2013-012 Certificate of Maintenance (Aboveground) Bachly Inv. Inc.THE CORPORATION OF THE TOWNSHIP OF ORO- MEDONTE
BY -LAW NO. 2013 -012
A By -law to Authorize the Issuance of the Certificate of
Maintenance and Final Acceptance (Aboveground Services)
for Heights of Moonstone — Stage 1 (Bachly Investments Inc.), Registered Plan
51 M -679
WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter
P. 13, as amended, provides that municipalities may enter into agreements imposed as
a condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
AND WHEREAS Council for the Corporation of the Township of Oro - Medonte entered into a
Subdivision Agreement with Bachly Investments Inc. in June 2000 to construct the first phase of
a residential development consisting of fifty nine (59) residential lots on Bachly Avenue, Jennett
Drive, Brechin Crescent, and Boyd Crescent.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
aboveground services have now been met;
NOW THEREFORE the Council of the Corporation of the Township of Oro - Medonte hereby
enacts as follows:
That the Certificate of Maintenance and Final Acceptance (Aboveground Services) for
Bachly Investments Inc., Registered Plan M -679, Stage 1, may now be issued by the
Township Engineers (AECOM) in compliance with the Subdivision Agreement between
the Corporation of the Township of Oro - Medonte and Bachly Investments Inc.
2. That the attached Schedule "A ", Certificate of Maintenance and Final Acceptance
(Aboveground Services) shall form part of this By -Law.
3. This by -law shall take effect on the final passing thereof.
BY -LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 6T" DAY
OF FEBRUARY, 2013.
iWNSHIP OF ORO- MEDONTE
Schedule "A"
to By -law No. 2013 -012 for
The Corporation of the Township of Oro - Medonte
A;-. irOM AECOM
55 Cedar Pointe Drive, Suite 620 705 7210222 tel
Barrie, ON, Canada 1_414 5R7 705734 0764 fax
WV aecom.com
TOWNSHIP ENGINEERS
CERTIFICATE OF
MAINTENANCE AND FINAL ACCEPTANCE
(ABOVEGROUND SERVICES)
MUNICIPALITY
Township of Oro- Medonte
PROJECT
Heights of Moonstone - Stage 1
Plan 51 M — 679
DEVELOPER
Bachly Investments Inc.
FILE NO.
60118211 (12- 01066 -50) 1437 - 89029
Description of the Works;
Roadways in the Heights of Moonstone Stage 1 Subdivision consisting of:
•
Bachly Avenue from Line 7 North to Boyd Crescent; a distance of 650 metres (2,132 feet);
• Jennett Drive from Bachly Avenue westerly; a distance of 72 metres (236 feet);
• Brechin Crescent from Bachly Avenue westerly; a distance of 128 metres (420 feet);
• Boyd Crescent from Bachly Avenue west to Bachly Avenue east; a distance of 838 metres (2,749
feet);
We, AECOM, notify the Municipality that the above mentioned works were inspected on October 29, 2012,
and to the best of our knowledge and judgement are complete in accordance with the Subdivision
Agreement, except for the deficiencies below:
• NIL
We, AECOM, notify the Municipality that to the best of our knowledge and judgment:
1. The Developer named herein has completed the required maintenance work, has rectified known
deficiencies and has fulfilled the other terms of the Subdivision Agreement.
2. The 'period of maintenance of this Subdivision Agre ent xpires o e issuance of this Certificate.
Date: +J6r�, . 7— _it Z 0/ 3 Signature: -��3a
Agay"man0 Mt. F. A. Stage
Schedule "A" to By -law No. 2013 -012
M Townshap at Ota- Medante
Construction Status Report
_ .. v I
-_.. _ .. .......... _.._.. __ .. _....
Fito Number 12 01066 50 (60118211)... _
_ _
Subdivision: Heights of Moonstone Stage 1 !
W.R. F!Odgson &Associates 905 8410052
DateneJa 2G13 Roonlraetor.
_ _ _, , _. gistered Plan: 61M-679 _
_ .. . .........._._—
_ START OF UNDERGROUND WORKS
__
Sfitattan Cqn rots -
Yes No
Date Completed and comments
�"� -- __ -�
1
ailtfencemstalledand maintained
✓
"_
2L_Yrock
check dams installed and mainted
ain
✓ - -.'- __ .
'
SWM Pond
1)_
ondearth workscom letod
?)_
storm outfail works completetl
_ 3
- }
access mad constructed
-
- --
4
and fencUtf completed with gate,
5)
_ 8
seed
pond topsoil !ing,_.__
landsca m com let6d
p
_._
F ; '
'~ -" ""
r •t•.
..
8
and survey submitted
. 0) ..,
7U)-
pond volume calculabons submitted
pond certification by Engineer
..........
sanitarvSewer
1i._.
ipe installed
2
f Pipe bedding summarv>acceptance re ort
3)
backtiIIAi s{ summarylaccepiance report
.:maintenance
Boles inspected /approved
-
......_.
--
.._.....
'- - - - ---
-- ----
---
d .._. ......._ _... _
............ -- "'-
. -- - _-........ -_..... _ _....-
^-
'• - -
� - : •- _ _
'' —" —'
✓ .._._............ _....__..,_._......--- ._.... —_
.......... .. ................ ... _.. ......... --
✓ "
✓
✓
✓ _ _....... .... _....... ..... _...
_... .._ _
✓ - - --
✓
✓
_.�..... _
;
n .... _._ .... ....... _ . _....__
,
_.____ .. _......._. -- -._...__.... .--- .............--
5
;benching inspected
6)
itop of prec R!. Urn below fresh grade
_
?gdeo inspection submitted forreylew - -- - -s
8�
9
video jnspechon revtewedlapproved
1lushmg of sewer for final acceptance
1•Q)
service recprrJ- sheets
_,1)..Pipemstaileii
2
Storm Sewer
pipe beddin summa /acceptance report
3
backfill test summary /acceptance re o t
4) . jmantenance
5) lbenchmg
6� itopofprecast03m.
?L._
8)
holes inspected /approval
-__
inspected �
below finish grade -- _ -,,
,video ms ecbon submitted for review
_ p........
video inspection reviewsdlapproyed
of sewer for flnai acceptance
9
.,flushing
10 Iservtce
record sheets
{
YOatermain
ipe Installed
-
1)
2p
31
4
pipe bedding ace�Ptance report .
backiiiitesbng.ecceptancereporf ._
by-pass installed and inspected --
pressure testing confirmed AECOM
5).._,
6
system chlorinated �
7) _potable
water sample &received by AECOM
8) ,
9) _tracer
by pass removed
wire - aUached to hydrant flange
10)
hydrant - water flow charts submitted
end caps painted,,.,
11)
- barrels painted to Twp spec
- markers Installed
sample stations iitspectipn completed
12)
14
Engineer's curb box ins action certification
Engineer's valve &hydrantinspectionce --... .-_ 11 _
service record sheets
Inspectors Name; Project Manager.
Schedule "A" to By -law No. 2013 -012
Tpyy_q"ip off Oro- Medonte_.__..
_... -- - -- -- .........
C......
ctiorr S #atus Report --
____ _....._._ _
Subdivision: Heights of Moonstcne- _Stage.1,
Engineer: W.R. Hog son & Associates (905} 64# 0052
JFII'0 umber 1201066 -50 {60118211}
1 Contractor."- - -- " -
Registered Pian BIM -679
Date Janus 22 2013
._�'__
__.._
START
OF UNDERGROUNb WORKS
g
Yes No
Date Completed and Comments
j Water Pilm house _
_�.
2
Certificate of Approval
Per'm'it to take water......_ _
✓
....... . —.. _..._ --- .......
_ " -- - - -- --- - - -- --
` ` — - -" ._ ................ _..
................
- _. ___.__._ ....._—
✓
3
Well - Records and H�drogeologic Report
✓
✓
_
aleanin /dismfecfien
_ ...._9.
video inspec_..
.cti_._. on ... _._....._. ._.__
✓
4
Well line - pressure test confirmed by AECOM
.._.—
✓
- disjnfeotton
- tracer wire c:ontnurt test
✓
_ ...._....__- ....._....__._,_... _.
-- -.— _— :._.
'" ._.._......
✓
✓
✓
5)
iyardPipe- pressure test conFtlnedbyAECpM,
_
- dtsinfectlon
tracer wire continuity test
As- Constructed Information submitted
6
7),._
8
Scads /Programmms _.... ........... _ .,_._._ _..
0 eratin and Maintenance Manuals - Electrical
✓
-- -" -- __ --'
-- "'
9
pperating and Maintenance Manuals - Mechanical
✓
Utilities
hydro crassrns completed " "-
bell works cam feted _..... __._
hydro works completed
1) .
2
3
✓
✓
✓
— --- - -`
.................. _ -- _
- - - .............. "..-
4
3}
,.,....__ ..........
streetlights energized
- - ----
__.. _...... _
_ _ .......
............. _...
-- . —
✓
--
6 icertification from electrical consultant
�, _gas works completed ✓
SL_ as- constructed infor anon ti electrical consultant
.�AS- Constructed Under round Works_
1} iasconstructed mforma(iori submitted and -4 ✓
;approved by AECOM
Certificate of S. C. & A Under round Issued ✓
_ 9
— _ END OF MAINTENANCE.
-
__.
Submitted on October 3, 2009. - -
--
nber
Awe' -- - -"
PERIOD FOR UNDERGROUND WORKS
SWM Pond
clean out prior to end of maintenance
Yes No IDate
: Com letedand Comments
- _— ..._._._
...._ - _
- .
3anita Sewer
fiushinq of sewer
video Inspection submitted for review _
video Inspection reviewed /approved,
-- - ._ . ..... ._. ....._-- ._._... _.._
-- --
2
3}
--
Storm - ewer
flushing of sewer
video ing ecgori submitted for review -_.
_.._....
1) _
2)
3
video ins ecllon revlewedlapproved
curb stopJns ection b AECOM
.— _ �Y , _
valve &hydrant inspection by AECOM
— _.._ . ......... ... ..... W._._
.... - -
1
2)
of M. & F. A (Index round lssood ✓
.._. a _.— ......__i
_..__....__ December 7, 2409
Certtftcate
Inspectors Name: / , . -�-�.. 2 Project Manager.
Schedule "A" to By -law No. 2013 -012
Township of Oro- Medonte
Construction Status Resort
Subdivision Heights of Mcanatone - Stage 1 t�]Fll. Number 12--01_066,50 (60118211)
Er�ineer: W R Hodgson &Associates. {9051841 0052 Cod - -
date:
January 22, 2013
Pn:
Registerela 59M -679 —
t
_.. ___ - .....__........ ......... ._...
ABOVEUROUNO WORKS
_...:_._. ._. __...- ........... _..
......................
START OF
L- -
Date Completed and Comments
1
Road Works
subgrade proof rolledbyAECDM -
✓
-- _._..._.__.
3}.
subgrade elevations confirmed b+LC- ngineer
sub drams installed sub- grade.
I -under curb
i. ditch
igranulartestedSoils Consuilant . -
granular El compaction reports to AECOM
t ranular A' compactwn_ reports to AECOM
crossings installed
✓
--- --
- -- —._ __ -
-"' - - - --
4
6)
✓
- .. ... .... - - _ ._ -_
-
✓
7) .hydro
✓ '
- -
- ..._...... .
—. -- -- - .._.._... ..
8) .(,concrete
curbs completed _
curb s inspected pnoc(o top lift as hat( '
concrete tested by Soils Consultant
✓
9)
10
✓
- ----
__
_ - -
11)
12)
base as halt laced —
signa�e- streetldentiflcafton
✓
✓
- road not assumed --
_ _._
- no exit
dead -end bardcades and signage
tlrivewa _a raps aved
sidewalks comp feted __ _
sidewalksinspectedbyAECOM
,r
✓
Stop signs to be adjusted to correct herghf by Developer.
- _..__.. _...
—.- _...._.._
--
.....
13
11
15
_._.. ..._.
16
✓
- -- --
Not completed on vacant lots.
17)
78dnchessha
19
boulevard topsoil and sodded /seeded
pe...tl ... . to P soil any d sodded /seeded
base as halt Inspected-
ns ected bAECOM
✓ ✓
__ _ - -- — .......... '-
._ ...... ... ..... ........
Completed May i1, 2010.
20)_, 'top
-
lift asphalt completed _,_,,,. ____.,
✓
Miscellanies Works
I ... -"""-
.... -- - -- _
--
1)
_
walkways com leted
-�_
3
,park works completed
fenom compietetl boundary -
,.g x �) -
—
waikways
T.: - --..
4i
Boundary Marker Post
___.... _ _.._..�...�._...^_
✓- - _ -'
June 7, 2010
._... ... .
Certificate of S. C. &A. nd r
Above ?ou Issued
— _...._ _ -
PERIOD FOR A80{/EGROUMD WORKS
END OF MAINTENANCE
Yes'
NoDate Completed and Comments
1)
2)
3
4)
5
General Works
treelanbngtn_ boulevard
pond landscaping inspection by AECOM
iencin In adion by A[CDM
final lot ra_- didgcertification
��o _._
OLS certification for monuments
✓
' _i
-'"
✓
✓ '
r
As of October 29 2012 72 /o of lots have recewed Finat Lot Grading Certifcation
Received on January 21 2013. _
6)
7)_
_:_: _
curb box inspection by AECOM - ✓ Complete as per Township email dated October 30, 2012.
valve & hydrant inspection�AECOrvt J Compiefe es per Township email dated October 30, 2012,
Anal ins ection -11ght standards ✓ -
-transformers 41�1.nqjt Utility boxes
top lift as halt ins ection b AECOM .................11 sidewalk ins ectlonk;AECOM ......
boulevards inspection by.AECOM e ownshi s email dated October 1? 201213)
- Constructed information submitted and drSwings approved_by AECOM.January 28 ,2031.
rravedbyAECOM
of M. & F. A. Aboveground issued ✓ Janus 24, 2013
8)
J._
12) f
Jas
_Ia
Certificate
Inspectors Name:_eX �� 3 Project Manager; t'1,- a