Loading...
2009-097 Authorize the Issuance of Certificate of Substantial Completion and Acceptance (Underground Services) for Moon Point CorporationTHE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE BY-LAW NO. 2009-097 Being a By-Law to Authorize the Issuance of Certificate of Substantial Completion and Acceptance (Underground Services) for Moon Point Corporation, Registered Plan 51 M-881 WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; AND WHEREAS Council for the Corporation of the Township of Oro-Medonte entered into a Subdivision Agreement with Moon Point Corporation in June 2007 to construct a residential development consisting of fourteen (14) lots on Warbler Way. AND WHEREAS the requirements of this Subdivision Agreement with respect to the underground works have now been met; NOW THEREFORE the Corporation of the Township of Oro-Medonte hereby enacts as follows: 1. That the Certificate of Substantial Completion and Acceptance (Underground Services) for Moon Point Corporation may now be issued by the Township Engineers (Aecom) in compliance with the Subdivision Agreement between the Corporation of the Township of Oro-Medonte and Moon Point Corporation. 2. That the attached Schedule "A", Certificate of Substantial Completion and Acceptance (Underground Services) shall form part of this By-Law. 3. That this By-law shall come into force and take effect on the final date of passing thereof. BY-LAW READ A FIRST AND SECOND TIME THIS 15TH DAY OF JULY, 2009. BY-LAW READ A THIRD TIME AND FINALLY PASSED THIS 15TH DAY OF JULY, 2009. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Mfiyor, H.S. Hug s J. Schedule "A" to By-Law No. 2009-097 AECOM 10 Checkley Street, Barrie, ON, Canada L4N 1W1 T 705.721.9222 F 705.734.0764 www.aecom.com TOWNSHIP ENGINEERS CERTIFICATE OF MUNICIPALITY PROJECT DEVELOPER FILE NO. Description of the Works: SUBSTANTIAL COMPLETION AND ACCEPTANCE (MUNICIPAL UNDERGROUND SERVICES) Township of Oro-Medonte Moon Point Development Plan 51 M-881 Moon Point Corporation 12-04059-50 (MHA 03045) • Storm Drainage ditch between Lots 7 & 8 from Warbler Way to Lake Simcoe. • Storm Drainage ditch outlet on the north side of Moon Point Drive from Warbler Way to Lake Simcoe. • Installation of Dry Hydrant south of Lot 1. • Street Lights We, AECOM, notify the Municipality that the above mentioned works were inspected on June 25, 2009 and to the best of our knowledge and judgement, are complete in accordance with the Subdivision Agreement except for the deficiencies below: Roadside and drainage ditches to be topsoiled and sodded. Roads Not Assumed" sign in accordance with Section 4.1.7 of the Agreement. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its Amendment. The date of Substantial Completion and Acceptance icipa! round Services) is established by the Certificate as of June 25, 2009. Date: Z1, 00 7 Signature: KA04059-50 C. and A.Underground.doc