04 13 2011 2011-OPA-01 2011-ZBA-01 (Napoleon/Wolf Steel)}
AA
rounuh{p of
Proud Heritgge, Expiring F01ere
NOTICE OF PUBLIC MEETING
FOR PROPOSED AMENDMENTS
TO THE OFFICIAL PLAN AND ZONING BY -LAW
OF THE TOWNSHIP OF ORO- MEDONTE
2011- OPA -01
2011- ZBA -01
(Napoleon/Wolf Steel)
TAKE NOTICE that the Council of the Corporation of the Township of Oro - Medonte will hold a Public
Meeting on Wednesday, April 13, 2011 at 7:00 p.m. in the Municipal Council Chambers. The purpose of
the public meeting is to obtain public comments on proposed amendments to the Official Plan and Zoning
By -law, under Section 17 and 34 of the Planning Act, R.S.O. 1990 c. P. 13.
THE PURPOSE of the proposed Official Plan and Zoning By -law Amendments is to redesignate and
rezone the lands described as Concession 1, North Part Lot 10 (formerly Oro Township) municipally
known as 2621 Gore Road. The lands are proposed to be redesignated from Agricultural to Industrial and
Environmental Protection One and rezoned from Agricultural/Rural (A/RU) and Environmental
Protection (EP) Zones to Economic Development (ED) Zone and Environmental Protection (EP) Zone, in
order to facilitate the development of a warehouse facility to store and distribute products manufactured
by Napoleon/Wolf Steel
A KEY MAP illustrating the location of the subject lands is provided below
ANY PERSON may attend the public meeting and/or make written or verbal representation either in support
of or in opposition to the proposed Amendments. If a person or public body that files an appeal of a decision
of the Township of Oro - Medonte in respect of the proposed Amendments does not make oral submission at
the public meeting or make written submissions to the Township before the proposed Amendment is
adopted, the Ontario Municipal Board may dismiss all or part of the appeal.
If you wish to be notified of the decision of the Township of Oro - Medonte in respect to the proposed Official
Plan and Zoning By -law Amendments, you must make a written request to the address below.
WRITTEN SUBMISSIONS should be directed to:
Township of Oro - Medonte
148 Line 7 South
P.O. Box 100, Oro, Ontario LOL 2X0
Attn: J. Douglas Irwin, Clerk
ADDITIONAL INFORMATION relating to the proposed Zoning By -law and Official Plan Amendment is
available for inspection between 8:30 a.m. and 4:30 p.m. at the Township of Oro - Medonte Administration
Building. For further information, contact the Planning Department at 705- 487 -2171.
DATED at the Township of Oro - Medonte this 24th day of March 2011.
Andria Leigh, MC1P, RPPO
Director of Development Services
2011-OPA-01
2011-ZBA-01
(Napoleon/Wolf Steel)
Subject Lands to be redesignated and rezoned
GHWAY-1
TOWNSHIP OF SPRINGWATER
-NAPOLEON
QUALITY FIREPLACES
Wolf Steel /Napoleon
Warehouse Expansion
Public Meeting
OPA and ZBA
April 13th, 2010
Presentation Outline
• History and corporate profile of Wolf Steel / Napoleon
• Review the Wolf Steel Official Plan Amendment
• Review the Wolf Steel Zoning By -law Amendment
• Answer questions regarding the proposed Amendments
1W
Project Team
QUALITY FIREPLACES
C.C. TATHAM & ASSOCIATES LTD.
CONSULTING ENGINEERS
Collingwood Orillia Brac ®bridge Barrio
• Wolfgang Schroeter
and Family
• Richard Motyka
General Manager of
Operations
• Dan Hurley, Jeremy
Ash & Michael Cullip
• Jim B roadfoot
• Nick McDonald
• Jamie Robinson
3
Introduction to Wolf Steel /Napoleon
• 500,000 ft2 of manufacturing space
• Over 400 employees
• Numerous phases of expansion in Oro- Medonte
• Corporate Headquarters in Oro - Medonte
• Global presence
• New warehouse facility to consolidate warehousing
operations and free -up additional manufacturing capacity at
Bayview Drive barbecue facility in Barrie and 24 Napoleon
Road.
• Warehouse expansion must be located adjacent to existing
operations.
• Not a high traffic volume warehouse. 4
Land Ownership
Conceptual Site Plan
Conceptual Land Use Plan
Oro=Medonte Official Plan Policies
• The Official Plan contains strategic directives that include:
a) To foster a competitive and positive business climate in the
Township.
g) To encourage wherever possible though the land use planning
process the retention and expansion of existing businesses in
the Township.
• Lands Designated Agricultural
• Rationale for redesignation from Agricultural to Industrial
— PPS criteria for removal of lands from Prime Agricultural Area
— Expansion of an existing, successful industrial business
— Small separated compartment of lands that are adjacent to
existing industrial lands, Highway interchange 8
Expansion of Existing Business
Proposed Zoning
• Zoning Amendment to zone the lands to permit the
development of a warehouse facility.
• Zoning Amendment to remove the EP zoning from the drainage
course that conveys water from MTO lands.
• Zoning Amendment will increase the amount of lands zoned EP
adjacent to Willow Creek and recognize appropriate
development setbacks from the environmental features on the
southern portion of the lands.
10
Existing Environmental Protection Zoning
Proposed EP Zoning
Conceptual Land Use Plan
13
Provincial Policy Statement
• Growth and Settlement
— New growth is to be focused in settlement areas
• Rural Areas
— In Rural Areas the PPS permits the management and
use of resources, resource -based recreational activities,
limited residential development, and other rural land uses.
— Wolf Steel is an existing industrial land use in the rural
area. Wolf Steel is an other rural land use.
14
Provincial Policy Statement Cont'd
• Removal of Land from Prime Agricultural Areas
• Criteria
1. the land does not comprise a specialty crop area;
2. there is a demonstrated need within the planning
horizon provided for in policy 1.1.2 for additional
land to be designated to accommodate the
proposed use;
3. there are no reasonable alternative locations which
avoid prime agricultural areas; and
4. there are no reasonable alternative locations in
prime agricultural areas with lower priority
agricultural lands."
15
Provincial Policy Statement Cont'd
• Employment Areas
1.3.1 Planning authorities shall promote economic
development and competitiveness by:
(a) providing for an appropriate mix and range of employment
(including industrial, commercial and institutional uses) to
meet long -term needs;
(b) providing opportunities for a diversified economic base,
including maintaining a range and choice of suitable sites for
employment uses which support a wide range of economic
activities and ancillary uses, and take into account the needs
of existing and future businesses;
(c) planning for, protecting and preserving employment areas for
current and future uses;
16
Growth Plan
• The Growth Plan provides direction on where and how growth
should occur in the Greater Golden Horseshoe
• Section 2.2.6 speak so the allocation of employment lands by
municipalities.
• Municipalities will promote economic development and
competitiveness by:
• c) planning for, protecting and preserving employment areas
for current and future uses;
17
Traffic Considerations
• 26 vehicles for the warehouse day shift
• 6 vehicles for afternoon shift
• 10 external truck trips per day
• 12 truck trips between Napoleon Road and Warehouse facilities
• Entrance on County Road 93 would reduce traffic on Highway
ramp /Gore Road interchange
MTO Comments
• MTO is a commenting agency and issues permits for
development within their jurisdictional limits.
• The MTO has expressed preliminary concerns with potential
traffic congestion at Gore Road and the Highway 11 ramp.
• The warehouse is not a high volume traffic warehouse.
• Consumer purchases are seasonal.
• The proposed development will have a limited impact traffic
movements in the area of Gore Road and the Highway 11
Ramp.
• Confident that MTO comments can be addressed though the
site planning and permitting process.
20
NVCA Comments
• NVCA comments generally relate to the preferred location for
development on the site including setbacks for development.
• NVCA generally requires a 30 metre setback from natural
featu res.
• The NVCA has not identified any concerns with the proposed
use of the lands for industrial purposes.
• We are prepared to work with the NVCA to establish appropriate
development setbacks and remedial buffering where
appropriate.
• Site Plan process can be used to implement remedial work
where necessary.
21
Conclusions
The Official Plan and Zoning By -law Applications:
— Are consistent with the PPS by promoting economic
development by protecting and preserving a local
employment areas.
— Conform to the County of Simcoe Official Plan.
— Implement the Township of Oro - Medonte Official Plan
fostering economic development though the expansion of a
successful business.
— Will bring significant economic investment to the
Municipality.
22
Next Steps
• Meridian to work with Planning Staff and commenting agencies
to resolve concerns where possible.
• Planning Staff to review public meeting comments and agency
comments and prepare recommendation to Council
• Zoning By -law Amendment — Township is the approval authority
• Official Plan Amendment — County is the approval authority.
• County Meeting Schedule —June 28, No July Meeting, August
25 (tentative)
• County Staff would require an adopted OPA from the Township
by mid -May in order to include on June Agenda.
23
Questions and Comments
24
PUBLIC MEETING
PROPOSED AMENDMENTS TO
THE TO\AINISHIP'S OFFICIAL PLAN
ANID 7r)NIINIG FY.LA\Ai 97 -9J
OFFICIAL PLAN AMENDMENT APPLICATION
2011- OPA -01
ZONING BY -LAW AMENDMENT APPLICIATION
2011- ZBA -01
North Part of Lot 10, Concession 1,
2621 Gore Road
Township of Oro- Medonte (formerly Township of Oro)
Ol 1 -0 PA -0 l & 201 J -ZBA-0 l
Public Meeting
April 1 37 201 1
o Purpose of Meeting — To obtain public comments on proposed
amendments to the Township's Official Plan and Zoning By -law 97 -95.
a The Proposed Official Plan and Zoning By -law Amendments would
apply to lands described as North Part of Lot 10, Concession 1, Township
of Oro - Medonte (formerly Township of Oro) as shown on the Location
Map (next slide).
tio n
o The property subject to the
amendments has a total lot
area of 20.5 hectares (50.6
acres) however, with the
development constraints,
only 6 hectares of land is
proposed to be re-
designated and rezoned for
the development of the
proposed warehouse
facility.
1 & zo> > zBa -oi
Public Meeting
A 13, 2011
o Official Plan Amendment Application 2011 - OPA -11 proposes to re-
designate a portion of the lands from the Agricultural designation to the
Industrial and Environmental Protection One designations
a Zoning By -law Amendment Application 2011- ZBA -01 proposes to rezone
the same portion of lands from the Agricultural/ Rural (A / RU) and
Environmental Protection (EP) Zones to the Economic Development (ED)
Zone and to rezone a portion of the Agricultural /Rural (A /RU) Zone to
the Environmental Protection (EP)Zone.
a The two applications were submitted in order to consider the proposed
development of a warehousing facility to store and distribute products
manufactured by (Napoleon) Wolf Steel Ltd.
Subject Lands to be redesignated rand rezoned
HIGHWAY -1
TOWNSHIP C F SPfZIN�WATER
._ J.` -�A
T
I
IIIDUSTRIAL EXPAIISION LANDS
OP • Industrial i
ZB - Economic Development
ENVIRONMENTAL, FEATURES
TO BE RECOGNIZED
OP - Environmental Protection
ZB - Environmental Protection
Ai
EXISTING RURAL LANDS
TO BE MAINTAINED
OP - Agricultural
ZB . Agricultural I Rural
EXISTING RURAL LANDS
TO BE MAIIITAIIJED
OP - Agricultural
ZB - Agricultural Rural
fl
2011 -OPA-0 I & 2011 7_BA Ol
Public Meeting
April 13,2011
The applicant has indicated that the proposed development of the warehouse
facility would:
1. Allow Wolf Steel. Ltd. to consolidate warehousing operations into one facility.
2. Free -up space within their existing facilities on Napoleon Drive and in Barrie
for additional manufacturing.
I Allow Wolf Steel Ltd. to continue to operate within the Township of Oro -
Medonte.
The applicant has indicated that at the present time, because the warehousing
operation is not consolidated with their facilities in Oro - Medonte, there are
impacts on cost and the timing of delivery of product to market. The freeing -
up of space at their current facilities in Oro - Medonte for manufacturing will
allow for even more corporate growth and expansion.
2011 OPA Oi & 2011-7-BA-0 l
P,
Public 4eeting
Api , il 1 3 2011
a Issues required to be analyzed by Planning staff in their Report to
Council in the future include:
- potential economic benefits from proposed development to be
weighed against appropriateness of development from planning
policy perspective
- conversion of land from "Agricultural" to "Industrial ",
- environmental issues (floodplain, wetland and erosion hazard
lands),
- transportation and traffic issues,
- archaeological investigations,
- PPS and Places to Grow policies reviewed,
All of the above issues will require staff to respond to the question on
whether "this is the appropriate land use for this site ?"
Nance of a Public Moeling of the 71
Tw3hip of BID-Medonle purauait to
Stxtlan A1151 and Soetion 341121 of the
PItamg act in tespect to a f oMed
MOM Man Amendment 12O11-OPA -011
and 2onmg By-law Amendment 12MI -21
Meeting Date; Wed, Aprd 13, 2011
At 72 pm
Township of Oro-Modonte GaurcO
Admin Building
1AB Una 1 South
Ptonesed Use: induS16A
parson may write or spend to 1
tnt submiseona ka mme infnrmauoo
ut % Tawnshio Plennii
rtmenr a► 487-21 ?t
Public Meeting NTotic
osted March 24, 2011
011 -(S PA-0 I
& 2011 -ZBA-0 I
Public_ Meeting
April 13, 701 1
Location of Proposed Industrial
Building facing East
PT
North -East Corner of Proposed
Industrial Building facing
West
0
I'm A4
I01 I -OPA-0 l & 2011 -ZBA-0 I
Public Meeting
A 13, Z
a Comment letters have been received to date from the
Nottawasaga Valley Conservation Authority and the Ministry
of Transportation. Environmental and Transportation/ traffic
concerns have been raised which the applicant will be required
to address for consideration. by Planning staff in their future
Report to Council.
a Questions or comments from Members of Council or the Public.
Ministry of
Transportation
Corridor Management Section
Central Region
7 "' Floor, Bldg. D
1201 Wilson Avenue
Downsview, ON M3M 1J8
Tel (416) 235 - 3991
Fax (416) 235 4267
STEVEN FARiQUHARSON
Intermediate Planner
Township of Oro - Medonte
148 Line 7 South, Box 100
Ontario, LOL 2X0
Ministere des
Transports
Section de is gestion des couloirs'routiers
Region du Centre
7e etage, edifice D
1241 avenue Wilson
Downsview ON M3M1J8
T61: 416 235- 3991
Teiec: 416 235 - 4267
April 07, 2011
RE: WOLF STEEL OFFICIAL PLAN AMENDMENT and ZONING BY-LAW AMENDMENT
2011- OPA•01 and 2011- ZBA -01
Con 1, Lot 10
Township of Oro - Medonte
South /East of Core Road and Penetangushene Road
Steven,
Further to your circulation, dated February 28, 2011 the Ministry of Transportation has reviewed the
above noted submission in accordance with the requirements under the Ministry's Public Transportation
and Highway Improvement Act. The following outlines our comments
Please be advised that as of today the ministry is not in favour of the OPA and Rezoning
applications regarding the above noted property. We are requesting you to postpone the rezoning
application until the ministry has had a chance to review a concept/preliminary site plan in greater
detail.
The existing connections of the Napoleon Road and Gore Road to Highway 11 ramp are
undesirable and add. ing any major development in the vicinity will enhance the operational issues
and will reduce the safety. The proposed development should take into consideration the future
need to reconstruct the Highway 11 interchange and realignment of Gore Road and Napoleon
Drive. We do not have any improvements planned at Highway 11 and Highway 93 interchange at
this time, however this development is in close proximity of Hwy 11 /Hwy 93 ramps and as you
may realize, once this developer has completed construction of their site, there would be limited
ability to improve the situation in the future. Therefore, at this stage of project is too early for unto
support the proponent's request for Rezoning and OP Amendments. We will require the
proponent to provide additional detailed information regarding the site plan development (which
would include the actual location of the bldg on the site, parking and loading areas and access
options).
e According to the TIS, the proposed warehouse facility will replace warehouse space at the
existing Wolf Steel facility. Once the new warehouse is in operation, there will be space made
available for an expansion or change in operation at the existing facility that will generate
additional traffic. The TIS should provide some information regarding future plans for the existing,
facility and take any traffic generated by changes at the existing Wolf Steel into account in the TIS
analysis.
The TIS trip generation rates are apparently based on information provided by Wolf Steel. There
is no way to verify if the trip generation rates are reasonable. However, the assumed trip
generation rates appear low when considering other information provided concerning the
proposed development. For example, a total 22 truck trips (10 trucks external to the site and 12
trucks daily from the Gore Road warehouse) are assumed. The related planning report provided
indicates loading facilities will be provided for 30 trucks. In addition, 56 parking spaces will be
provided, which indicates available parking will be significantly greater than required for office and
warehouse staff. Typically, the appropriate ITE trip generation rates should be applied to
determine the traffic impact of the proposed development. The proponent should confirm the size
of the development and resulting trip generation and compare the assumed trip generation rates
with the appropriate ITE trip generation rates. If ITE trip generation rates are substantially higher
than the assumed rates, the analysis should be done using the ITE trip generation rates.
• The proponent needs to comply with the requirements under the "Class Environmental
Assessment for Provincial Transportation Facilities, 2000 ". Based on the Planning Deport it was
noticed that an Environmental Report was prepared for this site. Please ensure that the
Environmental Screening Documentation is prepared and submitted for Ministry Review as per
the requirements under the Class EA document. Where applicable, the proponent may choose to
submit similar environmental documentation that conforms to the Municipal Class EA document.
• In general, any proposed development on these lands (including proposed buildings, above and
below ground structures, proposed accesses, fire roads, sewers and stormwater management
facilities /ponds) will require ministry review, and approvals. As part of the review process, the
applicantlowner will be required to submit 4 copies of the detailed, full- scale (1:500) site plan,
survey plan, site servicing and grading plan and a storm water management report, a lighting plan
with units in LUX and traffic impact study. All plans and reports must be stamped and signed,
• The applicant should be made aware that ministry permits are required for all structures above
and below ground, located within 396m of a ministry intersection and 45m from our highway
property limit. Please note that according to our records a section of Penetanguishene Road,
(around 150m south of the Gore Road) is designated as a King's Highway and therefore we
request that the proponent locate the future entrance to the Penetanguishene Road as far south
as possible from the ministry ramp.
• All signage on the site must be placed under a ministry issued sign permit. Proposed signs must
be shown on the site plan.
• Permits must be obtained from our office located on the 7t" Floor, Atrium Tower, 1201 Wilson
Avenue, Toronto, Ontario M31VI 1 J8. The Permit Officer contact for this area is Phil lannacito and
he can be reached at 416- 235 - 4592.
I trust that the above is clear and satisfactory. If you have any further questions or concerns, please
contact Phil lannacito at 416 - 235 -4592 or me at the number listed above at your earliest convenience.
We request your co- operation in advising the owner of the above noted matters,
Since ely,
W. Asia Polus
Corridor Managem ntTechnician
April 5, 2011
Township of Oro - Medonte
148 Line 7 South
P.O. Box 100, Oro, Ontario
LOL 2X0
Attn: Steven Farquharson
Re: Official Plan Amendment 2011- OPA -01
Member Zoning By -law Amendment 2011- ZBA -01
Municipalities Part of Lot 10, Concession 1, Gore Road and Penetanguishene Road
Township of Oro - Medonte (Formerly Oro)
Adjala- Tosarontio (Wolf Steel)
Amaranth
Barrie NVCA staff received the above mentioned application and understands the
The Blue Mountains purpose is to re -zone the lands from Agricultural, Rural and EP to also include
Bradford -West GwilIimbur'- Economic Development, and designate the property from Agricultural to
Industrial to permit construction of a warehouse facility to store and distribute
Clearview products manufactured by the applicant.
Coil ingwood
Essa The submission was accompanied by:
Grey Highlands • C. C. Tatham & Associates Ltd. Letter Brief "Wolf Steel — Proposed
innisfil Warehouse Facility, Natural Hazard Assessment" dated January 28, 2011.
Including engineering drawings [HAZ -1, HAZ -2] signed and stamped
trielancthon January 28, 2011.
Mono . Wolf Steel Expansion Proposal Submission Package dated February 22,
Mulmur 2011 prepared by Amick, Meridian and C.C. Tatham.
New Tecumseth
Ontario Regulation 172/06
Shelburne Oro - urne e The property is almost entirely regulated pursuant to Ontario Regulation 172/06,
the Authority's Development, Interference with Wetlands and Alterations to
Springwater Shorelines and Watercourses Regulation due to the presence of a wetland,
Wasaga Beach watercourse, and associated floodplain and meander belt. Permits are required
from NVCA prior to construction or grading on this property.
Watershed Engineering Comments
Counties Review of this submission was based on requirements and guidelines set out in
Dufferin the MNR Natural Hazards Technical Guidelines and current NVCA
Grey Development Review Guidelines available on the website, www.nvca.on.ca.
Simcoe NVCA engineering staff noted the following outstanding issues with this most
recent submission:
Member of
Ce %brdting 5Q Years in Conservation 1960 -2010
NOTTAWASAGA VALLEY CONSERVATION AUTHORITY Centre for Conservation
Conservation John Hix Conservation Administration Centre Tiffin Conservation Area 8195 8th Line U 1����M 1T0
ONTARIO Telephone: 705.424.1479 Fax: 705.424.2115 Web: www.nvca.on.ca Email: ad in c� on.ca
ua�i cn,mp7oirs
April 5, 2011
Re: official Plan Amendment 2011- OPA -01 and Zoning By -law Amendment 2011 - ZBA -01
Part of Lot 10, Concession 1, Gore Road and Penetanguishene Road
Township of Oro- Medonte (Formerly Oro)
(wolf steel)
1. As per the MNR Technical Guide, the limit of the erosion hazard for meandering
systems is the greater of the meander belt allowance or the flooding hazard limit
plus the 6 metre erosion access allowance. Please revise drawing HAZ -1 to
delineate the erosion access allowance adjacent to the floodplain.
2. The proposed locations for the stormwater management ponds are located within
the revised erosion hazard setback. Please note NVCA does not support the
location of stormwater management facilities in the erosion hazard setback
including the 6 metre access allowance with the exception of maintenance access
roads.
3. Details of the stormwater management system were not provided and NVCA
engineering staff cannot provide comments at this time on sizing or design of
these features.
Ecology
NVCA staff engaged in pre - consultation with the applicant's agents to discuss the
environmental (and hazard) concerns associated with the property. Through this pre -
consultation NVCA advised that the generic regulation wetland mapping was not field
truthed and ground truthing would be required during a wetland staking, at which NVCA
staff request to be present. In addition, NVCA guidelines require a 30 metre setback to
new development from wetlands. These concerns have not been addressed in the current
submission.
OPA and ZBA
• NVCA recommends the floodplain and erosion hazard land, plus 6 metre setback,
should be appropriately zoned and designated.
• NVCA recommends the wetland and associated 30 metre setback should be
appropriately zoned and designated.
• The drainage channel that is proposed to be re- routed could be part of the
stormwater management treatment train, and this feature contributes to fish
habitat. It may be necessary to zone and designate this feature accordingly.
Other
While the current application is for a ZBA and OPA, the submission includes information
that could be included in an upcoming site plan. The following comments relate to this
information. There is a drainage feature on site adjacent to Penetanguishene Road. The
feature contributes to fish habitat. NVCA staff believe moving the feature could be
addressed through a letter of advice, as per our agreement with the Department of
Fisheries and Oceans.
NVCA staff advised that if the feature is moved, it is preferred to keep the feature outside
of the road side ditch due to quality concerns and the impact on the wetland and the
fishery as road side water features can be exposed to more contaminants from salt, oil,
metals, etc. Drawing HAZ -1 shows the drainage feature being routed through the road
side ditch and the storm water management pond. Diverting the water feature through
Page 2 of 3
April 5, 2011
Re: Official Plan Amendment 2011- OPA -01 and Zoning By -law Amendment 2011- ZBA -01
Part of Lot 10, Concession 1, Gore Road and Penetanguishene Road
Township of Oro- Medonte (Formerly Oro)
(Wolf Steel)
the stomwater management pond may address some water quality concerns, but please be
aware that a treatment train approach is suggested. Enhanced plantings along the new
feature are strongly recommended and NVCA staff would request more information on
how this feature will be designed, to provide further comments.
Details of the stormwater management ponds were not provided. NVCA cannot provide
comments on the ponds, and cannot determine if they are sized properly or meet the
NVCA or MOE guidelines. In addition, it is possible that the stormwater management
facilities may require zoning and designation.
Conclusion
NVCA staff has outstanding concerns related to identifying, zoning and designating the
natural features and hazard land, and the associated setbacks. NVCA requires additional
information in order to complete our review and additional comments may be provided in
the future. We trust this is of assistance. If you have any questions or concerns, please
do not hesitate to contact the undersigned.
Regards,
Patti Young MCIP, RPP
Senior Planner
DF/KN /PY
cc: Jamie Robinson, Meridian Planning
Page 3 of 3