ ✓ 2� rock check dams Installed and maintained SWM Pond pond earth works completed storm outfali work s completed 1L 2 Existin SWM Pond - a;4� •�` r. ` r a -" _ 3 access road constructed 4) pond fencing completed with gate 5 and to soil /seeding 6) landscaping completed )—Po surrey submitted 9 and volume calculations submitted 10 and certification by En ineer Sanl sewer 1 pipe installed _.... { µN 4 r • ,;; . " r Individual Septic Systems 2) 3 pipe bedding summary /acceptance report back011 test summary lacceptancereort ___...- 4 maintenance holes lns ected /a roved 5) benching inspected 6 top of precast 0.3m below finish grade 7 video inspection submitted for review. _. -...., S video inspection reviewed /approved ✓ 1 Storm Sewer — pipe installed 2 pipe bedding summary /acceptance report J Terraprobe report dated September 26, 2012. 3) — 4 backfilttest summarylacceptance report - -- — -- - maintenance holes Ins ectedla provai benching inspected Terra robe report dated September 26 2012.T ✓ AECOM inspection_ wort November 19, 2012• 5) ✓ ✓ AECOM ins ction Re ort November 19, 2012• AECOM inspection Report November 19 2012• 6 top of precast 0.3m below finish grade 7 video inspection submitted for review ✓ ✓ Video submitted on December 4, 2012. Video reviewed and accepted Dscsmbsr 5, 2012. _8 L video inspection reviewed /accepted r Inspectors Name:� 1 of 3 Project Manager. Township of Oro- Medonte Construction Status Report Subdivislon: Rldgewood Court c >a — File Number: 60118051 T02 (12- 00013 -62) En0lnaer. Pearson Englneerin0 Ltd. _ Date'March 12 2013 START OF Contractor. Maacon Registered Plan 51M -1004 WORKS V DERGROUND II -- W termai - Yes No Date Com feted and Comments 1)_ piQelnstalled Terra robe report dated Se tam - 28, 2012. - - Terraprobe reportdated. September 28 2012. 2) pipe bedding aaw tp anca�ort backfiil testing acceptance report g bX pass installed and ins acted - ✓ 3 ✓ 4) , ✓ October 10, 2012. - - " -� October22, 2012. --- October 24 2012. 5 pressure testing confirmed b y Y . astern chlorinated _ ✓ 6 ✓ 7�. _8L ,potable water samples received by AECOM by-pass removed _ ___ _ tracer wire - attached to h drant flan e _ continuit test ✓ ✓ Sam le results confirmed in email dated Oct. M and Nov. 5, 2012. Novem_ber 6, 2012. - - 9 X ✓ AquaOne Water report dated Feb 4 2013_._ -- A uaOne report dated October 24, 2012. End caps painted blue, 10 h drant - water flow charts submitted end caps painted barrels painted to Twp spec. ✓ ✓ ✓ - - markers installed sample stations inspection completed Engineer's curb box ins action certification ✓ 11}_ d2) ✓ Letter Nsue b Pearson Engineering dated January 22, 2013, 13) En ineer's valve & h drant inspection certification ✓ Letter issued by Pearson Engineering dated January 22, 2013. — 1 Utilities h dro crossin s com lep_ted _ _ bell works completed _ _ ✓ 2 ✓ -- - Sea Carmen Fruci email dated March 10, 2013. Al hydro works completed _ ✓ See Carmen Fruci email dated March 10, 2013. 4 streetli hts installed _ streetli hts ener ized ✓ _ -- See Carmen Fruci email dated March 10, 2013. 6) X 6) certification (ESA) from_etectricai consultant - .,. ✓ Received in email dated —March 2013. - _ _ to start in A rii 2013, see En g. email dated March 12, 2013. 7 ) gas works completed as- constructed information by electrical consultant X lWorks 8) X As- Constructed Unde noun Works 1 as- constructed information submitted and ✓ Accepted on January 29, 2013. approved 1? AECOM Certificate of S. C. & A. (Municipal Underground Services) issued _ O MAINTENANCE March 13, 2013 ✓ PERIOD FOR UNDERGROUND WORKS _END SWM Pond - Yes No Date Completed and Comments f 1) clean out prior to end of maintenance Sanitary Sewer flushiN of sewer Existi� SWM Pond 11 2 u,,r f Individual Septic Systems -" video inspection submitted for review video ins action wed/approved 3 Storm Sewer flushing of sewer _ video inspection submitted for review video re_viewedlapproved X 2) X - 3) X Watermain curb stop inspection by AECOM valve & hydrant Inspection by AECOM -2, X _.__. X Certificate of M. & F. A. (Municipal Underground Services) issued X ) Inspectors Name: _ i � 2 of 3 Project Manager: /,4 Township of Oro - Medonte Construction Status Report Subdivision. Ridgewood Court c:y File Number: 60118051 T02 12- 00013 -52) Engineer; Pearson Engineering Ltd. Contractor: Maacon DatVe March 12, 2013 START OF ABOVEGROUND Registered Plan _61 M_ -10_04 WORKS ' Road Works sub rade roof rolled by AECOM Date Com leted and Commenfs 1 Prooll itss on Oc).__ 3} sub rade elevations _confirmed_ Engineer sub - drains installed - sub- rade under curb *Yes ditch by Soils Consultant 5_ granular "8" compaction reports to AECOM ranular "A" cox action re orts to AECOM 6 7L_ concre 8 curbs inspected prfor to top hk as halt _ concrete tested by Soils Consultant X -� 9 ✓ -- - - -'- -' " "- `- 10) bas e aspha'Ulaced _ _ _ ✓ Placed on November 13, 2012. 11 si na e- street identification stop ✓ —' —'` °' - .._ -- - - -- V road not assumed no exit dead -end barricades and si na a ✓ _.- _.. - - - -- — - -- ✓ 12 13) 14 dr vewaX aprons paved, sidewalks completed X 15 sidewalks inspected by AECOM 1 boulevard topsoil and sodded /seeded base asphalt Inspected by AECOM X X 17 18) top lift asphal( completed X Miscellanies W rks 1) ,walkways 2) completed ark works oom laled fencin cox feted - boundary , ��; 3 �_.- walkways -park •. q Boundary Marker Post Certificate of S. C: &A. (Aboveground Services) Issued X __ END OF MA NTENA C EP E RIOD FOR ABOV W GROUND ORKS i Yes No Date Completed and Comments iGeneral Works tree planting in boulevard 1 X _,_2)_ pond landsca,�ing_inspection AECOM : , X 3 fencing inspection by AECOM final lot radio certification _ _ — 4 5 OLS certification for monuments X 6) curb boz inspection by AECOM valve & hydrant Inspection by AECOM final Inspection -11ght standards I X - - -- " " -' 7) X 8 X - transformers. X Utility boxes top lift asphalt inspection by AECOM _ X X 9 10) curb inspection by AECOM_ X 11 sidewalk Inspection bv AECOM boulevards inspection by AECOM X - 12 13) as- constructed information submitted and roved b AECOM x - - - .1a Certificate of M. & F. A. (Aboveground Services) Issued X "'X�Inspectors Name: ^ - 3 of 3 Project Manag