03 02 2010 Rec Tech AgendaPage
8 -11
12 -21
22
28 -289
C9i eat k m te
Proud Heritage, Exciting Future
1. ADOPTION OF AGENDA
a) Motion for Adoption.
THE TOWNSHIP OF ORO- MEDONTE
RECREATION TECHNICAL SUPPORT GROUP
MEETING AGENDA
COUNCIL CHAMBERS
DATE: TUESDAY, MARCH 2, 2010
TIME: 7:00 P.M.
2. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE
THEREOF: "IN ACCORDANCE WITH THE ACT"
3. ADOPTION OF MINUTES OF PREVIOUS MEETING:
3 -7 a) Minutes of the Recreation Technical Support Group meeting of December 3,
2009.
4. DEPUTATIONS:
None.
5. COMMUNICATIONS:
a) Report No. RC 2010 -01, Shawn Binns, Director of Recreation and Community
Services, re: Fees Charges Review.
b) Report No. RC 2010 -03, Shawn Binns, Director of Recreation and Community
Services, re: 2009 Recreation Program Update.
c) Peter Dunbar, correspondence re: The Trails of Simcoe County Symposium,
April 13, 2010, Horseshoe Resort.
d) Shawn Binns, Director of Recreation and Community Services, re: 2010
Recreation and Community Services Spring /Summer Brochure.
23 -24 e) Draft minutes of the Oro Medonte History Association meeting held on January
18, 2010.
25 -27 f) Draft minutes of the Community Hall Board meeting held on January 25, 2010.
g) Shawn Binns, Director of Recreation and Community Services, re: Final Draft
Strategic Facility Plan.
Page 1 of 289
Page
Recreation Technical Support Group Agenda March 2, 2010
6. SUB COMMITTEE UPDATES:
7. ANNOUNCEMENTS
8. NEXT MEETING DATE
9. ADJOURNMENT
a) Motion for Adjournment.
Page 2 of 289
Proud Heritage, Exciting Future
Thursday, December 3, 2009 7: 05 p.m.
Present:
Regrets:
Staff Present:
Also Present:
1. ADOPTION OF AGENDA
a) Motion to adopt the agenda.
Councillor Crawford assumed the Chair and called the meeting to order.
Motion No. RTSG091203 -01
Agenda Item {AgendaNumber} {ItemDescription}
THE TOWNSHIP OF ORO- MEDONTE
RECREATION TECHNICAL
SUPPORT GROUP
MEETING MINUTES
Council Chambers
Councillor Sandy Agnew
Councillor John Crawford
Ted Duncan, Kelly Skinner Meyer, Linda Murray,
Reta Regelink, Carolyn Tripp
Mayor H.S. Hughes
John Thornton
Shawn Binns, Director of Recreation and
Community Services; Marie Brissette, Committee
Coordinator
Peter Dunbar, Christine Richards, Justin
Hodgkinson
Moved by Duncan, Seconded by Skinner -Meyer
It is recommended that the Recreation Technical Support Group agenda for
the meeting of Thursday, December 3, 2009 be received and adopted as
amended to add:
5f) Oro Medonte Minor Sports Association, minutes of meeting held on
November 3, 2009.
2. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL
NATURE THEREOF: "IN ACCORDANCE WITH THE ACT"
None.
1 Draft
Carried.
Page 1 of 5
Page 3 of 289
Recreation Technical Support Group minutes of December 3, 2009.
4. DEPUTATIONS:
a) Peter Dunbar, re: Trail Successes and Regional Trail Coordination.
Motion No. RTSG091203 -03
b) Christine Richards, Sports Administrator, Oro Medonte Minor Sports
Association, re: Request for Grant/Subsidy.
Motion No. RTSG091203 -04
Agenda Item {AgendaNumber} {ItemDescription}
(Draft)
3. ADOPTION OF MINUTES OF PREVIOUS MEETING:
a) Minutes of the meeting held on October 20, 2009.
Motion No. RTSG091203 -02
Moved by Regelink, Seconded by Tripp
It is recommended that the Recreation Technical Support Group minutes of the
meeting held on October 20, 2009 be adopted as printed and circulated.
Carried.
Moved by Skinner Meyer, Seconded by Duncan
It is recommended that the presentation by Peter Dunbar, re: Trail Successes
and Regional Trail Coordination be received.
Carried.
Moved by Duncan, Seconded by Regelink
It is recommended
1. That the presentation from Christine Richards, Sports Administrator,
Oro Medonte Minor Sports Association, re: Request for Grant/Subsidy
be received.
2. And That the Recreation Technical Support Group recommends that
Council considers the Request for Grant/Subsidy as presented by
Christine Richards, Sports Administrator, Oro Medonte Minor Sports
Association in the amount of $3780.00 in the 2010 budget deliberation.
Carried.
Page 2 of 5
Page 4 of 289
Recreation Technical Support Group minutes of December 3, 2009.
Agenda Item {AgendaNumber} {ItemDescription}
d) Community Hall Board Minutes of meeting held on November 30, 2009.
LD J
5. COMMUNICATIONS:
a) Mandatory Training, re: Accessible Customer Service.
Marie Brissette provided the training.
Motion No. RTSG091203 -05
Moved by Tripp, Seconded by Duncan
It is recommended that the Mandatory Training, re: Accessible Customer
Service be received.
Carried.
b) 2009 -2010 Recreation and Community Services Brochure.
Motion No. RTSG091203 -06
Moved by Murray, Seconded by Tripp
It is recommended that the 2009 -2010 Recreation and Community Services
Brochure be received.
Carried.
c) Oro Medonte History Association minutes of the meeting held on November
26, 2009.
Motion No. RTSG091203 -07
Moved by Tripp, Seconded by Murray
It is recommended that the Oro Medonte History Association minutes of the
meeting held on November 26, 2009 be received.
Carried.
Motion No. RTSG091203 -08
Moved by Skinner Meyer, Seconded by Duncan
It is recommended that the Community Hall Board Minutes of meeting held on
November 30, 2009 be received.
Carried.
Page 3 of 5
Page 5 of 289
Recreation Technical Support Group minutes of December 3, 2009.
e) Tourism and Economic Development Strategic Plan.
Motion No. RTSG091203 -09
6. SUB COMMITTEE UPDATES:
None.
7. ANNOUNCEMENTS
None.
8. NEXT MEETING DATE
To be determined.
Agenda Item {AgendaNumber} {ItemDescription}
Moved by Murray, Seconded by Skinner -Meyer
It is recommended that the verbal information presented by Shawn Binns,
Director of Recreation and Community Services, re: Tourism and Economic
Development Strategic Plan be received.
Carried.
f) Oro Medonte Minor Sports Association, minutes of meeting held on November
3, 2009.
Motion No. RTSG091203 -10
Moved by Tripp, Seconded by Duncan
It is recommended that the Oro Medonte Minor Sports Association minutes of
meeting held on November 3, 2009 be received.
Carried.
Page 4 of 5
Page 6 of 289
Recreation Technical Support Group minutes of December 3, 2009.
9. ADJOURNMENT
a) Motion to adjourn.
Motion No. RTSG091203 -11
Moved by Regelink, Seconded by Duncan
It is recommended that we do now adjourn at 9:06 p.m.
Marie Brissttee, Committee Coordinator
Agenda Item {AgendaNumber} {ItemDescription}
Draft
Carried.
Councillor John Crawford, Co -Chair Councillor Sandy, Agnew, Co -Chair
Page 5 of 5
Page 7 of 289
Report No.
RC2010 -01
BACKGROUND:
REPORT
To: Council
Agenda Item {AgendaNumber} {ItemDescription}
Township of
Proud Heritage, Exciting Future
Prepared By:
Shawn Binns
Meeting Date: Subject: Recreation and Motion
January 27, 2010 Community Services Fees and
Charges Review
Roll R.M.S. File
RECOMMENDATION(S): Requires Action X For Information Only
It is recommended that:
1. Report RC2010 -01 be received and adopted
2. That staff consult with the Recreation Technical Support Group and the Oro
Medonte Minor Sports Association regarding the proposed ice rental rates and
report back to Council by the end of the first quarter 2010
3. That the fees outlined in Table 3 of report RC2010 -01 be approved and
implemented effective July 1, 2010
4. That the clerk bring forward the appropriate By -Law for Council's consideration
An annual review of the Township's By -Law to provide for the imposition of fees and
charges has been completed for the Recreation and Community Services Department.
The process currently used for setting facility rental rates is first to determine the facility
operating expenses, and then review rates of other comparable municipalities. The
comparator rates are then reviewed along with facility operating costs and rates are
then established which are reasonable and sustainable.
With the implementation of the Harmonized Sales Tax on July 1, 2010 the Township will
be required to charge an additional 8% tax to facility rentals and Township Recreation
and Community Service Programs which are currently only inclusive of GST.
The 2010 Budget approved by Council includes a 5% increase in ice rental rates for
Minor Sports Groups and Non -Prime Time ice rentals in addition to the required HST
adjustments.
Recreation and Community Services January 27, 2010
Report No. RC2010 -01 Page 1 of 4
Page 8 of 289
ANALYSIS:
Recreation and Community Services Facilities
ICE RENTALS RATES
Review of Arena Revenues and Expenses
2010 budget (includes 5% increase for Minor and Non -Prime Time 2010 -2011 season)
Revenues as per Operating Budget $270,700
Subsidy -Minor Hockey (based on 2009) 49,400
Subsidy Oro Medonte Skating Club (based on 2009) 4,900
Subsidy (Schools and Senior and pre school skates) 7,700
Other revenues (Vending, Advertising, Concession) 8,000
Hall and Floor Rental 5,500
Total $346,200
Operating Costs $349019
Capital- Estimated average Annual Allocation 90,000
Total $439,019
Operating Deficit
A review of ice rental rates of other comparable municipalities was conducted to
determine market comparators (Table 1):
Springwater
ICE FEES
2009
Prime time 1 175.00
Non prime 1 175.00
ESSA
Resident,187
Non Resident 209
120.00
Minor Sports 1 130.00 1 138.00
Table 1: Comparator Ice Rental Rates 2009
Agenda Item {AgendaNumber} {ItemDescription}
Barrie
92,819
Orillia Midland Severn Average
218.00 1 158.00 139 130.00 174.00
218.00 1 113.00 95.00 1 100.00 137.00
182.00 1 133.00 116.00 1 97.00 133.00
Recommended adjustments including the HST: (Table 2)
1 Current 2010 -2011 Season 2011 -2012 Season
1 Adult Prime $130 $148 13 $163 10
Adult Non Prime $77 $88 13 $101 15
Minor $95 $109 13 $120 10
Table 2: Recommended Ice Rental Fee Adjustments
The impact on the minor sports organizations including the additional 8% sales tax
would be as follows:
Avg. Hours 2010 -2011 2011 -2012
Oro Minor Hockey 1,445 $20,230 $15,895
Oro Medonte Skating Club 140 1,960 $1,540
Recreation and Community Services January 27, 2010
Report No. RC2010 -01 Page 2 of 4
Page 9 of 289
Estimated revenue projections with implementation of proposed ice rental fees and
charges:
1 Prime Time
1 Non Prime
1 Minor Sports
1 Total
1 Facility
Old Town Hall
Ian Beard Room
Ball Diamonds
Minor sports lights
Minor no lights
Adult lights
Adult no lights
Pavillion Large
All Day
Pavillion Small
All Day
$22/h
$9 /h
$26/h
$13/h
$52
$39
Arena Floor Ice Out
Adult $49/h
Minor Sports $38/h
All Day Event $545
All Day with Socan $605
Banquet Hall
Adult
Minor
Tournament
Party /Reception
Current Rate
$25/h
$107 Day
$14/h
$28/h
$28/h
$164 /day
$290
Recreation and Community Services
Report No. RC2010 -01
Agenda Item {AgendaNumber} {ItemDescription}
2010
2,268
1,200
4,500
7,968
2011
6,865
6,280
12,594
25,739
2012 (Jan April)
4,720
3,923
8,440
17,083
The following recommendations for adjustments to fees and charges are being
recommended (Table 3) for Council's consideration.
Proposed Rate July 1,10
$27/h
$116 day
$15/h
$25/h
$11/h
$30 /h
$15/h
$60
$46
$53/h
$41
$589
$653
$31/h
$31/h
$177 /day
$313
Increase
8
8
8
15
20
15
15
15
18
8
8
8
8
10
10
8
8
Table 3: Recommendations for Recreation and Community Services facility fee adjustments
January 27, 2010
Page 3 of 4
Page 10 of 289
RECREATION AND COMMUNITY SERVICES REGISTERED PROGRAMS AND
CAMPS
Recreation and Community Service registered programs and camps are operated on a
direct cost recovery basis and the associated user fees which are not HST exempt will
require amendments to fees to reflect the additional tax as a result of the HST.
FINANCIAL:
See analysis
POLICIES /LEGISLATION:
By -Law 2009 -56
CONSULTATIONS:
Director of Finance
Oro Medonte Minor Sports Association
CONCLUSION:
The proposed fees and charges are reflective of market comparators and will assist in
the recovery of facility expenses in the 2010 and 2011 budgets.
Respectfully submitted,
Shawn Binns
Director, Recreation and Community Services
Agenda Item {AgendaNumber} {ItemDescription}
SMT Approval Comments: C.A.O. Approval Comments:
Recreation and Community Services January 27, 2010
Report No. RC2010 -01 Page 4 of 4
Page 11 of 289
REPORT
Agenda Item {AgendaNumber} {ItemDescription}
6t i Lnshi r g
e
Pw .d Heritage, Exciting Fl+tune
Report No. To: Recreation Technical Prepared By:
RC2010 -03 Support Group Justin Hodgkinson
Meeting Date:
March 2, 2010
Subject: 2009 Recreation Motion
Program Update
Roll R.M.S. File
BACKGROUND:
RECOMMENDATION(S): Requires Action For Information Only
It is recommended:
1. That report RC2010 -03 be received
ANALYSIS:
Recreation and Community Services
Report No. RC2010 -03
x
The following report provides an annual update on Recreation and Community Services
Programs.
The Township of Oro Medonte began offering recreation programming in 2004.
Attachment #1 provides a historical and current review of participation rates
Attachment #2 provides a financial review of seasonal Recreation Programs, Summer
Camps, and March Break programs offered by the Township of Oro Medonte.
Relation to Council's Mandate of: Service Excellence, while building a sustainable,
healthy community that enriches quality of life:
Recreation and Community Services are essential public services with many benefits;
research conducted by the Canadian Parks and Recreation Association has concluded
that:
Recreation and active living are essential to personal health
Recreation is a key to balanced human development
Recreation and parks are essential to quality of life
Recreation reduces self- destructive and anti social behavior
Recreation and parks build strong families and healthy communities
Recreation reduces health care, social service and police /justice costs
Recreation and parks are significant economic generators
Parks, open space and natural areas are essential to ecological
survival
March 3, 2010
Page 1 of 5
Page 12 of 289
Agenda Item {AgendaNumber} {ItemDescription}
More recently the Use and Benefits of Local Government Recreation and Parks
Services: An Ontario Perspective Research conducted by Parks and Recreation Ontario
concluded that:
1) For the first time, leisure trumps work in importance
2) Leisure contribute to overall health and happiness
3) Most Ontario residents live within walking distance of a park or greenspace
4) Eight in every 10 households use public parks
5) Nearly every Ontario household realizes the benefits from local parks, included
those who do not use them
6) 4 in every 10 Ontario residents take advantage of local recreation services
7) Even those who do not participate in recreation say they benefit
8) Ontario residents depend on public and community agencies for Recreation
9) Recreation and Parks are not just for children. It is spread equally across all ages
10) Most Ontario residents would pay more taxes for upgraded public recreation
services
11)The vast majority believes recreation and parks are essential public services
which benefit the entire community
12)Nearly all Ontario residents recognize that losing public parks, recreation
programs or facilities would have a significant negative impact.
13) Ontario residents overwhelmingly recognize that Recreation and Parks boost
social cohesion and quality of life
14)There's a strong agreement that recreation contributes to health and wellbeing
15)Ontario residents are especially adamant about the role of recreation and parks
in fostering healthy children
16)Over 3/4 of Ontario residents agree that recreation is an antidote to crime
17)The majority of Ontario residents agrees that recreation contributes to
environmental stewardship
Given the increasing obesity rates in Canada, Parks, Trails, Facilities and Recreation
Programs is of utmost importance. In 2004, 11.3 million adult Canadians were
overweight or obese and obesity rates amongst children has increased 200 -300% over
the past 20 years.
In addition to increasing obesity rates, Municipalities are experiencing an aging of the
population as the baby boomer generation reaches retirement. Recent statistics
illustrate the increase of the aging phenomenon, with the 55 plus age cohort doubling in
size in many communities in the next 20 years (an increase of 224% in Oro Medonte)
Along with the growing older adult population, this age segment is predicted to lead
more active, independent lives after retirement and expect higher quality services and
facilities.
Recreation and Community Services
Report No. RC2010 -03
March 3, 2010
Page 2 of 5
Page 13 of 289
Review of Programs
The 2009 recreation programs participation rates have maintained similar numbers from
2008. The numbers break down as follows:
Summer Camps
o Experienced a moderate decrease in participation from the previous year.
This can be attributed to the decline in the economy, 2009 saw a
decrease in the number of weeks parents registered their children in.
o Camps offered at 3 locations (Moonstone, Horseshoe Valley and Guthrie)
to maintain the level of service from the previous year
o The Moonstone location was not very successful; 3 out of the 4 weeks of
the camp had to be cancelled due to low registration
March Break Camps
o Experienced a slight decrease in registrants compared to previous years,
again it is possible that the economic situation may have played a part
o Had difficulties recruiting and hiring qualified staff
o All the day trips were to local attractions
Children's Programs
o Had slightly decreased participation rates compared to 2008 but well
above the participation rates from the previous 4 years
o Many new programs were offered and attempts were made to offer
programs in the north
o Success was limited in the north and most programs had to be cancelled
due to low registration, this is due to the fact that we do not have any
appropriate facilities in that region. We do have a Joint Use Agreement
with the SCDSB but due to custodial overtime charges these facilities are
not affordable when the overtime takes effect.
Note: The slight decline in participation rates for camps and children's programs is likely
attributable to two factors:
1) The current economic situation and,;
2) The gradual aging of the current child and youth population and fewer children in
the Township
Adult Programs
o Program participation rates continued to increase, a pattern consistent
from 2006.
o New programs such as Bootcamps (utilizing the Green Gym at Line 4
Park), Belly Dancing at Old Town Hall and Couples Country and Western
Dancing at Jarratt Hall were all very successful.
*See Attachment #1 for participation summary
Recreation and Community Services
Report No. RC2010 -03
Agenda Item {AgendaNumber} {ItemDescription}
March 3, 2010
Page 3 of 5
Page 14 of 289
Recreation and Community Services
Report No. RC2010 -03
Agenda Item {AgendaNumber} {ItemDescription}
Service Excellence
In the fall of 2009 a partnership was developed with the Chamber of Commerce and
Reynolds Graphic Design to redesign the Recreation and Community Services
Brochure. The guides were delivered to all residents in Township with Canada Post
ensuring that all residents receive a copy.
As a means of improving customer service, the Recreation and Community Services
Department implemented a Credit Card payment options for program registrations and
facility rentals under $500.00 in the fall of 2009. Customers can now phone or fax in
their registration and payment which has greatly enhanced the convenience of program
registration and facility rentals. Approximately 50% of all registrants utilized this option
in the first session it was offered. It appears that more residents are choosing to utilize
this option due its convenience and the numbers have increased for the winter 2010
registrations.
As a tool to ensure Customer Service Excellence and Continuous Quality Improvement
a participant survey was distributed to participants in the Spring and Summer sessions
of 2009. Results of the completed surveys have been summarized (Attachment #3),
and will be used for program enhancement. Key findings from the summary show that
the average response for both spring /summer evening programs and summer camps
was above 4.7 out of 5 (4 rating being "met or above expectations" and 5 rating being
"exceeded expectations Most categories scored 4.0 or above on average with a few
areas demonstrating slightly lower scores. The registration convenience category
scored below 4 on average however with the addition of the Credit Card option this past
fall, it is anticipated that this area will improve in the 2010. Another area of weaker
scores was the Facilities section with scores averaging below 4 for facility cleanliness,
equipment and aesthetics.
Looking to 2010
o find alternative facilities for some of our camps as the Pine Ridge facility is
no longer available
o partner with local community partners to minimize duplication of services
o continued expansion of service across the municipality
o offer enhanced convenience and customer service with 4 pickup locations
for campers in our March Break and Summer Camps programs
(Moonstone, Warminster, Sugar Bush Guthrie Arena) and we are
offering more dynamic day trip location for the 2010 program
o alternative children's programs are planned, including a gymnastics
program and computer based programs, as the traditional courses that
have been offered are no longer successful
o increase in program for seniors and adults with disabilities
o continued and enhanced support to community and volunteer groups
o continue to expand the Recreation and Community Service Brochure to
include relevant municipal and community information to improve
communication to residents
o enhance the Recreation and Community Services component during the
redevelopment of the Township website
March 3, 2010
Page 4 of 5
Page 15 of 289
Financial Analysis
In 2008 recreation programs met and exceeded direct cost recovery and have started to
recover a portion of associated administrative and institutional costs. The 2009 financial
review of recreation programs is consistent with the performance in 2008 (Note in 2008
only two brochures were produced reducing program marketing expenditures). In 2009
3 guides were produced to ensure enhanced timely communication to residents. The
2010 Budget approved by Council includes full direct cost recovery and the recovery of
$5925 towards institutional and administrative expenses.
ATTACHMENTS:
1) Recreation Program Participation Rates 2004 -2010
2) Customer Feedback
i) Questionnaire
ii) Summary of Feedback Fall 09
3) Financial Review
Respectfully submitted:
Justin Hodgkinson
Community Recreation Coordinator
C.A.O. Comments:
C.A.O. Approval: Date:
Recreation and Community Services
Report No. RC2010 -03
Agenda Item {AgendaNumber} {ItemDescription}
March 3, 2010
Page 5 of 5
Page 16 of 289
5:
2.0
200B 24p
20
2005
20
Summe Camps
March Break Camps
Children You
Adult
Total
Ta1 p of
Proud Heritage, Exciting Future
If other please indicate
Did you receive our Program Guide? YES NO If "YES" by which means:
a) By mail b) From a Township Facility
If other please indicate
Agenda Item {AgendaNumber} {ItemDescription}
TOWNSHIP OF ORO- MEDONTE
RECREATION AND COMMUNITY SERVICES
PROGRAM EVALUATION FORM
148 Line 7 South, Box 100 Oro ON LOL 2X0
jhodekinsoneoro- medonte.ca
We value your opinion
In an effort to serve the community and to ensure the quality of programs we ask that you take a moment to give us
your input on the program that you participated in.
Program Date
Please circle the answer that is most applicable.
How did you learn about the program?
a) Friends b) Program Guide
c) Township website d) Other
c) Township Website d) Other
Grading Guideline
S. Exceeded expectations 4. Met or above expectations 3. Satisfactory 2. Fair 1. Unacceptable
Program Highest Lowest
Enjoyable 5 4 3 2 1
Location convenience 5 4 3 2 1
Program time 5 4 3 2 1
Registration Process /Convenience 5 4 3 2 1
Registration Fees 5 4 3 2 1
Comments:
Brochure
Guide content and descriptions 5 4 3 2 1
Guide format 5 4 3 2 1 OVER
Page 18 of 289
Customer Service
Questions were answered appropriately
Clear information and correspondence provided
Concerns addressed
Comments:
Overall Rating of the Program
Comments:
Agenda Item {AgendaNumber} {ItemDescription}
Highest
Lowest
5 4 3 2 1
5 4 3 2 1
5 4 3 2 1
Staff Highest Lowest
Knowledgeable 5 4 3 2 1
Motivated 5 4 3 2 1
Organized 5 4 3 2 1
Prompt and on time 5 4 3 2 1
Encouraged participation 5 4 3 2 1
Comments:
Facility Highest Lowest
Condition 5 4 3 2 1
Cleanliness 5 4 3 2 1
Equipment 5 4 3 2 1
Aesthetics 5 4 3 2 1
Comments:
5 4 3 2 1
Is there a program you would like to see offered by the Recreation and Community Services Department?
Page 19 of 289
Customer Program Evaulation Form Summary
Grading Guideline: 5. Exceed expectations 4. Met or above expectations 3. Satisfactory 2. Fair 1. Unacceptable
44 Surveys 6 Programs 19 Surveys Summer Camps
Average Response Average Response
Enjoyable 4.81 Enjoyable 4.85
Location convenience 4.56 Location convenience 4.64
Program Time 4.34 Program lime 4.69
Reg. Process convenience 3.88 Reg. Process convenience 4.64
Reg. Fees 4.31 Reg. Fees 4.47
Brochure Customer Service
Guide content and descriptions 4.32 Questions answered appropriately
Guide format 4.31 Clear info and correspondence
Concerns addressed
Customer Service
Questions were answered promptly 4.34 Staff
Clear info and correspondence provided 4.22 Knowledgeable 4.79
Concerns addressed 4.3 Motivated 4.74
Organized 4.69
Staff Prompt and on time 4.9
Knowledgeable 4.89 Encouraged participants 4.8
Motivated 4.84
Organized 4.79 Facility
Prompt and on time 4.7 Condition 4.65
Encouraged participants 4.69 Cleanliness 4.45
Equipment 4.7
Facility Aesthetics 4.45
Condition 4.05
Cleanliness 3.59 Overal Program Rating 4.79
Equipment 3.97
Aesthetics 3.8
Overall Program Rating 4.72
4.74
4.64
4.74
2004 2005 2006 2007 2008 2009
MARCH BREAK
REVENUE 4,014 5,528 5,281 4,533 5,881 3,695
EXPENDITURES
Salaries Benefits 1,218 1,238 1,181 1,819 1,530 418
Advertising 819
Transportation 1,216 1,384 1,295 1,160 970 695
Admission Fees 1,732 2,401 2,561 2,515 824 933
Supplies 323 212 405 247 129 658
5,308 5,235 5,442 5,741 3,453 2,704
NET REVENUE /(EXPENDITURES) -1,294 293 -161 -1,208 2,428 991
DAY CAMP
REVENUE
Agenda Item {AgendaNumber} {ItemDescription}
TOWNSHIP OF ORO- MEDONTE
SUMMARY OF PROGRAM REVENUE EXPENDITURES
2004 -2009
8,594 16,151 17,114 18,218 26,944 15,255
EXPENDITURES
Salaries benefits 9,527 10,564 13,125 18,258 16,451 15,945
Education/Training 100
Rent 885 76
Transportation 965 1,056 1,380
Excursion Fees 1,399 865
Instructor Fees 2,800 920 1,480 50
Supplies 3,818 998 1,684 2,084 1,836 833
13,345 14,362 14,809 22,227 23,207 19,149
NET REVENUE /(EXPENDITURES) -4,751 1,789 2,305 -4,009 3,737 -3,894
EVENING PROGRAMS
REVENUE 9,893 14,068 10,608 22,466 43,506 42,279
EXPENDITURES
Salaries benefits 221 106 1,115 16,921 14,221
Promotional costs 5,282 5,300 5,300 5,065 3,114 5,335
Rent 1,500 559 100
Instructor fees 6,443 10,550 11,100 13,913 12,022 15,666
Supplies 3,093 1,121 1,437 2,172 4,063 2,817
16,539 16,971 17,943 22,265 36,679 38,139
NET REVENUE/(EXPENDITURES) -6,646 -2,903 -7,335 201 6,827 4,140
prepared by Paul Gravelle, Treasurer December 10, 2009
Page 21 of 289
SI
M
Agenda Item {AgendaNumber} {ItemDescription}
THE T
OF
coy COUNTY
Mark April 13th, 2010 on your calendars as a "MUST ATTEND"
symposium of Trail Development.
Located at the beautiful Horseshoe Resort, listen to professionals in the
field of Trail development. Representatives from PARC, Dillon Consulting,
Simcoe Muskoka District Health Unit to name a few will provide insight on the
future of trails in our region. Peter Dunbar, of Dunbar Associates, will
provide information on the County's direction concerning trails and the
development of a Trails Master Plan.
For more information contact:
Peter Dunbar at Pdunbar.home @gmail.com
Page 22 of 289
Agenda Item {AgendaNumber} {ItemDescription}
January 18, 2010 Minutes
Oro Medonte History Association
Attendance: Allan Howard, chair; Geoffrey Booth, vice chair; Bruce Wiggins, Sheila
Kirkland, secretary; Sandy Agnew, Councilor
Regrets: Jadeen Henderson
Minutes of the November 26, 2009 meeting. Moved by Bruce Wiggins and seconded by
Geoffrey Booth that they be accepted as circulated. Passed.
Old Business
1. Monthly column for the Orillia Today/Barrie Advance: Bruce has started two
articles. The first is an article on the Little Red Brick church and this will be
submitted to Sandie Spattz for an upcoming Parks Rec. brochure. The article on
Fairvalley that Allan had previously written will be submitted to the
Advance /Today.
2. Rail trail: Geoffrey will pick the pictures and Joanna McEwen will do the
didactic. Work is ongoing.
3. Banners: the first one is done and ready. It can be signed out when needed. It has
the interim new OMHA logo on it.
4. Rita Whiston has again donated another $40 from her print sales of the African
Church.
New Business
1. It is with regret that we received notification from Margaret Prewar that she is
resigning from the Oro Medonte History Association. Margaret contributed
greatly to our many successes in the past years.
2. Moved bv Bruce that we frame Rita's donated print, of the African church. at the
Hawkestone Village Frame Shop. Seconded bv Sheila. Passed
3. Bruce, Geoff and Jadeen supplied information to Pat Richards and Joanna
McEwen for a nomination of the OMHA by Crown Hill Women's Institute for a
Provincial History award.
4. Allan framed a print of the African Church done by Rita Whiston and it was
delivered to Helen Millar (descendent of the Black settlement of Oro)
5. All of us were invited to the screening of "Raise the Spirit" documentary of the
160 Anniversary of the Oro African Church -NHS done by Rogers TV and it will
take place on January 28 from 6 -8pm in Barrie.
6. Allan and Jadeen presented to the Guthrie W.I. for Black history.
7. Need to have direction from Council regarding the War 1812 funding /activities
for OMHA involvement as onnortunities for funding are starting to onen un.
8. Bruce will meet with Shawn and Samah regarding funding, media for 1812 and
our logo.
9. Allan suggests we review our Terms of Reference in view of reducing the length
of office to 2 years from 3 at an upcoming meeting.
10. Bruce gave us a brief update on Heritage Day for this year.
Page 23 of 289
Agenda Item {AgendaNumber} {ItemDescription}
Correspondence
1. Sympathies to Bruce Wiggins and family on the recent loss of his Aunt.
2. News Views newsletter from the Simcoe County Historical Association
received.
3. Simcoe County Historical Association membership renewal for 2010 received and
will be submitted for payment.
4. Orillia Museum of Art and History solicitation for donations letter received.
Next meeting is January 25, 2010 regarding the Carley Hall designation only will be held
at the Northway Restaurant at 6pm.
Next OMHA meeting is February 22, 2010 at 6pm at the Northway.
Adjourned at 7:35 pin.
Respectfully recorded and submitted by Sheila Kirkland
Page 24 of 289
Township of Oro Medonte Community Hall Association Meeting
Date: Monday January 25, 2009
Time: 7:00 pm
Where: Hawkestone Hall
Attendance: Evelyn Reid Eady David MacMillan Eady Lillian Gray Eady Linda Wilson Eady
Wendy Hough Eady Ralph Hough Eady Annie Coomb Eady Curtis Gray Craighurst Sandy
Agnew Councillor Louise Calvert Dale Carley Sue Britten Jarratt Susan Grant Jarratt Al
Fisher Edgar Pat Shellswell Edgar Shawn Binns Township of Oro Medonte
1. Welcome by Shawn Binns
2. Self Identification
3. Adoption of Aeenda
Moved by Sue Britten
Seconded by Susan Grant
That the agenda for the January 25, 2010 meting be adopted
4. Adoption of Minutes
Moved by Dave MacMillan
Seconded by Sue Britten
That the minutes of the Community Hall Association Meeting held on November 30, 2010 be
approved
Carried
5. Business Arising From Minutes
Hall boards to think about training they want and give feedback information
Shawn to have Cleaning product catalogues for the next hall board meeting.
Chemicals are the main concern. All halls will be set up with WHMIS binders. Supplies
would be dropped off during monthly fire inspections
Hall Board Manual
o Development of a hall board manual is underway. Shawn will check notes for names
of volunteers to assist and if any hall board members wish to assist please let Shawn
know
o Draft will be presented to the entire hall board committee.
6. Guest Sneaker none
7. Announcement and Special Events
a/ Jarratt Hall
b/ Craighurst Hall
Yoga has started again at the hall
Agenda Item {AgendaNumber} {ItemDescription}
Minutes
Ride for Literacy this week regular event
Page 25 of 289
c/ Eady Hall
Other programs continue
Agenda Item {AgendaNumber} {ItemDescription}
Quiet time of the year
Recent Wedding reception
Village Players will be starting
Coldwater Museum held meeting
Orillia Folk Society dance on April 2 2010
d/ Edgar Hall
Feb 20 Euchre Tournament
Regular events
8. Correspondence
a/ Financial Reports circulated
Final report will come out plus a one page sheet (ie. Year end reserves)
ii. 2010 Departmental Budget was outlined by Shawn
iii. You can put the code on the invoices.
iv. Individual halls met with Shawn to find out projects approved.
b/ Hydro One Power Saving Blitz and Upgrades
$1,000.00 was given to each hall for upgrades, upgrades completed to
fixtures
c/ Spring /Summer Brochure and Community Services Brochure will come out in February,
forward content asap
d/ U V System Upgrade
Will have an audible alarm and automatic shutoff
Must be installed by March 1, 2010
Simcoe /Muskoka District Health Unit are responsible for overseeing water
systems (previously the Ministry of Environment)
All public buildings must comply
9. Other New Business
a/ Fees and charges and HST —July 1, 2010
Need to raise fees to offset the additional 8% as of July 1, 2010
b/ Suggested that we review the alcohol liability policy regarding the insurance costs
10. Adiournment
Moved by Pat Shellswell
That we adjourn the meeting at the Eady Hall
Next Meeting: March 29. 2010 at 7:00 nm in the Edgar Hall
Page 26 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
March 31, 2010
Shawn Binns, Director
Recreation and Community Services Department
Township of Oro Medonte
148 Line 7 South
Box 100, Oro LOL 2X0
Dear Mr. Binns:
Agenda Item {AgendaNumber} {ItemDescription}
The RETHINK GROUP is pleased to submit this Draft Report of the Strategic Facility Plan for the
Township of Oro Medonte. The Strategy researched and evaluated most types of leisure facilities and
offers recommendations that are aligned to broad time frames, looking out twenty years.
The comprehensive township -wide strategy builds upon and integrates individual provision strategies that
have been developed for each type of facility. Key elements and themes include: measures to reduce
facility and service deficiencies in some parts of the Township; some consolidation and clustering of
facilities to improve efficiency and effectiveness; strengthening the three tiered hierarchy of parks and
facilities (local, community and township- wide); partnerships and strategic alliances with other public
entities, and the non -profit and commercial sectors; and a gradual and steady increase in the direct and
indirect role of the Municipality in the provision of leisure services, including an increased emphasis on
leisure interests that are growing in popularity. Fundamental to the Strategic Facility Plan are the
Planning and Provision Principles, which define key policy directions and provide tools to help adjust and
refine the strategy over time.
Integral to the Strategic Facility Plan is the detailed feasibility study for the proposed new arena complex
and the outdoor facilities recommended for the Guthrie site. Although Chapter Six has been dedicated to
the feasibility study, the associated recommendations have been integrated throughout the entire report.
The strategy was based on certain assumptions about growth and development, as well as trends in leisure
demand that will have to be regularly monitored. If conditions change and/or development proceeds
differently, the Strategy will need to be adjusted in response. For that reason, a good deal of flexibility
has been built into the Plan.
It was a pleasure to work with Township Council, municipal staff and the citizens of Oro Medonte
Township to help shape the best possible leisure services system.
Respectfully submitted,
The RETHINK GROUP
Robert Lockhart, Partner
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 1
Page 28 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 2
Page 29 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Acknowledgments
The RETHINK GROUP team would like to acknowledge the significant contributions made by
the following individuals and entities.
Township of Oro Medonte Council (2006 -2010)
Harry Hughes, Mayor
Ralph Hough, Deputy Mayor
Mel Coutanche, Councillor, Ward 1
Terry Allison, Councillor, Ward 2
Sandy Agnew, Councillor, Ward 3
John Crawford, Councillor, Ward 4
Dwight Evans, Councillor, Ward 5
The Recreation Technical Support Group (2006 -2010)
Councillor Mel Coutanche
Councillor John Crawford
Councillor Sandy Agnew
Ted Duncan
Reta Regelink
Carolyn Tripp
Kelly Meyer
Bob Gregory
Phillip Patchell
Linda Murray
John Thornton
Municipal Staff
Robin Dunn, CAO
Shawn Binns, Director, Recreation and Community Services
Andria Leigh, Director, Development Services
Paul Gravelle, Director, Finance
Jerry Ball, Director, Transportation and Environmental Services
Margaret Prewer, Recreation and Community Services Assistant
Rick Yule, Supervisor, Parks and Facility Operations
We would also like to acknowledge members of the Community Hall Boards, the Accessibility
Advisory Committee, various other stakeholder groups, other members of Oro Medonte staff,
and the citizens of Oro Medonte Township who contributed to the preparation of this report
through the Community Group Survey, submissions and briefs, the Search Conference, focus
group workshops, and the Community Forum.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 3
Page 30 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfeld Associates Landscape Architects, and the Tourism Company
Page 4
Page 31 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strate¢ic Facility Plan. Township of Oro Medonte March. 2010
Table of Contents
Letter of Transmittal 1
Acknowledgements 3
Table of Contents 5
Summary of Recommendations
Township -wide Provision Strategy 9
Overview of the Facility Specific Provision Strategies 11
Implications for the Proposed Multi -use Recreation Complex 17
Implementation Strategy 18
Chapter 1: Introduction
1.1 Scope of Work 23
1.2 Report Format 23
Chapter 2: Community Profile
2.1 Introduction 25
2.2 The Market Area 25
2.3 Community and Planning Context 26
2.4 Current Population (age structure, socio- demographic characteristics) 28
2.5 Looking to the Future and Implications for Leisure Services 35
Chapter 3: Delivery of Leisure Services
3.1 Introduction 43
3.2 Department of Recreation and Community Services 44
3.3 Private /Community -based Parkland and Open Space 50
3.4 Libraries ..50
3.5 The County of Simcoe 51
3.6 Ontario Ministry of Natural Resources 51
3.7 Conservation Authorities 52
3.8 The Simcoe County District School Board 52
3.9 The Simcoe Muskoka Catholic District School Board 53
3.10 Federal Resources 53
3.11 The Couchiching Conservancy 53
3.12 Trails 54
3.13 The Private /Commercial Sector 55
3.14 Other Non Commercial Sites 57
3.15 Voluntary Groups, Associations, Clubs, Hall Boards 57
3.16 Affordability ...59
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 5
Page 32 of 289
Agenda Item # {AgendaNumber} - {ItemDescription}
DRAFT REPORT Strategic Facility Plan, Township of Oro-Medonte March, 2010
Chapter 4: Facilities -Analysis and Provision Strategies
4.1 Introduction ......................................................... .............. 6 1
4.2 Broad Indicators of Current Unmet
and Future Demand for Leisure Services ....................... .............. 61
4.3 Planning and Provision Principles ............................... .............. 68
4.4 Arenas ................................................................ ............. 7 1
4.5 Indoor Multi-purpose Space (including public and
other community halls) ............................................ .............. 85
4.6 Fitness Facilities .................................................... ............ 104
4.7 Aquatic Facilities ................................................... ............ 106
4.8 Ball Diamonds ...................................................... ............ 106
4.9 Soccer Facilities .................................................... ............ 118
4.10 Multi-purpose Sport Pads ......................................... ............ 124
4.11 Tennis Courts ....................................................... ............ 1 27
4.12 Older Adult Facilities .............................................. ............ 129
4.13 Cultural Facilities ................................................... ............ 135
4.14 Curling Facilities ................................................... ............. 136
4.15 Library Facilities/Services ........................................ ............ 136
4.16 Wharfs and Boat Launches ........................................ ........... 137
4.17 Neighbourhood/Community Parkland Planning and Development ..... 141
Chapter 5: Township-wide Provision Strategy for Leisure Facilities
5.1 Introduction ......................................................................143
5.2 Summary of System-wide Findings and Conclusions ..................... 143
5.3 Overview of the Way Facilities are Recommended to be Provided
Across the Township ............................................................ 148
5.4 Overview of the Facility-Specific Strategies ............................... 150
5.5 Implications for the Proposed Multi-use Recreation Complex ........... 156
Chapter 6: Feasibility Analysis of the Multi-use Recreation Complex
6.1 Introduction ..................................................................... 159
6.2 The Evolving Facility Concept ............................................... 160
6.3 Guiding Principles for Planning, Design and Operation .................. 162
6.4 The Conceptual Facility Design and Facility-Fit Site Plan ............... 163
6.5 The Space Program and Capital Cost Estimate for the Arena Complex 171
6.6 Capital Cost Estimate for Site Development ............................... 173
6.7 Financial Projections .......................................................... 175
6.8 Summary of Advantages of a New Arena Complex ....................... 190
Chapter 7: Implementation Strategy
7.1 Introduction ..................................................................... 193
7.2 Flexibility and Timing ......................................................... 193
7.3 Co-operation and Collaboration .............................................. 194
7.4 Review and Modification ...................................................... 195
7.5 Phasing and Twenty-Year Capital Plan ..................................... 196
7.6 Financing Strategy ............................................................. 202
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield & Associates Landscape Architects, and the Tourism Company
Page 6
Page 33 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Appendix D:
Appendix E:
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
7.7 Raise Awareness and Keep the Community Informed 207
7.8 Promotion Strategy 208
7.9 Implementation Initiatives Specific to the Proposed Arena
Complex and Initial Development of the Guthrie Site 208
Appendix A: The Benefits of Improved Parks, Open Space and Leisure Facilities
A.1 Introduction 211
A.2 Personal Benefits 211
A.3 Social Benefits 212
A.4 Economic Benefits 212
A.5 Environmental 213
A.6 Conclusion 213
Appendix B: The Community Consultation Program
B.1 Introduction 215
B.2 The Search Conference 215
B.3 Focus Group Workshops 230
B.4 The Community and Recreation Group Survey 230
B.5 Submissions and Briefs 234
B.6 The Community Forum 235
Appendix C: Future Demand for Leisure Services and Other Key Trends
C.1 Anticipated Population Growth and Change, and Other Trends
Impacting Demand for Leisure in Oro Medonte 243
C.2 Other Societal Trends 243
C.3 Gradual Shifts in Leisure Interests are Taking Place Along
the Following Lines 246
C.4 Application of Generic Trends to the Oro Medonte Market 246
C.5 Other Trends 247
High Level Analysis of Options for the Provision of Indoor Ice Facilities,
Township of Oro Medonte, 2009 253
Building Condition Assessments and Fire Safety Inspections
Introduction to the Building Condition Assessments 261
Fire Safety Inspection Report 262
Oro Medonte Community Arena (numbered separately as an individual report)
Hawkestone Hall (numbered separately as an individual report)
Jarratt Hall (numbered separately as an individual report)
Eady Hall (numbered separately as an individual report)
Old Town Hall (numbered separately as an individual report)
Edgar Hall (numbered separately as an individual report)
Carley Hall (numbered separately as an individual report)
Craighurst Hall (numbered separately as an individual report)
Warminster Hall (numbered separately as an individual report)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 7
Page 34 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 8
Page 35 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Summary of Recommendations
Township -wide Provision Strategy
he Township -wide leisure facilities strategy establishes the foundation, philosophy and
broad direction for the facility specific and other recommendations contained in the
Strategic Facility Plan. Fundamental to the Township -wide and facility- specific strategies are
Planning and Provision Principles (see below and Section 4.3). The township -wide strategy
integrates all of the strategies for each individual type of facility (Chapter Four), and any
recommendations regarding the Leisure Delivery System (Chapter Three).
Planning and Provision Principles
The recommendations are founded on a number of principles that are intended to provide the
guiding philosophy for planning and decision making for now and into the future. Some of the
principles are based on the personal, social, economic and environmental benefits of parks,
recreation, culture and the arts. Others reflect contemporary planning principles for the
provision of leisure facilities and related programs, activities and services, adapted to the
Township of Oro Medonte. The recommendations contained within Chapter Three regarding the
leisure delivery system and the role of the Municipality, as well the recommendations that relate
to specific types of facilities in Chapter Four are based on these principles.
Principle One: Utilize the Benefits of Parks, Recreation, Culture and the Arts as the
Foundation of the Plan
The personal, social, economic and environmental benefits of parks, recreation, culture and the
arts are becoming increasingly well documented and widely known, and have become the
foundation of contemporary leisure delivery systems. The benefits are summarized in Appendix
A and have been translated into the following 'belief' statement that has been tailored to the
Township of Oro Medonte.
We believe that an investment in parks, recreation, arts and culture in the Township of Oro
Medonte is an investment in the beauty and appeal of our community; and the growth and
development of our citizens, our community, our economy and our environment.
Research indicates that the results of this investment will include:
Improved personal health and well being for our citizens.
Greater citizen engagement.
Proud and confident leaders.
Strong neighbourhoods.
Reduced crime and lower costs for policing and justice.
A cleaner and healthier environment.
Economic growth and prosperity.
Building strong families.
Balanced human development mind, body and spirit.
Preservation and celebration of our cultural heritage and diversity.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterlield Associates Landscape Architects, and the Tourism Company
Page 9
Page 36 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The following are the remainder of the planning and provision principles. Please refer to
Chapter Five for a more advanced version of each.
Principle 2: Support the concept of `Communities within a Community' recognizing both
historical and emerging residential areas.
Principle 3: Establish a Three Tiered System for Parks and Facilities:
i) Township- wide /Regional (e.g., Bayview Memorial Park, the Oro Medonte Community
Arena /Guthrie site)
ii) Community (e.g., the community halls, Sweetwater Park, Vasey Park, Warminster Park, a
new community park in Craighurst)
iii) Neighbourhood/Local (e.g., Ravines of Medonte Park, Shelswell Park, Barrillia Park)
A key element of the three- tiered system is to increase the linkage among the various open space
components via a network of trails and open space greenways.
Principle 4: Cluster Facilities community and Township wide /regional levels
Principle 5: Locate for Visibility and Prominence
Principle 6: Gradually Lessen Dependence on Surrounding Communities
Principle 7: Complement Rather than Compete
Principle 8: Continue to Evolve Partnerships between the Municipality, the Voluntary
Sector and Others
Principle 9: Optimize Facility Use
Principle 10: Ensure Physical Accessibility
Principle 11: Be Environmentally Responsible
Principle 12: Be Fiscally Responsible
Three Broad Themes of Enhancement are Recommended:
The strategy to improve leisure facilities is based, in part, on the following three themes:
i) Upgrade /improve /replace /add to many existing facilities;
ii) Consolidate some existing facilities; and
iii) As demand increases and evolves, add some types of facilities that are currently not provided
by the Township (as the Municipality can afford and through partnerships).
The Evolving Role of the Municipality
The following describes the recommended changes in the role of the Municipality as a provider
of public open space and leisure services over next decade and beyond.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 10
Page 37 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Continue to increase the community development role of the Municipality nurturing and
enhancing community /sports /arts groups and volunteer resources.
Encourage more partnerships.
Continue to increase direct programming.
Increase the role of the Department of Recreation and Community Services in facility
planning and operation.
Increase the role of the Department of Recreation and Community Services in park
planning, design and development.
Gradually move toward higher levels of service provision (parks, facilities and
programming).
Partnerships and strategic alliances of many kinds with other public entities, and the quasi
public and the commercial sectors are essential to making significant improvements to parks,
open space, facilities and leisure services in the Township of Oro Medonte over the next decade
and beyond. Continue to maintain and enhance partnerships with:
surrounding municipalities regarding library services agreements to be improved;
the Township of Severn regarding access to the Coldwater Arena;
the Coldwater and District Curling Club;
hall boards and community associations;
service clubs (e.g., Oro District Lions Club and Orillia Kinsmen);
the Province and the County re: county forests and the Copeland Forest; and
the two school boards.
Pursue potential partnership /strategic alliance opportunities with Skyline International (owners
of Horseshoe Valley Resort), the City of Orillia, the City of Barrie, and Springwater
Township /new Midhurst recreation centre particularly for improving access to aquatic, fitness,
arts and heritage facilities for Oro Medonte residents.
Pursue partnerships re: naming rights and sponsorships to help finance major capital projects,
promoting services, and programming and events.
Overview of the Facility- Specific Provision Strategies
B elow is an overview of the strategies and related recommendations specific to the culture
and recreation facilities included in this Strategic Facility Strategy.
Indoor Ice Facilities
Two options have been examined to continue to provide indoor ice facilities. Option One would
maintain the existing arena and associated second floor banquet hall for up to twenty years at an
estimated cost of approximately $3.4 million ($2008). The focus of the anticipated repairs and
replacements would be on accessibility, and life and fire safety, with a few improvements to
amenities and functionality. This estimate does not include inflation and the unknown costs to: i)
meet any additional accessibility standards; ii) deal with the floor movement between the main
building and the change room area; iii) consider any additional energy and environmental
initiatives, as well as any significant functional improvements; and iv) allow for replacement of
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 11
Page 38 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
the septic system. It is estimated that the existing facility will required almost $1 million in
repairs and replacements in the next 3 -5 years.
If a second ice pad is required and can be afforded in approximately ten years, it could either be
constructed as a stand -alone single ice pad facility or the existing arena complex could be retired
and replaced by a new twin -pad arena complex in another location, ideally within the 85 acre
Guthrie site.
Option Two would replace the existing facility with a new, larger, energy efficient and much
more functional facility to be located elsewhere on the Guthrie site. In May, 2009, Oro Medonte
Council recommended that Option Two be studied in detail through a feasibility study of
township -scale facilities that would be suitable for the Guthrie site over the next twenty years.
See Chapter Six for details.
The feasibility study proposed a new 63,600 square foot arena complex incorporating:
a new, larger ice surface with seating for 480 within the arena enclosure;
six larger dressing rooms, including two which are sized to accommodate persons with
disabilities, two rooms designed to accommodate female customers, and one over -sized room
for visiting Jr. `A' teams and large groups;
an additional over -sized dressing room and an office for the Jr. `A' hockey team;
a 5,600 square foot multipurpose program and event space with a kitchen and storage space;
two meeting /activity rooms;
a larger lobby with a larger food service area, improved display space, warm viewing area for
around 100, and better control points;
storage for historical /archival resources;
an office for the Sports Association;
a pro shop;
offices and a staff room for facility staff and the Department of Recreation and Community
Services;
more and better storage throughout, including storage for outdoor maintenance and sports
equipment;
full accessibility throughout for persons with a disability;
improved energy efficiency; and
room to expand to incorporate a second ice pad and other components that may be required
in future.
Outdoor facilities proposed for the Guthrie site include:
a third lit senior ball diamond;
two spaces prepared to support eleven soccer fields (two senior, three large mini and six
small mini);
walking /cycling trails;
picnic areas with play equipment and shade structures;
four tennis courts with possible future lighting and a club house;
an access road, internal roadway and parking areas;
environmental zones to protect and enhance the watercourse and wooded areas; and
two storm water management ponds.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 12
Page 39 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateuic Facility Plan. Township of Oro Medonte March. 2010
The proposed arena complex, which would be 28,600 square feet larger than the existing facility,
would cost approximately $14 million plus paved parking at $500,000 ($2009). Although the
structure is larger, the opportunity for increased revenue and lower operating expenses would
result in an annual net operating cost that is similar to and could be lower than the existing
facility.
It is estimated that other site and facility development at the Guthrie site would cost
approximately $3.34 million ($2009) not including parking for the arena complex, as noted
above, but including design fees and a contingency 5% allowance.
Option Two allows for a second ice pad to be added if demand warrants after 2014, as well as
other indoor facilities if future demand warrants and they can be afforded.
Please refer to Chapter Six for the details.
Community Halls
A strategy is recommended to define six or seven `settlement clusters' that would cover the
entire Township, with each incorporating a number of established/historical former hamlets
and/or emerging/future residential areas. In each settlement cluster, one or more venues (either
Municipal or under other ownership, but accessible to the publicly) would be available so that
residents can meet and participate in a variety of indoor and outdoor leisure /community
activities. This strategy recognizes and supports:
the need to maintain a `sense of community and identity' in all parts of the Township, and
provide equitable and sustainable distribution of facilities across the Township, based on the
philosophy of `communities within a community'.
Based on the results of the building condition assessments, the accessibility audits and the fire
safety inspections, as well as use patterns and the projected cost to maintain the halls as viable,
safe, accessible and functional public use facilities, it is recommended that Warminster Hall
and Carley Hall be retired as soon possible as public use facilities. (Oro Medonte Council
accepted the recommendation to close Warminster Hall via a resolution of Council dated May
13, 2009. On October 28, 2009, Oro Medonte Council agreed to declare Warminster Hall
surplus and offer it for sale.) It is recommended that Craighurst Hall be closed when a suitable
replacement hall is provided either in a future community park in Craighurst (hopefully
associated with an adjacent future school facility) or within the expanding residential community
at Horseshoe Valley Resort. Edgar Hall also requires more investment over the next twenty
years to maintain the facility than it is estimated to cost to replace it, with a good deal of the
investment required within the next five years. Criteria were provided (pages 98-100) to assist
with the decision about when to build a new community facility, and when to invest in or divest
an existing community facility. Serious consideration should be given to the retirement of Edgar
Hall as a public use facility within the next five years.
Although Eady Hall is in above average condition, its relatively isolated location, the relatively
high estimate of repair cost over the next twenty years, (although most of the major repairs are
not anticipated until the after 2024) and the recommended strategy to provide a new and larger
community centre in the nearby area suggests that ultimately, Eady Hall may become either
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 13
Page 40 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
redundant or too costly to maintain. In the interim, use of Eady Hall should be closely
monitored, especially if the proposed new `northern' new community centre becomes a reality.
In the near term, additional use may be able to be directed to Eady Hall, especially if Carley Hall
is retired as a public use facility (along with Warminster Hall). To determine the viability of
Eady Hall as a public facility, utilize the `divestment' criteria that are recommended in Section
4.5 (page 99 -100).
If the arena is rebuilt and repositioned on the Guthrie site and a new large multi purpose program
space is provided (as per Option Two under arenas), Municipal and community programming at
Old Town Hall can be gradually reduced, especially in the winter season, to provide a more
suitable venue at the new arena complex and reduce the annual operating cost of Old Town Hall.
Other groups (e.g., the Oro Agricultural Society, the Oro Medonte Horticultural Society, and the
History Association) consider Old Town Hall their `home'. These uses can still be supported
since much of this use takes place in the `warm' seasons. Fortunately, most of the anticipated
capital investment for this hall will not have to be made until the final five years of the twenty
year cycle.
It is recommended that a new 2,000 -3,000 square foot community centre be built in the
settlement cluster serving Moonstone /Eady /Vasey /Carley/Ravines of Medonte, and another in
either the growing Craighurst community or further east along the Horseshoe Valley Road
corridor. With no facilities north of Highway 400, the northern facility should have priority. As
described above, a 4,000 -5,000 square foot multi -use program and event hall is recommended as
part of the new arena complex, proposed for Guthrie (see Chapter 6).
If the fire hall in Shanty Bay is enlarged, consider including a multi purpose room to support
training and community programming, but larger than the Ian Arthur Beard community room.
Recommendations were also provided in Section 4.5 to improve the promotion of community
facilities, to better co- ordinate rentals, to set rental rates that are appropriate to each facility, to
define the respective roles of the Municipality and the hall boards in the operation of community
halls, and to deal with the requirement for atypical capital investment and operating costs.
Recommendations are also offered to consider all feasible options to retain as community assets,
the halls that are retired as public use facilities.
New community centres should be operated by the Municipality, working closely with local
recreation/community associations to help support programming and special events.
Gymnasia
If a new elementary school is built anywhere within the Township, explore the opportunity to
partner with the school board to provide a full -size single gymnasium for school and community
use a separate facility linked by a lockable corridor. If the option to partner with a school
board does not materialize in the next few years, the market for and feasibility of a gymnasium
should be further examined as a possible component of the Township -wide multi -use recreation
centre, proposed for the Guthrie site.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 14
Page 41 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Fitness Facilities
In new multi purpose community centres, provide floors that will support a wide range of uses,
including floor -based wellness /fitness programs. If it is not possible to partner with Horseshoe
Valley Resort/Skyline International to provide a full- service publicly accessible fitness centre
and possibly an indoor running track, such a facility should be considered as a future phase of the
arena complex proposed for the Guthrie site. Also explore opportunities to access municipal
fitness facilities and associated programming in Barrie and Orillia for Oro Medonte residents.
Aquatic Facilities
Explore partnership opportunities to provide an aquatic facility within the Township, or to access
municipal aquatic facilities and associated programming in Barrie and Orillia for Oro Medonte
residents. Continue to upgrade the beach and associated facilities at Bayview Memorial Park.
Ball Diamonds
Add a third lit softball diamond at the Lions Sports Field (the Guthrie site) recreation quality
initially. Re -align and re -build Diamond #2 at Vasey Park, including bleachers, but not lit.
Encourage greater use of the Vasey facilities. Upgrade Warminster diamond as required. If
part of Shanty Bay Park is required for expansion of the adjacent fire hall, convert the ball
diamond into a junior facility. Retire Craighurst Park ball diamond. Accommodate the adult
use from the Shanty Bay and Craighurst diamonds at the additional senior lit softball diamond
proposed to be located at the Guthrie site.
Soccer Fields
Develop soccer fields at the Guthrie site in phases:
Initially: develop a 15 acre unstructured turfed area to accommodate the equivalent of: 2 full
size fields, 3 large mini fields, and 6 small mini fields all unlit to support a local junior
recreational program.
Until the fields at the Guthrie site are completed, continue the partnership with Burl's Creek
Event Park to support a gradually scaled back soccer program.
With improved facilities available, test the market for competitive youth and adult programs.
If the soccer facility evolves into a major venue, regional use and tournaments can be
promoted and accommodated.
Given the current situation at Richlieu Park (as noted in Chapter Four), it cannot be
recommended that a significant investment be made to upgrade or rebuild those fields.
Monitor the Orsi proposal to provide a soccer centre in Severn Township and the use of the new
soccer facilities being built in Orillia, near the eastern boarder of Oro Medonte Township at
Highway 11, and, if required, adjust recommendations, particularly for the Guthrie site.
Multi- purpose Sport Pads
No new sports pads are recommended at this time.
Tennis Courts
It is recommended that consideration be given to provide a double unlit court in Line Four
Park. It is also recommended that the Township continue discussions with Horseshoe Valley
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 15
Page 42 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Resort /Skyline International re: the opportunity for a joint venture to provide publicly
available facilities within their emerging year -round residential community. If that opportunity
does not materialize, consideration should be given to providing four unlit courts at the Guthrie
site to support a township -wide tennis program, with the option to light those facilities if demand
warrants in future. Consideration should also be given to add a club house at the Guthrie site in
future.
Older Adult Facilities
Support programming and associated recreational, social, health and educational uses for older
adults in existing and proposed municipal multi -use facilities. Encourage the formation of older
adult clubs and associations.
Cultural Facilities
Continue to expand festivals and cultural events; visual arts and crafts programming; as
well as dance and other performing arts for all age groups (directly and indirectly).
Encourage the further development of `heritage' (folkloric arts, material arts and built heritage,
as well as archives, museums, historic sites and monuments, and heritage properties). In
particular, encourage and support the protectors of the African Methodist Episcopal Church
(Township of Oro Medonte History Association) to maintain this important national historic site.
Ensure that as new multi purpose community facilities are provided, they are designed to
support programming in the visual, media and performing arts (particularly dance). It will be
crucial that natural and artificial lighting is suitable to the creative arts and that storage is
provided to support multiple programming per multipurpose room. It is also crucial that a
`sprung' or suitably cushioned floor is available for dance programs.
Support Horseshoe Valley Resort/Skyline International in its interest to possibly provide a
`cultural centre' within the planned residential community.
Curling Facilities
It is not recommended that the Municipality play a direct role in providing a curling facility. If a
private /non profit club was to form and raise funds to build and operate a facility, it may be
feasible for the Municipality to provide a site, ideally associated with or adjacent to the proposed
new arena on the Guthrie site.
Library Facilities /Services
It is recommended that the service agreement with Springwater Township be terminated as soon
as possible. (Effective January 1, 2010, the agreement was terminated.) It is essential that
accurate and supportable records of Oro Medonte memberships are maintained for the other four
library services. Closely monitor membership levels and associated costs at the Severn
Township and Midland facilities.
Wharfs and Boat Launches
Since the wharf and boat launch located at Line 9 is the only site with even minimal space for
parking, there may be an opportunity to improve the dock and possibly install a break wall and
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 16
Page 43 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
dredge to increase the depth at the boat launch. Revise signage at the wharfs that have been
conveyed to the Township. As opportunities arise, consider acquiring waterfront lands adjacent
to boat launch areas to provide larger sites, and in other areas to create boat launch facilities.
Parks and Open Space
Although a comprehensive review of parks and publicly available open space was not completed
as a component of this Strategic Facility Plan, an analysis will be completed in 2010.
It is recommended that the Municipality, through the Department of Recreation and Community
Services (and guided by this Strategic Facility Plan, and the Parks and Open Space Assessment)
be much more proactive in the process of planning for, acquiring and developing all Municipal
parkland, including neighbourhood and community level parks.
Implications for the Proposed Multi -use Recreation Complex
T he terms of reference for this strategy included an assessment of the need for and feasibility
of a multi -use recreation facility that would be township- wide /regional in appeal and scale.
The recommendation for a three tiered system to classify open space and leisure facilities
included a township- wide /regional level into which this type of facility would be placed.
The 85 acre Guthrie site is only Township -owned land that is large enough to accommodate such
a facility. This property is currently the site of the Oro Medonte Community Arena and Banquet
Hall, as well as the two top senior lit softball diamonds. All of these facilities are township
wide /regional in scale and would associate well with a township -scale multi -use recreation centre
(indoor and outdoor facilities).
This site matched up quite well with the location criteria identified by the community at the
Search Conference that was held to solicit input to this plan.
It was recommended that the following facilities and components be most seriously considered
for the `feasibility study' phase of this strategy to examine demand more closely, and estimate
the cost to build and operate a Township -scale multi -use recreation facility. The research has
indentified both indoor and outdoor facilities that would be suitable for this site. As such, the
feasibility study was designed to provide guidance for both the proposed community centre as
well as the park in which the principle facility is to be located.
Indoor and Outdoor Facilities and Components to be Considered
Single indoor ice pad (a new and repositioned or renovated existing arena with space
allowance to twin in future if demand warrants that opportunity best exists for a new and
repositioned facility);
Multi- purpose program space (to support a wide range of uses to meet many of the needs of
all age groups, including older adults);
Meeting room(s);
Washrooms and change rooms to support both indoor and outdoor facilities, male and female
customers and persons with a disability;
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 17
Page 44 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Commercial uses (from a pro shop to related health services);
Third lit senior softball diamond;
Outdoor soccer pitches initially to support recreational children/youth program;
Outdoor hiking and bicycle trails;
Picnic areas with playgrounds;
Food services to support indoor and outdoor activities; and
Storage to support indoor and outdoor activities and equipment.
Several other facility components have been identified in this Strategic Facility Plan that could
be considered as potential future phases of this complex (or could be provided elsewhere, within
the Township possibly through partnerships with others):
A fitness centre (strength, conditioning and stretching gym plus an aerobic /spinning /dance
studio);
An indoor running /walking track;
An aquatic centre to support full range of types of uses and pool tanks (from therapeutic to
leisure and lane swimming);
Gymnasium (if a full -size gym is not provided through a partnership with a school board);
Curling rink (public /private partnership);
Second indoor ice pad (if future demand warrants);
Tennis courts; and
An indoor soccer facility (public /private partnership).
Refer to Chapter Six for the analysis of the proposed Township -scale multi -use recreation
complex and specific recommendations for this facility and the development of the Guthrie site.
Implementation Strategy
Agenda Item {AgendaNumber} {ItemDescription}
Chapter Seven contains recommendations to assist with the initiation, implementation and
financing of the Strategic Facility Plan.
Flexibility and Timing
The Strategic Facility Plan must provide clear direction about what needs to be done, but it also
must be sufficiently flexible to allow for shifting needs and priorities, and unforeseen changes in
the operating environment. More detail is provided for the first five years or so of the Plan and
options are provided where there is more than one way to proceed.
Except for 2010, recommendations are aligned with time periods rather than specific years, as
follows:
i) 2011 -2014,
ii) 2015 -2019, and
iii) 2020 -2029.
Even then, these suggested time periods are considered as guidelines only.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 18
Page 45 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Co- operation and Collaboration
The Township will have to continue to rely on a wide range of other entities in the public, non-
profit, voluntary and commercial sectors to share in the task of providing culture, recreation, arts
and heritage opportunities for Oro Medonte residents through direct provision by some, and
partnerships and strategic alliances with others operating within the Township and in
neighbouring communities.
Review and Modification
It is recommended that the Strategy be kept current, in part through ongoing research and
analysis of key information, including regular consultation with stakeholders and the wider
community. Every five years, the Plan should be reviewed, and updated and extended. The
planning process relative to leisure services should be linked to other ongoing municipal
planning and decision making functions.
Phasing and the Twenty -Year Capital Plan
Recommended phasing of facility development and other improvements are tied to 2010 the
three time frames introduced above. Because of the two dramatically different directions
identified for the arena complex, two scenarios have been prepared for the long -term capital
plan. Scenario One assumes that the existing arena complex is retained and maintained for at
least ten years and more likely twenty years as a recreation facility, at which point either a new
stand -alone single ice pad arena complex is built to provide two stand -alone arenas or the
existing arena complex is retired and a new single or twin pad arena complex is constructed to
replace it (depending on demand and affordability). Scenario Two assumes that the arena
complex proposed in this Strategic Facility Plan is constructed within the next five years and the
existing facility is retired as a recreation facility before much investment is required. The
existing arena may be able to be repurposed, potentially as a public works facility. If demand
warrants and it can be afforded, a second ice surface would be added to the new arena complex
after 2019.
The cost figures in both scenarios do not factor in the unknown potential for funding assistance
from senior levels of government, fundraising, sponsorship, or partnerships /strategic alliances.
The contributions from senior levels of government are typically in the order of two- thirds of the
application for capital support.
It is recommended that a reserve account be established with annual contributions to cover the
cost of future major repairs and replacement of all facilities.
Accounting for Scenarios One and Two and the variations within each, the estimate of
capital investment for the period 2011 -2014 ranges from $6,710,000 (for Scenario One) to
$20,583,715 (for Scenario Two) (not factoring in an annual contribution to a capital reserve
account, the unknown potential for funding assistance from senior levels of government,
fundraising, sponsorship, or partnerships /strategic alliances, or the estimated cost of upgrades to
wharfs and boat launches).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 19
Page 46 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Accounting for Scenarios One and Two and the variations within each, the estimate of
capital investment for the period 2015 -2019 varies between $1,556,000 (for Scenario Two)
and $2,965,000 (for Scenario One) (not factoring in an annual contribution to a capital reserve
account, the unknown potential for funding assistance from senior levels of government,
fundraising, sponsorship, or partnerships /strategic alliances, or the estimated cost of upgrades to
wharfs and boat launches).
Accounting for Scenarios One and Two and the variations within each, the estimate of
capital investment for the period 2020 -2029 ranges from $4,169,818 (for Scenario Two) to
$25,234,818 (for Scenario One) (not factoring in an annual contribution to a capital reserve
account, the unknown potential for funding assistance from senior levels of government,
fundraising, sponsorship, or partnerships /strategic alliances, or the estimated cost of upgrades to
wharfs and boat launches).
The total estimated cost for Scenario One over the next twenty years is $25,574,318
$35,226,318, and for Scenario Two, the total estimated cost is $26,304,533 $36,408,533.
For both scenarios, the required/recommended investment in the arena complex represents half
or more of the total projected capital forecast over the next twenty years. For Scenario One that
retains and maintains the existing arena complex for another 15 -20 years and then replaces it by
around 2029 with either a single or twin pad complex, the portion of the total capital budget
associated with the arena complex varies between 55 and 66 For Scenario Two, that invests
minimally into the existing arena complex for a short period of time and then invests in a new
and much larger arena complex within the next five years and possibly twins the ice surface after
2020, the portion of the total capital budget associated with the arena complex varies between 49
and 60 In total, over the next twenty years, more may be invested in the arena complex via
Scenario One ($14,115,500- $23,115,500) than Scenario Two ($12,852,246- $21,852,246).
Although the total minimum and maximum capital investments for Scenario One are slightly less
than for Scenario Two, the quality of sport and recreation facilities that can be achieved via
Scenario Two will be higher because the new arena complex will be available much sooner. For
Scenario One, the larger capital investments are delayed until later in the twenty year projection
mostly due to the incremental investment in the existing arena and the delayed investment in a
new single or twin pad arena complex.
The estimated capital cost of the proposed new arena complex is $14,115,715, exclusive of
GST/HST (2009$). Allowances have been made for various site development costs, internal
project management costs, architectural and engineering costs and contingency. However, no
allowances have been made for furnishings and equipment, building permits, and bringing three
phase electrical service into the site. Site development costs associated with parking, road access
and landscaping are included in the $3,833,487 cost estimate for development of the Guthrie site.
That cost estimate does not include GST /HST and also does not include the $196,800 allowance
to construct the access road from Line 5 to the eastern boundary of the site (which may not have
to be included in the cost of the development of the Guthrie site).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 20
Page 47 of 289
Sources of capital funding include the following broad categories:
municipal taxes annual allocation to capital projects,
municipal debenture,
contributions from specific user groups such as the potential investment by the Jr. `A' hockey
club for a dressing room and office in a new arena complex,
recreation facility capital reserves,
contributions from development charges,
community and corporate fundraising,
sponsorships,
naming rights (whole facility and individual components),
surcharge on rental rates and ticket prices,
contributions from senior levels of government, and
contributions from partners (via joint ventures /strategic alliances).
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The net operating deficit for the proposed arena complex (before transfers to or from
reserves) is projected to be lower for all five years of the projections than that currently budgeted
for the existing facility in 2009, and is in line with the pattem of the current facility since 2006
(varying between +$135 and $35,440, for the three operating scenarios over the years One to
Five of the projections).
Several examples of current senior government funding programs include:
The Ontario Trillium Foundation,
The Building Canada Fund Communities Component (one -third assistance for eligible
projects for communities with a population of less than 100,000),
The Ontario Recreation Program (Ontario REC) partnering with the Federal Building
Canada Fund (one -third assistance for eligible projects for communities with a population
of less than 100,000), and
The Recreation Infrastructure Program in Ontario (RInC) (for renovations to existing
recreation facilities).
The most significant potential contributions from senior levels of government are anticipated to
be potentially available in 2010.
Raise Awareness and Keep the Community Informed
After the results of the Township -wide recreation facilities strategy and associated feasibility
study for the Guthrie site are received by Township Council, it will be important to raise
awareness in the community, and with user and interest groups and other organizations within
the Municipality and the surrounding area about the results of the strategy and the feasibility
study. It is suggested that a series of `roll out' initiatives be undertaken in 2010.
The community should be regularly updated of any major developments regarding the
advancement of initiatives, including any potential senior government funding programs and
applications, and any new thoughts about community needs. Any new information can be shared
with the media to encourage follow -up stories.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 21
Page 48 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Promotion Strategy
All new and improved facilities will need to be promoted throughout the market area. Initially
and on a regular basis, residents within the market area will need to be made aware of the wider
variety of recreation facilities, programs and events that could be offered at the Guthrie site and
throughout the Township, some of which will be new to the community.
Implementation Initiatives Specific to the Proposed Arena Complex and the Development
of the Guthrie Site
The following initiatives are recommended as first steps toward the initiation of the proposed
new arena complex and the associated site and outdoor facility development proposed for the
Guthrie site.
high level assessment of hydro geological conditions;
advancement of the conceptual design for the proposed arena complex;
preparation of a master plan for the Guthrie Site;
confirmation of development priorities for the Guthrie Site (recommendations are provided
in this plan); and
Initiation of a fund development campaign.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 22
Page 49 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
1.1 Scope of Work
Agenda Item {AgendaNumber} {ItemDescription}
Chapter One: Introduction
T he intent of this project has been to produce a long range strategy for the provision of
municipal culture and recreation facilities that are expected to be required to meet the needs
of the community over the next twenty years as the Township grows and evolves. In addition to
a provision strategy for each type of culture and recreation facility, a comprehensive, township
wide provision strategy has been provided, including various options and opportunities for
consolidation and clustering/consolidation of certain facilities. The strategy also includes
planning and provision principles and guidelines.
The planning process involved research regarding the nature of the community and anticipated
growth and change over the next twenty years; an analysis of how culture and recreation
facilities and services are provided in the Township and the region (including the leisure services
role of the Municipality); an inventory of culture and recreation facilities; a facility condition
assessment and fire safety inspections of the eight public community halls and the arena; an
analysis of the utilization of municipal culture and recreation facilities; research into future
demand for leisure in the Township; an assessment of the ability of the Municipality to afford
improvements to culture and recreation parks, facilities and services; and an investigation of the
potential for partnerships and capital funding.
Community engagement was crucial to the process. To that end, a web site presence was
maintained; a survey of recreation and community groups was administered; sessions were held
with specific interest groups; a community -wide Search Conference was hosted; briefs and
submissions were received; and a community -wide Forum was hosted In addition, several
sessions were held with Township Council, municipal staff, the Recreation Technical
Committee, and a broader `sounding board' group of representatives of Municipal Council,
municipal staff, the Recreation Technical Support Group, the Accessibility Advisory Committee,
and representatives from specific recreation groups.
1.2 Report Format
C hapter Two comprises a definition of the market area, a description of the planning
context, a description of the current population, and predictions about future population
growth and potential change, and broad implications of the changing age profile on demand for
leisure activities.
Chapter Three contains an overview description of culture, recreation and open space
resources, and the principle service provides. Particular attention is paid to the role and
resources of Municipality and the Recreation and Community Services Department.
Chapter Four focuses on each of the types of leisure facilities included in the facility strategy,
including a description of current supply, utilization, projected needs and the specific provision
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 23
Page 50 of 289
Chapter Seven comprises the implementation strategy.
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
strategy that is recommended for each. Also included in Chapter Four is a summary of the
leisure trend analysis which is provided in more detail in Appendix C. Also included are the
Planning and Provision Principles for the Strategic Facility Plan.
In Chapter Five, the Township -wide Provision Strategy for Leisure Facilities is described,
including an overview of system -wide findings and conclusions, the comprehensive township
wide provision strategy, a summary of the provision strategy for each type of facility, and the
implications for the township -wide multi -use recreation complex.
Chapter Six contains the detailed feasibility study of the proposed township -wide multi -use
recreation complex.
Appendix A provides an overview of the personal, social, economic and environmental benefits
of improved parks, open space and leisure facilities.
Appendix B contains the details of the community consultation program.
Appendix C provides additional detail about leisure trends.
Appendix D comprises a May, 2009 report to Township Council regarding a High Level
Analysis of Options for the Provision of Indoor Ice Facilities.
Appendix E contains the nine building condition assessments and the fire safety inspection
reports.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 24
Page 51 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
2.1 Introduction
rr his chapter contains a description of the market area for this study, provides some key
context information about the community and leisure services, describes the current
population, and looks to the future to predict likely population growth and change for the
Township.
2.2 The Market Area
Agenda Item {AgendaNumber} {ItemDescription}
Chapter Two: Community Profile
T he principal market area for this facility strategy is the Township of Oro Medonte, with a
2006 population of 20,031 (an increase of 9.4% between 2001 and 2006). Since customers
freely travel across municipal boundaries to visit facilities and participate in programs and
events, the immediately surrounding communities will comprise the secondary market area.
Those communities include:
The City of Barrie;
The City of Orillia;
The Town of Midland;
The Township of Springwater (including Midhurst, Elmvale and Hillsdale);
The Township of Tay (including Port McNicoll, Victoria Harbour, Waubaushene);
The Township of Tiny (including Wyevale, Wyebridge, Perkinsfield, and Lafontaine); and
The Township of Severn (including Coldwater, Washago, Port Severn, Marchmont, Bass
Lake and Fesserton).
The 2006 population of these six municipalities was 208,707 and distributed as follows:
The City of Barrie 128,430 (23.8% population change 2001 2006)
The City of Orillia 30,259 (3.9% population change 2001 2006)
The Township of Springwater 17,456 (8.4% population change 2001 2006)
The Township of Tay 9,748 (6.4% population change 2001 2006)
Township of Tiny 10,784 (19.4% population change 2001 2006)
The Township of Severn 12.030 (8.0% nonulation change 2001 2006)
Total population 208,707 (17.1% average population change 2001 2006)
Oro Medonte is linked to Barrie and Orillia principally via Highway 11. The eastern boarder of
the Township relates south to Orillia and north to Coldwater via Highway 12. County Road
22 /Horseshoe Valley Road runs east -west through the Township near the midpoint and links to
Highway 400 to the west via an interchange. Highway 400 parallels the western border with
Barrie to the midpoint in the Township and then traverses northeast through the Township to
Coldwater and points north. Highway 93 /Penetanguishene Road, which links Barrie to
Penetanguishene, parallels the entire western border of the Township and connects to all of the
key east -west roads that traverse the Township.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 25
Page 52 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Residents who live in the northern third of Township travel to Coldwater, Midland and
Penetanguishene for many of their recreation activities. Residents who live in the
Warminster/Price's Corners area, orient to both Coldwater and Orillia. Residents along the Lake
Simcoe shoreline orient either to Barrie or Orillia. Residents who live in the southwestern part
of the Township (as far north as Craighurst) orient toward Barrie for many of their recreation
activities.
2.3 Community and Planning Context
Agenda Item {AgendaNumber} {ItemDescription}
T he Township of Oro Medonte comprises 586.65 square kilometers, with a population
density of 34.1 persons per square kilometer. Total private dwelling units in 2006 totaled
8,382. The Township comprises 15 recognized settlement areas.
In 1994, the former townships of Oro and Medonte, as well as portions of the Townships of Flos,
Vespra and Orillia amalgamated into the Township of Oro Medonte. The area has been
inhabited for around 2,000 years, first by native Indians, mostly Hurons. French explorers,
missionaries and fur traders travelled through the region from around the 1,600s. Immigrants
from England, Ireland and Scotland began to settle the area in the 1920s. In 1819, a Black
settlement was established by government decree along Line 1.
The excellent quality of life that residents cherish is said to be one of the key factors that makes
the Township a desirable place in which to live. According to the community vision that is the
basis of the Township Official Plan, residents have expressed that this high quality of life is
created in large part by the rural character, the open countryside, farmland, extensive wooded
areas, the Oro Moraine, Lake Simcoe and Bass Lake, as well as the large number of small
settlement areas. There is no one dominant settlement area in the Township, although there is a
grouping of settlement areas along the Lake Simcoe shoreline and three clusters of settlement
within the heart of the Oro Moraine in the west central part of the Township. Another grouping
of settlement areas can be found in the northeastern quadrant. More than half of the population
resides in the southwestern quadrant and along the Lake Simcoe shoreline.
The Township contains a number of significant environmental and topographical features that
comprise the much of the extensive natural heritage system, including the rolling upland areas
that recharge groundwater to the headwaters of six watersheds, the vast forest tracts and the
healthy wetland areas that support diverse wildlife communities, and the stream and valley
systems.
The main geological feature of the Township is the Oro Moraine which extends east -west
through the centre of the Municipality and extends west into Springwater Township. The
moraine is an area of resource competition with its topography that is attractive to recreational
uses, its natural features that are attractive to housing, and its mineral aggregate resources that
are sought after by the aggregate industry. The moraine is also one of the major groundwater
recharge areas in Simcoe County.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 26
Page 53 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
The Township is also blessed with a large number of provincially significant and other less
significant wetlands, as well as provincially significant and other less significant ANSIs (Areas
of Natural and Scientific Interest). There are also many large tracts of woodlands, particularly in
the northern third of the Township and along the Lake Simcoe shoreline. Significant tracks of
Provincially Significant Wetland and the Oro Moraine and the Copeland Forest and Wetland are
publicly owned (Simcoe County, Ontario Ministry of Natural Resources). Bass Lake Provincial
Park is located on the southeast shore of Bass Lake. Schedule B of the Oro Medonte Official
Plan maps the above and other natural features of the Township.
The protection of these natural attributes is a key underlying principle of the Official Plan and is
the basis for the `environment first' philosophy that permeates the Plan. This philosophy "is to
be considered in making all planning decisions whereby the importance of maintaining,
restoring, and where possible, enhancing and improving natural features and ecological
functions is recognized and promoted as a Township priority, to be considered with other
interests in accordance with Provincial Policy and legislation
The Official Plan "recognizes and enshrines the concept of landform permanence' and the need
to permanently protect certain landforms. These include the extensive natural heritage system,
and other lands to be preserved in large measure so that they will always form part of the
Township's landscape including the rural area, significant woodlands and major open space
areas
The Official Plan "includes a comprehensive policy framework which directs development away
from significant natural heritage features and from aggregate resource areas in the Moraine
The Official Plan "will make every effort to promote economic activity that does not negatively
impact the Township's attributes with "additional economic activity encouraged on the lands
in the vicinity of the Lake Simcoe Regional Airport and the Highway 11 /7` Line interchange
Fifteen small settlement areas have been identified in the Official Plan. From north to south,
they include: (the largest are in italic)
Moonstone,
Warminster,
Prices Corners,
Craighurst,
Horseshoe Valley,
Sugarbush,
Jarratt,
Edgar,
Rugby,
Forest Home,
East Oro,
Guthrie,
Hawkestone,
Oro Station, and
Shanty Bay.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 27
Page 54 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
In general terms, the Official Plan "anticipates that the existing pattern of development will
remain unchanged in the future Hawkestone, Craighurst, Horseshoe Valley Resort, Sugarbush
and Warminster are the only settlement areas where significant growth will be allowed by the
policies of the Official Plan. Additional growth in Hawkestone and Craighurst will require
secondary plans and a master servicing plan will be required in Hawkestone. A new rural
residential area called Buffalo Springs is in the planning stages. This development area, which is
projected to reach 500 people, is located on the north side of Horseshoe Valley Road, between
Lines 8 and 9.
2.4 Current Population
nterest in leisure pursuits is influenced by many factors, including demographic
characteristics, the most influential of which are age, income, education, and ethno cultural
background. Future trends in participation in leisure will be influenced by growth in the
population and changes in the profile of the community. The number and origin of new residents
moving into a community can greatly impact demand for leisure, particularly if the new residents
bring different values, interests and expectations. Increased requests are often made for higher
quality leisure opportunities, as well as facilities and programs than have not been offered to
date. However, in a fast growing community, the overall growth in population usually has the
greatest impact on future demand.
The community profile will focus on:
the current and past population and distribution pattern;
the anticipated growth and future distribution pattern;
current and projected future age profile;
household composition, household size and family structure;
education;
income;
employment and travel to work; and
diversity and ethnicity.
The analysis of the current population will primarily cover the 2006 period, with limited
reference to the 2001 population. The data sources include the 2001 and 2006 Canada Census,
as reported by Statistics Canada.
Total Population
The 2006 population for the Township of Oro Medonte was reported by Statistics Canada to be
20,031, an increase of 9.4% from 2001. In 2001, the population of the Municipality was
reported by Statistics Canada to be 18,315. By comparison, the Ontario population increased by
6.1% during the 2001 -2006 period, and the increase in the County of Simcoe was double that at
12 Statistics Canada indicated that most of the growth that was reported in the 2006 Census in
Oro Medonte took place in the first half of the 2001 -2006 period.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 28
Page 55 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Current Age Structure
The age profile of Oro Medonte residents is different from Ontario as a whole and the County of
Simcoe. The local population is considerably older than the provincial average with a 2006
median age of 42.5 years compared to a much lower 39 years for Ontario and 39.8 years for
Simcoe County. Although the 65+ age group was similar in percentage to both the province and
the County in 2006, the percentages for the age 45 -54 and 55 -64 groups were considerably larger
in the Township than either the province or the County (17% and 25% larger respectively for the
two age groups combined). Although the proportion of the child and youth population in the
Township was similar to the province and the County, the pre school age population in the
Township was almost 13% lower than the provincial average, and only slightly lower than the
County average. The young adult population (age 20 -35) was considerably lower in percentage
(27.1% and 17.7% lower respectively). The 25 -29 age group was considerably smaller at 3.7
compared to the provincial average of 6.1% and the County average of 5.2 The mid -age adult
population (age 35 -54) in the Township was similar, although slightly higher in percentage
compared to the province and the County (6.1% and 5.1% higher respectively). The lower
proportion of age 80+ residents in the Township reflects to need for a higher level of housing,
medical and other services that are much more available in urban areas like Barrie and Orillia.
Part of the explanation for the atypical population profile is the pattern of in- and out migration
in Oro Medonte Township. Statistics Canada reported that there is a high out migration of 18 -28
year old residents, with the peak being age 22 -25. Conversely, the most significant in- migration
is for ages 0 -17 and 29 -40, representing young, family- forming adults and their children. A
small out migration pattern was noted for age 43 -53 residents, while a net in- migration pattern
was noted for the 54 -65 age group. The period examined was 2004 -2007.
The larger than typical 50 -69 age group in Oro Medonte is likely the result of an above average
number of mid -aged and empty- nester residents who have been attracted to waterfront and
recreation oriented communities. Some of these residents will still be working and others will
have taken early retirement. It is also likely that an above average proportion of these residents
are in an above average income group.
The considerably lower proportion of young adults may result from an above average proportion
having left the community to seek higher education and employment opportunities, as well as a
more exciting lifestyle afforded by larger and urban communities, and lower cost housing.
Population Change, Township of Oro Medonte, 2001 -2006
Age Category
(Male and female)
Number
0 -4 1 955
5 -9 1,265
10 -14 1,390
15 -19 1,340
20 -24 900
25 -29 735
30 -34 1,045
35 -39 1,525
40 -44 1,630
45 -49 1,595
2001
5.2
6.9
7.6
7.3
4.9
4.0
5.7
8.3
8.9
8.7
Number
965
1,190
1,455
1,450
1,050
745
1,015
1,325
1,740
1,845
2006
Figure 2
4.8
5.9
7.3
7.2
5.2
3.7
5.1
6.6
8.7
9.2
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 29
Page 56 of 289
1
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
50 -54 1,430 1
55 -59 1,185
60 -64 930
65 -69 765
70 -74 670
75 -79 515
80 -84 290
85+ 140
0 -19 4,950
20 -34 2,680
35 -44 3,155
35 -54 9,335
45 -54 3,025
55 -64 2,115
55+ 4,495
65+ 2,380
Totals 18,305
Source: Statistics Canada, 2001 and 2006 Census
Agenda Item {AgendaNumber} {ItemDescription}
7.8
6.5
5.1
4.1
3.7
2.8
1.6
0.8
27.0
14.6
17.2
33.7
16.5
11.6
24.6
13.0
100.0
1
Key Observations: 2001 to 2006:
Overall, the population was older in 2006 compared to 2001.
As the Echo generation (age 12 -27 in 2006) continued to age out of the 0 -19 age group, the proportion of
children and youth declined by 6.3
As the Baby Boom generation aged five years (from age 36 -55 in 2001 to age 41 -60 by 2006), the 35 -44 age
group declined significantly in percentage (11 and the 45 -64 age group increased significantly (13.8
Most of the growth in the older adult population was in the younger portion (age 55 -69). By 2006, the 55+ age
group represented over one quarter of the total population, and exceeded the 0 -19 age group, which slipped to
less than one quarter of the total population.
Age Characteristics, Oro Medonte, Simcoe County and Ontario, 2006 Figure 3
Age Category
(male and
female)
Oro Medonte
Ontario
Difference
(Oro Medonte
Compared to Ontario)
Simcoe County
Difference
(Oro Medonte
Compared to Simcoe
County)
0 -4
5 -9
10 -14
15 -19
20 -24
25 -29
30 -34
35 -39
40 -44
45 -49
50 -54
55 -59
60 -64
65 -69
70 -74
1 75 -79
80 -84
85+
4.8
5.9
7.3
7.2
5.2
3.7
5.1
6.6
8.7
9.2
8.7
7.9
6.2
4.8
3.4
2.6
1.7
1.1
5.5 by12.7%
5.9 same
6.7 by 8.2%
7.3 similar
6.6
6.1
6.5
7.3
8.5
8.2
7.1
6.4
4.5
3.8
3.3 similar
2.8 similar
2.1
1.6
by 21.2%
by 39.3%
by 21.5%
by9.6%
similar
by 12.2%
by 22.5%
by 23.4%
by 37.8%
by 26.3%
by 23.5%
by 31.3%
1,735
1,575
1,245
955
690
520
335
210
5,060
2,810
3,065
6,615
3,580
2,820
5,530
2,710
20,031
5.4
6.2
7.4
7.2
5.8
5.2
6.0
7.1
9.0
8.4
6.9
6.3
5.1
4.1
3.5
2.9
2.0
1.5
March. 2010
8.7
7.9
6.2
4.8
3.4
2.6
1.7
1.1
25.3
14.0
15.3
33.0
17.9
14.1
27.6
13.5
100.0
similar
by4.8%
similar
same
by 10.3%
by 28.9%
by15%
by 7.1%
similar
by9.5%
by 26.1%
by 25.4%
by 21.6%
by 17.1%
similar
by 10.3%
by15%
by 26.7%
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 30
Page 57 of 289
0 -19
20 -34
35 -44
35 -54
45 -54
55 -64
55+
65+
Median Age
25.3 25.0
14.0 19.2
15.3 15.8
33.0 31.1
17.9 15.3
14.1 11.2
27.6 24.7
13.5 13.6
42.5 39.0
Source: Statistics Canada, 2006 Census
2.4.1 Selected Social- Demographic Characteristics
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
similar
by 27.1%
similar
by 6.1°A)
by 17.0%
by 25.9%
by 11.7%
similar
by 9.0%
26.2
17.0
16.1
31.4
15.3
11.3
25.3
14.0
39.8
by3.4%
by 17.7%
by5%
by5.1%
by 17.0%
by 24.8%
by9.1%
by 3.6%
by6.8%
Key Observations about the 2006 population:
The population profile of Oro Medonte is significantly different than average Ontario.
Overall, the population of Oro Medonte was older than both the province and the County (note the median age).
The pre school population (age 0 -4) is notably below the Ontario average as a proportion of the total
population.
The proportion of young adults is well below the Ontario and Simcoe County averages, particularly age 25 -29
reflecting a significant out migration pattern.
The population of middle -age adults and young seniors is well above average Ontario and Simcoe County,
particularly age 60 -64 compared to Ontario, reflecting the attractiveness of the area as a retirement community,
and also reflective of the high cost of housing which is more easily afforded by many middle -age and older
adults.
The proportion of the Township population that is age 80 and older is well below average Ontario and also
below the average for Simcoe County (which contains Barrie and Orillia), as a result of older seniors choosing
communities with required services and suitable housing opportunities.
There are a number of notable differences in the socio- demographic characteristics of Township
residents and families, when compared to averages for the Province and Simcoe County. The
Township is more affluent, with better educated and fewer disadvantaged residents. Most
residents travel outside of the Township to work and most drive their own vehicle to work. The
population is not ethnically diverse. Refer to Figure 4 and the following text for more
information.
Family and Household Characteristics
At 35.9 the percentage of families with children is above the provincial and County averages
(31.2% and 32.7% respectively). In the Township, there was an average or above average
proportion of 5 -19 year olds and a below average proportion of pre school age children in 2006.
There was an above average proportion of 40 and older adults, but a below average percentage of
20 -39 year olds (especially 24 -29 year olds). With a below average proportion of young adults
and very young children, this suggests that a good number of families with children may have
moved to the Township from elsewhere.
The other significant difference is that in Oro Medonte, the proportion of families that are `one
parent' is half the provincial and Simcoe County averages (7.9 compared to 15.8% and 14.3%
respectively). Not surprisingly, the percentage of one person households is also lower in Oro
Medonte (16 compared to 24.3% and 20.6% for Ontario and Simcoe County).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 31
Page 58 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Education
Township residents have attained a slightly higher level of education compared to provincial
averages. Only for completion of university, is the Township percentage a little lower.
However, the proportion of Township residents with a trade or college diploma is higher than the
provincial average. In all categories, educational attainment was higher in Oro Medonte than the
averages for Simcoe County in 2006.
Occupation
In Oro Medonte, an above average proportion of the working population is employed in trades,
transportation and equipment operation and related occupations (18% compared to the provincial
average of 14.1 Compared to provincial averages, the percentages were lower in the
Township for:
Business, finance and administration occupations;
Occupations unique to processing, manufacturing and utilities; and
Natural and applied sciences and related occupations.
In all other categories, the proportions were similar to the provincial averages in 2006. Overall,
the employment profile in Oro Medonte is closer to that of the County, although a little higher in
management occupations; social science, education, government service and religion; and
occupations in art, culture, recreation and sport. In the Township, the percentage for occupations
unique to processing, manufacturing and utilities; and natural and applied science and related
occupations were a little lower than in the County.
In 2006, the labour force employment rate was higher in the Township than the provincial
average and the County of Simcoe. Not surprisingly, the unemployment rate was lower,
especially compared to the provincial average.
Income
In all categories, except for lone parent families, family, household and personal income was
considerably higher in Oro Medonte in 2005 than provincial averages and figures in Simcoe
County (same pattern in 2001). The median income for lone parent families was similar to the
Province and County. The percentage of Township residents in the `low income' category was
about one third of the provincial average, and almost half of the Simcoe County average. The
percentage of residents receiving government assistance was also lower than the provincial
average and that of the County.
This suggests that `affordability' for the purchase of leisure services will be less of an issue for a
larger percentage of the population in Oro Medonte than in most communities. Given the
relatively limited supply of typical leisure opportunities in the Township, there may also be an
above average appetite for expanded and improved leisure services.
Place of Work
The `place of work' pattern in Oro Medonte is very atypical. In 2006, only 7.3% of the
workforce was employed within the Township, compared to the provincial average of 49.6% and
the County average of 33.1 The vast majority (57 worked in Simcoe County, and an above
average proportion (14.6 had no fixed workplace address. Also, an above average percentage
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 32
Page 59 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
worked at home (11.7% compared to the Ontario average of 7.1% and 7.5% for Simcoe County).
This figure is surprising, given the poor Internet service in the Township. However, this speaks
to the opportunity to further increase home -based employment with improved Internet service.
The high proportion of the workforce that commutes each day impacts the willingness and
availability of especially families with children to participate in weekday evening leisure
programming That is further magnified by the large size of the municipality and the above
average time that it takes many residents to travel to a leisure serve venue. Given the limited
time that people have to get home from work and travel to a recreation facility, and the poor
supply of restaurants in the township combine to provide an above average opportunity for food
service business at or near major leisure service venues.
An above average proportion of the Township workforce drive their vehicle to work, and, due to
very limited opportunity, a very small percentage of the workforce utilizes public transit (0.62
compared to 2.4% in the County and the provincial average of 12.9 Two percent of the
Township workforce walk or bicycle to work.
Diversity and Ethnicity
The 2006 census described a Township with very few residents of visible minority and very few
French speaking residents. The total visible minority population was 265 (1.32 compared to
provincial average of 22.8% and the County average of 4 Refer to Figure 4 for the details.
The aboriginal population was greater at 390 residents or 1.9% of the population. That
percentage was similar to the provincial average, but lower than Simcoe County with a figure of
3.1
Selected Socio demographic Characteristics, Township of Oro Medonte,
County of Simcoe and the Province of Ontario, 2006 Figure 4
Demographic Characteristics
Township of County
Oro Medonte of Ontario
Simcoe
Family and Household Characteristics
Total number of census families
Number of persons per family in all census families
Lone parent families
Number of persons per family in lone parent families
Total private households
Households containing a couple with children
Households containing a couple without children
One person households
Average household size (persons/household)
Education
No certificate, diploma or degree
High school certificate or equivalent
Apprenticeship of trades certificate or diploma
College, CECEP or other non university certificate or diploma
University certificate or diploma below the bachelor level
University certificate, diploma or degree
Income (2005)
Median income all census families
Median income all private households
Median income lone- parent families
Agenda Item {AgendaNumber} {ItemDescription}
6,160 122,655 3,422,315
2.9 3.0 3.0
485 (7.87 14.3% 15.8%
2.4 2.5 2.5
7,320 156,655 4,555,025
2,630 (35.9 32.7% 31.2%
2,835 (38.7 31.6% 28.3%
1,170 (16.0 20.6% 24.3%
2.7 2.6 2.6
3,270 (19.9 25.3% 22.2%
4,390 (26.8 28.7% 26.8%
1,820 (11.1 10.4% 8.0%
3,760 (22.9 21.6% 18.4%
585 (3.6 2.9% 4.1%
2,580 (15.7 11.9% 20.4%
$73,962 $69,263 $69,156
$69,274 $62,328 $60,455
$37,935 $37,932 $38,448
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 33
Page 60 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Persons 15 years and over with income 15,860 322,665 9,340,020
Median income persons 15 years and over $30,288 $27,838 $27,256
Government transfers as a of total income 8.6% 10.6% 9.8%
in low income before taxes all persons 5.5% 9.3% 14.7%
Employment
Labour force participation rate 70.6% 68.5% 67.1%
Labour force unemployment rate 5.3% 5.7% 6.4%
Occupation
Sales and Service occupations 2,765 (24.1 22.2% 23.5%
Trades, transport and equipment operators related occupations 2,060 (18.0 17.8% 14.1%
Business, finance administration occupations 1,755 (15.3 15.5% 18.6%
Management occupations 1,350 (11.8 9.9% 10.3%
Occupations in social science, education, government service 1,100 (9.6 7.5% 8.4%
religion 650 (5.7 5.3% 5.3%
Health occupations 615 (5.4 7.7% 7.2%
Occupations unique to processing, manufacturing utilities 430 (3.7 2.8% 2.6%
Occupations unique to primary industry 375 (3.3 4.1% 7.0%
Natural applied sciences related occupations 365 (3.2 2.3% 3.1%
Occupations in art, culture, recreation sport
Place of Work
Work at home 1,285 (11.7 7.5% 7.1%
Work outside of Canada 45 (0.41 0.34% 0.6%
No fixed workplace address 1,595 (14.6 11.9% 9.7%
Work in Oro Medonte (or municipality of residence) 805 (7.3 33.1% 49.6%
Work in another municipality within Simcoe County (or in a different 6,250 (57 27.0% 12.9%
census subdivision within the same census division/county)
Work outside of County of Simcoe but within Ontario (or in different 965 (8.8 19.9% 19.7%
census division/county)
Work in a different province 15 (0.14 0.18% 0.51%
Travel to Work
Car, truck or van as driver 8,440 (87.6 81.2% 71%
Car, truck or van as passenger 850 (8.8 9.4% 8.3%
Public transit 60 (0.62 2.4% 12.9%
Walk or bicycle 190 (2.0 5.7% 6.8%
All other modes 90 (0.93 0.51% 1.0%
Diversity and Ethnicity
Mother Tongue
English only 91.9% 87.9% 68.4%
French only 1.2% 2.6% 4.1%
English and French 0.17% 0.25% 0.27%
Other languages 6.7% 9.2% 27.2%
Language Most Often Spoken at Home
English 97.6% 95.5% 80.3%
French 0.2% 0.85% 2.4%
Non official language 2.1% 2.9% 15.1%
English and French 0.05% 0.10% 0.22%
English and non official language 0.12% 0.62% 2.0%
Visible Minority Characteristics
Total visible minority population 265 (1.32 4.0% 22.8%
Black 55 (0.27 0.88% 3.9%
Chinese 50 (0.25 0.44% 4.8%
Korean 35 (0.17 0.18% 0.58%
Filipino 30 (0.15 0.14% 1.7%
Latin American 20 (0.10 0.21% 1.2%
Japanese 20 (0.10 0.14% 0.23%
South Asian 15 (0.07 0.41% 6.6%
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 34
Page 61 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Southeast Asian 0.24% 0.92%
West Asian 0.12% 0.80%
Arab 0.10% 0.93%
Other 15 (0.07 0.12% 0.47%
Multiple 20 (0.10 0.17% 0.64%
Aboriginal Population 390 (1.9 3.1% 2.0%
Source: Statistics Canada, 2006 Census
2.5 Looking to the Future and Implications for Leisure Services
T he County of Simcoe has recently prepared a growth management strategy called the Simcoe
Area Growth Plan. The Plan responds to shifting public perceptions about growth and the
effects of urban development on the environment and the quality and sustainability of the
communities in the County and area. The Plan also responds to a number of new Provincial
policy directions regarding long -range planning and growth management. The population of the
County has nearly doubled since 1981 from 240,000 to almost 440,000 by 2006, with a good
deal of that growth (in population and employment) taking place in the past decade. The
expectations of the development community are for a County population of nearly one million by
2031, which would represent a significant acceleration in growth, compared to the past. Much of
that growth in employment and population is targeted for the southern third of the County, along
the Highway 400 corridor.
The Provincial Growth Plan has determined the 2031 population allocation for Simcoe County
and the separated cities of Barrie and Orillia at 667,000. The Provincial Growth Plan also has
provided guidelines for the 2031 population of the cities of Barrie and Orillia. The Simcoe Area
Growth Plan has recommended the distribution of the remaining unallocated population to the
other municipalities comprising the County. Refer to Figure 5 for the 2006 population of Oro
Medonte and the municipalities included in the secondary market area identified for this
Strategic Facility Plan.
Distribution of Population for Oro Medonte and the Municipalities
Within the Primary and Secondary Market Areas Identified for this Strategic
Facility Plan, as Determined by the Simcoe Area Growth Plan, 2008
Community
2006 Census Total 2031 Proposed Total Potential Population
Population Population Growth
2006 -2031
Oro Medonte
(primary market area)
City of Barrie
City Orillia
Town of Midland
Springwater Township
Tay Townshiy
Tiny Township
Severn Township
Total
20,800
133,500
31,400
16,900
18,100
10,100
11,200
12,500
254,500
Agenda Item {AgendaNumber} {ItemDescription}
28,100
185,000
41,000
19,700
26,500
11,300
13,900
20,300
354,800
7,300 (35.1%)
51,500 (38.6
9,600 (30.6
2,800 (16.6
8,400 (46.4
1,200 (11.9
2,700 (24.1%)
7,700 (61.6
91,200 (35.8
Source: Simcoe Area Growth Plan, Hemson Consulting Ltd., 2008
Note: The 2006 total population was adjusted upward within the Simcoe Area Growth Plan to include an
approximately 4% Census under coverage.
Figure 5
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 35
Page 62 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Based on either the official Statistics Canada number of 20,031 or the adjusted 2006 census
population as noted in Figure 5, it is predicted that the primary market area (the Township of
Oro Medonte) will increase in population by between 7,300 (35.1 and 8,000 (39.9 between
2006 and 2031. Utilizing the adjusted 2006 figures noted above, the secondary market area is
predicted to increase by 91,200 (35.8 during the same period, resulting in a primary and
secondary market area population of 354,800 by 2031. Note that the predicted rate of growth for
Oro Medonte is similar to Barrie, Orillia and the average for the market area. The growth rate is
expected to be lowest in Tay Township followed by the Town of Midland, and highest in Severn
Township, followed by Springwater Township.
The Simcoe Area Growth Plan made the following additional recommendations that will
influence the Township of Oro Medonte and this Strategic Facility Plan.
Employment for Oro Medonte is projected to increase by 1,500 between 2006 and 2031 (an
increase of 31.9
Employment for the secondary market area is projected to increase by 34,500 between 2006
and 2031 (an increase of 30.6
Recreation -based housing should be limited to specific locations associated with identified
natural creation attractions and where the following conditions are met:
The housing is adjacent to and has good accessibility to an identified natural recreation
attraction (e.g., waterfront, ski resorts, golf courses);
The housing is not adjacent to or abutting an existing designated settlement area
boundary;
The housing development is of a scale considered appropriate relative to the scale of the
natural recreation attraction;
The housing development would not have any negative impacts on nearby agricultural
activities, rural resources or the rural `aesthetic';
There would be no negative impacts on the Natural Heritage System, including hazard
lands, water bodies or water courses, or cultural or architectural resources;
There would be no negative impacts on existing shoreline areas;
The housing development is serviced with full municipal or communal services; and
There would be no negative impacts to the County or the Municipality with respect to the
cost to provide and maintain the necessary infrastructure.
The Growth Plan density and intensification targets should be applied to the larger urban
areas, and as a result, the small -town character of rural locations would be maintained.
Discussions with the staff in the Department of Development Services, Township of Oro
Medonte, identified the following anticipated growth pattern for the Township, looking ahead to
2031 and beyond. This projection is based on policies in the Township Official Plan and current
development proposals. See Figure 6 below.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 36
Page 63 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March, 2010
Residential Growth Potential, Township of Oro Medonte, 2009 -2031 and Beyond Figure 6
Seasonal Permanent Population
Area of the Township I Population
Craighurst 1 2,200
Hawkestone 1 Potential no current growth demand identified
Shanty Bay 700
Remainder of the Lake Simcoe Waterfront 800 -1,000
Horseshoe Valley 2,200 2,500 (may be higher)
Warminster 306
Price's Corners 50
Buffalo Springs 500
Moonstone 300
Small estate residential developments 150
Severances 3,000 -4,000
Totals 2,200 10,500- 11,700
2006 Census (Statistics Canada) 20,031
Allocation of permanent population to the Township 28,100 (8,069)
to 2031 by the Simcoe Area Growth Plan
Source: Oro Medonte Department of Development Services and Building, 2008
Based on the 2031 population allocation for Oro Medonte that is proposed in the Simcoe Area
Growth Plan, and other factors, patterns, and assumptions; age specific population projections
were prepared for this Strategic Facility Plan by demographer John Kettle for the years 2011,
2016, 2021, 2026 and 2031.
The population projections are based on Statistics Canada's final census figures for 2001, current
2006 census data, and Statistics Canada population estimates for 2004 -2007 for the Township.
The projections use the `cohort component' method, which is the demographic standard. The
calculations begin with the base -year population distributed by age and sex. Age- and -sex-
specific survival ratios and age specific fertility rates are applied to this distribution, making
allowance for immigration and emigration. (Statistics Canada, Population Projections for
Canada, Provinces and Territories, Catalogue 91 -520).
The projection incorporates the current Ontario age- and sex specific mortality rates and the
trends of these rates. Trends in the total fertility rate were calculated from Statistics Canada's
population estimates for the Township for 2004 -07. The distribution pattern of fertility rates
among the fertile women's age groups is that which is current for Ontario. The broad pattern is
for the highest number of births each year to be moving slowly from younger to older women.
The projections start with a total fertility rate of 1.53 in 2008 (TFR total lifetime births for a
woman who cumulatively experienced the current age specific rates), and ends at 1.3 in 2031.
The initial figure is higher than in other parts of the province, but the final figure is about equal
to what is anticipated in Ontario and Canada generally, a quarter century ahead. These TFRs
produce about 155 births in 2008 and are projected to result in 225 births in 2031.
Net in- migration for the period 2004 -07 showed a sharp annual decline from immediate previous
years. Because Township officials believe this trend will be reversed in the future, a theoretical
pattern of future in- migration was developed, based on an increasing development of new
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 37
Page 64 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
housing during the period 2008 -2031. For the population projection, the increase in new housing
begins slowly but accelerates in the later years of the projection. In the final year of the
projection, it was assumed that the Township will experience a net in- migration of 1,080, or
nearly 4% of the population.
The age distribution of newcomers was based on southern Ontario intra provincial migration
patterns with a small admixture of international immigrants, but with a significant addition of
people over 50 years of age. The age distribution in the last year of the projection shows the
population that would be aged 60+ as 38% of the total, compared with 18% in 2001.
The 2006 census showed an unusually skewed population distribution in Oro Medonte, with
large peaks in the 8 -18 and 35 -60 age groups, a marked valley in the 19 -34 age group
comparable to that experienced in some European countries after World War I, and also a
notable fall -off in the youngest part of the population, with populations for each year under the
age of 8 markedly lower than the older ones. These demographic characteristics, combined with
the noted decline in new housing development in recent years, led to the production of an initial
projection that showed no increase, in fact a slight decline, in population over the projection
period 2008 -31. However, because of the belief of Township officials that increasing
development and therefore population growth is likely, this projection has not been presented.
Refer to Figures 7 and 8 below for the age specific projections (numbers and
five -year age groupings and lifestyle grouping for 2011, 2016, 2021, 2026
included are the census figures for 2001 and 2006. The light shading represents
Echo generation and the darker shading represents the approximate Baby Boom
Age Specific Population Projections for the Period 2011- 2031by Five -year Age Groupings
including 2001 and 2006 Census Figures) for the Township of Oro Medonte
ge 2001 2006 1 2011 2016 2021
Group 1 I I
0 -4 950 5.19 971 4.85 859 4.17 863 4.04 1,030 4.49 1,233 1
5 -9 1 6.85 1,174 5.86 1,080 5.25 948 4.44 999 4.35 1,205
10 -14 1,395 7.62 1,396 6.97 1,221 5.93 1,133 5.93 1,041 4.54 1,119
15 -19 1,335 7.29 1,466 7.32 1,438 6.98 1,282 6.01 135 5.38 1,172
20 -24 900 4.91 1,186 5.92 1.320 6.41 1 317 6.17 1,223 5.33 1 32
25 -29 740 4.04 842 4.2 1,024 4.97 1.26 5.74 1,283 5.59 1,L56
30 -34 1,045 7.71 1,008 5.03 874 4.25 1 14 5.22 1,371 5.98 1.477
35 -39
50 54 1 1 8.41 1,352 6.75 1,093 5.31 Y62 4.51 1,260 5.49 1,553
45-49
40-44 ,�0 1,6 1,410
1 7r16 �(r7 v" 1,783 8.66 1,446 6.78 1,064 5.38 1,192
6 1(,73 1 �1 1,543 6.73 1,390
55 -59 1,185 6.47 1,507 4/4 16 .24 1,9051 8.3
60 -64 925 5.05 1,287 6.4 7 6i22T 7 LnY 21;609537 053
65-69
70-74 670 3.66 6 694 8 3.38 1 919 4.46 I 1 Z V 1,530 6 67 1 1,�
75 -79 1 520 I 2.84 540 2.7 60 2.94 1 849 3.98 1 5.16 1,487
80 -84 1 295 I 1.61 333 1.66 434 2.11 1 515 2.41 752 3.28 1 1,057
85+ 1 140 1 0.76 160 0.8 1 316 1.53 1 491 2.3 675 2.94 1 951
Totals 1 18,315 1 20,031 1 20,587 1 21,341 22,941 1 25,232
Source: Statistics Canada Census (2001, 2006); John Kettle, November, 2008
Agenda Item {AgendaNumber} {ItemDescription}
2026
percentages) by
and 2031. Also
the approximate
generation.
4.89
4.78
4.43
4.64
4.88
4.98
5.85
6.15
5.52
4.72
5.51
6.73
8.14
7
7.111
5.89
4.19
3.77
1,341
1,452
1,351
1,279
1,223
1,326
1,514
1,702
1,718
1,567
1415
1,618
1.920
2,225
1, 8
28,100
Figure 7
2031
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 38
4.77
5.17
4.81
4.55
4.35
4.72
5.39
6.06
6.11
5.58
5.04
5.76
6.83
7.92
A e
9
4.74
4.65
Page 65 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Lifestyle
Cateporx
Pre school
(0-4)
Elem. School
(5 -14)
ec. School
(15 -19)
Young Adults
(20 -34
Mid -li Adults
(35 -54)
Empty Nesters
(55 -64)
Older Adults
(65
Older Adults
(55+)
Older Adults
(75
Totals
Population Projections by Lifestyle Categories for the Period 2011 -2031
(including 2001 and 2006 Census Figures) for the Tp nship of Oro Medonte
2001 I 2006 2011 1 2016 1 2021
I I I% I I I
950 5.2 971 4.9 859 4.2
2,650 14.5 2,572 12.8 2,301 11.2
1,335 7.3 1,467 7.3 1,439 7.0
2,685
6,195
14.7 3,036
33.8 1 6,517
2,110 11.5 2,795
2,390 13.0 2,674
4,500 24.6 5,469
955 5.2 1 1,033
15.2 3,217
32.5 6,024
14.0 3,192
13.3 3,557
27.3
5.2
Agenda Item {AgendaNumber} {ItemDescription}
6,749
1,356
18,315 1 1 20,031 1 20,587 1
15.6
29.3
15.5
17.3
32.8
6.6
Source: Statistics Canada Census (2001, 2006); John Kettle,
863 4.0 1,030
2,081 9.8 2,040
1,282 6.0 1,235
3,656 17.1 3,878
5,373 24.2 5,098
3,464 16.2 3,760
4,627 21.7 5,902
8,088 37.9 9,662
1,854 8.7 2,610
21,341 1 1 22,941
November, 2008
Figure 8
2026 1 2031
I I I
4.5 1,233 4.9 1,341 4.8
8.9 2,324 9.2 2,802 1 10.0
5.4 1,172 4.6 1,279 I 4.6
16.9 3,966 15.7 4,063 14.5
22.2 5,528 21.9 6,401 22.8
16.4 3,750 14.9 3,538 12.6
25.7 7,260 28.8 8,676 30.9
42.1 11,010 43.6 12,214 43.5
11.4 3,495 13.8 4,408 15.7
1 25,232 1 28,100 I
Key Observations about the Population Projections
The total population is projected to increase slowly in the first five years of the projection
period and then gradually accelerate, with the fastest growth in the 2026 -2031 period.
The shifts in population profile will be most influenced by three factors: i) the aging of
the Echo generation (age 16 -31 in 2010), ii) the aging of the Baby Boom generation (age 45-
64 in 2010), iii) and the anticipated growth in the total population.
In the projection, the pre school age group is expected to decline in percentage to around the
year 2016 and then increase, but not back to the 2001 level until after 2031. The number of
0 -4 year olds is projected to decline between 2006 and 2016 and then rapidly increase to
exceed the 2001 level by 2021, and continue to increase to 2031 and beyond.
The elementary school population (age 5 -14) is expected to decline from the 2001 level until
around 2021 when both the number and percentage is projected to increase. The proportion
of the population that this age comprises is expected to decline from 14.5% in 2001 to 8.9%
by 2021. The number is projected to decline by 530 between 2006 and 2021.
The secondary school population (age 15 -19) peaked around 2006 and is projected to
decline through 2026, and then increase toward 2031 and beyond. However, the percentage
that this age group comprises is expected to decline steadily from 7.3 in 2006 through to at
least 2031 when the percentage is expected to be 4.6.
Even with the above average out migration of 18 -28 year olds, young adults (age 20 -34) are
projected to increase significantly in number through 2031 (1,027 or 33.8% between 2006
and 2031). Although the percentage will increase through 2016 to 17.1, it will begin to
decline after that date back to near the 2001 figure of 14.7 The aging of the large Echo
generation (currently age 15 -30) will be influencing this young adult age demographic.
After peaking around 2006, the mid -life generation (age 35 -54) is projected to decline by
21.9% (1,419) by 2021 and then gradually increase through 2031 and beyond. The
percentage that this age group comprises is anticipated to decline steadily from 33.8 in 2001
to around 22.2 by 2021, when it will begin to increase, but only to 22.8 by 2031.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 39
Page 66 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
The empty nester market (age 55 -64) is expected to increase by around 1,000 and also in
percentage until 2021, hold steady through 2026 and then begin to decline.
The older adult market (age 65 is projected to experience the greatest increase in number
and percentage of any age group. The number is projected to increase from 2,674 in 2006 to
8,676 by 2031 (an increase of 6,002 or 224.5 The percentage is expected to more than
double from 13.3 in 2006 to 30.9 by 2031.
Broad Implications of the Changing Age Profile for Demand for Leisure Activities
Fewer children will be available to participate in leisure activities. The aging of the large
Echo generation (age 16 -31 in 2010) and the smaller child and youth population that is following
the Echo generation (and now comprises almost all of the minor sports age profile) will result in
fewer children being available over the next fifteen years to participate in all sports and leisure
activities of interest to children and youth.
In all communities, the participation rate for sports begins to decline at around age 12 and drops
off considerably after age 20. The participation rate comprises the percentage of a particular
age group that participates regularly in an activity, and the number of hours of participation per
person per season.
It is projected that the 4 -12 age group will decline from 2,305 in 2001 and 2,198 in 2006, to a
low of 1,800 by 2016 through to 2021, (398 or 18 and then slowly rebound back to around the
2006 level by around 2026, and increase to 2,561 by around 2031. This age group is projected to
decline as a percentage of the total population from 12.6% in 2001 and 11% in 2006, to a low of
7.8% by 2021 and rebound a little to just 9.1% by 2031. If total population growth does not
accelerate in the later years of the projection as expected, then the number and percentage of the
principle participants in minor sports will not increase much, even after 2021.
Fewer youth will be available to participate in leisure activities. The 13 -17 age group is
expected to show the greatest and most sustained decline in number and percentage. This age
group peaked around 2006 at 1,461 (7.3 but, even as the Township is expected to grow, this
age group is projected to decline steadily through 2026 to a low of 1,123 (4.5 before
rebounding only slightly to 1,301 (4.6 by 2031.
Although the young adult market will increase in number, the overall number of young and
middle -aged adults available to participate in adult sports will at best hold steady. The
number of potential participants available for adult sports is also projected to decline a little.
After peaking in 2006, growth in the combined young and middle -age adult market (age 18 -54)
is projected to decline over the next 12 -15 years, even as the population of the Township is
projected to grow. It is anticipated that the 18 -54 age group will decline by 5.6% or 566 between
2006 and 2021 (10,130 to 9,468), gradually increase back to the 2006 level by around 2027, and
then increase to 10,969 by 2031. And although the crucial 18 -34 age group is projected to
steadily increase in number from 3,613 in 2006 to 4,567 by 2031 (an increase of 954 or 26
most of that growth will be in the next ten years as the Echo generation moves through, after
which growth will slow.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 40
Page 67 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
In most communities, the aging of the Echo generation (age 16 -31 in 2010) is `feeding' the
young adult market and increasing demand for individual and team sports. However, a dominant
phenomenon in Oro Medonte Township is the above average out migration of young adults
seeking high education, employment, excitement and lower cost housing. This out migration is
muting some of the potential for increasing demand for leisure activities of interest to this
young adult market (e.g., hockey, tennis, cycling, fitness programs, soccer, slow -pitch baseball,
etc.) and the pattern is not anticipated to change until more significantly lower -cost housing
becomes available and local employment opportunities improve.
Demand for leisure programming, events and activities of interest to older adults will more
than double over the next twenty years. With the aging of the Baby Boom generation and the
likelihood of most new residents being middle age or young seniors, the older adult markets will
increase, as will the demand for all of the activities of interest to the adult market. By 2031, the
Baby Boom generation will be age 66 -85 and is projected to represent 27% of the total
population. The adult market age 20 -84 is projected to increase steadily from 13,240 in 2001
and 14,864 in 2006 to 21,372 by 2031 (an increase of 6,508 or 43.8% since 2006, with most of
the increase in the older ages groups). This age group is projected to also increase as a
percentage of the total population from 72.3% in 2001 to peak at 78.3% by around 2021, and
then slowly decline to 76.1% by 2031, as the Baby Boom generation gradually ages into the
older years of the adult market.
Between 2006 and 2031, the 55+ age group is projected to increase by 6,745 or 123% (from
5,469 to 12,214). The increase in the proportion of the population for this age group is projected
to be from 27.3% in 2006, peak at 43.6% in 2026 and decline slightly to 43.5% by 2031. As
noted above, the age 65+ market is projected to increase by over 6,000 or 225% between 2006
and 2031.
Refer to Section 4.2 and Appendix C for more information on anticipated local trends in leisure
demand and related factors.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 41
Page 68 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 42
Page 69 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
3.1 Introduction
Agenda Item {AgendaNumber} (ItemDescription}
Chapter Three: Delivery of Leisure Services
D ue to the predominantly rural nature of the Township, its large size, the low density and
spread -out nature of the population, and the close proximity of Barrie, Orillia and Midland
with their well developed leisure facility and park systems, the Township has not had to provide
many of the types of facilities that are typical of communities with a population of 20,000. As a
result, the variety of providers of leisure services, as well as the range and quality of facilities,
parks and other open space is less developed in Oro Medonte than for most communities with its
population, but not unlike many rural communities. The principle provider of parks, facilities
and other leisure services is the Municipality through the Department of Recreation and
Community Services. Other providers of leisure opportunities (facilities, open space,
programming and support) within the Township include:
The voluntary/non profit sector (e.g., sports groups, community associations, hall boards, and
clubs);
The County of Simcoe;
Ontario Ministry of Natural Resources;
The Simcoe County District School Board;
The Simcoe Muskoka Catholic District School Board; and
The commercial sector.
Neighbouring Communities
The types of facilities in the surrounding communities that receive significant amounts of use
from Township residents include: arenas, indoor aquatic facilities, fitness facilities, gymnasia,
large halls, higher level soccer facilities, the Barrie Sports Dome (indoor soccer, golf, etc.), three
YMCAs, movie and performance theatres, art galleries, museums, libraries, youth centres, older
adult centres, and curling rinks
There are plans to expand and otherwise improve facility provision in the City of Barrie, the City
of Orillia and Springwater Township, with major complexes planned (from municipal facilities
to a YMCA). Facilities under consideration for the near term include: at least two additional
arenas, at least two indoor aquatic facilities, a fitness centre, gymnasia, multi purpose program
facilities, an indoor running /waking track, an older adult centre, an outdoor ball hockey facility,
and outdoor and indoor soccer facilities.
Three specific proposals include Orillia's twin pad arena and soccer facility, the Multi -Use
Recreation Facility in Orillia, the YMCA -by- the -Bay in Barrie, and the Multi -Use Recreation
Complex for the Midhurst area in Springwater Township. The Orsi Group of Companies has
been exploring the market for and feasibility of a soccer and arena facility to be located in
Severn Township, near Orillia and Oro Medonte.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 43
Page 70 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March, 2010
3.2 The Department of Recreation and Community Services
O ver the years, the Municipality has adopted a philosophy for the provision of leisure
services (parks, facilities and programming) whereby the Township has focused primarily
on the `base' and `recreational' level of provision, relying on Barrie, Orillia (and to a lesser
extent Midland and Severn Township) to provide higher level programming and more
specialized and higher level indoor and outdoor facilities. Examples would include: competitive
youth and adult soccer, indoor soccer, competitive ball facilities and programs, indoor and
outdoor tennis facilities, curling rinks, libraries, indoor aquatic facilities and programs, fitness
facilities and programs, arts facilities and programs, museums, large multi purpose and social
event space, facilities and programs for older adults, and arenas.
As a result of this philosophy which is typical of rural communities with a large geographic
area, low population density and a below average commercial and industrial tax base the
Municipality provides a limited range of facilities, parks and leisure programming, either through
direct public ownership and operation or via various indirect arrangements with others. The
types of facilities that the Municipality directly provides include indoor artificial ice,
recreational -level softball diamonds, recreational -level soccer fields, trails, playgrounds, outdoor
multi purpose sport pads, picnic areas, a beach, boat launches, and indoor multi purpose spaces
(the arena banquet hall, the Ian Arthur Beard program/seminar room and, until recently, eight
small community halls seven of which are managed by volunteer boards).
The Municipality provides recreation facilities, parks and programs through the Department of
Recreation and Community Services. In addition to providing and maintaining a number of
indoor and outdoor recreation facilities, the Department assists community -based volunteer and
non profit groups to provide facilities, programming and events, through community
development and volunteer engagement roles. If no group is available to provide a program that
is in sufficient demand, if there is excess demand, or if an available program is not of a high
enough quality or is too expensive for many residents, the Department could step in to offer that
program. Regularly, the Department offers programs on a `trial' basis to test demand. Although
the historical role of the Municipality has been mainly as an indirect provider and to support
others, an increased direct programming role has been assumed over the past three years.
Additional detail about specific Department roles is provided in Figure 9. Figure 10 outlines the
structure of the Department. Also see below for the Department's Mission Statement.
The Mission Statement of the Department of Recreation and Community Services is to
strengthen Community through programs, services, parks and facilities that promote healthy
lifestyles, connect families and neighbours, recognize culture and heritage; thereby enriching the
quality of life in Oro Medonte.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 44
Page 71 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte
Range of Services of the Department of Recreation and Community Services
Township of Oro Medonte, 2009
People
Social Recreation and Cultural
Programs
Recreation programs for all ages
throughout the Township
Summer and March Break camps
Community special events
Community Development
Support of the efforts of individual
communities within the Township
to identify and address their needs,
including partnerships, and
organizational and leadership
development
Foster and enhance volunteer
programs and opportunities
Provide leadership and community
development to enhance grassroots
community initiatives
Township Support
Support to community hall boards,
the History Association, the
Horticultural Society, sports groups
and other community service
organizations
Public information and production
of the Recreation and Community
Services Brochure
Administration of grants and
facility subsidies
Assistance with community -led
programming and events
Strategic and Business Applications
Ontario's Lake Country
Marketing and Contracts
Assistance in economic
development strategies
Long -term planning and strategy
development for recreation and
community Services
Agenda Item {AgendaNumber} {ItemDescription}
Places
Community Facilities
Development, management and
operation of:
Community halls, in partnership
with community hall boards
The Township Administration
Centre
The Oro Medonte Community
Arena and Hall
Old Town Hall
Ian Beard Community Centre
Historic and Heritage Sites
Oro African Church
Historic Plaques and
Monuments
Library Services
Management of library service
contracts
Township Administration Office
Facility management
Parks
March. 2010
Figure 9
Parks Development and Preservation
Management of construction and
development projects for parkland
and facilities
Acquisition of public parkland and
open space
Planning and development
Natural and environmentally
sensitive areas preservation
Operations and Maintenance of Parks
and Other Open Spaces
Contract administration for turf
maintenance
Sports fields
Playgrounds
Parks and open space
Swimming areas and wharfs
Trail Development and Management
Oro Medonte Rail Trail
Trail linkages
Partnership with local trail
organizations, County of Simcoe,
and surrounding municipalities to
enhance trails and develop linkages
Promotion of trails
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 45
Page 72 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Organization Chart for the Department of Recreation and Community Services Figure 10
Recreation and Community F
Services Assistant
Supervisor of Parks and Facility
Operations
Senior
Management
Director of Recreation and
Community Services
Parks and Facility
Operators (4)
Facility Maintenance
Custodian (1)
Part -Time Custodial
Staff (1)
Manager /Supervisor
Community Recreation
Coordinator
Program and Day Camp
Instructors
(Numerous)
Bargaining Unit
Excluded
Bargaining Unit
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 46
Page 73 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Based on the most recent inventory, the Township owns 117 hectares (290 acres) of parkland,
60% of which is undeveloped land. There are 11 waterfront properties that the Township owns,
ten of which are small and undeveloped. That is in addition to the Line 9, Shanty Bay and
Carthew Bay wharfs (two with launch ramps) which are all small sites, but developed to a
degree. The federal wharf in Hawkestone will soon be deeded to the Township. Bayview
Memorial Park is a 4.29 hectare waterfront park with a beach, picnic facilities (including two
shelters), a playground, a basketball half court, gardens and sitting areas. Over half (38 of 54) of
the parks are under two hectares in size, ten are between two and five hectares in size and only
five are larger than five hectares. The largest park, at 34.43 hectares, is the recently enlarged
arena/Lions sports park site, often referred to as the Guthrie Site. Eight parks contain one or
more ball diamonds and/or soccer fields. Eleven of the 54 parks have minimal frontage and are
thus difficult to access and not sufficiently visible. Currently, an assessment of the parks and
open space system is underway and it is likely that all of the above numbers will change, but not
the overall impression of the open space system.
When a community or sports group requests a new facility or improvements to an existing
facility or public park, the current policy is that the Municipality can enter into a 50/50
partnership with the group to cover the capital cost, if the facility is deemed `required'. If a new
facility or improvements are initiated by Council, the project is funded 100% from the Municipal
Recreation Capital Projects Fund. If improvements to facilities on private /communal parkland
are requested, all requests for funding must be directed to Township Council.
The Department is assisted by the Recreation Technical Support Group, comprised of
community members and Council representatives. This group acts in an advisory and planning
capacity.
Throughout the year, the Department and community -based volunteer groups offer a variety of
leisure and related programming, utilizing municipal halls, schools and outdoor venues.
Programs are available for:
infants and pre school age children (e.g., the Ontario Early Years Program, dance
programs, Red Cross Swim, parent and tot programs, introductory skating programs);
children and youth (age 6 -15) (e.g., dance, guitar lessons, baby sitting courses, summer day
camp, Red Cross swim, recreational skating); and
adults and older adults (e.g., recreational co -ed volleyball, a variety of types of dance,
health and wellness programs, sports coaching clinics, introductory computer and Internet
training, sea kayaking, art and craft programs, theatre arts, singing, cooking /baking classes,
Scouts, Beavers, Venturers, card and table games, Canada Day celebrations, New Year's Eve
dances, music concerts, Halloween parties, bicycle safety clinics, and recreational skating).
The above programs and events are in addition to organized minor and adult hockey, figure
skating, baseball and soccer.
Over the past three years, participation rates for recreation programs have increased dramatically
through increased focused programming, and enhanced marketing and promotion.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 47
Page 74 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
A recent re- structuring of the Recreation and Community Services Department (see Figure 10
above) has enabled it to focus additional efforts in programming and community development, as
well as parks management and operations.
Community Halls and Hall Boards
Seven of the eight municipally -owned community halls are managed by a volunteer board. Each
board is responsible for the operation and maintenance of `their' facility, guided by Municipal
policies and procedures, including fire safety and building inspections, as well as health, safety
and alcohol regulations. Each board must generate sufficient financial resources via facility
rental, donations and fundraising to cover annual operating costs and their share of capital
improvements as required. Boards must prepare a five -year capital plan and participate in the
annual review and update of their plan. The boards are also responsible for promoting and
booking their hall; recruiting and co- ordinating volunteer resources to assist with carrying out
responsibilities; and hosting an annual public meeting to select a chair, secretary, treasurer and
directors. The Old Town Hall community facility is managed by the Department of Recreation
and Community Services, as is the second floor hall associated with the arena and the small
program room located in the Ian Arthur Beard Complex.
Most of the events that are initiated by the hall boards are `fundraising' in nature rather than
leisure programs offered to the community. Some of the halls are rented by others to offer
scheduled programs and events or one -time, often annual events. The exception is Hawkestone
Hall, operated by the Hawkestone Hall Board and programmed by the Hawkestone Community
Association. In addition to events initiated by the hall board, Hawkestone Hall supports a variety
of leisure /community programs and events such as: Area Art Appreciation Day, the Young
Gourmet Club, Books and Baking, the Weight -loss Support Group, a painting seminar, the
Hawkestone Singers, Scottish Dance (including the Scottish festival Youth Dance Workshop and
Summer Camp), Scouts, Beavers, Venturers, Euchre, Canada Day celebrations, Easter Egg Hunt
in the Park, New Year's Eve Dance, music concerts, Halloween parties, bicycle safety clinics,
and the Hawkestone Theatre Camp. In addition, a small library of popular adult and children's
books is provided at the hall, along with Internet service via several on -site computers. Recently,
the hall is also accommodating the Oro Medonte Minor Sports Association office.
The Municipality is becoming increasing at risk regarding substandard facilities (fire safety,
accessibility, and insurance requirements; as well as security, and LCBO and Ontario Building
Code regulations). There is also risk associated with volunteers operating public buildings; for
example: compliance with Township and other policies and regulations regarding type of use,
compliance with regulations, the Occupiers Liability Act, etc.
Please refer to Section 4.4 for more on community halls and the recommended provision
strategy for indoor multi purpose facilities.
The Oro Medonte Minor Sport Association
One of the strategic priorities identified in 2007 by the Recreation Technical Support Group was
to help promote minor sports in Oro Medonte, to assist in `capacity building' and to `strengthen
the relationship between the Township and the minor sports organizations'. In February, 2008, a
`think tank' session was held with representatives from all Oro Medonte minor sports groups to
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 48
Page 75 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
discuss the possibility of collaborating to establish a partnership in the form of an `umbrella'
organization that would work collaboratively to promote and enhance minor sports in the
Township. The group identified common issues such as volunteer recruitment and retention,
community awareness, rising costs and risk management. Through the review the issues, it was
evident that there were a number of opportunities and advantages that could be realized by
forming an association as noted below:
development of common policies;
training for coaches and volunteers;
collaborative purchasing to decrease costs;
enhance community awareness development of a website that would promote minor sports
and information across the Township, have the capability to provide on -line registration, and
provide event and volunteer information combined registration events and advertisements
were also identified;
to represent the interests of minor sports groups e.g., address issues of facility allocation
and provide a link to the Township for facility- related issues; and
combine resources to allow for administrative support and coordination of volunteer
engagement and registration.
As a result, the Oro Medonte Minor Sport Association (OMMSA) was formed. In June, 2008 a
collaborative application was submitted (with Oro Minor Hockey being the lead applicant) to the
Ontario Trillium Foundation to build the internal capacity of the OMMSA, and to `ensure that
programs and services are accessible through ease of service, communication and marketing to
better meet the needs of the community'. The application involved funding to provide for
administrative support and related capital requirements, website development and on -line
registrations.
On November 6` 2008, the Ontario Trillium Foundation awarded the OMMSA a grant in the
amount of $94,200 over 24 months.
The Association consists of:
Vasey Minor Ball,
Oro Medonte Minor Ball,
Oro Medonte Minor Soccer,
Oro Minor Hockey,
Oro Medonte Skating Club, and
the Township of Oro Medonte.
Warminster Soccer has been reluctant to join the association.
In 2009, the OMMSA hired an administrator and is currently working on a number of initiatives,
including an enhanced website for all member associations.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 49
Page 76 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
3.3 Private Community -Based Parkland /Open Space
W ithin the Township, there are in the order of thirty sites that are located within rural
residential communities that function much like municipal parkland, but are communally
owned by the property owners within the development. Most sites are undeveloped, some
support a water course or small wetland, some are small waterfront lots, two are sites that contain
private community halls (Oro Station and Rugby), two are sites of private tennis courts, and
several have little to no frontage /access.
One of the ownership groups was the Indian Park Association, which had been operating for
about thirty years as a non profit capital corporation dedicated to providing recreational
facilities, programs and other benefits to its members in the Sugar Bush community. Until
recently, the Association, with 50 family members, owned a 1.21 hectare and a 5.26 hectare site
with recreational facilities (a club house with an outdoor swimming pool, a tennis court, a
basketball court, a playground, and some of the larger greenbelt areas within the community).
The Indian Park Association recently dissolved, sold its facility assets and is in the process of
selling its land assets. Unless the Municipality acquires the assets of a community association, it
cannot influence the sale of communal open space and/or recreation facilities, even if the
disposition of these assets results in a deficiency of parkland and community resources within a
neighbourhood or cluster of neighbourhoods.
The two small private halls (Oro Station and Rugby) operate on the proceeds of rentals and non-
municipal grants.
St. Thomas Anglican Church provides a 1.3 hectare site with a ball diamond backstop and a
junior playground. The site, which is named Village Green, is located in the Shanty Bay
community.
3.4 Libraries
Agenda Item {AgendaNumber} {ItemDescription}
ibrary services are provided through service agreements with the following adjacent
municipalities.
Barrie Public Library,
Coldwater Public Library,
Orillia Public Library,
Midland Public Library, and
Springwater Public Library (this agreement was terminated as of January 1, 2010 see
recommendation in Chapter 4, Section 4.14).
In addition, a small library, which stocks mostly novels, is provided in the Hawkestone
Community Hall and operated by community volunteers.
The County of Simcoe Library Co- operative is the only library co- operative in the province
and is officially recognized under the Public Libraries Act. The majority of funding comes from
the County of Simcoe, although the library service receives a modest annual operating grant
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 50
Page 77 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
from the Ministry of Culture. Membership in the Co- operative is restricted to public library
boards in the County of Simcoe, with the exception of the separated cities of Barrie and Orillia.
All municipalities in the County contribute to the support of the County Library Co- operative
through the general County levy. Therefore, all municipal public libraries in Simcoe County are
eligible to use the services of the Co- operative. Participation in any program or service of the
Co- operative is strictly voluntary.
Please refer to Section 4.14 for more on library services and the recommended service
provision strategy.
3.5 The County of Simcoe
Fr he most significant leisure /open space assets provided by Simcoe County are the County
forests. Throughout the County, there are over 30,000 acres (12,150 hectares) under active
management. Established in 1922, the lands comprise the largest municipally -owned forest in
Ontario. Within Oro Medonte Township, the County has named 35 forest tracts, comprising
5,881 acres (2,382 hectares), including two recent acquisitions comprising 86 acres (35 hectares).
Many of the forest tracts contain multi -use recreational /nature trails, many on old logging roads.
Most blocks are open to the public. The Sandford Block is used by Hardwood Hills Nordic Ski
and Mountain Bike Centre as a site for some of their trails. Six blocks are zoned Mineral
Aggregate Resources. The remaining blocks are zoned Agricultural, Rural or Environmental
Protection.
3.6 Ontario Ministry of Natural Resources
rr he 4,413 acre (1,787.23 hectare) Copeland Forest Resource Management Area is located
in the central west part of the Township. It is classified as an Area of Natural and Scientific
Interest and is `Regional' in significance. The property contains steep valley slopes of the Oro
Hills and a wetland that forms the headwaters of the Coldwater and Sturgeon Rivers. The
Copeland Forest, which is managed by M.N.R., contains a network of forestry roads and trails,
as well as reforested areas.
The 153 acre (62 hectare) Bass Lake Provincial Park is located on the south shore of Bass Lake
in the central eastern part of the Township. The park contains 182 camp sites (92 of which have
electrical services); three group camping areas; picnic and day use areas with shelters, BBQs, a
playground; a boat launch; and four season non motorized trails.
Located west of Bass Lake, there are four parcels of provincial crown land, comprising 456
acres (184.82 hectares). The lands are zoned Environmental Protection, Agricultural and Rural.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 51
Page 78 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March, 2010
3.7 Conservation Authorities
A lthough about two thirds of the Township is within the jurisdiction of the Nottawassaga
Conservation Authority, with the remaining area within the influence of the Lake Simcoe
Region Conservation Authority and their policies, neither agency owns or controls a
`conservation area' or other lands within Oro Medonte. The Nottawasaga Conservation
Authority owns /controls the most `conservation areas' within the region of their areas of
influence, principally to the west and south of the Township. All but two of the `conservation
areas' owned/controlled by the Lake Simcoe Region Conservation Authority are located east and
south of Lake Simcoe. The other two sites are located south of Barrie on the west side of Cook's
Bay.
3.8 The Simcoe County District School Board
Agenda Item {AgendaNumber} {ItemDescription}
A lthough the Simcoe County District School Board has six elementary schools, there are no
public secondary schools within the Township. The closest secondary schools are the five
in Barrie, the three in Orillia, and one in each of Midland and Elmvale. The five elementary
schools in Oro Medonte are:
Warminster Elementary School,
Moonstone Elementary School,
Guthrie Elementary School (Oro Station),
Shanty Bay Public School,
W. R. Best Memorial Public School, and
East Oro Elementary School (Hawkestone).
Nearby, there is a public elementary school located in Elmvale and another in Coldwater, as well
as public elementary schools in Barrie and Orillia.
Each of the elementary schools in Oro Medonte contains a small gymnasia, 1 -2 ball diamonds, 1
soccer field (except for Guthrie), and a playground. Shanty Bay, Warminster and Guthrie
schools have a basketball pad. Moonstone Elementary School has a multi purpose pad and
Guthrie Elementary School has a volleyball court. Community use ranges from one to three
nights per week for youth programs, Township programming and one adult group. The cost of
custodial supervision that is passed on to user groups and the requirement for insurance can be
deterrents to ability to provide affordable community programming.
The Township of Oro Medonte maintains a joint use agreement with the SCDSB which provides
a reciprocal agreement for facility use under the community use of schools program. This
agreement has enabled the Township to provide a number of recreational programs and camps.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 52
Page 79 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
3.9 The Simcoe Muskoka Catholic District School Board
L ocated along the eastern boundary, just south of Price's Corners, Notre Dame Elementary
School is the only Catholic school within the Township. Three Catholic elementary schools
are located in Barrie, four in Orillia and one in Midland. The school board also has an
elementary school in Elmvale and Victoria Harbour, and two in Midland.
Facilities at Notre Dame include: a soccer field with soccer /football nets, two junior baseball
diamonds, a multipurpose pad, a playground, a gym and a picnic shelter. There is room to
accommodate at least one more soccer field near the entrance to the school property. Youth and
sports groups are typical users of the indoor facilities.
3.10 Federal Resources
T he Department of Fisheries and Oceans Canada owns Hawkestone Wharf that extend into
Lake Simcoe, but no associated land. The DFO is currently completing work to the
Hawkestone Wharf and will be conveying the site to the Township.
3.11 The Couchiching Conservancy
Agenda Item {AgendaNumber} {ItemDescription}
rr he Couchiching Conservancy is a non profit, non government organization with the mandate
to accept donations of land to manage as nature preserves; to enter into conservations
easements with willing owners to legally restrict future development; to work co- operatively
with other organizations to acquire or manage ecological lands; to engage private landowners
and volunteers in positive conservation actions; and to increase local knowledge and awareness
about natural heritage conservation. Within the Township, the Conservancy owns or manages
the following six properties, five of which are available for public access:
Carthew Bay Nature Reserve 22 acres (8.9 hectares) owned for the Conservancy near
Eight -Mile Point on Lake Simcoe contains a provincially significant wetland, mature
hardwood forest, early success forest and meadow lands
East Coulson Swamp and Nature Reserve 82 acres (33.2 hectares) owned by the Nature
Conservancy of Canada and managed by The Couchiching Conservancy under a stewardship
agreement within the forested hills of the Oro Moraine upland forest and wetland habitats
headwaters of the Coldwater River contains a provincially significant wetland in 2003, an
adjacent 17 acre site was purchased by the NCC (with the assistance of the Township, The
Couchiching Conservancy, the Orillia Fish and Game Club and the County of Simcoe this 17
acre site abuts lands owned by the Orillia Fish and Game Club and a County Forest block to the
north
Church Woods 25 acres (10.1 hectares) owned by The Couchiching Conservancy located
behind St. Thomas Anglican Church in the village of Shanty Bay old growth hardwoods
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 53
Page 80 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Elliott Woods 19 acres (7.7 hectares) owned by The Couchiching Conservancy mature
upland hardwoods in a forest setting a Simcoe County forest tract is located directly to the
north.
Wilkins Conservation Easement (no size indicated by the Conservancy) privately owned, but
under a Conservation Easement with The Couchiching Conservancy located just north of the
Oro Moraine complex, an important geomorphologic feature of central Ontario to protect
Moraine habitat, the conservation easement seeks to restrict future land owners from subdividing
the land; constructing roadways; permitting motorized vehicles; allowing dumping, grading or
other topographic changes; permitting pesticides; water taking; planting or removal of
vegetation; use of fire arms or hunting, fishing and trapping; domestic livestock activities; and
construction and use of exterior lighting.
The Tushingham Property 45 acres (18.2 hectares) owned by the Ontario Heritage
Foundation and managed by The Couchiching Conservancy in the Moonstone area an fine
example of upland hardwood forest with a full complement of associated woodland plant species
and terraced springs creating a multi textured landscape on the edge of an ancient shoreline
also an area of First Nations settlement, under study by the Royal Ontario Museum.
3.12 Trails
The Ganaraska Hiking Trail
The Ganaraska Hiking Trail was officially opened in 1968. The trail begins in Port Hope on the
north shore of Lake Ontario, and passes through a variety of scenery from Lake Ontario, north
through the Ganaraska Forest within the Oak Ridges Moraine, past the lakes and drumlin fields
of the Kawarthas to the rugged wilderness of the Canadian Shield, then west through the rolling
hills of Simcoe County (and the Oro Moraine) and the shores of Georgian Bay to the edge of the
Niagara Escarpment, where the Ganaraska Trail meets the Bruce Trail. Including some branch
trails, the total length exceeds 500 kilometres, approximately 300 of which are within Simcoe
County. The trail is entirely maintained by the volunteers of various clubs, such as the Pine
Ridge, Kawartha, Wilderness Wildland, Orillia, Barrie, Mad River, Midland, Oro Medonte and
Wasaga Beach clubs. Within Oro Medonte, there are 57.7 kilometers of trails associated with
the Barrie, Orillia and Midland sections.
Simcoe County Forests
Many of the forest tracts within Oro Medonte and through the County contain multi -use
recreational /nature trails, many on old logging roads. Most blocks are open to the public. As
noted above, the Sandford Block is used by Hardwood Hills Ski and Bike as a site for some of
their trails.
The Ministry of Natural Resources
The 4,413 acre (1,787.23 hectare) Copland Forest (noted above) contains a network of forestry
roads and trails. The 153 acre (62 hectare) Bass Lake Provincial Park also contains four- season
non motorized trails.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 54
Page 81 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The Couchiching Conservancy
Some of the lands under Conservancy ownership, management and easement contain walking
trails.
The Lake Country Oro Medonte Rail Trail
This Township -owned 30 kilometre multi -use trail which supports walking, hiking, bicycling
and snowmobiling, parallels the Lake Simcoe shoreline from south of the lakefront in the City
Orillia to within 1.5 kilometres of the border with the City of Barrie.
Ontario Federation of Snowmobile Clubs
The OFSC manages 84.43 kilometers of trails throughout the Township on various parcels of
private and public land.
Commercial Venues
Horseshoe Valley Resort and the Hardwood Hills Ski and Bike provide trails for skiing and
cycling, as described below in Section 3.13.
The various trail networks within the Township are largely isolated from one another, and as a
whole, are not adequately promoted as recreation resources in the Township. The commercial
venues rely on tracts of County of Simcoe forest and the Copeland Forest. Increased marketing,
long term agreements /conservation easements and increased connectivity would greatly enhance
the `trail' resource.
3.13 The Private /Commercial Sector
T he private /commercial sector provides a variety of recreational opportunities within the
Township, ranging from golf to skiing, boating, curling, camping, an education/recreation
centre, equestrian facilities and special events. In total, there are 22 properties ranging in size
from 1.63 hectares to 208.13 hectares. Key among the assets are the following.
Golf Courses
There are 18 courses within the Barrie Orillia area and another four within the Midland
Penetanguishene area. There are seven golf courses located within Oro Medonte Township as
noted below:
Shanty Bay Golf and Country Club (3 x 9 holes public) 110.38 hectares,
Horseshoe Valley Resort (Highlands and The Valley, both 18 holes, and a driving range
semi-private) 30.3 hectares and 51.21 hectares,
Settlers Ghost Golf Club (18 holes public),
Heritage Hills Golf Club (18 holes public),
Orillia Golf and Country Club (18 holes semi private) 60.71 hectares,
Treehaven Golf and Country Club (18 holes public) 37.34 hectares, and
Simoro Golf Links (18 holes semi private) 82.28 hectares.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 55
Page 82 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Resorts
Cl Horseshoe Valley Resort (36 hole golf course, driving range, full service spa, tennis, indoor
swimming pool, fitness facility, dining room, alpine skiing (23 runs and 8 chair lifts),
snowboarding, and cross country skiing on 35 kilometres of trails pool and fitness facilities
available to the public on an annual, quarterly, monthly and daily fee basis)
Mount St. Louis Moonstone (alpine skiing with 40 runs and 12 lifts and two base lodges)
Carriage Hills /Carriage Ridge Resort (indoor and outdoor swimming pools not available to
the public)
Burl's Creek Family Event Park
This 49.28 hectare facility provides family camping, concerts, the Spring and Fall Barrie
Automotive Flee Market, Canadian All Truck Nationals, and an area to support temporary soccer
fields on a one night/week basis (leased to the Township of Oro Medonte).
Barrie Speedway
The speedway, which operates May through September, has a one -third mile paved track with a
covered and heated grand stand. It is located next to Burl's Creek Family Event Park (Highway
11 and 8 Line South).
Hardwood Ski and Bike
This is the first private Nordic ski centre in Canada with 88 kilometers of ski trails (5 routes),
80+ kilometers of mountain bike trails (6 routes), and 15+ kilometers of snowshoeing trails
arranged on 163.33 hectares plus the 39.26 hectare Sandford block of the Simcoe County forest.
Equestrian Facilities
In recent years, the number of commercial equestrian operations has greatly increased as some
traditional farms have been transformed into these specialized facilities.
Hawkestone Yacht Club
This is a small private club that caters to sailing craft that are less than 35 feet in length. The
facility is full and has a waiting list of potential customers.
Golden Medonte Powerboat Club
This 53 slip private marina accommodates pleasure craft up to 30 feet in length and contains a
launch ramp, and fuel and pump -out facilities.
3.14 Other Non Commercial Sites
T he Orillia Fish and Game Club owns two properties in Oro Medonte totaling 60.08 hectares.
The Oro Fairgrounds site comprises 6.54 hectares and contains five exhibit buildings, a track
with bleachers and a judges viewing platform. The site is owned by the Oro Agricultural
Society.
Five other non commercial sites include:
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 56
Page 83 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The Ukrainian Federation Village Park (31.7 hectares),
The Bonita Glenn Girl Guide Camp (8.29 hectares),
Youth Leadership Camps Canada (25.08 hectares),
The George Langman Bird Sanctuary, and
Big Cedar Estates.
Agenda Item {AgendaNumber} {ItemDescription}
3.15 Voluntary Groups, Associations, Clubs, Hall Boards
T here are close to one hundred volunteer clubs, associations and other non profit and for
profit groups providing agricultural, historical, arts and culture, recreation and sport
facilities; programs and other services to the residents of Oro Medonte Township and area.
Several that are based in Barrie and Orillia serve the Oro Medonte community as well. Overall,
the emphasis is on traditional sports. Below is a partial list of groups to illustrate the range of
interests and groups.
Agricultural organizations (3)
Oro Medonte Agricultural Society
Oro Medonte Horticultural Society
4 H Ontario
Historical Organizations (1)
Oro Medonte History Association
Sports and recreation groups (24
Oro Medonte Men's Recreational Slow Pitch League
Vasey Countrymen (recreational men's ball)
Vasey Minor Ball League
Warminster Ball League (men's)
Oro Medonte Minor Ball
Coldwater Minor Ball League (girls and boys)
Oro Medonte Minor Soccer League
Warminster Soccer League
Oro Minor Hockey Association (includes girls)
Coldwater and District Minor Hockey Association
North Simcoe Girls Hockey Association
Barrie Women's Hockey
Barrie North Hockey
Oro Medonte Adult Skating Club
Oro Medonte (figure) Skating Club and Power Skating /Canskate Program
Coldwater and District Figure Skating Club
Oro Medonte Junior 77s (Junior `A' hockey)
Barrie- Orillia Christian Co -ed and Men's hockey and ball (based in Oro Medonte)
many small to medium -size men's hockey groups
Barrie Ringette Association
Oro Swords Fencing Club
Horseshoe Valley Tennis Club
Kaos Sports
Oro Medonte Minor Sports Association
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 57
Page 84 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Service clubs (3)
Oro District Lions Club
Oro Lioness Club
Orillia Kinsmen
Seniors groups (3)
Big Cedar Estates
Oro Marigold Jolly Elders
Shanty Bay Seniors
Trail groups (3 hiking, 3 snowmobile)
Ganaraska Hiking Trail Association
Oro Medonte Club of the Ganaraska Trail Association
Huronia Trails and Greenways
Orillia and District Snowmobile Club
Mid Ontario Snowmobile Trails
Bass Lake Snow Riders
Resident Associations (14)
Moon Point Residents Association
Shanty Bay Community Centre
Moonstone Recreation Committee
Jarratt, Coulson and Community Group
Vasey Park Committee
Vasey Recreation Association
Ravines of Medonte Recreation Committee
Harbourwood Recreation Committee
Horseshoe Valley Property Association
Big Cedar Residents Association
Line 4 Park Committee
Sokil Property Owners Association
Hawkestone and Area Community Association
Eady Community Association
Community Hall Boards (7)
Warminster
Hawkestone
Craighurst
Eady
Jarratt
Carley
Edgar
Private Community Halls/boards (2)
Rugby
Oro Station
Women's Institutes (13)
Clowes
Coulson
Craighurst
Crown Hill
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 58
Page 85 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte March. 2010
Dalston
Eady- Genard
Guthrie
Harvie Settlement
Hawkestone
Jarratt- Creighton
Mitchell Square
Rugby
Vasey
Culture and Arts Groups and Associated Business (8 identified below there are many other
artisans living in the Township)
Hawkestone Singers
Images Studio Tour
Oro Medonte Craft Sale
Village Players
Brieley Pottery (Oro Station)
Judith Smith `Crafts with Class' (Warminster)
Esa's Fine art Studio (Hawkestone)
Richard VanderMeer Fine art Studio Gallery (Warminster)
Other Groups (5)
I.B.E.W.
Beavers, Cubs and Scouts
Sparks, Brownies, Guides and Pathfinders
Barrie Amateur Radio Club
Couchiching Conservancy
3.16 Affordability
A lthough similar to many rural communities of comparable character, the annual capital and
operating investment in parks and recreation has been below the norm for a community
with a population of 20,000. However, in recent years, this investment has been gradually
increasing with a larger role being defined and assumed by the Municipality through the
Recreation and Community Services Department. The evolving role has been in community
development, direct programming, facility maintenance, promotion, and partnerships /strategic
alliances with community groups and others for facility upgrading and new facility development,
as well as operations. Over the years, the most significant capital investments have been made in
the Oro Medonte Community Arena and Banquet Hall (built in 1971) and the two lit ball
diamonds adjacent to the arena. With the assistance of community and sports groups, smaller
investments have also been made in other ball diamonds, soccer fields, new sports pads,
playgrounds, the rail trail, and Ramey Memorial and Bayview Memorial parks. The most recent
significant community partnership has been the development of Sweetwater Park.
However, the level of capital investment that will be required to make significant improvements
to parks and facilities, as well as to develop new outdoor and indoor facilities and parks will be
much greater than historical levels.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 59
Page 86 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The servicing requirements of the Municipality are greater than the norm, due in part to the
relatively small population spread relatively thinly over a large geographic area. Compounding
this servicing challenge is the above average dependence on the residential tax base and the
above average investment required to maintain and improve the many kilometers of Township
roads.
Therefore, it is clear that other sources of funding and assistance will be required for the culture
and recreation system to be improved. An increasing reliance on community and corporate
fundraising; and partnerships with community groups, other public entities and the commercial
sector will be required for moderate and major initiatives. And the ongoing operating and
maintenance costs associated with existing, new and improved facilities will have to be
sustainable. The most serious issue is the relatively poor state of repair of many indoor and
outdoor recreation and community facilities which will require many millions of dollars of
investment over the next twenty years to maintain in a safe, functional and accessible condition
in order to at least meet current service levels.
In 2010, the Municipality may be able to access federal and provincial infrastructure grants to
support one or more capital projects. Refer to Chapter Seven for the recommended capital
forecast, phasing, implementation and financing strategy.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 60
Page 87 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
4.1 Introduction
Agenda Item {AgendaNumber} {ItemDescription}
Chapter Four:
Facilities Analysis and Provision Strategies
T his chapter describes the types of leisure facilities that are within the scope of this Leisure
Facilities Strategy. Trails and playgrounds were not included in the required scope of work.
For each category of facility, current supply is described, along with available information about
type and level of use. Known demand is documented along with predictions about likely future
demand. For each category of facility, a long -term provision strategy is also recommended.
Section 4.3 contains twelve Planning and Provision Principles which have influenced the
individual facility strategies contained in this chapter, as well as recommendations regarding the
Leisure Delivery System (Chapter Three). In Chapter Five, the individual facility strategies have
been integrated into a Township -wide Facility Provision Strategy, which is also influenced by
the Planning and Provision Principles.
As introduced in Chapter Three, Oro Medonte residents rely heavily on the facilities provided in
surrounding and nearby communities, especially: arenas, indoor aquatic facilities, fitness
facilities (municipal to commercial), school and municipal gymnasia, large halls (municipal to
commercial), higher level soccer pitches, the Barrie Sports Dome (indoor soccer, golf, etc.),
YMCAs, movie and performance theatres, art galleries, museums, older adult centres, youth
centres, and curling rinks. This is due to the `basic' and `recreational' role /level of provision that
the former townships of Oro and Medonte and the new Township of Oro Medonte have adopted
over the years.
Because of the unique topography found in Oro Medonte, alpine ski and snowboard facilities, as
well as equestrian centres and trails, nature- oriented recreation, and lake -based facilities are
available to local and regional residents as well as visitors to the Township from outside the
region.
4.2 Broad Indicators of Current Unmet and Future Demand for
Leisure Services
T he profile of the community provides important clues about leisure activity interests and
participation tendencies. The average age of Oro Medonte residents is considerably older
than the provincial average due, in part to the below average proportion of pre school age
children as well as young adults age 20 -39. The proportion of middle age adults and young
seniors are both considerably above the provincial average, as is the case for high school -age
children. The proportion of adults over the age of 80 is below the norm. Compared to provincial
averages, township residents are more affluent, better educated and there are fewer
disadvantaged residents. The population is not ethnically diverse. Most residents travel outside
the Township to work and most drive their own vehicle.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 61
Page 88 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
This community profile suggests above average interest in individual rather than group
activities; fitness and holistic wellness; swimming; sailing and other types of boating; arts and
culture including fine arts, performing arts, and museums; outdoor and nature- oriented
activities such as bicycling, walking for pleasure and exercise, hiking, tennis, cross country
skiing and bird watching; and higher priced pursuits such as alpine skiing, golfing and boating.
The large percentage of the permanent population that commutes on a daily basis impacts on the
ability of children to participate in weekday evening activities outside of the home. The existing
pattern of concentrating recreational soccer and ball programs into one or two nights per week
reflects this constraint.
Participants at the Search Conference conducted for this planning exercise indicated the
strongest preference for the following types of facilities:
an indoor aquatic centre,
improved indoor ice,
more and better program and meeting rooms,
improved baseball facilities (a third quality diamond),
more multi purpose outdoor sports pads,
a full -size (adult) gymnasium
a fitness /wellness facility,
expanded multi -use trails,
improved outdoor soccer facilities,
improved library facilities,
a curling rink,
improved facilities for older adults, and
a large multi -use facility to support big events and conferences.
Delegates at the Search Conference also indicated a preference for a three- tiered facility
provision model. At the top of the three- tiered system would be one (primary) major, township-
wide multi -use public site that would contain high level indoor and outdoor facilities that only
need to be provided in one location within the Township. The second tier of facilities would be
intermediate in scale and strategically located in areas of the Township where there are sufficient
clusters of population. Two of the seven groups suggested that a significant multi -use facility be
provided in the northern portion of the Township (former Medonte Township) in addition to a
primary facility in the south. The third tier would comprise close -to -home parks and smaller
scale facilities located within individual clusters of residential development. Most delegates
implied that the community halls are third -tier facilities, although only eight residential areas
have a municipally -owned hall, and two communities are served by small, privately -owned halls
that are similar in size to public halls.
The respondents to the recreation and community group survey indicated the most support for
the following types of what should be considered as potential components of a major, township
wide multi -use recreation complex:
a large, divisible multi purpose room,
another indoor ice pad,
an indoor swimming pool,
a gymnasium,
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 62
Page 89 of 289
meeting rooms,
a fitness centre,
a curling rink,
a facility to support indoor soccer,
a library, and
an indoor walking/running track.
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strate¢ic Facility Plan, Townshin of Oro Medonte March. 2010
Survey respondents indicated the strongest support for the following outdoor facilities to be
considered at the 85 acre Guthrie Road site (the only large Township -owed park):
soccer fields,
a third ball diamond,
tennis courts,
an open, but covered outdoor rink,
a lawn bowling facility,
a ball hockey rink,
an outdoor swimming pool and/or wading pool,
a lacrosse bowl,
a skateboard facility,
an outdoor running track,
multi purpose sports pads, and
outdoor basketball courts.
Survey respondents also indicated the strong support for the following facilities to be located
elsewhere in the Township:
more major- to intermediate -scale facilities to be located in the west central part of the
Township, along the Horseshoe Valley corridor (arena, indoor swimming pool, multi-
purpose building/recreation centre),
provide /maintain neighbourhood -based facilities (upgraded community halls, beach
volleyball, tether ball, soccer fields, unstructured facilities),
a facility closer to the northern part of the Township,
upgrade many existing facilities (Bayview Memorial Park, Vasey Park ball diamonds,
Warminster Park ball diamond),
improve tennis facilities, and
more trails and bike lanes on roads improve the linkage among trail networks.
Submissions
Five submissions were received from individuals and one was sent by 111 residents of Simcoe
Estates.
Township -wide Facilities:
trails in public open space areas better linked together
5 -6 foot wide bike lanes located along appropriate country roads
indoor swimming pool
lit multiple tennis courts with club house
gymnasia for court sports
facility for indoor soccer
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 63
Page 90 of 289
indoor tennis
twin pad ice rink
indoor running track
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Local facilities:
playground equipment
walking trails with benches
soccer field
outdoor ice rink
tether ball
beach volleyball
skateboard facility
shuffleboard court
tennis courts
create a park that could be shared with the emerging Craighurst development
reconsider the value of Craighurst Hall (too small, dangerously close to the highway, old)
Overview of Leisure Trends
As noted in Chapter Two, the Oro Medonte population is considerably older than the provincial
average due, in part to the below average proportion of pre school age children as well as young
adults age 20 -39. The proportion of middle age adults and young seniors are both considerably
above the provincial average, as is the case for high school -age children. The proportion of
adults over the age of 80 is below the norm. Compared to the provincial averages, township
residents are more affluent, better educated and there are fewer disadvantaged residents. The
population is not ethnically diverse.
Although the total population is projected to increase by 40% between 2006 and 2031, it is
projected that the following markets will decline over the next 15 -20 years and then begin to
increase after that:
children (age 4 -12) (by 400 residents or 18% of the total population)
youth (age 13 -17) (by 340 residents or 23% of the total population)
Mid -life adult (age 35 -54) (by 1420 residents or 22% of the total population)
The following markets are projected to increase over the next 25 years:
Pre school (age 0 -4) (369 residents or 38% of the total population) decline between 2006
and 2016 and then begin to increase
Young adult (age 18 -34) (954 residents or 26% of the total population)
Empty nester adult (age 55 -64) (955 residents or 34% of the total population)
Older adult (age 65 (6,000 residents or 224% of the total population)
The large Echo generation (the children of the Baby Boom generation that are age 15 -30 in
2009) is aging out of the child and youth markets and into the young adult market. With the
child and youth markets expected to remain relatively static over the next 25 years, demand for
the types of activities and facilities of interest to this age group should not increase, especially in
the next 15 years when this age group is projected to decline in number from 4,039 to around
3,275.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 64
Page 91 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan, Township of Oro Medonte March, 2010
The Baby Boom market (age 44 -63 in 2009) is aging into the late mid -life and early older adult
markets. This generation still accounts for around one third of the Ontario population.
Therefore, although the generic /provincial leisure trends will generally apply, the downward
trends in demand for individual activities that will be felt most in older and medium to slow
growing communities may be more pronounced in Oro Medonte. The activities that are
expected to grow in popularity due, in part to the aging of the population, should be accelerated
locally. And, it is important to remember that the influence of the values and interests of the big
Baby Boom generation and the smaller, but still quite large Echo generation will dominate
demand for leisure.
Additional influences will come from the above average income and education levels of the
Township's population, as well as the low level of ethnic diversity.
Other trends are combining with the gradual aging of the population to influence choices and
participation in leisure. Chief among them are:
shifting personal and societal values, attitudes and issues;
economic factors and trends;
gender;
increased understanding of the personal, social, economic and environmental benefits of
parks and recreation;
an increasingly time stressed society;
increasing disparity between rich and poor;
more aggressive public user pay policies;
increasing ethnic diversity and the increasing proportion of the population that is foreign
born;
increased inclusion and integration of those with special needs;
an increasingly better educated population;
changing work and workplace patterns;
the environmental imperative;
greatly increasing energy costs;
social malaise and the prevention paradigm;
the decline of institutions; and
the crisis in traditional leadership.
Figure 11 below provides a summary of the upward and downward trends in leisure activities
that are expected over the next decade or two. Both the upward and the downward trends are
expected to be more noticeable in Oro Medonte, due mainly to the older than average age of the
current and future population.
Refer to Appendix C for more information on generic leisure and related trends, and their
application to Oro Medonte.
Technical Analysis and Local Perceptions
Technical data relating to character, quality and use of facilities, as well as other technical
analysis will also influence future demand for each activity and facility, as well as unique local
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 65
Page 92 of 289
Upward and Downward Trends in Leisure Activities based on:
Provincial Trends and the Influences the Current and Anticipated
Future Characteristics and Growth Potential of the Local Population
Leisure Activities that are
Trending DOWNWARD
most arena activities especially minor hockey
and figure skating as the Echo generation
ages into their young adult years, and
eventually into older adult hockey as the Baby
Boom generation ages out however, there
should continue to be an increase in girls
hockey until the participation rate peaks (but
the numbers will be relatively small compared
to the decline in child and youth male
participation) and there should be an
increase in young adult hockey as the Echo
generation ages into their young adult years
but their participation rate will be lower than
for minor hockey
hardball
child and youth softball
children's camps (except for specialty camps)
Scouting and Guiding
swimming lessons for children
badminton
volleyball
basketball
mountain biking
long distance bicycling
water skiing
tobogganing
snowmobiling (unless the sport can find ways
to retain enough of the aging market through
sled design and other attractions)
hunting
attending sporting events (except for horse
racing which will be driven by the growing
appetite for gambling)
watching sporting events on TV
volunteering (the Baby Boom generation is
less likely to participate in the way that the
current older adult market has, and they will
participate less than when they were younger
unless volunteer engagement practices
change dramatically to entice this generation
into sustained volunteering).
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte March. 2010
participation patterns and public perspectives. Where this type of information was available, it
has been incorporated into the specific documentation under each facility type.
Leisure Activities that are
Trending UPWARD
Figure 11
nature appreciation/nature study activities, orienteering/adventure travel and eco-
tourism,
gardening,
visiting botanical /display gardens and related facilities,
reading,
walking, hiking and backpacking,
tennis, racquetball and squash (although the trend in these sports has been down
for a decade or two, if the Echo generation is encouraged to take up tennis,
racquetball and squash, and adequate facilities are provided and promoted,
demand could grow),
cross country skiing on shorter and gentler trails,
alpine skiing (although the trend has been down for a decade or two, if the Echo
generation is encouraged to take up alpine siding, demand could grow),
going on self guided/directed tours (local and travel oriented),
golf (especially for women),
lacrosse (influenced by recent increasing interest in professional lacrosse),
fitness and related activities that support health and holistic wellness mental
and physical well- being,
fitness /physical and well -being programs tailored specifically to older adults,
swimming for pleasure,
therapeutic and health- related aquatic programs,
outdoor soccer (across Canada, the participation rate is peaking youth
participation appears to have peaked, but there is still some growth in girls and
women's soccer and participation by men),
indoor soccer (demand is increasing dramatically from competitive youth and
adults, house league children and youth, and adult recreational, especially
women demand will be driven by the availability of facilities),
Ultimate Frisbee (a relatively new sport with growing interest demand will be
driven by the availability of indoor soccer facilities and excess time at suitable
outdoor fields),
in -line hockey (relatively new sport with growing interest),
recreational in -line skating (relatively new sport with growing interest),
attending theatre and concerts,
participating in creative art and hand craft activities,
attending multi cultural events /festivals,
attending handcraft exhibitions /shows,
visiting art galleries /attending art shows,
visiting museums and historic sites,
attending historic re- enactments and heritage festivals,
curling,
bowling (if up- scaled and packaged with other complimentary facilities /activities
that also appeal to people in their 40s and 50s),
casual/recreational skating, especially in attractive, amenity -rich outdoor settings,
dancing (ballroom, line, square, etc.),
bicycling,
fishing and fishing tournaments,
camping,
boating,
eating out,
driving for pleasure,
computer and Internet use, and
gambling.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 66
Page 93 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Figure 12
Key Culture and Recreation Facilities, Parks and other Open Space
Township of Oro Medonte, 2009
March, 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 67
Page 94 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
4.3 Planning and Provision Principles
T he recommendations of this Strategic Facility Plan for leisure facilities are founded on a
number of principles that are intended to provide the guiding philosophy for planning and
decision making for now and into the future. Some of the principles are based on the personal,
social, economic and environmental benefits of parks, recreation, culture and the arts.
Others reflect contemporary planning principles for the provision of leisure facilities and
related programs, activities and services, adapted to the Township of Oro Medonte. The
recommendations contained within Chapter Three regarding the leisure delivery system and the
role of the Municipality, as well the recommendations that relate to specific types of facilities
that are found in this chapter are based on these principles.
Principle One: Utilize the Benefits of Parks, Recreation, Culture and the Arts as the
Foundation of the Plan
The personal, social, economic and environmental benefits of parks, recreation, culture and the
arts are becoming increasingly well documented and widely known, and have become the
foundation of contemporary leisure delivery systems. The benefits are summarized in Appendix
A and have been translated into the following `belief statement, tailored to the Township of
Oro Medonte.
We believe that an investment in parks, recreation, arts and culture in the Township of Oro
Medonte is an investment in the beauty and appeal of our community; and the growth and
development of our citizens, our community, our economy and our environment.
Research indicates that the results of this investment will include:
Improved personal health and well being for our citizens recreation and active living
results in lower costs for health care, improved quality of life, and increased life expectancy.
Greater citizen participation and engagement involvement in community organizations
results in more civic engagement, and ultimately a safer and more democratic community
Proud and confident leaders involvement in recreation, parks, and arts and culture builds
important social skills and produces leaders that are better able to serve their community.
Strong neighbourhoods recreation, parks and the arts can be a catalyst for building a
strong and self sufficient community, and appealing and safe neighbourhoods.
Reduced crime and lower costs for policing and justice increased opportunities in
recreation, sports and the arts will reduce self destructive and anti social behaviour,
alienation and racism.
A cleaner and healthier environment parks and natural areas protect and can enhance
ecological integrity, improve air quality, help to purify our water and encourage stewardship
ethics.
Economic growth and prosperity recreation, sports tournaments, festivals, and arts and
culture contribute to the positive economic and social environment necessary for business
success stimulating spending and employment, increasing productivity and increasing the
attractiveness of Oro Medonte to new residents, tourists, and existing and new businesses.
Building strong families families that play together stay together. Recreation supports
and strengthens families.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 68
Page 95 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte March. 2010
Balanced human development mind, body and spirit involvement in recreation, play,
sports, and arts and cultural activity can help children, youth and adults develop their full
physical, social, creative, intellectual and spiritual capacity.
Preservation and celebration of our cultural heritage and diversity helps us to better
understand ourselves, our neighbours and newcomers to our community.
Principle Two: Support the Concept of `Communities within a Community'
The provision of and access to community facilities (halls /community centres, outdoor facilities
and public open spaces) should support concentrations or clusters of established/historical as
well as emerging/future communities. Therefore, where current and future population warrants,
the Municipality should strive to support `suitable centres of community activity' (either
municipally -owned or provided by others, but available for community use). A few higher level
facilities and leisure opportunities (e.g., arena, fitness centre, indoor swimming pool) that would
not be replicated in two or more parts of the Township should be provided to meet the needs of
all residents. For all non neighbourhood facilities, consider locations that are visible and easy to
access by well travelled roads and trails.
Principle Three: Establish a Three Tiered System for Parks and Facilities
To help support this concept of `communities within a community', and the very decentralized
and relatively sparse nature of the population, the following three tiered system to organize and
categorize public open space and leisure facilities should be established. The
`township /regional' tier is intended for facilities and parks /open space that are highly developed
and large scale, and regularly attract use from across much of the Municipality and beyond. The
`community' tier recognizes facilities and parks that regularly attract most of their use from a
relatively wide area, but not often the whole township, and as such, are generally developed to an
intermediate level or scale, and could involve clustered and lit facilities and provision for
parking. Neighbourhood parks and facilities represent the third tier and are intended to meet
the `basic /recreational' needs of nearby residents, and as such, should not incorporate even
intermediate -level facilities, clusters of facilities or lit facilities.
i) Township- wide /regional (Bayview Memorial Park, the Oro Medonte Community Arena,
the 85 acre Guthrie site, possibly future opportunities associated with Horseshoe Valley
Resort, golf courses, the Ganaraska Trail, ski areas, County forests, the Copelend Forest, etc.)
ii) Community (Sweetwater Park, Line 4 Park, Ramey Memorial Park, Vasey Park,
Warminster Park, Hawkestone Community Park, South Side Bass Lake Park, Shanty Bay
Park, the proposed new park in Craighurst, and the community halls)
iii) Neighbourhood/Local (Ravines of Medonte Park, Shelswell Park, Barrillia Park, Railside
Park, and others)
A key element of the three tiered system is to increase the linkage among the various open
space components via a network of trails and open space greenways. It is recommended that a
township -wide trails and greenways plan be prepared in the next five years.
Principle Four: Cluster Facilities
When and where appropriate, new indoor and outdoor non neigbourhood facilities should be
clustered to optimize efficiency and appeal, as well as to improve programming and marketing
potential. Where appropriate, consideration should be given to including education, library,
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 69
Page 96 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
cultural, and other complimentary facilities along with traditional leisure facilities. Given the
decentralized nature of much of the population, this principle cannot be applied as liberally as in
more compact communities or municipalities with at least one major population centre.
Principle Five: Locate for Visibility and Prominence
Whenever possible, locate major leisure facilities in visible locations to help promote their use
and to showcase what the community has to offer.
Principle Six: Gradually Lessen Dependence on Surrounding Communities
Although the Township has begun to gradually increase its self sufficiency, the residents of Oro
Medonte rely quite heavily on several of the municipalities in the surrounding area to supply
many types of the leisure facilities, programs and related events and services, particularly those
for which there is marginal or insufficient local demand, or where there has not been sufficient
local investment to provide adequate facilities and other services. However, as the Township
continues to mature and attract residents from larger centres, and as the population grows toward
25- 30,000 there will be an increasing need for the Municipality to provide more and better
leisure programming (directly and indirectly) and related services, and higher quality leisure
facilities (some types of which are currently not available in the Township).
Principle Seven: Complement Rather than Compete
When needs are adequately met for a particular leisure interest, the Municipality should not
engage in or increase competition with other providers in the community or nearby. However,
where there is sufficient unmet demand and/or other providers are not adequately and affordably
meeting the leisure needs of a particular market segment of residents, the Municipality should
consider providing or expanding service in that area. Municipal involvement could be direct or
indirect.
Principle Eight: Continue to Evolve Partnerships and other Strategic Alliances between the
Municipality, the Voluntary Sector and Others
As community expectations for parks and leisure services increase and broaden, and the
Township expands its leisure services role, the need to partner with the voluntary sector and
others will become increasingly important. Opportunities to partner with others in the public,
quasi public, non profit and commercial sectors should increasingly be sought, evaluated and
established where there are benefits to the Municipality and the community. Also, the role of the
Municipality in support of improved volunteer engagement should continue to increase to ensure
a strong volunteer presence in leisure service delivery.
Principle Nine: Optimize Facility Use
Relative to the characteristics of each type of facility, ensure that use is maximized before
additional facilities are provided. Facilities at the Township -wide /Regional level of provision
should always be programmed for the highest and best use in prime time.
Principle Ten: Ensure Physical Accessibility
Ensure that all existing municipal and new public facilities are fully accessible for persons with
disabilities and mobility impairments. `Accessibility' is defined by the Ontario Building Code
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 70
Page 97 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March, 2010
(1992), the Ontarians with Disabilities Act (OADA), and the Accessibility Standards for
Customer Service (Ontario Regulation 429/07) compliance required by January 1, 2010.
Principle Eleven: Be Environmentally Responsibility
When facilities undergo major renovation, strive to improve energy efficiency where possible
and economically feasible. For new construction, provide facilities that, through design and
operation, embrace contemporary energy conservation technology and measures. Strive for at
least a LEED `Silver' Certification or equivalent for all new facilities, including the site and
site development, as well as other factors including support of alternative transportation, light
pollution, recycling, optimum energy performance, and low emitting materials. LEED stands
for: the Leadership in Energy and Environmental Design scoring system, as regulated by the
Canadian Green Building Council.
Principle Twelve: Be Fiscally Responsibility
Ensure that capital and net operating costs associated with existing and planned public facilities
are affordable in the short term and are sustainable for the future.
4.4 Arenas
Agenda Item {AgendaNumber} {ItemDescription}
rr he Oro Medonte Community Arena is the only indoor ice surface in the Township. The
facility, which is located at Line 4 North and Highway 11, was constructed in 1972, with a
1989 addition and renovation. The facility, with a gross floor area of 35,000 square feet,
includes a 80' x 180' ice pad, accommodation for 265 in the stands (225 seated and 40 standing)
and 95 in the lobby (35 seated and 60 standing), a 2,850 square foot second floor banquet
hall /multi purpose room (with an elevator), six change rooms, a concession in the main floor
lobby, washrooms and support functions.
Arenas in the region and plans for more facilities include:
Barrie (eleven ice surfaces in seven facilities one twin pad is commercial no reported
plans for additional public ice surfaces)
Orillia (the Orillia Community Centre was closed in January, 2009 leaving one ice surface
plus plans for a new twin pad in the near future (NHL -size ice surfaces, seating for 700 and
200, 12 change rooms, to be located at the West Ridge Sports Complex on the border of Oro
Medonte near Forest Home) the useful life of the Brian Orser /Twin Lakes Arena is
reported to be about seven years the Orillia Community Centre will be repaired for the
2009/10 season to provide a `time bridge' to the new twin pad facility)
Midland (one twin pad the second pad was added recently)
Severn Township (one single pad Coldwater Arena under agreement to be also used by
Oro Medonte residents)
Springwater Township (one single pad one to two ice surfaces planned)
Penetanguishene (one single pad)
Mnjikaning Rama First Nation (Olympic size single ice pad)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 71
Page 98 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte
Figure 13: Oro Medonte Community Arena
Figure 14: Oro Medonte Community Arena
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 72
Page 99 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
Figure 15: Oro Medonte Community Arena
Facility Condition
In October, 2008, a facility condition assessment was completed by AECOM Canada Architects
Ltd. In general, building systems were found to be in `fair' condition. One notable issue that
will require further investigation is the movement observed between the change room floor and
the main arena enclosure. Recommended repairs and replacement over the next twenty years are
estimated to cost (in 2008$) $3,765,500, not including what could be required to repair the
movement between the building components and any improvements to the functionality of the
facility. Also not included in that figure are unknown costs to: i) meet additional accessibility
standards; ii) deal with the floor movement between main building and change room area; iii)
consider any additional energy and environmental initiatives; as well as any significant
functional improvements; iv) allow for replacement of the septic system; and v) inflation.
Over the next ten years, anticipated large expenditures include: roof replacement, refrigeration
components, improvements to dressing rooms, replace ice slab /refrigeration distribution
piping/under -slab heating system/related components, electrical upgrades and exterior cladding.
The estimated cost for each time period is as follows. These amounts include design,
engineering, approvals, construction, contingency and GST; but do not include non -fixed costs
such as program and maintenance equipment, supplies, furnishings, communications, IT and
security systems.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 73
Page 100 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Year Capital Cost Estimate
2009 133,500
2010 -2014 742,000
2015 -2020 825,000
2021 -2025 920,000
2026 -2030 1.145.000
Total $3,765,500
Additional recommendations regarding accessibility, energy and environmental considerations
were offered, including adaptations to create barrier -free dressing rooms.
The total cost of repair and retrofits over the next 20 years represents 68% of replacement cost
(not including `other' items as noted). Recreation facilities with repair budgets in the order of
65% of the replacement cost and greater normally are subject to replacement due to the operating
savings realized over the next life cycle. Functional updates such as features to address
accessibility and male /female requirements, in addition to greater resource efficiency and
environmental performance are also realized in new facilities with integrated systems.
Fire safety deficiencies were also found in the April, 2009 inspection by the Oro Medonte Fire
Department. These costs are not included in the figures above.
Refer to Appendix E for the full reports.
Operating Cost
Over the past four years, the facility has operated at an increasing annual deficit ranging from
$11,109 in 2006 and $10,655 in 2007 to $26,390 in 2008 and $60,100 in 2009. During that
period, total annual revenue increased from $242,094 in 2006 to $343,500 in 2009. The largest
revenue source was ice rental which increased from $228,693 in 2006 to $265,000 in 2009.
Total operating expenses increased from $253,203 in 2006 to $403,680 in 2009. In 2008 and
2009, there were notable expenditures relating to maintenance, and repairs and replacement of
equipment totaling $42,000 in 2008 and $85,500 in 2009, which inflated the `expenses' totals
in those years. For 2008, $23,115 was transferred from reserves and, for 2009, the figure was
$55,300. More detail is provided for the years 2006 -2009 in Section 6.7 of Chapter Six.
Utilization of the Ice Surface
Available hours of use are divided into two categories as noted below.
Prime time: 4pm -12pm Monday- Friday
6am -12nm Saturdays. Sundays and holidays
Total hours /week 76 hours /week
Non -prime time 6am -4nm Mondav Fridav 50 hours /week
Total time available 126 hours /week
Depending on the year, the length of the winter season can vary slightly. However, a typical
winter `ice -in' season is 32 weeks. Total prime and non -prime time for a typical 32 week winter
season is as follows.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 74
Page 101 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Total prime time hours 2,432
Total non -prime time hours 1.600
Total hours 4,032
In the 2007 `ice -in' winter season, 3,079.25 hours were rented, which equates to 76.4% of
total available `ice -in' time.
In the 2008 `ice -in' winter season, 3,065 hours were rented, which equates to 76% of total
available `ice -in' time.
In 2008, typically 73 of 76 available hours of prime time per week were rented, which
equates to 96% of total available prime time. Two of the three unrented hours each week
were typically early morning and late evening on Sundays.
In 2008, typically 33.5 of 50 available hours /week of non -prime time were rented, which
equates to 67% of total available non -prime time.
Ice related Use of the Oro Medonte Arena by Major Group, 2007 and 2008 Figure 16
User Groups 2007 2008
Children and youth 1,504.25 hours (48.9 1,519.0 hours (49.6
Adult 1,145.0 hours (37.2 1,169.5 hours (38.2
Schools 144 hours (4.7 145.0 hours (4.7
Township programs 286 hours (9.3 231.5 hours (7.6
Totals 3, 079.25 hours (100 3,065.0 hours (100
hours adjusted to more accurately allocate users and to remove the summer camp hours from the `ice
in' uses.
Other Key Use Statistics for 2008
Oro Minor Hockey and the Oro (figure) Skating Club used 1,477.5 hours (97.3% of all hours
booked by minor age groups). The Barrie North Minor Hockey league was the largest out
of- township minor sport group, utilizing 29 hours.
77.9% of school group use was by out -of- township schools.
Over half of adult rentals were by out -of- township groups.
Approximately 950 hours or approximately 30% of the total time used was allocated to adult
hockey groups that ranged from a few hours per season to 117 hours in 2008. In 2007, the
comparable figure was approximately 980 hours or 32% of the total time used.
Although the Barrie Women's Hockey League rented 81 hours in the 2007/80 season, no
women's groups rented ice time for hockey in the 2008/09 season, due to allocation of ice
time to the Jr. `A' hockey club (Oro Medonte 77s).
The overall utilization of the ice surface and the allocation to various broad age categories
and user groups remained relatively constant between 2007 and 2008
Access to and Use of the Coldwater and District Community Centre by Oro Medonte
Residents
In February, 1997, the Township of Oro Medonte entered into an agreement with the Township
of Sevem to participate in the affairs of the then Board of Management to oversee the operation
of the Coldwater and District Community Centre and the Coldwater Fairgrounds (arena,
fairground, ball diamond, race track). Recently, the Board of Management was dissolved and the
arena is now managed by the Township of Severn through the Public Works Department. An
annual grant provided by the Township of Oro Medonte to Severn Township guarantees equal
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 75
Page 102 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
access by Oro Medonte residents to all recreational and cultural programs provided at the
Coldwater and District Community Centre and the Coldwater Fairgrounds. It is the mandate of
the Municipality to achieve recovery of its annual operating expenses through revenues derived
from users of the facility. A Capital Reserve Fund, to which each municipality contributes
annually, has been established. The Township of Oro Medonte may annually contribute a non-
refundable amount equal to $2.00 x 10% of the total registered electors, as defined by the
Regional Assessment Office. The amount is renegotiated every three years.
For the 2007/08 season, 35.2% of ice users at the Coldwater and District Community Centre
were reported to be Oro Medonte residents, all registered within Severn Township groups such
as Coldwater and District Minor Hockey and Coldwater and District Figure Skating. That
2007/08 percentage was an increase from 16.4% in 2006/07, 26.3% in 2005/06, 25.4% in 2003
and 23% in 2002. For 2008, at least 159 Oro Medonte residents were reported to be registered
with groups using this arena, mostly in the Coldwater and District Minor Hockey League (103
registrants).
Where a minor hockey player lives within the Township determines which minor hockey
association they can join. Based on Ontario Minor Hockey Association Rules, most players who
live north of Horseshoe Valley Road must join minor hockey associations in Coldwater, Elmvale
and Midland.
Pattern of Use over the Past Three Winter `Ice -in' Seasons
In examining the 2006/07, 2007/08 and 2008/09 winter `ice -in' seasons, the following use
patterns were noted. In the case of the 2008/09 season, the numbers are as of the October, 2008
and are expected to increase by about 100 hours for uses such as school rentals and incidental
adult hockey rentals and holiday rentals.
Ice Rental Patterns for Principle User Groups,
Oro Medonte Community Arena, 2006/07, 2007/08 and 2008/09 Figure 17
Hours Rented per Season
Principle User Groups 2006/07 2007/08 2008/09
Oro Minor Hockey 1,200.25 1 1,260.5 1 1,391.5
Oro (figure) Skating Club 161.5 1 162.0 1 159.0
Township Programs 260.0 1 312.5 310.0
School Rentals 150.0 175.0 97.0
North Simcoe Girl's Hockey Association 22.0 9.0 9.0
Barrie North Hockey (minor) 28.0 30.0 29.0
Barrie Women's Hockey 66.0 81.0
Rob Taylor (men's hockey) 83.0 78.0 117.0
Rob Drury (Men's Recreational Hockey) 73.5 78.0 87.0
Rob Sutherland (Men's Pick -up Hockey) 81.0 81.0 75.0
Oro Medonte 77s 74.0
Bert Logan OPP (men's hockey) 79.5 80.0 64.0
John Gray (men's hocke_) 47.0 59.0 58.0
I. B. E.W. (men's hockey) 48.0 50.0 48.0
Jim Partridge (Adult Hockey men's) 40.0 41.5 44.0
Zambonies (men's hockey) 43.5 46.5 42.0
Simcoe County Paramedics (men's hockey) 36.0 42.0 40.5
David King (men's hockey) 36.0
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 76
Page 103 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Paul Duncan (men's hockey)
Dan Coates (men's hockey)
The Mountain League (men's hockey)
Paul Daoust Oro Medonte Fire (men's hockey)
Shanty Bay Old Boys (men's hockey)
The Green Team (men's hockey)
Barrie- Orillia Christian Sports (men's hockey)
The Bickle League (men's hockey)
Nick Harvie League (men's hockey)
Oro Medonte Adult Skating Club (Dave Caldwell)
Andy Bowers (men's hockey)
Tom Kennett (men's hockey)
Barrie Police (men's hockey)
Larry Maw League (men's hockey)
John Cuppage (men's hockey)
Wilkinson (men's hockey)
28.0
26.0
27.0
28.0
27.0
18.0
27.0
27.0
26.0
25.0
20.0
24.0
26.0
29.0 1 31.0
29.0 30.0
30.0
30.0 25.5
29.0 28.0
29.0
28.0
26.0 28.0
28.0 27.0
27.0 27.0
28.0 22.0
25.0 21.0
24.0 23.0
31.0 22.0
24.0 23.0
15.0
Observations:
Oro Medonte Minor Hockey is by far the largest user of ice time at 1,391.5 hours in 2008/09, and has been
renting an increasing amount of ice over the past three seasons an increase of almost 200 hours or 16
The amount of ice time rented for Township programs increased a great deal between the 2006/07 season and
2007/08 and leveled off for the 2008/09 season. The Township is now the second largest user of ice time.
The ice time rented by the Oro Figure Skating Club has been relatively constant over the past three years at 159-
162 hours. The club uses the third largest amount of ice time.
The fourth largest use of ice time is school rentals which were up in 2007/08 over 2006/07, but for the 2008/09
season, dropped well below the 2006/07 level. However, an additional 56 hours of rental is anticipated to be
allocated to schools before the end of the 2008 /09 winter season, which will bring the total up to the 2006/07
allocation.
The amount of ice time rented by the Barrie North Minor Hockey League has been consistent over the past
three years at 28 -30 hours.
The amount of time rented by North Simcoe Girl's Hockey `A' has declined over the last three seasons from 22
to 9 hours, in part due to the inclusion of the Oro Medonte 77s.
Barrie Women's Hockey did not rent any time this season, after renting 81 and 66 hours in the previous two
seasons. They had to relinquish their hours because they did not meet the Township criteria for the minimum
proportion of Township residents registered in their group. This was also influenced by the inclusion of the
Oro Medonte 77s.
The four men's hockey groups who rent the most ice are: Robert Taylor, Men's Recreational Hockey, Robert
Sutherland and Bert Logan (OPP), ranging from 64 to 117 hours. For the 2008/09 season, the total hours rented
by men's groups who rent at least one hour per week was 575.5 hours. For these regular users, the amount of
ice time rented has been relatively consistent over the past three seasons (567.5, 556, and 575.5 hours
respectively). Based on the address of the person who rented the ice, at least 425 hours of ice time allocated to
adult hockey is by an out -of- township group (74 However, some of the participants in the out -of- township
groups could be local residents.
Issues with the Oro Medonte Community Arena
Although some of the groups who responded to the Facility Needs Survey considered the arena
and banquet hall adequate, the following groups identified concerns.
Shanty Bay Old Boys adult hockey water temperature in showers fluctuates from cold to
scolding hot; rate the facility as a `B'
Oro Medonte (figure) Skating Club ice is sometimes very rough due to heavy use by
hockey, especially during try-outs; some of the small appliances are dated; kitchen cupboards
are not always clean (mouse droppings)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 77
Page 104 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Oro Medonte Fire adult hockey dressing rooms are too small for adults, as are the showers;
water temperature controls are dangerous; hallways are narrow for adults with equipment;
support facilities are lacking (e.g., pro shop, skate sharpening service, tape, sticks, laces, etc.)
Oro Minor Hockey need for a meeting room; storage room needs to be twice the size, be
insulated and have adequate air circulation to keep equipment and jerseys from molding;
trophy case is too small; sound system needs upgrading; no separate change room for girls
(an OMHA requirement for girls over the age of eight)
Staff noted the arena floor sweats during the summer which limits use.
The following issues were noted from the 2008 condition audit and other available technical
information about the facility.
Movement between the floor areas is evident along the west wall of the main arena enclosure
adjoining the dressing rooms.
The roofing is due for replacement and the joint between the high roof area of the main arena
enclosure and the lower adjacent roof area over the dressing rooms has experienced leaking
due to movement between the two floor areas.
The prefinished siding along the east elevation is exhibiting de- lamination of the coloured
coating. The undercoating appears to be galvanized which continues to protect the metal.
Recessed, sloped glazing details at the south elevation of the lobby addition/renovation
exhibit water penetration and need to be addressed.
Swing doors, overhead doors and hardware are being maintained, but are due for ongoing
maintenance regarding hardware and weather sealing.
Banquet hall, the concession, and office and staff areas are finished with painted block, lay -in
ceiling tile and vinyl/wood flooring and are in poor to fair condition.
The dasherboard system, glazing and related components are 10 years old and are in fair
condition.
Plumbing and drainage for washrooms, dressing rooms and the concession areas are in fair
condition, but beyond their useful life
Exhaust fans are provided in the dressing rooms and are functional, but exhibit damage
likely due to their being within reach of hockey sticks. The warm, moist air exiting via the
exhaust systems has resulted in ice build -up at the exterior vents.
One of the dehumidifier units is over 30 years old and is due for replacement.
Except of the lighting over the ice pad, which is 5 years old and in good condition, the
balance of the electrical components, although reasonably maintained, are beyond their
useful life and are within 5 -10 years of replacement.
The compressors are reaching the end of their life expectancy.
Although new in 2002, the 20 hp brine pump is under -sized and runs continuously.
The 17 year old condenser tower is showing signs of deterioration and water leaks.
The de -supra heater, which is used to recover heat for domestic water, is about 22 years old
and is reaching the end of its useful life expectancy.
The controls are original and are reaching the end of their useful life expectancy.
The ice slab, refrigeration piping, under -slab heating system and related components are
nearing the end of their life expectancy (within 5 -10 years).
The electrical power panels, distribution and related components in the original building are
nearing the end of their life expectancy (within 5 -10 years).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 78
Page 105 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Demand and Supply Indicators
Although residents and visitors from age 2 to 90 utilize the Oro Medonte Community Arena, the
principle ice users are age 4 to 12. In all communities, the participation rate for sports (the
percentage of a particular age group that participates regularly in an activity, and the number of
hours of participation per person per season) begins to decline at around age 12 and drops off
considerably after age 20. Although, according to local sports groups, all current demand cannot
be completely accommodated for minor hockey, figure skating and some adult hockey groups, it
is anticipated that local demand, especially for minor hockey and figure skating, but also for the
older adult hockey groups (with participants over age 35), will decline over the next 15 -20 years.
The age specific population projection completed for this study anticipates that the 4 -12 age
group which declined from 2,305 in 2001 and 2,198 in 2006, and will continue to decline to a
low of 1,800 by 2016 and 2021, (398 or 18 and then slowly rebound back to around the 2006
level by around 2026, and reach 2,561 by around 2031. This age group is projected to decline as
a percentage of the total population from 12.6% in 2001 and 11% in 2006, to a low of 7.8% by
2021 and rebound a little to just 9.1% by 2031. If total population growth in the township does
not accelerate in the later years of the projection as expected, then the number of the principle
users of arenas will not increase much even after 2021.
The 13 -17 age group is expected to show the greatest and most sustained decline in number
percentage (23 and number at 338. This age group peaked around 2006 at 1,461 (7.3% of the
total population). But, even as the Township grows, this age group is projected to decline
steadily through 2026 to a low of 1,123 (4.5% of the total population), before rebounding slightly
to 1,301 (4.6 by 2031.
The number of potential participants available for adult hockey is also projected to decline.
After peaking in 2006, the young and middle -age adult market (age 18 -54) is projected to decline
over the next 12 -15 years, even as the population of the Township grows. Based on the age
specific population projection completed for this study, it is anticipated that the 18 -54 age group
will decline by 5.6% or 566 between 2006 and 2021 (10,130 to 9,468), gradually increase back
to the 2006 level by around 2027, and then increase to 10,969 by 2031. And although the crucial
18 -34 age group is projected to steadily increase in number from 3,613 in 2006 to 4,567 by 2031
(an increase of 954 or 26 most of that growth will only be in the next ten years as the Echo
generation moves through this time interval, after which growth will slow.
In most communities, the aging of the Echo generation (age 15 -30 in 2009) is `feeding' the
young adult market and increasing demand for individual and team sports. However, a dominant
phenomenon of Oro Medonte Township is the above average out migration of young adults
seeking higher education, employment, excitement and lower cost housing. This out migration
is muting the potential for increasing demand for leisure activities of interest to this young adult
market (e.g., hockey, tennis, cycling, fitness programs, soccer, slow -pitch baseball, etc.) and the
pattern is not anticipated to change until more significantly lower cost housing becomes
available and local employment opportunities improve.
As indicated below under each type of user, the amount of estimated unmet prime time appears
to be between 800 and 1,000 hours annually, which would represent only 33 -41% of total prime
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 79
Page 106 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
ice time available in a second ice pad. With the anticipated decline in demand for minor hockey
and figure skating over the next 15 -20 years and some increase in demand for young adult
hockey (mostly over the next ten years), there will be very little if any opportunity for overall
demand to increase until the number of children and youth begins to increase in 15 -20 years.
Supply of ice surfaces in the region appears to be on the increase over the next few years. The
City of Orillia will increase the supply of indoor ice surfaces by a net of one through the
construction of a new twin -pad arena and the planned eventual retirement of its oldest arena
(which will be refurbished enough to open again for the next few years). Therefore, some of the
excess demand for prime ice time from Orillia and area residents will be absorbed. Throughout
the region, the appeal of new facilities will likely attract some use away from older, less
appealing arenas in the area, including Oro Medonte. The Orsi Group is considering including a
twin -pad arena as part of a proposed indoor /outdoor soccer complex that could be built south of
Price's Corners in Severn Township. Springwater Township is planning to include an indoor ice
surface (with potential to twin) in a new multi -use recreation complex proposed to be built in the
development area west of Midhurst.
Barrie has recently completed the Holly Community Centre which includes two ice pads and
other facilities. A Parks and Recreation Master Plan is currently underway which will examine
the need for all types of leisure facilities. However, given the recent increase in the number of
indoor ice surfaces, it is unlikely that any more will be added in the next ten years.
The recent addition of an ice surface to the North Simcoe Sports and Recreation Centre in
Midland has increased supply to the area to the north of Oro Medonte. This facility will be
attractive to residents living in the northern part of Oro Medonte, who already use facilities in
Midland.
No additional indoor ice facilities are planned for the other municipalities in the immediate area.
Minor Hockey
The Oro Minor Hockey Association increased their ice rental by 16% (or about 200 hours)
over the past three seasons from 1,200.25 to 1,391.5 hours.
The organization has requested an additional 20 hours /week of prime ice time to support: i)
one full practice /week for local teams, ii) two full practices /week for representative teams,
iii) offer an ongoing power skating and skills program, and iv) more tournaments. If that
level of increased use for a group with declining registration can be realized, that increased
rental would total about 640 hours of prime time per season.
For the 08/09 season, the ice rental rate was subsidized by $40/hour. The subsidy for the
09/10 season will be $35 /hour.
In 2008/09, there were 350 registered with Oro Minor Hockey and that number is reported to
be down from around 500 in the recent past.
Oro Minor Hockey currently receives about 57% of the available prime ice time and has ice
time seven days /week.
The 103 registrants for the 2007/08 season represented was an increase in the number of Oro
Medonte residents participating with the Coldwater and District Minor Hockey Association.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 80
Page 107 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Based on the age specific population projection completed for this study, unless the
participation level increases, demand for minor hockey should continue to be in decline over
the next 15 -20 years. The 4 -12 age group is expected to decline by 18% or 400 between
2006 and 2021 (from 2109 to 1,800) and then slowly increase back to the 2006 level by
around 2029 and continue to increase to 2,561 by 2031. The 13 -17 age group is expected to
decline by 23% or 338 between 2006 and 2026 (from 1,461 to 1,186) and then slowly
increase back to the 2006 level after 2031. That represents a total decline of around 750 for
the 4 -17 age group over the next 12 -20 years.
Figure Skating
For at least the past three seasons, the Oro Medonte Skating Club has been restricted to
around 160 hours per season or two nights per week for 5 -6 hours per night.
Current registration is around 100 -120 and is limited by available ice time.
For the 08/09 season, the ice rental rate was subsidized by $40 /hour. The subsidy for the
09/10 season will be $35 /hour.
Local skaters and coaches either regularly leave or do not even consider the local club due to
the shortage of ice time and especially, the lack of ice time on weekends. The larger and
more developed clubs in Barrie and Orillia attract significant numbers of Oro Medonte
residents. In 2007/08, it was reported that there were 16 township residents registered with
the Coldwater and District Figure Skating Club.
The Oro Medonte Skating Club reports that they could use 3 -4 more hours and one more
night per week to expand their program and attract more local skaters and coaches.
Based on the age specific population projection completed for this study, the number of Oro
Medonte residents available to participate in figure skating will be in decline over the next
15 -20 years, beginning immediately. The 3 -19 age group is expected to decline by 17% or
752 between 2006 and 2021 (from 4,436 to 3,684) and then slowly increase back to the 2006
level by around 2029 and continue to increase to 4,646 by 2031.
Girls Hockey
Oro Minor Hockey reports that 20% of registrants are female or approximately 100. North
Simcoe Girls Hockey reports a membership of 136 in the 4 -18 age range.
Although interest in girls hockey continues to increase across Canada, the number of
participants remains relatively small, compared to male participation.
Based on the age specific population projection completed for this study, the number of Oro
Medonte residents available to participate in girls hockey will be in decline over the next 15-
20 years, beginning in the next year or so. The 4 -17 age group is expected to decline by
16.4% or 291 between 2006 and 2021 (from 1,770 to 1,479) and then slowly increase back to
the 2006 level by around 2028 and continue to increase to 1,904 by 2031.
Adult Hockey
The age range of most adult hockey players is between 18 and 55, with a few participants
playing into their late 60s and most of the players in the 18 -34 age group.
Most of the smaller groups who use the Oro Medonte arena report that demand is either
holding steady or has declined somewhat recently, while some of the larger groups indicate
significant growth in the past five years (in the range of 15 -30 and project similar growth
in the next five years.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 81
Page 108 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
The 18 -54 age group increased by almost 8% or 740 (9,390 to 10,130) between 2001 and
2006. Since almost 40% of the growth was in the 20 -24 age group and there was growth in
most age categories (all but age 30 -39) during that period, that could account for some of the
recent spike in demand for adult hockey. However, growth across this entire age group will
not be sustained over the next decade and a half.
After peaking in 2006, growth in the young and middle -age adult market (age 18 -54) is
projected to decline over the next 12 -15 years, even as the overall population of the
Township grows. Based on the age specific population projection completed for this study,
it is anticipated that the 18 -54 age group will decline by 5.6% or 566 between 2006 and 2021
(10,130 to 9,468), gradually increase back to the 2006 level by around 2027, and then
increase to 10,969 by 2031.
And although the crucial 18 -34 age group is projected to steadily increase in number from
3,613 in 2006 to 4,567 by 2031 (an increase of 954 or 26 most of that growth will be in
the next ten years, after which growth will slow. As a percentage of the growing population
of the Township, this age group is projected to increase slightly from 18% in 2006, peak at
19.6% by 2016, and then decline to 16.3% by 2031, as the Echo generation moves through
and ages out of this age group.
Therefore, some teams, especially the over age 35 group, may not be able to sustain their
minimum numbers and will have to cancel their ice time, while the larger groups should soon
stabilize and therefore, not require additional ice time.
There appear to be few women participating in organized hockey in Oro Medonte.
Adult Pleasure Skating
An adult pleasure skating club exists in Oro Medonte, but comprises only around two dozen
regular members, with an additional 60 participants for special occasions.
Gender is close to 50/50 and the age range of participants is currently 19 to 90.
Participation has been steady over the past five years, but has fluctuated over the 35 years of
the club.
27 hours /season are utilized by the club. Twenty -one hours /season are also booked by the
Municipality for senior skating and 185 hours /season were booked in 2008 for general (all
ages) public skating (including holidays).
With the aging of the Baby Boom generation, the likelihood of most new residents being
middle age or young seniors and increasing motivation for exercise, the market for adult
pleasure skating has the potential to increase, if skating groups market effectively to this age
group, and venues and associated programming are sufficiently attractive to this increasingly
demanding and independent market. By 2031, the Baby Boom generation will be age 66 -85
and is projected to represent 27% of the total population. Based on the age specific
population projection completed for this study, the adult market age 20 -84 is projected to
increase steadily from 13,240 in 2001 and 14,864 in 2006 to 21,372 by 2031 (an increase of
6,508 or 43.8% since 2006, with most of the increase in the older ages groups). This age
group is projected to also increase as a percentage of the total population from 72.3% in 2001
to peak at 78.3% by around 2021, and then slowly decline to 76.1% by 2031, as the Baby
Boom generation gradually ages into the older years of the adult market.
Between 2006 and 3031, the 55+ age group is projected to increase by 6,745 or 123% (from
5,469 to 12,214). The increase in the proportion of the population for this age group is
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 82
Page 109 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
projected to be from 29.9% in 2006, peak at 43.6% in 2026 and hold steady at around that
figure through to 2031.
School Use
School rentals have varied between 150 and 175 hours of non -prime time per season. However,
the new rule requiring helmets to be worn by all students reduced demand in the 08/09 season. It
is uncertain if this drop in demand will continue in coming years if the effect of the helmet rule
lessens. Each school receives eight free hours of non -prime time ice rental per season.
Summer `Ice -out' Season
The summer camp program offered by the Department of Recreation and Community Services
utilized 240 hours, all between 8:00 am and 6:00 pm from Monday to Friday. The arena floor
was rented in 2007 and 2008 by the Oro District Lions Club and by the Navy League of Canada
(Barrie) for fund raising events. Oro Minor Hockey rents the arena floor annually for their
banquet. The Hawkestone Singers have rented the floor for a concert and Oro Minor Soccer has
rented the floor for a referee clinic. Occasionally, the arena floor is rented for a wedding
reception. The process of building ice begins the last week in August.
If the floor did not sweat during the summer months, considerably more use could be made of
the facility; for example, ball hockey, lacrosse, inline skating, trade show, exhibitions, large
social events, and music concerts.
Overall Demand for Ice Time over the Next Ten to Twenty Years
Although there is currently excess demand for ice time at the Oro Medonte Community Arena, it
is more likely than not that overall demand for ice time will decline over the next ten to twenty
years based on projected declining numbers in most age categories (especially for the principle
user groups) and increasing supply of arenas in the region.
Provision Strategy
Although prime time is fully utilized and two thirds of non -prime time is utilized, and there is
currently excess demand for ice time, it is more likely than not that overall demand for ice time
will decline over the next ten to twenty years based on projected declining numbers in most
age categories (especially for the principle user groups) and increasing supply of arenas in the
region.
Over the next ten years, local and regional demand should continue to be monitored to determine
if excess demand continues to exist in Oro Medonte and the immediate area. Even though Oro
Minor Hockey believes that many of their parents would be willing to pay for additional ice time
per week to provide more hours per child, their request for an additional 640 hours per season
falls far short of the 2,432 hours of prime time that would be available in a second ice surface.
As noted above, even with the addition of the estimate of excess demand for prime ice time from
figure skating and adult hockey, the total would be between 800 and 1,000 hours.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 83
Page 110 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Even if there continues to be excess demand for ice time from minor hockey and figure skating
(which is doubtful) and demand grows for young adult hockey, there is insufficient unmet
demand for prime time and non -prime time ice to justify a second ice surface in Oro Medonte for
at Least ten years. The additional indoor ice surfaces planned for the region are likely to have
excess capacity for at least the next decade, especially if the City Orillia retains the Orillia
Community Centre, even for a few more years.
Service Level /Provision Guideline
A service level or provision guideline of one indoor ice surface per 25,000 residents is
recommended to serve as a guideline for future planning. Based on the population projections
produced for this study, a population of 25,000 is anticipated by around 2026.
There are two options to continue to provide indoor ice in Oro Medonte Township. One is to
continue to invest in the existing arena over the next ten to twenty years. The other is to build a
new arena with a single ice pad and associated components and contemporary features in the
near future.
Although the existing arena could remain viable for another twenty years with an estimated
minimum investment of $3.8 million (in 2009 plus: i) inflation; ii) the cost to address fire
safety issues and iii) the unknown costs to address the movement between the change room floor
and the main arena enclosure, to improve accessibility, usability and appeal, and replace the
septic system a reasonable rationale can be made to consider replacing the facility in the near
future, as outlined below.
The estimate of $3.8 million plus inflation and the other unknown costs noted above
represents considerably over 65% of the replacement cost for exactly the same facility, which
is the point where a new facility is typically considered.
A projected minimum investment of almost $900,000 is required in next 3 -5 years and
almost $1.7 million over the next ten years.
A new facility would include additional components and features (meeting /program rooms,
storage for historical resources, a pro shop, a dressing room and office for the Jr. `A' hockey
team, a running track, offices, and external storage), as well as improved
facilities /components (change rooms, foyer, food services, multipurpose space, the arena
floor, spectator areas, storage, and display areas); total accessibility throughout the structure
for persons with disabilities; and contemporary design, engineering and features to
significantly improve energy efficiency and functionality.
Due to lower energy costs that would result from a more energy efficient building, and lower
annual maintenance costs, as well as the opportunity to generate higher revenues from a more
attractive and functional building with more revenue sources, a new and larger facility would
be no more expensive to operate and maintain.
A new facility would have a life expectancy of at least 30 years.
A new facility could be re- located on the recently expanded Guthrie site and designed to be
able to accommodate other facility components and support outdoor uses in the park.
Due to site restrictions, the existing arena cannot easily be enlarged to allow twinning or the
addition of other facility components, without moving the parking area and possibly the ball
diamonds.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 84
Page 111 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March, 2010
Due to improvements in design, features, functionality and energy efficiency measures, a typical
contemporary single ice pad could not be constructed for the estimated $5 6 million replacement
cost of the existing facility. It is estimated that a new, contemporary single ice pad would cost
between $8 and $10 million, depending on size, features, quality and degree of energy efficiency.
If a 4,000 -5,000 square foot ground floor multi purpose community hall was attached, along with
meeting rooms, offices for staff and sports groups, a pro shop, and other improvements and new
features, the cost would be in the order of $14 million See Chapter Six for more detail.
It is recommended that the Township continue to maintain the partnership with the Township of
Severn re: the Coldwater Arena far as long as that facility remains viable.
In May, 2009, Oro Medonte Council recommended that the `new facility' option be examined in
detail through a feasibility study of township -scale facilities that would be suitable and feasible
for the Guthrie site to be built over the next twenty years. See Chapter Six for the results of that
study.
4.5 Indoor Multi purpose Space
Quantity, Size and Distribution
ndoor multi purpose space comprises ten small community halls (eight public and two private,
but publicly available), the second floor hall at the Oro Medonte Community Arena, the small
program room associated with the fire hall located at Line 4 North and Horseshoe Valley Road
(the Ian Arthur Beard Complex), and the seven small gyms located at elementary schools within
the Township. Other available facilities include church halls; the Warminster Legion; and
facilities at Horseshoe Resort, Heights of Horseshoe, Carriage Ridge Resort and Carriage Hills
Resort.
The ten community halls are small and vary in size from 700 to 1,150 square feet on their main
floors (five halls have a usable basement). The second floor hall associated with the arena is
2,850 square feet in size and is accessed by an elevator. The size of the small program room at
the Ian Arthur Beard Complex is 770 square feet. The school gymnasia range in size from 2,046
to 2,490 square feet. The halls were built between 1877 and 1950, with most prior to 1930.
Although there are three community halls between Horseshoe Valley Road and Highway 400
(Warminster, Carley and Eady), there are no halls north of Highway 400. The only public -use
facilities in this part of the Township are Moonstone Elementary School and a small room
associated with the fire hall in Moonstone (which has not been used to date for community
events). Although there is an elementary school, another part of the Township with a substantial
population base that lacks a community hall is Shanty Bay. The area that comprises the
Horseshoe Valley Resort community and the Sugar Bush community is another under served
part of the Township with a sizable and growing population.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 85
Page 112 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte
Figure 18: Hawkestone Hall
Figure 19: Carley Hall
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 86
Page 113 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte
Figure 20: Craighurst Hall
Agenda Item {AgendaNumber} {ItemDescription}
Figure 21: Eady Hall
March, 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 87
Page 114 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte
Figure 22: Jarratt Hall
Figure 23: Warminster Hall
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 88
Page 115 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte
Figure 24: Old Town Hall
Figure 25: Edgar Hall
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 89
Page 116 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Quality and Condition
The quality and functionality of these multi -use facilities varies from poor for three of the small
community halls (Warminster, Craighurst and Carley), to reasonably high for two of the halls
(Hawkestone and Jarratt), to quite high for the school facilities, the arena hall, the program room
in Ian Arthur Beard Complex, most church halls and the resort facilities.
Excluding Old Town Hall, the cost of energy to heat the remaining public halls has been
increasing in recent years, as has the need for capital repairs. Over the past five years, the total
annual expenditure for these halls has varied between $40,500 and $53,350. Total revenue has
varied between $58,242 and $36,853. In 2004 and 2006, there was an overall deficit of $751 and
$3,997 respectively. In each of years, at least two of the halls ran a deficit. In 2004, six of halls
were is deficit. In the past five years, Warminster Hall has been in deficit four times, and Carley
and Edgar halls have been in deficit three times. Deficits are carried over from year to year,
unless written off by the Municipality. At the 2008 year end, Eady, Hawkestone and Warminster
halls accumulated deficits of $983 and $4,223 respectively. The Hawkestone Area Community
Association covers any annual shortfalls in operating costs for their facility. For those halls,
their reserves had also been depleted. At 2008 year end, Craighurst and Jarratt halls had the
largest reserves (between $11,500 and $12,500).
For most of the halls, a very strong sense of attachment and `ownership' has been cultivated over
the years through caring for the facilities and the use of the halls by the nearby community In
some cases, these halls are the remaining symbols of some of the hamlets that comprised the
former townships of Oro and Medonte.
In October, 2008, Ted Wilson, Architect with AECOM Architects Canada Ltd. completed a
building condition assessment for each of the eight municipal community halls. The on -site
assessments included visual reviews of existing conditions. No destructive or other intrusive
sampling or testing involving instrumentation was done.
Identified repairs responded to life safety and accessibility deficiencies, based on the
requirements of A2 occupancy under the Ontario Building Code for public use facilities, the
Ontarians with Disabilities Act (OADA), the Accessibility Standards for Customer Service
(Ontario Regulation 429/07), and the requirement for an asbestos survey under Ontario
Regulation 278/05. In general, a facility life cycle is in the order of thirty years and varies
depending on the systems incorporated and the maintenance programs implemented over the
operating life of each structure.
The analysis examined the building structure, envelop and interior, as well as the mechanical,
and electrical systems, and offered recommendations over a twenty year period.
Recommendations were also offered regarding accessibility, and energy and environmental
recommendations (water conservation, energy, materials, indoor environmental quality).
Replacements are recommended as systems /components reach the end of their useful life.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 90
Page 117 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Life cycles for buildings and components are based on the standards of the Building Owners and
Managers Association (BOMA) and Protocols for Building Condition Assessments published by
Public Works and Government Services Canada.
System repair and replacement budgets are derived from life cycle analysis data for Municipal
facilities of similar size, complexity and program accommodation. Tasks are prioritized with life
safety and structural concerns first and facility durability following. Facility replacement
budgets are sourced from:
published construction industry systems replacement data;
historical data on tendered projects of similar scope, construction type and finish; and
adjustments based on site specific conditions.
Hall board members indicated that many of the repairs /upgrades /replacements could be
completed for less that the amount indicated, with some volunteer labour, local connections,
donations and discounts and lower quality components where allowable. The estimate for capital
improvements assumed materials and equipment of a quality suitable for a contemporary public
use facility (A2 occupancy), with the work tendered and completed by bonded contractors.
Ultimately, the completion of each task is intended to enable the Municipality to meet its
obligation to continue to maintain each public facility over the next life cycle.
The recommended repairs, upgrades and replacements and associated capital cost estimates did
not include many upgrades to improve functionality or aesthetic quality. Many of the
recommended repairs /upgrades /replacements will not be noticed by most customers.
Although what was recommended for each facility was unique, there were a number of common
themes for repair /replacement /upgrade over the next 20 years. Common items included:
surveying for asbestos containing material (immediate),
adding CO detectors,
install fire suppression hoods over stoves and other cooking equipment (if required by local
regulations),
weather stripping,
replacement of doors and windows,
modifications to meet provincial requirements for accessibility (including barrier -free
washrooms),
roof repairs /replacement,
heating system repairs /replacement,
plumbing and water supply system improvements /repairs /replacement,
replacement of septic systems,
ongoing maintenance of interior walls and floor finishes,
improvements and repair to electrical systems, and
replacement of emergency systems.
The estimated budget for each facility includes design, engineering, approvals, construction,
contingency and GST. Replacements are recommended as systems /components reach the end of
their useful life.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 91
Page 118 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Edgar, Warminster, Eady and Carley halls are particularly high maintenance and require regular
and costly repair to brickwork and /or stucco finish. The estimate for recommended
repair /replacement and upkeep over the next 20 years varied from $235,000 for Craighurst Hall
to $534,000 for Carley Hall.
For each facility, the cost to replace the hall in its current size, configuration, style and
construction characteristics was estimated, along with the cost to replace each facility at the same
size, but utilizing a single -floor design and a construction style and materials more consistent
with conventional community facilities of this nature. The estimated cost to replace the halls as
they are currently configured ranged from $246,000 for Craighurst Hall to $652,500 for
Hawkestone Hall. Refer to Figure 27 for the cost per facility and to Appendix E for the details.
At $240 /square foot, the cost to replace the facilities in the general style and construction method
noted above varied from $168,000 for Warminster Hall to $549,200 for Jarratt Hall. The cost to
replace each facility was lower than to repair for all but Craighurst, Old Town, Eady, Jarratt and
Hawkestone halls. Jarratt and Hawkestone halls are in considerably better condition than the
others and are lower maintenance facilities.
When estimated repair budgets exceed 65% of replacement cost, facilities are generally replaced
with more functional, and energy- and cost efficient facilities. New facilities would be much
more efficient, functional and appealing; would generate increased revenues; and could allow for
the consolidation of some halls and associated volunteer resources.
Carley Hall requires the most investment, with almost half of that investment anticipated in the
next five or so years.
In March, 2009, the Oro Medonte Township Fire Department conducted Fire Safely Inspections
of the community halls and the Oro Medonte Arena. Refer to Appendix E for the details of
those reports. An estimate of costs associated with addressing the inspections was prepared by
the Municipality. The fire regulations must be met to allow for public occupancy.
Utilization
Use of the eight small public halls varies from very low (e.g., Warminster, Edgar, Eady and
Carley) to quite high on weekday evenings (e.g., Hawkestone, Jarratt, Craighurst and Old
Town Hall). Overall, daytime use is extremely low. Uses and programs are limited to what
can be accommodated in small venues, the ability or inability to heat the facility, the ability
or inability to clear snow so vehicles can be parked, the adequacy of washroom facilities,
overall aesthetic appeal, the nature of the floor, the absence of change rooms and showers to
support fitness programs, low ceilings (in some cases), and degree of accessibility for
persons with disabilities into and within the facilities (especially the lower levels). The
capacity of the upper and/or lower halls of the eight municipal halls ranges from 70 to 130
people depending on configuration.
The Ian Arthur Beard program room, which can accommodate 15 -30 people, is booked four
nights /week for between 2 and 3.5 hours. It is also booked four days /week during the
daytime for between one and 3.5 hours. Total scheduled use in 2008 for meetings, recreation
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 92
Page 119 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
and fitness programs and seasonal events was 994.5 hours, including 184.25 hours of
Municipal programming.
The 2,850 square foot arena hall is used for a wide variety of purposes from meetings,
seminars and training sessions; to parties, social events and receptions; as well as fitness and
seasonal programming. Although most of the use is generated by groups in the community,
most of the scheduled recreation and fitness programming is offered by the Recreation and
Community Services Department. Over the past three years, total annual use has varied a
great deal from 1,091 hours in 2006 to 1,410 hours in 2007, and 821 hours in 2008. With a
minimum of 4,212 hours per year available for use, this facility is operating at only 20 -33%
of capacity. Reasonable hours determined to be available are 8 a.m. to 10 p.m. Monday to
Thursday and Sunday, plus 8 a.m. to 2 a.m. for Fridays and Saturdays. The capacity of the
hall is 160 -250 depending on configuration.
Limited use is made of the school gymnasia by community-based groups. The Department
of Recreation and Community Services uses school gymnasia on occasion for regularly
scheduled programming. Weekday evening use varies from one to three nights. The
Township uses four of the schools one night per week. This low amount of community use is
due in part to the cost of additional custodial time required to supervise the schools after
regular maintenance hours. When these costs are added, the recovery cost of the programs
make them too expensive to offer. The public school board is looking into ways to schedule
custodial work to minimize costs to the community
Issues
A top issue is the small size and marginal quality of most of the public facilities that are available
for community use which limits the types of uses that can be accommodated and therefore the
breath of leisure and related programming that can be offered by community and sports groups,
as well as the Department of Recreation and Community Services.
Another top issue is the poor physical condition of many of the community halls, and the
deficiencies of many facilities. For example, Craighurst Hall lacks a water supply and a septic
system, and Edgar Hall has poor well water. The heating system and condition of the Carley
Hall makes winter use impossible. The recent condition audit of the halls that was noted above,
revealed that over the next twenty years, each of the facilities will require a great deal of
investment. The total estimated capital investment was close to $3 million And that did not
include any investment to improve the functionality and appeal of these facilities. See Figure 26
for a summary of information on each facility, Figure 27 for a summary of estimated repair,
replacement and upgrade costs, and Appendix D for the condition audit reports for each facility.
There is no barrier -free access to the main floor of Carley Hall or the unfinished basement. None
of the halls with a useable basement can provide barrier -free access to the lower level. Most
halls require some upgrades to the entry access and some require modifications to create a
barrier -free washroom.
For most of the community halls, there is either no opportunity or very limited opportunity to
expand the buildings, due to the small size of the sites. For Eady, Carley and Craighurst halls,
there is not enough room on site to provide adequate or, in the case of Carley Hall, any on -site
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 93
Page 120 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateuic Facility Plan. Township of Oro Medonte March. 2010
parking. Site sizes vary from 0.1 hectare for Eady Hall to 1.07 hectares for Old Town Hall. Five
of the halls are located on sites of 0.2 hectares and smaller.
The issue of inadequate distribution of indoor multi purpose facilities was noted earlier.
There is no consistent or centralized system for booking the use of the halls. Except for Old
Town Hall, which is operated by the Municipality, a potential user /renter has to find a private
phone number and then call someone on the hall board who may not be readily available to take
the booking. There is no centralized data base that tracts availability for all of the halls, so
referrals can be made to prospective customers if one hall is not available when requested. There
is also no consistency in rental rates and no mechanism to establish rates, based on the quality
and functionality of each facility.
Beyond the Recreation and Community Services brochure, which simply lists the halls with a
photo and booking information, there is no marketing strategy. No pertinent information
(features, capacity, rates, range of possible uses, etc.) about each of the halls is provided. On the
Township web site, there is no mention the community halls.
Given the estimated cost to repair and upgrade each of the community halls, it will not be
possible for the hall boards to cover their portion of capital cost sharing, if the current 50/50
arrangement with the Township remains the policy.
One of the biggest issues for the Municipality is the inability to afford to finance the high cost of
repairs and upgrades that will be required at many of the aging community halls.
Given increasing energy costs, and the poor condition of most of the buildings that contributes to
increasing repair costs, and high heat and cooling losses, it is increasingly difficult for the hall
boards to balance their annual operating budget, especially with the limited ability to generate
sufficient revenue at most facilities.
As introduced in Chapter Three, the Municipality is increasing at risk regarding substandard
facilities (fire safety, accessibility, and insurance requirements; as well as security, and LCBO
and Ontario Building Code regulations). There is also risk associated with volunteers operating
public buildings; for example compliance with Township and other policies and regulations
regarding type of use, compliance with regulations, the Occupiers Liability Act, etc.
For the management boards, it is increasingly difficult to recruit and maintain sufficient
volunteers with the required skills. Most of the activity of the management boards is focused on
hosting activities that are intended to raise funds to help off -set annual operating costs and build
a reserve to pay for some of the upcoming repairs. For Hawkestone and Eady halls, there is a
community association that organizes social, recreational and fitness programming; and annual
events to provide leisure activities for the community; supplement the activities of the hall
boards; and sometimes assist with operating and capital costs.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 94
Page 121 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Demand Indicators
Over the years, it appears that township residents have been relatively satisfied with the level of
service supported by the small community halls, and provided by the boards of management that
operate them and the community associations that exist in some areas. However, what is not
known is the degree to which the halls are being ignored or passed over by prospective
customers who know they are inadequate for their needs. A good deal of this latent demand (and
revenue) could be captured by adequate and well marketed facilities.
Residents of all ages are interested in leisure and social activities that cannot be either
accommodated adequately or at all by available multi -use facilities in the Township. Looking
ahead, it is anticipated that many of the leisure, wellness and social activity needs and aspirations
of especially the aging Baby Boom generation who have grown up in the Township and many of
the new residents who have and will in future make the Township home, will not be able to be
accommodated in the types of facilities currently available.
Examples of activities that cannot be accommodated or accommodated adequately include:
Medium size and larger social gatherings (most community halls cannot accommodate even
100 people and the banquet hall at the arena accommodates between 160 and 250 people,
depending on the configuration);
Floor based/aerobic fitness /wellness activities that require a sprung or otherwise cushioned
floor, and ideally change rooms and showers;
Dance programs that require a sprung or otherwise cushioned floor, and ideally change
rooms and showers;
All gym sports (there are no full -size single gymnasia in the Township all of the gyms are
school -based and under 2,500 square feet in size none of the halls are suitable for these
types of activities);
Indoor soccer (a minimum size pitch of 80 x 200 feet with adequate artificial turf is required
gyms are currently used for a minimum soccer program);
Creative arts programming (requiring adequate natural light, storage and a water source);
Performing arts events (including music); and
Recreation, social, instructional, information and wellness programs and other services for
older adults, especially for residents who require barrier -free access into and throughout the
facility.
For many programs to be economically viable, a floor area of over 1,000 square feet is required
to accommodate sufficient participants.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 95
Page 122 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Overview of Municipally -owned C mmurity Halls, Township of Oro Medonte, 2008
Facility and Components Usability Type and Level of General
Use Condition
Hawkestone
Hall
2,175 sq. ft.
(including
basement)
120 cap.
Jarratt Hall
2,290 sq. ft.
(including
basement)
130 cap.
Old Town
Hall
1,988 sq. ft.
(including
basement)
110 cap.
Eady Hall
1,876 sq. ft.
(including
basement)
110 cap.
Warminster
Hall
700 sq. ft.
(including
basement)
70 cap.
Craighurst
Hall
1,025 sq. ft.
120 cap.
Edgar Hall
1,600 sq. ft.
(including
basement)
110 cap.
Carley Hall
700 sq. ft.
(main floor
only)
80 cap.
Main -floor
multi purpose
room;
resource
centre /library
in basement;
washrooms;
kitchen
Multi- purpose
room on each
floor; new
kitchen in
basement;
washrooms
Multi- purpose
room on each
floor; kitchen;
washrooms
Multi purpose
room on each
floor; newer
kitchen;
washrooms;
air
conditioned;
sound system
Multi- purpose
room (55) on
each floor;
small kitchen;
washrooms
Multi- purpose
room;
washroom;
kitchenette
Multi- purpose
room (60 -70)
on each floor;
kitchen in
basement;
washrooms
Multi-purpose
room;
washroom;
kitchen;
unfinished
basement
Small open hall suitable
for a variety of
programs uses;
inadequate accessibility
to basement library; no
air conditioning
Moderate size open hall
suitable for a variety of
programs uses;
inadequate accessibility
to basement limits use
Small open hall
basement room suitable
for a variety of
programs uses;
inadequate accessibility
places some limits on
use
Small open hall with
stage basement room
suitable for a variety of
programs uses;
inadequate accessibility
(especially in winter)
limits use
Very small open hall
basement room
inadequate accessibility
to basement limits use
Small open hall, lack of
water supply
unconventional toilet
limits use
Small open hall small
basement room
inadequate accessibility
to basement; needs
kitchen upgrades
poor well water
Very small open hall
with small stage
inadequate accessibility;
no winter use due to
heat loss inability to
park due to snow; new
road surface has helped
use
Agenda Item {AgendaNumber} {ItemDescription}
Used regularly
often (4 nights /wk.
on weekends May be
Sept. -June for able to
community family expand
events programs behind
events library uses
Used five days /wk. 0.15 ha.
most of year
meetings, Girl No
Guides, private
recreation programs,
community events,
occasional rentals
Managed by Twp.;
Used regularly for
Twp. programs,
meetings 4
nights /wk. some
weekend use other
occasional uses
Used 10 -15% on wk.
nights less than
10% on weekends
Women's Institute,
church groups,
community family
events, Coldwater
Players (practices
x3 /wk.; pr 9p storge)
Used rarely main 0.2 ha. Poor
user is Orillia
Kinsmen once /wk. No
the odd rental
Used regularly by
Women's Institute,
private Karate
Taekwondo program
Used regularly
seniors Euchre,
Women's Institute,
community family
events, fundraisers,
assotted rentals
Used rarely
occasional rec.
programs, a few
community family
events no use
during winter
Room to
Expand
0.89 ha.
0.2 ha Poor;
no water
No supply or
septic
system
0.3 ha. Poor
Could
possibly
add a
little
0.42 ha. Poor
Yes,
50%
bigger,
rear yard
March. 2010
Figure 26
Barrier -free
Access
Good Exterior ramp
to main floor
(modifications
required); none
to basement
Good Exterior ramp
to main floor
(modifications
required); none
to basement
1.07 ha. Fair -good Exterior ramp
to main floor
Possibly (modifications
required); none
to basement
0.10 ha. Fair -good Exterior ramp
to main floor
Possibly (modifications
required); none
to basement
Exterior ramp
to main floor
(modifications
required); none
to basement
Exterior ramp
to main floor
(modifications
required)
Exterior ramp
to main floor
(modifications
required); none
to basement
No barrier -free
access is
provided to the
building or the
basement
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 96
Page 123 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte
Capital Replacement Costs and Estimate of Minimum
Repairs/Replacement /Upgrades by Milestone Years (Beginning in 2010),
Municipally -owned Commun}ty Halls, Township of Oro Medonte, 2008
Facility I Capital Replacement I Year 1 I Year 5 I Year 10 I Year 15 I Year 20
Hawkestone Hall
2,175 sq. ft.
(cludii Q
Jarratt 1alI
2,290 sq. ft.
(including basement)
Old Town Hall
1,988 sq. ft.
(including basement)
Eady Hall
1,876 sq. ft.
(including basement)
Warminster Hall
700 sq. ft.
(including basement)
Craighurst
Hall
1,025 sq. ft.
Edgar Hall
1,600 sq. ft.
(including basement)
Carley Hall
700 sq. ft.
(not incl. basement)
T otals
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
Cost 0
$652,500($300/sq. ft.) 86,000 89,000 $30,000 825,000
$522,000 ($240 /sq. ft.)
46%
8641,200 ($280 /sq. ft.) $6,000 $46,000 826,000 $44,000
$549,000 ($240 /sq. ft.)
48%
$596,400 ($300 /sq. ft.) $10,000 $78,000 810,000 $29,000
$477,120 ($240 /sq. ft.)
52%
8600,320 ($320 /sq. ft.) 87,000 858,000 $59,000 839,000
$450,240 ($240 /sq. ft.)
60%
$336,000 ($480 /sq. ft.) 813,000 8117,000 828,000 $29,000
$168,000 ($240 /sq. ft.)
79%
$246,000 ($240 /sq. ft.) 87,000 8124,000 $12,000 $43,000
$246,000 ($240 /sq. ft.)
95%
8448,000 ($280 /sq. ft.) 86,000 $118,000 846,000 8102,000
$384,000 ($240 /sq. ft.)
100%
8406,000 ($580 /sq. ft.) 816,000 $242,000 894,000 838,000
$336,000 ($240 /sq. ft.)
132%
1 $3,925,420
$234,000
$185,000
$187,000
$197,000
$80,000
$49,000
$177,000
$144,000
March. 2010
tgyre 27
Total
$304,000
$307,000
$314,000
$360,000
$267,000
$235,000
$449,000
$534,000
1 571,000 5792,000 1 5305,000 1 5349,000 1 51,253 000 1 $2 770 000
1. The first figure under capital replacement cost represents the cost to replace the facility in its
current style and construction technique. The second figure represents replacement cost for a
contemporary facility (style and construction methods) with the total square footage on one floor.
2. The percentage figure in column two represents the relationship between the cost of required
investments compared to replacement cost of the facility in its current style and construction method.
When the required investment reached approximately 65% of replacement cost, the facility is
seriously considered for replacement or divestment as a public facility.
3. The order of listed facilities represents the relationship between the cost of required investment
compared to replacement cost, beginning with the most viable facilities.
Clusters of Settlement Areas
The overall aim is to provide a network of community venues (either Municipal or under other
ownership, but accessible to the publicly) across the Township so that residents can meet and
participate in a variety of indoor and outdoor leisure and community activities. This strategy
recognizes and supports:
the need to maintain a `sense of community and identity', and
to provide equitable and sustainable distribution of facilities across the Township, based on
the philosophy of `communities within a community'.
Only facilities that are readily available and affordable for community use will be considered to
be part of the network.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 97
Page 124 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Due in part to the disbursed nature and low density of the population, it is not possible to provide
a community venue in each established/historical or emerging /future settlement area. Over the
years, the number of small local halls has diminished to eight. Therefore, more than half of the
original hamlets do not have a public hall or similar facility.
Under the proposed provision strategy, consideration should be given to provide a facility(s)
(either Municipal or others that are available for public use) to support the following seven
clusters of settlement areas:
i. Moonstone /Eady /Fair Valley /Vasey /Hobart/Mount St. Louis /Carley /Ravines of Medonte;
ii. Jarratt/Coulson/Warminster /Price's Corners Bass /Lake /Buffalo /Springs /Rugby /Knox
Corner
iii. Horseshoe Valley /Sugarbush;
iv. Craighurst /Dalston/the Bidwell Road community;
v. Hawkestone/ East Oro/Forest Home /Fergus Hill Estate/ Mitchell Square /the eastern Lake
Simcoe shoreline community;
vi. Guthrie/ Edgar /Morningstar Corner /Oro Station/ the central Lake Simcoe shoreline
community; and
vii. Shanty Bay /the western Lake Simcoe shoreline community.
For several of the communities/hamlets, the orientation toward participation in an activity or
attendance at an event could go in two or more directions, depending on the activities /programs
offered at any of the community halls, schools, churches, etc.; for example: Edgar, Morningstar
Corner, Mitchell Square, Oro Station, Rugby, Knox Corner, and Fergus Hill Estate.
To augment some of the activities in community halls and similar facilities, they should be
directly associated with a park and appropriate outdoor facilities (e.g., playground, picnic area,
attractive social gathering space). To accomplish this, larger sites will be required.
Service Level /Provision Guideline
Under this scenario, the following service level /provision guideline is recommended to serve as a
guideline for future planning:
One Township -wide large multi purpose facility (Guthrie)
6 -8 smaller multi purpose halls /community centres /program rooms, ranging in size from
around 700 3,000 square feet.
The total square feet of multi purpose space should be in the order of 17- 20,000, which
equates to 0.6 0.7 square feet per resident, based on a future population of 28,000.
Factors /criteria to consider when deciding to provide additional or alternative public
indoor multi purpose space:
1. If a gap in service is identified or an emerging need in a specific area is identified and the
supply of existing facilities is unable to meet the growing and/or changing need (this could
include demand for a new type of facility /activity and/or growth in demand for an existing
type of facility /activity);
2. When an existing municipal or community -used facility is at the end of its useful life (when
the cost to maintain reaches or exceeds approximately 65% of the cost to replace);
3. When an existing facility is no longer suitable for its intended purpose;
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 98
Page 125 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
4. When the provision of a new public facility will contribute to the outcomes and objectives of
a particular planning objective or policy; and
5. When no viable partnership or alliance opportunity for meeting community needs has been
identified.
If research indicates the need to redevelop an existing facility, further detailed analysis should be
undertaken to verify and detail needs for the market area of the facility, and to identify and
evaluate all potential opportunities for meeting those needs. The primary focus will be on how
best to develop it to meet changing needs and demands.
Criteria for redevelopment /renovation/upgrade /expansion of public indoor multi- purpose
space /community halls would include:
1. When demand research confirms a localized need for a change or redevelopment of a
particular facility;
2. When there are relatively high levels of facility use and the facility can no longer meet
demand;
3. When there is demand or pressure for a facility to meet different or greater levels of needs
than are currently addressed;
4. When the physical design and size of the facility is unsuitable for the preferred community
use, and it is unable to meet demand, or is better suited to another use;
5. When the condition of the building is good and warrants redevelopment to meet changing
and/or growing demand;
6. When there is relatively high customer satisfaction with this current facility;
7. When the building is of historical value;
8. When there are no viable partnership or strategic alliance opportunities to meet emerging
new and/or growing needs; and
9. When there are major operational issues affecting the viability of the operation such that it is
or will be non competitive (e.g., conflict /competition between commercial use and
community use).
The following criteria are recommended to help determine when to divest an existing
public indoor multi purpose space /community hall:
1. When the facility is unsuitable to meet current and changing future uses (design, size,
characteristics, location);
2. The ability of the facility to be easily and satisfactorily modified to meet additional and/or
new uses and expectations for service level;
3. The ability of a facility to be enlarged and to support outdoor facilities, including parking;
4. Very low usage and/or over supply;
5. Close proximity of similar facilities;
6. Planned development of another public facility(s) which would render the existing facility
obsolete or surplus;
7. When a facility which requires major capital improvement/repair /upgrade which could not be
justified due to the poor condition of the building, low use levels, or other factors (typically,
when the cost to maintain the structure reaches or exceeds approximately 65% of the cost to
replace; and
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 99
Page 126 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
8. When the Community Hall Board of Management is unable to meet their obligations for 50%
contribution to required capital investments and/or finance 100% of ongoing operating
expenses.
Divestment options include:
1. Sell the facility for another use;
2. Lease the facility for another use;
3. Convey the facility to another provider to maintain as a viable community -use venue;
4. Seek a strategic alliance with another provider (public, quasi public, non profit, commercial)
to help maintain the facility as a public -use venue; and
5. Convert the facility into another public use.
Other General Recommendations
A key recommendation for all halls is to define the respective roles of the Municipality and the
management boards in the operation of community halls This should be done in close
consultation with the hall boards. It is crucial that the Municipality is aware of the uses of the
halls and that the boards comply with all rules and regulations regarding fire safety, accessibility,
LCBO, the Occupiers Liability Act, etc.
Since most halls are under utilized, minimally promoted, and under increasing financial stress,
additional efforts are required to try to increase revenues. It is recommended that most useable
halls be much better promoted, including their features, potential for uses /programs and their
availability. Increased promotion should be by the individual hall boards and by better utilizing
Township resources such as the semi annual Recreation and Community Services Brochure, and
the Township web site.
To the extent possible, and in co- operation with the Township, encourage increased utilization
through more rentals, community-based programs, Township- driven programs, and
annual/seasonal events that go beyond `fundraising' as the only goal.
Consider a booking and referral protocol to make it easier for customers to book a facility and
research all opportunities /options.
Consider establishing rental fees that are consistent and relate to the characteristics and features
of each hall.
For the halls that are retired as public use facilities, consider all feasible options to retain them as
community assets, including encouraging other entities to assume ownership and operational
responsibility. It will be necessary to fully disclose any current and anticipated deficiencies in
the buildings that may apply to any new ownership arrangement and uses.
For the community halls that are retained, the 50/50 capital cost sharing arrangement with the
Municipality will have to be adjusted to account for the large expenditures that are required over
the next 20 years. As requirements for investments that exceed typical annual maintenance and
repair are identified, it is recommended that these be discussed with the Municipality on a case-
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 100
Page 127 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
by -case basis, and a decision made about how the investment will be financed and the respective
responsibilities of the Municipality and the hall board.
The current policy for hall boards to balance their annual operating budget may have to be
implemented with increasing flexibility as ongoing expenses increasingly exceed revenue.
New community centres should be operated by the Municipality, working closely with local
recreation/community associations to help support programming and special events.
Craighurst Hall
The inadequate Craighurst Hall should be replaced within the next five years with a
contemporary community centre which could be located within the future community park that
will be provided in one of the growth areas of the Craighurst community Another option may
include a community facility located within the residential area of Horseshoe Valley Resort.
Ideally, the replacement facility should be one storey and comprise 2,000 -3,000 square feet of
flexible program space with a ten twelve foot ceiling, and contain suitable additional space for
washrooms, storage, a kitchenette and mechanical equipment. The floor should be suitable for all
floor -based fitness /wellness programming, dance programs, junior sports programs, creative arts
activities, and other programming for all ages, including older adults. If the multi purpose space
is directly associated with a full -size gymnasium, the amount of space could be reduced and the
requirement for the cushioned floor would also be reduced. If a school is built adjacent to the
community park in Craighurst, consider associating this multi purpose program space with the
school. It is recommended below that a full -size single gymnasium be provided with all new
elementary schools, through a capital and operational partnership between the Municipality and
the school board. The site should be large enough to support parking and some outdoor facilities
to complement the activities that the facility will attract. A playground and a picnic area are two
example facilities.
Before embarking on this initiative to provide a new community centre, it is recommended that a
feasibility study/business case be completed to further test the market/interest, determine the full
range of uses, refine the nature and size of the building, estimate revenue and operating costs and
estimate capital costs. It is further recommended that this facility be operated and programmed
by the Municipality, with assistance from the immediate community
Warminster Hall
Before any significant additional capital investment is made in the Warminster Hall, it should be
retired as a public facility. The condition audit identified up to $13,000 in upgrades in Year One
and an additional $117,000 in repairs within five years. Given the small size and limited
usability of this facility, it is considered that this 700 square foot hall is not a good candidate for
continued service as a public recreational/social facility. The limited programming that takes in
the facility should be transferred to nearby facilities (Legion, church, school).
Note
The recommendation to retire Warminster Hall as a public use facility was accepted by
Township Council. On May 13, 2009, a resolution was passed to close the hall. On October 28,
2009, Township Council agreed to declare the hall surplus and offer the facility and site for sale.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 101
Page 128 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
However, since this facility was operational during most of the period that this Strategic Facility
Plan was being prepared and was part of the condition assessment of Township buildings and
other analysis, it has been included in the descriptions, analysis and recommendations in this
section and throughout the report.
Carley Hall
Since this hall requires the most investment to maintain life and fire safety, especially in the
short term, is a relatively remote facility, and receives only seasonal use due to its physical
condition and very small site, it is recommended that this facility be immediately retired as a
public use facility. It is estimated that a capital investment of around $250,000 will be required
in the next five years, which represents almost half of the total estimated investment of $534,000.
Also, over $10,000 in additional upgrades are needed immediately to meet fire safety
requirements. Public use cannot be allowed until these improvements are completed. Consider a
heritage designation for this facility to protect its character, no matter the future use.
Edgar Hall
Due to the significant investment required to maintain this facility in adequate and safe repair,
and its limitations regarding poor well water and accessibility, serious consideration should be
given to its retirement as a public use facility within the next five years. An investment of
around $125,000 is estimated for the next five years and a total of approximately $450,000 will
be required over the next twenty years.
Eady Hall
Although Eady Hall is in above average condition, its relatively isolated location, the relatively
high estimate of repair cost over the next twenty years, (although most of the major repairs are
not anticipated until the after 2024) and the recommended strategy to provide a new and larger
community centre in the nearby area suggests that ultimately, Eady Hall may become either
redundant or too costly to maintain. In the interim, use of Eady Hall should be closely
monitored, especially if the proposed new `northern' new community centre becomes a reality.
In the near term, additional use may be able to be directed to Eady Hall, especially if Carley Hall
is retired as a public use facility (along with Warminster Hall). To determine the viability of
Eady Hall as a public facility, utilize the `divestment' criteria that are recommended in Section
4.4 (page 99 -100).
Old Town Hall
If the arena is rebuilt and repositioned on the Guthrie site, and a new large multi purpose
program and event space is provided, municipal and community programming at Old Town Hall
can be gradually reduced, especially in the winter season, to provide a more suitable venue and
reduce the annual operating cost of the facility. Other groups (e.g., the Oro Agricultural Society,
the Oro Medonte Horticultural Society and the History Association) consider Old Town Hall
their `home'. These uses can still be supported since of these uses take place in the warm
seasons. Fortunately, most of the anticipated capital investment for this hall will not have to be
made until the final five years of the twenty year cycle.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 102
Page 129 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Jarratt Hall
Although this facility is will require considerable capital investment over the next twenty years,
most of the investment will not be required until the final five years of that period. The facility is
well used, mostly by community groups. Jarratt Hall is strategically located to serve many of the
needs of an area bounded roughly by a line half way between Warminster Road and Mount St.
Louis Road on the north, Line 7 on the west, Old Barrie Road on the south and the eastern
boundary of the Township. Unfortunately the current site is too small to support an expansion of
the facility and required parking, and to provide a community park at this location. Additional
land should be acquired adjacent the site, if the opportunity arises.
Hawkestone Hall
This community hall is the busiest of the public halls, supported by the hall board and the local
community association. The hall, which also contains a small community library, is heavily
scheduled for regular community -based programming and seasonal events. The hall board and
the community association operate the hall like a mini recreation department. Although a capital
investment of around $300,000 will be required over the next twenty years, most of that
investment will not be required until the final five years of the maintenance cycle. Given that
the hall is located on a 0.83 hectare (2 acre) site, there is the opportunity to develop the land
behind the hall into a passive recreation area and link it to the Oro Medonte Rail Trail that passes
by the site on the south side.
New Northern Community Centre
It is recommended that a new contemporary community centre be located in the northern part of
the Township, possibly within the Moonstone community to serve the Moonstone /Eady /Fair
Valley /Vasey/Hobart/Mount St. Louis /Carley/Ravines of Medonte area. As with the facility
proposed for the Craighurst or Horseshoe Valley /Sugar Bush communities, this community
centre should be a one storey facility should comprising 2,000 -3,000 square feet of flexible
program space with a ten twelve foot ceiling, and contain suitable additional space for
washrooms, storage, a kitchenette and mechanical equipment. The floor should be suitable for
all floor -based fitness /wellness programming, dance programs and junior sports programs. If
Eady and Carley halls are retired, the facility in Moonstone should be larger, with more than one
room created by one or more high quality folding walls.
A suitable site will have to be identified and acquired for this facility. The site should be large
enough to support parking and some outdoor facilities to complement the activities that the
facility will attract. A playground and a picnic area are two example facilities.
Before embarking on this initiative, it is recommended that a feasibility study/business case be
completed to further test the market/interest, determine the full range of uses, refine the nature
and size of the building, estimate revenue and operating costs and estimate capital costs. It is
further recommended that this facility be operated and programmed by the Municipality, with
assistance from the community. It is recommended that this proposed new northern community
centre be identified as higher in priority than the one proposed for Craighurst/Horseshoe Valley
Resort, unless a partnership opportunity arises in the near future to accelerate the
Craighurst/Horseshoe Valley Resort facility.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 103
Page 130 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan, Township of Oro Medonte March, 2010
Shanty Bay Community
If the fire hall in Shanty Bay is enlarged, consider including a multi purpose room to support
training and some community programming, similar to, but larger than the Ian Arthur Beard
community room.
Multi- purpose Space Associated with the Oro Medonte Arena
If a major multi purpose recreation facility is provided in association with a rebuilt and relocated
arena at the Guthrie site, a suitable amount of flexible, multi purpose, ground floor program
space should be provided. A minimum of 4,000 square feet of space should be considered,
along with washrooms, storage and a kitchenette. The ability to divide the space into two rooms
should be facilitated via a high quality folding wall. If a gymnasium is also provided as part of
this facility, the requirement for a cushioned floor in the multi purpose room could be reduced.
Full -size Single Gymnasia
If a new school is built anywhere within the Township, vigorously explore the opportunity to
partner with the school board to provide a full -size single gymnasium for school and community
use. The gymnasium, with change rooms and possibly one or more smaller multi purpose
program room, should be designed to be separated from the main school building by a lockable
corridor to eliminate the need for after -hours custodial security. If a secondary school is built in
the Township, one or more full -size gymnasia would be included. If the option to partner with a
school board does not materialize in the next few years, the market for and feasibility of a
gymnasium should be further examined as a possible component of the Township -wide multi -use
recreation centre, proposed for the Guthrie site.
4.6 Fitness Facilities
A lthough the Municipality does not provide any formal fitness facilities, a number of
facilities that are owned by the Township (the banquet hall at the Oro Medonte Community
Arena and some of the community halls) are used for floor -based fitness programs offered by the
Department of Recreation and Community Services, community associations and others.
Examples of types of fitness and wellness programs include: Healthy Bones, Get Fit, Total Body
Sculpture, Stretch and Relaxation, Pilates, Yoga and Movement Improvisation. A major issue
with these facilities is the fact that the floors are not `sprung' or otherwise cushioned, which is a
prerequisite for many floor -based fitness activities.
Other types of fitness and wellness opportunities such as strength and conditioning, spinning,
running, cardio and aqua are not readily available in the community and area, except through a
membership at Horseshoe Valley Resort or venues in:
Barrie (four municipal fitness centres, the YMCA with its fitness centre and indoor running
track, and commercial entities such as Curves for Women and GoodLife);
Orillia (the YMCA with its fitness centre and indoor running track, and commercial entities
such as Genesis and Curves for Women);
Midland (the YMCA and Curves for Women); and
Penetanguishene (Curves for Women).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 104
Page 131 of 289
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Monthly, quarterly and annual membership for individuals, couples and families are available at
Horseshoe Valley Resort (treadmills, ellipticals, recumbent bikes, Universal and free weights).
Monthly rates vary from $50 for individuals to $75 for couples and $100 for families. A day rate
is also available. Currently, there are approximately 100 family memberships.
It is likely that many residents enroll at a fitness centre or program outside of the community,
and sometimes, near where they work.
Interest in fitness and especially wellness programs is increasing, driven in part by the aging
Baby Boom generation as this large generation identifies better fitness levels with greater
longevity, and improved stamina and mobility.
The multi -use recreation facility that the City of Orillia has been planning does not include a
fitness centre, nor does the multi -use recreation facility that is planned for Springwater
Township, to be built in the Midhurst area. The townships of Tiny, Tay and Severn are not
planning for any fitness facilities. In the City of Barrie, the YMCA is planning for a new and
substantially enhanced 70,000 square foot facility as part of the Allandale Station lands and
Allandale Village project. The facility would include a full service fitness centre, as well as
aquatic facilities, a gymnasium, employment and community services, and child and family
services.
As part of the study into the need for and feasibility of a township -wide multi -use recreation
centre (see Chapter Six), the potential inclusion of a limited to full- service fitness facility was
examined. It was determined that although there is current and growing interest in such a facility
and a fitness facility is a relatively high priority among residents, this type of facility is beyond
the financial ability of the Municipality to provide at this time and into the medium -term future.
There are a number of options and possibilities to provide an improved fitness program for
Township residents, as noted below.
1. If, as recommended, new multi -use community centres are provided throughout the
Township, consider floors in these facilities that will support a wide range of uses, including
floor -based wellness /fitness programs.
2. As a component of the new arena complex that is proposed for the Guthrie site, the potential
to incorporate a three -lane running /walking track around the perimeter of the ice surface on
the second floor was investigated. It was determined that the ice surface enclosure would
have to be widened and more headroom would be required to accommodate the track. This
additional cost would be too high to justify a running track in an arena.
3. Continue to discuss with Skyline International (Horseshoe Valley Resort), the possibility of a
strategic alliance between the Municipality and the resort to provide a full- service fitness
facility at the resort with access to all Township residents via a range of competitively priced
memberships and pay -as -you go fitness program opportunities.
4. If it is not possible to achieve a strategic alliance with the owners of Horseshoe Valley
Resort, the Township could consider adding a fitness centre to the new arena complex that is
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 105
Page 132 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshio of Oro Medonte March. 2010
proposed for the Guthrie site. One possibility may be to locate this facility on the second
floor between the two ice surfaces, if the second ice pad is added as a future phase. A small
walking track may be possible within the fitness centre. As was recommended under multi-
use facilities, a full -size single or double gymnasium could also be considered as a
component of this potential fitness facility, along with a multi -use aerobic exercise /dance
studio. If a full -size gymnasium is included with a new or renovated elementary of
secondary school in the Township, one may not be required at the Guthrie site.
5. If it is not possible to achieve a strategic alliance with the owners of Horseshoe Valley
Resort, or to add to the proposed arena complex at the Guthrie site as local demand continues
to grow, the Township should contact the cities of Barrie and Orillia, and the Township of
Springwater to attempt to negotiate an arrangement that would allow Oro Medonte residents
access to municipal fitness facilities and associated programming at rates consistent with the
residents of those municipalities.
6. A service level/provision guideline of one full- service fitness facility per 30,000 people is
recommended to serve as a guideline for future planning.
4.7 Aquatic Facilities
There are no public aquatic facilities in the Township, either indoor or outdoor. However, a
quality public beach is available at Bayview Memorial Park. Located at Horseshoe Valley
Resort are two outdoor swimming pools and an indoor pool. As noted above under fitness
facilities, memberships are available to the public to access the aquatic, fitness, tennis and squash
facilities at the resort. There are indoor aquatic facilities located at various other resorts
throughout the Township such as the aquatic centre with a small main pool, a children's pool and
a whirl pool in the recreation centre at Carriage Ridge Resort in Horseshoe Valley for use by
guests and timeshare residents; and the indoor /outdoor pool and hot tubs at Carriage Hills Resort.
As introduced in Section 3.1, aquatic facilities are located in neighbouring communities and are
available to Oro Medonte residents through program fees and memberships. In Barrie, there are
three municipal indoor aquatic facilities comprising three 25 metre lane -style pools, one leisure
style pool, two smaller therapeutic tanks and one `toddler' pool. Also in Barrie is the YMCA
facility with its 20 yard indoor pool and a 20'x20' instructional pool. As noted earlier, the
YMCA of Simcoe /Muskoka is planning for a new Y facility in Barrie, which is proposed to
include a lane pool, a leisure pool and a therapeutic /children's tank. The YMCA facility in
Orillia provides a 25 metre, six lane pool as well as whirlpools and saunas. The old YMCA
indoor pool is owned and operated as a commercial venture (Pauline Barratt Aquatics). For
some time, the City of Orillia has been planning for a major multi -use recreation centre which is
proposed to include an aquatic facility comprising a 25 metre x eight lane swimming pool, a
leisure /teaching pool, a therapy pool, a water slide and seating for 150 spectators. Given the
recent and unexpected closure of the Orillia Community Centre (single pad arena) and the
challenges relating to the site that has been purchased for the new recreation centre, the City may
have to delay building the full multi -use recreation facility. The City has decided to construct a
twin pad arena on another site as soon as possible (West Ridge Sports Complex on the border of
Oro Medonte near Forest Home). The Midland YMCA contains a small pool, and in
Penetanguishene, there is an indoor pool associated with the Oakridge Community Centre.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 106
Page 133 of 289
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Figure 28:
The Beach at
Bayview
Memorial Park
As part of the study into the need for and feasibility of a township -wide multi -use recreation
centre (see Chapter Six), the potential inclusion of an indoor aquatic facility was examined. It
was determined that although there is current and growing interest in such a facility and an
aquatic facility is a relatively high priority among residents, this type of facility is beyond the
financial ability of the Municipality to provide at this time and into the medium -term future.
There are a number of options and possibilities to provide an aquatic program for Township
residents, as noted below.
1. Continue to upgrade the beach and associated facilities at Bayview Memorial Park.
2. Continue to discuss with the owners of Horseshoe Valley Resort, the possibility of a strategic
alliance between the Municipality and the resort to provide an indoor aquatic facility at the
resort with access to all Township residents via a range of competitively priced memberships
and pay -as -you go aquatic program opportunities. The design of the facility should tend
toward a main leisure -style tank with at least four 25 metre lanes and a separate therapeutic
tank to support some of the aquafit programs; cardio and other rehabilitation and therapy
programs; and other aquatic, fitness and wellness programs that would benefit from warmer,
shallow water.
3. If it is not possible to achieve a strategic alliance with the owners of Horseshoe Valley
Resort, the Township could consider adding an aquatic facility to the new arena complex that
is proposed for the Guthrie site. The design of the facility should tend toward a main leisure-
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Bastertiield Associates Landscape Architects, and the Tourism Company
Page 107
Page 134 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
style tank with at least four 25 metre lanes and a separate therapeutic tank to support some of
the aquafit programs; cardio and other rehabilitation and therapy programs; and other
aquatic, fitness and wellness programs that would benefit from warmer, shallow water.
4. If it is not possible to achieve a strategic alliance with the owners of Horseshoe Valley
Resort, or to add to the proposed arena complex at the Guthrie site as local demand continues
to grow, the Township should contact the cities of Barrie and Orillia to attempt to negotiate
an arrangement that would allow Oro Medonte residents access to municipal aquatic
facilities and associated programming at rates consistent with the residents of those
municipalities.
5. A service level /provision guideline of one indoor aquatic facility per 30,000 people is
recommended to serve as a guideline for future planning.
4.8 Ball Diamonds
rr he quality of ball diamonds in Oro Medonte Township ranges from `fair to excellent'. The
best fields are well to very well used, and the worst are extremely under utilized.
Baseball /softball programs in Oro Medonte are provided by six local and one regional group,
with the assistance of the Township of Oro Medonte:
Oro Medonte Minor Ball registered 230 players between the ages of 4 and 16 in 2008. Male
participation represented approximately 60 They used the two diamonds at Lion's Sports
Field (Guthrie site), and the Shanty Ball Park and Craighurst Park diamonds for a total of
264.5 hours per season.
Vasey Minor Ball registered 150 players between the ages of 5 and 19 in 2008 for slow -pitch
and fastball. Male participation represented approximately 70 They use the two Vasey
Park diamonds for a total of 40 hours per season. The group uses the unlit diamond the most.
Oro Medonte Men's Recreational Slow -pitch League. They use the two diamonds at the
Lion's Sports Field (Guthrie site) and the diamond in Shanty Bay Park.
Warminster (men's) Ball League uses the diamond at Warminster Park.
Shanty Bay Fire Fighters use the unlit diamond in Shanty Bay Park.
Vasey Countrymen (men's) use Diamond #1 in Vasey Park.
Barrie- Orillia Christian Sports Co -ed and Men's Ball registered 200 players between the ages
of 16 and 50 in 2008 in a Slow -Pitch league. Many participants are Oro Medonte residents.
Male participation represented approximately 60 They use the two diamonds at the Lion's
Sports Field (Guthrie site).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 108
Page 135 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
Figure 30: Lion's Sports Field Diamond
Figure 29: Lion's Sports Field Diamond
Concession /Picnic Facility
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 109
Page 136 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte
Figure 31: Lion's Sports Field Diamond
Figure 32: Shanty Bay Park Ball Diamond
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 110
Page 137 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Figure 33: Vasey Park Ball Diamond #1
Figure 34: Vasey Park Ball Diamond #2
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 111
Page 138 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte
Agenda Item {AgendaNumber} {ItemDescription}
Figure 35: Warminster Park Ball Diamond
March. 2010
Quantity, Size and Distribution
There are 19 publicly available ball diamonds in Oro Medonte. Refer to Figure 36 below for
details.
Seven diamonds are located on Township lands and 13 are located at elementary schools.
Six diamonds are categorized as `full- size', and of those, three are lit. All of the lit diamonds
are Township facilities. The outfields range from 215' to 270', which are on the small side
for adult facilities. The three lit diamonds are the only facilities with fenced outfields.
There are two intermediate scale diamonds (Craighurst Park and Moonstone Elementary
School).
There are 11 junior diamonds, all located at elementary schools.
Except for school facilities, ball diamonds are mainly concentrated in two locations: i) the
Lion's Sports Field adjacent the Oro Medonte Community Arena, and ii) Vasey Park located
in the far northern part of the Township. In addition, one municipal ball diamond is located
in each of Warminster Park, Shanty Bay Ball Park, and Craighurst Park.
One poor quality scrub diamond exists in the Hawkestone community (adjacent to
Hawkestone community Park) on lands owned by the Ukrainian National Federation.
None of the diamonds are tile drained or irrigated, and as such, take longer to dry in the
Spring and after rains, and it is more difficult to maintain quality turf, especially during a dry
summer
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 112
Page 139 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Quality
The diamonds that are used the most (Lion's Sports Field, Warminster Park and Shanty Bay
Park) and are in the best condition. Adjacent to the Lions Sports Field diamonds is an
attractive concession building with a small attached picnic shelter and bleachers. Associated
with the Warminster diamond are bleachers, a concession building, a playground and parking
at the adjacent fire hall. Associated with the Shanty Bay diamond are bleachers.
The Vasey Park diamonds are rated as `good' to `average' condition. For Diamond #2, the
infield requires improvement and the bleachers and backstop are in poor condition. In Vasey
Park, there is a concession, washrooms, a warm -up pen, bleachers at both diamonds, a picnic
shelter, a parking lot and a playground, all adjacent to Diamond #1.
The Craighurst Park diamond is rated as `fair', and the park has very poor physical and visual
access from Highway 93. There are bleachers behind the backstop. Along with the very
poor access to the park and poor parking, is the close proximity of the diamond to adjacent
residences.
The school diamonds are typical (minimum) quality for educational facilities.
Utilization
The lit diamonds at the Lion's Sports Field, adjacent to the arena are used the most, and
scheduled six nights /week and sometimes on Saturday afternoons. There is additional time
available for daytime weekend use for tournaments. Use of both diamonds is mostly by adult
groups, with a good deal of use from out -of- township groups.
At 88 the next most used diamond is Shanty Bay, with scheduled use five nights per week.
Use is mostly by minor ball, with one night of adult use.
At 70% utilization, the next best used diamond is Warminster, with scheduled use three
nights per week, all by adult groups (two thirds of which is the Orillia Slow -Pitch League).
Diamond #1 at Vasey Park is scheduled for use only two nights per week for one time slot.
Based on a four -night per week standard, this lit diamond is only used 33% of available
hours. Use is by both minor and adult groups, along with a few tournaments. It is reported
that a good deal of unscheduled use takes place, where no fee is paid to the Township. That
unscheduled use has not been factored into the above utilization figures.
Diamond #2 at Vasey Park and the unlit diamond in Craighurst Park are used only one night
per week on a regular basis, but there are other infrequent uses at Vasey #2 (16% utilization
for Craighurst and 50% utilization at Vasey diamond #2). Use of these diamonds is by both
minor and adult groups, along with a few tournaments.
Cl In 2008, use was up slightly for the Lion's Sports Field diamonds, Diamond #1 at Vasey
Park, and Warminster diamond.
In 2008, use was down slightly at Craighurst, and down significantly at Diamond #2 in
Vasey Park.
Issues
Oro Medonte Minor Ball noted that the Craighurst diamond could be prepared better.
Craighurst Park has issues of insufficient frontage and visibility which contributes to
problems of access and knowledge of the existence of the ball diamond. The small size of
the park provides very limited opportunities for parking, and also creates noise conflicts and
privacy issues for adjacent residents when the ball diamond is in use.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 113
Page 140 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The unlit diamond in Vasey Park could be re- oriented and enlarged to accommodate older
age groups.
Vasey Minor Ball suggested that the lights at the Vasey Park diamond are inadequate and a
water well should be provided at the park to support irrigation. (Potable water is supplied via
a well that is shared with an adjacent church.)
The Barrie- Orillia Christian Co -ed and Men's Slow -Pitch League noted that the diamonds at
the Lion's Sports Fields are not always dragged and the portable chemical toilets should be
emptied more often.
Demand Indicators
There is interest from the ball community in the northern part of the Township to re -align and
enlarge Diamond #2 in Vasey Park, make improvements to Diamond #1 in Vasey Park, and
add another adult -size diamond.
To meet current unmet demand for two more teams, Oro Medonte Minor Ball has requested
1.5 additional hours per week on Tuesdays and Thursday for the first seven weeks of the
season and a total of 4.5 additional hours per week for the remaining five weeks of their
season. They also would like additional diamonds to support their annual tournament and
rainouts.
Oro Medonte Minor Ball anticipates an increase in participation of 15% over the next five
years. Over the past five years, registration has increased by 18
Vasey Minor Ball anticipates an increase in participation of 10% over the next five years.
Over the past five years, registration has held steady.
The Barrie Orillia Christian Co -ed and Men's Slow -Pitch League (which is actually based in
Oro Medonte) indicated that registration has increased by 20% over the past five years and
they anticipate that demand could increase by another 25% over the next five years. Due to a
shortage of available facilities in Oro Medonte, they are renting diamond time in Barrie.
They currently use three hours at each of the Lion's diamonds on Monday and Friday nights
and could use 50% more time.
Anticipated Changes in the Local Market for Minor Ball
Overall, the number of children, youth and adults who regularly play ball is projected to decline
in number over the next 12 to 20 years and then begin to increase again.
Based on the age- specific population projections completed for this study, the number of
potential participants available to play minor ball in Oro Medonte is projected to decline in
number (586 between 2006 and 2021) and percentage (from 15% in 2206 to 10.5% by 2921)
through to around the year 2020, after which, it is predicted there will be an increase back to
2006 levels by 2031. The decline for the 5 -19 age group is predicted to be 763 from 2006 to
2021.
The decline in the 5 -16 age group (Oro Medonte Minor Ball) through to around 2026 is
predicted to be as follows (the percentage indicated the proportion of the total population that
this age group represents and will represent):
3,065 in 2001 (16.7
3,002 in 2006 (15.0
2,727 in 2011 (13.2
2,409 in 2016 (11.3
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 114
Page 141 of 289
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
2,413 in 2021 (10.5
2,664 in 2026 (10.6 and
3,194 in 2031 (11.4
The decline in the 5 -19 age group (Vasey Minor Ball) through to around 2031 is predicted to
be as follows (the percentage indicated the proportion of the total population that this age
group represents and will represent):
3,985 in 2001 (21.8
4,038 in 2006 (20.2
3,739 in 2011 (18.2
3,363 in 2016 (15.8
3,275 in 2021 (14.3
3,496 in 2026 (13.9 and
4,081 in 2031 (14.5
Anticipated Changes in the Local Market for Adult Ball
Based on the age specific population projections completed for this study, the number of
potential participants available to play adult ball in Oro Medonte is projected to decline by
close to 10% (279) over the next 8 -10 years and then slowly increase, but not back to the
2006 level until around 2030.
For the 21 -40 age group (Vasey Countrymen), the number is projected to actually decline a
little until around 2016, when the number is expected to continue to increase through to at
least 2031. For this age group, the population in 2006 was 2,179. The number is projected to
bottom out at 2,016 (by around 2016) and then slowly increase to 2,458 by 2031. As a
percentage of the population, this age group is expected to decline from 23% in 2001 to
19.8% by 2016 and then fluctuate through to 2031 when it is projected to represent 18.5% of
the population.
For the 16 -40 age group (Oro Medonte Men's Recreational Slow -pitch League), the number
is also projected to decline until around 2016 and then increase through to at least the year
2031. For this age group, the population in 2006 was 2,830. The number is projected to
bottom out at 2,681 (by around 2016) and then slowly increase to 3,064 by 2031. As a
percentage of the population, this age group is expected to steadily decline from 30.7% of the
population in 2001 to 23.1% by 2031.
Lions Sports Field Diamonds
Add screening to the infield of both diamonds (2010)
Add a third full -size lit softball diamond of slightly larger size (325' outfield) and similar
quality to create a three- diamond tournament facility.
If a new arena is built elsewhere at the Guthrie site, ensure that there is access from outside
to washrooms and food services to support outdoor uses of the park.
When three diamonds are available, promote the availability of this tournament facility
within the region.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 115
Page 142 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Vasey Park Diamonds
Encourage greater use of Diamond #1.
Re -align and re -build Diamond #2, including bleachers and an adequate backstop, but do not
add lights.
Encourage greater use of Diamond #2.
More closely monitor the use of both diamonds to ensure that the rental fee to the Township
is paid for all regular use.
Shanty Bay Park Diamond
If the adjacent fire hall is expanded into the park, program the ball diamond as a junior facility.
The adult uses that are currently supported by this diamond for one night per week can be
accommodated at the proposed three- diamond facility at the Guthrie site (as noted above).
Craighurst Park Ball Diamond
It is recommended that this substandard facility be retired and the uses that it currently supports
be accommodated at the proposed three- diamond facility at the Guthrie site (as noted above).
Warminster Park Diamond
Maintain this unlit diamond in its current condition.
Service Level /Provision Guideline
The following Service Level/Provision Guideline is recommended for full- size /senior ball
diamonds to serve as a guideline for future planning.
1 lit diamond per 5,000 residents
1 unlit diamond per 3,000 residents
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 116
Page 143 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Inventory and Utilization of Ball Diamonds
Township of Oro Medonte, 2008
Diamond
Category
Full -Size Lit
Arena (Lions #1)
Arena (Lions #2)
Vasey #1
Full-Size Unlit
Vasey #2 81 270 Scheduled regularly 1
night/wk. 2 hrs. /night,
minor ball a few small
tournaments (50.2%
utilization), use down
significantly from '07
Warminster 72 240 Scheduled regularly 3
nights /wk. 1.5 -2 hrs. /night
(70% utilization), 79% out
of- town groups, all adult,
use up slight from `07
Shanty Bay 78 260 Scheduled regularly 5
nights /wk. 2 hrs. /night,
mostly minor ball (87.5%
utilization), use same as `07
Intermediate
Craighurst 1 Twp. 60 200 Scheduled regularly 1
night/wk. 2 hrs. /night,
minor ball (15.8%
utilization), use down from
`07
Moonstone El. Sch. 1 SCDSB 7 Not scheduled
Quantity
and
Provider
1 Twp 78 260
1 Twp 81 270
1 Twp 64.5 215
1 Twp.
1 Twp.
1 Twp.
Outfield
Dimersions
Metres Feet
Agenda Item {AgendaNumber} {ItemDescription}
Utilization
Scheduled regularly 6
nights /wk. 3 -3.5 hrs /night,
mostly adult, a good deal of
out -of -town -use, use up
slightly from `07
Scheduled regularly 6
nights /wk. 2 -3.5 hrs. /night
Sat. afternoon, 68% adult,
37% out -of -town, use up
slightly from `07
Scheduled regularly 2
nights /wk. 1.5 -2
hrs. /night, adult minor ball
a few small tournaments
(32.6% utilization), use up
slightly from '07
Notes
March. 2010
Figure 36
Fenced outfield, lighting on 3
infield and 4 outfield poles, no
warning track, picnic area,
canteen, excellent condition
Fenced outfield, lighting on 2
infield and 2 outfield poles, no
warning track, picnic area,
canteen, excellent condition
Fenced outfield, lighting on 4
outfield and 2 infield poles, no
warning track, bleachers,
washrooms, picnic area, canteen,
good condition
Minimum wooden pole
backstop, minimum infield, no
outfield fence, no waming track,
washrooms, picnic area, canteen,
below average condition
No outfield fence, bleachers, no
waming track, storage building,
excellent condition
No outfield fence, no warning
track, bleachers, good condition
No outfield fence, bleachers, fair
condition
No outfield fence, fair condition
Junior /Scrub
Pub. El. schools 9 SCDSB Not scheduled No outfield fence, fair condition
Sep. Ei. schools 2 SMCDSB 7 Not scheduled No outfield fence, fair condition
Notes:
Utilization is based on four nights /days /week x a 19 week season, with lit diamonds available for two 2-
hour time slots and unlit diamonds available for one 2 -hour time slot. So, a lighted diamond would have
304 hours available and an unlighted diamond would have 152 hours available per season.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 117
Page 144 of 289
4.9 Soccer Facilities
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
T he quality and availability of outdoor soccer facilities in Oro Medonte Township is poor.
Within the Township, the soccer program is provided by three groups, with the assistance of the
Township of Oro Medonte:
Oro Medonte Minor Soccer supports just over 400 participants ranging in age from 5 -14,
with approximately 60% male. Their program is `recreational'. One night per week, they
use fields at Burl's Creek Family Event Park that are leased by the Municipality.
The Warminster Minor Soccer League reports approximately 600 participants for their one
night per week recreational program. Participants range in age from 4 to 14. Male
participation represents 55 They use the fields at Richlieu Park.
Kaos Sports provides a minor indoor soccer program utilizing a number of school gyms. In
the past, the Township has offered an indoor soccer program, also utilizing school gyms.
Figure 37: Soccer Fields at Richelieu Park, Warminster
Quantity, Size and Distribution
The two minor soccer programs serve the Warminster area (eastern half of the former Township
of Medonte) and the central southern part of the Township (former Township of Oro). There is
no soccer program to specifically support residents north of Highway 400.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 118
Page 145 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
There are 33 publicly available soccer fields in Oro Medonte. Refer to Figure 38 below for
details. There used to be a field in Warminster Park, but the facility fell into disuse and the goals
posts have been removed.
Seven fields are located on Township lands, seven fields are located at elementary schools,
and the remaining 19 are located at Burl's Creek Family Event Park and leased to the
Township for use one night per week.
Three fields are close to Full -Size (60x 110 metres), and for this study, they have been
categorized as Full -Size.
Although 21 fields are categorized as Intermediate or Mini, all are smaller than the optimum
60x75 metres.
The remaining 10 fields are categorized as Micro, although all are smaller than the optimum
20x30 metres.
Except for school facilities, soccer fields are concentrated in two locations: i) Richlieu Park
in the Warminster area (5 fields), and ii) Burl's Creek Family Event Park (19 fields) in the
central south part of the Township. In addition, one municipal soccer field is located in
Ramey Memorial Park and at Guthrie neighbourhood Park.
For younger players, the larger fields can support several micro games simultaneously,
utilizing portable nets.
The only indoor soccer facility in the region is the private Barrie Sports Dome, located on
Hanmer Street, in the north end of the city.
City of Orillia Council has approved the construction of four new soccer pitches at the West
Ridge Sports Complex on the border of Oro Medonte near Forest Home. Two of the pitches
will be full -size (67x 105 metres) lit facilities, and two will be smaller at 55x82 metres and
unlit. One of the large fields will be artificial turf, which will allow extended season use.
The plan is for all four pitches to be open by the fall of 2010. Also sharing this site is a new
twin pad arena and a four -court lit acrylic surface tennis facility. The future site of the Orillia
Campus of Lakehead University will share the northern border of this site.
Quality
None of the fields are lit, tile drained or irrigated.
In each category, all fields are under sized.
Turf quality is moderate to poor.
The fields at Richlieu Park are particularly inadequate (under- sized, sloping, rough turf).
One of the better municipal fields is located in Ramey Memorial Park, but it is not scheduled
for regular use by either soccer organization.
Since the space occupied by the leased fields at Burl's Creek is used for a variety of large
event throughout the spring, summer and fall, the turf cannot be well maintained and as a
result, is of marginal quality. In addition, portable nets have to be used.
Due to size limitations and the marginal to poor quality of fields, neither a competitive youth
nor an adult soccer program can be supported. Thus, both youth programs only serve
children and youth up to age 14 for `introductory' and `recreational' programs. And even for
this level of soccer program, facilities are marginal in quality.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 119
Page 146 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Utilization
The available soccer fields are either used very infrequently or not at all by the community.
Only 18 of the 28 fields are scheduled for regular community use. Two of the seven
Township fields receive no scheduled use (fields at Guthrie and Ramey Memorial parks).
Two of the three nearly Full -Size fields, located at Burl's Creek, are used only one
night/week. The third nearly Full -Size field, located at Guthrie Park, is not scheduled.
Only seven of the 15 Intermediate /Mini fields are scheduled for use and all are used only one
night/week.
The fields at Richelieu Park are used during June and July by the Warminster Minor Soccer
League for House League play, and the fields at Burl's Creek are used from mid May to early
August by Oro Medonte Minor Soccer for House League play.
The fields located at schools are only utilized for school programs, and unscheduled,
undocumented community use.
Issues
The major issue with soccer fields is inadequate overall quality including the size of the
pitches, the quality of the turf and the sloping grade of some of the pitches at Richlieu Park. This
discourages an unknown number of potential minor soccer customers. Current fields cannot
support a competitive youth soccer program or adult soccer, both of which have potential to be
developed in Oro Medonte. The two soccer organizations appear motivated to only provide an
`introductory' and `recreational' program for children and youth.
The second major issue is the soccer facility in Richlieu Park which is extremely unsatisfactory
for soccer participants. As well, having 600 children descending on such a small site and
directly abutting to the back yards of residents and with a good deal of the parking on adjacent
residential streets even for one night per week is not acceptable for adjacent and nearby
residents by most standards.
The Warminster Soccer League identified the following issues.
There is little opportunity to park vehicles on site.
The organization has to provide a storage bin/facility each season to stow equipment.
Washrooms are portable chemical toilets, with no hand washing facilities.
Other issues and observations about the facilities at Richlieu Park include:
The adjacent streets are utilized for parking, even though a parking area is available at nearby
Warminster Park.
The fields are in poor condition and require significant leveling and turf enhancement. Lack
of tile drainage and irrigation limits turf management and quality.
Even the three largest fields (at 45x66 metres) are not large enough nor of sufficiently
adequate quality for youth over age 14, a competitive minor soccer program or adult play.
At 8.5 acres (4.41 hectares) in size, there is no more room to expand facilities or provide for
additional parking in Richlieu Park. About 10% of the park is unavailable for sports fields
due to a row of trees. The park is bordered on two sides by houses, with the only `official'
access point being a narrow laneway suitable only for pedestrian access. The park is
unofficially accessed via private property off Champlain Crescent at the northwest comer of
the park. Richlieu Park is classed as a large neighbourhood park and because there is no
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 120
Page 147 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
alternative in the Warminster community, it has been utilized for a purpose that is unsuitable
for this type of park in this location, especially a park with no street frontage.
The number of fields at this location is inadequate to support a minor soccer program with
600 participants that functions only one night per week. However, an associated issue is that
the soccer program only operates for one night per week, rather than the typical four nights
per week.
The lease arrangement with Burl's Creek Family Event Park, which comprises of an annual fee
of $5,000, is subject to annual renewal and could be terminated at any time. It does not allow for
the development of adequate quality fields to support a broader soccer program (youth 15 -17 for
recreational and competitive youth soccer, or adult recreational and competitive soccer).
The Oro Medonte Minor Soccer League identified the following issues relative to the facilities
available at the Burl's Creek location, and other issues:
The difficulty to recruit and retain sufficient volunteers.
The inability to offer a program for youth over the age of 14, and to support an adult
program. Many Township residents travel to Barrie and Orillia to join higher level programs.
It was reported that in both of those communities, there are often insufficient numbers to
form a competitive youth league.
Other Observations
Neither site is suitable to support soccer tournaments Richelieu Park (due to the small size
of the site, poor condition and size of the fields, and the location within a residential
neighbourhood) the Burl's Creek location (due to size and condition of fields, and
competition for weekend time with events at the park).
With scheduled play only one night per week for 10 and 12 week seasons for the two local
clubs and no tournaments, soccer facilities in the Township are extremely under utilized.
Most soccer programs operate on a minimum four night /week schedule and some offer a
seven night /week schedule. Most seasons are 15 -20 weeks in duration, with some play
extended into September.
Demand Indicators
The Warminster Soccer League noted that they do not attempt to attract additional
participants since no more can be accommodated via the existing facilities and the one -night
per week schedule. They indicate that there is often a waiting list of around 50 children and
youth.
With adequate facilities and/or a schedule that is more than one night/week, the soccer
programs could be expanded to accommodate additional participants in the minor soccer
program and to extend the age of participants to 17. With adequate facilities, the soccer
program could also be extended to accommodate adults, and to support tournaments.
There is unmet demand for competitive minor soccer, with many players participating in
programs in neighbouring communities.
It is ideal to concentrate the two soccer programs at one site for each.
The Township has recently received several requests from Orillia -based adult soccer groups,
but cannot accommodate them due to inadequate or unavailable fields.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 121
Page 148 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Based on the age- specific population projections completed for this study, unless the
participation rate increases, demand for minor soccer in Oro Medonte will decline over the
next 15 -20 years, beginning in the very next future. The 4 -14 age group is expected to
decline by 19% or 525 between 2006 and 2021 (from 2,769 to 2,244) and then slowly
increase back to around the 2006 level by around 2028 and continue to increase to 3,088 by
2031. The proportion of the population that this age group represents is projected to decline
from 15.6% in 2001 and 13.8% in 2006 to 9.8% by 2021 and then increase to 11% by 2031.
Oro Medonte Minor Soccer saw a decline of 80 participants in 2008. Although the
organization attributed the decline in numbers to the introduction of on -line registration and
severe weather on registration night, it may have been partially a result of the decline in the
number of children and youth in the Township (a decline of 96 children and youth between
that ages of 4 and 14 was reported by Statistics Canada between 2001 and 2006, and that
downward trend will continue).
However, if there were adequate facilities in the Township, demand for adult soccer has the
potential to increase, since the age groups typically associated with adult soccer are projected
to increase in number over the next 25 years. The 18 -34 age group is projected to increase
slowly from 3,613 in 2006 to 4,567 by 2031 (an increase of almost 1,000 or 26 The
proportion of the population that the 18 -34 age group represents is also projected to increase
from 17.4% in 2001 and 18.0% in 2006 to peak at 19.6% by 2016 and then decline to 16.3%
by 2031. The 18 -54 age group is projected to increase from 10,130 in 2006 to 10,969 by
3031 (an increase of 839 or 8.3 with almost 90% of the growth in the 18 -34 portion of
this age group. However, the proportion of the population that the 18 -54 age group
represents is projected to decline from 51.1% in 2001 and 50.6% in 2006 to 39% by 2031.
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
The Arena /Guthrie Site
This site is a logical location to establish a quality soccer facility to support an expanded
Oro Medonte Soccer League as well as to support tournaments for the entire Township and
the region. With adequate, eventually lit facilities at this location, a township -wide adult
program should be able to be established if the organizational structure can be established
to promote and support such a program.
Initially: develop an approximately 15 acre unstructured turfed area to support the equivalent
of: 2 full -size fields (60 -110 metres), 3 large mini fields (50x75 metres) and 6 small mini
fields (40x60 metres) all unlit to initially support a local junior /recreational program.
In the coming years, and as facilities improve, test the market for a competitive youth and
adult program in Oro Medonte.
If the soccer facility at the Guthrie site evolves into a major venue, regional use and
tournaments can be promoted and accommodated.
Richlieu Park
Given the current situation at Richlieu Park (as noted above), it cannot be recommended that
a significant investment be made to upgrade or rebuild the fields to sustain the soccer
program in even the medium term.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 122
Page 149 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Other
Monitor the Orsi proposal to provide a soccer centre in Severn Township.
Monitor the use of the new soccer facilities to be built nearby in Orillia in 2010, and adjust
recommendations for Oro Medonte soccer facilities, if required.
Until the fields at the Guthrie site are completed, continue the partnership with Burl's Creek
Event Park to support a gradually scaled back soccer program.
Service Level /Provision Guideline
The following Service Level/Provision Guideline is recommended to serve as a guideline for
future planning. The following guideline refers to optimum size fields as noted under Figure 38.
1 Full -size field per 10,000 residents
1 large mini field per 6,000 residents
1 small mini field per 4,000 residents
Inventory and Utilization of Soccer Fields
Township of Oro Medonte, 2008
Quantity Dimensions
Field Category and Metres Feet
Provider
Full Size /Senior
Burl's Creek
Burl's Creek
Guthrie Park
Intermediate/Mini
Richlieu Park
Richlieu Park
Ramey Mem. Pk.
Burl's Creek
Burl's Creek
I (leased) 54x96 180x320
1 (leased) 49x96 162x320
1 Twp. 48x99 160x330
3 Twp. 45x66 150x220
2 Twp. 27x63 90x210
1 Twp. 36x75 120x250
1 (leased) 50x70 166x220
3 (leased) 48x66 160x220
Burl's Creek 4 (leased) 30x48 100x160
Pub. El. schools 5 SCDSB
Sep. El. schools 1 SMCDSB
Micro
Burl's Creek 5 (leased) 15x24 50x80
Burl's Creek 4 (leased) 12x19 40x64
Pub. El. schools 1
Notes:
None of the fields are lit, tile- drained or irrigated.
The annual fee to lease the Burl's Creek fields is currently $5,000.
Typical Levels and Optimum Field Sizes:
Full- size /Senior 60x110 metres
Intermediate /Large Mini 50x75 metres
Small Mini 40x60 metres
Micro /Junior 20x30 metres
Agenda Item {AgendaNumber} {ItemDescription}
Utilization
Notes
1 night/wk. house league (mid May
early Aug.)
1 night/wk. house league (mid May
early Aug.)
Not scheduled
1 night/wk. house league
(June /July), infrequent use by Orillia
Soccer Ultimate Frisbee
1 night/wk. (June /July)
Not scheduled
1 night/wk. house league (mid May
early Aug.)
1 night/wk. house league (mid May
early Aug.)
1 night/wk. house league (mid May
early Aug.)
Not scheduled
Not scheduled
1 night/wk. house league (mid May
early Aug.)
1 night/wk. house league (mid May
early Aug.)
Not scheduled
Figure 38
Moderate condition,
portable nets
Moderate condition,
portable nets
Moderate condition
Moderate condition,
parking issue
Mod. cond., parking issue
Good condition
Moderate condition,
portable nets
Moderate condition,
portable nets
Moderate condition,
portable nets
Moderate condition
Moderate condition
Moderate condition,
portable nets
Moderate condition,
portable nets
Moderate condition
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 123
Page 150 of 289
4.10 Multi- purpose Sport Pads
Figure 39: Ravines of Medonte Park
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
n partnership with resident groups, the Township has developed six outdoor multi purpose
sport pads in the following locations. In June, 2009, a seventh court was approved in principle
by Township Council for Line 4 Park to be constructed in 2009.
Sweetwater Park (50'x100') concrete base and lit (used for ball hockey, basketball, and ice
skating)
Ravines of Medonte Park (60'x120') 10' fence surrounds the concrete surface (used for
tennis, ball hockey, basketball and ice skating)
Shanty Bay Park (60'x120') no boards (used for ball hockey, basketball, and ice skating)
Ramey Memorial Park (60'x120') concrete base, boards and lights (used for ball hockey,
skateboarding, basketball, ice hockey, ice skating and community picnics)
Shelswell Park (50'x100') concrete base, no boards (used for ball hockey, basketball and
ice skating)
Hawkestone Community Centre and adjacent park (asphalt surfaced basketball court)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 124
Page 151 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Figure 40: Sweetwater Park
Figure 41: Shanty Bay Park
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 125
Page 152 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte
Figure 42: Ramey Memorial Park
Agenda Item {AgendaNumber} {ItemDescription}
Figure 43: Hawkestone Community Hall and Park outdoor basketball court
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 126
Page 153 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
4.11 Tennis Courts
Agenda Item {AgendaNumber} {ItemDescription}
Figure 44: Shelswell Park
Provision Strategy
At this time, there are no recommendations to provide additional sport pads.
March. 2010
Service Level /Provision Guideline
Including the new facility to be provided in Line 4 Park, the current provision level will be
approximately 1 pad per 2,850. Assuming no more sport pads are provided, the ration by erode
to around 1 pad per 4,000 when the population reached 28,000, projected for 2031.
rr he Municipality provides one unlit tennis court at Barrillia Park in the Oro Station
community The facility is only fenced at the ends and is of very marginal quality.
Two moderate quality lit tennis courts are available via a $30 /month per person membership fee
at Horseshoe Valley Resort.
There is a private two -court tennis facility at Lakewood Estates located on Line 13 near Lake
Simcoe. The courts are owned by the Association with a $3,500 one -time initiation fee and an
annual maintenance fee.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 127
Page 154 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro- Medonte
Figure 45: Barrillia Park Tennis Court
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
There is another private double -court unlit facility provided by the Eight Mile Point Tennis and
Cottager's Association.
It is recommended that consideration be given to provide a double unlit tennis court in Line Four
Park. It is also recommended that the Township continue discussions with Horseshoe Valley
Resort re: the opportunity for a joint venture with the Municipality to provide publicly available
facilities within the emerging year -round residential community at Horseshoe Valley. If that
opportunity does not materialize, consideration should be given to providing four unlit courts at
the Guthrie site to support a township -wide tennis program, with the option to light these
facilities if demand warrants in future. Consideration should also be given to add a club house at
the Guthrie site in future.
Service Level /Provision Guideline
Given the potential for increasing demand for tennis, the current provision ratio of one unlit
public court per 10,000 population should be increased. Since it cannot be determined how
much interest will grow and the role of the commercial and non profit sectors, a definitive
provision level cannot be recommended. However, if six more courts are provided, the ratio
would be 1 court per 2,875 by the time the population reaches 23,000, projected for around 2021.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 128
Page 155 of 289
DRAFT REPORT Strategic Facility Plan. Townshio of Oro Medonte March, 2010
4.12 Older Adult Facilities
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
T here are no facilities in the Township that cater exclusively to older adults. However, adult
programs are offered at various venues by the Department of Recreation and Community
Services (e.g., wellness and exercise, dance, computer training, basketball and volleyball). The
facilities utilized for municipal adult programs include: the banquet hall at the Oro Medonte
Community Centre Arena, Guthrie Elementary School gymnasium, Moonstone Elementary
School gymnasium, Jarratt Hall, Edgar Hall, Old Town Hall, Carley Hall, the Ian Arthur Beard
community room, and the Oro Medonte municipal offices.
The community hall boards and some community associations offer a variety of programs and
events, many of which are family and adult- oriented and of interest to older adults (e.g., Scottish
Country Dance; social events, dances and dinners; community picnics; garage sales; craft shows,
singing groups; card games; practice for theatre; Women's Institute events; church group events;
and floor -based exercise activities).
Support programming and associated recreational, social, health and educational uses for older
adults in existing community halls, the arena multi -use room and the Ian Arthur Beard
community room.
Support programming and associated recreational, social, health and educational uses for older
adults in new and improved municipal multi -use facilities.
Encourage the formation of older adult clubs and associations.
Service Level /Provision Guideline
Since it is anticipated that facilities to support older adult activities will be integrated into various
other venues, no specific service level /provision guideline is applicable for older adult facilities.
4.13 Cultural Facilities
T here is only one public cultural or arts facility in the Township, that being the historic
African Methodist Episcopal Church in Oro or the `Oro African Church' as it is also
called. Built in 1849, this National Historic Site is the last built remnant of an African Canadian
community uniquely rooted in the history of the United Empire Loyalists. Between 1830 and
1850, some 24 Negro families who fled from slavery in the United States to freedom in Canada
were settled in Oro Township. In 1849, they acquired this piece of land for a burial ground and
built the church.
There are a few historical plaques throughout the Township identifying significant events and
places.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 129
Page 156 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
There are no other public cultural facilities such as an art gallery, a concert hall or playhouse, an
outdoor performance space, public artist studios, or a public garden. Several of the community
halls and the small school gymnasia could be utilized for minor performances and rehearsing,
although, other than a small stage, there are no support features such as sound, lighting, or green
room in these facilities.
However, there are approximately a dozen and a half artists and a number of private art galleries;
for example:
Woodside Pottery in Craighurst,
Mill Pond Studio Gallery,
Double Doors,
Brierley Pottery in Oro Station, and
Ridge West Gallery in Oro /Shanty Bay.
A limited number of cultural programs are offered by the Municipality including: children's
creative dance and drama for age 6 -9, kinder dance for age 3 -5, pre ballet instruction for age 5 -7,
junior ballet for age 5 -7, introduction to guitar for age 8 -15, beginner tap dancing for adults,
movement improvisation for adults, dance lessons for youth and adults, and scrapbooking for
adults.
A few other programs and events are sponsored by community groups:
Scottish Country Dancing for adults and youth (Hawkestone Community Hall)
Hawkestone Singers (Hawkestone Community Hall)
Coldwater Players theatre group who rehearse at Eady Hall
The annual Coldwater Studio Tour stops at Carley Hall in June
The annual Images Studio Tour (Thanksgiving Weekend)
The Christmas Craft Show at Jarratt Hall
Oro Medonte Christmas Craft Tour (Old Town Hall, Oro Station Community Hall, St.
Thomas Church hall)
The annual agricultural fair, which is held in September at the fairgrounds
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 130
Page 157 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Agenda Item {AgendaNumber} {ItemDescription}
Figure 46: Oro African Church, Built in 1849
Dedicated to the. memory of the Black pioneers who settled in
this area. The first settlers were soldiers of Capt. Runchey's
"Company of Coloured Men" who fought the Americans in the
War of 1812. The next wave of settlers were "freemen" from
the Northern U.S. They initially settled on Wilberforce Street
(Line *11, worshipped in this church and were buried in this.
and nearby, unmarked cemeteries.
It is with the highest esteem we acknowledge the challenge
they accepted. the contribution they made to the development
of this community and their unique spirituality.
Commemorating the 150th Anniversary of this Heritage Church
1849 1999
The Township of Oro-Medonte
Ian Beard, Mayor
Figure 47: Plaque located at the Oro African Church
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 131
Page 158 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The City of Barrie
In 2007, the City of Barrie established the Department of Culture which is dedicated to cultural
development in the City. Significant cultural facilities and activities in Barrie and area include:
Performance Spaces
Gryphon Theatre for Arts and Entertainment at Georgian College
The Downtown Theatre
Fisher Auditorium
Theatre by the Bay
The Gibson Theatre Alliston
Museums
Simcoe County Museum
Base Borden Military Museum
Galleries
The MacLaren Art Centre
Barrie Native Friendship Centre gallery
Yvette Miller Fine Art Studio /Gallery
Gallery on Queen
Martin House Garden Art
Sample of Festivals and Events in the Region
Barrie Waterfront Festival and the Festival of Ice
Kempenfelt Festival arts and crafts
Barrie Jazz and Blues Festival
Roots Music Festival
Barrie Film Festival
Barrie Kiwanis Music Festival
Colours of Music Festival
Barrie Dragon Boat Festival
Other
Barrie Public Library
Georgian College School of Design and Visual Art
Barrie Farmers Market (temporary)
Talk is Fine Theatre an artist driven company
The Huronia Symphony
The Barrie Concert Series
Agenda Item {AgendaNumber} {ItemDescription}
City of Orillia
The City of Orillia has established a Department of Culture and Heritage which is responsible for
the management of the Orillia Opera House and the Stephen Leacock Museum. Significant
cultural facilities and activities in Orillia and area include:
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 132
Page 159 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Performance Spaces
The Opera House the Gordon Lightfoot Auditorium (700 seats) plus the Shilling Studio
Theatre (104 seats)
Swanmore Hall Leacock Museum
Couchiching Beach Park Bandstand (outdoor)
Museums
Leacock Museum National Historic Site
Orillia Museum of Art and History showcases the best of Orillia and Lake Country's
culture and history through local and national exhibitions
Ontario Provincial Police Museum
Galleries
Orillia Museum of Art and History
various private galleries, mostly in the downtown
Agenda Item {AgendaNumber} {ItemDescription}
Sample of Festivals and Events
Leacock Summer Festival
Annual Orillia Scottish Festival
Orillia Spring Blues Festival
Annual Orillia Jazz Festival
Orillia Comedy Festival
Orillia Beatles Celebration
Mariposa Folk Festival
Mariposa Butterfly Festival
Christmas in July
Orillia Waterfront Festival
Doors Open Orillia
Orillia Canada Day Celebrations
Orillia Santa Clause Parade
Orillia Winter Carnival
Arts with Class Arts and Craft Show
Christmas Arts and Crafts Show
National Aboriginal Day Celebrations Casino Rama
Arts for Peace Festival
Sunday Evening Band Concert Couchiching Beach Park Bandstand
Annual Tribute Artists Weekend
Village of the Arts
Annual Orillia and District Fall Fair
Mnjikaning First Nation Annual Thanksgiving weekend and Mother's Day Pow Wows
Other
Orillia Fanners Market
Orillia Public Library (local history, local art, public internet, books, video, CDs)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 133
Page 160 of 289
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Elsewhere in the Region
There are other cultural attractions and events in the region including the following examples:
Casino Rama 5000 seat entertainment centre (Mnjikaning Rama First Nations)
Mnjikaning Fish Weirs (at the Atherley Narrows) a 5000 year old National Historic Site
Ste. Marie Among the Hurons museum Penetanguishene
Discovery Harbour Penetanguishene
King's Wharf Theatre Penetanguishene
Penetanguishene Centennial Museum and Archives
The Martyr's Shrine Midland
Simcoe County Museum Midland
Coldwater Gallery Village of Coldwater
Coldwater and Area Studio Tour (with nine stops in Oro Medonte)
The Gibson Centre for Community Arts and Culture (theatre, gallery, studios) Alliston
It is recommended that the Municipality, through the Department of Recreation and Community
Services, continue to expand visual arts and crafts programming, as well as dance and other
performing arts for all age groups. This should be accomplished directly through municipal
programming, as well as through the encouragement and support of community volunteer -based
groups. It is recommended that the Municipality also encourage independent /commercial
interests who provide culture activities and facilities (such as classes in the visual arts, crafts, and
the performing arts), as well as cultural facilities such as galleries, studios and performance
facilities.
It is also recommended that the Municipality encourage and support festivals and cultural events,
both civic and independent.
In addition, it is recommended that the Municipality encourage the further development of
`heritage' (folkloric arts, material arts and built heritage, as well as archives, museums, historic
sites and monuments, and heritage properties). In particular, encourage and support the
protectors (Township of Oro Medonte History Association) of the African Methodist Episcopal
Church to maintain this important national historic site.
Ensure that as new multi purpose community facilities are provided, they are designed to support
programming in the visual, media and performing arts (particularly dance). It will be crucial that
natural and artificial lighting is suitable to the creative arts and that storage is provided to support
multiple programming per multi purpose room. It is also crucial that a `sprung' or cushioned
floor is available for dance programs. That is the type of flooring that is also suitable for floor
based fitness /aerobic and stretching programs.
Support Horseshoe Valley Resort in its interest in possibly providing a `cultural centre' within
the planned residential community To date the Resort has not defined the nature of this cultural
centre.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 134
Page 161 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Service Level /Provision Guideline
Since no specific new facilities are recommended and it is anticipated that indoor and outdoor
facilities /spaces to support cultural activities /programs /events will be integrated into various
other venues in the Township, no specific service level /provision guideline is applicable for
cultural facilities at this time.
4.14 Curling Facilities
A lthough there are no curling facilities in Oro Medonte, there are fourteen facilities within
surrounding and nearby communities (see the list below). The facilities range in size from
two to seven sheets of ice. Most facilities have a lounge and some have a dining room and/or
banquet hall. Some of the larger facilities are nearby.
Coldwater and District Curling Club (4
agreement with this Club.
Penetanguishene Curling Club (6 sheets, banquet hall)
Midland Curling Club (5 sheets, lounge, banquet hall)
Orillia Curling Club (6 sheets, associated with the Barnfield Point
Atherley)
Barrie Curling Club (7 sheets, lounge, dining room)
Elmvale Curling Club (2 sheets)
Stroud (5 sheets, lounge Innisfil)
Churchill Curling Club (2 sheets, Innisfil)
Bradford Curling Club (4 sheets, lounge)
Cookstown Curling Club (4 sheets)
Alliston Curling Club (4 sheets, lounge)
Collingwood Curling Club (6 sheets, lounge)
Creemore Curling Club (2 sheets)
Stayner Granite curling Club (4 sheets, lounge)
Provision Strategy
sheets, banquet hall) the Township has an
Recreation Centre at
Through the Search Conference, some of the group surveys and the Community Forum, there
was some interest expressed for a curling facility in Oro Medonte Township. A more in -depth
investigation into the utilization and viability of nearby curling facilities, as well as the degree of
any unmet demand would be required to help determine the need for and feasibility of such a
facility in the Township.
It is not recommended that the Municipality play a direct role in providing a curling facility. If a
private /non -profit club was to form and raise funds to build and operate a facility, it may be
feasible for the Municipality to provide a site, ideally associated with or adjacent to the arena on
the Guthrie site.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 135
Page 162 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
4.15 Library Facilities /Services
Agenda Item {AgendaNumber} {ItemDescription}
F or a variety of reasons, including the widely disbursed nature of the population, the
Township does not directly provide library services to Township residents via a Township
facility. Instead, the Municipality has negotiated various agreements to allow Township
residents to access library facilities in five of the surrounding communities, including:
The City of Barrie
The City of Orillia
The Town of Midland
Springwater Township (Elmvale and Midhurst branches), and
Severn Township (Coldwater Branch).
In 2008, it was reported that there were 6,433 memberships registered through the five libraries.
The agreement with the City of Barrie is a service contract, which, in 2008, totaled $111,228 and
served an estimated 2,830 Oro Medonte residents (for an average annual cost per member of
$41). The annual fee charged to non members from other communities was $100.
The agreement with the City of Orillia is also a service contract, which, in 2008, totaled $92,700
and served an estimated 2,269 Oro Medonte residents (1,852 adults and 417 children) (for an
average annual cost per member of $41). The annual fee charged to non- members from other
communities was $60.
The Municipality also has a service contract agreement with the Town of Midland, which, in
2008, totaled $4,500 and served an estimated 270 Oro Medonte residents (230 adults and 40
juveniles) (for an average annual cost per member of $17). The annual fee charged to non-
members from other communities was $110.
The agreement with the Township of Severn (Coldwater branch) is a service contract, which, in
2008, totaled $15,000 and served an estimated 957 Oro Medonte residents (711 adults and 246
juveniles represented 30% of total membership at this branch) (for an average annual cost per
member of $19). The annual fee charged to non- members from other communities was $25.
The agreement with the Township of Springwater (Midhurst and Elmvale branches) is a fee per
member arrangement, which, in 2008, totaled $6,230, based on a rate of $70 x a reported 89
households. The Ontario Ministry of Culture estimated that in 2007 and 2008, 107 Oro Medonte
households were members (40 at the Midhurst Branch and 69 at the Elmvale Branch). The
average annual cost per member in 2008 was $70. The annual fee charged to non members from
other communities is $75. This annual cost per membership is double the average for the other
libraries ($35.26, not including the annual fee to Springwater Township). It is clear that the
value of the Springwater Township library service is the lowest in terms of the cost per member
and members served.
In 2008, the total cost to the Township of Oro Medonte for library services was $229,308. The
three services in Barrie, Orillia and Coldwater (Severn Township) accounted for 94% of all
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 136
Page 163 of 289
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte March. 2010
memberships and 95.5% of the annual cost. Factoring in the higher cost of the Springwater
service, the average annual cost per membership was $35.65. This represents good value.
There a small library located in the lower level of the Hawkestone Hall, which was established
and is maintained and administered by the Hawkestone and Area Community Association. The
library focuses on popular adult reading, as well as a collection for infants and toddlers.
Computers and Internet access are also available.
The 6,433 memberships registered through the five libraries represents one third of the
population of the Township. Although no reliable data is available on average membership
levels, library specialist, Jim Morgenstern of dmA Planning and Management Services indicated
that it is not unusual for rural and county systems to have a market penetration in the 30 -40%
range. He also indicated that highly developed urban systems claim membership rates in the 50-
70% range. He suggested that the local membership rate could be increased with more effective
marketing, better services and more remote access. And because the Municipality has five
separate agreements, they may be paying more in total than if there were fewer agreements to
negotiate.
Provision Strategy
It is recommended that the service agreement with Springwater Township be terminated as soon
as possible. (Effective January 1, 2010, the agreement was terminated.) It is essential that
accurate and supportable records of Oro Medonte memberships are maintained for the other four
library services. It is also recommended that membership levels and associated costs at the
Severn Township and Midland facilities are closely monitored.
4.16 Wharfs and Boat Launches
Agenda Item {AgendaNumber} {ItemDescription}
There are four public wharfs and three official public boat launch sites along the Lake Simcoe
shoreline within the Township, as well as a public boat launch at Southside Bass Lake Park.
This 2.5 acre park at Bass Lake (including the road allowance) provides some space for parking;
however, parking limits the opportunity to develop this park for picnicking and passive
recreation. Although the Hawkestone wharf is federal, the transfer of ownership to the
Municipality is nearing completion. None of the Lake Simcoe boat launch facilities are
adequate, as noted below.
Line 9 wharf and boat launch poor condition and poor access the ramp is too short for the
shallow water depth however, this is the only facility with adequate parking
Carthew Bay Wharf and boat launch although the boat launch facility not in good shape
and access is poor, it is, by default, one of the better options however, loose stone /gravel at
the entry limits traction, especially for haul -out there is very limited parking which
parallels the adjacent roadway
Line 2 /Shanty Bay wharf and boat launch old and deteriorated, very steep loading angle
Hawkestone Wharf wharf only
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 137
Page 164 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Shelswell Park (gravel) beach used by ice fishermen as an important access point to Lake
Simcoe with parking
Figure 48: Hawkestone Wharf
Figure 49: Carthew Bay Wharf and Boat Launch
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 138
Page 165 of 289
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte
Figure 50 Line Nine Boat Launch
Figure 51: Line Nine Boat Launch Parking Lot
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 139
Page 166 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Figure 52: Shanty Bay Wharf
Figure 53: Shanty Bay Wharf
Agenda Item {AgendaNumber} {ItemDescription}
March, 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 140
Page 167 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Provision Strategy
Since Line 9 wharf and boat launch is the only site with even minimal space for parking, there
may be an opportunity to improve the dock and possibly install a break wall and dredge to
increase the depth at the boat launch.
Revise signage at the wharfs that have been conveyed to the Township.
As opportunities arise, consider acquiring waterfront lands adjacent to boat launch areas, or in
other areas to create boat launch facilities.
Service Level /Provision Guideline
No specific service level /provision guidelines are recommended. The current provision level for
public wharfs is one per 5,000 population, and for public boat launches, the ratio is one per
6,700.
4.17 Neighbourhood /Community Parkland Planning and
Development
H istorically, neighbourhood and community parks have not been developed based on even a
conceptual level site plan which identifies desirable and suitable facilities (type and scale),
as well as an optimum layout and phasing strategy. Typically, local residents and/or sometimes
a local /community -based recreation association have taken the initiative to decide what is desired
in `their' park and where to locate each individual facility within their local park. Often, the
decision about a type of facility to add to their park and where to locate it was made in a one-
facility -at -a -time fashion, without the benefit of an overall plan or experienced advice about the
appropriate scale and layout that would be suitable for each park. The result has often been
facilities in a neighbourhood park that are out of scale or character for the type and size of park
(e.g., lighted facilities in a neighbourhood park, surrounded by residences); sports facilities that
are aligned in the wrong direction; facilities that have been developed to an inadequate level of
quality to support the intended use; facilities that are not required in a particular park (given the
overall demand, leisure trends, the existing supply and distribution of similar facilities, etc.); and
facilities inappropriately located within the park.
In part, this approach has been encouraged by the Township policy that if a community raises
enough money to pay for a particular facility, they can locate it in `their' park. Typically, very
little analysis has been undertaken to ensure that the decision about the need for the facility, the
type and scale of the facility, or its location are all correct.
Provision Strategy
Agenda Item {AgendaNumber} {ItemDescription}
It is recommended that the Municipality, through the Department of Recreation and Community
Services (and guided by this Strategic Facility Plan, and the Parks and Open Space Assessment
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 141
Page 168 of 289
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte
Agenda Item {AgendaNumber} {ItemDescription}
March. 2010
to be completed after this Strategy) be much more proactive in the process of planning for and
developing all Municipal parkland, including neighbourhood and community level parks.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 142
Page 169 of 289
5.1 Introduction
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Chapter Five:
Township -wide Leisure Facility Provision Strategy
rr his chapter is devoted to the township -wide leisure facilities provision strategy which
establishes the foundation, philosophy and broad direction for the facility- specific and other
recommendations contained in the Strategic Facility Plan. Fundamental to the Township -wide
and facility specific strategies are Planning and Provision Principles (see Sections 4.3 in Chapter
4). The township -wide strategy integrates all of the strategies for each individual type of facility
(Chapter Four) and any recommendations regarding the Leisure Delivery System (Chapter
Three). Section 5.2 summarizes the system -wide findings and conclusions. In Section 5.4, the
individual facility specific strategies are summarized. Section 5.5 reports on the implications for
the proposed township -wide multi -use recreation centre. The capital cost estimates,
recommended phasing, the financing strategy, and other implementation recommendations can
be found in Chapter Seven.
5.2 Summary of System -wide Findings and Conclusions
T he following is intended to summarize the key findings and conclusions contained in
Chapters Two, Three and Four.
Key facts about the population of the Township
The 2006 population was 20,031 (source: Statistics Canada census).
The population is considerably older than the provincial average.
Considerably more than half of the population lives in the southern half of the Township,
particularly in the southwest quadrant.
Overall, Township residents are more affluent, better educated and fewer are disadvantaged
than is the average for Ontario.
Looking to the Future
The population has been projected in five year intervals to 2031 as indicated below and was also
projected by age of residents.
2001 18,315
2006 20,031
2011 20,587
2016 21,341
2021 22,941
2026 25,232
Cl 2031 28,100
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 143
Page 170 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
A notable concentration of population is beginning to emerge along the Horseshoe Valley Road
corridor (Craighurst, Horseshoe Valley Resort, Sugarbush, and Buffalo Springs) with
accommodation for 5 -6,000 new permanent residents planned.
As the Baby Boom and the children of the Baby Boom (the Echo generation) age, it is projected
that the following markets will decline in size over the next 15 -20 years:
4 -12 age group (by 400 residents or 18% of the total population)
13 -17 age group (by 340 residents or 23% of the total population)
Mid -life adult group (age 35 -54) (by 1420 residents or 22% of the total population)
For the same reasons, the following markets are projected to increase over the next 25 years:
Young adults (age 18 -34) (954 residents or 26% of the total population)
Empty nester adult group (age 55 -64) (955 residents or 34% of the total population)
Older adults (age 65 (6,000 residents or 224% of the total population)
Broad Implications for Demand for Leisure Activities
Over the next 30 years, there will be a very large increase in demand for all of the activities that
a mature Baby Boom market and an adult Echo generation will desire including increasing
expectations for: quality, comfort, value for price, flexibility, focus on the individual,
accessibility, and eco- friendly.
Over the next 10 -15 years, there will a decline in demand for all activities of interest to children
and youth then a slow increase in demand back to current levels by 2025 -2030.
This is due in large part to the aging of the big Baby Boom population (age 45 -64 in 2010) and
the influence of their values and leisure interests; as well as the aging of the Echo generation (the
children of the Baby Boom population who, in 2010, are age 16 -31).
Due to the above average age of the population of Township residents, the upward and
downward trends in leisure interests will be more pronounced in Oro Medonte.
Implications of Some of the Unique Characteristics of the Township
Due to the large size of the Township, the widely disbursed nature and low density of the
population with no (current) dominant population centre, and the amalgamation of two former
rural townships (and small parts of three others municipalities) with different levels of provision,
the following has resulted:
an oversupply of some facilities, leaving facilities such as some ball diamonds, soccer fields,
and community halls under utilized or simply unused;
facility provision that is not uniform across the Township, in terms of type, quantity and
quality of facilities;
a less than ideal location/distribution of most facilities and parks relative to where people live
with very little in the area of the Township that is north of Highway 400 and the area
immediately southeast of the highway.
there is only one of some types of facilities (e.g., arena, large municipal hall, beach), and all
of these facilities are located in the southern third of the Township;
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 144
Page 171 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
there is a focus on the `base' and `recreational' level of provision with a strong dependence
on Barrie, Orillia, Midland, and to a lesser extent, the Township of Severn, to provide many
leisure facilities and a good deal of programming and events; and
there is a focus within the Township on tradition recreation and sports facilities and
programming with little available in the arts and culture sector.
The Resource Base and Key Providers of Leisure Services and Open Space
The existence of the Oro Moraine, Lake Simcoe, Bass Lake, and large tracts of forest and
wetlands has provided an outstanding inventory of nature- oriented recreation opportunities that
greatly exceeds the norm.
The existence of two well developed trail systems and pockets of other well developed trail
networks is an asset, which would be greatly enhanced (for local and regional recreation and
tourism) if the systems and pockets of trail activity were better integrated and promoted in their
entirety.
The significant role of other providers in the public, quasi public, non profit and commercial
domains has resulted in an array of typical, as well as some unique recreation opportunities (e.g.,
golf courses, marinas and yacht clubs, other water -based opportunities, alpine skiing and
snowboarding, cross country skiing, bicycling, equestrian activities, camping, nature
appreciation, exhibitions, and large spectator events).
The strong base of volunteers is at the centre of program and facility provision, and defines an
essential community development role for the Department of Recreation and Community
Services. However, this diminishing asset must be nurtured if volunteers are to continue to play
a pivotal role in the future.
The existence of a good number of non public /community -based parks, open space and
recreation facilities is unusual. This presents both opportunities and issues.
The lack of a secondary school in or near the Township removes some key public facilities and
focuses many community -based (and especially youth) activities and communities of interest
away from the Township.
Parks and Open Space
Over the years, the slow and piecemeal nature of residential development and the small size of
many residential clusters, as well as inadequate parkland acquisition policies /philosophy and
decisions have resulted in many examples of poorly located, sized and shaped parkland, some
with minimal frontage, and some sites that are unusable or only marginally useful.
The absence of parcels of parkland that are of suitable size, location and setting for the
development of modem recreation facilities and clusters of facilities is seriously jeopardizing the
ability to find adequate solutions to a number of facility shortfalls. Only ten parks are between
two and five hectares in size and only five are larger than five hectares. This deficiency may
require the purchase of some additional parkland.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 145
Page 172 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
By contemporary standards, few parks are well developed, with only Sweetwater and Bayview
Memorial parks approaching minimum standards for functionality, layout and attractiveness.
Many parks do not have signs or even basic identification that the site is public parkland.
Some parks have been developed and utilized for purposes that are not in keeping with their size,
location and purpose (e.g., Richlieu and Craighurst).
Indoor Facilities
Most municipal facilities are in fair to poor condition, requiring large amounts of capital
investment in the coming years, if they are to remain safe, accessible and viable as public use
facilities. In some cases, the cost to maintain these facilities over the next 20 years exceeds the
cost to replace each facility with one of similar size, but of higher quality, character and
functionality, as well as requiring lower annual maintenance and utility costs going forward.
Many indoor and outdoor facilities are too small and of marginal quality and character to support
the type of leisure programming and uses expected by contemporary society. And the
expectations of tomorrow's residents will continue to increase.
The northern third of the Township is extremely under- serviced compared to the rest of the
Township, with no indoor community facilities (other than Moonstone Elementary School) north
of Highway 400.
In 2008, building condition assessments were completed for the eight community halls owned by
the Municipality. The estimate for recommended repair and upkeep over the next 20 years
varied from $235,000 to $534,000, and totaled $2.8 million. Although the actual cost of
individual works could be lower (depending how the works are undertaken and materials used),
inflation may more than compensate. Edgar, Warminster, Eady and Carley halls are particularly
high maintenance facilities, and will require regular and costly repairs to brickwork and to the
stucco finish on the Edgar facility. See Appendix E for details.
Fire safety audits were also conducted by the Municipality in 2009 on the community halls and
the arena. Deficiencies were identified in each facility, some of which require immediate
attention. See Appendix E for details.
Identified repairs responded to life safety and accessibility deficiencies, based on the
requirements of A2 occupancy under the Ontario Building Code for public use facilities, the
Ontarians with Disabilities Act and the requirement for an asbestos survey under Ontario
Regulation 278/05. In general, a facility life cycle is in the order of thirty years and varies
depending on the systems incorporated and the maintenance programs implemented over the
operating life of each structure.
At $240 /square foot, the cost to replace these facilities using contemporary style, configuration
and construction methods varied from $168,000 for Warminster Hall to $546,000 for Jarratt Hall.
The cost is higher to repair than to replace Warminster, Carley and Edgar halls, with Craighurst
very close. When repair budgets exceed 65% of the replacement cost of a similar facility, it is
deemed prudent to consider replacing those facilities with more functional, and energy and cost-
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 146
Page 173 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
efficient buildings. New facilities would be much more efficient, functional and appealing;
would generate increased revenue; and, if larger, could consolidate two or more halls and their
associated functions, and also combine the pool of diminishing volunteer resources associated
with each facility.
The Oro Medonte Community Arena and banquet hall also requires a great deal of repair over
the next 20 years and beyond, if the facility is to be retained.
$875,500 is targeted for the next five years and another $825,000 for Years 6 -10.
Upkeep and repairs are estimated at $3.8 million over the next 20 years in 2008$.
Only a few functional and aesthetic upgrades are included in the recommended initiatives.
The identified repair and replacement items do not include: i) inflation; ii) the cost to address
fire safety issues and iii) the unknown costs to address the movement between the change
room floor and the main arena enclosure, and to improve accessibility, usability and appeal.
High cost items in the next 10 years include roof replacement, replacement of refrigeration
components, improvements to dressing rooms, replacement of the ice slab /refrigeration
distribution piping /under -slab heating system/related components, electrical upgrades, and
exterior cladding.
A new contemporary arena, which would cost between $8 million and $10 million (depending on
size, components, features and quality) would be more functional and appealing, would be more
energy efficient and would cost less to operate and maintain. A new and repositioned facility
(on the 85 acre Guthrie site) would also provide the only reasonable option to add components to
better support existing and future park functions, and additional indoor activities in the near and
longer -term future.
Operation of the Community Halls
Although volunteers are heavily invested in the management, operation, marketing, scheduling
and programming of community halls, the current model is not working as well as it should.
Rather than providing essential community programming, a good deal of the volunteer time is
invested and many events are hosted simply to raise funds to cover operating costs and support
minor capital improvements and upgrades. The Municipality is increasing at risk regarding
substandard facilities (fire safety, accessibility, and insurance requirements; as well as security,
and LCBO and Ontario Building Code regulations). There is also risk associated with volunteers
operating public buildings; for example: compliance with Township and other policies and
regulations regarding type of use, compliance with regulations, the Occupiers Liability Act, etc.
Affordability
The relatively small number of residents relative to the large geographic size of the Township
and the above average burden placed on the residential tax base, has made it challenging to
adequately service township residents and finance municipal services, especially parks,
recreation and arts /culture.
Partnerships with local groups /entities and surrounding communities (in the public, quasi public,
non profit and commercial sector) will be essential to significantly improve and add to existing
leisure opportunities. Assistance from senior levels of government will likely be required to
advance major investments in facility improvement and expansion.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 147
Page 174 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
5.3 Overview of the Way Facilities are Recommended to be
Provided Across the Township
Three Broad Themes of Enhancement are Recommended:
The strategy to improve leisure facilities is based, in part, on the following three themes:
i) Upgrade /improve /replace /add to many existing facilities;
ii) Consolidate some existing facilities; and
iii) As demand increases and evolves, add some types of facilities that are currently not provided
by the Township (as the Municipality can afford and through partnerships).
The Evolving Role of the Municipality and the Recreation and Community Services
Department
The following describes the recommended evolution of the role of the Municipality as a provider
of public open space and leisure facilities and services over next decade and beyond.
Continue to increase the community development role of the Municipality nurturing and
enhancing community/sports /culture /arts groups and volunteer resources in pursuit of their
roles relative to the provision of leisure services (e.g., programming; arts, culture and
recreation group activities; facility and parkland provision and operation; and fundraising).
Encourage more partnerships and strategic alliances with other public, non profit and
commercial entities to further the provision of publicly available leisure opportunities for
Township residents.
Continue to increase and improve the quality of leisure programming, provided directly
by /through the Department of Recreation and Community Services.
Increase the role of the Department of Recreation and Community Services in facility
planning, provision and operation.
Increase the role of the Department of Recreation and Community Services in park
planning, design and development, including all activities associated with the
acquisition of municipal parkland.
Gradually move toward higher levels of service provision (municipal parks and open
space, leisure facilities, and programming).
Partnerships and strategic alliances of many kinds with other public entities, and the non-
profit, quasi public and the commercial sectors are essential to make significant improvements to
parks, open space, facilities, programming and other leisure services in the Township of Oro
Medonte over the next decade and beyond. Continue to maintain and enhance partnerships and
strategic alliances with:
surrounding municipalities regarding library services agreements to be improved;
the Township of Severn regarding access to the Coldwater Arena;
the Coldwater and District Curling Club;
hall boards and community associations;
service clubs (e.g., Oro District Lions Club and Orillia Kinsmen);
the Province and the County re: county forests and the Copeland Forest; and
the school boards.
Pursue potential partnership /strategic alliance opportunities with Horseshoe Valley
Resort/Skyline International, the City of Orillia, the City of Barrie, the Town of Midland,
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 148
Page 175 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Springwater Township /new Midhurst recreation centre, and Lakehead University (Orillia
Campus) particularly for improving access for Township residents to aquatic, fitness, soccer,
arena, arts and heritage facilities and programs.
Pursue partnerships re: naming rights and sponsorships to help finance major capital projects and
programming in Township facilities.
Application of the Three Tiered System
The recommended three- tiered system applies to parks and other open space, as well as facilities
in the public, non profit, quasi public and commercial realms, as long as `public access' is
available. The following examples of open spaces and facilities are allocated to each of the three
tiers as noted below:
Agenda Item {AgendaNumber} {ItemDescription}
Township- wide /Regional -scale Parks, Open Space, Facilities and Clusters of facilities
Bayview Memorial Park
The Oro Medonte Community Arena
The 85 acre Guthrie site
Potential cultural/community centre (and potentially other facilities) at Horseshoe Valley
Resort (if provided at a high enough scale otherwise, they would be classified as
Community scale)
Copeland Forest and trails
County forests and trails
Bass Lake Provincial Park
Ganaraska Trail and the Rail Trail trails and nature- oriented recreation improve linkage
Oro African Church
golf courses
ski facilities
boat launches
equestrian facilities
Oro Fairground
Burl's Creek Family Event Park
Community -scale Parks, Open Space and Facilities
The community halls
The future community -scale park in the Craighurst residential development area
The future community -scale park in the Moonstone area
Sweetwater Park
Line 4 Park
Ramey Memorial Park
Vasey Park and ball diamonds
Warminster Park and ball diamond
Shanty Bay Park and ball diamond
The soccer fields in Richlieu Park (although, due to its location, size and original purpose,
this park should be classified as a neighbourhood facility)
Craighurst Park and ball diamond (although, due to its location, size and original purpose,
this park should be classified as a neighbourhood facility)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 149
Page 176 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Neighbourhood /Local Parks, Open Space and Facilities (examples only)
Ravines of Medonte Park
Shelswell Park
Barrillia Park
Railside Park
Price Park
Robin Crest Park and toboggan hill
Medonte Hills Park
Woodland Crescent Park
Huronia Homes Parkland
Northwood Court Park
Horseshoe Valley Park (Pods Alpine)
Emily Park
Cathedral Pines Park
Joy Avenue Park
Lloyd Scott Memorial Park
Bachly Subdivision Parkland (private /non commercial)
Maplewood Waterfront Park (private /non commercial)
5.4 Overview of the Facility Specific Strategies
ffihe following section summarizes the key facility- specific strategies and related
recommendations.
Indoor Ice Facilities
Two options have been examined to continue to provide indoor ice facilities. Option One would
maintain the existing arena and associated second floor banquet hall for up to twenty years at an
estimated cost of approximately $3.4 million ($2008). The focus of the anticipated repairs and
replacements would be on accessibility, and life and fire safety, with a few improvements to
amenities and functionality. This estimate does not include inflation and the unknown costs to: i)
meet any additional accessibility standards; ii) deal with the floor movement between the main
building and the change room area; iii) consider any additional energy and environmental
initiatives, as well as any significant functional improvements; and iv) allow for replacement of
the septic system. It is estimated that the existing facility will required almost $1 million in
repairs and replacements in the next 3 -5 years.
If a second ice pad is required and can be afforded in approximately ten years, it could either be
constructed as a stand -alone single ice pad facility or the existing arena complex could be retired
and replaced by a new twin -pad arena complex in another location, ideally within the 85 acre
Guthrie site.
Option Two would replace the existing facility with a new, larger, energy efficient and much
more functional facility to be located elsewhere on the Guthrie site. In May, 2009, Oro Medonte
Council recommended that Option Two be studied in detail through a feasibility study of
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 150
Page 177 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
township -scale facilities that would be suitable for the Guthrie site over the next twenty years.
See Chapter Six for details.
The feasibility study proposed a new 63,600 square foot arena complex incorporating:
a new, larger ice surface with seating for 480 within the arena enclosure;
six larger dressing rooms, including two which are sized to accommodate persons with
disabilities, two rooms designed to accommodate female customers, and one over -sized room
for visiting Jr. `A' teams and large groups;
an additional over -sized dressing room and an office for the Jr. `A' hockey team;
a 5,600 square foot multipurpose program and event space with a kitchen and storage space;
two meeting/activity rooms;
a larger lobby with a larger food service area, improved display space, warm viewing area for
around 100, and better control points;
storage for historical /archival resources;
an office for the Sports Association;
a pro shop;
offices and a staff room for facility staff and the Department of Recreation and Community
Services;
more and better storage throughout, including storage for outdoor maintenance and sports
equipment;
full accessibility throughout for persons with a disability;
improved energy efficiency; and
room to expand to incorporate a second ice pad and other components that may be required
in future.
Outdoor facilities proposed for the Guthrie site include:
a third lit senior ball diamond;
two spaces prepared to support eleven soccer fields (two senior, three large mini and six
small mini);
walking/cycling trails;
LI picnic areas with play equipment and shade structures;
four tennis courts with possible future lighting and a club house;
an access road, internal roadway and parking areas;
environmental zones to protect and enhance the watercourse and wooded areas; and
two storm water management ponds.
The proposed arena complex, which would be 28,600 square feet larger than the existing facility,
would cost approximately $14 million plus paved parking at $500,000 ($2009). Although the
structure is larger, the opportunity for increased revenue and lower operating expenses would
result in an annual net operating cost that is similar to and could be lower than the existing
facility.
It is estimated that other site and facility development at the Guthrie site would cost
approximately $3.34 million ($2009) not including parking for the arena complex, as noted
above, but including design fees and a contingency 5% allowance.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 151
Page 178 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Option Two allows for a second ice pad to be added if demand warrants after 2014, as well as
other indoor facilities if future demand warrants and they can be afforded.
Please refer to Chapter Six for the details.
Agenda Item {AgendaNumber} {ItemDescription}
Community Halls
A strategy is recommended to define six or seven `settlement clusters' throughout the Township
that would each incorporate a number of established/historical former hamlets and/or
emerging/future residential areas. In total, the settlement clusters cover the entire Township. In
each settlement cluster, one or more venues (either Municipal or under other ownership, but
accessible to the publicly) would be available so that residents can meet and participate in a
variety of indoor and outdoor leisure /community activities. This strategy recognizes and
supports:
the need to maintain a `sense of community and identity' in all parts of the Township, and
provide equitable and sustainable distribution of facilities across the Township, based on the
philosophy of `communities within a community'.
Based on the results of the building condition assessments, the accessibility audits and the fire
safety inspections, as well as use patterns and the projected cost to maintain the halls as viable,
safe, accessible and functional public use facilities, it is recommended that Warminster Hall
and Carley Hall be retired as soon possible as public use facilities. (Oro Medonte Council
accepted the recommendation to close Warminster Hall via a resolution of Council dated May
13, 2009. On October 28, 2009, Oro Medonte Council agreed to declare Warminster Hall
surplus and offer it for sale.) It is recommended that Craighurst Hall be closed when a suitable
replacement hall is provided either in a future community park in Craighurst (hopefully
associated with an adjacent future school facility) or within the expanding residential community
at Horseshoe Valley Resort. Edgar Hall also requires more investment over the next twenty
years to maintain the facility than it is estimated to cost to replace it, with a good deal of the
investment required within the next five years. Criteria were provided (pages 98 -100) to assist
with the decision about when to build a new community facility, and when to invest in or divest
an existing community facility. Serious consideration should be given to the retirement of Edgar
Hall as a public use facility within the next five years.
Although Eady Hall is in above average condition, its relatively isolated location, the relatively
high estimate of repair cost over the next twenty years, (although most of the major repairs are
not anticipated until the after 2024) and the recommended strategy to provide a new and larger
community centre in the nearby area suggests that ultimately, Eady Hall may become either
redundant or too costly to maintain. In the interim, use of Eady Hall should be closely
monitored, especially if the proposed new `northern' new community centre becomes a reality.
In the near term, additional use may be able to be directed to Eady Hall, especially if Carley Hall
is retired as a public use facility (along with Warminster Hall). To determine the viability of
Eady Hall as a public facility, utilize the `divestment' criteria that are recommended in Section
4.5 (page 99 -100).
If the arena is rebuilt and repositioned on the Guthrie site and new large multi purpose program
space is provided (as per Option Two under arenas), Municipal and community programming at
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 152
Page 179 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Old Town Hall can be gradually reduced, especially in the winter season, to provide a more
suitable venue at the new arena complex and reduce the annual operating cost of Old Town Hall.
Other groups (e.g., the Oro Agricultural Society, the Oro Medonte Horticultural Society, and the
History Association) consider Old Town Hall their `home'. These uses can still be supported
since much of this use takes place in the `warm' seasons. Fortunately, most of the anticipated
capital investment for this hall will not have to be made until the final five years of the twenty
year cycle.
It is recommended that a new 2,000 -3,000 square foot community centre be built in the
settlement cluster serving Moonstone /Eady /Vasey /Carley/Ravines of Medonte, and another in
either the growing Craighurst community or further east along the Horseshoe Valley Road
corridor. With no facilities north of Highway 400, the northern facility should have priority. As
described above, a 4,000 -5,000 square foot multi -use program and event hall is recommended as
part of the new arena complex, proposed for Guthrie (see Chapter 6).
If the fire hall in Shanty Bay is enlarged, consider including a multi purpose room to support
training and community programming, but larger than the Ian Arthur Beard community room.
Recommendations were also provided in Section 4.5 to improve the promotion of community
facilities, to better co- ordinate rentals, to set rental rates that are appropriate to each facility, to
define the respective roles of the Municipality and the hall boards in the operation of community
halls, and to deal with the requirement for atypical capital investment and operating costs.
Recommendations are also offered to consider all feasible options to retain as community assets,
the halls that are retired as public use facilities.
New community centres should be operated by the Municipality, working closely with local
recreation/community associations to help support programming and special events.
Gymnasia
If a new elementary school is built anywhere within the Township, explore the opportunity to
partner with the school board to provide a full -size single gymnasium for school and community
use a separate facility linked by a lockable corridor. If the option to partner with a school
board does not materialize in the next few years, the market for and feasibility of a gymnasium
should be further examined as a possible component of the Township -wide multi -use recreation
centre, proposed for the Guthrie site.
Fitness Facilities
In new multi purpose community centres, provide floors that will support a wide range of uses,
including floor -based wellness /fitness programs. If it is not possible to partner with Horseshoe
Valley Resort/Skyline International to provide a full- service publicly accessible fitness centre
and possibly an indoor running track, such a facility should be considered as a future phase of the
arena complex proposed for the Guthrie site. Also explore opportunities to access municipal
fitness facilities and associated programming in Barrie and Orillia for Oro Medonte residents.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 153
Page 180 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Aquatic Facilities
Explore partnership opportunities to provide an aquatic facility within the Township, or to access
municipal aquatic facilities and associated programming in Barrie and Orillia for Oro Medonte
residents. Continue to upgrade the beach and associated facilities at Bayview Memorial Park.
Ball Diamonds
Add a third lit softball diamond at the Lions Sports Field (the Guthrie site) recreation quality
initially. Re -align and re -build Diamond #2 at Vasey Park, including bleachers, but not lit.
Encourage greater use of the Vasey facilities. Upgrade Warminster diamond as required. If
part of Shanty Bay Park is required for expansion of the adjacent fire hall, convert the ball
diamond into a junior facility. Retire Craighurst Park ball diamond. Accommodate the adult
use from the Shanty Bay and Craighurst diamonds at the additional senior lit softball diamond
proposed to be located at the Guthrie site.
Soccer Fields
Develop soccer fields at the Guthrie site in phases:
Initially: develop a 15 acre unstructured turfed area to accommodate the equivalent of: 2 full
size fields, 3 large mini fields, and 6 small mini fields all unlit to support a local junior
recreational program.
Until the fields at the Guthrie site are completed, continue the partnership with Burl's Creek
Event Park to support a gradually scaled back soccer program.
With improved facilities available, test the market for competitive youth and adult programs.
If the soccer facility evolves into a major venue, regional use and tournaments can be
promoted and accommodated.
Given the current situation at Richlieu Park (as noted in Chapter Four), it cannot be
recommended that a significant investment be made to upgrade or rebuild those fields.
Monitor the Orsi proposal to provide a soccer centre in Severn Township and the use of the new
soccer facilities being built in Orillia, near the eastern boarder of Oro Medonte Township at
Highway 11, and, if required, adjust recommendations, particularly for the Guthrie site.
Multi- purpose Sport Pads
No new sports pads are recommended at this time.
Tennis Courts
It is recommended that consideration be given to provide a double unlit court in Line Four
Park. It is also recommended that the Township continue discussions with Horseshoe Valley
Resort /Skyline International re: the opportunity for a joint venture to provide publicly
available facilities within their emerging year -round residential community. If that opportunity
does not materialize, consideration should be given to providing four unlit courts at the Guthrie
site to support a township -wide tennis program, with the option to light those facilities if demand
warrants in future. Consideration should also be given to add a club house at the Guthrie site in
future.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 154
Page 181 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Older Adult Facilities
Support programming and associated recreational, social, health and educational uses for older
adults in existing and proposed municipal multi -use facilities. Encourage the formation of older
adult clubs and associations.
Cultural Facilities
Continue to expand festivals and cultural events; visual arts and crafts programming; as
well as dance and other performing arts for all age groups (directly and indirectly).
Encourage the further development of `heritage' (folkloric arts, material arts and built heritage,
as well as archives, museums, historic sites and monuments, and heritage properties). In
particular, encourage and support the protectors of the African Methodist Episcopal Church
(Township of Oro Medonte History Association) to maintain this important national historic site.
Ensure that as new multi purpose community facilities are provided, they are designed to
support programming in the visual, media and performing arts (particularly dance). It will be
crucial that natural and artificial lighting is suitable to the creative arts and that storage is
provided to support multiple programming per multipurpose room. It is also crucial that a
`sprung' or suitably cushioned floor is available for dance programs.
Support Horseshoe Valley Resort/Skyline International in its interest to possibly provide a
`cultural centre' within the planned residential community.
Curling Facilities
It is not recommended that the Municipality play a direct role in providing a curling facility. If a
private /non profit club was to form and raise funds to build and operate a facility, it may be
feasible for the Municipality to provide a site, ideally associated with or adjacent to the proposed
new arena on the Guthrie site.
Library Facilities /Services
It is recommended that the service agreement with Springwater Township be terminated as soon
as possible. (Effective January 1, 2010, the agreement was terminated.) It is essential that
accurate and supportable records of Oro Medonte memberships are maintained for the other four
library services. Closely monitor membership levels and associated costs at the Severn
Township and Midland facilities.
Wharfs and Boat Launches
Since the wharf and boat launch located at Line 9 is the only site with even minimal space for
parking, there may be an opportunity to improve the dock and possibly install a break wall and
dredge to increase the depth at the boat launch. Revise signage at the wharfs that have been
conveyed to the Township. As opportunities arise, consider acquiring waterfront lands adjacent
to boat launch areas to provide larger sites, and in other areas to create boat launch facilities.
Parks and Open Space
Although a comprehensive review of parks and publicly available open space was not completed
as a component of this Strategic Facility Plan, an analysis will be completed in 2010.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 155
Page 182 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
It is recommended that the Municipality, through the Department of Recreation and Community
Services (and guided by this Strategic Facility Plan, and the Parks and Open Space Assessment)
be much more proactive in the process of planning for, acquiring and developing all Municipal
parkland, including neighbourhood and community level parks.
5.5 Implications for the Proposed Multi -use Recreation Complex
T he terms of reference for this strategy included an assessment of the need for and feasibility
of a multi -use recreation facility that would be township wide /regional in appeal and scale.
The recommendation for a three tiered system to classify open space and leisure facilities
included a township- wide /regional level into which this type of facility would be placed.
The 85 acre Guthrie site is only Township -owned land that is large enough to accommodate such
a facility. This property is currently the site of the Oro Medonte Community Arena and Banquet
Hall, as well as the two top senior lit softball diamonds. All of these facilities are township
wide /regional in scale and would associate well with a township -scale multi -use recreation centre
(indoor and outdoor facilities).
This site matched up quite well with the location criteria identified by the community at the
Search Conference that was held to solicit input to this plan.
It was recommended that the following facilities and components be most seriously considered
for the `feasibility study' phase of this strategy to examine demand more closely, and estimate
the cost to build and operate a Township -scale multi -use recreation facility. The research has
indentified both indoor and outdoor facilities that would be suitable for this site. As such, the
feasibility study was designed to provide guidance for both the proposed community centre as
well as the park in which the principle facility is to be located.
Indoor and Outdoor Facilities and Components to be Considered
Single indoor ice pad (a new and repositioned or renovated existing arena with space
allowance to twin in future if demand warrants that opportunity best exists for a new and
repositioned facility);
Multi- purpose program space (to support a wide range of uses to meet many of the needs of
all age groups, including older adults);
Meeting room(s);
Washrooms and change rooms to support both indoor and outdoor facilities, male and female
customers and persons with a disability;
Commercial uses (from a pro shop to related health services);
Third lit senior softball diamond;
Outdoor soccer pitches initially to support recreational children/youth program;
Outdoor hiking and bicycle trails;
Picnic areas with playgrounds;
Food services to support indoor and outdoor activities; and
Storage to support indoor and outdoor activities and equipment.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 156
Page 183 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Several other facility components have been identified in this Strategic Facility Plan that could
be considered as potential future phases of this complex (or could be provided elsewhere, within
the Township possibly through partnerships with others):
A fitness centre (strength, conditioning and stretching gym plus an aerobic /spinning/dance
studio);
An indoor running /walking track;
An aquatic centre to support a full range of types of uses and pool tanks (from therapeutic
to leisure and lane swimming);
Gymnasium (if a full -size gym is not provided through a partnership with a school board);
Curling rink (public /private partnership);
Second indoor ice pad (if future demand warrants);
Tennis courts; and
An indoor soccer facility (public /private partnership).
Refer to Chapter Six for the analysis of the proposed Township -scale multi -use recreation
complex and specific recommendations for this facility and the development of the Guthrie site.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 157
Page 184 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 158
Page 185 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Chapter Six:
Feasibility Study for the Township -wide Recreation
Complex
6.1 Introduction
he Strategic Facility Plan identified a number of types of indoor and outdoor facilities to be
considered for the 85 acre Guthrie Site, which is located on the north side of Highway 11
between Line 4 north and Line 5 north. As reported in Section 5.6, the following facilities and
components should be most seriously considered for the feasibility study phase of the Strategic
Facility Plan. The need and priority for these facilities was to be confirmed, along with the
estimated cost to build and operate a Township -scale multi -use recreation centre. The research
has indentified both indoor and outdoor facilities that would be suitable for this site. This
follow -up study has provided guidance for both the proposed community centre as well as the
park in which the principle facility is to be located.
The highest priority facilities for the Guthrie site have been identified as:
A single indoor ice pad (new and repositioned or renovated existing with space allowance
to twin in future if demand warrants that opportunity best exists for a new and repositioned
facility);
Multi- purpose program space (to support a wide range of uses to meet many of the needs of
all age groups, including older adults);
Meeting/seminar room(s);
Washrooms to support both indoor and outdoor facilities /activities;
Commercial uses (from a pro shop to related health services);
Third lit senior softball diamond;
Outdoor soccer pitches initially to support a recreational children /youth program;
Walkways and multi -use trails;
Picnic areas with playgrounds;
Food services to support indoor and outdoor activities; and
Storage to support indoor and outdoor activities and equipment.
Several other facility components have been identified and were examined as potential future
phases of this complex. These facilities could also be located elsewhere in the Township, some
through partnerships with other providers.
Fitness centre (strength, conditioning and stretching gym plus an aerobic /spinning /dance
studio);
Indoor running/walking track;
Aquatic centre to support the full range of types of uses and pools (from therapeutic to
leisure and lane swimming);
Gymnasium (if a full -size gym is not provided through a partnership with a school board or
becomes part of another publicly available recreation complex);
Curling rink (public /private partnership);
Second indoor ice pad (if future demand warrants);
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 159
Page 186 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Tennis courts; and
An indoor soccer facility (public /private partnership).
6.2 The Evolving Facility Concept
Agenda Item {AgendaNumber} {ItemDescription}
A n important task in the follow -up research on facility needs that could be accommodated at
the Guthrie site included a workshop with the sports groups who are already using facilities
at the site and potential groups who could utilize other facilities under consideration.
The input from the user group workshop influenced the evolving facility concept and outdoor
facility development in the following way:
The ice surface should be larger than initially proposed
Seating for around 500 within the arena enclosure (with heating)
A good sound system for music and announcements
An elevated (possibly corner) music room for figure skating
A foyer with an ice surface viewing area for around 100, washrooms and display cabinets
(sports, history)
An office for the Sports Association large enough for the various user groups to be able to
store files and small things associated with each group
Quality, dry storage for outdoor users however, depending on the location of the arena and
outdoor sports facilities, it may be better for ball and soccer groups to have storage in another
location on the site) the Municipality also needs storage for maintenance equipment
Meeting/seminar rooms likely two with one overlooking the ice surface (if possible)
Office(s) for facility staff
Outdoor accessible washrooms (with two larger stalls in both the male and female
washrooms that would include a bench and hooks to facilitate changing of clothes)
washrooms could be time locked to correspond with the timer for the outside lights
A minimum of 4,000 square feet of multi- purpose space (sprung floor or otherwise cushioned
for half of the space, divisible, access to storage for programming equipment, kitchenette,
washrooms ideally at ground floor level)
Indoor three -lane running/walking track
An additional larger, more professional -style dressing room with player equipment stalls and
benches for the Junior `A' team, with room for exercise bikes for cool -down after play
An office for the Junior `A' team
Facility oriented and designed to accommodate expansion to accommodate a second ice pad
and other complementary and supportable facility components (if future demand warrants)
Soccer area(s) (approximately 15 acres of unstructured turfed area laid out to be easily
converted and upgraded to higher level fields in future, if demand warrants). Provide
sufficient space for the equivalent of:
2 full -size senior fields (60x110 metres)
3 large mini fields (50x75 metres)
6 small mini fields (40x60 metres)
all pitches unlit, initially
potential to upgrade some or all of the with better soil conditions to support quality turf,
drainage and irrigation
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 160
Page 187 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Stratevic Facility Plan. Township of Oro Medonte March. 2010
portable nets (for now)
it was proposed in the Leisure Facility Strategy that over the next few years, the market
for competitive youth and adult programs should be tested
if the soccer facility evolves into a major venue, regional use and tournaments can be
promoted and accommodated
A 3rd lit senior softball diamond with skinned infield and an outfield fence (270' outfield
like Diamond #2)
Leave space to add a fourth diamond in future (if demand warrants and there is room)
May have to correct a drainage issue with the outfield of the lower ball diamond
Storage building(s) for smaller soccer nets, balls, etc., plus baseball and infield lining
equipment or incorporate all or part of storage needs in the principle (arena) building
Hopefully, the steel unit that is used by the Township to store field dragging and other
equipment could become a more attractive and maybe better located `facility' or
incorporated into the principle (arena) building (currently located between the parking lot and
the ball diamonds)
May require a set or two of portable toilets in the far reaches of the property (structures
screened to improve appearance) to augment washrooms provided within the principle
building
Picnic area(s) well positioned to support the various field functions
Playground(s) well positioned to support the various field functions
Sun shelter(s) associated with the picnic area(s) and playground(s) well positioned to
support the various field functions
Pedestrian circulation pathways to support the various sports and associated functions
Wider multi -use trails associated with other activities and parts of the site
Allow room for 4 lit tennis courts possible future club house
Parking with room to expand as additional uses /facilities are added possibly convert current
arena footprint to parking
Vehicular circulation system to provide access from Lines 5 and 4, and to service internal
functions
Electronic sign facing Highway 11 (possibly)
As the facility was initially taking shape, the following components were added by municipal
staff:
Climate controlled storage space for the History Association archives, etc.;
Expanded office space to accommodate the staff of the Recreation and Community Services
Department, including a public counter to support enquiries and program registration; and
A staff room.
The architect suggested that the arena spectator seating be arranged along one side for efficiency
and to reduce capital cost.
As the conceptual site plan began to evolve, the following was discovered and adjustments made
to the initial thinking about facilities and the capacity of the site:
1. A 30 metre setback from the top of bank along the length of the watercourse on the site had
to be established.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 161
Page 188 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte March. 2010
2. That left two areas to the north of the watercourse that are difficult to access and include into
the site plan.
3. Significant space had to be allowed for the septic tile bed(s) it may be possible to locate the
tile bed under minor soccer fields.
4. A significant area(s) had to be allocated for possible future facilities.
5. The area to the east of Ball Diamond #2 was not large enough to accommodate the third ball
diamond.
6. With all of the other facility requirements and the site constraints, there was not enough room
on the site to locate a fourth senior ball diamond.
7. Since most of the soccer fields will have to be located in the eastern half of the site, and it
was advantageous to keep the ball diamonds together, it was necessary to locate the arena
complex (with its components to also serve outdoor uses) further into the site than was
originally envisioned.
8. Due to site constraints, the number of large mini soccer fields had to be reduced by two and
replaced with two additional small mini fields.
9. The concept of incorporating a three -lane running/walking track around the inside of the
arena enclosure became too expensive to justify when, through the conceptual design
process, it was determined that the arena enclosure would have to be widened on both sides
to accommodate the track, and greater roof height would be required to allow the track to
clear the high door required for the ice re- surfacer to exit the building.
10. During the initial conceptual design process, it was also determined that the capital cost
would be prohibitive to prepare the front portion of the building to accommodate a second
floor in future that could house a fitness centre and possibly other facilities.
11. If a second ice pad is added in future, it would be reasonable to spread the two ice surfaces
beyond the minimum to create a good sized upper level between the ice surfaces that may be
suitable to accommodate a fitness centre and possibly a small walking track (or other
required recreation facilities).
In September, 2009, the evolving plans for the principle facility and outdoor facilities were
presented to potential user groups. Their input continued to evolve the facility concept.
6.3 Guiding Principles for Planning, Design and Operation
A number of important guiding principles have been identified to guide planning and design for, and
operation of the proposed township -wide recreation complex and associated outdoor facilities.
1. To provide new and improved facilities which will allow the community to offer a much
wider range of leisure and wellness programs.
2. To provide facilities, programs and events that appeal to many leisure interests, all age
groups, individuals and families; and are accessible to residents of all incomes.
3. To support activities that improve the health and well being of residents in the market area
and reduce health care costs.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfieid Associates Landscape Architects, and the Tourism Company
Page 162
Page 189 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan, Township of Oro Medonte March, 2010
4. To ensure that the facility is accessible for persons with a disability and /or a mobility
impairment.
5. To provide facilities and support programs and events which contribute to civic pride and
help to unify the Township.
6. To help enhance the economy of the Township by improving the ability of the Municipality
to provide enhanced leisure programming; host sporting events, tournaments, trade shows,
exhibitions, and community social events and festivals; and to attract visitors to the
community as customers of the proposed recreation facilities, programs and events.
7. To make the Township more attractive to existing and new employers; health care,
education, and other professionals; and residents (both working and retired).
8. To create a contemporary community recreation centre that is open and bright with an
inviting and free flowing interior that shows off and promotes all of its components and
encourages the visitor to sample new activities.
9. To provide a facility that is cost effective to operate, and incorporates current technology, and
centres of revenue /profit.
10. To provide a facility that, through design and operation, embraces contemporary energy
conservation technology and measures, and mitigates the negative impact on the physical
environment.
11. To provide a facility that is designed and sited in a fashion that allows for future expansion and the
addition of other adjacent facilities and/or associated components.
12. To concentrate major ball and soccer facilities to support regular programming, as well local and
regional tournaments.
6.4 The Conceptual Facility Design and Facility -Fit Site Plan
6.4.1 The Guthrie Site
The 85 acre site is located on the north side of Highway 11 between Line 4 north and Line 5
north. The original "T shaped ten acre site of the Oro Medonte Community Arena and Banquet
Hall and the two Lion's Sport Field ball diamonds was recently enlarged through a combination
of land donation and purchase.
Currently, access to the site is gained directly from Highway 11 southbound and via Line 4.
From the northbound lanes of Highway 11, indirect access to the site is gained from the
interchange at Line 5. In this case, visitors to the site have to either travel south to Ridge Road
or north to the 15/16 Side Road and then west to Line 4 where they would then have to travel
either north of south to reach the entrance to the site off Line 4. To greatly improve access from
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 163
Page 190 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Highway 11 north, a strip of land was acquired (part of the 85 acre site) that is wide enough to
accommodate a road that links the enlarged site directly to Line 5.
The arena structure and associated parking lot comprise the base of the `T'— shaped original site.
The two lighted ball diamonds and associated parking and access roadway from Line 4 are
located on the western third of the remainder of the original site. The portion of the original site
to the east of the ball diamonds is undeveloped. A portion of this part of the site contains the
septic system for the arena structure.
6.4.2 Physical Characteristics
The central portion of the total site contains two small wooded areas. Running roughly across
the northern portion of the site is a very narrow and shallow intermittent stream /watercourse with
its headwaters in the immediate area to the north and east of the site. Except where it traverses
through the northern wooded area, the edges of the watercourse have grown up in tall
grass /weeds and low brush. The western half of the site, north of the ball diamonds and the
arena, is currently in agricultural use for seasonal crops. The eastern half of the site has recently
been tilled, but for the summer of 2009, this area has been left fallow. The entire site is
relatively level and gently slopes toward the watercourse.
6.4.3 Opportunities and Constraints
Opportunities for the continued development of this site as a Township -wide recreation facility
include:
1. The original ten acre site is an established and well known major sport facility containing the
Oro Medonte Community Arena and Banquet Hall, and the two Lion's Sport Field ball
diamonds.
2. Direct access to and from Highway 11 southbound.
3. Direct access to Line 4.
4. Once the access road to Line 5 is built, there will be the ability to directly access Line 5 and
Highway 11 north and south.
5. The relatively large size of the site, with no other large or even medium size parks within the
Township that can be developed for active recreation.
6. The relatively open and level nature of the site.
7. With redevelopment of the site, there is opportunity to enlarge the outfield of each of the two
existing ball diamonds (if desired).
8. The two small wooded areas and the environmental zone containing the watercourse will
provide a setting for the development of walking trails, nature appreciation and passive
recreation pursuits; and also provide a contrast to the larger portions of the site that will be
developed for active recreation.
The most significant constraints to the development of this site as a Township -wide recreation
facility include:
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 164
Page 191 of 289
6.4.4 Proposed Site Development
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strate¢ic Facility Plan. Township of Oro- Medonte March. 2010
1. The existence of the watercourse that traverses across the length of the site in the vicinity of
the northern boundary, and the requirement for a 30 metre setback from the top of bank on
each side to create an environmental zone or corridor (with limits to development within the
zone).
2. The location of the watercourse and the required environmental zone will isolate two
portions of the site, especially the larger area in the northeast comer. The ability to cross the
watercourse into these two areas, with even a pedestrian bridge, may be prohibited
(physically and/or due to cost). Although the area in the northwest corner can be accessed
directly from Line 4, the small size and isolated nature of this parcel of land (due in part to
the required setback for the watercourse) limits its use for many recreation purposes. To
date, no facilities have been identified in this Township -wide leisure facilities strategy for an
area and location such as this.
3. The desire to protect all or most of the wooded portions of the site removes additional
acreage from development. However, each of these wooded areas is relatively small and the
quality is not very high, especially the southern block.
4. If no re -use is found for the existing arena, there will be a cost associated with demolishing
the old building when the new arena is opened and the old facility is no longer required.
However, interest in the shell of the building and the office area has been expressed from the
Township Works Department.
The constraints posed by the watercourse and the wooded areas, greatly reduces the amount of
the site that is available for development for active recreation uses. Approximately half of the 85
acre site is unavailable for development.
The Township -wide leisure facilities strategy identified facilities that would be suitable for this
site, including an area to support soccer, one or two major lighted ball diamonds, a replacement
ice surface and multi purpose space (if that option is chosen by Township Council), tennis
courts, walking trails, picnic areas, playgrounds, parking and space for future expansion of the
principle building.
A `facility -fit analysis' was undertaken to determine if there is sufficient room to accommodate
the desired facilities. It was determined that there is room to accommodate the following:
Two full -size soccer fields (60x110 metres),
Three large mini soccer fields (50x75 metres),
Six small mini soccer fields (40x60 metres),
One major lighted softball diamond (325' fenced outfield),
A four -court lit tennis facility with a club house,
A replacement arena/multi- purpose hall complex with room to twin the ice surface and add
additional facilities (if demand warrants),
Picnic and playground areas and two shade structures,
Walking/cycling trails,
Pedestrian access to /from Melville Court and Guthrie (neighbourhood) Park
Nature interpretation opportunities,
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 165
Page 192 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Two storm water management/passive recreation areas,
Parking areas throughout the site,
Internal vehicular access, and
An access road to Line 5.
Agenda Item {AgendaNumber} {ItemDescription}
The facility -fit analysis recommends the following site layout. This high level, very general
facility -fit layout could be modified when the more detailed site master plan is prepared
(recommended for 2010). Also, more detail will be provided at that stage in the evolution of site
planning and design. See Figure 54 for details.
The eastern half of the site contains the two wood lots and part of the watercourse. The
remainder of the area has been dedicated to soccer (with sufficient space allocated for two full
size pitches, three large mini pitches and two of the six small mini pitches). Other facilities
designated for the eastern half of the site include: two small gravel- surfaced parking areas, a
picnic and playground area with a shade structure, a storm water management/passive recreation
area, and half of the watercourse- oriented environmental zone /corridor. No development has
been identified for the area in the northeast corner beyond the watercourse and environmental
zone. However, if the watercourse was bridged, at least two more mini soccer fields could be
located there.
The western half of the site already contains two lit and fenced senior ball diamonds, a small
canteen and covered picnic shelter, an access road from Line 4, a parking area parallel to the
access road, a portable storage unit, and the arena structure and associated parking lot. Proposed
new facilities in the western half of the site include a third lit and fenced senior softball diamond
to be located directly north of the smallest of the two existing diamonds; four lit tennis courts
and a clubhouse located directly north of the third ball diamond; a storm water management
pond and recreation area east of the tennis courts; an area east of the pond that will accommodate
four small mini soccer fields; and the new arena complex and principle parking areas located
directly to the east of the third ball diamond. The area to the south of the proposed arena
complex has been identified for future building expansion. It is proposed that the area north of
the arena complex that has been identified for the four small mini soccer fields could also
accommodate the septic system for the principle building.
6.4.5 The Proposed Arena Complex
The principle components of the arena complex include the ice surface and the multi purpose
hall. The ice surface is 85'x200', with seating along one side for 480. Six dressing rooms have
been included, two of which are sized to accommodate persons with disabilities. Two of
dressing rooms have been designed to accommodate female customers. One of the dressing
rooms is over -sized to accommodate visiting Jr. `A' teams and large groups (e.g., school groups,
skating parties). Seven secured storage areas are located under the arena seating. Male and
female referee rooms and a first aid room are also included. The player's benches and penalty
boxes are located opposite the seating.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 166
Page 193 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The lower level front of the building contains the lobby with portable seating for 100 that can be
arranged to view the ice surface, the concession, display cases, two meeting /activity /seminar
rooms with storage, a box office and control point on the `arena' side, offices for the Department
of Recreation and Community Services, a staff room, an elevator, an office for the Sports
Association, the Junior `A' hockey team office, a pro shop, a storage /archive room for the
History Association, and public washrooms.
The 5,600 square foot dividable multipurpose hall, with kitchen, bar and three storage rooms is
also located at the front of the complex. To separate ice- related and other uses, the hall has its
own entrance, with associated coat room. The upper level contains a small lobby.
The refrigeration room, the ice re- surfacer room, an outdoor storage room, and the dressing room
for the Junior `A' hockey team are located at the back of the building, accessed by a corridor
with access to the outside. The ice re- surfacer is located so it can also access a second ice
surface if provided in future. A building mechanical and electrical room is located behind the
multi purpose room and staircase to the second floor.
Refer to Figure 55 for the proposed conceptual layout of the facility. The intent of this high level
conceptual design exercise is to provide sufficient information to be able to prepare order of
magnitude estimates of capital and operating costs. This layout could be modified at the detailed
design stage when the layout undergoes much more scrutiny. More detail will also be provided
at the next stage in the conceptual planning and design process.
Improved Accessibility Compared to the Existing Building The proposed facility will be
fully accessible for spectators and participants in ice sport and other activities accommodated by
the building spaces. From facility entry, barrier -free access will be provided throughout the floor
areas. Strategies for accommodating spectators will include locations throughout the facility so
that optimal choice is provided for all to experience events. For other community activities
utilizing the multi purpose room, details for washrooms, serving areas, canteen counters and
other like features will provide universal access.
Prolonging the Economic Life of the Asset The facility design strategy can provide an
integrated systems approach. Conservation can be used to reduce wear on mechanical systems.
By increasing the thermal resistance of the facility envelope, the amount of energy required in
the building is reduced. This reduces the design load and size of equipment components. The
ventilation systems can include heat recovery to return energy used in the building to be reused
in the facility for space heating, domestic water pre- heating, the ice re- surfacer, water pre-
heating, and the snowmelt system.
Environmental Benefits of a New Building Integrated design can be the underpinning
approach to the project. For example, the collection of roof water from the ice pad enclosures
into storage cisterns will allow for recycling into toilets on -site. The building envelope should
include R40 roof insulation, R20 wall insulation and a low -E ceiling over the ice sheet. These
strategies will assist in reducing overall energy demand and increase interior comfort. The
refrigeration system can include ice battery technology. This concept engages the compressors
overnight to utilize off -peak rate electrical energy to create an ice bank which can then be
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 167
Page 194 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
sourced in the daytime to top up cooling for the ice pad or interior spaces in the shoulder
seasons. Consideration could be given to integrating a geo- thermal system (this was not
included in the cost estimates to date). For a single pad facility, data from similar facilities in
southern Ontario have confirmed that a payback on the capital premium invested in a geo-
thermal system design and equipment is in the order of seven years. The heat from the system
rejected from ice making can be introduced into preheat systems for the domestic hot water
supply, space heating for dressing rooms, spectator heating and other areas of the building. The
interior snow melt system (from ice maintenance) will eliminate the need for exterior disposal,
thus mitigating the potential for environmental contamination from dyes used for ice sheet and
line panting. As noted above, the ventilation systems will include energy recovery and transfer
technologies to recycle energy for other system uses.
Reduction of Greenhouse Gas Emissions Energy conservation strategies for the facility
envelope, and mechanical and electrical systems will reduce energy demand. This in turn will
reduce greenhouse gas emissions from equipment operating in the building, and the upstream
demand from energy sources (electrical and natural gas) needing to be produced to serve the
facility.
Sharing Components and Reducing Building Size If other components are associated with
the proposed arena complex (as would be possible with a new building), the following
advantages would be realized:
the ability to share common facility elements among all components and uses, and reduce
overall space requirements and associated capital and operating costs; e.g., some of the
washrooms, the meeting /seminar room(s), the food service area (expanded and enhanced due
to additional customer traffic with broader profile), the entrance /foyer, circulation space,
mechanical and electrical space, storage space, parking, etc.
the opportunity for `one -stop' shopping and associated cross marketing of the various uses
supported by a highly visible and appealing multi functional facility;
the ability to cross program, utilizing various complementary components; and
the ability for some components to generate revenue to help off -set operating deficits
associated with other components.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 168
Page 195 of 289
FIGURE 54
FACILITY -FIT ANALYSIS, PROPOSED DEVELOPMENT OF THE GUTHRIE SITE, TOWNSHIP OF ORO- MEDONTE, 2010
Preparedby: ttasterfield Associates The Rethink Group AECOM Architects Canada Ltd. and the Tourism Company
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 169
JANUARY, 2010 SCALE 1 1000
4'
S
4
1°i
1#
it! L _H 2 1
O
4 fliifOU
V 11
1
1 1
I
Ca
CD
0
a
Agenda Item {AgendaNumber} {ItemDescription}
11
J
1
1
T T
T
()I J b
r
Page 197 of 289
3
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
6.5 The Space Program and Capital Cost Estimate for the Arena
Complex
figure 56 lists the proposed components of the arena complex and the approximate size that
has been estimated for each. The detailed design process will refine these figures. Total
building size is estimated at 63,600 square feet. The estimated cost of each component is also
included in Figure 56. Note that construction costs vary for different components.
All costs have been estimated in 2009 dollars. Allowances have been made for various site
development costs, internal project management costs, architectural and engineering costs, and
contingency. However, no allowances have been made for furnishings and equipment, building
permits, and bringing three -phase electrical service into the site. Site development costs
associated with parking, road access and landscaping are included in the capital cost estimates
for development of the Guthrie site (Section 6.6 and Figure 57).
In 2009 dollars and based on current projects in southern Ontario, the estimated total cost for the
arena complex is $14,115,715, exclusive of GST/HST, plus the cost of the parking lot and
associated landscaping ($500,000).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 171
Page 198 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Estimate of Area Allocations and Capital Cost per Component,
Proposed Township of Oro Medonte Community Arena Complex
Area I Area Cost
Functional Space M' I FT' Estimate
Arena 2622 28,222
Upper Lobby
Standard Dressing Rooms
Storage and Corridor (under seating)
Junior A Dressing Room and Corridor
Outdoor Storage
Outdoor Seasonal Washrooms
Refrigeration and Ice Re- surfacer Rooms
Multi- purpose rooms (including two meeting rooms)
Meeting/Activity Rooms
Arena Ground Floor Lobby
Arena Ground Floor Lobby
Concession area
Pro Shop
Junior `A' Hockey Team Office
Sports Assoc. Offices
Recreation and Community Services Department Office
Internal Public Washrooms
Corridor an Vestibule Adjacent to Multi- purpose Rooms
Archives Storage
Building Mechanical and Electrical Services
Totals
Directly Related Site Development Costs
Septic System
Well
Water Reservoir
Pump
Diesel Fire Pump
Related Building Development Costs
Internal Project Management
Architectural and Engineering Fees 8.25%
Contingency Allowance @10%
Building Permit
Equipment and Furnishings
Totals
Agenda Item {AgendaNumber} {ItemDescription}
320
368
331
84
81
39
146
520
149
405
104
71
36
51
70
152
113
110
51
85
5,908
5,908
3,440
3,960
3,570
900
875
420
1,575
5,600
1,600
4,361
1,120
759
388
551
750
1,635
1,219
1,190
545
920
63,600
$7,016,100
$220,150
$263,250
$1,120,000
$320,000
$784,980
$201,600
$136,620
$69,840
$528,480
$219, 420
$130,900
$95,375
$138,000
$11,217,715
$350,000.
$75,000.
$100,000.
$25,000.
$85,000.
$103,000.
$980,000
1,180,000
Not included
Not included
63,600 1 $14,115,715
March. 2010
Figure 56
Comments/Notes
Including seating area with infrared heating)
Not including upper lobby area
Includes Referee's Room
Reduced headroom area
Includes small change area in each washroom
Includes, bar and related storage rooms
commercial kitchen equip. not incl. (est.
$100,000)
Includes related storage room. (Concession
equipment not included)
Includes corridor
Includes staff washroom within area
Allowance only
Allowance only
Allowance only
Allowance only
Allowance only
Allowance only
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 172
Page 199 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Townshin of Oro Medonte March. 2010
Notes to Cost Estimate Summary:
1. Area calculations are based upon the Concept Floor Plans dated January, 2010.
2. Cost estimates are based upon 2009 construction costs for projects that are competitively tendered.
3. The Contingency Allowance is for revisions to design as the design develops in further detail as well as a pricing contingency.
Additional allowances are to be applied for construction cost increases should the project not proceed within the next year.
4. Site development cost allowance does not include parking, landscaping, road access and circulation, as well as other site development
costs.
AECOM Canada Architects Ltd., January, 2010
6.6 Capital Cost Estimate for Site Development
rr he following estimates of capital cost (Figure 57) are for all aspects of the development of
the Guthrie site that are in addition to the arena complex, including parking for the arena
complex and other parking locations and the access road from Line 5 and internal road network.
The cost estimates for sports fields assumes that the existing top soil is adequate and will not
require amendment.
The following cost estimates must be considered as `order -of- magnitude'. They are NOT based
on a detailed master plan for the site or more detailed site planning and design of individual
facilities and components. Such detailed planning and design may identify additional works and
will refine many aspects of the high level of site planning provided in this `facility -fit analysis'.
The cost estimate for the soccer facilities assumes that several areas designated for soccer will be
graded and seeded to support a recreational soccer program. Although the facility -fit analysis
defined three sizes of fields and has outlined dimensions and locations, it is assumed that the
soccer organization will determine how to define the fields, at least initially. It is expected that
in future, individual fields will be defined and at least the major ones will be developed to a
higher level (enhanced growing surface, graded playing surface, likely drained and possibly
irrigated). Several fields may be lighted in future.
See Chapter Seven, Section 7.5 for phasing recommendations within the twenty -year capital
plan.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 173
Page 200 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Agenda Item {AgendaNumber} {ItemDescription}
Capital Cost Estimate for Proposed Outdoor Facilities
and Associated Site Development at the Guthrie Site
Facility /Component
Senior softball diamond 325 foot outfield, fenced and lighted minimum quality not drained
or irrigated lighting assumes 6 poles and `recreational' quality lighting does not include
bringing power to the facility, a transformer and control system, etc., and does not include the cost
to provide a water supply (pump station, electrical supply, well storage tanks etc.)
Areas to support the recreational soccer program two graded and seeded areas to support the
equivalent of: 2 full -size fields (60x110 metres), 3 large mini fields (50 -75 metres) and 6 small
mini fields (40x60 metres) total area (including 40% for perimeter spacing) 54,500 sq. m. (5.45
ha.) $6.50 /square metre
A full drained irrigated field would cost $330,000 each $150,000 to light (does not
include bringing power to the facility, a transformer and control system, etc., and does not include
the cost to provide a water supply (pump station, electrical supply, well storage tanks, etc.)
Portable soccer nets (if required)
pair of portable nets 8'x 24' $5,000 x 2
pair of portable nets 6'6" x 12' $2,500 x 3
pair of portable nets 4' x 6' $1,800 x 6
Four unlit tennis courts medium quality surface
Optional cost to light four courts: $450,000
Optional club house (assumes 2,000 sq. ft @$150 /SF): $300,000 (does not include bringing power
to the facility, a transformer and control system, etc., and does not include the cost to provide a
water supply (pump station, electrical supply, well storage tanks, etc.)
Granular walking/cycling trails throughout site
Cost per kilometer (assumes 1000 metres x 3 metres wide $25.00 /sq. m.
Paved asphalt access road
8 metres wide x 800 m long (within park boundary) 6,400 sq. m. $40.00 /sq. m.
(615 metres from Line 4 to eastern park boundary an additional $196,800)
Asphalt parking lot at the arena complex
Parking lot approximately 12,400 sq. m. $40.00 (assuming 28 sq. m. /parking space 440
spaces)
Gravel parking areas along access road approx. 3,000 sq. m. 105 spaces) $30.00 /sq. m.
Planting allowance
Trees (cost per tree: $400)
Shrub beds and creek buffer allowance $40.00 /sq. m.
Two storm water ponds Pond One approx. 4,000 sq. m.; Pond Two approx. 2,400 sq. m.
Two shade structures
Miscellaneous ball field bleachers, soccer bleachers, play areas, culverts, pre -cast curbs
furniture, etc.
Subtotal for construction cost
Fees:
i) Site Master Plan (not including principle building) refine areas, materials and circulation for
site development refine budget costing, initial agency reviews /requirements landscape
architectural and civil services
ii) Detailed design based on 5 -6.5% of construction costs (assume 5.75% for this estimate)
1 Contingency (assume 5% of construction costs)
Total Project Cost (not including the 615 metres of access road from Line 4 to the eastern
boundary of the site, estimated at $196,800)
1
1
March, 2010
Figure 57
Capital Cost
Estimate
$425,000
$354,250
$28,300
$400,000
$75,000
$256,000
$496,000
I $90,000
$350,000
$350,000
$60,000
$350,000
$3,434,300
$30,000
$197,472
$171,715 I
$3,833,487
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 174
Page 201 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
6.7 Financial Projections
6.7.1 Introduction to Financial Projections
Figures 58, 59, 60 and 61 present pro forma operating revenue and expense projections for the
proposed new Oro Medonte Arena Complex as described above. The period of the financial
projections is the first five years of operation of the proposed new facility, assumed to begin
January 1, 2011, which is the earliest possible date that the new facility could be ready for use if
development were to begin immediately.
The pro forma operating revenue and expense projections are based on information supplied
by the client, research undertaken by us, and our experience in these matters. The
assumptions upon which the pro forma projections are based are stated below (Section 6.7.3).
However, certain assumptions may not materialize and circumstances may change. Accordingly,
actual results may vary from the pro forma projections and the variations may be material.
Furthermore, the consultant (the Tourism Company) is not responsible for future management and
marketing decisions upon which actual results will depend.
The pro forma projections present expected operating revenue and expenses based on achieving
the levels of use as described below (Section 6.7.3). Detailed market demand assessment,
described above, was undertaken to forecast expected levels of ice season use. Levels of non -ice
season use are targets provided by the client. Facility use at levels lower than described in
Section 6.7.3, without any change in the assumed level of prices and fees, could be expected to
result in a higher net operating deficit or lower net operating surplus than projected since most of
the operating expenses are `fixed' and would not decline in proportion to a decline in revenue.
Conversely, usage higher than that described in Section 6.7.3 could be expected to reduce the
projected net operating deficit or increase the projected net operating surplus, without any
change in the assumed level of prices and fees.
6.7.2 Projected Financial Operating Results
Agenda Item {AgendaNumber} {ItemDescription}
Pro forma financial operating projections were prepared for three operating scenarios that vary
in the level of non -ice season use and operating efficiencies associated with a new facility.
The assumed levels of the key variables in Scenario A are:
non -ice season use at the target levels provided by the client (see Section 6.7.3 below); and
facility operating efficiencies as per the consulting team's estimates (see Section 6.7.3
below).
In Scenario B, non -ice season use is assumed to be 10% less than the target levels provided by
the client, while facility operating efficiencies are assumed to be 5% less than the consulting
team's estimates.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 175
Page 202 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
In Scenario C, non -ice season use is assumed to be 10% more than the target levels provided by
the client, while facility operating efficiencies are assumed to be 5% more than the consulting
team's estimates.
Figure 58 summarizes the pro forma financial operating projections for each of the three
scenarios.
As illustrated in Figure 58, for each of the three scenarios, the net operating deficit before
transfers to or from reserves is projected to be the lower for all five years of the projections than
that currently budgeted for the existing facility in 2009. And the projected net operating deficit
is in line with the pattern since 2006. In viewing the first five years of projections for all three
scenarios, the annual net operating figures vary between +$135 and $35,440. The net operating
deficit between 2006 and 2009 inclusive varied between $10,655 and $60,180.
This improved operating picture results from a growth in projected revenue, generated primarily
by a combination of higher facility rental rates (including ice rental rates) and an expected
increase in non -ice season use equaling or exceeding the increase in projected operating
expenses, which are dampened by the expected increased operating efficiencies of the new
building (maintenance, repairs, utilities) in each scenario.
Figures 59, 60 and 61 present more detailed financial operating projections for Scenarios A, B
and C, respectively.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 176
Page 203 of 289
Scenario A: Non -Ice Season Use As Per Client Targets; Facility Operating Efficiencies As Per Consultant Estimates
Proposed New Oro Medonte Arena: Summary of Pro Forma Financial Operating Performance
Hours of Ice Use
Prime Time Rate
Minor Sports Rate
Non -Prime Rate
Ice Rental Revenue
Ice Rental Subsidy
Ice Related Revenue
Non -Ice Revenue
Total Revenue
Total Operating Expenses
Net Surplusl(Deficlt)
Hours of Ice Use
Prime Time Rate
Minor Sports Rate
Non -Prime Rate
Ice Rental Revenue
Ice Rental Subsidy
I Ice Related Revenue
Non -Ice Revenue
Total Revenue
Total Operating Expenses
1 Net Surplus/(Deficit)
Transfer From Reserve
Hours of Ice Use
Prime Time Rate
Minor Sports Rate
Non -Prime Rate
Ice Rental Revenue
Ice Rental Subsidy
Ice Related Revenue
Non -Ice Revenue
Total Revenue
Total Operating Expenses
Net Surplusl(Deficit)
Transfer From Reserve
Transfer To Reserve
r
r
Actual
2006 1 2007
0 3,079
125 130
90 90
74 77
228,693 1 243,450
5,417
7,984
242,094 1
253,203
(11,109)
1
2006
0
125
90
74
228,693
2006
5,417
7,983
242.093
253,203
(11,109)
0
125
90
74
228,693
5,417
7,983
242,094
253,203
(11,109)
10,484
10,175
264,109
274,764
(10,655)
2007 1
3,0791
1301$
90
77
243,450
10.484
10,175
264,109
274,764
(10,655)
2008
3,065
130
95
77
257,303
67,485
6,803
8,903
340,494
366,884
(26,390)
23,115
Actual
2007 I 2008
3,079 1 3,065
130 1 130
90 95
77 77
243,450 257,303
67,485
10,484 6,803
10,175 6,935
264,109 338,526
274,764 366,884
(10,655) (26,390)
23,115
2008
3,065
130
95
77
257,303
67,485
6,803
6,935
340,494
366,884
(26,390)
23,115
Figure 58
Budget Projected
2009 Year 1 Year 2 Year 3 Year 4 I Year 5
3,064 3,064 3,064 3,064 3,0641 3,064
130 150 164 169 174 1 180
95 109 120 124 127 131
77 89 97 100 103 106
265,000 304,800 335,200 345,300 355,600 366,300
65,000 74,800 82,200 84,700 87,200 89,800
8,000 10,500 10,700 11,000 11,600 11,800
5,500 48,700 54,800 56,400 58,100 1 59,800
343,500 438,800 482,900 497,400 512,500 1 527,700
403,680 462,640 482,765 503,591 525,418 1 548,045
(60,180) (23,840)1 135 (6,191) (12,918) (20,345)
55,300 1 1
228.800
Transfer From Reserve
Transfer To Reserve
228,800 228,800 228,800
Scenario B: Non -Ice Season Use 10% Less Than Scenario A; Facility Operating Efficiencies 5% Less Than Scenario A
Projected
uage
2009 Year 1 1 Year 2 1
3,064 3,0641 3,0641
130 150 164
95 109 120
77 89 97
265,000 304,800 335,200
65,000 74,800 82,200
8,000 10,500 10,700
5,500 43,900 49,400
343,500 434,000 477,500
403,680 1 469,440 489,665
(60,180)1 (35,440) (12,165)
55,300 1
Transfer To Reserve
228,800) 228,800 228,800 228,800 228,800
Scenario C: Non -Ice Season Use 10% More Than Scenario A; Facility Operating Efficiencies 5% More Than Scenario A
Actual Budget Projected
2003
3,064
130
95
77
265,000
65,000
8,000
5,500
343,500
403,680
(60,180)
55,300
Year 1 Year 2 1
3,064 3,0641
150 164 1
109 120
89 97
304,800 335,200
74,800 82,200
10,500 10,700
53,500 60,300
443,600 488,400
449,240 469,165
(5,640) 19,235
228,800 228,800
Year 3
3,064
169
124
100
345,300
84,700
11,000
50,800
491,800
510,991
(19,191)
Year 3
3,064
169
124
100
345,300
84,700
11,000
62,000
503,000
489,491
13,509
Year 4
3,064
174
127
103
355,600
87,200
11,600
52,400
506,800
533,218
(26,418)
Year 5
3,064
180
131
106
366,300
89,80Q
11,80{}
53,900
521,800
556,245
(34,445)
Year 4 Year 5
3,064 3,064
174 180
127 131
103 106
355,600 366,300
87,200 89,800
11,600 11,800
64,000 65,800
518,400 533,700
510,518 532,545
7,882 1,155
228,800 228,800
Source: Townshiop of Oro Medonte, 2010; the Tourism Company, 2010
228,800
Proposed New Oro Medonte Arena: Pro Forma Financial Operating Performance Scenario A
Existing Facility New Facility
2006 2007 2008 2009 Year 1
Year 2
Year 3
Year 4 Year 5
Revenue
Late Payment Fees
Other Revenue
Ice Rental
Floor Rental
Hall /Multi- Purpose Rooms Rental
Concession Booth Rental
Pro Shop Rental
Advertising Rentals
Ice Rental Subsidies
Vending Machines
Total Revenue
Expenses
Salaries Full Time
!Salaries Part Time
Distributed Benefits
Banquet Hall Supervision
Education Training
Licences
Clothing Allowance
Internet Service
Vending Machines
Insurance
Security Service
Maintenance
Repairs
Utilities
Telephone
Grounds Maintenance snow removal
Rentals Own Forces
Materials, Supplies
Supplies
Waste Disposal
Water Testing
Fire Code Deficiencies
Flat Panel TV
Bio- Remediation Oil Tank
Roof Repair
Speakers
Sign Glass Replacement
Distributed Wages
Distributed Benefits
Insurance
Maintenance
Fuel
Repairs
Equipment Repairs
Total Expenses
Net Surplus/(Deficit) Before Reserves and Debenture Interes
Transfer from /(to) general reserves
Transfer from /(to) building reserve
Transfer from /(to) ice resurfacer reserve
Net Surplus /(Deficit) Before Debenture Interest
1
228,693 243,450
1,411 381
6,573 9.794
701 3,113
2,620
4,716 4,751
242,094 264,109
99,522 101,683
9,564 16,361
3,101 2,155
704
3,444 2,890
5,331 5,752
73
1,895
257,303
736
6,199
1,400
820
67,485
4,582
340,494
105,697
16,557
50,126
661
6,131
546
1,189
3,301
5,733
14,434 13,447 14,060
84,600 92,931 94,365
1,845 1,696 1,839
3,650 3,987 4,631
411
5,479 7,517 6,371
6,481 8,827 10,280
1,892 3,842 4,552
2,385 2,552 2,669
23,115
268 281 537
215
142 154 153
6,510 7,218 8,715
3,184 1,132 4,729
961 1,636 714
253,203 274,764 366,884
(11,109) (10,655) (26,390)
23,115
(11,1 (10,655) (3,275)
265,000
500
5,000
2,500
1,000
65,000
4,500
343,500
105,655
6,462
45,326
1,200
5,000
1,000
1,600
2,000
2,200
5,848
22,000
5.500
92,000
1,600
4,500
15,000
4,200
2,500
9,536
2,500
50,000
3,500
1.500
1.300
783
314
156
1,500
7,000
2,000
403,680
(60,180)
55,300
4,880)
304,800
14,100
34,600
2,800
1,400
1,100
74,800
5,200
438,800
137,800
20,700
65,000
2,500
5,300
1,000
1,700
840
3,600
11,300
31,800
7.900
117,900
1,900
4,900
28,900
4,500
2,700
800
300
200
1,600
7,400
2,100
462,640
(23,840)
(214,000)
(14,800)
(252,640)
335,200
16,800
38,000
2,800
1,400
1,100
82,200
5,400
482,900
141,900
23,900
68,000
2,600
5,500
1,100
1,800
865
3,700
11,600
32,700
8,200
123,800
2,000
5,000
29,800
4,600
2,800
900
400
200
1,600
7,600
2,200
482,765
135
(214,000)
(14,800)
(228,665)
Figure 59
345,300 355,600 366,300
17,300 17,800 18,300
39,100 40,300 41,500
2,800 3,100 3,100
1,500 1,500 1,500
1,100 1,200 1,200
84,700 87,200 89,800
5,600 5,800 6,000
497,400 512,500 527,700
146,200 150,600 155,100
27,300 30,900 34,700
71,100 74,400 77,800
2,700 2,800 2,800
5,700 5,900 6,100
1,200 1,200 1,200
1,900 2,000 2,100
891 918 945
3,800 4,000 4,100
11,900 12,300 12,700
33,700 34,700 35,800
8,400 8,700 8,900
129,900 136,400 143,300
2,100 2.200 2,300
5,200 5,400 5,600
30,700 31,600 32,500
4,700 4,800 4,900
2,900 3,000 3,100
900 900 900
400 400 400
200 200 200
1,700 1,700 1,800
7,900 8,100 8,400
2,200 2,300 2,400
1
503,591 525,418 1 548,045
(6,191) (12,918) (20,345)
(214,000) (214,000) (214,000)
(14,800) (14,800) (14,800)
(234,991 (241,718) (249,145)
Source: Townshiop of Oro- Medonte, 2010; the Tourism Company. 2010
Proposed New Oro Medonte Arena: Pro Forma Financial Operating Performance Scenario B
Source: Townshiop of Oro- Medonte. 2010; the Tourism Company. 2010
Existing Facility
2006 2007
2008
2009
New Facility
Year 1
Year 2
Year 3
Year 4
Year 5
Revenue
Late Payment Fees
Other Revenue
Ice Rental
Floor Rental
Hall /Multi Purpose Rooms Rental
Concession Booth Rental
Pro Shop Rental
!Advertising Rentals
lice Rental Subsidies
Vending Machines
Total Revenue
(Expenses
Salaries Full Time
Salaries Part Time
Distributed Benefits
Banquet Hall Supervision
Education Training
Licences
Clothing Allowance
Internet Service
Vending Machines
Insurance
Security Service
Maintenance
Repairs
Utilities
Telephone
Grounds Maintenance snow removal
Rentals Own Forces
Materials, Supplies
Supplies
Waste Disposal
Water Testing
Fire Code Deficiencies
Flat Panel TV
Bio- Remediation Oil Tank
Roof Repair
Speakers
Sign Glass Replacement
Distributed Wages
Distributed Benefits
Insurance
Maintenance
Fuel
Repairs
Equipment Repairs
Total Expenses
Net Surplus /(Deficit) Before Reserves and Debenture Interest
Transfer from /(to) general reserves
Transfer from /(to) building reserve
Transfer from /(to) ice resurfacer reserve
Net Surplus /(Deficit) Before Debenture Interest
1
228,693
1
6,573
701
4,716
242,094
99,522
9,564
3,101
3,444
5,331
14,434
84,600
1,845
3,650
411
5,479
6,481
1,892
2,385
268
142
6,510
3,184
961
253,203
(11,109)
(11,109)
243,450
381
9,794
3,113
2,620
4,751
264,109
101,683
16,361
2,155
704
2,890
5,752
13,447
92,931
1,696
3,987
7,517
8,827
3,842
2,552
281
154
7,218
1,132
1,636
274,764
(10,655)
73
1,895
257,303
736
6,199
1,400
820
67,485
4,582
340,494
105,697
16,557
50,126
661
6,131
546
1,189
3,301
5,733
14,060
94,365
1,839
4,631
6,371
10,280
4,552
2,669
23,115
537
215
153
8,715
4,729
714
366,884
(26,390)
23,115
(10,655) (3,275)
265,000
500
5,000
2,500
1,000
65,000
4,500
343,500
105,655
6,462
45,326
1,200
5,000
1,000
1,600
2,000
2,200
5,848
22,000
5,500
92,000
1,600
4,500
15,000
4,200
2,500
9,536
2,500
50,000
3,500
1,500
1,300
783
314
156
1,500
7,000
2,000
403,680
(60,180)
55,300
(4,880)
I$
304,800 I 335,200
12,700 I 15,100
31,200 34,300
2,800 2,800
1,400 1 1,400
1,100 1 1,100
74,800 1 82,200
5,200 1 5,400
434,000 1 477,500
135,400
20,700
64,000
2,500
5,300
900
1,700
840
3,600
11,300
33,900
8,500
125,700
1,900
4,900
28,900
4,300
2,700
800
300
200
1,600
7,400
2,100
469,440
(35,440) j
1
(214,000)1
(14,800)1
(264,240)
T
139,500
23,900
67,000
2,300
5,500
1,000
1,800
865
3,700
11,600
34,900
8,700
132,000
2,000
5,000
29,800
4,400
2,800
900
400
200
1,600
7,600
2,200
489,665
(12,165)
(214,000)
(14,800)
(240,965)
Figure 60
1$
1
345,300 355,600 1 366,300
15,500 16,000 1 16,500
35,300 36,400 37,400
5 2,800 3,100 3,100
1,500 1,500 1,500
1,100 1,200 1,200
84,700 87,200 89,800
5,600 5,800 6,000
491,800 506,800 521,800
36,000
9,000
138,600
2,100
5,200
30,700
4,500
2,900
900
400
200
1,700
7,900
2,200
510,991
(19,191)
(214,000)
(14,800)
(247,991)
143,700
27,300
70,100
2,400
5,700
1,000
1,900
891
3,800
11,900
148,000 152,400
30,900 34,700
73,400 76,700
2,500 2,600
5,900 6,100
1,100 1.100
2,000 2,100
918 945
4,000 4,100
12,300 12,700
37,000 38,200
9,300 9,500
145,500 152,800
2,200 2,300
5,400 5,600
31,600 32,500
4,600 4,700
3,000 3,100
900 900
400 400
200 200
1,700 1,800
8,100 8,400
2,300 2,400
533,218 556,245
(26,418)1 (34,445)
1
(214,000)1 (214,000)
(14,800)1 (14,800)
(255,218) (263,245)
Proposed New Oro Medonte Arena: Pro Forma Financial Operating Performance Scenario C
Existing Facility New Facility
2006 2007 2008 2009 Year1 Year2 Year3 Year4 Year5
ROVenuo
Late Payment Fees
Other Revenue
Ice Rental
Floor Rental
Hall /Multi- Purpose Rooms Rental
Concession Booth Rental
Pro Shop Rental
Advertising Rentals
Ice Rental Subsidies
Vending Machines
Total Revenue
Expenses
Salaries Full Time
!Salaries Part Time
Distributed Benefits
Banquet Hall Supervision
Education Training
Licences
Clothing Allowance
Internet Service
Vending Machines
Insurance
Security Service
Maintenance
Repairs
Utilities
Telephone
Grounds Maintenance snow removal
Rentals Own Forces
Materials, Supplies
Supplies
Waste Disposal
Water Testing
Fire Code Deficiencies
Flat Panel TV
Bio- Remediation Oil Tank
Roof Repair
Speakers
Sign Glass Replacement
Distributed Wages
Distributed Benefits
Insurance
Maintenance
Fuel
Repairs
Equipment Repairs
Total Expenses
Net Surplus /(Deficit) Before Reserves and Debenture Interest
Transfer from /(to) general reserves
Transfer from /(to) building reserve
Transfer from /(to) ice resurfacer reserve
1
228,693
1,411
6,573
701
4,716
242,094
243,450
381
9,794
3,113
2,620
4,751
264,109
99,522 101,683
9,564 16,361
3,101 2,155
704
3,444 2,890
5,331 5,752
14,434 13,447
84,600 92,931
1,845 1,696
3,650 3,987
411
5,479 7,517
6,481 8,827
1,892 3,842
2,385 2,552
268 281
142 154
6,510 7,218
3,184 1,132
961 1,636
253,203 274,764
(11,109) (10,655)
73
1,895
257,303
736
6,199
1,400
820
67,485
4,582
340,494
105,697
16,557
50,126
661
6,131
546
1.189
3,301
5,733
14,060
94,365
1,839
4,631
6,371
10,280
4,552
2,669
23,115
537
215
153
8,715
4,729
714
366,884
(26,390)
23,115
105,655
6,462
45,326
1,200
5,000
1,000
1,600
2,000
2,200
5,848
22,000
5,500
92,000
1,600
4,500
15,000
4,200
2,500
9,536
2,500
50,000
3,500
1,500
1,300
783
314
156
1,500
7,000
2,000
403,680
(60,180)
55,300
Figure 61
265,000 304,800 335,200 345,300 355,600 366,300
500 15,500 18,500 19,000 19,600 20,200
5,000 38,000 41,800 43,000 44,400 45,600
2,500 2,800 2,800 2,800 3,100 3,100
1,400 1.400 1,500 1,500 1,500
1,000 1,100 1,100 1,100 1,200 1,200
65,000 74,800 82,200 84,700 87,200 89,800
4,500 5,200 5,400 5,600 5,800 6,000
343,500 443,600 488,400 503,000 518,400 533,700
135,400 139,500 143,700 148,000 152,400
20,700 23,900 27,300 30,900 34,700
64,000 67,000 70,100 73,400 76,700
2,500 2,900 2,900 3,000 3,100
5,300 5,500 5,700 5,900 6,100
1,100 1,200 1,300 1,300 1,400
2,100 2,200 2,300 2,400 2,500
840 865 891 918 945
3.600 3,700 3,800 4,000 4,100
11,300 11,600 11,900 12,300 12,700
29,700 30,600 31,500 32,400 33,400
7,400 7,600 7,900 8,100 8,300
110,000 115,500 121,300 127,300 133,700
1,900 2,000 2,100 2,200 2,300
4,900 5,000 5,200 5,400 5,600
28,900 29,800 30,700 31,600 32,500
4,500 4,600 4,700 4,800 4,900
2,700 2,800 2,900 3,000 3,100
800 900 900 900 900
300 400 400 400 400
200 8 200 200 8 200 200
1,600 1,600 1,700 1,700 1,800
7,400 7,600 7,900 8,100 8,400
2,100 2,200 2,200 2,300 2,400
449,240 469,165 489,491 510,518 532,545
(5,640) 19,235 13,509 7,882 1,155
(214,000) (214,000) (214,000) (214,000) (214,000)
(14,800) (14,800) (14,800) (14,800) (14,800)
Net Surplus /(Deficit) Before Debenture Interest
Source. Townshiop of Oro- Medonte, 2010; the Tourism Company, 2010
(11,109) (10,655) (3,275) (4,880) (234,440) (209,565) (215,291) (220,918) (227,645)
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
6.7.3 Financial Projection Assumptions
The assumptions underlying projected revenues and expenses presented in Figures 58, 59, 60 and
61 are described, following.
Facility Specifications
The types, functions and sizes of spaces in the proposed new Oro Medonte Arena Complex are
described in Sections 6.4 and 6.5 above.
Hours of Operation
It is assumed that in each of the three scenarios, the proposed new arena will operate on the
schedule currently followed by the existing arena, including:
The ice season will be 32 weeks in length and the ice surface will be available for use from
6:00 am to 12 midnight, inclusive, 7 days per week.
The non -ice season will be 16 weeks in length and the facility's main floor will be available
for use from 6:00 am to 1:00 am, 7 days per week.
For approximately 4 weeks annually, while the ice surface is installed and removed, the
facility's floor will not be available for use.
The proposed large multi purpose hall and the two meeting /activity rooms will be available
for use 7 days /week, 52 weeks per year, between the hours of 6:00 am and 1:00 am.
Ice Season Level of Use
It is assumed that the current level of use of available ice time approximately 3,064 of a
possible 4,032 hours of prime and non -prime time or 76% will remain unchanged in each of
the three scenarios. In addition, the mix of adult and minor sport prime time and non -prime time
use is assumed to remain unchanged in each of the three scenarios.
Non -Ice Season Level of Use
The following targets for level of use of the proposed new arena facility's main floor, multi
purpose/banquet hall and meeting/activity rooms were provided by the client and used in
Scenario A.
2 hours /week for 10 weeks use of the facility main floor by adult sports during Year 1,
increasing to 4 hours /week for 10 weeks in Year 2 through Year 5 inclusive;
15 hours /week for 16 weeks use of the facility main floor by minor sports in Year 1 through
Year 5 inclusive;
4 events (full day) use of the facility main floor in Year 1 through Year 5 inclusive;
35 banquet hall events (full day) in Year 1 through Year 5 inclusive;
6 tournament events in the banquet hall (full day) in Year 1 through Year 5 inclusive; and
10 hours /week for 52 weeks use of the meeting /activity rooms in Year 1 through Year 5
inclusive.
In Scenario B, the level of use is assumed to be 10% less than Scenario A for each type of use. In
Scenario C the level of use is assumed to be 10% higher than Scenario A for each type of use.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 181
Page 208 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Revenue
Late payment Fees of approximately $73 were recorded at the existing arena in 2008. In each
of the three scenarios, no late payment fee revenue is projected for any of Years 1 through Year
5, inclusive.
Other Revenue is the account used to record grants from federal and provincial government
programs. Given the uncertainty of the timing and amounts of such grants, in each of the three
scenarios no "other revenue" is projected for any of Years 1 through Year 5 inclusive.
Ice Rental revenue is the sum of fees paid by organizations, groups and/or individuals to use the
arena's ice surface (and dressing rooms, as required) during the ice season. This source of
revenue is assumed to increase as a result of price increases only no change in level of use is
projected. For the proposed new arena facility, it is assumed that ice rental rates in each of the
three scenarios will increase as follows based on information provided by the client:
Prime Time Rate in Year 1, an increase of 15% from the current (2009) rate of $130 /hour
to $150/hour. In Year 2, an increase of 10 and for Years 3 through 5 inclusive, an annual
increase of 3% is assumed, resulting in a Year 5 rate of $180 /hour.
Non -Prime Time Rate in Year 1, an increase of 15% from the current (2009) rate of
$77 /hour to $89/hour. In Year 2, an increase of 10 and for Years 3 through 5 inclusive, an
annual increase of 3% is assumed, resulting in a Year 5 rate of $106 /hour.
Minor Sport Prime Time Rate in Year 1, an increase of 15% from the current (2009) rate
of $95 /hour to $109/hour. In Year 2, an increase of 10 and for Years 3 through 5
inclusive, an annual increase of 3% is assumed, resulting in a Year 5 rate of $131 /hour.
Floor Rental revenue is the sum of fees paid by organizations, groups and/or individuals to use
the arena's floor (and dressing rooms, as required) during the non -ice season. In each of the
three scenarios, the following non -ice season floor rental rates are assumed based on information
provided by the client:
For adult sports in Year 1, an increase of 15% from the current (2009) rate of $49/hour to
$56/hour. In Year 2, an increase of 10 and for Years 3 through 5 inclusive, an annual
increase of 3% is assumed, resulting in a Year 5 rate of $68/hour.
For minor sports in Year 1, an increase of 15% from the current (2009) rate of $38 /hour to
$44/hour. In Year 2, an increase of 10 and for Years 3 through 5 inclusive, an annual
increase of 3% is assumed, resulting in a Year 5 rate of $53/hour.
For events without music in Year 1, an increase of 15% from the current (2009) rate of
$545 /day to $627 /day. In Year 2, an increase of 10 and for Years 3 through 5 inclusive, an
annual increase of 3% is assumed, resulting in a Year 5 rate of $753 /day.
For events with music in Year 1, an increase of 15% from the current (2009) rate of
$605 /day to $696 /day. In Year 2, an increase of 10 and for Years 3 through 5 inclusive, an
annual increase of 3% is assumed, resulting in a Year 5 rate of $836 /day.
Multi- Purpose /Banquet Hall and Meeting /Activity Rooms Rental revenue is the sum of fees
paid by organizations, groups and/or individuals for use of the large multi purpose/banquet hall
and two meeting/activity rooms. In the existing arena facility, only a banquet hall is available for
use. In each of the three scenarios, the following hall/multi- purpose room rates are assumed
based on information provided by the client:
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 182
Page 209 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
For banquet hall events with music in Year 1, an increase of 15% from the current (2009)
rate of $290 /day to $334 /day. In Year 2, an increase of 10 and for Years 3 through 5
inclusive, an annual increase of 3% is assumed, resulting in a Year 5 rate of $401 /day.
For banquet hall tournament events in Year 1, an increase of 15% from the current
(2009) rate of $164 /day to $189 /day. In Year 2, an increase of 10 and for Years 3 through
5 inclusive, an annual increase of 3% is assumed, resulting in a Year 5 rate of $227 /day.
For multi- purpose room rental in Year 1, an increase of 15% from the current (2009) rate
of $38/hour to $44/hour. In Year 2, an increase of 10 and for Years 3 through 5 inclusive,
an annual increase of 3% is assumed, resulting in a Year 5 rate of $53/hour.
Since a pattern of use and rental rates have not been established, no rental revenue has been
allocated to the meeting /activity rooms. Typically, non profit groups are not charged for the
use of meeting rooms for regular meetings, and the potential for utilization of these small rooms
for programming is currently unknown.
Concession Booth Rental revenue is the annual rental fee currently paid by an independent food
concession operator to prepare and sell food and drink items from the food concession booth
located in the arena. Although the food concession booth will be significantly larger and of
higher quality in the proposed new facility, it is expected to be operated in the same way. Based
on information provided by the client, for each of the three scenarios:
The rental fee in Year 1 is assumed to increase 10% from the current (2009) fee of
$2,250 /year to $2,800 /year.
In Years 2 and 3, the rental fee is assumed to remain unchanged.
In Year 4, a 10% increase to $3,100 /year is assumed.
In Year 5, the rental fee is assumed to remain unchanged.
Pro Shop Rental revenue will be the annual rental fee paid by an independent sports pro shop
operator to sell sports equipment items and services from a pro shop space proposed for the new
arena complex. It is assumed that the Municipality will charge an annual rental fee modeled on
the fee charged for rental of the concession booth (see above), with an adjustment to recognize
the fact that the pro shop is planned to be approximately 46% (285 sq. ft.) of the size of the
concession booth (614 sq. ft.). As a result, for each of the three scenarios, it is assumed that:
The Year 1 and 2 rental fee will be $1,300 /year.
In Year 3, the rental fee will increase 10% to $1,400 /year.
In Years 4 and 5, the rental fee will remained unchanged.
Advertising Rental revenue is the revenue collected by the Municipality from sales of
advertising space on the walls in the existing facility and on the ice re- surfacer. Currently, the
Municipality contracts with the Chamber of Commerce to sell the advertising space to third
parties. The terms of the agreement with the Chamber of Commerce results in 60% of the
advertising revenue accruing to the Municipality. For the proposed new facility, in each of the
three scenarios it is assumed that:
A similar amount of space will be available for advertising sales, a similar amount of the
space will be sold to advertisers, and that the Municipality will continue its relationship with
the Chamber of Commerce.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 183
Page 210 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Advertising rates charged by the Chamber of Commerce will increase 10% above the 2009
rate in Year 1.
Advertising rates will remain unchanged in Years 2 and 3.
In Year 4, advertising rates will increase 10% above the Year 3 rate.
Advertising rates will remain unchanged in Year 5.
The difference in ice rental revenue paid by minor sports organizations for use of prime time ice
and the revenue that would be earned if the full prime time ice rental rate was charged is
recorded as Ice Rental Subsidies. In each of the three scenarios, this amount changes annually
as a result of changes in the prime time and minor sport ice rental rates. It is assumed that there
will be no change from the 2009 level of prime time use by minor sports organizations.
Vending Machine revenue is the revenue collected by the Municipality from the vending
machine sales inside the arena complex. In each of the three scenarios, it is assumed that:
A similar number of vending machines selling similar products will be available in the
proposed new arena facility.
Vending machine sales will increase by 10% as a result of the increase in non -ice season
activity.
Prices of products in the vending machine will increase approximately 3% annually as a
result of general price inflation.
Salaries Full Time expense is the cost of wages paid to unionized full time staff that operate
and maintain the existing arena building, the artificial ice surface, and machinery and equipment
including the ice re- surfacer. In each of the three scenarios, it is assumed that:
Wage rates established by the current union contract will apply in Year 1. For Years 2
through 5, an annual wage increase of 3% is assumed based on the pattern of annual wage
increases in the current union contract.
The mix of full time staff at each of the five wage rate levels will remain unchanged,
resulting in an average wage rate of approximately $21.84 in Year 1, increasing to
approximately $24.64 by Year 5.
An additional 30 hours /week of staff time will be required annually during the 32 -week ice
season, beginning in Year 1.
An additional 20 hours /week of staff time will be required annually during the 16 -week non-
ice season, beginning in Year 1.
Salaries Part Time expense is the cost of wages paid to unionized part time staff that operate
and maintain the existing arena building, the artificial ice surface, and machinery and equipment
including the ice re- surfacer. It also includes wages paid to attendants who supervise public ice
skating programs. In each of the three scenarios, it is assumed that:
Wage rates established by the current union contract will apply in Year 1. For Years 2
through 5, an annual wage increase of 3% is assumed based on the pattern of annual wage
increases in the current union contract.
The mix of full time staff at each of the five wage rate levels will remain unchanged,
resulting in an average wage rate of approximately $21.84 in Year 1, increasing to
approximately $24.64 by Year 5.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 184
Page 211 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
For public skating program attendants, the wage rate will be $12.72/hour in Year 1,
increasing 3% annually to $14.32 by Year 5, for a total of approximately 2,000 hours
annually.
Distributed Benefits expense is the cost of statutory and other benefits provided to full and part
time staff that is paid by the Municipality. In each of the three scenarios, it is assumed that the
cost of benefits will remain proportional to the total cost of full and part time salaries at the
current level of 41
Banquet Hall Supervision expense is the cost of part-time staff assigned to supervise events
that occur in the banquet hall. Based on the current pattern, it is assumed that approximately
5.14 hours of supervision are required for each banquet hall event. Based on information
provided by the client, in each of the three scenarios it is assumed that the cost of supervision
will be $14.00/hr for Year 1, increasing 3% annually to reach $15.76/hr by Year 5. The total
cost of banquet hall supervision varies among the three scenarios as a result of varying forecasts
of banquet hall use (see "Revenue Multi-Purpose/Banquet Hall and Meeting/Activity Room
Rental" above).
Education Training expense is the direct cost (course fees, course materials, travel,
accommodation, meals, etc.) associated with arena staff participating in training courses and
events. In each of the three scenarios, it is assumed that:
The number and length of training courses and the number of staff participating in the
courses will be unchanged from the current level.
In Year 1, the price of course fees, course material, travel, accommodation, meals, etc. will
increase 6% from the 2009 level.
In Years 2 through 5, the price of course fees, course material, travel, accommodation, meals,
etc. will increase 3% annually.
Licenses expense is the sum of SOCAN fees (i.e., license to play recorded music at events held
in the arena facility) collected as part of the banquet hall /multi purpose room fees for events with
music, and paid by the Municipality. In each of the three scenarios, it is assumed that this
expense will continue to be calculated as 8.8% of the basic space rental fee.
Clothing Allowance is the cost of uniforms provided to full and part time arena staff. In each of
the three scenarios, it is assumed that:
The quantity of uniforms provided to staff will be essentially unchanged from the current
level.
In Year 1, the price of uniforms will increase 6% from the 2009 level as a result of general
price inflation.
In Years 2 through 5, the price of uniforms will increase 3% annually as a result of general
price inflation.
Internet Service expense is the cost of fees paid by the Municipality for the provision of Internet
service at the existing arena. In each of the three scenarios, it is assumed that:
A similar level of Internet service will be purchased for the proposed new arena complex.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 185
Page 212 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Based on information provided by the client, in Year 1, the fee will be $70 /month for 12
months /year.
In Years 2 through 5, the monthly fee will increase 3% annually as a result of general price
inflation.
Vending Machines expense is the cost of product sold through the vending machines in the
existing arena. In each of the three scenarios, it is assumed that the relationship between the cost
and the selling price of the product will be equal to the average level over the past three complete
years (2006 -2008, inclusive) of 0.69:1 (i.e., cost at 69% of selling price).
Insurance expense is the cost of property casualty insurance for the existing arena facility, based
on the replacement value of the building and contents. This cost is assumed to be proportional to
facility size and contents, with a 2009 cost per square foot calculated at $0.17. In each of the
three scenarios it is assumed that:
In Year 1, the 2009 cost per square foot of $0.17 will increase 6% as a result of general price
inflation.
In Years 2 through 5, the cost per square foot will increase 3% annually as a result of general
price inflation.
Consistent with the operations over the past four years, it is assumed there will be no security
service expense in any of the three scenarios.
Maintenance expense is the cost of materials for non janitorial facility and ice plant
maintenance undertaken by arena staff. Beginning in 2009, some items that were previously
recorded as repairs (see below) are now included in maintenance. In Scenario A, it is assumed
that:
In Year 1, the 2009 maintenance expense of $0.63 per square foot will decline by 25% to
reflect the newer facility and equipment, while increasing 6% as a result of general price
inflation.
In Years 2 through 5, the cost per square foot will increase 3% annually as a result of general
price inflation.
In Scenario B, the cost per square foot is assumed to decline only 20% from the 2009 level to
reflect savings associated with a new facility and equipment. In Scenario C, a 30% decline in
cost per square foot is assumed.
Repairs expense is the cost of repair services (e.g., plumbing, electrical, heating /ventilation/air
conditioning) and related materials provided by independent contractors to extend the life of the
building, furnishings, fixtures and equipment (other than the ice re- surfacer). In Scenario A, it is
assumed that:
In Year 1, the 2009 repairs expense of $0.16 per square foot will decline by 25% to reflect
the newer facility and equipment, while increasing 6% as a result of general price inflation.
In Years 2 through 5, the cost per square foot will increase 3% annually as a result of general
price inflation.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 186
Page 213 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
In Scenario B, the cost per square foot is assumed to decline only 20% from the 2009 level to
reflect savings associated with a new facility and equipment. In Scenario C, a 30% decline in
cost per square foot is assumed.
Utilities expense comprises the costs for heating (oil) the arena facility and hot water, as well as
electricity for lights and equipment, including the ice plant. In Scenario A, it is assumed that:
In Year 1, the estimated 2009 heating (space and water) cost of $1.05 /sq. ft. will decline by
25% to reflect a more energy efficient building and hot water system, while increasing 10%
as a result of expected price inflation for oil.
In Year 1, the estimated 2009 electricity cost of $0.78/sq. ft. for lights and equipment
(excluding the ice plant) will decline by 25% to reflect a more energy efficient lighting
system and equipment, while increasing 10% as a result of expected price inflation for
electricity.
In Year 1, the estimated 2009 electricity cost of $1,744 /week (ice season only) for operating
the ice plant will decline by 25% to reflect a more energy efficient ice plant, while increasing
10% as a result of expected price inflation for electricity.
In Years 2 through 5, the cost per square foot for space and water heating will increase 5%
annually as a result of oil price inflation.
In Years 2 through 5, the cost per square foot for lighting and equipment power will increase
5% annually as a result of electricity price inflation.
In Years 2 through 5, the weekly cost of electricity for the ice plan will increase 5% annually
as a result of electricity price inflation.
In Scenario B, the cost per square foot for oil and electricity (lights, equipment), and the weekly
cost of electricity (ice plant) is assumed to decline only 20% from the 2009 levels to reflect
savings associated with a new facility and equipment. In Scenario C, a 30% decline is assumed.
Telephone expense is the cost of monthly telephone service and associated long distance calling
charges. In each of the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $1,600 will increase 6% as a result of expected price inflation.
In Years 2 through 5, the monthly cost will increase 3% annually as a result of general price
inflation.
Grounds maintenance and snow removal expense is the cost of snow plowing service
provided under contract by an independent third party. In each of the three scenarios, it is
assumed that:
In Year 1, the 2009 cost of $4,500 will increase 6% as a result of expected price inflation.
In Years 2 through 5, the monthly cost will increase 3% annually as a result of general price
inflation.
Materials and Supplies expense is the cost of janitorial and consumable supplies. In each of the
three scenarios it is assumed that:
In Year 1, the 2009 cost of $0.43/sq. ft. will increase 6% as a result of expected price
inflation.
In Years 2 through 5, the cost will increase 3% annually as a result of general price inflation.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 187
Page 214 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Supplies expense was discontinued as a separate expense account in 2009, being combined with
materials and supplies (see above).
Waste disposal expense is the cost of waste pick -up and disposal service provided under
contract by an independent third party. In each of the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $4,200 will increase 6% as a result of expected price inflation.
In Years 2 through 5, the cost will increase 3% annually as a result of general price inflation.
Water testing expense is the cost of mandatory testing of potable water undertaken by a private
laboratory. In each of the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $2,500 will increase 6% as a result of expected price inflation.
In Years 2 through 5, the cost will increase 3% annually as a result of general price inflation.
Fire code deficiencies, flat panel TV, bio- remediation (oil tank), roof repair, speakers and
sign glass replacement expenses were one -time repairs recorded in 2009 (and 2008 for roof
repair). In each of the three scenarios, these expenses are not expected to reoccur during the first
5 years of operation.
Distributed Wages Ice Re- surfacer is an allocation of arena staff time for maintenance and
repair work undertaken on the ice re- surfacer. In each of the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $24.47 /week of the ice season will increase 6.5 consistent with
the scheduled wage increase under the current contract.
In Years 2 through 5, the cost will increase 3% annually, consistent with projected wage
increases for full and part time staff (see above).
Distributed Benefits Ice Re- surfacer is the cost of benefits associated with distributed wages
(see above). In each of the three scenarios, it is assumed to remain at 40% of wages annually,
consistent with the level of benefits projected for full and part time staff benefits (see above).
Insurance Ice Re- surfacer expense is the cost of insurance for the ice re- surfacer. In each of
the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $156 will increase 6% as a result of expected price inflation.
In Years 2 through 5, the cost will increase 3% annually as a result of general price inflation.
Maintenance Ice Re- surfacer expense is the cost of materials for ice re- surfacer maintenance
undertaken by arena staff. In each of the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $0.49/hour of ice use will increase 6% as a result of expected
price inflation.
In Years 2 through 5, the cost will increase 3% annually as a result of general price inflation.
Fuel Ice Re- surfacer expense is the cost of fuel used to operate the ice re- surfacer. In each of
the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $2.28/hour of ice use will increase 6% as a result of expected
price inflation.
In Years 2 through 5, the cost will increase 3% annually as a result of general price inflation.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 188
Page 215 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Repairs Ice Re- surfacer expense is the cost of ice re- surfacer repair services provided by third
party independent contractors. In each of the three scenarios, it is assumed that:
In Year 1, the 2009 cost of $0.65/hour of ice use will increase 6% as a result of expected
price inflation.
In Years 2 through 5, the cost will increase 3% annually as a result of general price inflation.
Equipment Repairs Ice Re- surfacer expense was discontinued as a separate expense item in
2009, with the costs moved to the Maintenance ice re- surfacer account (see above).
Reserve for Replacement Building expense is the estimated annual contribution to a reserve
fund established for the purpose of financing the future replacement of the proposed new arena
complex. It is recommended that such a fund be established in Year 1. The annual contribution
amount has been calculated based on the following assumptions:
An estimated capital cost for the proposed new arena facility (Functional space and building
development costs) of approximately $13.5 million in 2010;
An expected 40 year useful life for the proposed new facility and an estimated replacement
cost of approximately $42.7 million in 2050 based on annual average price inflation of 3
and
Average annual interest of 7% earned on the reserve fund balance, with interest earned
retained in the reserve fund.
Reserve for Replacement Ice Re- surfacer expense is the estimated annual contribution to a
reserve fund established for the purpose of financing the future replacement of the existing ice
re- surfacer. It is recommended that such a fund be established in Year 1. The annual
contribution amount has been calculated based on the following assumptions:
A capital cost for the ice re- surfacer of approximately $80,000 when purchased new in 2006;
An expected 10 year useful life for the ice re- surfacer and an estimated replacement cost of
approximately $95,600 in 2016 based on annual average price inflation of 3 and
Average annual interest of 3% earned on the reserve fund balance, with interest earned
retained in the reserve fund.
6.8 Summary of the Advantages of a New Arena Complex
he following points summarize the key advantages of replacing the 40 year old arena
complex with a new facility as described in Chapter Six of this Strategic Facility Plan.
The new facility will include additional components:
two meeting/seminar /activity rooms,
storage /archival space for historical resources,
an office for the Sports Association,
a room for female referees,
a dressing room and an office for the Junior `A' hockey team,
an external change room/washroom (possibly),
a pro shop, and
offices and a staff room for the Recreation and Community Services Department.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 189
Page 216 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The new facility will include improved components:
more and better dressing rooms (all larger, with one over -sized for visiting Jr. `A' teams and
large groups, and two to accommodate females and two to accommodate persons with a
disability),
more and better spectator areas (480 heated seats within the arena enclosure and
approximately 100 portable seats within the lobby seating could also be arranged in the
upper lobby area),
a larger (almost double the size) and better multi purpose program/event space main floor
location, dividable, larger modern kitchen, storage rooms, separate entrance),
a useable arena floor for summer `ice -out' activities,
a larger concession area,
more and much improved indoor and outdoor storage,
better control points to the ice surface and the hall, and
improved display space in the main floor lobby.
The new facility will:
be fully accessible throughout including the ground -floor multi purpose hall (the current
facility cannot achieve this);
be more space and energy efficient resulting in lower operating costs and lower
environmental impact;
provide the opportunity to expand (e.g., second ice pad, fitness centre, indoor running
track, additional multi purpose space, curling rink, indoor soccer, etc.) the current facility
cannot be expanded without moving parking and possibly one of the ball diamonds;
support a wider variety of activities and meet the needs and interests of many more
residents; and
attract more use and generate increased revenue.
The cost to maintain the existing arena is estimated to be in excess of $3 4 million over the
next 20 years (in 2008 and current estimates do not account for annual inflation and the
unknown costs to:
meet any additional accessibility requirements,
deal with the floor movement between the main building and the change room area,
additional energy and environmental considerations,
any significant functional improvements, and
replacement of the septic system.
The current facility will require almost $1 million to be invested in the next 3 -5 years.
Although the average annual cost estimated to maintain the existing building is $170,000 in 2008
costs, that investment will not result in many actual improvements to the quality, appeal and
usability of the facility. Eventually, the exiting building will have to be replaced with a new
arena complex. It is estimated that the cost to build an arena complex similar to what is
proposed in this Strategic Facility Plan will be in the order of $43 million in 2030. As the old
facility continues to age, it may reach a point where it will unexpectedly need to be closed,
disrupting seasonal uses and leaving no time to prepare for a replacement.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 190
Page 217 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Due to increased revenue and lower per square foot operating cost, a new, 82% larger, more
appealing and more functional facility is projected to operate at a similar annual net cost as
the existing building (not including debenture costs that could be associated with a new
building, the capital investment required to maintain the existing building or an annual
contribution to a reserve account).
It is estimated that the average annual cost to maintain the existing building to 2030 will be at
least $170,000 per year (recognizing that there are unknown costs noted above and inflation
which could average 3% per year). The recommended annual contribution to a reserve account
is $228,800.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 191
Page 218 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 192
Page 219 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Chapter Seven: Implementation Strategy
7.1 Introduction
Agenda Item {AgendaNumber} {ItemDescription}
'Throughout this chapter, recommendations will be offered for how to initiate, implement and
finance the recommendations contained in this Strategic Facility Plan. Recommendations
have been prioritized and implementation target dates established to reflect the relative need for
action within available resources.
Having a strategy for implementation is essential to successfully carry out a comprehensive
facility development strategy. To assist with implementation, recommendations will be offered
dealing with: flexibility and timing; co- operation and collaboration; on -going review and
modification; financing; raising awareness and keeping the community informed; and
promotion. Section 7.9 provides implementation initiatives, specific to the proposed arena
complex and the development of the Guthrie Site.
7.2 Flexibility and Timing
T he Strategic Facility Plan must provide clear direction about what needs to be done, but it
must also be sufficiently flexible to allow for shifting needs and priorities, and unforeseen
changes in the operating environment. However, recommendations should only be changed,
overridden or re prioritized when there is solid justification and a well conceived rationale for
doing so.
As much flexibility as possible has been built into the Plan. Where research, trends and analysis
strongly support a recommendation, as much detail as possible is provided concerning what,
when and sometimes how. Where recommendations are intended for the longer term, and where
data is less detailed and trends less definite, a more general sense of priority, strategy and timing
has been offered. In the intervening years, further study may be required to update and collect
more information, fine -tune some of the recommendations, and pinpoint when and how they
should be implemented. In some cases, options are provided. The recommendations to provide
a new community centre in the Moonstone area and a similar facility in the Craighurst/Horseshoe
Valley Road corridor are examples of initiatives that will require additional study to fine -tune
size and components, uses, costs, location, timing and potential partners.
The timing for most recommendations has been linked to identified needs and the ability of the
Municipality and others to fund programs, services, and new and improved facilities, as well as
land acquisition.
Instead of tying each recommendation to a specific year for implementation, three multi -year
time frames (after 2010) have been established to provide more flexibility. And even these
time frames should be considered as guidelines. Some initiatives will `shift' into the next time
frame due to financial realities and/or the further refinement of need and priority; and therefore,
timing. For example, it has been recommended that certain equipment and components be
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 193
Page 220 of 289
7.3 Co- operation and Collaboration
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
replaced and repairs made within identified time frames (five year intervals) for each of the
community centres, based, in part, on the average life expectancy of each component.
Sometimes, the replacement date can be extended or interim measures taken to put off a large
expenditure for a few more years. Sometimes, however, the date has to be moved up in response
to a premature failure. Another example would be a recommendation to provide additional
soccer, ball, arena and other facilities, based on anticipated growth in the population and/or
demand. If the growth in demand does not emerge as anticipated in the Plan, the provision of the
new or improved facility(s) can be delayed.
The four time frames that have been established for the Strategic Facilities Plan are:
1. 2010,
2. 2011 -2014,
3. 2015 -2019, and
4. 2020 -2029.
The timing of some of the recommendations may have to be adjusted to align with the mandate,
resources and priorities of other service providers (such as the boards of education, the County of
Simcoe, community associations, private operators, etc.) who share in the responsibility to
implement parts of this Plan.
n any municipal setting, no one agency can provide all of the required leisure services, or
implement a comprehensive plan on their own. Together is not only necessary; it is also
better for identifying and carrying out plans, meeting community needs and providing better
services. There are many areas that require co- operative effort to have an impact. Among them
are: research, planning, programming, facility provision and upgrade, land acquisition, park/open
space development and redevelopment, awareness and promotion, volunteer enhancement, and
funding.
A recent study published by Parks and Recreation Ontario (Recreation and Parks Essential for
Quality of Life, 2009) reported that although 34% of Ontario residents rely `a great deal' on local
government parks and leisure services, they also `rely a great deal' on other sources for
recreation activities, including: friends and family (36 service /religious /community clubs
(21 private clubs (17 private clubs (15 schools (14 and their employer (5
Therefore, to help ensure that as many gaps as possible are plugged and overlaps are minimized,
it is essential that all direct and indirect providers of leisure services and resources work in close
co- operation with the Municipality (through the Department the Recreation and Community
Services) playing the co- ordinating/lead role.
A number of projects have been identified that require, or could benefit from collaboration
between two or more agencies. Examples include:
provision of a full -size single gymnasium (e.g., in co- operation with a school board);
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 194
Page 221 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
provision of tennis courts, a fitness centre, an indoor running track, and an indoor aquatic
facility (potentially, through a strategic alliance with Skyline Developments /Horseshoe
Valley Resort);
provision of an indoor soccer facility (potentially, through a strategic alliance with a
commercial, institutional or a non profit operator);
provision of a curling rink (potentially, through a strategic alliance with a non profit curling
club);
trail development (with Simcoe County, the Ganaraska Hiking Trail Association, Lake
Country Oro Medonte Rail Trail, the Ontario Ministry of natural Resources, the Ontario
Federation of Snowmobile Clubs and others); and
provision of a cultural centre (Skyline Developments /Horseshoe Valley Resort).
7.4 Review and Modification
Agenda Item {AgendaNumber} {ItemDescription}
I t is important to continually re- examine and update this Strategic Facility Plan. It should be a
strategic `living' document that is responsive to the community and its needs as the
community grows and evolves. If conditions change sufficiently or new information becomes
available that questions any of the recommendations or general directions of the Plan, the
Department of Recreation and Community Services, the Township and other major providers
should work together to make appropriate modifications. However, no changes should be made
to the Plan without adequate analysis and deliberation.
The following is the type of on -going research and analysis that is recommended to keep the base
data current. This will allow modifications to be made as conditions change and to sort through
options and make the best decisions. When it is time to update and extend the Plan, relevant data
will be readily at hand. Also, valuable information on past trends will be available. Much of this
data can be collected and analyzed by municipal staff.
The following types of data should be kept current:
The demographic profile of the Township (next census will be in 2011, and age specific
projections are valuable to augment and extend the census data);
Development /growth projections (Township, County, provincial);
Inventory of all public and publicly available leisure facilities and parks /open space;
Inventory of leisure programming and events offered by all agencies and groups as well as
participation data and wait lists;
Base data on community groups involved in the provision of sports, recreation and
arts /culture programs and events;
The utilization of indoor and outdoor publicly available leisure facilities;
Changes in land use, especially residential new residential areas and expansion of existing
areas;
Resident preferences for leisure activities, and trends in participation;
Resident and user group appraisal of parks /open space, leisure facilities and programs, and
related services; and
The plans, activities and roles /mandate of all leisure entities in the Township and major
providers in the surrounding communities.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 195
Page 222 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Community Forums
It is recommended that every other year, the Department of Recreation and Community Services
host a township -wide forum to give residents and stakeholders a regular opportunity to hear
about progress and plans, and to provide input into evolving needs and priorities. An approach
similar to what was used for this Plan would be appropriate.
Five Year Review
Every five years, a more detailed assessment of needs and a review of recommendations and
progress relative to this Plan should be undertaken, and the Strategic Facility Plan should be
`advanced' for the next five -year period.
Link Continuous Research and Planning Effort to Other Regular Exercises
The update of relevant information, and on -going review and modification of the Strategic
Facilities Plan should be tied to a number of other exercises that are essential components of the
municipal operation:
the annual capital and operating budget process;
the long -term capital forecast of the Municipality;
the municipal mandate, roles, vision and strategic direction; and
ongoing resident and stakeholder involvement.
7.5 Phasing and Twenty -Year Capital Plan
W herever possible, capital costs associated with facility- specific recommendations for
renovation, improvement, expansion or additional facilities have been estimated and
allocated to the four time frames to provide guidance regarding priorities, phasing and
implementation. In some cases, where the optimum solution is currently not clear, options have
been recommended to provide flexibility in determining the optimum solution. Further
investigation and additional information may be required, and sometimes, other decisions have to
be made first.
The following estimates of capital cost (Figures 62 and 63) are `order of magnitude' and based
on recent (2008/09) costs for facility construction in Southern Ontario. The estimates do not
account for inflation, and the totals for each time period do not account for the establishment of a
capital reserve account which would receive annual contributions. Future circumstances,
detailed facility design and local site conditions will influence these `high level' cost estimates.
Two Cost Scenarios for the Twenty -Year Capital Plan
Because the future direction of the arena complex has such an impact on especially the timing of
capital costs, two 20 -year capital cost scenarios have been prepared and presented as Scenarios
One and Two. Scenario One assumes that the existing arena complex is retained and
maintained for at least ten years and more likely twenty years as a recreation facility, at which
point either a new stand -alone single ice pad arena complex is built to provide two stand -alone
arenas or the existing arena complex is retired and a new single or twin pad arena complex is
constructed to replace it (depending on demand and affordability). Scenario Two assumes that
the arena complex proposed in this Strategic Facility Plan is constructed within the next five
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 196
Page 223 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
years and the existing facility is retired as a recreation facility before much investment is
required. The existing arena may be able to be repurposed, potentially as a public works facility.
If demand warrants and it can be afforded, a second ice surface would be added to the new arena
complex after 2019.
The cost figures in both scenarios do not factor in the unknown potential for funding assistance
from senior levels of government, fundraising, sponsorship, or partnerships /strategic alliances.
The contributions from senior levels of government are typically in the order of two- thirds of the
application for capital support.
Please refer to the Financing Strategy (Section 7.6) for broad indications of potential sources of
funding for all projects, and a number of example scenarios for financing the arena complex and
initial development of the Guthrie site.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 197
Page 224 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan, Township of Oro Medonte March. 2010
Scenario One:
Recommended Phasing Strategy and Associated Estimate of Capital Costs Figure 62
Retain the Oro Medonte Community Arena and Banquet Hall for at least ten years (and likely closer to 20
years) and then either build a new stand -alone single ice pad to provide two ice surfaces, or retire the existing
arena complex and build either a single or twin pad depending on demand, and affordability).
Estimate of Capital Cost and Recommended
Implementation Timetable
Recommendations by Facility Category (the figures in brackets represent capital investment that
may not be required)
2010 2011 -2014 2015 -2019 2020 -2029
Arenas Option A: Retain renovate /upgrade the $133,500 $742,000 $825,000 $2,065,000
existing facility over a twenty year period (minimum of
$3,765,000 in 2008$)
Allowance for a New Septic System for the Existing $350,000
Arena Complex (timing approximate)
Replacement Arena Complex (either a new stand- $10,000,000
alone single ice pad complex or a new twin pad arena
complex if a new twin pad facility, the $2,065,000 ($7 million)
required to be invested in the retained arena complex in
the 2020 -2029 time period may not all be required)
Community Halls
These numbers represent the estimated cost to maintain
the viability of the halls that are recommended to be
retained for at least five years. These costs do not
include very much upgrade in appeal or functionality,
but do include upgrades /repairs to meet A2 occupancy
requirements for public buildings under the Ontario
Building Code, accessibility upgrades re: the Ontarians
with Disabilities Act (OADA), and the Accessibility
Standards for Customer Service (Ontario Regulation
429/07), and the requirement for an asbestos survey
under Ontario Regulation 278/05.
Hawkestone ($304,000) $6,000 $9,000 $30,000 $259,000
Jarratt ($307,000) $6,000 $46,000 $26,000 $229,000
Eady (depending on if/when retired: $65- 360,000) $7,000 $58,000 ($59,000) ($236,000)
Old Town (depending on if/when retired: $98- 314,000) $10,000 $78,000 $10,000 ($216,000)
Edgar (depending on when retired: $6- 124,000) $6,000 ($118,000)
Craighurst (min. investment est. of $5,000) $5,000
Total 8785,000 $1,414,000
Other Multi- purpose Program Space
New northern community centre $820,000
(assumes 3,000 s.f., incl. servicing costs)
New west central community centre $820,000
Craighurst/Horseshoe Valley
(assumes 3,000 s.f., incl. servicing costs)
Multi- purpose room associated with expanded fire $360,000
hall building in Shanty Bay
Soccer Fields
Develop recreational level soccer fields at the Guthrie $250,000 $140,000 $1,020,000
site, beginning with the creation of an open turfed area
(approx. 15 acres) to support equiv. of 2 senior, 3 large
mini, 6 small mini fields ($250,000 in 2011 -2014
$140,000 in 2015 -2019) develop the area into
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 198
Page 225 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
designated fields over time, as demand dictates,
beginning with the senior fields ($700,000) which
can eventually be lit ($320,000)
Ball Diamonds
Develop a 3rd lit senior softball diamond at the $475,000
Guthrie site (assumes adequate power on -site)
Minor improvements to Vasey Diamond #1 $5,000
Re -align re -build Vasey Diamond #2, including $250,000
bleachers but no lights
Remove the diamond in Craighurst Park $2,000
Tennis Courts
Develop a medium quality double unlit tennis $200,000
court at Line 4 Park
In partnership with the owners of Horseshoe $400,000
Valley Resort, provide a medium quality lit four
court facility Option B would be to provide this ($475,000)
facility at the Guthrie site if so, lighting could be
a later phase (2015 -2019)
Walking /cycling trails assumes 3 m. wide trail $300,000 300,000 $600,000
$40 /sq. m. or $120,000/km. for paved surface
($75,000 /km. for granular surface)
Remainder of Site Development Cost Associated $1,000,000 $300,000 $561,818
with the Guthrie Site (access road to within site,
gravel parking for outdoor facilities; playgrounds;
picnic areas; sun shelters; furnishings; planning
allowance; storm water ponds; miscellaneous items;
related detailed design fees, construction, supervision
contingency) Total: $1,861,818
Master Plan for the Guthrie Site 1 $30,000 1 1 1
Neighbourhood Parkland Development
Municipal responsibilities (e.g., turf, landscaping, $500,000 $500,000 $1,000,000
pathways, playgrounds, sun shelters, water fountains,
parking, signage, security lighting, etc.)
Wharfs and Boat Launches 1 1 undetermined 1 undetermined 1 undetermined
Land Acquisition
Allowance for approximately 5 acre site for $500,000
proposed northern community centre
Allowance for other parkland acquisition $250,000 $250,000 $500,000
Totals: $25,574,318 $35,678,318 $198,5 00 I $6,710,000- I $2,431,000 I $16,234,818
$6,828,000 1 $2,965,000 I $25, 686,818
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 199
Page 226 of 289
DRAFT REPORT Strate¢ic Facility Plan. Township of Oro Medonte March. 2010
Scenario Two:
Recommended Phasing Strategy and Associated Estimate of Capital Costs Figure 63
Retire the Oro Medonte Community Arena and Banquet Hall as a recreation facility and replace it with a new
single -pad arena complex within five years— then add a second ice pad in approximately ten years, if demand
warrants and it can be afforded.
Recommendations by Facility Category
Arenas Option B: Build a new, contemporary single
pad arena in a different location on the Guthrie site.
Cost will be influenced by size, components, features,
quality if the ice surface is associated with other
facilities. Does not include the associated 5,600 safe.
multi purpose hall priced below)
Minimum Repairs to the Existing Arena Complex
(if it is to be replaced in near future not including
roof replacement)
Conceptual Design of the Arena Complex
Twin the Ice Surface (if demand warrants)
Community Halls
These numbers represent the estimated cost to maintain
the viability of the halls that are recommended to be
retained for at least five years. These costs do not
include very much upgrade in appeal or functionality,
but do include upgrades /repairs to meet A2 occupancy
requirements for public buildings under the Ontario
Building Code, accessibility upgrades re: the Ontarians
with Disabilities Act (OADA), and the Accessibility
Standards for Customer Service (Ontario Regulation
429/07), and the requirement for an asbestos survey
under Ontario Regulation 278/05.
Hawkestone ($304,000)
Jarratt ($307,000)
Eady (depending on if/when retired: $65- 360,000)
Old Town (depending on if/when retired: $98- 314,000)
Edgar (depending on when retired: $6- 124,000)
Craighurst (min. investment est. of $5,000)
Total $785,000 $1,414,000
Other Multi- purpose Program Space
New northern community centre
(assumes 3,000 s.f., incl. servicing costs)
New west central community centre
Craighurst/Horseshoe Valley
(assumes 3,000 s.f., incl. servicing costs)
Multi- purpose program space added to new arena
complex Option Two (assumes 5,600 s.f.)
Multi purpose room associated with expanded fire
hall building in Shanty Bay
Soccer Fields
Develop recreational level soccer fields at the Guthrie
Agenda Item {AgendaNumber} {ItemDescription}
Estimate of Capital Cost and Recommended
Implementation Timetable
(the figures in brackets represent capital investment that
may not be required)
2010 2011 -2014 2015 -2019 2020 -2029
$12,782,246
$38,500 $22,000
$9,500
$6,000 $9,000 $30,000 $259,000
$6,000 $46,000 $26,000 $229,000
$7,000 $58,000 ($59,000) ($236,000)
$10,000 $78,000 $10,000 ($216,000)
$6,000 ($118,000)
$5,000
$820,000
$820,000
$1,333,469
$360,000
$250,000 $140,000 $1,020,000
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 200
($7 -9 million)
Page 227 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
site, beginning with the creation of an open turfed area
(approx. 15 acres) to support equiv. of 2 senior, 3 large
mini, 6 small mini fields ($250,000 in 2011 -2014
$140,000 in 2015 -2019) develop the area into
designated fields over time, as demand dictates,
beginning with the senior fields ($700,000) which
can eventually be lit ($320,000)
Ball Diamonds
Develop a 3rd lit senior softball diamond at the $475,000
Guthrie site (assumes adequate power on -site)
Minor improvements to Vasey Diamond #1 $5,000
Re -align re -build Vasey Diamond #2, including $250,000
bleachers but no lights
Remove the diamond in Craighurst Park $2,000
Tennis Courts
Develop a medium quality double unlit tennis $200,000
court at Line 4 Park
In partnership with the owners of Horseshoe $400,000 ($475,000)
Valley Resort, provide a medium quality lit four
court facility Option B would be to provide this
facility at the Guthrie site if so, lighting could be
a later phase (2015 -2019)
Walking /cycling trails assumes 3 m. wide trail
$40 /sq. m. or $120,000/km. for paved surface
($75,000 /km. for granular surface)
Remainder of Site Development Cost Associated
with the Guthrie Site (access road to within site,
gravel parking for outdoor facilities; playgrounds;
picnic areas; sun shelters; furnishings; planning
allowance; storm water ponds; miscellaneous items;
related detailed design fees, construction, supervision
contingency) Total: $1,861,818
Master Plan for the Guthrie Site 1 $30,000 1 1
Neighbourhood Parkland Development
Municipal responsibilities (e.g., turf, landscaping,
pathways, playground, sun shelter, water fountain,
parking, signage, security lighting, etc.)
Wharfs and Boat Launches 1 1 undetermined
Land Acquisition
Allowance for approximately 5 acre site for $500,000
proposed northern community centre
Allowance for other parkland acquisition $250,000 $250,000
Totals: $26,304,533 $36,408,533 $113,000 I $20,465,715- I $1,556,000
$20,583,715 I $2,090,000
$300,000 $300,000 $600,000
$1,000,000 $300,000 $561,818
$500,000 $500,000 $1,000,000
undetermined 1
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 201
undetermined
$500,000
$4,169,818
$13,621,818
Page 228 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Capital Reserve Account
It is a prudent practice to establish and annually contribute to a reserve account to cover the cost
of future major repairs and replacement of all facilities. The annual contribution is calculated as
the amount required to fund up to 100% of the estimated replacement cost of all municipal
facilities approximately twenty years into the future, based on assumed average interest earned
on the reserve fund of 7% annually for long -term investments and 3% annually for shorter -term
reserve accounts (e.g., for an ice re- surfacer).
7.6 Financing Strategy
Agenda Item {AgendaNumber} {ItemDescription}
As introduced in Chapter Three, investment in parks, recreation and culture in Oro Medonte over
the years has been relatively low, when compared to other communities of 20,000 although, in
recent years, this investment has been gradually increasing with a larger role being defined and
assumed by the Municipality through the Recreation and Community Services Department.
Over the years, the most significant capital investments have been made in the Oro Medonte
Community Arena and Banquet Hall (built in 1971) and the two lit ball diamonds adjacent to the
arena. With the assistance of community and sports groups, smaller investments have also been
made in other ball diamonds, soccer fields, new sports pads, playgrounds, the rail trail, and
Ramey Memorial and Bayview Memorial parks. The most recent significant community
partnership has been the development of Sweetwater Park.
However, the level of capital investment that will be required to make significant improvements
to parks and facilities, as well as to develop new outdoor and indoor facilities and parks will need
to be greater than historical levels.
As noted throughout this plan, the servicing requirements of the Municipality are above the
norm, due in part to the relatively small population spread relatively thinly over a large
geographic area. Compounding this servicing challenge is the above average dependence on the
residential tax base and the above average investment required to maintain and improve the
many kilometers of Township roads.
Therefore, it is clear that other sources of funding and assistance will be required for the culture
and recreation system to be improved. An increasing reliance on community and corporate
fundraising; and partnerships /strategic alliances with community groups, other public entities
and the commercial sector will be required for moderate and major initiatives. And the ongoing
operating and maintenance costs associated with existing, new and improved facilities will have
to be sustainable. As identified throughout the plan, the most serious issue is the relatively poor
state of repair of many indoor and outdoor recreation and community facilities which will require
many millions of dollars of investment over the next twenty years to maintain in a safe,
functional and accessible condition in order to at least meet current service levels.
Numerous funding sources and financing scenarios are presented below, with a focus on the
arena complex and the Guthrie site.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 202
Page 229 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Accounting for Scenarios One and Two and the variations within each, the estimate of
capital investment for the period 2011 -2014 ranges from $6,710,000 (for Scenario One) to
$20,583,715 (for Scenario Two) (not factoring in an annual contribution to a capital reserve
account, the unknown potential for funding assistance from senior levels of government,
fundraising, sponsorship, or partnerships /strategic alliances, or the estimated cost of upgrades to
wharfs and boat launches).
Accounting for Scenarios One and Two and the variations within each, the estimate of
capital investment for the period 2015 -2019 varies between $1,556,000 (for Scenario Two)
and $2,965,000 (for Scenario One) (not factoring in an annual contribution to a capital reserve
account, the unknown potential for funding assistance from senior levels of government,
fundraising, sponsorship, or partnerships /strategic alliances, or the estimated cost of upgrades to
wharfs and boat launches).
Accounting for Scenarios One and Two and the variations within each, the estimate of
capital investment for the period 2020 -2029 ranges from $4,169,818 (for Scenario Two) to
$25,234,818 (for Scenario One) (not factoring in an annual contribution to a capital reserve
account, the unknown potential for funding assistance from senior levels of government,
fundraising, sponsorship, or partnerships /strategic alliances, or the estimated cost of upgrades to
wharfs and boat launches).
The total estimated cost for Scenario One over the next twenty years is $25,574,318
$35,226,318, and for Scenario Two, the total estimated cost is $26,304,533 $36,408,533.
Although the total minimum and maximum capital investments for Scenario One are slightly less
than for Scenario Two, the quality of sport and recreation facilities that can be achieved via
Scenario Two will be higher because the new, larger and better arena complex will be available
much sooner. For Scenario One, the larger capital investments are delayed until later in the
twenty year projection mostly due to the incremental investment in the existing arena and the
delayed investment in a new single or twin pad arena complex.
Investment in the Arena Complex Dominates the Twenty -year Capital Plan
For both scenarios, the required/recommended investment in the arena complex represents half
or more of the total projected capital forecast over the next twenty years. For Scenario One that
retains and maintains the existing arena complex for another 15 -20 years and then replaces it by
around 2029 with either a single or twin pad complex, the portion of the total capital budget
associated with the arena complex varies between 55 and 66 For Scenario Two, that invests
minimally into the existing arena complex for a short period of time and then invests in a new
and much larger arena complex within the next five years and possibly twins the ice surface after
2020, the portion of the total capital budget associated with the arena complex varies between 49
and 60 In total, over the next twenty years, more may be invested in the arena complex via
Scenario One ($14,115,500- $23,115,500) than Scenario Two ($12,852,246- $21,852,246).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 203
Page 230 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The Cost of Community Hall Renovations and Improvements is Significant, but Will Not
Be as High as Estimated in the Building Condition Assessments
Although it was estimated that $2.77 million (in 2008 will be required to maintain the eight
community halls in a safe and accessible state over the next twenty years, the cost will be less
due to the following factors:
If Warminster, Craighurst, Carley, Edgar and Eady Halls are either immediately or
eventually retired as public facilities, either none or only some of the recommended
investments will be required (see the recommended divestment criteria on pages 99 -100 this
strategy of gradual divestment has already been built into the twenty -year forecast on
October 28, 2009, Township Council decided to retire Warminster Hall);
Some of the recommended repairs and replacements may be able to be achieved at lower cost
than estimated, due to local circumstances, services in kind, etc.; and
Some of the recommended improvements that are not related to safety and accessibility may
not be undertaken.
Sources of capital funding include the following broad categories:
municipal taxes annual allocation to capital projects,
municipal debenture,
contributions from specific user groups such as the potential investment by the Jr. `A' hockey
club for a dressing room and office in a new arena complex,
recreation facility capital reserves ($915,042 as of December 31, 2009),
contributions from development charges ($194,121 in DC reserve for outdoor facilities and
$263,156 in DC reserve for indoor facilities as of December 31, 2009),
community and corporate fundraising,
sponsorships,
naming rights (whole facility and individual components),
surcharge on rental rates and ticket prices,
contributions from senior levels of government, and
contributions from partners (via joint ventures /strategic alliances).
Currently, development charges on new single- and semi detached residential development
generate $696 per unit for outdoor recreation facilities and $1,001 per unit for indoor facilities.
Based on the current rate of 117 units per year, development charges would generate $81,432 per
year for outdoor facilities and $117,117 per year for indoor facilities. The population projections
generated with this Plan and the Simcoe Area Growth Plan predict an average growth rate of
around 108 residential housing units per year over the next 22 years to 3031. Based on 108 units
per year and current development charges per unit, over the twenty -year life of this Plan, this
source would generate $1,503,360 for indoor facilities and $2,162,160 for indoor facilities, or a
total of $3,665,520. Combined with current DC reserves, the total would be $4,122,797. That
represents between 11.3% and 16.1% of the total capital costs estimated for the twenty-year
Strategic Facility Plan.
Several examples of current senior government funding programs include:
The Ontario Trillium Foundation,
The Building Canada Fund Communities Component (one -third assistance for eligible
projects for communities with a population of less than 100,000),
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 204
Page 231 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The Ontario Recreation Program (Ontario REC) partnering with the Federal Building
Canada Fund (one -third assistance for eligible projects for communities with a population
of less than 100,000), and
The Recreation Infrastructure Program in Ontario (RInC) (for renovations to existing
recreation facilities).
The most significant potential contributions from senior levels of government are anticipated to
be potentially available in 2010.
Sample Scenarios for How the Development of Phase One of the Arena Complex and the
Initial Development of the Guthrie Site could be Initiated and Financed
Assuming the following items and associated estimated capital costs are included in the initial
development phase of the Guthrie site and the arena complex, three example financing scenarios
have been provided for each of Phases One and Two of this major component of the overall
Strategic Facility Plan.
Items Included in the Initial Development Phases
for the Arena Complex and the Guthrie Site
Phase;One_
Site Master Plan
The service road from Line 5 to half way into the site (to service the first phase of soccer field
development)
The first phase of soccer field development (an area to support 2 full -size, 3 large and 2 small
mini fields, and nets as required recreational quality of development only)
The eastern storm water pond and recreation area
The gravel parking areas, picnic area, sun shade structure and playground associated with
Phase One of the soccer field development
Initial phase of granular walking/cycling trails
Initial phase of the planting program
Initial phase of miscellaneous items
Detailed design for outdoor facilities and features included in initial development phase
Contingency allowance for outdoor facilities included in initial development phase
Sub -total (Phase One)
:Phase Trim
Initial conceptual design for the arena complex
Phase One of the arena complex (incl. project management architectural, engineering fees
building permit and contingency allowance)
Paved parking area associated with the arena complex
Landscaping around the arena complex
The second storm water pond and recreation area
Sub -total (Phase Two)
Total (Phases One ,and Tw
Agenda Item {AgendaNumber} {ItemDescription}
o).
Figure 64
$30,000 1
$452,800
$270,000
$175,000
$225,000
$35,000
$175,000
$100,000
$100,000
$80,000
$1,642,800
$9,500
$14,115,700
$250,000
$30,000 1
$175,000 1
$14,620,200 1
$1063;00011
Below are three sample scenarios that have been developed to illustrate a number of ways to
finance Phases One and Two of the initial development of the Guthrie site and the Arena
Complex. A portion of the current capital reserves, and current and future DC funding (for the
next five years) for indoor and outdoor facilities have been applied to these projects and sample
scenarios.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 205
Page 232 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte
Agenda Item {AgendaNumber} {ItemDescription}
Phase One: Initial Development of Outdoor Facilities at the Guthrie Site (see Figure 64)
Financing Scenario A for Phase One: (estimated cost $1,642,800)
2/3 senior government grants
60% of current Recreation Reserve (outdoor facilities)
60% of current Development Charges Reserve (outdoor facilities)
Fundraising, naming rights, sponsorships
48% of predicted contributions from development charges for outdoor
facilities over next 5 years
Financing Scenario B for Phase One: (estimated cost $1,642,800)
1/3 fundraising
60% of current Recreation Reserve (outdoor facilities)
60% of current Development Charges Reserve (outdoor facilities)
Fundraising, naming rights, sponsorships
60% of predicted contributions from development charges for outdoor
facilities over next 5 years
Remainder to be debentured annual cost over 20 yrs. 6% $43,548
Financing Scenario C for Phase One: (estimated cost $1,642,800)
60% of current Recreation Reserve (outdoor facilities)
60% of current Development Charges Reserve (outdoor facilities)
Fundraising, naming rights, sponsorships
60% of predicted contributions from development charges for outdoor
facilities over next 5 years
Remainder to be debentured annual cost over 20 yrs. 6% $90,929
Phase Two: The Arena Complex, Including Associated Site Development
Financing Scenario A for Phase Two: (estimated cost $14,620,200)
2/3 senior government grants
80% of current Recreation Reserve (indoor facilities)
60% of current Development Charges Reserve (indoor facilities)
Fundraising, naming rights, sponsorships
Contribution from Jr. `A' hockey club
60% of predicted contributions from development charges for indoor
facilities over next 5 years
Remainder to be debentured
Annual debenture charges over 20 years 6% $222,724
$5 surcharge on hourly rental rates and ticket prices would net $25,000 /year
Financing Scenario B for Phase Two: (estimated cost $14,620,200)
1/3 senior government grants
80% of current Recreation Reserve (indoor facilities)
60% of current Development Charges Reserve (indoor facilities)
March. 2010
$1,095,189
224,418
116,647
25,000
181,546
547,599
224,400
117,000
25,000
225,500
503,301
224,400
117,000
25,000
225,500
$1,050,900
(see Figure 64)
$9,746,790
432,896
157,894
$1,000,000
384,200
324,324
$2,574,096
$4,873,400
432,896
157,894
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 206
Page 233 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Fundraising, naming rights, sponsorships $1,000,000
Contribution from Jr. `A' hockey club 384,200
60% of predicted contributions from development charges for indoor
facilities over next 5 years 324,324
Remainder to be debentured $7,442,486
Annual debenture charges over 20 years 6% $643,960
$5 surcharge on hourly rental rates and ticket prices would net $25,000 /year
Financing Scenario C for Phase Two: (estimated cost $14,620,200)
80% of current Recreation Reserve (indoor facilities) 432,896
60% of current Development Charges Reserve (indoor facilities) 117,000
Fundraising, naming rights, sponsorships 1,000,000
Contribution from Jr. `A' hockey club 384,200
60% of predicted contributions from development charges over next 5 years 324,324
Remainder to be debentured $12,315,886
Annual debenture charges over 20 years 6% $1,065,632
$5 surcharge on hourly rental rates and ticket prices would net $25,000 /year
7.7 Raise Awareness and Keep the Community Informed
A fter the results of the Township -wide recreation facilities strategy and associated feasibility
study for the Guthrie site are received by Township Council, it will be important to raise
awareness in the community, and with user and interest groups and other organizations within
the Municipality and the surrounding area about the results of the strategy and the feasibility
study. It is suggested that a series of `roll out' initiatives be undertaken in 2010:
Prepare a media release and conduct a media event and/or interviews with the appropriate
media in the region.
Host an information event and invite key organizations, businesses, and government
representatives, and advertise the event to the entire regional community. In the invitations,
send an overview of the project highlights so the invited delegates have information, even if
they cannot attend.
Make presentations to sports group, interest groups, service clubs and other key groups in the
local and regional community.
Post information and updates on the Township website and promote the web site.
Utilize the semi annual Recreation and Community Services Brochure to promote the Plan
and progress in implementation.
Keep the community updated of any major developments regarding the advancement of
initiatives, including any potential senior government funding programs and applications, and
any new thoughts about community needs. Any new information can be shared with the media
to encourage follow -up stories.
Once the parks and open space analysis, the detailed conceptual design for the arena complex,
and the master plan for the Guthrie site are completed, they should also be promoted to the
community
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 207
Page 234 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
7.8 Promotion Strategy
Agenda Item {AgendaNumber} {ItemDescription}
A ll new and improved facilities will need to be promoted throughout the market area. It will
be easy to reach the established groups, but others in the Township and the wider market
area who may not yet be involved in leisure activities in the Township (due in part to insufficient
facilities or lack of availability of rental time) will need to know about new facilities and rental
times that may be available. Initially and on a regular basis, residents within the market area will
need to be made aware of the wider variety of recreation facilities, programs and events that will
be offered at the Guthrie site (if the new arena complex is built) and throughout the Township,
some of which will be new to the community.
Key recreation and arts /culture facilities should be promoted on the Township web site with links
to regional sites. Print and radio advertising may also be required to promote expanded
availability. Also, advertisements in regional magazines that are widely read will help.
7.9 Implementation Initiatives Specific to the Proposed Arena
Complex and Initial Development of the Guthrie Site
T he following initiatives are recommended as first steps toward the initiation of the proposed
new arena complex and the associated site and outdoor facility development proposed for
the Guthrie site.
7.9.1 Assessment of Hydro geological Conditions, Provision of Potable Water
and Sewage Servicing Requirements and Treatment Options
Since insufficient information is known about water capacity in the vicinity of the Guthrie site
that is proposed for the new arena complex, it will be necessary to conduct a preliminary
assessment of hydro- geological conditions and the capacity for potable water. The hydro
geological information is crucial before a final decision is made about providing a major indoor
facility at this site. It is recommended that the hydro- geological assessment be completed in
2010.
If the decision is made to proceed with a new arena complex, an associated task would be an
assessment of the requirement for sewage servicing, as well as identification of options (and
associated costs) for treatment.
7.9.2 Advance the Conceptual Design for the Proposed Arena Complex
To provide more detail regarding the proposed arena complex, it is recommended that the base
conceptual design for the arena complex that has been prepared for this feasibility study (Figure
55) be advanced sufficiently to be able to confirm the design with the Municipality and produce
illustrative renderings of what the exterior and interior of the facility could look like. This
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 208
Page 235 of 289
7.9.3 Prepare a Master Plan for the Guthrie Site
7.9.4 Establish Priorities for the Guthrie Site
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
process will allow for more detailed input from user and interest groups, municipal staff and
Township Council. The results will strongly support the capital campaign by providing strong
graphic images of what the facility could look like. It is recommended that this task be
completed in 2010, assuming positive results from the hydro- geological assessment.
It is recommended that the facility -fit analysis that was prepared for this feasibility study (Figure
54) be utilized as the basis for a more detailed master plan for the site. The master plan process
will allow for more detailed input from user and interest groups, municipal staff and Township
Council. The very general level of the proposed facility layout and site development illustrated
in the `facility fit analysis' will be refined and detailed through the master planning process.
Facilities such as walking trails and nature interpretation sites can be added. Picnic areas,
playgrounds, sun shade structures, the storm water management /passive recreation areas, parking
areas and internal vehicular access can be sited in more detail, and the planting plan can be
conceptualized. The capital cost estimate for outdoor facilities, features and other aspects of site
development can also be refined, based on the increased level of detail provided through the
master planning process. This process will help to illustrate the nature of proposed development
of the entire site and will complement the detailed conceptual design proposed for the arena
complex. It is recommended that the park master plan be completed in 2010 even if a final
decision about the proposed arena complex is pending. Much of the development of outdoor
facilities, especially the eastern half of the site, can be planned for and completed regardless of
the decision about the arena complex.
It is not intended that the entire park will be developed at one time. Given the relatively large
scope of facility development, it is crucial to identify how best to phase the project. In part,
phasing should be based on relative recreation needs, the willingness and ability to extend the
life of the existing arena complex, capital funding opportunities, and site development logistics.
Based on this Township -wide recreation facilities strategy, including the feasibility study, the
following components /features are recommended as highest priority to initiate site development.
The focus of Phase One of park development would be the eastern half of the site and include
the following.
the access road from Line 5 to and including the eastern-most gravel parking area;
the eastern half of the internal access road to about the midway point of the site;
the eastern soccer area (equivalent of 2 senior, 2 large mini and 3 small mini pitches);
one of the picnic areas with a playground and sun shelter;
portable washrooms (one or two locations);
the eastern storm water pond and the initial phase of development of the adjacent passive
recreation area;
definition of the environment zone paralleling the water course within the eastern half of the
site; and
the beginning of woodlot and watercourse enhancement (via the Horticultural Society).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 209
Page 236 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Site development associated with the proposed arena complex could be the Second Phase, if the
decision is made to proceed with that facility in the near future. That would include:
Phase One of the arena complex,
extension of the internal road through to and including the parking areas associated with the
arena complex with access provided to Line 4 north of the existing ball diamonds,
the second storm water pond and the initial phase of development of the adjacent passive
recreation area, and
the septic system for the arena complex.
The third senior lit ball diamond should be the next facility to be developed. If the arena
complex is delayed, the ball diamond should be Phase Two. And if the ball diamond precedes
the arena, the following site development would be required to support that facility (at a
minimum):
extension of the internal access road through to Line 4,
some interim parking to support the expanded ball function, and
the second storm water pond and the initial phase of development of the adjacent passive
recreation area.
7.9.5 Initiate a Fund Development Campaign
A Fund Development Committee should be established in 2010 to begin the process of preparing
for a fundraising campaign for the proposed arena complex and/or development of outdoor
facilities at the Guthrie site. An important first steps will be the preparation of illustrations of
what the facility and park could look like (assuming a positive outcome from the hydro
geological assessment). A second important action will be to select a campaign chair for the
Fund Development Committee. It is likely that professional assistance will be required to design
and oversee a campaign of this stature.
When the community is ready to proceed with the development of facilities, the fund
development campaign should be initiated.
Since investment in the Guthrie site may begin with some of the outdoor facilities, the Fund
Development Campaign could be designated to also assist with those projects.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 210
Page 237 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Appendix A:
The Benefits of Improved Parks, Open Space and
Leisure Facilities
A.1 Introduction
B eyond the obvious benefits of providing more and better leisure facilities and program
opportunities for residents, there are many other important and lasting benefits of parks,
recreation and the arts.
Below is a summary of the personal, social, economic and environmental benefits of parks
and recreation, much of which relate directly to the recommendations in this Strategic Facility
Plan for recreation, arts, culture and heritage. It should help put into perspective the value of
additional investment in parks, open space, and leisure facilities, programs and services for the
Township of Oro Medonte.
These benefit statements have come from a comprehensive study of the benefits of parks and
recreation conducted by the RETHINK GROUP and sponsored by the Parks and Recreation
Federation of Ontario. The Benefits Catalogue which documents the benefits and the substantial
support evidence was published in 1997 and is available from the Canadian Parks and Recreation
Association. An update of the Benefits Catalogue is underway.
A.2 Personal Benefits
Agenda Item {AgendaNumber} {ItemDescription}
i) Physical recreation and fitness contributes to a full and meaningful life.
ii) Regular physical activity is one of the very best methods of health insurance for
individuals.
iii) Relaxation, rest and revitalization through the opportunity of leisure are essential to stress
management in today's busy and demanding world.
iv) Meaningful leisure activity is an essential source of self esteem and positive self image.
v) Leisure provides the opportunity to lead balanced lives, achieve our full potential and
gain life satisfaction.
vi) Children's play is essential to the human development process.
vii) Leisure opportunities for youth provide positive lifestyle choices and alternatives to self
destructive behaviour.
viii) Parks and open space bring beauty to an area while giving people satisfaction and
improving their quality of life.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 211
Page 238 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
A.3 Social Benefits
i) Leisure provides leadership opportunities that build strong communities.
ii) Community recreation reduces alienation, loneliness and anti social behaviours.
iii) Community recreation promotes ethnic and cultural harmony.
iv) Recreating together builds strong families, the foundation of a stronger society.
v) Leisure provides opportunities for community involvement, and shared management and
ownership of resources.
vi) Integrated and accessible leisure services are critical to the quality of life of people with a
disability and disadvantaged individuals.
vii) Leisure opportunities, facilities and the quality of the local environment are the foundations
of community pride.
viii) Leisure services enrich and complement protective services for latchkey children through
after school and other recreational services.
A.4 Economic Benefits
i) Pay now or pay more later! Investment in recreation as a preventative health service
makes sense.
ii) A fit work force is a productive work force.
iii) Small investments in recreation yield big economic returns.
iv) Parks and recreation services motivate business relocation and expansion in your
community.
v) Meaningful leisure services reduce the high cost of vandalism and criminal activity.
vi) Recreation and park services are often the catalyst for tourism, a growing sector of our
economy.
vii) Investments in environmental protection through the provision of parks and open spaces
pay for themselves.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 212
Page 239 of 289
A.5 Environmental Benefits
A.6 Conclusion
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
i) Through the provision of parks, open spaces and protected natural environments, recreation
can contribute to the environmental health of our communities. This is an essential, life
sustaining role.
ii) The public is often prepared to pay for environmental protection and rehabilitation in
their communities, and to support parks and recreation organizations that play a lead role in
that provision.
iii) Investing in the environment through parks and the provision of open space in residential
areas, leads to an increase in neighbourhood property values through accessibility to
environmentally friendly green spaces and associated recreation opportunities.
iv) The trend toward natural environment -based leisure activities is insurance for a new and
improved environmental future.
W hat this shows is that the proposed parks, open space, facilities programs and related
services further all of the personal, social, economic and environmental benefits. Of
particular note are the quality of life and community, health, safety /security and economic
benefits that will directly balance the recommended capital and ongoing operating investments
outlined in this Strategic Facility Plan for recreation, arts, culture and heritage.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 213
Page 240 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 214
Page 241 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Appendix B:
The Community Consultation Program
B.1 Introduction
T he community consultation program was designed to communicate, and solicit opinion and
other information about current and future community perspectives, needs and priorities. It
was also intended to test the emerging strategy. Progress and results were regularly posted on
the Township web site. A community -wide Search Conference was held early in the process.
An information survey was sent to all recreation and community groups and agencies. Several
focus groups workshops were held to solicit more in -depth opinion and information. Sessions
were held with Township Council; the project committee; the Recreation Technical Committee;
and an ad hoc group comprised of representatives from Township Council, municipal staff, the
community hall boards, the Recreational Technical Committee and sports groups. In the final
stages of the process, a community -wide Forum was hosted to present the plan and hear from
community and interest group representatives and residents about: i) what they liked, ii) anything
they couldn't live with and iii) suggestions to add, subtract and change.
B.2 The Search Conference
Agenda Item {AgendaNumber} {ItemDescription}
O n September 23, 2008, a Search Conference was hosted by the Township of Oro Medonte
to solicit input into the Strategic Facility Plan for culture, recreation, arts and library
facilities. Including the group leaders, most of who participated in the discussions, 71 delegates
attended from across the Municipality. Delegates represented a wide range of groups, leisure
interests, and service providers, as well as municipal and elected officials. The evening began
with a presentation of key context information about the project, the community, facilities and
trends in leisure. Through the process that was utilized, everyone was encouraged to provide
input into the three discussion topics, the results of which are integrated and summarized below.
For two of the topics, delegates were asked to `vote' on their top or favourite items that were
generated by their group.
Requested Types of Recreation, Culture and Arts Facilities
(including libraries)
Note: All delegates within each of the seven discussion groups were allowed to `vote' for their
top /favourite three facilities from the list generated by their group. Delegates were not allowed
to vote more than once per facility. The numbers in the `Score' column represent the number of
`votes' cast. When there are more than seven numbers in a sequence, it means that two or more
similar facility descriptions were combined into one generic facility description. Based on the
total scores, the facilities have been ranked as noted below.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 215
Page 242 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March, 2010
Requested Types of Recreation, Culture and Arts Facilities Figure 65
1 Rank 1 Score 1 Facility
1 6 +2 +4 +3 +1 +1 +4 21 Indoor aquatic facility (hot tub /sauna /salt water /large
viewing area)
2 1 2 +5 +3 +6 +1 +2 +1 +0 20 1 Arena /indoor ice pad(s) single or double
3 3 +6 +2 +2 +2 +3 +0 18 Community halls (multi purpose /local/small rooms for
euchre /indoor games room/modernize existing
halls /enlarge/handicap accessible /new halls /meeting
rooms /larger halls /community diner)
4 6 +3 +2 +2 +3 16 Program/meeting rooms (divisible /licensed/full
kitchen/dance floor /accessible /modern/multi- use /programs)
5 2 +2 +1 +4 +1 +2 +1 =13 Baseball diamonds (3 together for
tournaments /washrooms/hardball and softball/lighted /local
schools)
1 5 6 +4+ 3 13 1 Multi- purpose outdoor sports pads (local)
6 2+ 1 +2 +1 +1 +0 +2 9 Gymnasium divisible (floor -based exercise
programs/basketball /full size gym/ball hockey /programs
for kids and teens)
7 0 +2 +0 +1 +3 +0 +0 +1 +1 8 Fitness /wellness facility (squash courts /spa/indoor running
track)
7 2 +2 +0 +1 +3 8 Expanded multi -use trails (better
linked /walking/cycling /snowmobile /improved rail
trails /with equipment/ATV /local)
8 1 +0 +2 +2 +0 +2 7 Outdoor soccer fields /pitches (10 more in the south/ full
size)
8 1 +2 +0 +1 +2 +1 7 Library (mobile around the Township /shared
services /family research centre /arts)
9 1 1 +0 +2 +2 +1 6 1 Curling rink
10 2 +3 +0 5 Senior's Village (in centralized recreation area/older adult
social /older adult day programs)
10 1 3 +2 5 1 Event conference facility (kitchen/rental function)
11 2 +1 +0 +1 4 Non motorized trails (improved links /nature information
centre /shaded or sheltered)
11 1 0 +3 +1 4 1 Theatre (performance centre for music and the arts)
11 1 4 1 Outdoor skating rink (artificial and covered)
12 1 +2 3 Museum (general heritage interpretive
centre /storage /display space for artifacts)
12 0 +1 +0 3 Outdoor aquatic facility (pool /splash pads /in community
parks /associated washroom facilities)
12 3 Public market (farmer's /crafts)
13 2 Beach volleyball area
13 2 Leash -free dog park
1 13 0 +0 +1 +0 +1 2 Tennis court (outdoor)
1 13 2 Fairground improvement (heritage)
1 14 1 Emergency evacuation facilities
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 216
Page 243 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
14 0 +1 +0 1
14 1
14 1
14 1
14 1
14 1
15 0
15 0
15 0
15 0
15 0
15 0 +0
15 0
15 0
Agenda Item {AgendaNumber} (ItemDescription}
Bike lanes on township roads (paved cycle trails)
Cross country ski trails (public /groomed)
Paintball facility
Oro African Church interpretive centre
Virtual centre /library (computer center /web based)
More parks like Sweetwater (newest park just opened)
Outdoor lawn bowling
Outdoor basketball
Horseshoe pitches
Daycare (children)
Sidewalks (in residential areas)
Skateboard park (skateboarding)
Playgrounds
Outdoor vegetable garden
Response to the Following Concept for Providing Municipal Recreation, Arts
and Culture Facilities
The concept of providing public indoor and outdoor recreation and culture /arts facilities on two
levels is being explored.
Facilities that draw most of their use from the nearby area would be strategically located to
serve the various pockets of population throughout the Township.
Most facilities that draw regular use from across the Township and sometimes beyond would
be clustered into one principle location and possibly several secondary locations.
Clustering of major facilities would provide somewhat of a `one- stop- shopping' opportunity;
and would improve program offerings, significantly increase cost efficiencies, and greatly
improve the ability to attract out -of -town business for tournaments and events.
General Response to the Facility Provision Concept
Although all groups supported the concept of at least a two- tiered system of facility provision,
most suggested or alluded to some form of three tiered system. At the top of the three- tiered
system would be one (primary) major multi -use site that would contain high level indoor and
outdoor facilities that only need to be provided in one location within the Township. The second
tier of facilities would be intermediate in scale and strategically located in areas of the Township
where there are sufficient clusters of population. Two of the seven groups suggested that a
significant multi -use facility be provided in the northern portion of the Township (former
Medonte Township) in addition to a primary facility in the south. The third tier would comprise
close -to -home parks and smaller scale facilities located within individual clusters of residential
development. Most delegates implied that the community halls are third tier facilities, although
only eight residential areas have a municipally -owned hall, and two communities are served by
small, privately -owned halls that are similar in size to public halls.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 217
Page 244 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Primary Site
Every group offered comments about this level of site /facility as summarized below.
There was widespread understanding of the value of clustering types of facilities such as ball
diamonds, soccer fields and indoor ice surfaces.
There was also broad support for the concept of clustering a number of high level facilities
into one site (economy of scale /more cost effective to build and operate, one stop- shopping,
able to support a wider variety of programs and events and larger events, support
tournaments, bring communities together /global meeting place/blending of ages and social
backgrounds).
A number of points were made about the disadvantages of a larger facility (e.g., fewer will
volunteer to help manage and operate, further to travel for most residents, costly to operate a
large facility, increased limits on availability, expensive to build)
One group questioned the need for additional large -scale facilities.
Such a facility may be able support a partnership with the commercial sector (e.g., food
services)
If the facility is to be located adjacent the arena, better access is required from Highway 11.
Intermediate Sites /Facilities
A number of points were made about this in- between level of facility that would be suitable for a
municipality like Oro Medonte.
Ideal location for multi purpose sport pads
If an intermediate scale facility was located in the northern portion of the Township, this area
would be much better served.
Locate this scale of facility to serve several clusters of population and include some facilities
that are of a scale that is beyond what would be provided in a neighbourhood park.
One example of this level of facility would be to locate one to serve Warminster and Price's
Corners.
Close -to- home/Neighbourhood Facilities /Parks /Sites
The following points were made about this level of facility.
A common theme was the sense of community identity and togetherness that is supported,
especially by the eight public and three private community halls.
Another related theme was about pride of ownership and connection to the historical roots of
many communities.
Some delegates suggested that the existing halls be improved/upgraded and expanded to
support more programming /uses.
Some delegates suggested that more of this scale of facility be provided to serve individual
communities of residents.
It was noted that community -based indoor and outdoor facilities are better able to attract and
retain volunteers to help with booking and management, and thus reduce operating costs.
It was also noted that the local community has more influence over programming and use of
community halls compared to a larger facility that would be shared.
Every group noted the advantage of these facilities being closer to most residents, with some
people being able to walk or bicycle to these facilities.
Some people acknowledged that maintaining so many small facilities is more costly than
integrating some.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 218
Page 245 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Other concerns about community halls were raised, namely: limited hours of operation,
security, allocation of time, and dependence on volunteers.
Other comments about facility provision included:
The desirability of seeking out partnerships with the commercial sector and the school board,
although some noted drawbacks such as vulnerability, uncertainty and loss of control.
Facilities should be gender neutral (e.g., change rooms).
For all facilities, recognize the aging of the population and therefore, provide for all age
groups.
Don't forget about creative and performing arts facilities.
The various trail systems throughout the Township need to be better integrated, with the
further suggestion of being supported by a nature centre.
Although not specifically requested, several suggestions were offered under this topic (and
via Topic Three) about locations to consider for a major facility.
Line 7 and Highway 11 (Oro Centre)
Avoid Line 7 due to gravel pits and the airport
Coulson area (geographic centre of the Township)
Horseshoe Valley corridor (Line 8 to 10 and Line 4)
Guthrie
Edgar Adult Occupational Centre (Old Barrie Road and Line 4)
Criteria for Locating a Major Multi -Use Recreation, Arts and Culture
Facility in the Township of Oro Medonte
Note: All delegates within each of the seven discussion groups were allowed to `vote' for their
top /favourite three site selection criteria from the list generated by their group. Delegates were
not allowed to vote more than once per criteria. The numbers in the `Score' column represent
the number of `votes' cast. When there are more than seven numbers in a sequence, it means
that two or more similar criteria were combined into one generic criterion. Based on the total
scores, criteria have been ranked as noted below.
Location Criteria for a Multi -Use Recreation, Arts and Culture Facility Figure 66
Rank Score Criteria
1 6 +7 +6 +6 +4 +5 +3 +1+ Accessible and Visible (good roads /winter
6 +4 +6 +0 +1 +1 +1 +1 58 plowing /proximity to major roads /year round
access /proximity to highways /on a well travelled road/a
major artery/easy to find/ability to support good
signage /ability to promote facility/potential for public
transportation/connectivity to potential public transportation
and trails /safety/ease of winter travel/relates well to typical
traffic patterns).
2 4 +6 +5 +4 +3 +0 +3 25 Proximity to the most residents (closest to densest
population present and future development /consider future
development locations /closer to younger
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 219
Page 246 of 289
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
3 1 0 +3 +3 +8 +5 19
3 7 +0 +4 +1+ 7
4 9 +1 +1 +0 +1 12
5 3 +6 +2
6 4 +4 +2 10
7 2 +0 +0 +5 7
8 2 +1 3
9 1 +0 +1 2
9
10
10
10
10
10
11
1
Agenda Item {AgendaNumber} {ItemDescription}
population/research time travel from all parts of the
Township).
Central location (geographic).
A location that promotes partnership opportunities
(municipal/or commercial /Lakehead University and
Georgian College /viability for naming rights /public-
private).
Large enough to accommodate desired uses, including
parking and room for expansion.
Cost of the site and the feasibility to develop the site/
Township ownership of site.
A location that is not close to competing facilities in
neighboring municipalities (influence of
Barrie /Orillia/Midland and existing facilities /existing
commercial areas).
Environmental impact without environmental concerns
or impact (no contaminated land/eco friendly).
A natural setting (fit into community /natural resources
available for programming)
Should not negatively impact on adjacent residential
areas (minimize impact on neighbors /not in residential
area).
Proximity to existing recreation facilities and schools.
Reduce speed limit around facility.
Private ownership
Appropriate zoning
Location in relation to EMS (emergency access).
Sustainability
Existing services
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 220
Page 247 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Notes from the Community -wide Search Conference
Associated with the Township of Oro Medonte
Strategic Facility Plan
September 23, 2008
Question/Discussion Topic #1:
What types of recreation, culture and arts facilities (including
libraries) are needed in the Township?
The following is a listing by group of the suggestions for needed and/or improved facilities.
GROUP 1
of Dots
Indoor swimming pool with hot tub sauna 6
Meeting room facility with dividing panels licensed full kitchen dance floor 6
Small rooms for euchre community halls 3
Gym with dividing panels seniors exercise room 2
Dog park leash free 2
Baseball Diamonds (3 together for tournaments washroom facilities 2
Arena 2
Virtual Centre Library Computers Centre Website 1
Splash pads in community parks washroom facilities 1
Soccer facilities 1
Emergency evacuation facilities 1
Tennis court 0
Outdoor lawn bowling 0
Indoor games room 0
Horseshoe pitches 0
Bike lanes on township roads 0
Group 2
of Dots
Community Halls modernize enlarge handicap accessible 6
Indoor Ice pad 5
Outdoor all purpose pad 4
Modern meeting facilities accessible and modern 3
Indoor swimming pool (salt water) 2
Baseball Diamonds 2
Fairground improvement (heritage) 2
Trails no motorized use improved links 2
of Dots
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 221
Page 248 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Library (mobile around township) 1
Gym indoor (basketball) 1
Snowmobile ATV access trails 1
Soccer pitch (outdoor) 0
Curling rink 0
Sidewalks residential areas 0
Tennis courts 0
Indoor fitness facility squash courts 0
Theatre music arts 0
Group 3
of Dots
Indoor swimming pool including large viewing area) 4
Double pad ice rinks 3
Event conference facilities (with kitchen) 3
Library 2
Meeting facilities (accessible) 2
Gym 2
Soccer fields (10 more) south 2
Senior's village (in centralized recreation area) 2
Fitness centre 2
Beach volleyball area 2
Tennis court(s) 1
Trail nature information centre 1
Paintball facilities 1
Baseball diamonds 1
Trails 0
Curling rink 0
Skateboard park 0
Group 4
of Dots
Indoor ice surface 6
Softball field lighted 4
Outdoor rink covered artificial 4
Indoor swimming pool 3
Curling surface 2
Multi use rooms (meeting programs) kitchen facilities 2
Trails expanding linked walking cycling snowmobile 2
Soccer pitch 2
New community halls 2
Museum 1
Gymnasium full size 1
Paved cycle trail 1
Splash pad 0
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 222
Page 249 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte
Exercise room fitness centre
Cycle lanes on roads
Tennis court
Shared library services mobile
Agenda Item {AgendaNumber} {ItemDescription}
Group 5
of Dots
Public market (farmer's, crafts) 3
Performance live space (arts) theatre 3
Improved rail trails 2
General heritage interpretive centre storage /display space for artifacts 2
Meeting rooms community halls (improved) (larger) 2
Curling 2
Indoor skating 1
Ball parks (lit) 1
Groomed cross country ski trails public 1
More Sweetwater Parks (newest park just opened) 1
Indoor swimming pool 1
Tennis courts (outside) 1
Oro African Church interpretive centre 1
Library family research centre 1
Indoor gym 1
Daycare (children) 0
Squash courts 0
Indoor running track 0
Ball hockey 0
Group 6
March. 2010
0
0
0
0
of Dots
Older adult social 3
Meeting room 3
Outdoor pad (skate) 2
Library 2
Community dinner 2
Rental Functions 2
Ball diamond 2
Spa 1
Fitness 1
Wellness 1
Art Fac. 1
Indoor skating rink 1
Gym 1
Indoor swimming pool 1
Trails with equipment 0
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 223
Page 250 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Skateboarding 0
Playground room 0
Basketball outdoor 0
Garden (outdoor) veg. 0
Outdoor swimming pool 0
Soccer field 0
Older adult day programs 0
Group 7
of Dots
Multi- purpose pads (local) 6
Indoor swimming pool 4
Multi -use pads (local) 3
Multi -use trails (local) 3
Fitness facilities 3
Multi- purpose community halls (local) 3
Gym kids teens 2
Soccer fields full size 2
Baseball diamonds lit (local schools) 1
Library (arts) 1
Outdoor (shaded or sheltered) parks /trails natural 1
Curling club 1
Arena single pad 0
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 224
Page 251 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Question/Discussion Topic #2:
What do you think about the following concept for providing
facilities?
The concept of providing public indoor and outdoor recreation and culture /arts facilities on two
levels is being explored. Facilities that draw most of their use from the nearby area would
be strategically located to serve the various pockets of population throughout the Township.
Most facilities that draw regular use from across the Township and sometimes beyond would
be clustered into one principle location and possibly several secondary locations. Clustering of
major facilities would provide somewhat of a `one- stop- shopping' opportunity; and would
improve program offerings, significantly increase cost efficiencies, and greatly improve the
ability to attract out -of -town business for tournaments and events.
The following notes capture the essence of the discussion in each group.
GROUP 1
Smaller arenas and outdoor ice pads
Ease of access across Highway 11 better traffic flow
Primary at Guthrie, secondary in Medonte and tertiary in Community Halls
One major facility at Line 7 and Highway 11 (at the Oro Centre)
GROUP 2
Need two levels
Families use walk to parks
So spread out need two levels
Need to cluster things like ball diamonds
Two level system to accommodate more seniors
Ownership volunteers in small "local" facilities
Sharing Vulnerability
Two clusters 1 south 1 central
GROUP 3
Location Suggestions
Coulson
Horseshoe Valley Corridor
Avoid Line 7 (gravel pits
airport)
Line 8 to 10 at Horseshoe
Valley Road
Guthrie
Cluster together swimming pool, ice rink, gymnasium, fitness centre, and multiple soccer
fields/ball diamonds.
Allow for tournament play
Nature centre (major starting point) of trails system
Trail network (throughout township)
Meeting area
Multi- purpose facilities
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 225
Page 252 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Event centre
Senior's facility
Library
Must have multiple uses (including commercial facilities) (including the provision of
food services)
Viability for partnerships
Neiehbourhood Facilities
Support existing halls by adding new facilities to existing sites
Support small scale neighbourhood facilities
Both levels important
Mai or Facilities
Should be centrally located
Cluster large facilities
Work with private sector (Horseshoe)
Accessible
Affordability
Agenda Item {AgendaNumber} {ItemDescription}
GROUP 4
GROUPS
Large facilities need to be accessible (fairly) (geo.)
More smaller (transport accessibility) community -based simple
Large facilities financial benefits (Capital operational) (one stop shop)
Need both (small community no driving needed) (large cost efficiencies)
Small keeps local communities united Warminster vs. Oro Station
Need both utilize our existing halls more
Multiuse blending of social ages in one stop
Communities have personal value! Should be preserved rural neighbourhoods
Opportunity to group by area/region (Warminster Price's Corners)
Facilities should be gender neutral preference should not be given to one gender over
another (change rooms in current arena are not suitable for girls)
GROUP 6
Nearby neighbourhood clustered
Research how smaller ones are doing. Arena is at its capacity. Will big centre get used?
Population age: older. Partnership with private
Opinions: pro smaller neighbourhood
Smaller halls very important community feeling
Smaller halls need improvement
Distance of travelling
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 226
Page 253 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
All pro small concept more affordable
Cl Bigger events toward arenas two tier facility
Clustering: negative: upkeep accessibility availability?
Volunteers? For bigger centre?
Cost factor larger centre
Local facilities to serve pockets of populations throughout the township
Clustered facilities larger facilities to serve greater pockets of the township
Major multi -use facility designed to serve the entire township
Positives for Neighbourhood Facilities
Close to home
Available convenient
Walk to active transport
Local neighbours meet greet
Influence (local)
More volunteer involvement
Enriches community
Pride of ownership
Partnership with existing facilities (schools)
Negatives for Neighbourhood Facilities
Expense to develop many local facilities
Hours of operation
Security
Who gets what?
Depends on volunteers
GROUP 7
Positives for a Clustered Facility
Bring communities together
Meeting place (global)
Larger number of people more skill
sets to offer
Cost effective
Negatives for a Clustered Facility
Driving distance time
Less neighbourhood feeling
Positives for a Multi -use Facility
Facility options
Expense
Display art cultural works
Theatre site
Negatives for a Multi -use Facility
Cost to build
Accessibility
Focus on recreation (arts /culture
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 227
Page 254 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Question/Discussion Topic #3:
What are important considerations when deciding where to locate a
major multi -use facility?
GROUP 1
of dots
Accessibility 6
Good signage 6
Visible on well travelled road (major artery) 4
Cost feasibility 3
Without environmental concerns 2
Private Ownership 1
Safety ease of winter travel 1
Reduced speed limit around facility 1
GROUP 2
of dots
Accessibility roads winter plowing 7
Public Private partnership 7
Cost 6
Population growth area 4
Facilities close by in other municipalities 4
Sustainability future 1
Room for expansion 1
Ability to promote 0
Existing services water sewers 0
GROUP 3
of dots
Adequate parking 9
Good accessible roads 6
Close to population density (most of people) growth area present/future 6
Influence of Barrie Orillia Midland and existing facilities 4
Viability for partnerships (naming rights) visible 1
Central location 0
Easy to find 0
Big enough facility to accommodate users 0
Room for expansion 0
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 228
Page 255 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
GROUP 4
of dots
Partnerships municipal or commercial 7
Easy access good roads 6
Proximity to major roads 4
Centrally located population 4
Centrally located geographically 3
Research time travel 3
Existing commercial areas 2
Should not interfere with existing lifestyles 1
Near schools boundaries 0
Criteria
General: easy access wheelchair access
More room to grow septic (services)
GROUPS
of dots
Major road access 5
Near major population centres centralize (proximity) 5
Central location 3
Accessible year round 3
Consider future development locations 3
Natural setting fit into community 2
If Oro Medonte township already owns land 2
Public transportation 1
Consider natural resources for programming 1
Safe access from roads (traffic patterns) 1
Appropriate zoning for land 1
Minimize impact on neighbours 0
No contaminated land 0
Location in relation to EMS 0
Environmental impacts 0
Locate closer to younger population 0
Opportunity to partner with others i.e. Lakehead, Georgian, etc. 0
GROUP 6
Guthrie (fix road) Central Hwy 11/ pop density rentals more
Visible more chance for a private partnership
Edgar Adult Occupational Centre
Main road: Highway 11
Horseshoe Valley Road Line 4
Horseshoe Valley Road Line 7
of dots
7
6
5
2
1
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 229
Page 256 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Parking visible population density
Banquet facilities emergency access
Food services accommodation not in residential area
GROUP 7
of dots
Accessibility to all (proximity) 8
Proximity to highways 6
Central location 5
"Eco" friendly 5
Partnerships 4
Connectivity to trails active transportation 1
Near existing facilities 1
B.3 Focus Group Workshops
Community Hall Boards
On October 27, 2008, 14 representatives of the community hall board met to hear about the
project and to provide information about how each of their hall was being used, as well as issues
facing each of the hall boards. The information has been integrated into the report, particularly
in Section 4.4.
Minor Hockey
A meeting was hosted for minor hockey to provide information about population trends, and to
hear about needs and issues. The Oro Minor Hockey Association indicated that registration had
recently declined from around 500 to approximately 350, which is in line with the declining
population of the age 4 -17 market. However, the amount of ice time rented by the association
has increased by 16% over the past three years. They indicated that they could likely utilize
another 20 hours of prime time per week to support one full practice /week for local teams, two
full practices /week for representative teams, offer an ongoing power skating and skills program,
and more tournaments. That would total about 640 additional hours of prime time per season.
B.4 The Community and Recreation Group Survey
A two -page survey was sent to close to two hundred recreation/culture /arts user groups,
community groups, stakeholder organizations and institutions in the Township and surrounding
area that may have some interest in the preparation of this leisure facilities strategy. The survey
was also sent to the parks and recreation departments in the surrounding communities. Forty
three surveys were completed.
Information was gathered about each organization (e.g., purpose, membership profile,
participation information and trends, future expectations). Questions were asked about facilities
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 230
Page 257 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
used and their adequacy, the group's ability to meet the current demand for their program, their
facility requirements, suggestions for indoor and outdoor facilities that could be part of a
township -wide recreation complex, suggestions for culture and recreation facilities that should be
located elsewhere in the township, and ways that their group could help to fundraise for a major
complex.
Some of this information has been integrated into specific sections of the report, particularly
under facility analysis in Chapter Four. Suggestions for indoor and outdoor facilities to be
considered for the proposed major multi -use recreation complex, as well as suggestions for
facilities to be located elsewhere in the township are summarized below.
Suggestions for Indoor Facilities in a Major Multi -use Recreation Complex Figure 67
1 Frequency 1 Facility /Component
18 Large, divisible multi purpose room carpet bowling, archery, banquets, fitness,
conferences, music, card games, pre school program, dance classes, shuffleboard
16 Another ice pad
14 Indoor swimming pool
12 Gymnasium
8 Meeting rooms
8 Fitness centre
6 Curling rink
5 Indoor soccer
5 Library
4 Walking/running track
2 Indoor tennis
2 Performance facility
1 Rock climbing wall
1 Small ice pad for development of goalies, shooting practice, individualized figure
skating practice
1 Handball courts
1 Seniors room
1 Sports hall of fame
1 Storage space for user groups
1 Dedicated change room for females
1 One more family washroom than at the arena
1 Sports equipment shop, skate sharpening
1 Snack bar
1 Ensure entire facility is accessible for physically challenged customers
1 Additional parking
1 Ensure the facility is accessible for mobility challenged
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 231
Page 258 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Suggestions for Outdoor Facilities on the 85 Acre Site that Houses
the Oro Medonte Community Arena, Banquet Hall and Ball Diamonds Figure 68
1 Frequency Facility
1 15 Soccer fields
1 8 Ball diamonds a third diamond to support tournaments
6 Tennis courts
4 Outdoor rink, one suggestion for covered surface, able to be serviced by Zambonie
4 Lawn bowling green
3 Ball hockey rink
2 Outdoor swimming pool, wading pool
2 Lacrosse bowl
2 Skateboard facility
2 Outdoor track (around a sports field)
2 Multi -use sports pad
2 Basketball court
1 Area to support summer day camp
1 Picnic area
1 Outdoor area for fitness training
1 Ability to support summer sports camp
1 Shuffleboard court
1 Mini golf
1 Open unstructured area
1 Playground
1 Covered gazebo
1 Concert venue
1 Rollerblade area
1 Rugby field
1 Multipurpose sports field
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 232
Page 259 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Suggestions for the Provision of Culture and Recreation
Facilities to be Located Elsewhere in the Township Figure 69
1 Frequency 1 Suggestions
7 Arena and indoor swimming pool in Horseshoe Valley area around the Line 4
North and Horseshoe Valley Road
Arena and multi -use building in the Horseshoe corridor
Closer to the middle of the Township Horseshoe area
Horseshoe Valley Road is a `magic line' for residents from the south travelling
north, while people from the north will travel south of this point therefore a
central location in this area seems appropriate
Sugarbush/Cathedral Pines /Line 4 Park
Craighurst area
Major recreation centre should be located in Craighurst (accessible for all
residents current arena is not accessible to many residents)
7 Upgrade community halls, especially to support winter programs
Have more facilities spread around the Township
Prefer neighbourhood -based decentralized facilities
Not supportive of the concept of a major facility at Guthrie prefer smaller
facilities spread around the Township
Unstructured facilities for teens, families and seniors decentralized, low
maintenance (beach volleyball, tetherball, soccer fields)
Could better develop the land around the Hawkestone Community Hall for
outdoor use
5 A facility closer to the northern part of the Township
Residents from Warminster and the north end of the township will travel to
Orillia before they will use a facility in Guthrie.
5 Upgrade many existing facilities (e.g., band shell at the park Oro Memorial
Park
Upgrade Vasey Park (water well, new lights on main ball diamond, upgrade
small ball diamond, irrigation of main ball diamond)
Better playground equipment in Warminster Park
3 Tennis courts
Adequate public tennis facility, ideally in a central location more than one
court possibly covered for winter use
Improve tennis court in Barrillia Park, expand to two courts (this is the only
court in Oro)
3 Current location of the arena at Guthrie is adequate
Guthrie site is best for large scale facilities, with extensive parking and room to
expand
3 More trails and bike lanes partner with others
Outdoor centre to tie into hiking trails
2 Outdoor rink
Outdoor rink in Warminster
1 1 1 Soccer fields
1 1 1 Lawn bowling
1 1 1 Beach volleyball
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 233
Page 260 of 289
B.5 Submissions and Briefs
Other local facilities
soccer field
tether ball
beach volleyball
skateboard facility
shuffleboard court
trails
additional tennis courts
upgrade, double and fence the tennis facility at Barrillia Park
Township -wide Facilities
trails in public open space areas better linked together
5 -6 foot wide bike lanes located along appropriate country roads
indoor swimming pool
lit multiple tennis courts with club house
gymnasia for court sports
facility for indoor soccer
indoor tennis
twin pad ice rink
indoor running track
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
1 1 1 Summer camp at Oro Memorial Park
1 Expand the Ian Beard Centre (meeting space for Scouts, Guides, nursery school,
exercise programs, arts /craft classes)
1 1 1 Develop Line 4 Park
1 No active facilities in Bidwell Road community (consider: sports field for soccer
and football, ball diamond, outdoor ice rink)
1 Craighurst Hall is poor should reconsider its existence (cold in winter, too close
to a busy road, inadequate parking, dangerous for children)
1 1 1 Ensure that all facilities are accessible for the mobility challenged
1 1 1 Ensure adequate parking at remote sites
I n addition to the surveys and the delegates who attended the Search Conference and the focus
group workshops, five submissions were received from individuals and one was sent by 111
residents of Simcoe Estates. The following summarizes the collective responses.
Simcoe Estates
playground equipment
walking trails with benches
an open, level grassed area or a soccer field
outdoor ice rink
create a park that could be shared with the emerging Craighurst development
reconsider the value of Craighurst Hall (too small, dangerously close to the highway, old)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 234
1
Page 261 of 289
B.6 The Community Forum
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro- Medonte March. 2010
O n April 21, 2009, 67 delegates assembled at Warminster Elementary School to provide final
input into the Strategic Facility Plan. Registration information indicated that the entire
Township was represented along with a wide variety of recreation and other key groups. An
overview of the strategy was presented and then the delegates, who were assigned to seven
facilitated groups, discussed three questions. An overview /summary of what was provided by
each of the groups for each of the questions is provided below. The detailed notes follow the
summaries.
What do You Most Like about the Strategy?
Although not everyone agreed with the following comments (as illustrated by the responses to
questions two and three), they represent what was reported in the group discussions.
Thoroughly researched and comprehensive
Inclusive and balanced recognizes diversity even includes `culture and heritage'
Retains the sense of community like the concept of `communities within a community'
Provides vision we have a comprehensive plan for now and the future
The concept of clustering and consolidation of community halls and other facilities and
building new, larger community halls
The concept of a township -scale multi -use recreation centre at the Guthrie site inclusive of
indoor and outdoor facilities
Partnerships
Updating of some facilities (ball diamonds, soccer fields, community halls)
The incremental approach to implementation
Shanty Bay to finally get a community room
The concept of linking the trail systems
Responded to what we discussed at the Search Conference
Is There Anything in the Strategy that You Can't Live With?
About a third of the delegates indicated that they wanted to see a second ice pad sooner than
`ten years from now'.
Not everyone liked the concept of a township -wide multi -use recreation centre located at the
Guthrie site too far from the northern parts of the Township should be geographically
more central and nearer to the largest concentration of population
Not everyone liked the concept of closing some of the community halls and consolidating
into larger halls that would serve a larger area.
Some felt that the cost estimates to maintain the community halls as accessible and safe
public use facilities are on the high side.
Some saw that servicing the northern-most communities would be difficult especially
through consolidation of community halls
Arts and culture should be better represented
Not everyone liked the philosophy of depending on neighbouring communities for many
types of culture and recreation facilities, programs and events.
A curling rink should be given more consideration.
Some were concerned that the public school board cannot be trusted as a potential partner.
Craighurst is `separate' from Horseshoe Valley and Sugarbush communities.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 235
Page 262 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan, Township of Oro- Medonte March. 2010
Concerned about light pollution and traffic from an expanded facility at the Guthrie site.
Is There Anything that You would Like to Add, Subtract or Change?
The comments below represent the suggestions most often mentioned. Not included are any
suggestions that are already covered in the Strategy. Many comments, which are not noted in the
overview below, were only made by one person. Please see the detailed notes following the
summary.
Increase the priority for a second ice pad.
Renew the library agreement with Severn Township (Coldwater library)
Increase the priority for a curling rink.
Improve the opportunity for groups to network.
Through new /expanded facilities, increase the emphasis on arts and culture.
Don't want to lose the `community' focus and availability of facilities.
Consider a more geographically central location for major facilities.
Re- examine the cost estimates regarding the community hall condition assessments.
Consider an indoor aquatic facility, likely through a partnership arrangement.
Topic /Question One: What do You Most Like about the Strategy?
The symbols on the right -hand side of the page indicate that more than one person noted a
particular point /idea /suggestion.
Group 1
See Township as one. Include all
Retain sense of community while considering future build strong community
Partnerships across the community
Keep what you have and build what is needed soccer
Balance
Large central not MURF
No library
Linking Trails nature trails
Community clustering El
Use gyms schools
Group 2
Expansion of the Lions Sport field
New Multi Function Facility
Having the overall plan (Vision)
Clustering the Halls Facilities
No surprises
Replace Arena (more user friendly)
Using road access easy access (5 Line)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 236
Page 263 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Group 3
Partnerships
Use of existing facilities
Touches on what we knew was coming
Rink 2 pads
Swimming Pool
Residents can stay in our community
Agree with updating ball diamonds
Highlight of outdoor trails, etc.
Set up of registry for facility rental centralized
Registration
Know what facilities are available
Will help with communication in the
community
Localized source of community halls
Agenda Item {AgendaNumber} {ItemDescription}
Group 4
Cluster of the recreation facilities area around Guthrie site and using the land that has
already been donated H L
In addition to the cluster, the idea of the roads being cleared of snow in that area
(24 hr /round the clock) especially winter
Heritage has to be considered (and is!)
I like the idea of the clustering of community halls, especially giving a meeting
hall back to Shanty Bay
I like the idea of another baseball and a soccer pitch
I like the idea of newer facilities in other Oro communities
I like the idea of linking the trails and pathways
I like the idea of adding a partnership with the other public or private areas
Group 5
Guthrie site developed
Looking at the whole Township
Multi— purpose facility
Community within community serviced
Good planning
Changes over number of years
Working old groups and new groups
Partnerships with other communities
Partners with other groups on fund raising
Curling in picture for older people
Realize that some facilities should be closed
Soccer facilities included
Financial plan
El El LI L
LLLL
LL
LL
n❑
LL
LL
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 237
Page 264 of 289
Agenda Item {AgendaNumber} (ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Group 6
Information value
Consolidation of facilities
Building on municipally -owned land
Research thorough and concise. Comprehensive
Recreation, arts, heritage, library comprehensive
Explanation re: vastness, size, population lack of services in smaller areas
Guthrie plan is more of a complete plan
Clustering of communities and building of new, larger community halls
Joining of the trail systems
Group 7
Community level
Upgrading of recreation throughout
Multi -use of Guthrie site
Depth of plan recognition of diversity
Difficult to form partnerships today
Group 8
Overall approval
(Now) Guthrie
Guthrie entry off Line 5
saved by retiring existing facilities options (responsible)
Demographics -based "cluster" approach
Twin pad option
Trails connected
Partnership private Barrie /Orillia
Potential aquatics, fitness
Consultant recommendations and presentation
Topic /Question Two: Is There Anything in the Strategy that You Can't Live With?
The symbols on the right -hand side of the page indicate that more than one person noted a
particular point /idea /suggestion.
Group 2
Closing Warminster Hall (location of new cluster hall /facility)
Over inflated costs to repair halls
Group 1
Only one ice surface
Relying on other municipalities' time frame
Too much at Guthrie
If closing a hall, ensure there is something for those residents within the
cluster (i.e., if close Carley, provide something else in that cluster)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 238
Page 265 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Difficulty servicing (northern) communities
each community treasures own area
cannot cross boundaries for support/clustering
don't understand Oro Medonte (how it works)
Group 3
Not having arts and culture as well represented in the plan drama
Group 4
Single pad arena; double pad is needed; I don't think they've looked at more
than just Oro Minor Hockey
I don't like the idea to have to share /rely on another area (like arena, library,
etc. concern is we would be the first to get dumped)
Concerned that our demographic calculation may be wrong. .believe that
seniors will be moving out so provide some things to /for the youth
Location of the arena /multi purpose area if the main population will be in
Horseshoe perhaps that should be a location
Group 5
Cost of repairs of halls seem out of line
Don't want to shut down halls
Don't want everything in Guthrie and not in other areas
Want another or second ice pad
Lack of development in Warminster area (soccer park)
Trail develop for snowmobiles
That young families leave to other areas because of lack of facilities
Curling should be public not private partnership facility (more curling)
Curling too low on priority list
nri
n
IEF]
Group 6
Smaller community's needs are being met playing fields, rinks, etc
Investment needs to be made
Cognizant that centralization is good for large investment only e.g.,: Guthrie Arena
Non Oro Medonte residents be given priority e.g.,: ice scheduling
Only one ice surface in existence now and only one being proposed
Can't live with the Warminster Hall sitting empty and unused
Without a link between community hall programming co- ordinated programming between
halls
Without co- ordination of facilities between Boards of Education and the Municipality
Inflexibility of School Board
Group 7
Lack of second ice pad mi ri n
Size of consolidation/loss of local community
Craighurst separate from Horseshoe /Sugarbush
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 239
Page 266 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Group 8
Bigger picture surrounding townships
Only one ice pad
Don't refurbish old arena
Traffic light pollution from Guthrie complex for "local" residents
Carley Hall herital?e facility impact?
Prioritize facilities next step?
Community Hall clusters what does it mean? Where do they go? etc.
Community Hall fees? Girl Guides, etc.
Group 3
Keep facilities within the communities gives kids something to do
Design facility to have arts culture space that will not be disrupted by sports
Plan focuses on sports
Want more emphasis on arts culture
School board agreement has not worked in the past, not willing to work with
Municipality
Work with community partners who have interest of residents in mind
are very community based
n [in❑
Topic /Question Three: Is There Anything That You Would Like to Add, Subtract or
Change?
The symbols on the right -hand side of the page indicate that more than one person noted a
particular point /idea /suggestion.
Group 1
Promote area facilities to draw new residents
Renew library agreement with Coldwater ri
More consideration for developments in surrounding communities
How it impacts partnership opportunities
i.e. if Coldwater rink were to be closed could Oro Medonte partner with Severn
If partnerships with schools, ensure the community has fair /reasonable access guaranteed
Fair /reasonable rates
Borrow from other's facility design rather than design from scratch
i.e. Victoria Harbour or Wyebridge
Establish a networking opportunity for all the groups who might work together funding,
connections
Group 2
Add community hall in Horseshoe Valley Area (in the area of the OPP /Fire Hall) Cl
Review of costs /repairs (in kind work/volunteers)
Carley Hall kept as a Heritage Bldg prefer as a community hall
Tennis Courts
Indoor Pool (through a partnership)
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 240
Page 267 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan, Township of Oro Medonte March, 2010
Hope to keep volunteers in the plan and keep volunteers in the community
Aging population will have grandchildren include them in the plan
Look more at expansion of surrounding cities with relation to Horseshoe (Valley)
corridor Barrie rapidly growing consider growth to Oro Medonte in ability to
expand facilities
Communities will evolve age demographics of population may change /shift and younger
families will move into community
Tourists looking for activities in our community other than Horseshoe Valley athletic
families coming in to use commercial facilities (ski resorts)
Attraction of tournaments and additional activities to the new facilities
Don't want to lose community emphasis for facilities Oro Minor Hockey, Oro 77s, Skating
Club, etc.
Double ice pad to ensure meet the need of community sports
Keep smaller clusters facilities
Consider other sites, lots of additional land from a community perspective, it's not just
about population
Guthrie site not central for all residents Horseshoe, Vasey, north end
tough access from some areas in the township
current arena site gets use from Barrie Orillia groups additional revenues
with day time use
Ensure space is shared equally by all user groups
entrances, noise
think about future uses of buildings, things going on inside outside
Group 4
Change I'd go with a double pad
Change Consideration for the placement of the pad at Horseshoe area (to
partner with the Horseshoe Valley Resort area similar to Nottawasaga)
Change If we cluster around one area, Guthrie multi -use, other areas will
have to drive
Change Put it in Coulson at the geographical centre of the Township
Halls have to have space /areas to have a play /soccer area
If you build a double pad, market it as a place to rent (it's being proposed
for the halls, so it should be for the pad)
Group 5
Add curling
Add ball hockey use in summer
Add second ice surface
Add playground equipment to small parks
Change estimates of hall maintenance and repair
Improve Memorial Park
Subtract pool because of high maintenance
❑n❑
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 241
Page 268 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March, 2010
Group 6
More financial information regarding comparison spending of other
Municipality's recreation budgets
Another ice pad
Fitness facility and gymnasium as a higher priority
4 Line Park is excluded from report
Recreation facilitator to co- ordinate communication to market programs and avoid
duplication
Group 7
Add second ice surface
Add detailed cost study earning of 2 pads
Volunteer resource assessment over 20 years
Draw non traditional people into participating /volunteering in traditional events
(e.g., Fair, Heritage day, etc.)
Group 8
Curling
"Merging" plan with surrounding municipalities
Public emergency access facilities?
Waterfront recreation boat ramps Shanty Bay, 9 Line, Carthew Bay, Bass Lake parking?
Solar panels energy conservation (back -up power Strategies?
Aquatic facility partnerships?
Cost to build new "regional halls" (cost analysis)
Total cost refurbish to fire safety standards
Road enhancements to support facilities
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 242
Page 269 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshiu of Oro Medonte March. 2010
Appendix C:
Future Demand for Leisure Services and Other Key
Trends
C.1 Anticipated Population Growth and Change, and Other Trends
Impacting Demand for Leisure in Oro Medonte
C lues about the likely future demand for leisure services can be gleaned by applying
provincial generic leisure and related trends to the unique characteristics and size of the
current and anticipated future population of the Township.
As reported in Section 4.2, the current profile of the community provides important clues about
leisure activity interests and participation tendencies. The unique profile of Oro Medonte
residents suggests above average interest in individual rather than group activities; fitness and
holistic wellness; swimming; sailing and other types of boating; arts and culture, including fine
arts, performing arts, and museums; outdoor and nature- oriented activities such as bicycling,
walking for pleasure and exercise, hiking, tennis, cross country skiing and bird watching; and
higher priced pursuits such as alpine skiing and golf. The large percentage of the permanent
population that is required to commute on a daily basis will impact on the ability of children to
participate in weekday evening activities outside of the home. The existing pattern of
concentrating soccer and ball programs into one or two nights per week reflects this constraint.
The age specific population projections completed for this strategy paint a picture of a
community that will grow slowly for the next few years and then growth is expected to
accelerate to above average rates through 2031. The projected 2031 population is 28,100, an
increase of 8,069 from 2006. It is anticipated that the community will maintain a median age
that is considerably above the provincial average, with above average income and above average
attainment levels for education. It is anticipated that a large proportion of the working
population will continue to commute out of the community for work, and the population will not
become very ethnically diverse. The proportion of the population that is retired and permanently
living in the Township should continue to increase.
The projection suggested that there will be far fewer children and youth available to participate
in all sports and leisure activities over the next 15 years. A key group is the age 4 -12
demographic, which is the sector of the population that participates the most in sports and other
leisure activities. This group is projected to decline by around 18% by 2016 and then slowly
increase in number back to 2006 levels, but not until around 2026.
Although the number of 18 -54 year olds available to participate in adult sports is projected to
decline by 5 -6% or 550 -600 by around 2021 before rebounding back to 2006 levels by 2027, the
age 18 -34 sub -group is projected to steadily increase by about 1,000 or 26% by 2031, thanks to
the aging Echo generation. Growth in this age group would be even larger, if not for the above
average out migration of late teens and early to mid twenty year olds. This continuing out
migration is muting the potential for increasing demand for leisure activities of interest to this
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 243
Page 270 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
young adult market (e.g., hockey, tennis, cycling, fitness programs, soccer, slow -pitch baseball,
etc.) and the pattern is not anticipated to change until more significantly lower cost housing
becomes available and local employment opportunities improve.
As reported in Section 2.5, with the aging of the Baby Boom generation and the likelihood of
most new residents being middle age or young seniors, the middle age and older adult markets
are projected to increase, as will the demand for all of the activities of interest to the adult
market. By 2031, the Baby Boom generation will be age 66 -85 and is projected to represent
27% of the total population. The adult market age 20 -84 is projected to increase steadily from
13,240 in 2001 and 14,864 in 2006 to 21,372 by 2031 (an increase of 6,508 or 43.8% since 2006,
with most of the increase in the older ages groups). This age group is projected to also increase
as a percentage of the total population from 72.3% in 2001 to peak at 78.3% by around 2021, and
then slowly decline to 76.1% by 2031, as the Baby Boom generation gradually ages into the
older years of the adult market.
Between 2006 and 3031, the 55+ age group is projected to increase by 6,745 or 123% (from
5,469 to 12,214). The increase in the proportion of the population for this age group is projected
to be from 27.3% in 2006, peak at 43.6% in 2026 and decline slightly to 43.5% by 2031. As
noted above, the 65+ market is projected to increase by over 6,000 or 225% between 2006 and
2031.
In 2010, the Echo generation is age 16 -31. Being much larger that the generation that preceded
it (and is following it), this generation has increased the demand for traditional sports and
recreation activities and facilities over the past two decades. However, by 2012, the Echo
generation will have aged completely out of their child and youth years. The child and youth
market will likely reach their lowest numbers by around 2016. Consequently, the demand for the
traditional sports and recreation activities for which this age group is the principle customer,
should not increase and may, in fact decline over the next 15 -20 years. Therefore, demand from
this age group should be at its lowest point in five to eight years.
At the same time, the young, middle and older adult markets will continue to place increasing
demands on leisure services over the next 20 -25 years. The demand for the types of leisure
activities of interest to this active adult age group is expected to increase somewhat over current
levels, especially as the Echo generation joins the Baby Boomers in this large adult age
demographic. Both the Baby Boom and Echo generations (as well as the much smaller 32 -44
age generation that bridges both) grew up participating at higher levels and in a wider array of
activities than the parents of the Baby Boom. And although most of the Baby Boom generation
has been busy raising their families, they have continued to participate in greater numbers in
more activities than any previous adult generation leisure activities from sports and fitness to
the arts, and walking and cycling. As this big generation continues to age and is followed by
their offspring into adulthood, it is expected that interest and participation levels will remain
high, but demand will gradually shift from very active to less physically demanding activities for
the mid -life market. And, interest in activities that provide health benefits will become
increasingly popular and people will be willing to invest more time and money in these activities.
Over the next twenty years, demand is expected to increase by two to three -fold for the types of
leisure pursuits that will be of interest to the future generation of older adults. It is anticipated
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 244
Page 271 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
that this generation, with their `Baby Boom' values and life -long leisure and learning interests,
will want to participate in a much wider variety of high quality, individualistic and group
activities than their predecessors. It is also anticipated that most of at least the younger of this
older adult market will not want to join traditional `seniors' clubs or utilize `seniors -only'
facilities.
C.2 Other Societal Trends
O ther societal trends are combining with the gradual aging of the population to influence
choices and participation in leisure. Chief among them are:
shifting personal and societal values, attitudes and issues;
economic factors and cycles;
increasing participation by females;
increased understanding of the personal, social, economic and environmental benefits of
parks and recreation;
an increasingly time stressed society;
increasing disparity between rich and poor;
more aggressive public user -pay policies;
increasing ethnic diversity and the increasing proportion of the population that is foreign
born;
an increasingly better educated population;
changing work and workplace patterns;
an increasing less fit population;
the environmental imperative;
social malaise and the prevention paradigm;
the decline of institutions; and
the crisis in traditional leadership.
C.3 Gradual Shifts in Leisure Interests are Taking Place Along the
Following Lines
Interest will gradually become less and may even decline for:
many team sports and large group activities;
many rugged, strenuous activities;
activities with a fitness -only focus (as opposed to holistic wellness);
formal, highly structured or directed pursuits (e.g., highly organized and scheduled
programs);
consumptive activities (e.g., hockey in summer);
indoor pursuits (other than home); and
activities that provide a limited range of benefits (personal, social, economic, environmental).
At the same time, interest will gradually increase for the following:
gentler, more passive activities;
individualistic, self directed, self scheduled pursuits;
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 245
Page 272 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
activities that support flexibility and convenience;
pursuits that provide a cultural experience;
casual, informal pursuits and activities that take less time;
team and personal sports for women and girls;
home oriented pursuits;
experiences that provide for learning and personal enrichment;
higher quality, higher levels of service and more comfort;
outdoor activities;
environmentally friendly facilities and programs;
pursuits that are self fulfilling and provide a wide range of benefits, particularly to
individuals and families;
activities /facilities that focus on holistic wellness mental and physical well- being; and
pursuits that are more economical and provide good value.
Increasing Demand for Non -Prime Time
With the aging of the Baby Boom generation, more people will be available to participate in
what used to be considered off -peak times and in the winter, spring and fall seasons.
Increasing Child and Youth Obesity
With increasing levels of child and youth inactivity and associated low fitness levels, obesity and
health issues the need to increase physical activity and fitness levels for this age group is
critical. Increased participation in physical recreation activities by a much greater proportion of
this age group will greatly contribute to improved health and lower health care costs as children
and youth become adults. The value of municipal recreation programs is increasing and essential
as the overall need for physical activity increases, and physical education and activity associated
with the everyday life of children and youth and school programs declines. Therefore, one could
argue that the municipal sector has an obligation to provide increased opportunities for access by
youth to facilities and programs that increase fitness levels.
The Need for Subsidies among Older Adults will Decline
The age 50 plus market controls over half of the personal wealth in Canada, so the need for
subsidies for this generation will continue to decline.
C.4 Application of Generic Trends to the Oro Medonte Market
ince the age profile of Oro Medonte is currently much older than Ontario as a whole and a
similar aging of the population is expected to continue, the upward and downward
generic /provincial leisure trends will be more pronounced. Additional influences will come from
the above average income and education levels of the population, as well as the low level of
ethnic diversity.
Therefore, it is expected that demand for most (if not all) of the following types of activities
should stabilize or decline in the Oro Medonte area over the next ten to twenty years. For some
activities, the downward trend has already begun.
most arena activities especially minor hockey and figure skating as the Echo generation
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 246
Page 273 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
ages into their young adult years, and eventually older adult hockey as the Baby Boom
generation ages however, there should continue to be an increase in girls hockey until the
participation rate peaks (but the numbers will be relatively small compared to the decline in
child and youth male participation) and there should be an increase in young adult hockey
as the Echo generation ages into their young adult years but their participation rate will be
lower than for minor hockey,
hardball,
child and youth softball
children's camps (except for specialty camps),
Scouting and Guiding,
swimming lessons for children,
badminton,
volleyball,
basketball,
mountain biking,
long distance bicycling,
water skiing,
tobogganing,
snowmobiling (unless the sport can find ways to retain enough of the aging market through
sled design and other attractions),
hunting,
attending sporting events (except for horse racing which will be driven by the growing
appetite for gambling),
watching sporting events on TV, and
volunteering (the Baby Boom generation is less likely to participate in the way that the
current older adult market has, and they could participate less than when they were younger
future participation in volunteering will be most influenced by the application of improved
engagement and retention techniques).
Demand for some activities and programs that have not traditionally been offered, as well as
other activities and programs that are currently provided will increase a good deal as the adult
population increases and continues to age.
It is predicted that the following types of activities will see a gradual to dramatic upswing in
demand over the next twenty years. The increase in demand for these activities in Oro Medonte
should exceed the norm, if there are appropriate facilities to support each activity.
nature appreciation/nature study activities, orienteering/adventure travel and eco- tourism,
gardening,
visiting botanical/display gardens and related facilities,
reading,
Cl walking, hiking and backpacking,
tennis (although the trend has been down for a decade or two, if the Echo generation is
encouraged to take up tennis and facilities are provided and promoted, demand could grow),
racquetball (although the trend has been down for a decade or two, if the Echo generation is
encouraged to take up racquetball and facilities are provided and promoted, demand could
grow),
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 247
Page 274 of 289
DRAFT REPORT Strategic Facility Plan, Townshin of Oro Medonte March. 2010
Agenda Item {AgendaNumber} {ItemDescription}
squash (although the trend has been down for a decade or two, if the Echo generation is
encouraged to take up squash, demand could grow a little),
cross country skiing on shorter and gentler trails,
alpine skiing (although the trend has been down for a decade or two, if the Echo generation is
encouraged to take up alpine skiing, demand could grow),
going on self guided/directed tours (local and travel- oriented),
golf (especially for women),
lacrosse (influenced by recent increasing interest in professional lacrosse),
fitness and related activities that support health and holistic wellness mental and physical
well- being),
fitness /physical well -being programs tailored specifically to older adults,
swimming for pleasure,
therapeutic and health related aquatic programs,
outdoor soccer (across Canada, the participation rate is peaking youth participation appears
to have peaked, but there is still some growth in girls and women's soccer and participation
by men),
indoor soccer (demand is increasing dramatically from competitive youth and adults, house
league children and youth, and adult recreational, especially women demand will be driven
by the availability of local indoor soccer facilities, and the strength of local soccer groups),
Ultimate Frisbee (a relatively new sport with growing interest demand will be driven by the
availability of local indoor soccer facilities and excess time at suitable outdoor fields),
in -line hockey (relatively new sport with growing interest),
recreational in -line skating (relatively new sport with growing interest),
attending theatre and concerts,
participating in creative art and hand craft activities,
attending multi cultural events /festivals,
attending handcraft exhibitions /shows,
visiting art galleries /attending art shows,
visiting museums and historic sites,
attending historic re- enactments and heritage festivals,
curling,
bowling (if up- scaled and packaged with other complimentary facilities /activities that also
appeal to people in their 40s and 50s),
casual/recreational skating, especially in attractive, amenity -rich outdoor settings,
dancing (ballroom, line, square, etc,),
bicycling,
fishing and fishing tournaments,
camping,
boating,
eating out in restaurants,
driving for pleasure,
computer and Internet use, and
gambling.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 248
Page 275 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
C.5 Other Trends
Agenda Item {AgendaNumber} {ItemDescription}
T here are other trends in facility and open space planning, and service provision that are
shaping the future of open space and facility provision, and leisure delivery systems in
communities across Canada. These trends are responding to the shifts in demand and
community values and attitudes. They are also responding to:
the desire for increased operational efficiency and revenues;
the need for improved programmability and usability;
the increasing desire for one stop- shopping for programs, facilities, information, registration,
etc.;
an increasing understanding of the value of creating a higher physical profile and increased
visibility for public leisure facilities (both location and critical mass);
the increasing desire for extended season and year -round participation in some sports;
heavy promotion to potential young participants of some sports to try to generate increased
interest at an early age (e.g., softball `Blast Bali' program, baseball, slo- pitch, lacrosse, and
rugby);
increasing demand for activities that require large, nature- oriented spaces;
the increasing desire to protect lands that are environmentally sensitive, and the trend toward
ecosystem -based planning that acknowledges the link between natural systems, communities
and people;
the need to create open space networks and greenway corridors to support healthy
ecosystems and low impact linear recreation activities;
an increased understanding that open space systems can provide essential environmental and
health benefits; and
an increased understanding that park systems and other leisure services provide valuable
personal benefits, are essential to a high quality of life; help to build strong, attractive
communities; and help to sustain economic growth.
Some Key Leisure Facility Trends
Toward multi purpose indoor leisure facilities and away from single purpose facilities.
Toward the inclusion of complementary facilities such as a library, a municipal service
centre, food services and retail space into leisure- oriented complexes.
Toward clustering of similar major (often lighted) outdoor facilities into a multi facility
complex with appropriate support facilities (e.g., ball diamonds, soccer fields and tennis
courts).
Toward a greater percentage of outdoor sports facilities being irrigated and lighted to support
increased frequency of use and to survive severe summer weather and the trend toward
pesticide -free maintenance. However, many minor sports groups cannot afford the
associated higher rental fees.
Since aquatic facilities continue to be one of the most requested facilities and it has become
clear that most people like to swim for pleasure and fitness, pool designs have become more
supportive of the wider range of swimming interests, including fitness /wellness/health,
social, and the needs of the less mobile. Aquatic facilities that cater well to a wide range of
needs attract greater use and generate more revenue than traditional designs.
Interest in cultural facilities and spending on the arts has been growing, supported, in part by
growing awareness, and an increasing adult market that is better educated and more affluent.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 249
Page 276 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Arts and culture have a positive impact on the economy of a community and help to increase
the overall appeal of a community to business and residents. With the reduction of arts
programming in schools, responsibility is shifting to other public and community providers
to ensure balance in the growth and development of youth.
Gymnasia are increasingly being provided by municipal leisure service agencies as part of
larger multi purpose complexes. This has been influenced in part by recent difficulties in
accessing school facilities in a way that is affordable to many traditional customers, and
sufficiently consistent to support scheduled programming. In addition, municipal leisure
service agencies are appreciating the flexibility of gymnasia to accommodate a wide variety
of leisure and other activities, as well as the benefit of having programming /scheduling
control at all times.
Emerging sports are demanding more and different types of facilities. For example, sports
such as Ultimate Frisbee, in -line hockey, recreational in -line skating, indoor soccer, cricket,
field hockey, rugby and field lacrosse are gaining in popularity. Some of the emerging sports
are able to utilize existing facilities in `slow' or off season times, while others are placing
increased pressure on already heavily utilized facilities (e.g., Ultimate Frisbee and field
hockey vs. soccer).
Toward an increasing number of revenue generating ancillary spaces in public community
centres (e.g., arcades, ATM machines, food and drink dispensers, increased and more
attractive food services, licensed food services, and pro shops and other retail shops).
Toward increasing acceptance of sponsorship and naming rights for entire facilities and parts
of facilities.
Throughout Ontario, there are many leisure facilities that were built in the 1960s and '70s
that are outdated, inefficient, unappealing, not sufficiently accessible, and in need of
considerable repair or replacement.
Some Key Park and Open Space System Trends
Toward the increased linking of parks and other public open spaces to create open space
networks and natural open space greenways at the local, community and municipality
wide /regional levels.
Increased desire to protect and enhance natural heritage resources such as wetlands,
woodlots, valley lands, Environmentally Significant Areas, and Areas of Natural and
Scientific Interest. There is an increasing desire to include `locally significant' natural
heritage assets into the public open space system in urban areas.
Toward increased habitat protection and naturalization of parkland.
The increased desire to acquire and/or protect or restore as open space, waterfront lands
along lakes and rivers in urban areas.
Toward locating major community leisure facilities and sports- oriented parks on high profile,
visible sites with good frontage, rather than hiding them away on lower cost, less visible
sites, often with little street frontage.
Toward less `sport' dominance in parks, especially neighbourhood parks.
Some Key Leisure Delivery System Trends
Toward an increasing number of facility, operational and programming partnerships and
other strategic alliances among municipal and other leisure- oriented providers, health
organizations, educational institutions, organizations serving older adults, etc.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 250
Page 277 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Toward increased marketing of community leisure opportunities and more joint ventures
among leisure service providers to promote leisure opportunities and enhance the concept of
`one -stop shopping'.
Toward an increasing role in facilitation/indirect provision and a return to community
development and fostering `healthy communities'.
Toward fewer combined parks and recreation departments and a lower profile for leisure
services operations (often incorporated into departments such as community services, public
works, and operational services).
Even though recreation demand may be stabilizing for younger age groups, municipalities
are still playing catch -up to bridge the gap between demand levels and current supply for
some types of facilities (e.g., soccer fields and arts facilities).
Increasingly, residents are expecting higher quality in programming, facilities and parks,
influenced in part by higher rental rates and program fees.
There is an increasing need for specially trained staff who are experienced in the areas of
research and planning, fund development, community development, volunteer engagement,
special events, marketing /promotion, and technology.
Toward a more professional and better funded approach to community development and
volunteer engagement, founded on sound philosophy and operating principles.
Toward non traditional and more aggressive revenue generating initiatives and programs
such as 'adopt-a-park', program and facility sponsorship and naming rights, advertising in
public buildings and on equipment, gift catalogues, etc.
Toward an increasing appreciation of the significant economic and social benefits of sports
tournaments and other regional/provincial sport competitions; major cultural, seasonal and
arts events; major leisure oriented trade shows; and the development of leisure venues that
are of a scale to support community and tourism business.
Toward an understanding that the annual net operating costs of leisure facilities are an
ongoing investment in our communities and the local economy, rather than thinking about
these ongoing costs as a deficit.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 251
Page 278 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan, Township of Oro Medonte March, 2010
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 252
Page 279 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Appendix D:
High Level Analysis of Options for the Provision of
Indoor Ice Facilities, Township of Oro Medonte, 2009
This report was prepared in May, 2009 for Township Council before the feasibility analysis of
the proposed Township -wide multi -use recreation facility was initiated. Therefore, some of the
elements of the facility concept that emerged from the feasibility study and some of the
financial figures are different from this report. This report to Council was prepared, based on
the best available information at the time about the potential facility, potential revenue, likely
operating costs, estimated capital costs, etc.
T he Strategic Facility Plan has examined most types of culture and recreation facilities in the
Township, including the Oro Medonte Community Arena and Banquet Hall. The analysis
of indoor ice facilities in Oro Medonte and the surrounding area included a building condition
assessment, a review of accessibility, a fire safety inspection, and a review of the utilization of
the Oro Medonte Community Arena and Banquet Hall. The analysis also included an
examination of likely future demand and an investigation of what is known about the current
unmet demand for indoor ice in surrounding communities, as well as the plans of other
communities to expand and improve their arenas.
The Strategic Facility Plan proposed a strategy for the long term provision of indoor ice surfaces
in the Township. Even though there is unmet demand in the local community and the region, it
was concluded that a second ice surface should not be provided in Oro Medonte for at least ten
years, due to:
the current estimate of unmet local demand for prime time ice that represents only between
33% and 40% of the total prime ice time that would be available in a second pad;
an expectation of relative stability in local demand in the near future (with some shifting
from child and youth demand to young adult anticipated);
an increase in the supply of indoor ice surfaces in the immediate area over the next one to
five years; and
the limited resources of the Municipality and the considerable and growing unmet and under
serviced demand for other leisure interests that could not be supported if a second ice pad is
to be financed in the near future.
Although the young adult market is anticipated to grow by about 1,000 over the next 25 years
and the mid -life adult market is projected to increase by around 1,400 during the same time
period, the increased demand that these older age groups could place on the arena will be off -set
by a significant decline in the number of children and youth over the next 10 -15 years (in the
order of 750 4 -17 year olds). The principle customer of the arena is minor hockey which utilized
half of all the time rented in 2008 and 57% of all available prime time. Figure skating utilizes
6.5% of total prime time (for a total of 63% of prime time used by children and youth). It is
estimated that adult hockey represents about 30% of total time rented (prime and non -prime
time) with over half of that use attributed to non township residents. With an increase in ice
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 253
Page 280 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
surfaces in the region in the very near future, some of the non resident use will be drawn back to
new, modern arenas in neighbouring communities.
A good number of issues /deficiencies with the Oro Medonte Community Arena were identified
by customer groups and facility staff (e.g., small dressing rooms, poorly functioning showers, no
separate change rooms for female customers, inadequate storage for all uses, narrow hallways, a
multi purpose hall without a sprung floor to support fitness and dance programs, the small
kitchen, limited support facilities (e.g., pro shop, skate sharpening), no meeting room, no offices
for minor hockey and figure skating, the arena floor sweats in summer and is used far less than it
could be, and the ability to keep the facility clean). Many additional deficiencies, inefficiencies
and anticipated future requirements were identified through the condition, accessibility and fire
safety assessments.
In the Strategic Facility Plan, two options were examined for the provision of indoor ice facilities
in the Township over the next twenty years.
Option One would be to continue to invest in the existing building for the next twenty years,
including all recommended capital investments as per the condition assessment and the required
fire safety and accessibility upgrades. Most of the recommended capital investment focused on
structural, mechanical, electrical and safety repair, energy efficiency upgrades, and other
equipment replacement and upgrade. In addition, investment was recommended to meet
accessibility requirements under the Accessibility for Ontarians with Disabilities Act (AODA)
and the Accessibility Standards for Customer Service (Ontario Regulation 429/07). Some
investment in refinishing, refurbishing and painting was also recommended.
In general, building systems were found to be in `fair' condition. One notable issue that will
require further investigation, if the building is to be extended beyond the near future, is the
movement observed between the change room floor and the main arena enclosure.
Recommended repairs and replacement over the next twenty years are estimated to cost
$3,765,500 (in 2008$), not including what could be required to repair the movement between the
building components and any improvements to the functionality of the facility. Over the next ten
years, anticipated large expenditures include: roof replacement, refrigeration components,
improvements to dressing rooms, replacement of the ice slab /refrigeration distribution
piping /under -slab heating system/related components, electrical upgrades and exterior cladding.
The estimated total cost for each time period is as follows. These amounts include design,
engineering, approvals, construction, contingency and GST; but do not include non -fixed costs
such as program and maintenance equipment, supplies, furnishings, communications, IT and
security systems. Also not include is the cost of a new septic system when required (estimated at
approximately $350,000).
Year(s) Capital Cost Estimate
2009 133,500
2010 -2014 742,000
2015 -2020 825,000
2021 -2025 920,000
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 254
Page 281 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan, Township of Oro Medonte March. 2010
2026 -2030 1.145.000
Total $3,765,500
Additional recommendations regarding accessibility, energy and environmental considerations
were offered, including adaptations to create barrier -free dressing rooms.
The total cost of repair and retrofits over the next twenty years represents 68% of the
replacement cost of exactly the same facility, which would cost 5.6 million if built today in the
same style. Recreation facilities with repair budgets in the order of 65% of the replacement cost
and greater are normally subject to replacement due to the operating savings realized over the
next life cycle. Functional updates such as features to address accessibility and male /female
requirements, in addition to greater resource efficiency and environmental performance are also
realized in new facilities with integrated systems.
Refer to the condition assessment report and the fire safety report for more detail (Appendix E).
Option Two would be to construct a new, modern single pad arena in another location on the
enlarged Guthrie site. To date, the Strategic Facility Plan has recommended the following as
minimum components and features in a new arena (including adequate multi purpose space, but
not including any other major components such as a gymnasium, a fitness centre, an indoor
aquatic facility, an indoor running track, etc.).
assume a stand -alone structure (for now);
85' x 195' ice surface with seating for 500 around the ice surface;
6 dressing rooms;
staff office;
other typical arena support functions;
adequate foyer with ice surface viewing, concession and washrooms;
ground -floor multi purpose room (4,000 square feet including kitchenette, storage,
washrooms);
meeting/seminar room;
office for minor sports;
a room to support a sport service operation (skate sharpening, basic supplies, etc.);
direct access to washrooms and change rooms from outside (for park and outdoor facility
users); and
adequate parking and access.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 255
Page 282 of 289
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
Preliminary Estimated Cost for a New Building
with the Following Components and Features Figure 70
Minimum Order of Total of
Components /Items Size Magnitude Unit Magnitude
Arena with 85' x 195' ice surface, seating for 500 inside the ice
enclosure; 6 dressing rooms; lobby area with viewing gallery,
concession and pro shop; offices (staff, minor hockey, figure
skating); storage, support spaces offices could be on a second
floor
4,000 square foot ground -floor multi purpose room with high
quality dividing wall, kitchenette, storage, washrooms
Meeting /seminar room
Site development (parking, landscaping, services) septic
system and wells
Internal project management (1
Architecture and engineering fees (8% on building and site
costs)
Building permit
Contingency allowance (10
Allowance for equipment, furnishings, etc.
Totals
Advantages and Disadvantages of Option One
Agenda Item {AgendaNumber} {ItemDescription}
(square feet) Rate Estimate
40,000 $160 /s.f. $6,400,000
4,000
500
44,500
$200 /s.f. $800,000
$200 /s.f. $100,000
$1,200,000
$85,000
$680,000
Not included
$850,000
$10,000
$10,125,000
Advantages
The capital investment will be incremental over the next twenty years.
If the debenture cost for a new building exceeds $300,000 per year, then the average annual
capital costs associated with Option A will be lower (on average) over the next twenty years
than the costs associated with a new building. However, depending on how much of the
capital cost of a new building is debentured, and factoring in lower operating costs and
additional revenue, the average annual differential in cost over the next twenty years could
range from a high of around $700,000 per year to a figure that is slightly lower than the
approximately $200,000 $250,000 per year (on average) in capital investment estimated to
maintain a viable building for the next twenty years. For a 27% larger, more energy- efficient
and more functional new building, the annual debenture cost could range from a high of
$802,425 to $280,849 or lower, depending on the amount debentured and the interest rate.
The high figure assumes no assistance from senior levels of government, and neither figure
includes contributions from fundraising or sponsorships. Increased revenue in a new
building is estimated to be in the order of $70,000. Annual operating costs for a new
building would be 25% lower for consumable items ($25- $30,000 for a building of similar
size to the existing arena).
Disadvantages
The exact timing of required capital investment will be uncertain and will be difficult to
budget for. To ensure that sufficient resources are available, a significant annual contribution
to a reserve fund should be allocated (in the order of $200,000 per year).
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 256
Page 283 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
There are deficiencies in the dated building design, features and components that are not
included in the cost estimate associated with the condition, accessibility and fire safety
assessments. For example:
the multi purpose room/banquet hall is located on the second floor and it does not have a
sprung floor to support fitness and dance programs;
the kitchen associated with the multi purpose room/banquet hall is small;
there is limited storage for all functions;
the dressing rooms are small (especially for adults);
the hallways are narrow (especially for adults);
support facilities are lacking (e.g., pro shop, skate sharpening);
there is no meeting room;
there are no offices for minor hockey and figure skating; and
the arena floor sweats in summer eliminating most `ice -out' uses.
Due to the location of the building on the site and the location of the septic system and
outdoor facilities, the existing building cannot be enlarged to include other significant
components, including a second ice surface.
If the building is to be retained beyond five or so years, almost $1,000,000 of the $3,765,500
estimated for capital investment over the next twenty years is targeted to be spent in the next
five years. That includes priority repairs, assessments and upgrades identified for Year One,
which are estimated to cost $133,500. These figures do not include the unknown cost to
address the problem of the movement between the change room floor area and the main
arena enclosure. However, if the strategy is to retire the building in the near future, many of
the recommended capital investments identified for the next five years should not be
undertaken. In this scenario, it is expected that Year One investments could be reduced to
around $38,500 and for the next five year cycle, the investment could be reduced to around
$22,000, for a total of around $60,500. And that does not include an unknown amount of
investment that will be required to extend the life of the roof for a few more years (although
not the $250,000 estimated for a new roof).
All of the cost estimates are in current dollars and do not factor in inflation which will add
considerably to the cost by the end of the twenty year period.
The annual costs associated with energy, incidental repair /upkeep and regular cleaning will
increase beyond inflation as the building ages, and will be at least 25% higher than for a new,
modern and energy efficient building. In a new building, the annual requirement for
incidental repair will be very low in the first five or so years of operation.
The ability to generate revenue in the `ice -out' season is limited due to sweating on the arena
floor.
The physical characteristics of the second floor multi purpose room/banquet hall limits
functionality and reduces the ability to provide a wide range of culture and recreation
opportunities, and associated revenue that could be realized with a more functional and
attractive facility.
In the near future, as new arenas open in neighbouring communities, the ability of the less
appealing forty -year old Oro Medonte Community Arena to compete for non resident and
even resident use will diminish
A dated and increasingly unattractive arena with limited function will reduce the quality of
life and appeal of the Township, which will increasingly reduce the appeal of the
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 257
Page 284 of 289
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Municipality to existing residents and businesses, as well as new residents and potential new
employment opportunities.
Advantages and Disadvantages of Option Two
Agenda Item {AgendaNumber} {ItemDescription}
Advantages
A new building with energy efficiency improvements that would put the building systems at
25% better than current building code standards will cost less to operate in the order of 25%
less for consumable items (e.g., electricity, fuel, and maintenance materials and repairs under
$1,000 per occurrence) or $25- $30,000 for a building the size of the current arena. A new,
energy efficient building will require considerably less energy to operate, the annual
requirement for incidental repair will be very low in the first or so five years of operation,
and initial cleaning costs will be lower in a new building. (Also see the points below re: the
environmental benefits of contemporary design.)
The ability to attract more use and revenue to a main -floor multi purpose hall will be much
higher, especially in association with an overall more attractive facility and access to a
functional arena floor during the `ice -out' season. The ability to generate revenue on the
arena floor during the `ice -out' season will be considerably greater due to a much more
functional and attractive facility, supported by a relatively large ground -floor multi purpose
hall and attractive foyer. Additional annual revenue of $70,000 is estimated as follows:
additional ice rental $40,000
additional arena floor rental 8,000
additional rental of multi purpose hall 12,000
additional revenue from expanded range of programming 10.000
total $70,000
A new arena, which will be located elsewhere on the enlarged Guthrie site, will be able to
support the addition of other major facilities as demand warrants, and these additional
facilities can be afforded.
A new and relocated arena will be able to better support every day outdoor activities and
sports tournaments by providing washrooms and change rooms that can be accessed from the
outside.
A modern, attractive and more functional facility will provide a greater range of culture and
recreation programming and activity opportunity for Township residents.
A modern, attractive and more functional facility will contribute to the increased quality of
life and appeal of the Township, which will result in increased residential development and
an increased ability to retain existing and attract new employment opportunities to Oro
Medonte.
A new facility will have a life expectancy that will extend well beyond the next twenty year
cycle of the existing building.
Improved Accessibility Compared to the Existing Building A new facility will be fully
accessible for spectators and participants in ice sport and other activities accommodated by
the building spaces. From facility entry, barrier -free access will be provided throughout the
floor areas. Strategies for accommodating spectators will include locations throughout the
facility so that optimal choice is provided for all to experience events. For other community
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 258
Page 285 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Township of Oro Medonte March. 2010
activities utilizing the multi purpose room, details for washrooms, serving areas, canteen
counters and other like features will provide universal access.
Prolonging the Economic Life of the Asset The facility design strategy can provide an
integrated systems approach. Conservation can be used to reduce wear on mechanical
systems. By increasing the thermal resistance of the facility envelope, the amount of energy
required in the building is reduced. This reduces the design load and size of equipment
components. The ventilation systems can include heat recovery to return energy used in the
building to be reused in the facility for space heating, domestic water pre- heating, re- surfacer
water pre- heating, and the snowmelt system.
Environmental Benefits of a New Building Integrated design can be the underpinning
approach to the project. For example, the collection of roof water from the ice pad enclosures
into storage cisterns will allow for recycling into toilets on site. The building envelope
should include R40 roof insulation, R20 wall insulation and a low -E ceiling over the ice
sheet. These strategies will assist in reducing overall energy demand and increase interior
comfort. The refrigeration system can include ice -battery technology. This concept engages
the compressors overnight to utilize off -peak rate electrical energy to create an ice bank
which can then be sourced in the daytime to top up cooling for the ice pad or interior spaces
in the shoulder seasons. Consideration could be given to integrating a geo- thermal system.
For a single pad facility, data from similar facilities in southern Ontario have confirmed that
a payback on the capital premium invested in a geo thermal system design and equipment is
in the order of seven years. The heat from the system rejected from ice making can be
introduced into preheat systems for the domestic hot water supply, space heating for dressing
rooms, spectator heating and other areas of the building. The interior snow melt system
(from ice maintenance) will eliminate the need for exterior disposal, thus mitigating the
potential for environmental contamination from dyes used for ice sheet and line panting. As
noted above, the ventilation systems will include energy recovery and transfer technologies
to recycle energy for other system uses.
Reduction of Greenhouse Gas Emissions Energy conservation strategies for the facility
envelope, and mechanical and electrical systems will reduce energy demand. This in turn
will reduce greenhouse gas emissions from equipment operating in the building, and the
upstream demand from energy sources (electrical and natural gas) needing to be produced to
serve the facility.
If other components are associated with the arena and multi purpose rooms (as would be
possible with Option B), the following advantages would be realized:
the ability to share common facility elements among all components and uses, and reduce
overall space requirements and associated capital and operating costs; e.g., some of the
washrooms, the meeting/seminar room(s), the food service area (expanded and enhanced
due to additional customer traffic with broader profile), the entrance /foyer, circulation
space, mechanical space, storage space, parking, etc.
the opportunity for `one -stop' shopping and associated cross marketing of the various
uses supported by a highly visible and appealing multi functional facility;
the ability to cross program, utilizing various complementary components; and
the ability for some components to generate revenue to help off -set operating deficits
associated with other components.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 259
Page 286 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateslic Facility Plan. Township of Oro Medonte March. 2010
Disadvantages
The annual cost to finance and operate a new and larger facility may be higher than the
average annual investment in capital and operating costs required for the existing building
over the next twenty years. However, the overall annual cost for a new building could be
similar or lower. Depending on how much of the capital cost of a new building is
debentured, and factoring in the lower operating costs and additional revenue that would be
generated from a new building, the average differential in cost over the next twenty years
could range from a high of around $700,000 per year to a figure that is slightly lower than the
approximately $200,000 $250,000 per year in capital investment estimated to maintain a
viable current building for the next twenty years. Annual operating costs for consumable
items would be 25% lower for a new and more energy- efficient building ($25- $30,000 for a
building the size of similar size to the current arena). Also, annual revenue is expected to be
around $70,000 higher. As noted below, the annual debenture cost for a new building would
range from $280,849 to $802,425, depending on the amount debentured and assuming a 5%
interest rate. The lowest figure below assumes two- thirds assistance from senior levels of
government and does not factor in local fundraising and sponsorships, which would lower the
amount to be debentured.
$10 million over 20 years 5% would equal an annual repayment of $802,425
$7 million over 20 years 5% would equal an annual repayment of $561,698
$3 5 million over 20 years 5% would equal an annual repayment of $280,849
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 260
Page 287 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strategic Facility Plan. Townshin of Oro Medonte March. 2010
Appendix E: Building Condition Assessments and
Fire Safety Inspections
E.1 Introduction to the Building Condition Assessments
n the summer and fall of 2008, building condition assessments were completed on the eight
community halls and the Oro Medonte Community Arena and Banquet Hall by AECOM
Canada Architects Ltd.
The audit only examined building systems, accessibility, and energy and environmental
concerns. The recommended repairs and replacements and associated capital cost estimates did
not include any upgrades to improve usability and aesthetic quality. Most of the recommended
repairs /replacements will not be noticed by most customers.
Although what was recommended for each facility was unique, there were a number of common
themes for repair /replacement over the next 20 years. Common items included: surveying for
asbestos- containing material, adding CO detectors, installing fire suppression hoods over stoves
and other cooking equipment, weather stripping, replacement of doors and windows,
modifications to meet provincial requirements for accessibility, barrier -free washrooms, roof
repairs /replacement, heating system repairs /replacement, plumbing and water supply system
improvements /repair /replacement, replacement of septic systems, ongoing maintenance of
interior walls and floor finishes, improvements and repair to electrical systems, and replacement
of emergency systems. Edgar, Warminster, Eady and Carley halls are particularly high
maintenance and require regular and costly repair to brickwork and the stucco finish on the
Edgar facility. The estimate for recommended repair and upkeep over the next 20 years varied
from $235,000 to $534,000.
For each facility, the cost to replace the hall in its current size, configuration, style and
construction characteristics was estimated, along with the cost to replace each facility at the same
size, but utilizing a one -floor design and a construction style and materials more consistent with
conventional community facilities of this nature. At $240 /square foot, the cost to replace the
facilities in the general style and construction method noted above varied from $168,000 for
Warminster Hall to $549,200 for Jarratt Hall. The cost to replace each facility was lower than to
repair for all but Craighurst, Old Town Hall, Eady, Jarratt and Hawkestone halls Jarratt and
Hawkestone halls are in considerably better condition than the others and are generally lower
maintenance facilities.
Replacements are recommended as systems /components reach the end of their useful life. Life
cycles for buildings and components are based on Building Owners and Managers Association
(BOMA) standards and Protocols for Building Condition Assessments published by Public
Works and Government Services Canada.
In general, a facility life cycle is in the order of thirty years and varies depending on the systems
incorporated and the maintenance programs implemented over the operating life.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 261
Page 288 of 289
Agenda Item {AgendaNumber} {ItemDescription}
DRAFT REPORT Strateeic Facility Plan. Township of Oro Medonte March. 2010
Costs are derived from life cycle analysis data for municipal facilities of similar size, complexity
and program accommodation. Costs are based on:
The obligation the Municipality has to maintain a public building in each case. This type of
building is referenced as `A2 occupancy' under the Ontario Building Code. The community
halls and the arena are considered public buildings.
The values of individual work tasks identified in the condition reports are estimated on the
basis of separate work scopes being prepared and publicly tendered by the Municipality as
individual projects to bonded contractors.
The Municipal building database that was referenced above includes hundreds of facilities of
similar size and complexity which AECOM Canada Architects Ltd. have reviewed and for
which they have prepared condition reports with the same format.
There may be opportunities at each site to combine tasks in order to reduce expenditures and/or
accomplish individual tasks for less than the estimates carried in the report. Ultimately, the
completion of each task is intended to enable the Municipality to meet its obligation to continue
to maintain each public facility over the next life cycle.
E.2 Fire Safety Inspections
I n March, 2009, the Oro Medonte Township Fire Department conducted Fire Safely
Inspections of the community halls and the Oro Medonte Arena. The following 18 pages
contain the individual reports. An estimate of costs associated with addressing the inspections
were prepared by the Municipality.
The RETHINK GROUP
Leisure Services Planning and Management
with AECOM Architects Canada Ltd., Basterfield Associates Landscape Architects, and the Tourism Company
Page 262
Page 289 of 289