2013-028 Issuance of Certificate of Completion - Ridgewood CourtTHE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
BY -LAW NO. 2013 -028
Being a By -Law to Authorize the Issuance of the Certificate of
Substantial Completion and Acceptance (Municipal Underground Services)
for Horseshoe Valley Lands Limited (Ridgewood Court), Plan 51 M -1004
WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter
P. 13, as amended, provides that municipalities may enter into agreements imposed as
a condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered
into a Subdivision Agreement with Horseshoe Valley Lands Limited (Ridgewood Court)
in January 2013 for fifteen (15) residential lots on Ridgewood Court.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
underground works have now been met;
NOW THEREFORE the Corporation of the Township of Oro - Medonte hereby enacts as
follows:
That the Certificate of Substantial Completion and Acceptance (Municipal
Underground Services) for Ridgewood Court (Horseshoe Valley Lands Limited),
Plan 51 M -1004 may now be issued by the Township Engineers (AECOM) in
compliance with the Subdivision Agreement between the Corporation of the
Township of Oro - Medonte and Horseshoe Valley Lands Limited.
2. That the attached Schedule "A ", Certificate of Substantial Completion and
Acceptance (Municipal Underground Services) shall form part of this By -Law.
3. That this By -law shall come into force and take effect on the final date of passing
thereof.
BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 20TH
DAY OF MARCH, 2013.
THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
, H.S. Kt[ghes
Cie
'COM
CERTIFICATE OF
MUNICIPALITY
PROJECT
DEVELOPER
FILE NO.
Description of the Works:
SCHEDULE "A"
AECOM
55 Cedm Paude Drive, Suite 620
Barre, ON, Cneada 1AN 5R7
MIV'aecoin.eom
TOWNSHIP ENGINEERS
7057219222 tel
705 734 0764 fax
SUBSTANTIAL COMPLETION AND ACCEPTANCE
(MUNICIPAL UNDERGROUND SERVICES)
Township of Oro- Medoente
Ridgewood Court
Plan 51M -1004
Horseshoe Valley Lands Ltd. and Romspen Investment Corporation
601/8051 (12- 00013 -52) 143 -OM- 200011
• Watermain Works in the Ridgewood Court Subdivision on Ridgewood Court from the intersection of
Nordic Trail east (218 metres) to the cul -de -sac;
• Storm Works in the Ridgewood Court Subdivision on Ridgewood Court from the intersection of
Nordic Trail east (218 metres) to the cul-de-sac including outlet pipe to Existing Storm Pond #5E at
the end of the cul-de-sac;
We, AECOM, notify the Municipality that the above mentioned works were inspected on March 12, 2013 and
to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement
except for the deficiencies below:
• Items listed in AECOM Construction Status Report dated March 12, 2013.
We hereby accept these works for use and operation by the Municipality subject to the rectification of the
above noted deficiencies and to the rectification of any further deficiencies that may become apparent during
the maintenance period and to the maintenance that is require by the Subdivision Agreement and its
Amendment.
The date of Substantial Completion and Acceptance (Municipal Underground Services) is established by the
Certificate as of March 13, 2013.
Date: f i 13 Zd 0 Signature: o
KA00013- 52\CerUffcates \S. C. and A.Underground,doc
Township of Oro - Medonte
Construction Status Report
Subdivision: Ridtewood Court
rs Pile Number
60118061
T02 (12. 00013.52)
Contractor: Mascon
Registered Plan 51M -1004
WORKS
I Date Completed and Comments
Engineer Pearson Engineering Ltd,
Data +March 12, 2013
_
START OF
UNDERGROUND
Yes
No
Siltation Controls
4
silt fence installed and maintained _ .
✓
✓
2�
rock check dams Installed and maintained
SWM Pond
pond earth works completed
storm outfali work s completed
1L
2
Existin SWM Pond
-
a;4�
•�` r.
`
r a
-"
_
3
access road constructed
4)
pond fencing completed with gate
5
and to soil /seeding
6)
landscaping completed
)—Po
surrey submitted
9
and volume calculations submitted
10
and certification by En ineer
Sanl sewer
1
pipe installed
_....
{ µN
4
r • ,;; .
" r
Individual Septic Systems
2)
3
pipe bedding summary /acceptance report
back011 test summary lacceptancereort
___...-
4
maintenance holes lns ected /a roved
5)
benching inspected
6
top of precast 0.3m below finish grade
7
video inspection submitted for review.
_. -....,
S
video inspection reviewed /approved
✓
1
Storm Sewer
—
pipe installed
2
pipe bedding summary /acceptance report
J
Terraprobe report dated September 26, 2012.
3)
—
4
backfilttest summarylacceptance report
- -- — -- -
maintenance holes Ins ectedla provai
benching inspected
Terra robe report dated September 26 2012.T
✓
AECOM inspection_ wort November 19, 2012•
5)
✓
✓
AECOM ins ction Re ort November 19, 2012•
AECOM inspection Report November 19 2012•
6
top of precast 0.3m below finish grade
7
video inspection submitted for review
✓
✓
Video submitted on December 4, 2012.
Video reviewed and accepted Dscsmbsr 5, 2012.
_8 L
video inspection reviewed /accepted
r
Inspectors Name:� 1 of 3 Project Manager.
Township of Oro- Medonte
Construction Status Report
Subdivislon: Rldgewood Court
c >a — File Number: 60118051 T02 (12- 00013 -62)
En0lnaer. Pearson Englneerin0 Ltd. _
Date'March 12 2013
START OF
Contractor. Maacon
Registered Plan 51M -1004
WORKS
V DERGROUND
II
--
W termai -
Yes
No
Date Com feted and Comments
1)_
piQelnstalled
Terra robe report dated Se tam - 28, 2012. - -
Terraprobe reportdated. September 28 2012.
2)
pipe bedding aaw tp anca�ort
backfiil testing acceptance report
g
bX pass installed and ins acted -
✓
3
✓
4) ,
✓
October 10, 2012.
- - " -�
October22, 2012.
---
October 24 2012.
5
pressure testing confirmed b y
Y .
astern chlorinated _
✓
6
✓
7�.
_8L
,potable water samples received by AECOM
by-pass removed _ ___ _
tracer wire - attached to h drant flan e _
continuit test
✓
✓
Sam le results confirmed in email dated Oct. M and Nov. 5, 2012.
Novem_ber 6, 2012.
- -
9
X
✓
AquaOne Water report dated Feb 4 2013_._ --
A uaOne report dated October 24, 2012.
End caps painted blue,
10
h drant - water flow charts submitted
end caps painted
barrels painted to Twp spec.
✓
✓
✓
- -
markers installed
sample stations inspection completed
Engineer's curb box ins action certification
✓
11}_
d2)
✓
Letter Nsue b Pearson Engineering dated January 22, 2013,
13)
En ineer's valve & h drant inspection certification
✓
Letter issued by Pearson Engineering dated January 22, 2013.
—
1
Utilities
h dro crossin s com lep_ted _ _
bell works completed _ _
✓
2
✓
-- -
Sea Carmen Fruci email dated March 10, 2013.
Al
hydro works completed _
✓
See Carmen Fruci email dated March 10, 2013.
4
streetli hts installed _
streetli hts ener ized
✓
_ --
See Carmen Fruci email dated March 10, 2013.
6)
X
6)
certification (ESA) from_etectricai consultant
- .,.
✓
Received in email dated —March
2013.
- _ _
to start in A rii 2013, see En g. email dated March 12, 2013.
7 )
gas works completed
as- constructed information by electrical consultant
X lWorks
8)
X
As- Constructed Unde noun Works
1
as- constructed information submitted and
✓
Accepted on January 29, 2013.
approved 1? AECOM
Certificate of S. C. & A. (Municipal Underground Services) issued
_ O MAINTENANCE
March 13, 2013
✓
PERIOD
FOR
UNDERGROUND WORKS
_END
SWM Pond -
Yes
No
Date Completed and Comments
f
1)
clean out prior to end of maintenance
Sanitary Sewer
flushiN of sewer
Existi� SWM Pond
11
2
u,,r
f
Individual Septic Systems
-"
video inspection submitted for review
video ins action wed/approved
3
Storm Sewer
flushing of sewer _
video inspection submitted for review
video re_viewedlapproved
X
2)
X
-
3)
X
Watermain
curb stop inspection by AECOM
valve & hydrant Inspection by AECOM
-2,
X
_.__.
X
Certificate
of M. & F. A. (Municipal Underground Services) issued
X
)
Inspectors Name: _ i � 2 of 3 Project Manager: /,4
Township of Oro - Medonte
Construction Status Report
Subdivision. Ridgewood Court
c:y
File Number: 60118051 T02 12- 00013 -52)
Engineer;
Pearson Engineering Ltd.
Contractor: Maacon
DatVe March 12, 2013
START OF ABOVEGROUND
Registered Plan _61 M_ -10_04
WORKS '
Road Works
sub rade roof rolled by AECOM
Date Com leted and Commenfs
1
Prooll itss on Oc).__
3}
sub rade elevations _confirmed_ Engineer
sub - drains installed - sub- rade
under curb
*Yes
ditch
by Soils Consultant
5_
granular "8" compaction reports to AECOM
ranular "A" cox action re orts to AECOM
6
7L_
concre
8
curbs inspected prfor to top hk as halt _
concrete tested by Soils Consultant
X
-�
9
✓
-- - - -'- -' " "- `-
10)
bas e aspha'Ulaced _ _ _
✓
Placed on November 13, 2012.
11
si na e- street identification
stop
✓
—' —'` °' - .._ --
- - --
V
road not assumed
no exit
dead -end barricades and si na a
✓
_.- _.. - - - -- —
- --
✓
12
13)
14
dr vewaX aprons paved,
sidewalks completed
X
15
sidewalks inspected by AECOM
1
boulevard topsoil and sodded /seeded
base asphalt Inspected by AECOM
X
X
17
18)
top lift asphal( completed
X
Miscellanies W rks
1) ,walkways
2)
completed
ark works oom laled
fencin cox feted - boundary
,
��;
3
�_.- walkways
-park
•.
q
Boundary Marker Post
Certificate of S. C: &A. (Aboveground Services) Issued
X
__
END OF MA NTENA C EP
E RIOD
FOR
ABOV W
GROUND ORKS
i
Yes
No
Date Completed and Comments
iGeneral
Works
tree planting in boulevard
1
X
_,_2)_
pond landsca,�ing_inspection AECOM
: ,
X
3
fencing inspection by AECOM
final lot radio certification _ _
—
4
5
OLS certification for monuments
X
6)
curb boz inspection by AECOM
valve & hydrant Inspection by AECOM
final Inspection -11ght standards
I
X
- - -- " " -'
7)
X
8
X
- transformers.
X
Utility boxes
top lift asphalt inspection by AECOM _
X
X
9
10)
curb inspection by AECOM_
X
11
sidewalk Inspection bv AECOM
boulevards inspection by AECOM
X
-
12
13)
as- constructed information submitted and
roved b AECOM
x
- - -
.1a
Certificate of M. & F. A. (Aboveground Services) Issued
X
"'X�Inspectors Name: ^ - 3 of 3 Project Manag