Loading...
2013-013 Certificate of Maintance (Underground) Heights Stage 2THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE BY -LAW NO. 2013 -013 A By -law to Authorize the Issuance of the Certificate of Maintenance and Final Acceptance (Underground Services) for Heights of Moonstone — Stage 2 (Bachly Investments Inc.), Registered Plan 51 M -679 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered into an addendum to the Subdivision Agreement with Bachly Investments Inc. in August 2009 to construct the second phase of a residential development consisting of an additional thirty seven (37) residential lots on Bachly Avenue, Jennett Drive, Brechin Crescent, and Boyd Crescent. AND WHEREAS the requirements of this Subdivision Agreement with respect to the aboveground services have now been met; NOW THEREFORE the Council of the Corporation of the Township of Oro - Medonte hereby enacts as follows: 1. That the Certificate of Maintenance and Final Acceptance (Underground Services) for Bachly Investments Inc., Registered Plan M -679, Stage 2, may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and Bachly Investments Inc. 2. That the attached Schedule "A ", Certificate of Maintenance and Final Acceptance (Underground Services) shall form part of this By -Law. 3. This by -law shall take effect on the final passing thereof. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 6T" DAY OF FEBRUARY, 2013. THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE Schedule "A" to By -law No. 2013 -013 for The Corporation of the Township of Oro - Medonte ACOM AECOM 55 Cedar Pointe Drive, suite 020 705 721 0222 M Barrie, ON, Canada L4N 5117 705 734.0704 fax - mrn.aecdm.com TOWNSHIP ENGINEERS CERTIFICATE OF MAINTENANCE AND FINAL ACCEPTANCE IUNDERGROUND SERVICE) MUNICIPALITY Townshiu of Oro- Medonte PROJECT Heights of Moonstone - Stage 2 Plan 51R -36876 (Part of Plan 61 M — 6791 DEVELOPER Bachly Investments Inc. FILE NO. 60118212 (12- 01066- 52)_r43T- 890299 Description of the Works: • Watermain Works in the Heights of Moonstone - Stage 2 Subdivision on Brechin Crescent from Jennett Drive west then south to Sta. 0 +340, Jennett Drive from County Road 19 south to Sta. 0 +215 and Bachly Avenue Sta. 0 +650 north to cul -de -sac; • SWM Facility in Block 56 including Drainage Ditches in the Heights of Moonstone - Stage 2 Subdivision; We, AECOM, notify the Municipality that the above mentioned works were inspected on October 29, 2012, and to the best of our knowledge and judgement are complete in accordance with the Subdivision Agreement, except for the deficiencies below: • NIL We, AECOM, notify the Municipality that to the best of our knowledge and judgment: 1. The Developer named herein has completed the required maintenance work, has rectified known deficiencies and has fulfilled the other terms of the Subdivision Agreement, 2. The period of maintenance of this Subdivision Agreeme t n the issuance this Certificate. Date; "\..1GY" Signature: Q7° eederpmm'd M & F. A. aMnpe Schedule 'A' to By-Law 2013-013 Township of Oro-Medonte . . ...... Instruction Status Report . . ............. . .... . .... . .... . . zn Heights of -"stone - —Stage 2 (6011821 ­ 2) ............ . owl tied ed port art Fate —CMpleted and Comments . . ............ ..... ..... . .... .. ........ . . ......... . ................. . ... . tefer to Inspection Report #6 dated April 23, 2009. . .................. . gee letter dated May 20, 2009 _iee_letter dated May 20, 2009. .. ea letter dated, May 20, 2009, . . .............. . ............. ...... ..... . . ... ....... . .. . .......... . . . ....... . ........ .. . ... . . .. . ........ . .......... lew culvert on Jennatt Drive Sta. 0+230 not installed. (ComI*eled2A _p ... ...... . �fInspectors Na me: I Project Manager. Schedule 'A' to By -Law 2013 -013 Schedule 'A' to By -Law 2013 -013 '"00M Township of Oro- Medonte — __ .. ......._. .. —.. Construction Status Report Co* .... Subdivision Heights of Mognstone Stage Z � � Engineer' W R Hodgson & Associates (905) 841 0052 Dafe. danua 25 2013 � File Number 12 01066 52 (60118212) Contractor -" - — - - - - Re istered Plan 51R -36876 Part of Plan 51M -679) START OF ---- .............. . .— ....._ ABOVEGROUND WORKS _ Yes No I Date Com feted and Comments .. 1 Road Works Isub gra de " roofroIIed by AECOM - — _— -- ✓ __ " ............. . .... 2 sub grade elevations confirmed by Engineer ✓ 3) - sub•dramsustaffed sub - grade,_ _under curb ✓ ✓ __._.. . ._..... _— ...._—. - -- - - -- -- - - - --- 4 �), 6 7 ditch ranular tested by Soils consultant .. granular 8 compaction reports toAECOM ___ ranular A" compaabon �epotts toAECOM - h dro grossln�s it stalled - .._ _.__ - ................. _ ✓ - - -- -- ___ .. ................. .__...__.. _ 8) 9) concre {e curbs completed (curbs In ectsd prior to fop lift asphalt X X Refer to Inspection Report #8 dated April 28, 2009. - 10 concrete tested b Soils Consu {tart —_ _. _ ✓ 11 12 base as haft placed s{gnage street identification ✓ —_... - 13 14) __IL road not assumed _ _ no exit dead end barricades an_d s_ignage dnvewayapranspaved _; sidewalks —y ✓ - -- ' - -- —` -- - _ —'_'° _ " — " _.._ ....... .......... ..._._ . sr ............_ . _..... X6 sidewalks mcompcleteted b_ AE COM_ 17) 18) boulevard topsoil and sodded /seeded base asphalt inspected by AECOM X Refer to Inspogtion Raport #8 dated April 23, 2009. X - -` 19) Itop Ziff asphalt.completed _ . - I Miscellanies Works 1 walkways completed — ............ ? � " 2) 3) park works completed fencing completed boundary c — — . r" —. _ walkwa s Park. 4 'Bounde Marker Post ..... __._ ....... — -- - -- r --_..._..._ ................. __...................._......__ Gertificate Aboveground X PERIOD FOR ABOVEGROUND WORKS END OF MAINTENANCE Gsneral qr s tree Ai n boulevard -11 pond landscaping inspection by AECOM Yes No IDate Completed and Comments 1) 2) I X X -- — AL fencing mspeotion by AECOM - 4) 5 OLS certification for monuments curb box inspection by AECOM X X 6 X _ -._. _.. _.........__ ................. - Straetli ht at east corner of Boyd Crescent and Bactily Avenueto be levelled. 7 Ivalve 8 &hydrant inspection byAECQM final Inspection - light standards _..__. - transformers X X x X 9) - utility boxes top lift asphalt inspection by. AECOM curb ins ection b AECOM X 10 X 11j 12) stdewalk ins pection,byAECOM boulevards inspection by AECOM X __ _______.._._._. _ _. ......... 131. as-constructed information submitted and X approved b AECOM i of M. & F. A. Aboveground Issued I Certificate X � i Inspectors Name:Y 3 ProjecIManager, ✓