2010-139 Certificate of Substantial Completion (Moonstone Stage 1)THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
BY-LAW NO. 2010-139
Being a By-Law to Authorize the Issuance of the Certificate of
Substantial Completion and Acceptance (Aboveground Services)
for Heights of Moonstone -Stage 1 (Bachly Investments Inc.), Registered Plan
51 M-679
WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter
P. 13, as amended, provides that municipalities may enter into agreements imposed as
a condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
AND WHEREAS Council for the Corporation of the Township of Oro-Medonte entered
into a Subdivision Agreement with Heights of Moonstone (Bachly Investments Inc.) in
June 2000 for fifty nine (59) residential lots on Bachly Avenue, Jennett Drive, Brechin
Crescent, and Boyd Crescent.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
aboveground services have now been met;
NOW THEREFORE the Corporation of the Township of Oro-Medonte hereby enacts as
follows:
That the Certificate of Substantial Completion and Acceptance (Aboveground
Services) for Heights of Moonstone -Stage 1 (Bachly Investments Inc.),
Registered Plan M-679 may now be issued by the Township Engineers
(AECOM) in compliance with the Subdivision Agreement between the
Corporation of the Township of Oro-Medonte and Bachly Investments Inc.
2. That the attached Schedule "A", Certificate of Substantial Completion and
Acceptance (Aboveground Services) shall form part of this By-Law.
3. That this By-law shall come into force and take effect on the final date of passing
thereof.
BY-LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 14TH DAY
OF JULY, 2010.
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
Mayor, H.S. H
Cleo, J.-Do6cifas Irwin
Schedule "A" to By-law No. 2010-139
SCHEDULE "A"
A AHCOM
9r1v /~9. 10 ChecRley SVaet 705 7219222 del
Banie,.ON, Canada L4N iW1 705734 0764. :fax
www.aacornzw
TOWNSHIP ENGINEERS
CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE
(ABOVEGROUND SERVICES)
MUNICIPALITY Township of Oro-Medonte
PROJECT Heights of Moonstone Staae 1
Plan 51M-679
DEVELOPER Bachly Investments Inc.
FILE NO. 12-01066.50 (MMA 43-890291
Description of the Works:
Roadways in the Heights of Moonstone Stage 1 Subdivision consisting of.,
Bachly Avenue from Line 7 North to Boyd Crescent; a distance of 650 metres (2;132 feet);
Jennett Drive from Bachly Avenue westerly; a distance of 72 metres (236 feet);
Brechin Crescent from Bachly Avenue westerly; a distance of 128 metres (420 feet);
Boyd Crescent from Bachly Avenue west to Bachly Avenue east; a distance,of'836 metres (2,749
feet);
We, AECOM notify the Municipality that the above mentioned works were inspected on June 17, 2010,
and to the best of our knowledge and judgment, are complete in accordance with the Subdivision
Agreement except for the deficiencies `below:
• As per the attached Construction Status Report dated June 7, 2010:.
We hereby accept these works for use and operation by the Municipality subject to the rectification of
the above noted deficiencies and to the rectification of any further deficiencies that may become
apparent during the maintenance period and to the maintenance that is required by the Subdivision
Agreement.
The date of Substantial Completion and Acceptant oveground Services} is established by the
Certificate as of une 17, 201D.
Date: ZO Id Signature:
Schedule "A" to By-law No. 2010-139
AMM Township of Oro-Medonte
Construction Status Report
I, _ I
Subdivision: Heights of Moonstone -Stage 1 lFile Number: 12-01066-60 (60118211)
Engineer. W.R. Hodgson & Associates (905) 841-0052 1 !Contractor.
Date. (June 7, 2010 1 l Registered Plan: 5IM-679
1 I
START OF UNDERGROUND WORKS
i, Yes, No Date Completed andComments
I Iltatlon Confro s I i
1) ;silt fence installed and maintained
2) frock check dams Installed and maintained
!SWM Pond
1) jpond earth works completed
2) storm outfall works completed
5) 1top of precast 0.3m belo6y finish. grade
7) !video inspection submitted for review
8) ;video inspection reviewed/approved
9) !flushing of sewer for final acceptance
10 !service record sheets
1
_ L I
Stone. Sewer.
1) 1 pipe installed
2L plpe bedding summary/acceptance report
3) Ibackfill test summary/acceptance report
4). !maintenance holasi_ns ecp ted/approval
5) lbenching Inspected'
6'f top of precast 0.3m below finish grade
7 video inspection submitted for review
8) ;video inspection reviewedlapproved
9) ";flushing of sewer for final acceptance
V
10) !service record sheets
I _
I 1 I
9)Na~ermair!
I I
pipe installed
2) 1pipe bedding acceptance report
3) jbackflll testing acce Lance re or1
4) 'I by-pass installed and inspected
5) pressure testing confirmed by AECOM
r
6 ;ssystem chlorinated
7 I table water samples received by AECOM
✓
-
8 b -pass removed
_
9) tracer wire -attached tb hydrant flange
_i continuity test
-
10 (hydrant -water flowcharts submitted
_
_ end caps painted
I barrels painted to Tw s c
markers installed
Inspectors Name:. A 7
Project Manager.
Schedule "A" to By-law No. 2010-139
Township of Oro»Medontts
Construction Status Report-
1
1
1
.
Subdivision: Heights of Moonstone -Stage 1 I I
IFlle'Number. 12.01066-50 (60118211)
Engineer. W.R. Hodgson & Associates (905) 841-0052 1 _I
!Contractor.
Date, !June 7, 2010 ( i
"Registered Plan: SiM-679
ST
ART
OF U
NDERGROUND WORKS'
Yes'
No
Date Completed and Comments
IWaterPur~rphouse
7
1
,
i)
ICertificate -f Approval
2)
1Permit to lake water
✓
3
!Well - Records and,H dro eolo i Re ort
-cleaning/disinfection
I -video inspection
4
!Well line - pressure test confirmed b AECOM
disinfection
tracer wire continuity test
_
5)
1Yard Pipe.-pressure test confirmed AECOM
disinfection
tracer wire continuity test
6)
As-Constructed information submitted
ScadalProgrammin~
~
8) !
Operating and Maintenance Manuals Electrical
✓
9) ;
Operating and Maintenance Manuals - Mechanical
Training
I
I
1
1JUIttles
1
hydro crossings completed
2
bell works completed
3
h dro workscom lefed
Y
✓
4) I
streeti.4his Installed
5) I
streetli htcLs energized
6) !
certification from electrical consultant
MU
MS
7) 1
9 swcrks completed
as-constructed information by electrical consultant
As-Const ucted Under round Works
I
1) l
as-constructed information submitted antl
✓
Submitted on October 3, 2009:
approved by AECOM
I
I
I
i
Certificate of S. C. &A. Underground Issued
September 14, 1999
I I
! _ I
END OF MAINTE
NANC
E PE
RIOD FOR UNDERGROUND WORKS
Yes
No
Date Com feted and Comments
=SWM Pond
I
!
- - - -
1) (clean out prior to end of maintenance
:(Senile a er
1) 1flushing ,ofsewer
2) Ivideo inspection submitted for review
~
3) !video inspection reviewed/approved' u
.
I
-
IStorm Sewer
1) !flushing of sewer
2) lyideo•inspedlon submitted for review
3 [video ins ection reviewedfa roved:
I I
IWatermaln
1) !curb stop inspection by AECOM
2) "!valve & hydrant inspection by AECOM
I I
i
Certificate of M. & F. A. Underground Issued
December 7, 2009
Inspectors Name;-e.`-~~sa=/ 2 Project Manager
Schedule "A" to By-law No. 2010-139
AECOM Township of Oro-Medonte
Goll
struption Status Report
I I
{
Subdivision: Heights of Moonstone -Stage 1
Fite Number 12.01066-50 (60118211)
Engineer: W.R. Hodgson & Associates 905) 841-0052 1
. _1
T
. _Contractor.
Date: (June 7 2010
i
I
Registered Plan: 51M-679
I
STA
RT'O
F A
BOVEGROUND WORKS
Yes
No
Date Completed and Comments
~ROad W rks [
_ 'l
1) )of rolled by AECOM
2) _lsubgrade elevations confirmed b Engineer
3) 1 sub-drains Installed - sub-grade
_
under curb
-ditch
4 l ranular tested b Soils Consultant
5) [granular"8",compaction reports to AECOM
✓
6 [granular "N' com action reports to AECOM
✓
7) 1hydro crossings lnstalled
f
8) [concrete curbs completed
9) 1 curbs inspected. prior to top lift asphalt
10) 1concrete tested by Soils Consultant
✓
11) (base asphalt placed"
12) ;sgnage -street identification
I stop
~
road not assumed
no exit
13) !I..dead-end barricades and signage
14) !,driveway aprons paved
X
_
_ 15) 'tsitlewaIN completed "
16) s)dewalks inspected by`AECOM
17) 1boulevard topsoil and sodded/seeded
1B) Iditches shaped, topsoil and sodded/seeded'
✓
19) i base asphalt inspected by AECOM
✓
20) 1 to lift asphalt completed
✓
Completed May 11,201D....
I
L
i
IMf,~celianies Works
I'
1) walkways completed
2) [park works completed
3) !fencing completed - boundary
I walkways _
ark
4) 13ounda Marker Post
I
Certificate of S. C. & A. Aboveground Issued
✓
ENA OF (WAINTE
NANG
EPERIOD FOR ABOVEGROUND WORKS
Yes
No
Date Completed and comments
_ Gegeral Works 1
)
_
1 tree planting in boulevard
am
lam
2) and landscaping inspection by AECOM
_
3) Ifencin inspection b AECOM
X
_
4) (final lot rradtng certification
x
5) IOLS certification for monuments
x
ox nspection by AECOM'
6) (curb b
X
7) ,valve hydrant inspection by AECOM
&
X "
8 final inspection - Iightstandards
x
-transformers
X
- utility boxes
x
9)" ;top "lift asphalt inspection byAECOM
X
10) [curb Inspection by AECOM
X
11) isldewalk inspectlon by AECOM:
12) [boulevards inspection by AECOM
X
13) las-constructed information submitted and
x
approved by AECOM
X
I
1
Certtficate of M. t& F. A. Aboveground Issued
X
Inspectors Name: / 3 Project Manager: ✓ Z, A