Loading...
03 20 2013 SpCouncil AgendaPage Township Proud Heritage, Excitinq Fiaure THE TOWNSHIP OF ORO- MEDONTE SPECIAL COUNCIL MEETING AGENDA COUNCIL CHAMBERS Wednesday, March 20, 2013 4:30 p.m. - Open Session 1. CALL TO ORDER - PRIVATE PRAYER /MOMENT OF REFLECTION: 2. ADOPTION OF AGENDA: a) Motion to Adopt the Agenda. 3. DISCLOSURE OF PECUNIARY INTEREST: 4. REPORTS OF MUNICIPAL OFFICERS: 3 -9 a) Report No. DS2013 -010, Andria Leigh, Director of Development Services, re: Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Ridgewood Court, Registered Plan M -1004 [refer to Items 5a) and b)]. 5. BY -LAWS: 10 -14 a) By -Law No. 2013 -028 Being a By -Law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Horseshoe Valley Lands Limited (Ridgewood Court), Plan 51 M -1004. 15 -16 b) By -Law No. 2013 -029 A By -law to Remove a Holding Provision on lands described as follows: Part Lots 3 and 4, Concession 4, Oro, Part 15, Plan 51R-30671, T/W easement over Parts 3, plan 51R-30671, as in LT 522878, Oro - Medonte, Township of Oro - Medonte (Geographic Township of Oro), County of Simcoe, PIN 74055 -0121 (LT), (known as Horseshoe Valley Lands — Ridgewood Court Subdivision), Registered Plan 51 M -1004, Township of Oro - Medonte, County of Simcoe. 6. CLOSED SESSION ITEMS: a) Motion to go In Closed Session. b) Motion to Rise and Report. c) Doug Irwin, Director of Corporate Services /Clerk, re: Solicitor - client privilege (Lakeshore Promenade). Page 1 of 17 Page Special Council Meeting Agenda - March 20, 2013. 6. CLOSED SESSION ITEMS: d) Robin Dunn, CAO, re: Labour relations /employee negotiations (Arbitration). 7. QUESTIONS FROM THE PUBLIC CLARIFYING AN AGENDA ITEM: 8. CONFIRMATION BY -LAW: 17 a) By -Law No. 2013 -027 Being a By -Law to Confirm the Proceedings of the Special Council Meeting held on Wednesday, March 20, 2013. 9. ADJOURNMENT: a) Motion to Adjourn. Page 2 of 17 4a) Report No. DS2013 -010, Andria Leigh, Director of Dev... REPORT township of Proud Heritaffe, Exciting Future Report No. To: Prepared By: DS2013 -010 Council Andria Leigh Meeting Date: Subject: Motion # March 20, 2013 Certificate of Substantial Completion and Acceptance (Municipal Underground Roll #: 010- 002 -15898 R.M.S. File #: Services) for Ridgewood D12 41238 Court, Registered Plan M -1004 RECOMMENDATION(S): Requires Action For Information Only It is recommended that: 1. THAT Report No. DS2013 -010 be received and adopted; 2. THAT the Township issue the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Ridgewood Court for Horseshoe Valley Lands Limited dated March 12, 2013, Registered Plan 51 M -1004; 3. THAT the Clerk bring forward the appropriate By -law for Council's consideration; and 4. THAT the Developer be notified of Council's decision. BACKGROUND: The Township entered into a Subdivision Agreement in Ridgewood Court development which consisted of a total of 15 residential lots which are serviced by municipal water and individual sewage treatment systems. ANALYSIS: In accordance with the Subdivision Agreement, the developer has completed the underground services which were inspected by the Township's engineer on March 13, 2013 and are found to be acceptable with the exception of the deficiencies noted in AECOM's Construction Status report dated March 12, 2013 (Attachment #2). On this basis, AECOM is now recommending the issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) (Attachment #1). With the issuance of the Certificate, the Developer's two (2) year maintenance period will begin in accordance with the terms and conditions of the subdivision agreement. DEVELOPMENT SERVICES March 20, 2013 Report No. DS2013 -010 Page 1 of 7 Page 3 of 17 4a) Report No. DS2013 -010, Andria Leigh, Director of Dev... Section 8.2. (ii) of the Subdivision Agreement states that: The approval of the Plan by the Township, or the acceptance by the Township of the works, shall not be deemed to give any assurance that the Building Permits, when applied for, will be issued in respect of the lots or blocks shown on the Plan. Notwithstanding the foregoing, no Building Permits will be given and the Chief Building Official may refuse any application until: (ii) The Storm Water Management System and Waterworks have been installed, tested and approved by the Township Engineer and he has issued his Certificate of Substantial Completion and Acceptance (Municipal Underground Services). With the issuance of the Certificate (By -law 2013 -028) by Council, building permits could now be considered provided they are in compliance with the additional subdivision agreement requirements. In order for such building permits to be considered, the Holding Provision which continues to be applied to the Ridgewood Court subdivision lands is now required to be lifted. By -law 2013 -029 provides the necessary by -law to lift the Holding Provision applying to the subject lands. AECOM will also be providing the Township shortly a recommendation regarding a reduction in the Letter of Credit based on the works completed and inspected to date. The Township currently holds $ 182,051.09. The request for the Letter of Credit reduction will be circulated to Senior Management and once confirmation is obtained that the Township Developer Deposit account is in good standing and the required Statutory Declaration is obtained from the developer, the recommended letter of credit reduction will be submitted to the Director of Finance/Treasurer. FINANCIAL/ LEGAL IMPLICATIONS/ RISK MANAGEMENT: Not applicable. POLICIES /LEGISLATION: Planning Act Subdivision Agreement CORPORATE STRATEGIC GOALS: Sustainability — To build an increasingly sustainable community with regard for; and sensitivity to the needs of future generations. Financial Stewardship — To continue to improve value received in the expenditure of tax dollars as well as maintaining a financial position that is fiscally sound for the Township. Service Excellence — To provide a welcoming, courteous and professional culture of service excellence on the part of Council and Township staff. DEVELOPMENT SERVICES Report No. DS2013 -010 ch 20, 2013 Page 2 of 7 Page 4 of 17 4a) Report No. DS2013 -010, Andria Leigh, Director of Dev... CONSULTATIONS: AECOM ATTACHMENTS: Attachment #1 – Certificate of Substantial Completion and Acceptance (Municipal Underground Services) Attachment #2 – AECOM Construction Status Report March 12, 2013 CONCLUSION: The above noted certificate for the Ridgewood Court subdivision (Horseshoe Valley Lands Limited) is in compliance with the subdivision agreement and therefore the issuance of the Certificate is considered appropriate. With the issuance of the Certificate for the Municipal Underground Services, the required two year maintenance period will begin. Respectfully submitted: — 't —1 PPP Andria Leigh, MCIP, Director of Development Services SMT Approval / Comments: I C.A.0. Approval / Comments: DEVELOPMENT SERVICES Report No. DS2013 -010 March 20, 2013 Page 3 of 7 Page 5 of 17 4a) Report No. DS2013 -010, Andria Leigh, Director of Dev... Attachment #1 w-v � w AECOM 55CedarNW.D&4,&h620 7057219222 W B-,d , ON, C—dz IAN 5X7 705 734 0764 f tv,hr.aecoiacom TOWNSHIP ENGINEERS CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICESI MUNICIPALITY Township of Oro - Medonte PROJECT Rldetewood Court Plan 5IM4004 DEVELOPER Horseshoe ValleV Lands Ltd, and Romspen Investment Corporation FILE NO. 60118051 (12-00013-62) (43 -OM- 200011 Description of the Works: . Watermaln Works in the Ridgewood Court Subdivision on Ridgewood Court from the intersection of Nordic Trail east (218 metres) to the cul -de -sac; • Storm Works in the Ridgewood Court Subdivision on Ridgewood Court from the intersection of Nordic Trail east (218 metres) to the cul -de -sac including outlet pipe to Existing Storm Pond #5E at the end of the cul -de -sac; We, AECOM, notify the Municipality that the above mentioned works were inspected on March 12, 2013 and to the best of our knowledge and judgement, are complete in accordance With the Subdivision Agreement except for the deficiencies below: Items listed in AECOM Construction Status Report dated March 12, 2013 We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its Amendment. The date of Substantial Completion and Acceptance (Municipal Underground Services) Is established by the Certificate as of March 13, 2013. Cltl A Date; 91J, I3t 200 Signature: /1Vf K:1o0013521Cediricalesl5. C, aMA,Under9�ound.doc �`� DEVELOPMENT SERVICES March 20, 2013 Report No. DS2013 -010 Page 4 of 7 Page 6 of 17 4a) Report No. DS2013 -010, Andria Leigh, Director of Dev... Attachment #2 Township of Oro- Medonte Construction Status Repoht Subdivision: ewood Court n;a File Number. Engineer: Pearson EngtheeYing Lttl. T02 (72- 0007352) Contractor. Maacon - OatelMardM12,2013 _ STARTOF � _ Re Istered Plan.67 M -7004 _ _ UNDERGROUND.WORKS 511Eatlon Controls _ p Yes No Date Completed and Comments 1) _ _ sill fares installed and maintained _ ✓ ✓ - .,, Exrsfing SWM Pond _ _ �._ rock check dams installed and maintained pond earth works com leted � storm outfall works completed -1L 2 3 Access road constructed 4) _ 5 pond fencing completed wilhgate_ pond to soillseeding. .,omple 6 IaritlscalOg completed ponKsurmy submitted pond volume calculations submitted 8 ) 9 10 and certification by En loser - 1 pipe Installed Individual Septic Systems r• , ` 2) 3) lee beddt_0 summarylacceptance report backlill test summa y /acceptance report 4 maintenance holes InspectedlaWroved tienchm� inspected -- - 6 top of precast 0.3m below fhlsh grade 7) video inspection submitted for review. video inspection teviewedlapproved B 1. Storm Sewer Ipe installed - ._..... __�— - -� - .... __._ _..__ ✓ Z pipe bedding summary/asce,Ltance report { ' Terraprobe_ report dated.September 28, 2012 a� tiacKtill test summary / acceptanee report _ maintenance hales ins ecledla proval benching inspected _ to of recast 0.3m below finish ratle - „__�___8 � ✓ ' Terraprobe report dated September 26 2072. ✓ AECOM inspection Report November 19 2012. -5 ✓ AECOM Inspection Report November 19 20.1.2__._ 6 ✓ _ AECOM inspectbn Report November 19 2012. 7 vldeolns coon submitted for review vidcw mspection reviewed/accepted ✓ Video. sub mittetlon December 4, 2012. -- _8] ✓ Video reviewed and accepted December 5,2012. ___ Inspectors Name:,J.. 1 of 3 Project Manager . DEVELOPMENT SERVICES Report No. DS2013 -010 March 20, 2013 Page 5 of 7 Page 7 of 17 4a) Report No. DS2013 -010, Andria Leigh, Director of Dev... Attachment #2 (cont.) Township of Oro - Medonte Construction Status Report Subdivision: Ridgewood Court File Number, 60118061 T02. (12.00013 -62) - crr° -- -- _ . _..._ — -- Engineer . Pearson Engineering Ltd.,"____ _. __ -_ ConV_ actor: Maecon Date March 12, 22013 � " , _ ____ _ Registered Plan 51 M•9004 STARTOFUNDERGROUND L I Y051 N I Date Completed leted and Comments ✓ ...I�_. Pi einstai led __ -_.. -- ....._ _� _ _ _ 8 - - robere rtdatetl September 28, 2012. ' Te mmpe report dated September 28 2012. -- _- -- 2 3) i a beddm acre lance re ort_ — __e_— p_. . backfill testing acceptance repo rt bypass installed and inspected ✓ ..Terra ✓ ✓ October 10. 2012. October _22,2U12. _ ressura tasting confirmed�AECOM _ _ ✓ 8 system chlorinated : potable water samples received by AECOM .._._ October24, 2012. _ _TZ ✓ Sam la results confirmed m emaif dated Oct 30 and. Nov. 5, 2012. _�.._.._.. . _ 8 9 by-pass removed (racer wire - attached to hydrant flange continuity test , . _ _ _ ✓ _ November 8, 2012. - X. ✓ AquaOne WWater report dated Feb 4, 2013. 10) hydrant -water fiowcharts submitted. __ _ - end caps painted . - barrels aimed to T sec. 4 _ AguaOnereport dated October 24, 2012. .__.. _- End caps. ✓ ✓ - Letter issued by Pearson Engineering at January 22, 2013. markers installed _ sample stations Inspection completed Engineer's curh boufnspectlomcertification ✓ 14 ✓ 12) 13 Fir sneer's valve & hydrant inspeceon cenification ✓ Letter Issued by Pearson Engineering dated Janua 22, 2013. ✓ 7) 2 Utilities. hydro crossings completed bell works completed - - ✓ See Carmen Fmoi email dated Marc111.2011. 3) hydro works: completed_ _ -- ✓ See Carmen Fruci email dated March 10, 2013. 4) streetlights Installed streetlights energized ✓ See Carmen Fruar email dated Nlamh 10, 2013 -__ 5) X _ __ __ _ - G cedifica0on ( ESA) from alectncaf consuhant ✓ Received inemail dated March 11, 2013. " 7 as works completed as- constructed information electrical consultant X Works 10 start in April 2013 see Eng. email dated March 12 2013.�- 8) X - ---___ __— ._-- - -- --- As-Constructed lUnderciround Works _ as- canstructed infarmation submitted and '__ 1 ✓ Acc e tact on January 29, 2813: _..._._.. � _.. apiawyed by AECOM GertlFlcate of S: C R. A. (Municipal Underground Services( Issued March 13 2013 ✓ END OF MAINTENANCE PERIOD FOR UNDERGROUND WORKS Yes I No Date Com feted and Comments SWM Pond " 1) clean outprior to end of maintenance -" Sancta 'Se war f flushmg_oTsewor _:_ - - ExisOn� SWM Pond Indnaduai Sophc Systems_ T -° - I 1) 2 3) �:: video inspection submitted for review video Inspection revlewedla proved' X 1 Sfortn Sewer 8ushin of sewer video inspection submitted for review video inspection_Teyiewedlapproved Watermairi curb sigp Inspection byAECOM - - 2) "3�_ —_. X 1� 2 X valve & hydrant Inspection by AECOM, X Cer4lficate of M..& F. A. (Municipal Underground Services) Issued X Inspectors Name: .1-112. 2 of 3 Project Manager: DEVELOPMENT SERVICES March 20, 2013 Report No. DS2013 -010 Page 6 of 7 Page 8 of 17 4a) Report No. DS2013 -010, Andria Leigh, Director of Dev... Attachment #2 (cont.) Township of Oro- Medonte Construction Status Report Subdivision: Ridgewood Court r File Number: 60118051 T02 (12 00013 -52) En ineer. Pearson Engineering Ltd._ _ J;E�MiAenjd actorMaaeon Datar122013 START OF ABOVEGROUND I plan 51M -1004 WQWS _ Road Works _ sub grade roof rolled by AECOM Date Completed and Comments I ✓ Proof roll witness on October 3, 2012 See Inspection repod'R3 .- 3Z subgrade sleva0ons cortfemed by Engineer sub drains installed - :sub - grade -untler curb ✓ - 4) -ditch 9ranute4-s qy -dit Coesultanl. _ ----- - - " - "` - - -'- - -- ""- - ianular'B" com action re oria to.AECOM - renWar "A "wm actionre mts to AECOM _ ✓ ✓ - - -- -- - -- ��-�' "-- " "'-"" - -' -__ -- — --- ' - ° " "- - S 7 __ concrete curbs com eted __ _.._ »M _�..._ ✓ 8 curbs ins eUed. dodo top Ii0 as halt concrete tested by Soils Consultant - - ✓ X 9 - - -" 101 11 sl na8e- street identificetion - -- ___ Placed on November 13,.2pt 2. ✓ _ �"` - -' -- -`- ` " " " - - - -— - -- -road not assumed -no exit dead-end barricades and sign age ✓ - - _ " " "-- _.__ ___. ___...__�'__�_._ - - - - - -" " "-- - - " - -- ____ ✓ X _L21 _13) 14 drWeWay aprons paved sitleWalcswmplated 15 sidewalks in. acted b AECOM Y ' ,1 D boulevard to soil and soddedlseeded base asphalt Inspected by AECOM X - -_ - - -- .17L 18 top lift as halt com leted X _ i) 7 2 walkways cornplated - fencing completed -boundary ' walkways." ; � _ 3) - " 4) Boundary Marker Post Certificate or s. C. & A. lAboveground Services) Issued X __ END OF MAINTENANCE - ___ PERIOD FOR ABOVEGROUND WORKS Yes No I Date Completed and Comments General Work Uee lantiindoulevaril 1 2) pond iandscapmq inspa un by AECOM Mal lot grading � Alflcalfon - _ - - - X - 4 6. OLS cartification for monuments X _ 6} 7 curh boz Nspeotlon by AECOM valve & h tlrant inspection b AECOM , final inspection - light standards _ .. transformers -- X %.. B). % utlboxes �ty to lift as halt inspection by AECOM -_ _ x X -'� "- - -- 9 _10) 11 12 _ curb mspecliomWy AECOM ._._ � sitlewalk Ins action b AECOM boalevardsins ewfron by AECOM - - -- " - - - -: X X - — " - - - -- 13) -- as constructed infonnaticn - submitted and 22proved by AECOM - - - - -- - -_ -- - X certificate of M. & F. A. WOTr round Servicas) Issued -. I - ....... ____�.r_ _ __....... Inspectors Name'.. _.fJ. 4� 3of3 Project M—AWL DEVELOPMENT SERVICES March 20, 2013 Report No. DS2013 -010 Page 7 of 7 Page 9 of 17 5a) Being a By -Law to Authorize the Issuance of the Cert... 19710101 Na0]:7A ll 1 01Z 110]a9:1:01101TJIZ6y:I110]:90]:1019 �d 11I01 ki 119 1 BY -LAW NO. 2013 -028 Being a By -Law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Horseshoe Valley Lands Limited (Ridgewood Court), Plan 51 M -1004 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered into a Subdivision Agreement with Horseshoe Valley Lands Limited (Ridgewood Court) in January 2013 for fifteen (15) residential lots on Ridgewood Court. AND WHEREAS the requirements of this Subdivision Agreement with respect to the underground works have now been met; NOW THEREFORE the Corporation of the Township of Oro - Medonte hereby enacts as follows: That the Certificate of Substantial Completion and Acceptance (Municipal Underground Services) for Ridgewood Court (Horseshoe Valley Lands Limited), Plan 51 M -1004 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and Horseshoe Valley Lands Limited. That the attached Schedule "A ", Certificate of Substantial Completion and Acceptance (Municipal Underground Services) shall form part of this By -Law. That this By -law shall come into force and take effect on the final date of passing thereof. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 20TH DAY OF MARCH, 2013. THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE Mayor, H.S. Hughes Clerk, J. Douglas Irwin Page 10 of 17 5a) Being a By -Law to Authorize the Issuance of the Cert... SCHEDULE "A" A_L1DM ^� ssce+.ra.ens.,a:4ro msni oan >d �+cPN, (.�i GN SNF �p5 T31 Wfi !tl TOWNSHIP ENGINEERS CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) MUNICIPALITY Townshoal Oro- Medonte PROJECT Rddoawood Court DEVELOPER Horseshoe Valley Lands Ltd. and Rnmspen Investment Corporation FILE NO, 8011805i.ti2 -00013 -52) 143 -OM- 200011 Demcrl U the Works • Watermafn Works in the Ridgewood Court Subdivision on Ridgewood Court from the intersestlon of Nordic Trail east (21a motres) to the cul -de- • Stern Works in the Ridgewood Court Subdi+4aton on Ridgewood Court from the ineersection of Nordic Trail east (218 metres) to the owl -deaac Induding outel pipe to Existlrg Stan Pond MSE at the and of the wlde -sac: We, AECOM, noW the Municlpality that the above mentloned works were inspected on March 12, 2013 and to the test of our knc Medge and judgement. are complete in acwrdance Witi the Subdlviston Agreement except for Die defidencles below: . Items ilseed in AECOM Cdnstucbon Status Report dated March 12, 2013. We hereby accept New works for use and operation by the Munldpality subject to the rectlficakon of the above netted defiNeWes and to the rectficatlpn or any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the SobKIMslon Agreement and its Amendment. The date of Substantial CarnpMOOrt and Acceptance (Municipal Underground Services) Is astabllshad by the Certificate as of March 13, 2013. G11 /a Date'. SiNnalum Knw1r- u�oa�a�zes. e.rxrwuees�vna.ex Page 11 of 17 5a) Being a By -Law to Authorize the Issuance of the Cert... Page 12 of 17 Township nl Cro- Medonle Construction Status Report Su6dlvlslon: Rldgewoatl CouA Flip Number. 6011@051702 a-05d1�321 E veer: Paseon avie LK Cmiradar. Mamn _ 47aAa Yarclt 12,2013 RaOW.aretl Plan SIM•Y004 - _ UNDENGROUNDWOMS Yoe No Dat@ Can kled ald Comments 1 ar fm ®Ywlelhd ad mdnkined _ _ talk Ltlerlt tlama rauaM etW maln>m1rreA 1j pond eadt weft bled ExNkV SWM Pond 2L clean eudel works eomeklM 3 amssioadconstruated 4) pogd_ m._M - Mpleedvnthpaa_ un 51 wte [o�sA f—Ing 61 poM survey suMnOkd ..34:, Wume cakuWlianswbmiled 1 - Vrailab.Enginoar _ Saner Sewer 1 IrcelaOed Indrww Septic 2) - betldng summartracceplence RPM 3L WWI lest summayOa plenco wood 4 malr"nanas holes ins eppmved. 5 bemhlagM ed 5 a[ roust Q 3m below runs 7 MW 4pmlon sWmwo fateukw 0 video NspecQOn teuieaetllapprmretl Storm Sews t meta _ d 2 Ope boMing summa laoreptam ropod T _.,_ d&W 26,2D12. 3) ILarafill test summa'sooinm reort� _ T pad 78,2612. - 4 Imalrrrenan{e holeeins edy roust ✓ AECCM' Re bd NovemEer 181012. 5 benching.lmpe*d r AECOMh ton Naaumba 142012 0 of 0 3 b®lax MWh grade d AECpM it�edlon NepalPhverr&er 11, NYIZ video ins `nsuhmmod fora w mdw aubmend m Dammher42M 2, e +rdeb inspection revietueNa- rcedad _ _ VAN teA"W wucopw pecambW6,2017 _ Inspactare 1v}3 P*dMen.p Page 12 of 17 5a) Being a By -Law to Authorize the Issuance of the Cert... Township of Qro,Medonte Constnletian Status Report Subdlvlal0a: Rldgaw0atl Coon AlgW FAn 90116011 T02112-0061232i meat Peeraal •..•.� —. - __ �. E+17!�dn3 ue. ca,o-eaw:3awar Niwsl! r —xo 1a , Ne9�emra Pilreal�Aw s Yw Nm pkf9 CwA pad Calrlwrerlle pipe lrulafad 2 beds acne G1Ma T dulntl .Gar 2012. 3 beckAN W!Irg axeptance opal _ T ba re 0 dweed ea anbw 3 2042. 4). hy�>wn_., Na{WaE_ead lns OWGV1 x[112 5 pm tae 1 filg wnRrnrad pj AE�pN October 2012. SL m nawlnatea .. _ _ _ _Omober2l 20aR. 7) palaEle walar..: _Ala Isnfrsd MCOM e raaulaa mM:rrwd Flanal tlNetl atlt 90 rW lobe. 2012 .. 6 a idmovd0 _ rocs, wire-- 'oimWAd m 1 � x NoruYnhet a 2012 _ -_. lu - mnlNWt�tem -dm = Wm @f flJ timid eu0mldetl -end capg pelnled _ _ - harmis peinled Im Txy spew. - markets inalalaatl aempb stalwns rnspec!Imn ranlp:eletl Lgg_ere carh box ­p­ k. M.liu'. fa­. nydranil.upoction ce.if arcn UUIM- mvapel. ¢s. co.male!eo beOwarNS plo" hyena ke —pl-d - kaaellejhls mglangq Orwell hls_e�2izM. caNOCelun BA�irmrn clecincel wn R.t _efo,IwWded inramaban by al auneuAaM enslruated Slntle rountl Wodr d - CrieWeN m. A&1.dFak4,q 3. A deOml rat OR ddatl O[1mBf ?A 2012 - End W, pmnm bk _ a7 1¢, 13 - Lednr hand bv pWleon En0iaesm dWWAmur 222013, LaMar NYlaad b, PaenonE doled 2015 a 2 - r See Ceamee Fruci oma_Rdaled Mud110 2043. S9e Gmnaen Fred emstlOWOd Nelrh 10,. 211,4a. _ SaeCwoaan Frwi amau daaueGlercht07019. Rav[etaed an —H dated Mnrch 11, 2011 N`7oda,�n emnan rwrR2�a e�Er .emoN dated Manh 2013. 31 4 6 9f / % % 1 cons4�Ued- i.lmrme nsuhm�rada Ap and by AECOM of &F6F.IMwlic 1pel llrldagruund Swsdoeellseuad Ada on Jun 29,2010 OeMfflw AAurcG 13, 3013 Ym fb pate Can uad Canmeate 1� dm aRpda mrd aameMw.loane BYYId Pend _ 1a nue OAaerler MWMMSeplbsyrteme . ailera elarll�etl for revanv 1 0rd0 INeeuer _ etleo fa nrliw _ m % 3 _ M. bnpndlen larinwedla wtmvmb =emy YlRecrbn AECgA % _ 1L % k W a AECCM % grtllleW el9ld P. A. unto illln Sm1m 1ruW % Irmpedala Ndn Z 2W3 Pm*d Mane9er Page 13 of 17 5a) Being a By -Law to Authorize the Issuance of the Cert... Page 14 of 17 Township of Oro- Medoots ConstruotPOn Statua Reor[ S,dbdltrklan- Rid 9nh'OOd Court P1Y Nrars6er: eUN 8pb9 TOY 1a- 0 op13-62p - - -.- inae�: Pra= �.irweAn9 4.[d. Contraabr. uata,nYme 12r 2013 _ Y No Oad pmAeM+�arnlrArlb a worse - -- uNiaee_rpwtp8ed Froarm9 x99tnemoaoeM 2012 imp�m MW rs` �) ®utga8e mave9em amc,meeMerginw. ✓ 3) autrdreirm Irmtsi•d - wbgre6s antler curb. — ai� -- _ 4) �eYa»War loa[etl by SOaa COnsvltenl 5 ranala,'9- compaction reports loREGdM B naear °A'mmp »Hlen reports laAECAYI_ _ ]j m••oe[e curbs completed- EZ wa,s inspectudpriorbbp lift asphalt x _ 4} `Ica.xsete txetea q'sniie Cansunam 0 i p ep. 19 BDtY r ^ge - o lJemrf �1t2 ltl— —_ —_ srh g aemasaR p e aad as a n;a»a< r e eenms c_nptl m tl se g nage 73) .tlrvaway aprons pawtl % 16 siaewalka winpleled 15 4i •J♦.WBIk9in9fCCICe_o-.,�AE.aM_ 16) boulevard kpsoil entl aeda»algrmdgd % 17 naeea hattY FEilorA x tee wpm espnmWmp*ed M t� -�y-�� --rte- l`.nr88enen &S. C. BA •anW BMNow Yeared x vn. rw Dale cam aYa »rra commapwa 1 Hen MgglYVma K — ...2] sMaEOOM - 9 Yad,w Y9pn4nn by aecaM - a mai Ia raelp wNBCMkn x pis wxBMeeba nwrwnrmis R s neeenetn.pedmneyAecaM - x valve s RECt]M Pm 8 Y - M Wndrdn _ x t x - berbAOrrrfMn R 9 -MR—Mk ._ AiCOM % 10) cure,fn!PMhn..eA'P.EtSDM 71 elCaxalk Nspa lbn by AECON _ _ - 1 baple+rras AECOM % - 13) •- - - """' InbnnMipn e�&rnipea eM a sows- aL R lrropeelare Nafna:�'"'r� 9 d9 PmJetl Mery Page 14 of 17 cow _.. aeMx�ate ail. a F: ti e me,m s«v�..} laafea x Page 14 of 17 5b) A By -law to Remove a Holding Provision on lands desc... THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE BY -LAW NO. 2013 -029 A By -law to Remove a Holding Provision on lands described as follows: Part Lots 3 and 4, Concession 4, Oro, Part 15, Plan 51 R- 30671, T/W easement over Parts 3, plan 51 R- 30671, as in LT 522878, Oro - Medonte, Township of Oro - Medonte (Geographic Township of Oro), County of Simcoe, PIN 74055 -0121 (LT), (known as Horseshoe Valley Lands — Ridgewood Court Subdivision), Registered Plan 51M- 1004, Township of Oro - Medonte, County of Simcoe WHEREAS the Council of the Corporation of the Township of Oro - Medonte is empowered to pass By -laws to remove a Holding provision pursuant to Section 36 of the Planning Act, R.S.O. 1990, c.P.13. AND WHEREAS Council deems it appropriate to remove the Holding provision applying to the subject lands; NOW THEREFORE the Council of the Corporation of the Township of Oro - Medonte enacts as follows: Schedule 'At 5', to Zoning By -law No. 97 -95 as amended, is hereby further amended by removing the Holding provision applying to lands known as "Part Lots 3 and 4, Concession 4, Oro, Part 15, Plan 51R-30671, T/W easement over Parts 3, plan 51R- 30671, as in LT 522878, Oro - Medonte, Township of Oro - Medonte (Geographic Township of Oro), County of Simcoe, PIN 74055 -0121 (LT), (known as Horseshoe Valley Lands — Ridgewood Court Subdivision), Registered Plan 51 M -1004, Township of Oro - Medonte, County of Simcoe" as shown on Schedule 'A' attached hereto and forming part of this By -law. 2. This By -law shall come into effect upon the date of passage hereof, subject to the provisions of the Planning Act, as amended. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 20TH DAY OF MARCH, 2013. THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE Mayor, H.S. Hughes Clerk, J. Douglas Irwin Page 15 of 17 5b) A By -law to Remove a Holding Provision on lands desc... Schedule 'A' to By-Law No. 2013 -029 This is Schedule 'A' to By -Law 2013 -029 passed the 20" day of March, 2013. Mayor H.S. Hughes Clerk J. Douglas Irwin HORSESHOE VALLEY ROAD W a a U Z � c Z J 9iy cy�s�c. �rN�.WAY z T ri �RpfC "TRAfL �� ti z J El LANDS SUBJECT REM ALOF HOLDIN PR VISION N RIDGEWOD COURT TOWNSHIP OF ORO- MEDONTE Page 16 of 17 8a) Being a By -Law to Confirm the Proceedings of the Spe... THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE BY -LAW NO. 2013 -027 Being a By -Law to Confirm the Proceedings of the Special Council Meeting held on Wednesday, March 20, 2013 WHEREAS Section 5 of the Municipal Act, 2001, S.O. 2001, C. 25, as amended provides that the powers of the Municipal Council shall be exercised by By -Law, unless the municipality is specifically authorized to do otherwise; AND WHEREAS The Council of The Corporation of the Township of Oro - Medonte deems it expedient that the proceedings at this Special Council Meeting be confirmed and adopted by By -Law; NOW THEREFORE the Council of The Corporation of the Township of Oro - Medonte hereby enacts as follows: 1. That the actions of the Council at its Special Council Meeting held on Wednesday, March 20, 2013, and in respect to each Motion, Resolution and other actions passed and taken by the Council at its said Meeting is, except where prior approval of the Ontario Municipal Board is required, hereby adopted, ratified and confirmed. 2. That the Mayor and the proper Officials of the Township are hereby authorized and directed to do all things necessary to give effect to the said action or to obtain approvals where required and to execute all documents as may be necessary on behalf of the Council of the Corporation of the Township of Oro - Medonte. 3. That the Mayor /Chair and Clerk /Designate are hereby authorized and directed to execute and affix the corporate seal to all necessary documents. 4. And That this by -law shall come into force and take effect on the final passing thereof. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 20TH DAY OF MARCH, 2013. THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE Mayor, H.S. Hughes Clerk, J. Douglas Irwin Page 17 of 17