Loading...
2010-139 Certificate of Substantial Completion (Moonstone Stage 1)THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE BY-LAW NO. 2010-139 Being a By-Law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Aboveground Services) for Heights of Moonstone -Stage 1 (Bachly Investments Inc.), Registered Plan 51 M-679 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro-Medonte entered into a Subdivision Agreement with Heights of Moonstone (Bachly Investments Inc.) in June 2000 for fifty nine (59) residential lots on Bachly Avenue, Jennett Drive, Brechin Crescent, and Boyd Crescent. AND WHEREAS the requirements of this Subdivision Agreement with respect to the aboveground services have now been met; NOW THEREFORE the Corporation of the Township of Oro-Medonte hereby enacts as follows: That the Certificate of Substantial Completion and Acceptance (Aboveground Services) for Heights of Moonstone -Stage 1 (Bachly Investments Inc.), Registered Plan M-679 may now be issued by the Township Engineers (AECOM) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro-Medonte and Bachly Investments Inc. 2. That the attached Schedule "A", Certificate of Substantial Completion and Acceptance (Aboveground Services) shall form part of this By-Law. 3. That this By-law shall come into force and take effect on the final date of passing thereof. BY-LAW READ A FIRST, SECOND AND THIRD TIME, AND PASSED THIS 14TH DAY OF JULY, 2010. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Mayor, H.S. H Cleo, J.-Do6cifas Irwin Schedule "A" to By-law No. 2010-139 SCHEDULE "A" A AHCOM 9r1v /~9. 10 ChecRley SVaet 705 7219222 del Banie,.ON, Canada L4N iW1 705734 0764. :fax www.aacornzw TOWNSHIP ENGINEERS CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (ABOVEGROUND SERVICES) MUNICIPALITY Township of Oro-Medonte PROJECT Heights of Moonstone Staae 1 Plan 51M-679 DEVELOPER Bachly Investments Inc. FILE NO. 12-01066.50 (MMA 43-890291 Description of the Works: Roadways in the Heights of Moonstone Stage 1 Subdivision consisting of., Bachly Avenue from Line 7 North to Boyd Crescent; a distance of 650 metres (2;132 feet); Jennett Drive from Bachly Avenue westerly; a distance of 72 metres (236 feet); Brechin Crescent from Bachly Avenue westerly; a distance of 128 metres (420 feet); Boyd Crescent from Bachly Avenue west to Bachly Avenue east; a distance,of'836 metres (2,749 feet); We, AECOM notify the Municipality that the above mentioned works were inspected on June 17, 2010, and to the best of our knowledge and judgment, are complete in accordance with the Subdivision Agreement except for the deficiencies `below: • As per the attached Construction Status Report dated June 7, 2010:. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is required by the Subdivision Agreement. The date of Substantial Completion and Acceptant oveground Services} is established by the Certificate as of une 17, 201D. Date: ZO Id Signature: Schedule "A" to By-law No. 2010-139 AMM Township of Oro-Medonte Construction Status Report I, _ I Subdivision: Heights of Moonstone -Stage 1 lFile Number: 12-01066-60 (60118211) Engineer. W.R. Hodgson & Associates (905) 841-0052 1 !Contractor. Date. (June 7, 2010 1 l Registered Plan: 5IM-679 1 I START OF UNDERGROUND WORKS i, Yes, No Date Completed andComments I Iltatlon Confro s I i 1) ;silt fence installed and maintained 2) frock check dams Installed and maintained !SWM Pond 1) jpond earth works completed 2) storm outfall works completed 5) 1top of precast 0.3m belo6y finish. grade 7) !video inspection submitted for review 8) ;video inspection reviewed/approved 9) !flushing of sewer for final acceptance 10 !service record sheets 1 _ L I Stone. Sewer. 1) 1 pipe installed 2L plpe bedding summary/acceptance report 3) Ibackfill test summary/acceptance report 4). !maintenance holasi_ns ecp ted/approval 5) lbenching Inspected' 6'f top of precast 0.3m below finish grade 7 video inspection submitted for review 8) ;video inspection reviewedlapproved 9) ";flushing of sewer for final acceptance V 10) !service record sheets I _ I 1 I 9)Na~ermair! I I pipe installed 2) 1pipe bedding acceptance report 3) jbackflll testing acce Lance re or1 4) 'I by-pass installed and inspected 5) pressure testing confirmed by AECOM r 6 ;ssystem chlorinated 7 I table water samples received by AECOM ✓ - 8 b -pass removed _ 9) tracer wire -attached tb hydrant flange _i continuity test - 10 (hydrant -water flowcharts submitted _ _ end caps painted I barrels painted to Tw s c markers installed Inspectors Name:. A 7 Project Manager. Schedule "A" to By-law No. 2010-139 Township of Oro»Medontts Construction Status Report- 1 1 1 . Subdivision: Heights of Moonstone -Stage 1 I I IFlle'Number. 12.01066-50 (60118211) Engineer. W.R. Hodgson & Associates (905) 841-0052 1 _I !Contractor. Date, !June 7, 2010 ( i "Registered Plan: SiM-679 ST ART OF U NDERGROUND WORKS' Yes' No Date Completed and Comments IWaterPur~rphouse 7 1 , i) ICertificate -f Approval 2) 1Permit to lake water ✓ 3 !Well - Records and,H dro eolo i Re ort -cleaning/disinfection I -video inspection 4 !Well line - pressure test confirmed b AECOM disinfection tracer wire continuity test _ 5) 1Yard Pipe.-pressure test confirmed AECOM disinfection tracer wire continuity test 6) As-Constructed information submitted ScadalProgrammin~ ~ 8) ! Operating and Maintenance Manuals Electrical ✓ 9) ; Operating and Maintenance Manuals - Mechanical Training I I 1 1JUIttles 1 hydro crossings completed 2 bell works completed 3 h dro workscom lefed Y ✓ 4) I streeti.4his Installed 5) I streetli htcLs energized 6) ! certification from electrical consultant MU MS 7) 1 9 swcrks completed as-constructed information by electrical consultant As-Const ucted Under round Works I 1) l as-constructed information submitted antl ✓ Submitted on October 3, 2009: approved by AECOM I I I i Certificate of S. C. &A. Underground Issued September 14, 1999 I I ! _ I END OF MAINTE NANC E PE RIOD FOR UNDERGROUND WORKS Yes No Date Com feted and Comments =SWM Pond I ! - - - - 1) (clean out prior to end of maintenance :(Senile a er 1) 1flushing ,ofsewer 2) Ivideo inspection submitted for review ~ 3) !video inspection reviewed/approved' u . I - IStorm Sewer 1) !flushing of sewer 2) lyideo•inspedlon submitted for review 3 [video ins ection reviewedfa roved: I I IWatermaln 1) !curb stop inspection by AECOM 2) "!valve & hydrant inspection by AECOM I I i Certificate of M. & F. A. Underground Issued December 7, 2009 Inspectors Name;-e.`-~~sa=/ 2 Project Manager Schedule "A" to By-law No. 2010-139 AECOM Township of Oro-Medonte Goll struption Status Report I I { Subdivision: Heights of Moonstone -Stage 1 Fite Number 12.01066-50 (60118211) Engineer: W.R. Hodgson & Associates 905) 841-0052 1 . _1 T . _Contractor. Date: (June 7 2010 i I Registered Plan: 51M-679 I STA RT'O F A BOVEGROUND WORKS Yes No Date Completed and Comments ~ROad W rks [ _ 'l 1) )of rolled by AECOM 2) _lsubgrade elevations confirmed b Engineer 3) 1 sub-drains Installed - sub-grade _ under curb -ditch 4 l ranular tested b Soils Consultant 5) [granular"8",compaction reports to AECOM ✓ 6 [granular "N' com action reports to AECOM ✓ 7) 1hydro crossings lnstalled f 8) [concrete curbs completed 9) 1 curbs inspected. prior to top lift asphalt 10) 1concrete tested by Soils Consultant ✓ 11) (base asphalt placed" 12) ;sgnage -street identification I stop ~ road not assumed no exit 13) !I..dead-end barricades and signage 14) !,driveway aprons paved X _ _ 15) 'tsitlewaIN completed " 16) s)dewalks inspected by`AECOM 17) 1boulevard topsoil and sodded/seeded 1B) Iditches shaped, topsoil and sodded/seeded' ✓ 19) i base asphalt inspected by AECOM ✓ 20) 1 to lift asphalt completed ✓ Completed May 11,201D.... I L i IMf,~celianies Works I' 1) walkways completed 2) [park works completed 3) !fencing completed - boundary I walkways _ ark 4) 13ounda Marker Post I Certificate of S. C. & A. Aboveground Issued ✓ ENA OF (WAINTE NANG EPERIOD FOR ABOVEGROUND WORKS Yes No Date Completed and comments _ Gegeral Works 1 ) _ 1 tree planting in boulevard am lam 2) and landscaping inspection by AECOM _ 3) Ifencin inspection b AECOM X _ 4) (final lot rradtng certification x 5) IOLS certification for monuments x ox nspection by AECOM' 6) (curb b X 7) ,valve hydrant inspection by AECOM & X " 8 final inspection - Iightstandards x -transformers X - utility boxes x 9)" ;top "lift asphalt inspection byAECOM X 10) [curb Inspection by AECOM X 11) isldewalk inspectlon by AECOM: 12) [boulevards inspection by AECOM X 13) las-constructed information submitted and x approved by AECOM X I 1 Certtficate of M. t& F. A. Aboveground Issued X Inspectors Name: / 3 Project Manager: ✓ Z, A