Loading...
2013-012 Certificate of Maintenance (Aboveground) Bachly Inv. Inc.THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE BY -LAW NO. 2013 -012 A By -law to Authorize the Issuance of the Certificate of Maintenance and Final Acceptance (Aboveground Services) for Heights of Moonstone — Stage 1 (Bachly Investments Inc.), Registered Plan 51 M -679 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered into a Subdivision Agreement with Bachly Investments Inc. in June 2000 to construct the first phase of a residential development consisting of fifty nine (59) residential lots on Bachly Avenue, Jennett Drive, Brechin Crescent, and Boyd Crescent. AND WHEREAS the requirements of this Subdivision Agreement with respect to the aboveground services have now been met; NOW THEREFORE the Council of the Corporation of the Township of Oro - Medonte hereby enacts as follows: That the Certificate of Maintenance and Final Acceptance (Aboveground Services) for Bachly Investments Inc., Registered Plan M -679, Stage 1, may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro - Medonte and Bachly Investments Inc. 2. That the attached Schedule "A ", Certificate of Maintenance and Final Acceptance (Aboveground Services) shall form part of this By -Law. 3. This by -law shall take effect on the final passing thereof. BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 6T" DAY OF FEBRUARY, 2013. iWNSHIP OF ORO- MEDONTE Schedule "A" to By -law No. 2013 -012 for The Corporation of the Township of Oro - Medonte A;-. irOM AECOM 55 Cedar Pointe Drive, Suite 620 705 7210222 tel Barrie, ON, Canada 1_414 5R7 705734 0764 fax WV aecom.com TOWNSHIP ENGINEERS CERTIFICATE OF MAINTENANCE AND FINAL ACCEPTANCE (ABOVEGROUND SERVICES) MUNICIPALITY Township of Oro- Medonte PROJECT Heights of Moonstone - Stage 1 Plan 51 M — 679 DEVELOPER Bachly Investments Inc. FILE NO. 60118211 (12- 01066 -50) 1437 - 89029 Description of the Works; Roadways in the Heights of Moonstone Stage 1 Subdivision consisting of: • Bachly Avenue from Line 7 North to Boyd Crescent; a distance of 650 metres (2,132 feet); • Jennett Drive from Bachly Avenue westerly; a distance of 72 metres (236 feet); • Brechin Crescent from Bachly Avenue westerly; a distance of 128 metres (420 feet); • Boyd Crescent from Bachly Avenue west to Bachly Avenue east; a distance of 838 metres (2,749 feet); We, AECOM, notify the Municipality that the above mentioned works were inspected on October 29, 2012, and to the best of our knowledge and judgement are complete in accordance with the Subdivision Agreement, except for the deficiencies below: • NIL We, AECOM, notify the Municipality that to the best of our knowledge and judgment: 1. The Developer named herein has completed the required maintenance work, has rectified known deficiencies and has fulfilled the other terms of the Subdivision Agreement. 2. The 'period of maintenance of this Subdivision Agre ent xpires o e issuance of this Certificate. Date: +J6r�, . 7— _it Z 0/ 3 Signature: -��3a Agay"man0 Mt. F. A. Stage Schedule "A" to By -law No. 2013 -012 M Townshap at Ota- Medante Construction Status Report _ .. v I -_.. _ .. .......... _.._.. __ .. _.... Fito Number 12 01066 50 (60118211)... _ _ _ Subdivision: Heights of Moonstone Stage 1 ! W.R. F!Odgson &Associates 905 8410052 DateneJa 2G13 Roonlraetor. _ _ _, , _. gistered Plan: 61M-679 _ _ .. . .........._._— _ START OF UNDERGROUND WORKS __ Sfitattan Cqn rots - Yes No Date Completed and comments �"� -- __ -� 1 ailtfencemstalledand maintained ✓ "_ 2L_Yrock check dams installed and mainted ain ✓ - -.'- __ . ' SWM Pond 1)_ ondearth workscom letod ?)_ storm outfail works completetl _ 3 - } access mad constructed - - -- 4 and fencUtf completed with gate, 5) _ 8 seed pond topsoil !ing,_.__ landsca m com let6d p _._ F ; ' '~ -" "" r •t•. .. 8 and survey submitted . 0) .., 7U)- pond volume calculabons submitted pond certification by Engineer .......... sanitarvSewer 1i._. ipe installed 2 f Pipe bedding summarv>acceptance re ort 3) backtiIIAi s{ summarylaccepiance report .:maintenance Boles inspected /approved - ......_. -- .._..... '- - - - --- -- ---- --- d .._. ......._ _... _ ............ -- "'- . -- - _-........ -_..... _ _....- ^- '• - - � - : •- _ _ '' —" —' ✓ .._._............ _....__..,_._......--- ._.... —_ .......... .. ................ ... _.. ......... -- ✓ " ✓ ✓ ✓ _ _....... .... _....... ..... _... _... .._ _ ✓ - - -- ✓ ✓ _.�..... _ ; n .... _._ .... ....... _ . _....__ , _.____ .. _......._. -- -._...__.... .--- .............-- 5 ;benching inspected 6) itop of prec R!. Urn below fresh grade _ ?gdeo inspection submitted forreylew - -- - -s 8� 9 video jnspechon revtewedlapproved 1lushmg of sewer for final acceptance 1•Q) service recprrJ- sheets _,1)..Pipemstaileii 2 Storm Sewer pipe beddin summa /acceptance report 3 backfill test summary /acceptance re o t 4) . jmantenance 5) lbenchmg 6� itopofprecast03m. ?L._ 8) holes inspected /approval -__ inspected � below finish grade -- _ -,, ,video ms ecbon submitted for review _ p........ video inspection reviewsdlapproyed of sewer for flnai acceptance 9 .,flushing 10 Iservtce record sheets { YOatermain ipe Installed - 1) 2p 31 4 pipe bedding ace�Ptance report . backiiiitesbng.ecceptancereporf ._ by-pass installed and inspected -- pressure testing confirmed AECOM 5).._, 6 system chlorinated � 7) _potable water sample &received by AECOM 8) , 9) _tracer by pass removed wire - aUached to hydrant flange 10) hydrant - water flow charts submitted end caps painted,,., 11) - barrels painted to Twp spec - markers Installed sample stations iitspectipn completed 12) 14 Engineer's curb box ins action certification Engineer's valve &hydrantinspectionce --... .-_ 11 _ service record sheets Inspectors Name; Project Manager. Schedule "A" to By -law No. 2013 -012 Tpyy_q"ip off Oro- Medonte_.__.. _... -- - -- -- ......... C...... ctiorr S #atus Report -- ____ _....._._ _ Subdivision: Heights of Moonstcne- _Stage.1, Engineer: W.R. Hog son & Associates (905} 64# 0052 JFII'0 umber 1201066 -50 {60118211} 1 Contractor."- - -- " - Registered Pian BIM -679 Date Janus 22 2013 ._�'__ __.._ START OF UNDERGROUNb WORKS g Yes No Date Completed and Comments j Water Pilm house _ _�. 2 Certificate of Approval Per'm'it to take water......_ _ ✓ ....... . —.. _..._ --- ....... _ " -- - - -- --- - - -- -- ` ` — - -" ._ ................ _.. ................ - _. ___.__._ ....._— ✓ 3 Well - Records and H�drogeologic Report ✓ ✓ _ aleanin /dismfecfien _ ...._9. video inspec_.. .cti_._. on ... _._....._. ._.__ ✓ 4 Well line - pressure test confirmed by AECOM .._.— ✓ - disjnfeotton - tracer wire c:ontnurt test ✓ _ ...._....__- ....._....__._,_... _. -- -.— _— :._. '" ._.._...... ✓ ✓ ✓ 5) iyardPipe- pressure test conFtlnedbyAECpM, _ - dtsinfectlon tracer wire continuity test As- Constructed Information submitted 6 7),._ 8 Scads /Programmms _.... ........... _ .,_._._ _.. 0 eratin and Maintenance Manuals - Electrical ✓ -- -" -- __ --' -- "' 9 pperating and Maintenance Manuals - Mechanical ✓ Utilities hydro crassrns completed " "- bell works cam feted _..... __._ hydro works completed 1) . 2 3 ✓ ✓ ✓ — --- - -` .................. _ -- _ - - - .............. "..- 4 3} ,.,....__ .......... streetlights energized - - ---- __.. _...... _ _ _ ....... ............. _... -- . — ✓ -- 6 icertification from electrical consultant �, _gas works completed ✓ SL_ as- constructed infor anon ti electrical consultant .�AS- Constructed Under round Works_ 1} iasconstructed mforma(iori submitted and -4 ✓ ;approved by AECOM Certificate of S. C. & A Under round Issued ✓ _ 9 — _ END OF MAINTENANCE. - __. Submitted on October 3, 2009. - - -- nber Awe' -- - -" PERIOD FOR UNDERGROUND WORKS SWM Pond clean out prior to end of maintenance Yes No IDate : Com letedand Comments - _— ..._._._ ...._ - _ - . 3anita Sewer fiushinq of sewer video Inspection submitted for review _ video Inspection reviewed /approved, -- - ._ . ..... ._. ....._-- ._._... _.._ -- -- 2 3} -- Storm - ewer flushing of sewer video ing ecgori submitted for review -_. _.._.... 1) _ 2) 3 video ins ecllon revlewedlapproved curb stopJns ection b AECOM .— _ �Y , _ valve &hydrant inspection by AECOM — _.._ . ......... ... ..... W._._ .... - - 1 2) of M. & F. A (Index round lssood ✓ .._. a _.— ......__i _..__....__ December 7, 2409 Certtftcate Inspectors Name: / , . -�-�.. 2 Project Manager. Schedule "A" to By -law No. 2013 -012 Township of Oro- Medonte Construction Status Resort Subdivision Heights of Mcanatone - Stage 1 t�]Fll. Number 12--01_066,50 (60118211) Er�ineer: W R Hodgson &Associates. {9051841 0052 Cod - - date: January 22, 2013 Pn: Registerela 59M -679 — t _.. ___ - .....__........ ......... ._... ABOVEUROUNO WORKS _...:_._. ._. __...- ........... _.. ...................... START OF L- - Date Completed and Comments 1 Road Works subgrade proof rolledbyAECDM - ✓ -- _._..._.__. 3}. subgrade elevations confirmed b+LC- ngineer sub drams installed sub- grade. I -under curb i. ditch igranulartestedSoils Consuilant . - granular El compaction reports to AECOM t ranular A' compactwn_ reports to AECOM crossings installed ✓ --- -- - -- —._ __ - -"' - - - -- 4 6) ✓ - .. ... .... - - _ ._ -_ - ✓ 7) .hydro ✓ ' - - - ..._...... . —. -- -- - .._.._... .. 8) .(,concrete curbs completed _ curb s inspected pnoc(o top lift as hat( ' concrete tested by Soils Consultant ✓ 9) 10 ✓ - ---- __ _ - - 11) 12) base as halt laced — signa�e- streetldentiflcafton ✓ ✓ - road not assumed -- _ _._ - no exit dead -end bardcades and signage tlrivewa _a raps aved sidewalks comp feted __ _ sidewalksinspectedbyAECOM ,r ✓ Stop signs to be adjusted to correct herghf by Developer. - _..__.. _... —.- _...._.._ -- ..... 13 11 15 _._.. ..._. 16 ✓ - -- -- Not completed on vacant lots. 17) 78dnchessha 19 boulevard topsoil and sodded /seeded pe...tl ... . to P soil any d sodded /seeded base as halt Inspected- ns ected bAECOM ✓ ✓ __ _ - -- — .......... '- ._ ...... ... ..... ........ Completed May i1, 2010. 20)_, 'top - lift asphalt completed _,_,,,. ____., ✓ Miscellanies Works I ... -"""- .... -- - -- _ -- 1) _ walkways com leted -�_ 3 ,park works completed fenom compietetl boundary - ,.g x �) - — waikways T.: - --.. 4i Boundary Marker Post ___.... _ _.._..�...�._...^_ ✓- - _ -' June 7, 2010 ._... ... . Certificate of S. C. &A. nd r Above ?ou Issued — _...._ _ - PERIOD FOR A80{/EGROUMD WORKS END OF MAINTENANCE Yes' NoDate Completed and Comments 1) 2) 3 4) 5 General Works treelanbngtn_ boulevard pond landscaping inspection by AECOM iencin In adion by A[CDM final lot ra_- didgcertification ��o _._ OLS certification for monuments ✓ ' _i -'" ✓ ✓ ' r As of October 29 2012 72 /o of lots have recewed Finat Lot Grading Certifcation Received on January 21 2013. _ 6) 7)_ _:_: _ curb box inspection by AECOM - ✓ Complete as per Township email dated October 30, 2012. valve & hydrant inspection�AECOrvt J Compiefe es per Township email dated October 30, 2012, Anal ins ection -11ght standards ✓ - -transformers 41�1.nqjt Utility boxes top lift as halt ins ection b AECOM .................11 sidewalk ins ectlonk;AECOM ...... boulevards inspection by.AECOM e ownshi s email dated October 1? 201213) - Constructed information submitted and drSwings approved_by AECOM.January 28 ,2031. rravedbyAECOM of M. & F. A. Aboveground issued ✓ Janus 24, 2013 8) J._ 12) f Jas _Ia Certificate Inspectors Name:_eX �� 3 Project Manager; t'1,- a