Loading...
01 26 2009 PAC AgendaTOWNSHIP OF ORO-MEDONTE :r,LANNING ADVISORY COMMITTEE MEETING AGENDA COUNCIL CHAMBERS Date: Monday, January 26, 2009 Time: 7:00 p.m. HN111612AM i M." Id U 1 _4"j*61 F—A141401 • 97-11 Z LOC&TA 19: 0 9 0"IM-11" 0 4. MINUTES OF PREVIOUS MEETING —November 24, 2008. I A L 6. PUBLIC MEETINGS: ffem_ 7. PLANNING APPLICATIONS: a) Report No. DS 2009-002, Steve Farquharson, Intermediate Planner, re: Proposed Official Plan and Zoning By-law Amendment, 2008-ZBA-10, 2008-OPA-02, Lot 1, Concession 5 (Oro), Township of Oro-Medonte, South Side of Horseshoe Valley Road and West of Line 4 (1198677 Ontario Ltd.). 8. CORRESPONDENCE AND COMMUNICATION: 2 =92 9. OTHER BUSINESS / EDUCATION: a) Tom Kurtz, re: Source Water Protection Committee Update. b) Andria Leigh, re: Draft Lake Simcoe Protection Plan -Consultations TOWNSHIP OF ORO-MEDONTE PLANNING ADVISORY COMMITTEE MINUTES N 0 V 2 6 2006 2006-2010 TERM November 24, 2008, 7:03 p.m. Lw Council Chambers l- Present: Council Representatives Mayor H.S. Hughes Deputy Mayor Ralph Hough Councillor Mel Coutanche Councillor Terry Allison Councillor Sandy Agnew Councillor John Crawford Councillor Dwight Evans Public Reoresentatives Linda Babulic Roy Hastings Tom Kurtz Mary O'Farrell-Bowers Larry Tupling Staff Present: Andria Leigh, Director of Development Services; Glenn White, Manager of Planning Services; Janette Teeter, Deputy Clerk Also Present: Sally Leppard, Lura Consulting Deputy Mayor Hough assumed the chair and called the meeting to order. , P16120611"IL61:2 Motion No. PAC081124-1 Moved by Larry Tupling, Seconded by Mary O'Farrell-Bowers It is recommended that the agenda for the Planning Advisory Committee meeting of Monday, November 24, 2008 be received and adopted, as amended, to add Item 9c), Andria Leigh, Director of Development Services, re: Update on Craighurst Secondary Plan. Carried. 3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF: - "IN ACCORDANCE WITH THE ACT" None declared. 41 galwal It is recommended that the minutes of the Planning Advisory Committee Meeting held on October 27, 2008 be received and adopted. Carried. 5. PRESENTATIONS: a) Sally Leppard, Lura Consulting on behalf of Severn Sound Environmental Association, re: Severn Sound Watershed Sustainability Plan. An updated version was distributed to members of the Committee. Motion No. PAC081124-3 Moved by Roy Hastings, Seconded by Mary O'Farrell-Bowers It is recommended that the correspondence and verbal information presented by Sally Leppard, Lura Consulting on behalf of Severn Sound Environmental Association, re: Severn Sound Watershed Sustainability Plan be received. Carried. 6. PUBLIC MEETINGS: None. 7. PLANNING APPLICATIONS: None. Andria Leigh, Director of Development Services, memorandum correspondenco dated November 14, 2008 re: Status — Planning Applications. A map and updated memorandum correspondence were distributed to members of the Committee. 2AS(IT-311 Moved by Tom Kurtz, Seconded by Roy Hastings It is recommended that the memorandum correspondence dated November 14, 2008 and updated version dated November 24, 2008 presented by Andria Leigh, Director of Development Services and Glenn White, Manager of Planning Services, re: Status — Planning Applications be received. MINE a) Tom Kurtz, re: Source Water Protection Committee Update, Motion No. PAC081124-5 00=0 =0 MEM. • F It is recommended that the verbal information presented by Tom Kurtz re: Source Water Protection Committee update be received. Carried. b) Andria Leigh, Director of Development Services, re: County of Simcoe Official Plan Update. Motion No. PAC081124-6 Moved by Linda Babulic, Seconded by Larry Tupling It is recommended that the verbal information presented by Andria Leigh, Director of Development Services re: County of Simcoe Official Plan Status Update be received. Carried. c) Andria Leigh, Director of Development Services, re: Craighurst Secondary Plan Update. :ET01113 I =4 It is recommended that the verbal information presented by Andria Leigh, Director of Development Services re: Update on Craighurst Secondary Plan be received. 41- :7A*11TJ 5 Moved by Mary O'Farrell- Bowers, Seconded by Tom Kurtz It is recommended that we do now adjourn at 9:41 p.m. Chair, Deputy Mayor Ralph Hough Carried. Director of Development Services, Andria Leigh Z3 Township Of REPORT Proud Heritage, Exciting Future Report No. To: Prepared By: DS 2009-002 Planning Advisory Committee Steven Farquharson, Intermediate Planner Meeting Date: January 26th, 2009 Subject: Proposed Official Plan and Zoning By-law Motion # Amendment Applications 2008-OPA-02 and 2008-ZBA- Roll #: R.M.S. File #: D09 38435 4343-010-002-3000 10, 1198677 Ontario Limited - D14 38413 Lot 1, Concession 5 (Oro), Township of Oro-Medonte IRECOMMENDATION (S): Requires Action For Information Only It is recommended that Planning Advisory Committee recommend to Council: THAT Report DS 2009-002 Re: Official Plan and Zoning By-law Amendment Applications 2008-OPA-02 and 2008-ZBA-10 for 1198677 Ontario Ltd., Lot 1, Concession 5, (Oro), Township of Oro-Medonte, be received and adopted. 2. THAT Official Plan and Zoning By-law Amendment Applications 2008-OPA-02 and 2008-ZBA-10, Lot 1, Concession 4, (Oro), Township of Oro-Medonte that would serve to redesignate the subject lands from "Horseshoe Valley — Medium Density" to "Horseshoe Valley- Low Density Residential" on Schedule D of the Official Plan, and to rezone lands from Agricultural/Rural Exception (A1RU*15) Zone to Residential One Exception Hold (R1 *H) Zone on Schedule A15 of Zoning By-law 97-95, be approved. 3. AND THAT the Clerk bring forward the necessary Official Plan Amendment and Zoning By-law for Council's consideration. BACKGROUND: The purpose of this report is to consider proposed Official Plan and Zoning By-law Amendment applications submitted by MHBC Planning on behalf of the above noted property owner, and make recommendations to Planning Advisory Committee as to the disposition of the matter. DEVELOPMENT SERVICES Meeting Date: Monday January 26, 2009 Report No. DS 2009-002 Page 1 of 8 ANALYSIS: The subject property is located on the south side of Horseshoe Valley Road West and on the west side of Line 4 North. The subject land has a frontage of approximately 246.8 metres (809 feet) on Line 4 North and approximately 196.3 metres (644 feet) of frontage along Horseshoe Valley Road West. The site continues to be vacant, and was vacant prior to the adoption of By-law 97-95, which is why the amendment to the Zoning By-law is required as discussed further below. A statutory public meeting was held on October 27, 2008 regarding the proposed development. No verbal comments were received at the public meeting. Written comments were received by internal staff stating they had no concerns. Subsequent to the public meeting, comments were received from the County of Simcoe and AECOM (the Township's Engineering Consultant). The comments received from the County of Simcoe have indicated that they will not permit any access from County Road 22 (Horseshoe Valley Road) to either Lot 4 or the retained lands It is the intent of the applicant to develop the property for residential uses, which will comprise four lots. A re-designation and rezoning is necessary to support this proposed development of the site. The applicant has submitted a Functional Servicing Report, which was completed by Cole Engineering dated July 2008. In their study they found that partial servicing is a feasible option for the proposed development. The Township had circulated the applications to AECOM, the Township's engineering consultant, who have commented that the developer would not be required to extend the watermain since it extends past the proposed lots. AECOM further recommended that the developer install a hydrant on the existing watermain at the proposed lot line of lots 2 and 3 at the developer's expense. FINANCIAL: N/A POLICIES/LEGISLATION: Township of Oro-Medonte Official Plan: The subject lands are presently designated "Horseshoe Valley —Medium Density Residential" and "Horseshoe Valley — Resort Facility" in the Township's Official Plan. The proposed amendment would permit low density residential units on a portion of the subject lands. The portion of the lands that are the subject of this application are located in the "Horseshoe Valley —Medium Density Residential" designation. The remaining lands which are located in the eastern portion at the corner of Horseshoe Valley Road West and Line 4 North, and are designated "Horseshoe Valley — Resort Facility", are not proposed to be amended at this time. DEVELOPMENT SERVICES Meeting Date: Monday January 26, 2009 Report No. DS 2009-002 Page 2 of 8 The current designation of "Horseshoe Valley- Medium Density Residential" permits townhouse dwellings, multiple dwellings, apartment dwellings and home occupations. The density of development permitted under the policies shall not exceed 30 units per gross hectare. The applicant is applying to have the lands redesignated to the "Horseshoe Valley — Low Density Residential" designation, in order to facilitate the development of four residential lots. The permitted uses within the "Horseshoe Valley — Low Density Residential" designation include single detached dwellings, home occupations, and Bed and Breakfast establishments. Within this designation the density of residential development shall generally not exceed 7.0 units per gross hectare, which the proposed development would not appear to exceed. In terms of servicing the subject lands, Section A5.2 of the Plan states that prior to the creation of any new lot in a settlement area that is to be serviced by a private septic system, Council shall be satisfied that the soils are appropriate for the construction and use of a private septic system on the lot. The Planning Report that was submitted by MHBC Planning (attached) referenced a Hydrogeology Report completed by Terraprobe, which concluded that the soils are appropriate for private septic systems. The Planning Report also indicted that there was sufficient water supply to support the development. The Functional Servicing Report was completed by Cole Engineering. The Township's engineering consultant AECOM has reviewed this reports and have advised it is acceptable. Based on the above, the proposed application would generally conform with the policies of the Horseshoe Valley-Low Density Residential designation in the Official Plan. rfflm rnm I am The Zoning By-law Amendment Application would rezone the lots from the Agricultural/Rural Exception 15 (A/RU*15) Zone to Residential One Exception (Rl*) Zone to accurately reflect the intended residential use of the property. Exception 15 which affects the subject lands, states that only the permitted uses that existed on the effective date of this By-law are permitted. Given that the lands were vacant at the time of approval of Zoning By-law 97-95, the lands are only permitted to be maintained in their vacant state without a zoning by-law amendment having been considered. The four residential lots proposed will range in lot frontage from 35.3 metres (115 feet) to 105.1 metres (344 feet), with an average lot area of 1.5 hectares (3.8 acres). The lands will be the subject of both an Exception Zone to recognize the larger lot frontage and area requirements and to restrict further subdivision; and the lots will also be subject to a Holding Provision requiring each of the lots to proceed through a Site Plan Control process. The intent of the Site Plan Control process is to identify building envelopes for each of the four lots and require tree preservation outside of the identified building envelopes. This approach to the rezoning including the exception zone and the holding provision is consistent with the process previously completed for the Horseshoe estate lots on Highland Drive. Given that each of the proposed residential lots exceeds the minimum required lot area, the proposed building envelopes will ensure that all proposed residential buildings can satisfy the minimum required setbacks of the Residential One (R1) Zone to property lines. DEVELOPMENT SERVICES Meeting Date: Monday January 26, 2009 Report No. DS 2009-002 Page 3 of 8 Section 5.32 of the By-law states that no building or structure is permitted to be located within 23 metres (75 feet) of a slope or embankment that exceeds 33% or 3 to 1. The applicant has submitted a Slope Stability and Hydrogeology report prepared by Terraprobe; this report concluded that the slope is stable and that a setback of zero metres from the slope could be established on the subject lands. Notwithstanding the report conclusions, the applicant is recommending that any portion of a dwelling on the residential lots be constructed no closer then 5 metres (16.4 feet) of the slope crest. The Township's engineering consultant has reviewed the Slope Stability and Hydrogeology report and has confirmed that they are satisfied with the report and could support the proposed 5 metre setback from the slope crest. Based on the above, the proposed residential use, and the associated exception for the lot frontage and area requirements, would generally comply with the policies of the Township's Zoning By-law. County Official Plan The applications were circulated to the County of Simcoe Planning Department for comments and they have advised that they require a setback of 15 metres (49 feet) from County Road 22 (Horseshoe Valley Road West), to be included in the zoning provisions for Lot 4, which has frontage along the County Road. This request will be incorporated into the exception zoning specifically for Lot 4. In analyzing the Official Plan and Zoning By-law Amendment applications, Township staff reviewed both the County Official Plan currently in effect as well as the Plan adopted by County Council in November 2008 but not yet in force and effect. Section 4.1.6, of the current County Official Plan, states that development within settlement designations should be compatible with the character and features of the existing community; the Horseshoe Valley Settlement area currently encompasses a large amount of low-density residential dwellings a number of which surround the subject lands. The proposed low density residential use would be compatible with the character of the surrounding area and given the natural features of this site would be considered more appropriate to ensure the preservation of the slope and vegetation on the site. The County Plan also contains General Development Policies and Guidelines which are found in Section 4.3, these policies are focused more on the design and layout of proposed developments. These policies require that proposed developments consider: the minimization of removal of natural vegetation, the protection of scenic resources, and the scale and pattern of development being compatible with the character of the existing area. The proposed development has considered these policies and has been designed to conform to these policies of the County Plan. The adopted County Plan continues to include the policies discussed above and therefore it is our opinion that the proposed development general conforms to the policies of both County Plans (approved and adopted). Provincial Policy Statement The intent of the Provincial Policy Statement (PPS) is to build strong and healthy communities while at the same time promoting efficient land use and development patterns. In the Planning Report submitted by MHBC Planning (attached) they have given an explanation of how the proposed application meets the policies as outlined by the PPS. DEVELOPMENT SERVICES Meeting Date: Monday January 26, 2009 Report No. DS 2009-002 Page 4 of 8 Policy 1.1.3.1 states that settlement areas shall be the focus of growth and their vitality and regeneration shall be promoted. Since the lands are located within the Horseshoe Valley Settlement Area, the growth is being directed to an area in which the PPS encourages growth to occur. In Policy 1.6, "Infrastructure and Public Service Facilities", addresses issues such as the use of existing infrastructure and public service facilities should be optimized, wherever feasible, before consideration is given to developing new infrastructure and public service facilities. The applicant is proposing to utilize the existing water infrastructure that is utilized to service the Fire Department and OPP Stations on the east side of Line 4 South. The utilization of the water infrastructure already existing will satisfy the intent of the PIPS. Policy 1.6.3 of the PPS, requires infrastructure and public service facilities to be strategically located to support the effective and efficient delivery of emergency management services. Through comments received from the Township's Engineering consultant, it was recommended that a fire hydrant should be installed on the existing watermain. The proposed Official Plan and Rezoning amendment applications are considered to be consistent with the Provincial Policy Statement. Places to Grow The application that has been submitted has been reviewed with reference to the Place to Grow policies that have been in place since 2006. In Policy 2.2.2 Managing Growth subsection (i) states that development should be directed to settlement areas. As stated above, Horseshoe Valley has been identified through the County and Township's Official Plans as a settlement area and therefore the proposed residential development would be within a settlement area as required by Places to Grow. Subsection (j) states that growth in settlement areas should offer municipal water and wastewater services. The proposed development will utilize municipal water, however individual septic systems will be used for wastewater services due to full municipal wastewater services not being a feasible option given the topography of the subject lands. The Township of Oro-Medonte has been identified as a Rural Area in the Places to Grow legislation. In Section 2.2.9 Rural Areas subsection (3), states that new multiple lots and units for residential development will be directed to settlement areas and may be allowed in rural areas in site-specific location with approved zoning or designation that permits this type of development. Given that the proposed residential development is located within a settlement area, the application would satisfy this policy. Based on the above, the applications to amend the Official Plan and Zoning By-law, would generally conform with the Place to Grow legislation. CONSULTATIONS: No concerns from any internal or external departments. Simcoe County District School Board County of Simcoe DEVELOPMENT SERVICES Meeting Date: Monday January 26, 2009 Report No. DS 2009-002 Page 5 of 8 ATTACHMENTS: �cneauie 41- Location map Schedule #2- Context Map CONCLUSION: The subject land is an irregular shaped lot with a lo and fronts onto both Line 4 North and Horseshoe V Vehicular access to the proposed lots will only be being Line 4 North. The County of Simcoe has cor access permitted to the proposed Lot 4 from He proposed residential uses will utilize a remnant parc on the edge of the Horseshoe Valley Settlement ar( support the proposed Official Plan Amendment to "Horseshoe Valley- Medium Density Residential" t Residential". The Official Plan will be implemented and rezonina the lands from A/RLJ*15 7nnp to area of approximately 10 hectares illey Road West (County Road 22). permitted from the municipal road imented that there will be no direct rseshoe Valley Road West. The 31 of land that has remained vacant a. Given the above, Planning staff 'edesignate the subject lands from ) "Horseshoe Valley- Low Density by a site specific zoning exception R1 *H 7nno Tha 7nninri Pxi_lnut amendment will allow for the intended residential uses as a site specific zoning, w- hich will limit the ability to subdivide the proposed lots further then what is being proposed and to include the setback for Lot 4 as identified by the County of Simcoe. Planning staff have no objection to proposed Official Plan and Zoning Amendment (2008-OPA-02 & 2008-ZBA-10) applications. A draft of the Official Plan Amendment and Zoning By- law Amendments prepared by MHBC Planning has been attached for the Committee's reference. Respectfully submitted: Reviewed by: Steven Farquharson, B.URPL Intermediate Planner ­7e Andria Leigh, MCIP, RPP Director of Development Services SMT Approval / Comments: I C.A.O. Approval / Comments: DEVELOPMENT SERVICES Meeting Date: Monday January 2_6, 20-09 Report No. DS 2009-002 Page 6 of 8 Schedule #1- Location Map HORSESHOE VAL SUBJECT LANDS TO BE REZONED AND RE-DESIGNATED DEVELOPMENT SERVICES Meeting Date: Monday January 26, 2009 Report No. DS 2009-002 Page 7 of 8 Schedule #2- Context Map oa�anu. ao .uow.ncc ecrw¢N aoan.w+c *a..��s a wo � �oovrt HORSESHOE VALLEY Raw )CWMTY Raw Ma 71) DEVELOPMENT SERVICES Meeting Date: Monday January 26, 2009 Report No. DS 2009 -002 Page 8 of 8 PLANNING ANALYSIS HORSESHOE VALLEY: 1198677 Ontario Limited OFFICIAL PLAN AMENDMENT !4 REZONING i Township of Oro-Medonte August 2008 1.0 INTRODUCTION MHBC Planning was retained by 1198677 Ontario Limited to prepare a planning analysis regarding their proposal to apply for an Official Plan Amendment and Rezoning on the subject site within the Horseshoe Valley Resort. The site is located at the south-west comer of Horseshoe Valley Road (County Road 22) and Line 4 North in the Township of Oro-Medonte. The site is subject to an offer to purchase by 1198677 Ontario Limited from Horseshoe Resort. The purpose of the application is to achieve the required planning approvals from the Township of Oro-Medonte and County of Simcoe so as to enable a further planning application for Consent to sever the land into four (4) residential lots to accommodate four (4) single detached residential dwellings. MIJ 9 Ittel 01* ".. The proposal is for an Official Plan Amendment and Rezoning on the portion of the subject site currently designated Horseshoe Valley — Medium Density Residential. The site hosts two Official Plan designations; Horseshoe Valley - Medium Density Residential, and Horseshoe Valley — Resort Facility. The portion of the property designated Horseshoe Valley - Medium Density Residential is subject to the application for an Official Plan Amendment and Rezoning. MHBC Planning 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte The application for an Official Plan Amendment is to permit a down - designation from Horseshoe Valley — Medium Density Residential to Horseshoe Valley — Low Density Residential. The rationale for this Official Plan down - designation stems from the site topography itself and the difficulty the physical site conditions create for implementation of the current Official Plan designation. The limited plateau area and steep slope conditions provide adverse topographical conditions which provide support for a less intensive residential use on this site than what is currently permitted. The application for Rezoning requests the removal of the Agricultural / Rural Exception 15 (A /RU *15) zone, to be replaced with the Residential One Exception *_ (RI *_J zone, permitting single family residential dwellings. It is proposed that four (4) lots be located on the re- designated lands. Proposed lot sizes range from 1.45ha (3.58ac) to 2.04ha (5.04ac). The frontage's on Line 4 North are between 35.3m to 105.1m. In order to ensure further subdivision does not take place, an exception to allow the site specific lots sizes is being sought. The lots are proposed to be developed on the Municipal water system and private septic systems. 3.0 SITE AND SURROUNDING USES The site is located at the south -west corner of Horseshoe Valley Road and Line 4 North, in the north -east section of the Horseshoe Valley Resort lands. The site is contained within the area numerically depicted as "T' on Schedule D of the Oro - Medonte Official Plan. The lands are legally described herein as being Lot 1, Concession 5, Township of Oro - Medonte (former Township of Oro), County of Simcoc. The land subject to this application has approximately 246.8m of frontage along Line 4 North to the east and south -east and approximately 196.3m of road frontage along Horseshoe Valley Road. The subject site affected by the Official Plan Amendment and Rezoning is 6.4ha in size, as depicted on the Concept Plan (see attached). The site has a split designation. The portion of the property designated "Horseshoe Valley — Resort Facility" is not part of this application. The site itself provides very little plateau area, quickly opening onto steep slope conditions overlooking Horseshoe Valley Resort. There are no existing buildings or structures on the property. The site is primarily tree covered with scrub vegetation. To the south, south -west, and west of the site, is the existing community comprised of low - density single detached residential dwellings. The site therefore is a rounding out or completion of the residential development in the north east corner of the Horseshoe Resort area. To the north is Horseshoe Valley Road (County Road 22), beyond which are more low density single detached residential dwellings. The eastern portion of the site, not subject to the Official Plan Amendment, is a relatively flat area currently designated Horseshoe Valley — Resort Facility. Adjacent to this portion of the site is Line 4 North, beyond which exist a fire hall, police station, public park, and surrounding forest and scrubland. MHBC Planning 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte N 4.4 THE PROVINCIAL POLICY STATEMENT The Provincial Policy Statement (PPS) was issued in 2005 under Section 3 of the Ontario Planning Act. The intent of the PPS is to provide policy direction for land use matters which are of Provincial interest. Planning Authorities are to be consistent with the Policy Statement when exercising any authority. This section briefly reviews how the 1198677 Ontario Ltd. proposal for an Official Plan Amendment and Rezoning conforms to the Policy Statement. The Provincial Policy Statement seeks to promote economically and environmentally strong communities with an appropriate mix of residential and employment opportunities. Accordingly, Settlement Areas, such as the Horseshoe Valley Resort Node, should be the focus for future growth. The proposed residential development is within an identified Settlement Area and is currently designated for residential development. The down - designation from medium density residential to low density residential is proposed because of the challenges of site development based on the site specific topographical conditions. Policy 1.1.3.3 requires planning authorities to promote opportunities for intensification where it can be accommodated, taking into account existing or planned infrastructure and public service facilities required to accommodate projected needs taking into consideration the PPS policies of wise use of resources and protecting public health and safety. The area that the site is located is currently serviced with municipal water. The communal sewage services at Horseshoe Resort do not service this area. There are no plans to provide sewage service to this area in either the short or long term. As the subject lands are the last parcel of Land to be developed in this area of the Resort, it is probable that sewage services may not be provided in this area. Providing sewage services from the existing communal facility would be very costly due to the distance of the sewage services from the site and due to the topography involved in getting services to the site. An additional small communal system servicing only this site is also likely not feasible. There is therefore no planned sewage infrastructure for the site. As discussed, the site hosts topographical constraints. Intensification on the site on the limited plateau land would be limited and would likely not warrant consideration for only a handful of medium density residential uses. These uses would be required to be fully serviced in order to develop. It is for these reasons that it is the opinion of this office that promotion of intensification of this site with medium density residential uses is not appropriate and further, there is other opportunity to promote intensification at the Resort Settlement Area that effectively utilize the sewage capabilities at the Resort. Policy 1.4 speaks to providing for an appropriate range of housing types and densities required to meet projected requirements of current and future residents of the regional market area. In this instance, Horseshoe Valley Resort Node offers a particular type of lifestyle housing for residents. The Resort also offers full servicing in other portions of the Resort. As this portion of MHBC Planning 3 1198677 Ontario Ltd OPA and Rezoning Township of Oro - Medonte the Resort is difficult to fully service, it is not practical to host higher density housing that could be made available in other locations at the Resort. The proposed low-density residential housing type is consistent with the type of housing offered in this niche community and will add to the milieu of housing type and mix available, and to be made available, throughout the balance of the Resort. Policy 1.6 speaks to Infrastructure and Public Service Facilities. Specifically policy 1.6.1 relates to infrastructure and public service facilities being provided in a coordinated, efficient and cost- effective manner to accommodate projected needs. Policy 1.6.2 speaks to optimizing the use of existing infrastructure and public service facilities and policy 1.6.3 speaks to strategically locating infrastructure to support the efficient and effective delivery of emergency management services. As discussed, the application will utilize the water infrastructure available to it. This service will provide for fire flows and the fire department is located across the street. The sewage service cannot be provided in a cost effective manner and does not require the development of new infrastructure to provide for sewage facilities. Policy 1.6.4.2 identifies that municipal services are the preferred means of site servicing. Partial services, as is the proposal for the subject lands, are permitted within settlement areas for the rounding out of existing development where there is reserve capacity and site conditions are suitable for the long term. It is submitted that the subject lands are the last parcel of residential land in this area of the Resort settlement area and thus provides for the rounding out of the settlement area and that hydrogeologically the site is suitable for the proposed septic systems. The hydrogeology details are found in Section 10 of this report. There are no natural heritage features on the site in the PPS context. The natural features from a local context will be addressed within the County of Simcoe and Township of Oro-Medonte Official Plan sections of this report. It is thus submitted that the proposal for a re-designation of this site in the Oro-Medonte Official Plan and rezoning is consistent with the Provincial Policy Statement. 5.0 THE PLANNING ACT The Planning Act has various criteria under Section 51 which are to be addressed during subdivision application (lot division) phases. The official plan amendment and rezoning applications are not subject to a detailed review in the context of these policies at this time. A review of the application under Section 51 parameters will be undertaken should the official plan amendment and rezoning applications be successful and the applicant can then apply for consent to sever the property. MHBC Planning 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte M 6.0 PLACES TO GROW The Places b) Grow Growth Plan for the Greater Golden Horseshoe (the Growth Plan) was produced by the Province to guide the building nf stronger more prosperous communities by managing growth. The Growth Plan focuses un achieving a better use n[ land and infrastructure by directing growth h) existing urban areas. While the Growth Plan iyu Provincial and Municipal wide dmounuoni there are policies which relate gpcoifiouDy to directing growth to mct1/nrnczU areas. The Growth Plan takes precedence over the PPS where there is a conflict except where the natural environment and human health are concerned then the document which provides the most protection prevails. The Growth Plan speaks to directing growth to areas ofucommunity, intensification, tuumh major growth to settlement areas where it can bo serviced by municipal services, various other economic policies, and policies that rokzb: to the development of complete communities. The Plan directs 10 existing so1deznsut areas which are recognized by existing official plan policy. Policy 2.2�3 hosts policies General Intensification requirements for municipalities. D is the opinion ofUde office that the Undtod amount ofmedium density residential development that could appropriately bo developed on the site if full services could cost-effectively be brought to the site is odoio)al and nx)u|d not biodcz the Connh/`u efforts to oobicvc their intensification targets. There ioalso opportunity hm provide for medium density residential development in the fully serviced areas of the Resort Settlement area to assist with the density targets. The Horseshoe Resort settlement area has been identified as an ^\undc|inu\cdhuik-nn" area and can also bc deemed u "rural settlement area". Rural settlement areas are determined k)bc key to the vitality and economic well being ofrural communities, such um(}ro-Modoutc. New multiple lots and uuda for reoidcudu| Jcvc|opnxcrd are directed to mcttlorocot mzan` such as Bnrmcohno Resort's settlement area. Itim thus submitted that the proposed Official Plan Amendment and Rezoning bn the Horseshoe Valley Resort Node iu consistent with the Growth Plan. 7.0 COUNTY of SIMCOE OFFICIAL PLAN MHBC Planning 1/y8677 Ontario Ltd. (3vA and Rezoning Township of Oro-Medonte R k t The site is subject to the policies of the County of Simcoe Official Plan as well as the policies of the Township of Oro-Medonte Official Plan. These policies are discussed herein as they relate to the subject applications for an Official Plan Amendment and Rezoning. County of Simcoe Official Plan Part I - Introduction: The County Official Plan provisions are aimed at the achievement of particular and interdependent goals. These goals have been derived from numerous sources including the Provincial Policy Statement (1997), the County's Strategic Plan, and from public input and research undertaken during the preparation of the Plan. Summarized below are each of the County's stated goals and a synopsis describing bow this application supports the County in achieving these goals: ■ protect, conserve, and enhance the County's natural and cultural heritage; o The application involves land within an identified settlement area, which is currently designated to permit residential development, and where no natural or cultural heritage resources have been identified. ■ wise management and use of the County's resources; o The application is consistent with the overall intent of the County Official Plan providing support for the way in which the County has determined future growth should take place. ■ growth management to achieve lifestyle quality and efficient and cost - effective municipal servicing, development and land use; o The application is consistent with this as it supports locating growth within an established settlement area and thus conserving County resources by concentrating the need for future services in an established settlement area. • coordinated land use planning among the County's local municipalities and with neighbouring counties, districts, regions, separated cities, and First Nations lands; o The application is consistent with this in that the necessary planning processes have been wholly abided by, and the required supporting technical information has been generated, and provided herein. The site is also currently designated for residential land use in the Township of Oro-Medonte Official Plan. ■ community economic development which promotes economic sustainability in Simcoe County communities, providing employment and business opportunities; MHBC Planning 6 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte o The application proposes to change the 'medium density residential' designation to 'low density residential' as the 'resort facility' component is not included in this application but rather provides for future economic opportunity. ■ protect public health and safety; o The application is consistent with this as it seeks to retain the intent and purpose of the Official Plan for residential development. It is due to technical site specific challenges with the topography that a down-designation to penult a lower density residential use is being sought. Thus, it is submitted the application supports the County in achieving their stated goals. Part 2 - Structure and Features of the County: This section of the Official Plan discusses the general structure of the County of Simcoe Policies in terms of the Municipal Organization, Physical Geography, Settlement Areas, and the Resources and Economic Base. These sections are provided for general information purposes and thus are not for specific reference to specific applications. Part 3 - Growth Management Strategy: Section 3.1: Strategy Section 3.1 provides an overview of the planning strategy behind the County Official Plan. A review of the intent of the applications against the intent of these four strategic themes has been completed below: Direction of most non resource related growth and development to settlements; o The application is consistent with this theme as this site is within a settlement area and is currently designated for residential growth; ■ Enabling and managing resource based development including agriculture, forestry, aggregates, and tourism and recreation; o The application is not applicable to this strategy as the site is not within an area designated for agriculture, forestry, or aggregate, and although the site is in a tourism and recreational area, the tourism portion of the property is not affected by this application. The use does however support the nearby tourism and recreational uses in the area. ■ Protection and enhancement of the County's natural and cultural heritage, including water resources,* o The application supports this as it proposes to remove less vegetation than would otherwise be necessary with a medium density residential proposal. The Hydrogeology and Slope Stability Report concluded site alteration for the purpose of low density residential development will not negatively affect area water resources. a Development of communities with diversed economic functions and opportunities; MHBC Planning 7 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte o The application is consistent with this theme as it seeks to continue to support the character of this settlement area as it would provide more population to support the local recreational based economy. Section 3.2: Population, Housing, and Employment Projections /Allocations Section 3.2 explains general provisions regarding the above noted elements to County growth in the future. These general provisions are meant to be guidelines and are not site specific. Section 3.3: General Subdivision and Development Policies Section 3.3 of the Official Plan describes general subdivision and development policies which apply in all land use designations. Essentially these policies address a number of development objectives to ensure the proposal is consistent with these County objectives. The following is a summary of the general subdivision and development policies from Section 3.3 which are not applicable. These criteria are not applicable as neither the site nor the adjacent lands host these conditions and /or attributes. These conditions and/or attributes include, ensuring potential lots are not within wetlands, habitat areas, or hazardous lands (3.3.4); development or site alternation are within 50m of natural heritage features and functions (3.3.5); development of public uses (3.3.7); development or continuation, expansion, or enlargement of non - conforming uses (3.3.8); applicants for subdivision by plan have entered into appropriate agreements (3.3.9); compliance with the Niagara Escarpment Plan policies (3.3.11); Natural Heritage conservation and forestry uses being permitted in all designations of this Plan; a Stormwater Management report is completed where more than five (5) new lots are proposed (3.3.15); compliance with the Oak Ridges Moraine Plan policies (3.3.19); The following is a summary of the general subdivision (lot creation) and development policies from section 3.3 which are applicable to this application and a description as to how the application conforms: ■ 3.3.1: The Subdivision of land maintains the intent of the Plan's objectives and policies; o The subject land is within an identified Settlement Area and is designated residential. The application retains the residential intent of the land use, seeking due to technical site conditions, to reduce the intensity of the permitted residential land use. The proposal also maintains the intention of the Plan's environmental and other applicable policies. ■ 3.3.2: Lots may be created only where they have access to and frontage on a public highway and where an access permit can be obtained. o The intent of the proposal is to create four (4) residential lots which will all have access to Line 4 North and frontage on this public roadway. The Traffic Assessment completed as part of the Functional Servicing Report by Cole Engineering, dated July 2008 concluded that the proposed driveway locations, as depicted on Figure 4 of this report, all have adequate site distances and can thus be accommodated. Access permits to permit the development of these driveways will be applied for at the appropriate time. MHBC Planning 8 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte • 3.3.3: Consents for the purpose of boundary adjustments and consolidation of land holdings are permitted but shall not be for the purpose of creating new lots except where otherwise permitted in this Plan. o The land is within the settlement area of Horseshoe Valley and is designated for residential development. The intent of this application is to eventually be permitted to subdivide the parcel into four (4) residential lots. ■ 3.3.6: Decisions on the location and form of development should be made with an objective of conserving high quality landscapes, including views and vistas; o The subject site is located on land designated for residential development thus the Official Plan intent for this property is to be developed in this manner. Achieving a less intensive residential use on the subject site will assist in the retention of the views and vistas. • 3.3.10: Local municipal official plans should map natural heritage features or areas which may be of local significance and which contribute to the viability of the County Greenland system; o The subject site itself is designated for residential development and is not mapped as Greenlands in the County Official Plan. ■ 3.3.12: Compliance with the Minimum Distance Separation Fomulae as prepared by the Province; o The subject site is not within the vicinity of a livestock barn, thus the Minimum Distance Separation Formulae is not applicable. ■ 3.3.13: New lots should not be permitted to extend into Provincially Significant wetlands, flood plains, hazardous slopes, and Escarpment Natural Areas; o The application complies with this as the subject site is not part of a Provincially Significant Wetland, flood plain or Escarpment Natural Area. A Slope Stability Report has been completed by Terraprobe dated July 2008 and it concludes that the slope is not hazardous. ■ 3.3.16: Prepare a Traffic Impact Study, where appropriate; o A Traffic Assessment was prepared as part of the Functional Servicing Report by Cole Engineering, dated July 2008. This report concludes the proposed driveway locations on Line 4 North, as depicted on Figure 4, will have adequate site distances to be accommodated. The details of this report are found in Section 12 of this report and the full report is included with this application. • 3.17: Where a land use change is proposed that is f ikely to adversely affect feet existing uses; o In this instance, the application proposes a compatible land use and is not adjacent to a railway line, thus a feasibility study that assess the impacts of odour, noise, vibration or other emissions is not required. MHBC Planning 9 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte ■ 3.18: Site is known or suspected to be contaminated, o The site is vacant and thus there is no suspicion of on-site contaminants. Section 3.5: Settlement Areas Schedule 5.1 (Land Use Plan) of the County of Simcoe Official Plan (County OP) identifies and designates Horseshoe Valley, including the subject lands, within the Township of Oro-Medonte as a 'Settlement Area'. This designation is provided for areas where non-resource related growth and development is to be directed too, as per objective 3.5.1, and encourages a planned mix of uses to promote economically viable communities, as per objective 3.5.3. The proposal for an official plan down-designation does not conflict with these policies as the intent for residential development in settlement areas is maintained. It is for technical reasons that a change in the type of residential development designated to take place on these lands is being pursued. The policies guiding settlement areas follow. Section 3.5 of the County OP outlines the policies concerning development in Settlement Areas. Although these policies are municipal wide policies, the following policies relate to site specific development and are thus applicable. Policy 3.5.8 speaks to providing for a compact urban form and the development of economically viable communities with a diversity of land uses, including residential. The application seeks to contribute to the Horseshoe Resort Settlement Area by providing more residential development through infill which will in turn provide more population to support the recreational based economy of the Horseshoe Resort community. Policy 3.5.9 provides policies for servicing within settlement areas and states, where a settlement has municipal water and sewer services, compact development shall be promoted. The Horseshoe Valley Settlement does not benefit from municipal water and municipal sewage thus this policy does not apply. The Functional Servicing Report and Traffic Assessment completed by Cole Engineering, July 2008, concluded that partial services can be accommodated. The municipal water supply can be extended from the north-east side of Line 4 North, under the road, to the north-west side in order to service these four proposed lots. It was also determined the proposed lots provide more than enough area to accommodate a private sewage system. Further details can be found in the Functional Servicing Report and in Section 11 of this report. This proposed servicing strategy can be accommodated despite the topographical challenges with this site and would maintain the character of the surrounding community. Policy 3.5.12 supports urban infill through subdivision by consent, subject to policy 3.5.6. Policy 3.5.6 states that local municipalities shall undertake a strategic planning exercise to identify settlements which are best suited to accommodate growth based on the considerations of section 3.8 and 4.1 and in doing so need not accommodate a complete range of land uses in any one settlement area. In this instance, the proposed development would be allowing four (4) MHBC Planning 10 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte residential lots to be approved, the impact of which is not be substantial to the overall community. Sections 3.8: Niagara Escarpment Plan, 3.9: Special Development Areas and 3.10: Oak Ridges Moraine is not applicable to this application as the subject site is not located within these geographically specific areas. The above described policies have been reviewed in the context of the application on the subject site and the application has been found to conform to the collective intent of these County OP policies. Part 4 - Policy Statement: Part 4 of the County Official Plan provides policy statements which supplement the policies of Part 3, previously discussed. These policies deal with special topics or procedures, or land uses that affect more than one designation Section 4.1 policies are related to Settlement Form and Expansion and are intended to supplement the policies of Section 3. As discussed, the site is currently designated for residential use and the new local land use designation conforms to these policies. Policy 4.1.7 speaks to promoting the intensification and efficient use of land in built up areas. The proposal is consistent with these policies as it proposes a compatible residential built form for the community and promotes the efficient use of the site. Further to this, the proposal seeks to round out this corner of the settlement area and infill this area with compatible residential development which provides an appropriate form of intensification for Horseshoe Resort. Section 4.2: Community Facilities and Services This policy provides direction for location of community facilities. The subject proposal is not for community facility use and thus is not applicable to this proposal. Section 4.3: General Development Policies and Guidelines This section outlines general development policies and guidelines for the design and layout of development proposals, each of which is discussed as follows: 4.3.1: In the design and layout of development proposals, the following is to be considered: Minimize the removal o. f natural vegetation; The site is comprised of forest cover and scrubland. The site is designated for medium density development. An application for medium density residential development would require the removal of more vegetation than that of this proposal for low density residential development because the intensity of the land use is less. The removal of trees would therefore be minimized. ■ Protect and maintain scenic resources; MHBC Planning 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte 11 The site is located on a steep slope providing views into Horseshoe Valley Resort. The site is currently designated for medium density residential development. As the density of the development is proposed to be reduced, the opportunity to maintain the scenic resource is increased. The architecture, scale of development and development pattern be compatible with or enhance the character of the existing area; The exact nature of the architecture of the proposed homes is not known at this time. The proposal however, is to develop four (4) single unit residential homes. The current medium density residential designation permits the development of townhouses, multiple dwellings, apartments and home occupations. The development of single unit homes in this area is prevalent, and thus single unit homes provides for continuity. ■ Outdoor lighting complement the setting; Outdoor lighting shall meet the Municipal standards, in effect at the time. ■ Development be clustered at the edge of significant open spaces; The site is not located near any significant open spaces but rather proposes to provide for further infilling of low density single family dwellings in this designated residential community. The development will not traverse down the valley. ■ Road patternsfit and complement the topography; There are no roads proposed in this development. Sign by -laws reduce the undesirable visual impacts of signs; The Municipalities sign by -law will be adhered to. ■ Cultural heritage resources shall be conserved; There are no cultural heritage resources on the property. ■ Green spaces, parks and open space, where possible, be connected: The site is not adjacent to any public green space, open space or park and thus there is no opportunity for connection. The valley slopes are proposed to be left in their natural state. ■ A mix of housing types (variety of houses and lot sizes) be included in residential developments and subdivisions; The proposal is for four (4) residential lots. This provides little opportunity for housing types and variety. The site is not serviced by municipal sewage which limits the type and variety of housing permitted. ■ Communities be developed having a strong pedestrian orientation; and This is a municipal or community wide policy and is not to be applied site specifically. Notwithstanding this, the intent for the future development of this site is to ensure the continuation of strong pedestrian linkages throughout the community. MHBC Planning 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte 12 �Mt The integration of trails and pathways. The site will be integrated into the existing pedestrian trail system through a connection with the existing road network; due to topographical constraints, there is little opportunity to provide linkages interior to the development. The remainder of the policies of Section 4.3: General Development Policies and Guidelines are not applicable as they are related to development in rural areas, the Niagara Escarpment, or the Oak Ridges Moraine. Resources and Environment: Section 4.4: Aggregate Resources Schedule 5.2.1 High Potential Mineral Aggregate Resources identifies the subject site as being located within an area of high potential for Sand and Gravel Resources. Section 4.4 Aggregate Developments provides the policy basis for development within these identified areas. Policy 4.4.2 stipulates that high potential mineral aggregate resource areas shall be protected for potential long term use. Development for alternate land uses in accordance with other policies of this plan is permitted where it would not preclude or hinder the establishment of new operations or access to the resources, utilization is not feasible due to natural physical or existing man -made constraints or the proposal serves a greater long term public interest. In this circumstance, the site is within an established and identified settlement area, is designated for residential development, and is a rounding out of this area of the Horseshoe Resort node. It is the opinion of this office that development of the site for the proposed use would not preclude or hinder the establishment of new resources and given the small size of the development and the "infill" nature of the development, it is further the opinion of this office that establishment of a future aggregate operation on this small site is not feasible and is constrained due to existing man -made constraints. The remaining policies in this section are related specifically to the operation of aggregate extraction operations and thus are not applicable to the subject application. Thus, upon review, the application meets the overall intent of the applicable aggregate policies. Section 4.5: Natural Heritage Conservation Guidelines Schedule 5.4 Natural Heritage System, identifies those areas within the natural heritage system which are subject to specific policy provisions. The subject site is not identified within a natural heritage feature identified on this schedule however it is adjacent to natural heritage areas and thus consideration of the location in terms of the surrounding natural heritage features and applicable policies is appropriate. The policies of section 4.5 Natural Heritage Conservation Guidelines are generally applicable to the community as a whole and not applied on a site specific basis. Notwithstanding this, there are several policies which are site specific and thus applicable to the subject application. These have been reviewed in the context of the subject application and summarized below: MHBC Planning 13 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte Section 4.5.1 through to 4.5.5 relate to large scale consideration of watershed based planning, development near flood plains, shorelines or areas of fish habitat and the jurisdiction of the Conservation Authority. These policies are either municipal wide policies or do not apply as the site is not near a watercourse. Section 4.5.6 policy speaks to Steep Slopes and ensuring development will be prohibited on slopes and ravines which are subject to active erosion or historic slope failure. In this instance, the site contains a steep slope along the western edge of the property. The Hydrogeology and Slope Stability Assessment completed by Terraprobe dated July 2008 concluded that the slope is stable and not subject to active erosion or historic slope failure. The development is not proposed to be located on the slope. Section 4.5.7 policies speak to Forested Lands within the Greenlands designation being subject to the policies of Section 3.7. The subject site currently hosts trees on the property. The OP policies address forests in the Greenlands designation, the County tree cutting By -law and locally significant forested lands. The site is not subject to these policies as it is not within a Greenland designation and is designated in the local plan for development. The Country tree cutting By -law may apply and thus, trees will only be removed from the policy in accordance with the By -law. Section 4.5.8 policies speak to Landform Conservation and the prevention disruption and destruction of landscape features such as the Oro Moraine, by mass grading and other extensive land alteration activities. The subject site is part of the Oro - Moraine. The site is however designated for residential development within a settlement area. The proposal to down - designate the land will not effectively change the current approvals for land use and the development proposal will respect the slope which exists on the lands. This will ensure consistency with policy 4.5.8.2 which requires such consideration of the impacts development will have on landscapes. Section 4.5.12 policies speak to Corridors, Pathways and Trails when considering development applications. This is a general County wide policy and as such is not applicable on a site specific basis however it should be noted there is no trail system which provides opportunity for linkages to this proposed development as per the policy. Section 4.6: Cultural Heritage Conservation The subject site is not identified as containing cultural heritage resources which would be conserved as per policies 4.6.1 and 4.6.2. Infrastructure Section 4.7: Water and Sewer Services Section 4.7 Water and Sewer Services contain the policies related to the provision of water and sewage services. Policy 4.7.1 states that the preferred method of servicing development in Settlement Areas is full municipal water and sewer services. The policy relates to major and multi -lot development. Although the subject proposal is to develop 4 residential lots, the policy context implies that this small infill type situation is not what is intended under this policy MHBC Planning 14 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte regime. As discussed, the application proposes the use of partial services through the extension of the municipal watermain and the installment of private on-site septic systems. The Functional Servicing Report (FSR) completed by Cole Engineering dated July 2008, determined that a partial servicing option is feasible as the water main can be extended from the north-west, where it currently services the fire hall and police station, under Line 4 North in order to provide water to each of the proposed lots. The water main would thus extend south to the last of the proposed lots and be terminated with a hydrant. The Hydrogeology Study completed by Terraprobe, dated July 2008 concluded that the soils and site conditions are appropriate for the safe development of on-site septic systems. Policy 4.7.3.1 speaks to new partial services being generally not permitted. The water service proposed to service the site is existing.. Consistent with this section, the impact of development on this site has been considered through both a thorough review of the policy framework and the outcome of the technical work completed as part of this application. The technical work, briefly described throughout and further explained in detail in later sections of this report, determined the most appropriate option for this small infill type development is for private septic systems and municipal water service. The determination of the most appropriate site specific location for the private septic systems and the building footprint is to be determined during detailed design of these proposed lots. The remaining policies within this section are County wide and thus not relevant to this site specific application. Section 4.8: Transportation and County Roads Policy 4.8.2 speaks to Arterial Roads in the County and their classification. These policies are applicable as the subject site does abut County Road 22 (Horseshoe Valley Road) which is classified as a Primary Arterial Road as per Schedule 5.5 County Road System. As per policy 4.8.2.2, the required provision of land to the County road system in order to achieve the right of way widths identified in Schedule 5.5 is already provided on the lands subject to this application. Policy 4.8.2.4 speaks to County road policies with regard to entrances, widening, reserves, and related matters. In this instance, the proposed lots will not have direct access onto County Road 22 (Horseshoe Valley Road). Section 4.8.3 speaks to the preference for site access to the proposed lots to be from an existing local municipal road rather than a County Road or Provincial Highway. In this instance, the proposed lots will be provided access from Line 4 North which is a local road. The Traffic Impact Assessment completed by Cole Engineering dated July 2008 confirmed the proposed driveway locations as depicted on the attached Concept Plan provide acceptable site line distances and can thus be accommodated. County Official Plan Conclusions MHBC Planning 15 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte Referring to the analysis provided above, it is submitted that the proposal by 1198677 Ontario Limited to down - designate the Township of Oro - Medonte Official Plan status of this parcel of land and rezone the land accordingly to permit the development of four (4) single residential lots, conforms to the intent of policies of the Official Plan for the County of Simcoe. 8.0: TOWNSHIP of ORO- MEDONTE OFFICIAL PLAN The subject land is contained within the Horseshoe Valley Resort Settlement Node in the Township of Oro - Medonte's Official Plan (OP). The subject land is designated "Horseshoe Valley — Medium Density Residential" and "Horseshoe Valley — Resort Facility" on Schedule D in the Township OP. The site is also located within the Oro Moraine boundary and is not subject to or in close proximity to any environmental feature. The application for development of the land only pertains to that portion of the site designated "Horseshoe Valley - Medium Density Residential ". Part A — Vision, Goals and Strategic Objectives and Land Use Concept The Township vision is rooted in the desire to maintain and enhance the high quality of life now enjoyed by the residents by preserving the areas natural heritage features, natural resources, and rural character of the community. The application is consistent with this vision in that it seeks to provide residential development where the Township has designated it should take place. The application also seeks to provide for a built form which will reduce the impact to the physical site and be consistent with the rural character of the surrounding community. The proposed development does not propose to negatively affect groundwater recharge areas and it does not purported to remove land designated for aggregate extraction or agriculture. The proposal also includes an appropriate site specific servicing solution utilizing existing municipal water services and on -site septic systems. A4.2.2: Horseshoe Valley Resort In terms of the servicing strategy for this node, all new development, with the exception of single detached dwellings on existing lots, should be serviced by communal sewer and water systems. The purpose of this policy relates to the density of existing and proposed development in the area. At the time of the authoring of the policy there were numerous multi -unit developments and a hotel in place at the Resort as well as single residential development and recreational and service commercial uses. With the exception of the adult lifestyle community, which is being developed on full services, the additional planned development was either directly resort related or multi -unit related. It is the opinion of this office that the intention of the policy was to give guidance to the servicing of these proposed medium density or high water and sewage uses. The use of the site for limited single unit residential does not necessitate the need for full sewage on the property and delivery of a full sewage solution would be costly. It is clear that the Township did not see a need to utilize full services for the fire hall and police station across the road from the site further reducing the need to bring full sewage to this area. It is the opinion of this office that the policy MHBC Planning 16 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte is not absolute, that it was written to guide servicing of higher density and service commercial uses and given that there is an appropriate private solution, the policy can be met. A5: Servicing Strategy As per policy A5.2 the preferred means of servicing in Horseshoe Valley is by municipally owned water and sewage treatment systems or by communal systems. This section provides that prior to the creation of any new lot in a settlement area that is proposed to be serviced via private septic systems, Council shall be satisfied that the soils are appropriate for the construction and use of a private septic system. In the Hydrogeology Report completed by Terraprobe dated July 2008, it was concluded that the soils are appropriate for the construction and use of a private septic system. The FSR further concluded that the lot sizes provide ample area for private septic systems of varying sizes. The parameters to determine servicing by municipal water state that for any new lot in a settlement area that is proposed to be serviced via private well or the municipal water supply system, Council shall again be satisfied that an adequate supply of potable water will be available to service the new lot. The Functional Servicing Report completed by Cole Engineering dated July 2008, concluded that there was sufficient municipal water supply to support the lot development. Part B — Environmental and Open Space Land Use Policies B 1: Oro Moraine Planning Area The Oro Moraine is recognized as the most significant landform feature in the Township and as such policies have been established to maintain and enhance the significant natural heritage features and ecological functions of this feature. The site is located within the Oro Moraine boundary but is not subject to the specific land use policies of the Oro Moraine — Natural Core /Corridor Area or the Oro Moraine — Enhancement Area. The proposal supports these objectives in that it does not purport to provide residential development in an area where this use is not permitted or encouraged. In this instance, although the Horseshoe Valley node is located within the core area of the Oro Moraine, the settlement policies would prevail. B1.6.2: Development Policies The policies of the Plan outline development policies for "major" development applications on the Moraine. The subject application is considered "major" as it seeks an Official Plan Amendment from "Horseshoe Valley — Medium Density Residential" to "Horseshoe Valley — Low Density Residential ". As discussed, this is a down designation on lands which are currently designated for higher density development. It is submitted that the policy intent is to review the function of the Moraine in light of a new development application and not the change from one residential designation to another. Development permissions are clearly applicable on the site today; the down designation does not change this. The intent of the development is to implement the current policy permissions, albeit, to a lesser extent as the density is proposed to be reduced. MHBC Planning 17 1198677 Ontario Ltd. OPA and Rezoning Township of Oro - Medonte Section 131.8 speaks to Protecting and Maintaining the Rural Character of the Oro Moraine wherever possible. In this instance, the proposed development seeks to blend in with the existing topography and vegetation, as well as be consistent with the surrounding community, as there will be less vegetation removed from the site with a lower density designation. Low density residential dwellings will also remain below the tree cover canopy, maintaining much of the rural character and vegetative cover of this site. Section B5.1.4 speaks to Hazardous Slopes and provides the policies applicable to development proposed in association with steep slopes and ravines. The Slope Stability Assessment completed by Terraprobe dated July 2008, concluded this slope is not subject to active erosion or historic slope failure. As per this policy, the set-back distance will be determined in consultation with the Nottawasaga Valley Conservation Authority at the appropriate stage in the process. Part C: Land Use Designations Section C14: Horseshoe Valley Road The proposal is consistent with the objectives for the Horseshoe Valley Road. The Plan outlines required road improvements to Horseshoe Valley Road prior to the approval of additional development. With respect to development at Horseshoe Valley Resort, this traffic analysis was completed as part of the settlement node approvals at the Resort and is embodied in section C14.3 The Plan outlines various road improvements required for Horseshoe Valley Road (County Road 22) and the 4th Line, the 3rd Line and the entrance to the Resort itself Any development application is required to ensure that the applicable road improvements form part of the approvals for any development application. For the purposes of the transportation review, the site is located on zone "7" on Schedule "D" of the Plan. Upon review of the policies in the context of this proposal, the following road improvements are triggered by development in zone 7: 1. no more than 250 new dwelling units are permitted in zones 6 & 7 until the right turn lane on the eastbound approach to the intersection of County Road 22 and the 4th line is constructed and, 2. no more than 600 new dwelling units are permitted in zones 6 & 7 until the left turn lanes on Country road 22 and the improvements to the 4th Line approach to the intersection are constructed. Four units are proposed in zone 7 and no additional units have been constructed in this zone. Since the policy was formed, thirteen units have been constructed on Highland Drive and 66 units have been draft plan approved and partially constructed in the Adult Lifestyle site; both of which are in zone 6. It is clear therefore that the 250 and 600 unit test is not near to being reached and thus no road improvements will be triggered by this application. MHBC Planning 18 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte Section C14.3 discusses the Horseshoe Valley Resort Node itself and the intent of this Plan to encourage the development of the lands within this node for a variety of residential, commercial and recreational uses, primarily on full sewer and water services. This section also speaks to the evolving role and function of the Horseshoe Valley Resort and that it is expected to serve as a focus for many forms of development in the future. Section C14.3.4 outlines the policies respecting the "Horseshoe Valley - Low Density Residential" designation. Should this application be accepted and the lands re- designated "Horseshoe Valley Low Density Residential ", the proposed development will be in conformity as it is for single detached dwellings and will not exceed 7.0 units per gross hectare. The proposed development will retain a parcel to the east designated "Horseshoe Valley - Resort Facility ". Thus the "Horseshoe Valley - Low Density Residential" designation will abut the "Horseshoe Valley Resort Facility" designation with this proposal. The "Horseshoe Valley Resort Facility" designation provides for the development of small scale resort- related facilities including, dining and entertainment lounges, restaurants or snack bars, physical fitness and sports centres, pro shops and tack shops, and administrative offices and workshops. There are currently low density residential uses mixed in with resort facilities elsewhere on the Resort lands as this is the nature of Resort development. Any proposal for development on the Resort Facility site will need to take into consideration any potential land use conflict and mitigate accordingly, if required. Part D: General Development Policies Part D sets out the General Development policies which are applicable to all development applications in the Township of Oro - Medonte. All of these matters have been considered as part of this analysis and those that are applicable to this proposal are discussed herein. Servicing in Settlement Areas: The Plan hosts numerous policies related to requirements for transportation studies and access and policies to Provincial, County and local roads. As stated, the site has been subject to numerous transportation studies as discussed herein and access is proposed to be from a local road which is supported by the policies. The Plan also speaks to the preferred means of land division. The purpose of the Official Plan Amendment and Rezoning is to support division of a portion of the site into four (4) residential lots and leave the lands designated "Horseshoe Resort — Resort Facility" as a remnant lot. It is the opinion of this office that the proposed form of land division is supported by the policies and this will be more fully discussed at the time of the consent application. Conclusions: Township of Oro - Medonte Official Plan The proposed official plan amendment and rezoning applications are consistent with the Township of Oro - Medonte Official Plan Policies in that: 1. the proposal still allows the Town to meet their official plan objectives for residential development on this site, MHBC Planning 1198677 Ontario Ltd OPA and Rezoning Township of Oro - Medonte 19 2. the difficult topography supports a technical basis for an official plan amendment and rezoning; 3. the site can be appropriately serviced; and 4. there is appropriate road access into and out of the proposed lots. On the basis of the analysis provided above, the application for an official plan amendment and rezoning is deemed to generally conform to the intent and purpose behind the policies of the Township's Official Plan. 9.0 ZONING BYLAW The site is subject to the current zoning standards of the consolidated Oro - Medonte Zoning By- Law. The current zoning on the subject site is identified on Schedule A15 of the Ora - Medonte Zoning By -Law as `Agricultural /Rural exception 15' (A /RU* 15). The exception stipulates that, "Notwithstanding any other provision in this By -law, only uses that existed on the effective date of this By -law are permitted on those lands denoted by the symbol * 15 on the schedules to this By -law ". As the land is vacant, the permitted uses are for the site to remain vacant. This proposal seeks to rezone the site from `Agricultural /Rural exception 15' (A /RU* 15) to `Residential I Exception* — (R1 *__) which would allow for the development of single detached dwelling units. The exception would limit lots sizes to the proposed lots to ensure no further subdivision can take place. The chart below depicts the zoning standards for the Residential One (R1) category, showing the proposed lots meet the minimum standards and thus no variances are required. Residential One R1 Standard Required Proposed Minimum Lot Area 0.2 ha 1.45 ha Minimum Lot Frontage 30m 32.9m Minimum Required Front Yard 7.5m 7.5m Minimum Required Exterior Side Yard 4.5m 4.5m Minimum Required Interior Side Yard 2.5m 2.5m Minimum Required Rear Yard 7.5m 7.5m Minimum First Storey Floor Area 90 s . m 90 s . m Maximum Height 11M 11M Setback from Sloe Section 5.32 23m 5m Section 5.32 of the Township of Ora - Medonte Zoning By -law 97 -95 concerns Setback from Slopes and stipulates that notwithstanding any other provisions in this By -law, no building, MHBC Planning 20 1198677 Ontario Ltd OPA and Rezoning Township of Oro - Medonte structure or septic system tile field shall be located within 23m (75 feet) of a slope or embankment that exceeds 33% or 3 to 1. Notwithstanding Section 5.32 Setback from Slopes, the minimum setback from the slope that exceeds 3:1 shall be 5m. Proposed Lot Minimum Lot Frontage Minimum Lot Area 1 105.1 in 1.45ha/3.58ac 2 59.0m 1.23ha/3.04ac 3 35.3m 1.45ha/3.58ac 4 47.4m 2.04 10.0 HYDROGEOLOGY and SLOPE STABILITY ASSESSMENT The Slope Stability and Hydrogeology report completed by Terraprobe dated July 2008 concluded that the slope is stable and set-back requirements are zero. In terms of the building opportunity on this slope, this report concluded there are no engineering reasons which would limit the set-back from the slope. It is recommended that any portion of the proposed residential dwellings to be constructed within 5m of the slope crest should be extended down into the dense sand material. This will ensure there is no risk with respect to shallow slips or failures of the footings in the upper loose sand at the slope of the crest. Thus, this may require footings to be deeper than normal at the rear of the homes near the slope crest. In terms of the geotechnical assessment, no groundwater is anticipated within the normal excavation depth of between 2.Om to 3.Om below the ground surface. This report highlights a number of general constraints on the residential development area including, ensuring that construction activity being conducted in a manner which does not result in surface erosion on the slope; maintaining a healthy vegetative cover on the slope and not removing trees on the slope; and ensuring no alteration to the slope takes place without prior consultation with a geotechnical engineer. These will all be adhered to. In terms of providing private septic systems, this report concludes that there is minimal to no risk associated with groundwater impacts to local private wells from development of private septic systems on the proposed lots. Discharge from the proposed septic systems will migrate down to the water table at substantial depths below the site then migrate north - westward following general surface topography. 11.0 SERVICING and STORMWATER The Functional Servicing Report completed by Cole Engineering dated July 2008 concluded that servicing these sites via municipal water and private on-site septic systems is preferable. The MHBC Planning 21 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte L Township expressed support to extend the existing watermain south-west from the Fire station on the east side of Line 4 North, to the proposed development, and terminate it at the most southerly lot with a hydrant and provide individual on-site septic systems to each lot. There are no municipal sewage services to this settlement however there is a communal system. In this instance, the low number of lots and the cost to extend the system to the site does not make extension of the existing system or providing a new communal system feasible for the proposed development and thus provides support for individual on-site septic systems. The report confirmed the proposed lot sizes provide enough area to accommodate private septic systems and thus this is an acceptable solution. Terraprobe completed a soils investigation and concluded in their Hydrogeology and Slope Stability Assessment report dated July 2008, that the soils are indeed appropriate for septic system construction as they are generally sandy in nature which is preferable for the bed construction. In terms of the on-site management of Stormwater, the report concluded there are a number of ways this will be done in order to minimize the impact on the existing steep slope on the west side of the development site. Areas on each lot for the house, the bed, and driveway will be graded such that overland flow is directed away from the proposed facilities into side yard swales separating the proposed lots. These side yard swales will then direct the water towards the existing ditch on Line 4 North. In order to reduce the possibility of slope erosion the swales must not be directed towards the west as the only flows which are permitted to flow over the slope are sheet flow runoff. Investigating methods for rainwater harvesting of roof runoff for each lot may also reduce the overall swale length required to direct runoff to Line 4 North. It would also be beneficial to keep tree clearing to a minimum. 12.0 TRANSPORTATION Cole Engineering confirmed in the Functional Servicing Report and Traffic Assessment dated July 2008 that the proposed driveway locations along Line 4 North meet minimum stopping sight distance criteria. The grade of Line 4 North is consistent which ensures sight lines are not compromised by a crest in the roadway or back-slopes within the right-of-way (ROW). This means that the field measurements reflect the maximum horizontal sight distance for these proposed driveway locations. Thus, the four (4) proposed lots can be accommodated with a safe accessible driveway location from Line 4 North. 13.0 CONCLUSION The proposed Official Plan Amendment and Rezoning applications to permit the development of 4 residential lots on the site are appropriate as they conform to the policies of the Province, the County and the Township. The site is within the Settlement boundary of the Horseshoe Valley community and the land is currently designated for residential development by the Township Official Plan. MHBC Planning 1198677 Ontario Ltd. OPA and Rezoning Township of Oro-Medonte 0 The proposal can be effectively serviced via municipal water and on-site septic systems, and the development does not present a 1bzcat 0n the yk`ne stability for the potential bozuc ovvocrm, or du000 in the existing community. The proposed built fbno is consistent with the surrounding community and allowing low density residential development to take place on this site will allow the site 1obc developed inu manner consistent with the intent of the Township Official Plan. It will also allow for the removal of less vegetation on this site than the cooun( OP designation may pcnnk, thus decreasing the inzyuot to the site and aunnmodiog area, and the proposed development will not have un effect on water resources. Approval of the (]PA and Rezoning would cnuhke the development of this site for residential yoqxoeoo in u manner consistent with the surrounding community. With the difficult site topography, a low density form of residential development is also a practical built form, as there ix limited plateau area and steep slope conditions on-oito. Respectfully Submitted, — MUUBC Planning Kris Menzies, M4ClPTlPP Partner co. l|98V77 Ontario Ltd. MHBC Planning 1198677 Ontario Ltd. 0/A and Rezoning Township @'Oro'Mudonte 23 � FE F i 0 C r 11 7 I 0 7 C 7 u PLANNING ANALYSIS - ADDENDUM HORSESHOE VALLEY: 1198677 Ontario Limited OFFICIAL PLAN AMENDMENT & REZONING Township of Oro - Medonte December 2008 INTRODUCTION This is an Addendum to the Planning Analysis dated August 2008 by MHBC Planning in response to the comments received from the Township's peer reviewer AECOM dated November 26, 2008 and the comments received from the County of Simcoe dated November 28, 2008. The comments from AECOM described in section 3.1 of their letter to the Township essentially speak to engineering related comments pertaining to the location of the Municipal watermain. The comments from the County are essentially related to ensuring the proposed development does not breach the relevant County Roads by -laws. Furthermore, this addendum speaks to text changes to ensure the correct minimum lot size and frontage is described throughout the report. RESPONSE TO COMMENTS With respect to addressing AECOM's comments pertaining to the location of the municipal watermain, on page 15 in the first and second paragraphs and on page 22 in the first paragraph, we acknowledge that the description of the location of the municipal watermain is not accurate. The description should have acknowledged that there is an existing municipal watermain on the west side of Line 4 North, in front of the proposed lots and thus, the extension of this line is not required. Water can be provided to the proposed lots via a valve. Furthermore, we acknowledge that the municipal engineers have indicated that a hydrant should be installed by the developer at the lot 2 / 3 lot line. MHBC Planning 1198677 Ontario Ltd. — OPA & Rezoning Township of Oro - Medonte With respect to addressing the comments from the County of8huuoncma\edtothe Township on November 28, 2000 we acknowledge that the County requires that all new buildings or � structures be located at |cag 15m from the limit of County Road No. 22. We also acknowledge that no access from County Road No. 22ho the developable property will hepermitted. N� Further to this, we ocknovv|cd#n the CVooty`m request for their road set-back by-law zcqnircnnroto and note regarding access be included iothe zoning for the properties and this will be taken into consideration. I.undy, we uokounvlcdoo the County will request the applicant N� transfer u road widening and standard dovUDbt irioog|c from the retained parcel at the intersection of the 4m l.ioo and County Buud No. 22, at the applicant's expense, when the consent applications are circulated. This too will be iukco into consideration. With respect to addressing the text changes iu the report, vvc acknowledge that the lot sizes and lot frontages depicted on the Concept P}uo are accurate however there are two }ocudooe in the N� P\000iog Analysis, dated August 2008, by MBBC Planning vbcrc the minimum lot size and minimum lot frontage have not been accurately described. We acknowledge this oversight on page in the second paragraph and in the chart atthe top of page 20, vvbcn: the minimum lot size N� should have been stated au l.23bu and where the minimum lot frontage should have been stated as 35.3m. We acknowledge these errors as an oversight during final review. N� Based on the above described change, the chart at the top of page 20 should read: Residential One (RI) Standard Required Proposed Minimum Lot Area 0.2 ha 1.23 ha Minimum Lot Frontage 30m 35.3m Minimum Required Fro t Yard 7.5m 7.5m Minimum Required Exterior Side Yard 4.5m 4.5m Minimum Required Interior Side Yard 2.5m 2.5m Minimum Required Rear Yard 7.5m 7.5m Minimum First Storey Floor Area 90 sq. m 90 sq. m Maximum Height 11M 11m Setback from Slope.(Section 5.32) 23m 5m MHBC Planning UV8677 Ontario Ltd -(P4&Rezoning Township of Oro-Medonte 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 The above described changes complete this addendum to the Planning Analysis, dated August 2008 completed by MHBC Planning. We trust this satisfies the Township's comments at this time and welcome any further comments to be addressed to the undersigned. Respectfully Submitted, MHBC Planning Stacey Forfar, MLBUrPl Planner Cc 1148677 Ontario Limited MHBC Planning 1198677 Ontario Ltd — OPT! & Rezoning Township of Oro- Aledonte 3 OFFICIAL PLAN AMENDMENT NO. (1198677 Ontario Limited) TOWNSHIP OF ORO-MEDONTE 2 AMENDMENT NO. TO THE OFFICIAL PLAN OF THE The attached explanatory text and Schedule "A-l" constituting Amendment No. to the Official Plan of the Township of Oro-Medonte, was prepared and adopted by the Council of the Corporation of the Township of Oro-Medonte, by By-law No. 2008 - in accordance with provisions of Sections 17 and 21 of the Planning Act, R.S.O. 1990, as amended. CLERK THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE BY-LAW NUMBER 2008 — Being a By-Law to adopt Amendment No. to the Official Plan of the Township of Oro-Medonte WHEREAS Section 21 of the Planning Act, R.S.O. 1990, c.P.13 as amended provides that Council may amend its Official Plan; AND WHEREAS the policies of the Official Plan of the Township of Oro-Medonte are approved and in force and effect at this time; AND WHEREAS Council has considered the appropriateness of amending the Official Plan in regard to lands located within Concessions 4 & 5 of Part of the Original Road Allowance between Concession's 4 & 5 (As Closed by By-Law 1169) Geographic Township of Oro, Township of Oro-Medonte, County of Simcoe; AND WHEREAS the Council of the Corporation of the Township of Oro-Medonte deems it necessary and desirable to amend the Official Plan of the Township of Oro-Mcdonte: NOW THEREFORE the Council of the Corporation of the Township of Oro-Medonte enacts as follows: 1. THAT the attached explanatory text and Schedule "A-l" which constitutes Amendment No. to the Official Plan of the Township of Oro-Medonte is hereby adopted; 2. THAT the Clerk is hereby authorized and directed to make application to the County of Simcoe for approval of the aforementioned Amendment No. to the Official Plan of the Township of Oro-Medonte; and 3. THAT this By-Law shall come into force and take effect in accordance with the provisions of the Planning Act, R. S.O. 1990, c.P. 13 as amended. READ A FIRST AND SECOND TIME THIS DAY OF 2008 READ A THIRD TIME AND FINALLY PASSED THIS DAY OF 2008 MHBC Planning 1198677 Ontario Limited Official Plan Amendment August 2008 MAYOR CLERK MAYOR CLERK- CERTIFICATION Certified that the above is a true copy of By-law No. 2007 - passed by Council of the Township of Oro-Medonte on the 2007. as enacted and . day of _, I t MHBC Planning 4 1198677 Ontario Limited Official Plan Amendment August 2008 TABLE OF CONTENTS CONSTITUTIONAL STATEMENT PART I — THE INTRODUCTION 1.0 PURPOSE 2.0 LOCATION 3.0 BASIS PART 11 - THE AMENDMENT PART III — THE APPENDICES Appendix 1: Schedule A MHBC Planning 1198677 Ontario Limited Official Plan Amendment August 2008 CONSTITUTIONAL STATEMENT Part 1: The Preamble - consists of the title, components, purpose, location and basis for the Amendment and does not constitute part of the actual Amendment. Part 11: The Amendment - provides the details of the Official Plan Amendment and consists of text and Schedule "A" constitutes Amendment No. to the Official Plan. Part III: The Appendices - provide more specific information regarding the Amendment and the background work that led to the preparation of the Amendment. The Appendices do not constitute an operative part of Amendment No. to the Official Plan. MHBC Planning 6 1198677 Ontario Limited Official Plan Amendment August 2008 AMENDMENT No. R TO THE OFFICIAL PLAN OF THE TOWNSHIP OF ORO- MEDONTE "1198677 Ontario Limited" 1.1 TITLE This Amendment, when approved by the County of Simcoe, shall be known as Amendment No. _ to the Official Plan of the Township of Oro - Medonte. 1.2 COMPONENTS This Amendment consists of the text and Schedule A -1 attached hereto. Schedule A -1 attached hereto, provides a map indicating thereon the location of the lands for which a change in the land use designation is being proposed and the specific land use proposed for the site. The text provides for a policy amendment to permit the development of Horseshoe Valley — Low Density Residential uses on the subject lands. The introduction does not constitute part of the actual Amendment, but is included for information purposes. 1.3 BACKGROUND The purpose of this Amendment to the Official Plan of the Township of Oro - Medonte, is to place certain lands in Part of Lot 1, Concessions 4 & 5 and Part of the original road allowance between Concessions 4 & 5 (as closed by by -law 1169) geographic Township of Oro, Township of Oro - Medonte, County of Simcoe, in the Horseshoe Valley — Low Density Residential designation in order to permit low density residential type uses on the lands. 1.4 LOCATION The Lands affected by this amendment are located at the south -west corner of Horseshoe Valley Road and Line 4 North, in the north -east section of the Horseshoe Valley Resort lands. MHBC Planning 7 1198677 Ontario Limited Official Plan Amendment August 2008 1.5 BASIS OF THE AMENDMENT 1.5.1 Application An application was made to amend the Township of Oro-Medonte Official Plan and Zoning By-law on August 18, 2008 by 1198677 Ontario Limited. The purpose of the application was to provide the policy basis to permit the development of low density residential uses on the site. Various documents were submitted in support of the application including: 1. A Planning Analysis Report, prepared by MHBC Planning, dated August 2008; 2. A Functional Servicing Report and Traffic Assessment, prepared by Cole Engineering, dated July 2008; 3. A Hydrogeology and Slope Stability Assessment, prepared by Terraprobe Limited, dated July 2008; 4. A Concept Plan prepared by MHBC Planning dated June 12 2008. 1.5.2 Proposal The 1198677 Ontario Limited proposal is to permit the eventual development of four (4) single detached residential homes on a portion of the property. The proposal necessitates an amendment to the Township's Official Plan to redesignate the lands from Horseshoe Valley — Medium Density Residential to Horseshoe Valley — Low Density Residential uses. The site hosts two Official Plan designations; Horseshoe Valley - Medium Density and Horseshoe Valley — Resort Facility. The Official Plan Amendment application solely affects the Horseshoe Valley - Medium Density portion of the site. The application for an Official Plan Amendment is to permit a down-designation from Horseshoe Valley — Medium Density Residential to Horseshoe Valley — Low Density Residential. The rationale for this Official Plan down-designation stems from the site topography itself and the difficulty the physical site conditions create for implementation of the current Official Plan designation. The limited plateau area and steep slope conditions provide adverse topographical conditions which provide support for a less intensive residential use on this site than what is currently permitted. The proposed four (4) lots will integrate into the existing built form of this area of Horseshoe Valley Resort as it is primarily single detached homes surrounding the site on three sides. MHBC Planning 8 1198677 Ontario Limited Official Plan Amendment August 2008 r 1.5.3 Provincial Policy tatement (PPS) The Provincial Policy Statement seeks to promote economically and environmentally strong communities with an appropriate mix of residential and employment opportunities. Accordingly, Settlement Areas, such as the Horseshoe Valley Resort Node, should be the focus for future growth. The proposed residential development is within an identified Settlement Area and is currently designated for residential development. The down - designation from medium density residential to low density residential is proposed because of the challenges of site development based on the site specific topographical conditions. The PPS outlines various criteria for the consideration of new development and these have been reviewed and this proposal has found to be consistent. 1.5.4 County of Simeoe Planning Policies The site is designated Rural and Agricultural in the County of Simcoe Official Plan. An amendment to the County Plan is not required as the County policies indicate that in settlement areas permitted uses include residential lots created by consent. The County does outline various criteria for consideration for new development and these have been taken into consideration in the 1198677 Ontario Limited Proposal. 1.5.5 Township of Oro - Medonte Planning Policies The site is designated Horseshoe Valley — Medium Density Residential in the Township of Oro- Medonte Official Plan. The goals and objectives of the Township's Official Plan indicate they are rooted in the desire to maintain and enhance the high quality of life now enjoyed by the residents by preserving the areas natural heritage features, natural resources, and rural character of the community. The principles of the Official Plan direct new residential uses to settlement areas, as proposed by this application. The application is consistent with this vision in that it seeks to provide residential development in a location which the Township has designated such form of development should occur. The application seeks to provide for a residential built form which is considered more appropriate for the challenging site topography. The reduction in density will reduce the impact to the physical site, will assist in preserving the natural heritage features of the area, and will be consistent with the character of the surrounding community. The proposed Official Plan Amendment and Rezoning would allow for the development of residential uses where the Official Plan has deemed them appropriate. MHBC Planning 9 1198677 Ontario Limited Official Plan Amendment August 2008 1 The uses in the surrounding area include low density residential to the south and west, and Horseshoe Valley Road (County Road 22) to the north, beyond which are low density single detached residential dwellings. To the East of the subject land is the remainder of the site designated Horseshoe Valley — Resort Facility. Further east is Line 4 North, beyond which is located the Township's fire station, OPP satellite office /Township community room, public park, and surrounding natural forested areas. There are no existing buildings or structures on the property as the site is primarily tree covered with some scrubland vegetation. The Goals and Objectives of the Township's Official Plan were reviewed in the context of development of the site for residential lots and it has been determined that the spirit and intent of these policies shall be adhered to with this development. The intent of the Official Plan is to encourage the development of the lands within the Horseshoe Valley Resort node for a variety of residential, commercial and recreational uses, primarily on full sewer and water services. As previously indicated the subject lands are within the vicinity of low- density residential development on three sides, and civic uses on the fourth side. The land area affected by the Official Plan Amendment and Rezoning is approximately 6.4ha (15.25ac) in size. As previously indicated, the majority of the surrounding land uses are low density residential uses. Permitted uses in the Horseshoe Valley — Low Density Residential designation include single detached dwellings, home occupations, Bed & Breakfast establishments, private recreational uses such as golf courses, and accessory uses. The subject land also requires an amendment to the implementing zoning by -law to permit low density residential dwellings. The subject lands are located such that the proposed use would have little impact on existing and future development, can be serviced with an appropriate water supply and means of sewage disposal, are accessed by a municipal road that can accommodate the increased traffic generated by the proposed low density residential use, and can be designed to blend in with the site topography and neighbouring low density dwellings, to maintain the existing character of the area. The proposed Official Plan Amendment and Rezoning would permit the use of this site for Horseshoe Valley — Low Density Residential and will maintain these principles. MHBC Planning 10 1148677 Ontario Limited Official Plan Amendment August 2008 1.5.6 Engineering A Functional Servicing Report and Traffic Assessment was prepared by Cole Engineering dated July 2008. In summary this report concludes that the site can be provided with municipal water by extending the existing watermain under the road from the fire hall and police station. The watermain can then be extended south along Line 4 North to be terminated by a hydrant at the most southerly lot. Municipal sewage services are not available however the proposed lot sizes are large enough to accommodate private septic systems without any adverse impacts to the surrounding area. The soils are suitable for the construction and operation of a septic system and thus there are no engineering constraints to such a system. This was confirmed though a hydrogeological analysis. Stormwater management will take place on-site and will consist of side yard swales directed to Line 4 North. The only Stormwater permitted to flow over the slope is sheet flow runoff as this will reduce the possibility of slope erosion. The Traffic Assessment portion of this report concluded that the proposed driveway locations, as depicted on the Concept Plan, meet minimum stopping sight distance criteria and thus, they are acceptable. The sight lines are not compromised by a crest in the roadway as the grade on Line 4 North is consistent. On the basis of the conclusions drawn from this report the proposal conforms with the policies contained in the Township's Official Plan. MHBC Planning 1198677 Ontario Limited Official Plan Amendment August 2008 r PART II- THE AMENDMENT 2.1 PREAMBLE All of this part of the document entitled "Part II- The Amendment ", consisting of the attached text and map schedule constitutes Amendment No. to the Official Plan of the Township of Oro - Medonte. 2.2 DETAILS OF THE ACTUAL AMENDMENT 2.2.1 Schedule "D" Horseshoe Valley of the Township of Oro - Medonte Official Plan is hereby amended as shown on the attached Schedule "A -1" to this amendment. 2.2.2 The lands identified on Schedule "D" of the Township of Oro - Medonte Official Plan and shown on Schedule "A -1" attached hereto are hereby redesignated from Horseshoe Valley — Medium Density Residential to Horseshoe Valley — Low Density Residential. 2.3 IMPLEMENTATION Amendment No. to the Official Plan of the Township of Oro - Medonte will be implemented by an amendment to Zoning By -law 97 -95, as amended, of the Township of Oro - Medonte. 2.4 1NTREPRETATION The policies of the Township of Oro - Medonte, as amended from time to time regarding the interpretation of the Plan, shall apply to this Amendment. MHBC Planning 1198677 Ontario Limited Official Plan Amendment August 2008 12 Schedule A to Amendment No. to the Official Plan of the Township of Oro- Medonte This is Schedule 'A' to Official Plan Amendment No. passed this day of , 2008. Mayor, H.S. Hughes Clerk, J. Douglas Irwin ,a Y 1 F Horseshoe Valley Rd. Scale 1:4000 Lands to be re- designated from Horseshoe Valley Medium Density Residential to Horseshoe Valley Low Density Residential. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE BY-LAW NO. 2008- A By-law to change the zoning on the lands within Part of Lot 1, Concession 4 & 5 and Part of the Original Road Allowance Between Concessions 4 & 5 (As Closed by By-law 1169) Geographic Township of Oro, Township of Oro-Meclonte, County of Simcoe WHEREAS the Council of the Corporation of the Township of Oro-Medonte is empowered to pass By-laws to regulate the use of land pursuant to Section 34 of the Planning Act, R.S.O. 1990, c.P.13; AND WHEREAS Council deems it appropriate to rezone the subject lands; AND WHEREAS the passage of such a by-law will conform to the Official Plan; NOW THEREFORE the Council of the Corporation of the Township of Oro-Medonte hereby enacts as follows: Schedule 'A15' to Zoning By-law No. 97-95 as amended, is hereby further amended by changing the zone symbol applying to the lands located in Part of Lot 1, Concessions 4 & 5 and part of the original road allowance between Concessions 4 & 5 (as closed by by-law 1169) Geographic Township of Oro, Township of Oro-Medonte, County of Simcoe, from the Agricultural/Rural Exception 15 (A/RU*15) Zone to the Residential One Exception — (Rl—*) Zone as shown on Schedule 'A', attached hereto and forming part of this By-law. 2. Section 7 EXCEPTIONS is hereby amended by adding subsection 7.— as follows: "7. *_ - Concessions 4 & 5, Part of Lot 1 (Oro) Notwithstanding Section 5.32 of this By-law, the following zone provisions apply on the lands denoted by the symbol R1 *_ on the schedules to this By-law: No building or structure shall be located within 5 metres (16.4 feet) of a slope or embankment that exceeds 33% or 3 to V 3. This By-law shall come into effect upon the date of passage hereof, subject to the provisions of the Planning Act, as amended. BY-LAW READ A FIRST AND SECOND TIME THIS — DAY OF 2008. BY-LAW READ A THIRD TIME AND FINALLY PASSED THIS — DAY OF 2008. THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE Mayor, H.S Hughes Clerk, J. Douglas Irwin Schedule 'A -1' This is Schedule 'A-lto By-Law No. 2008 - passed the day of Mayor, H.S. Hughes Clerk, J. Douglas Irwin 6 q ALI-, V- R1*631 N I At A-4 J1, RI-43 0 X S 1, At/ .......... �"�i "III/,', -"" ' PR*118 P SUBJECT A" �� PROPERTY k RI 42 �0' ^ 4Zf A, \x" R Scale I.-1000 EDSubject property to be rezoned from AgriculturallRural Exception 15 (AiRU* 15) to Residential One Exception (R 1 *__). �, o `) Y�. NC0'i - e I Z'bA,-1 0 - Location Map 111 i k 2 Y` facilities, a and o open s F uses. . . . . . . . . . . . . . . . 2008mwZBA=I 0 a n a a IR u u iW' V R ' Vii-$ fitZ:r�Taf c' o Official Plan —currently designated nated Horseshoe Y Valle - Medium Density Residential, which is Y be to re-designated to Horseshoe Valle proposed - g Valley- Low Density Residential which permits single detached dwellin s home occu ations rivate o Agricultural/ Rural Exception 15 (A /RU*15) Zone allows for only the uses that existied on the effective date of this By -law. o Residential One (R1) Zone permits single detached dwellings and is intended to be subject to an exception being placed on the property. recreational f facilities, a and o open s space u uses. Agricultural/ Rural Exception 15 (A /RU*15) Zone allows for only the uses that existied on the effective date of this By -law. o Residential One (R1) Zone permits single detached dwellings and is intended to be subject to an exception being placed on the property. J �. MHBC Horseshoe Valley: Line 4 North &Horseshoe Valley Road Planning Advisory Committee Meeting Presentation: Official Plan Amendment &Rezoning January 26, 2009 'M II MHBC Official Plan Amendment &Rezoning Location: • Horseshoe Valley Road &Line 4 North • South -west corner Total Site Size: • 6.4ha / 15.8ac Proposal: • Official Plan Amendment & Rezoning to permit a total of 4 lots on the property. TC LL, rr -k Subject Site nl III MHBC Applications Official Plan Amendment: From "Horseshoe Valley — Medium Density Residential" to "Horseshoe Valley — Low Density Residential" Rezoning: From "Agricultural / Rural *15" to "Residential One *" Ultimate Proposal: Four (4) lots to permit Single Family Homes III MHBC Servicing Strategy: Servicing: ■ Municipal Water Service • Private Septic System • Servicing solution reviewed by Terraprobe & Cole Engineering and found to be acceptable Traff i c : • Four (4) proposed driveways • Examined from transportation perspective and found to be acceptable Geotechnical: • Terraprobe confirmed slopes are stable • Setbacks of Om from the top -of -bank can be supported MHBC Official Plan: "Low Density Residential" "Medium Density Residential" Permits: • Single detached dwellings • Home occupations • Bed and Breakfasts • Private Recreational Uses • Accessory Uses General Density: ■ 7.0 units / gross ha Permits: • Townhouse dwellings • Multiple dwellings • Apartment dwellings • Home Occupations • Timeshare General Density: ■ 30 units / gross ha III MHBC Conclusion: The proposed Official Plan Amendment and Rezoning conforms to: ■ Provincial Policy Statement & The Planning Act • Places to Grow Growth Plan • County of Simcoe & Township of Oro - Medonte Official Plans • Township of Oro - Medonte Zoning By -Law • Meets the technical requirements of the proposed residential development DRINKING WATER -"q SOURCE PROTECTION ACT FOR CLEAN WATER South Georgian Bay Lake Simcoe Source Protection Region Source Water Protection: An Update on Progress DRINKING WATER -'qq SOURCE PROTECTION ACT FOR CLEAN WATER What is Source Water Protection? South Georgian Bay Lake Simcoe Source Protection Region Capture Zone Boundary Water Table / 1' (` r• A .. ,/ Pumping well S Drawduwn Cunc -��r -- •�-- -" 1 Year 5 Year Time of Travel Time of Travel S ay- Matfirwa "WM Bar, now" W epee, Ni— t. Mamma- UMF al-bie Conjervation kn Coalition Saugeen, Grey Sauble, SaIRM CleorEjian B..Y A-1 "a irthoirn Hr,.cp f-pilLmsula Lake 9 imccic Swasawn valley NwItowd"D a r 9—rek. fhltlddA Virg r—dit VAMY Tnrnnln Aumable BayficJd H.H.. NialMind Vallpy v Lake Fria Hamilton R-Wc4d Uva,". RA- Nimuzira Peninsula 19 :L le Long P,** Thames, Sydpr'whnm C—Ok & Lake '1404V CW) Ontark) Source Protection Areas & Region L-*O Offftrja Lakohead Lon a rl� Misillinsippi. Rideau Valley, va" Cataraqui 41 3"h Nfl- RaWn Region SoutkHatian Northern Ontario ranapdeu Sliidb4y' 'I, Mrltrwu - ID Cl Vv Our Region • Four watersheds • Black-Severn • Lake Simcoe • Nottawasaga • Severn Sound • > 10,000 km 2 • 52 municipalities • 41 lower tier • 8 upper tier • 3 separated cities • 3 First Nations communities DRI N K I N6 WA�TE R South Georgian Bay Lake Simcoe SOURCE PROTEC"TI6N AC�T FOP N FA14 WATF-P Source Protection Region Draft (PO& Az 20"1 N Muskoka ',.Fla libu; ton 'n S-4 in c o e Severn Sound Kawartha Lakes �Source Protection A u t h o r i t y - _ IS. ---!, 1. rn C 0 ja ....... L'a k - a nid, ./ B I k C o u c h i c h i n 4 - _a"4 . �,v e r 'Source P'7rofe-ctio. A u t h oIr i t S i rn C a L, G r Nottawasaga valley'`: alley 1 Source Protection A u t h 0 r i t y D u f f e. I i II rl 1. Peel 2 D u r h a m MM j6If 'b I U_ Muskoka ',.Fla libu; ton 'n S-4 in c o e Severn Sound Kawartha Lakes �Source Protection A u t h o r i t y - _ IS. ---!, 1. rn C 0 ja ....... L'a k - a nid, ./ B I k C o u c h i c h i n 4 - _a"4 . �,v e r 'Source P'7rofe-ctio. A u t h oIr i t S i rn C a L, G r Nottawasaga valley'`: alley 1 Source Protection A u t h 0 r i t y D u f f e. I i II rl 1. Peel 2 D u r h a m Our Region Greatest # of Drinking Water Systems in Ontario • 285 municipal wells • 17 surface water intakes Varied geology • Oak Ridges & Oro Moraines, Niagara Escarpment, Canadian Shield, Karst Topography Diverse population • With both urban and rural areas DRINKING WATER � south Georgian Bay Lake Simcoe SOURCE PROTECTioN ;'Source Protection Region ; ACT FAR f.I,FI,N WATFR'', Draft t— sz --I- N ASi164000 X]11 +M +N +1LI+r'AM+•�Nd 4� '.w.v' +:w�!'MaA•Mn+! •••iii I. 1 . }f'L Muskoka Walibit ton f V � S-imcae $eSevern Sound �, Kawartha Lakes ;Source Protection Authority iy s L a k le` i` 'S i.,m c o `ja a n d C ouchiching'',/B_I c RifVer Source P ;roil "e'�etion / Autho-i•ity, i $�. Simcoc _. 7 } Nottawasaga Valley' ! _ `+ Source Protection di Authority itu.fferist�' i 5ti tiDurham r -_1- Yo r k Peel is' DRINKING WATER ­q4 SOURCE PROTECTION ACT FOR CLEAN WATER Objectives/Timelines South Georgian Bay Lake Simcoe Source Protection Region Fall 2008 Terms of Reference (workplan) due to Ministry of Environment Spring 2010 Assessment Report due to Ministry of Environment The Assessment Report describes the local watershed and available water supply; identifies vulnerable areas where municipal drinking water sources might face a risk of contamination or depletion Fall 2012 Source Protection Plans completed This plan sets out the policies to address significant drinking water threats, monitoring requirements DRINKING WATER SOURCE PROTECTION ACT FOR CLEAN WATER Multiple Advisory Groups Technical Working Group (meets monthly) Municipal Working Group (meets quarterly) South Georgian Bay Lake Simcoe Source Protection Region Communications Working Group (meets quarterly) n DRINKING WATER SOURCE PROTECTION ACT FOR CLEAN WATER SWP region lead (LSRCA, NVCA, SSEA) Landscape vulnerable areas • Significant Recharge • Vulnerable Aquifer Areas Water Budget work • Conceptual through Tier 2 System- specific vulnerable areas • IPZ for all surface water systems • Vulnerability ranking of IPZ • Vulnerability ranking of WHPA for about half of wells Water Quality Risk Assessment • For all SW systems and about half of the GW systems Municipal lead Water Budget work • Tier 3 South Georgian Bay Lake Simcoe Source Protection Region System- specific vulnerable areas • WHPA for new systems and/or revisions (including GUDI) • Vulnerability ranking of WHPA for about half of wells Water Quality Risk Assessment • About 25% of the GW systems SSEA lead System- specific vulnerable areas • Vulnerability ranking of WHPA for about half of wells Water Quality Risk Assessment • About 25% of the GW systems `, DRINKING WATER SOURCE PROTECTION ACT FOR CLEAN WATER Tier 1 water budgets South Georgian Bay Lake Simcoe Source Protection Region • Completed internally • NVCA and LSRCA documents completed and peer reviewed • SSEA report drafted, but future water use data concerning, and being verified by SSEA • Black River stress assessment to be completed (no stress anticipated) s 1 DRINKING WATER -'q SOURCE PROTECTION ACT FOR CLEAN WATER South Georgian Bay Lake Simcoe Source Protection Region (Draft) Stress Assessment for Lake Simcoe subwatersheds moderate stress highly stressed Tier based on sensitivity M5 Current Future Conditions - C onditions - annualstress annual stress Current C onditions - monthly Municipal System Tier 2 recommended Groundwater Groundwater 0roundrater Surface Water 0roundwater Surface Water Groundwater Surface W ater, ra11 ged West Holland 11 13 Apr -Sept Oct Yes No Yes No East Holland 90 102 July Jan -Dec May -Aug Sept Yes No Yes No Black River 4 6 June -Sept May, Oct Yes No No No PefferlawBrook 15 16 May -Aug No No No No Uxbridge Brook 7 8 July -Aug Yes No Yes No Beaver River 3 3 Jul -Aug Yes No No No f I1xla11ged Innisfil Creeks 2 4 May -Sept Apr Yes No No No Lovers Creek 7 11 Yes No Yes No Talbot River 16 16 Aug -Sept Jak,Frl,,raa;,Jike, Oct, Dec No No No No Whites Creek 0 1 No No No No Barrie Creeks 141 183 Jan -Dec Yes No Yes No Georgina Creeks 4 6 balance ofyear Mar, Apr, Aug No No No No HeWtts Creek 9 13 Yes No Yes No Hawkstone 1 2 Yes No No No Maskinonge 22 20 June -Aug Yes No Yes No Oro North Creeks 1 1 July June, Aug Yes No No No Oro South Creeks 1 8 July June, Aug Yes No Yes No Ramara Creeks 1 1 1 1 Yes No No No moderate stress highly stressed Tier based on sensitivity M5 DRINKING WATER -"q SOURCE PROTECTION ACT FOR CLEAN WATER South Georgian Bay Lake Simcoe Source Protection Region (Draft) Stress Assessment for Nottawasaga subwatersheds Tahla , 9 AnninI ,trafifiAcgFgtirnant ;iirnrn2ne Moderate Stress High Stress urre FIT Conditions- annual stress F a ure Conditions- annual stress Current Conditions- month14 Municipal S./stem Tier 2 recommended Groundwater GrounNeater Groundwater 3urface%Af ate r Ground +Hater Surface'Aater G rou nd,otate r Surface'liVater Gauged BoVrie River 7 7 Jul -Oct Yes No No NO Innisfil Creek 12 15 Jul -A ug July -Oct Yes No 'Yes N0 Mad River 2 3 Yes No N ID lJo Middle Nottawasa 7 9 JUI+ -Oct 'Yes N 0 Yes N_1 Pine River 7 10 July Aup 'Yes No 'Yes No Upper Nottawasa a 7 7 Jan,Feb,June - Nbv Yes No l"Jo No U Lower Nottawasag 4 5 Aug Yes No No No Blue Mountain Wat_q 1 1 J1-1I ,LOct Yes No No N0 l Illow Creek 1 4 6 Auq Yes No 1%] ID Nr_ Moderate Stress High Stress uRc v 7 �, O U L11 G e ° lgia n Day 2 Water Budgets � Sl.kr Shocoe PRO.-TECTI Watershed R eg io ri LSRCA Holland River (East and West) Maskinonge River Uxbridge Brook Beaver River Barrie Creeks Lovers Creek Hewitts Creek Oro Creeks South NVCA Pine River Middle Nottawasaga River Innisfil Creek SSEA A. °trs feflow + rrao +v an 11 � "H S P F r r FefIow ,Feflow and `;ancl HSPF -0 Moclflow '; and PPM,,z �a d Moflow and - VVABAS rte.. DRINKING WATER -q'q SOURCE PROTECTION ACT FOR CLEAN WATER Intake Protection Zones (IPZ) Lake Simcoe and Couchiching • 1 PZ drafted South Georgian Bay Lake Simcoe Source Protection Region • Scope change negotiated to address final directors rules (IPZ 3 change and vulnerability ranking process for Lake Simcoe) Severn River / Little Lake • 1 PZ drafted • Scope change being negotiated to address final directors rules Georgian Bay • 1 PZ drafted • Scope change being negotiated to address final directors rules DRINKING WATER -..q SOURCE PROTECTION ACT FOR CLEAN WATER Wellhead Protection Areas (WHPA) LSRCA • 83 Wells NVCA SSEA Wells / 100 m zones • 285 2 year capture zones 104 Wells • 184 • 89 Wells Black- Severn • 9 Wells 25 year capture zones 153 South Georgian Bay Lake Simcoe Source Protection Region n d DRINKING WATER --N SOURCE PROTECTION ACT FOR CLEAN WATER South Georgian Bay Lake Simcoe Source Protection Region Wellhead Protection Areas - geographic coverage 43337.7 100.0 4.08% J all WHIPA ha all 'VVHPA % % region InCILI trial / commercial 3748.3 8.6 0.35% gI-iCLI ltLi raJ 14647.3 33.8 1.38% Open Space / roads 1 7593.9 40.6 1.66% Residential 7 4 .2 1 17.E 1 0.69% 43337.7 100.0 4.08% J DRINKING WATER SOURCE PROTECTION ACT FOR CLEAN WATER South Georgian Bay Lake Simcoe Source Protection Region 166.6 0.55% RZ -1 Ila 2 yr TOT ha total VLIIn ha total `% `% re ion Industrial 1 comn1ercial 37.3 620.5 665.9 11.4 6.06(% Agricultural 1.3 1269.7 1271.1 21.7 0.12`%l Open space 1 roads 250.5 2266.2 2464.7 42.6 0.23(%l Residential 191.5 1272.6 1464.1 25.6 0.14`! 166.6 0.55% DRINKING WATER --N SOURCE PROTECTION ACT FOR CLEAN WATER Risk Assessment Projects Tasks involved: South Georgian Bay Lake Simcoe Source Protection Region • Issues Evaluation, Transport Pathways assessment, Vulnerability ranking of WHPA, Threats /Risk Assessment Experts retained: • Jagger Hims Limited (SWP Region study and 2 municipal studies) • Golder Associates (SSEA and multiple municipal projects) • RJ Burnside (Dufferin County area) • Gartner Lee Ltd (Aecon) (Durham GW systems) 117) • Jacques Whitford (York GIN systems) DRINKING WATER SOURCE PROTECTION ACT FOR CLEAN WATER Upcoming Communications Activities South Georgian Bay Lake Simcoe Source Protection Region • Mailings to landowners in the expanded zones (2 yr TOT of a WHPA and IPZ 1 of an intake) • More in person visits during summer 2009 • Municipal Workshops: 4 planned this year • Deputations to Council (52 municipalities) • Outreach to community groups and associations (mailing and follow up presentations) • Attendance at events (Ag Info Days, Georgian Bay Waterworks Conference) • Article submissions to relevant trade publications �n • Working with partners (York Region, Wellwise Resource Centre) to deliver s programs /workshops Funding for risk reduction ,A Eligible Projects' t. .. • well decommissioning • septic upgrades (including pump outs) • pollution prevention reviews • land conservation measures Eligible Areas • 2 year capture zone of a municipal wellhead • 120 m (inland) of surface water intake 0 Source Water Protection Strategies for M u nici pa I Stakeh old ers A series of four cornpl mentary workshops that will refresh the way that you think about source water protection. Topics include: lRisks to Water Supply • Current Financial Incentives • Existing Tool s for Lard Use PI ann ing • and much more, So tie the Dates (8,,3 O c .m. to Moon) April 2, M ay29, Sep tem ber 17 and October 29 Watch for Your<de tai ledinv tvtion cofn in g in February or see avww.ourwatershe ;d.ca 1 FBI ! ICI SIG. W TER ,� �:e Nft ftm See "M " L�te:ilm b.fT F�IF. ;LEAF♦ ". "d "_a Reem DRINKING WATER --N SOURCE PROTECTION ACT FOR CLEAN WATER South Georgian Bay Lake Simcoe Source Protection Region www.ourwatershed-ca 1 800 465 0437 Leigh, Andria From: Irwin, Doug Sent: Wednesday, January 14, 2009 9:36 AM To: Council Cc: Senior Management Team; Othman, Samah; Teeter, Janette; Brissette, Marie Subject: FW: Draft Lake Simcoe Protection Plan Attachments: FINAL NR—Draft Lake Simcoe Protection Plan Jan 13.pdf; FINAL BG—Proposed Lake Simcoe Protection Plan—Jan 13.pdf From: Watt, Heather (ENE) [ma i Ito: Heather.Watt@onta rio.ca Sent: Tuesday, January 13, 2009 6:06 PIVI To: Watt, Heather (ENE) Subject: Draft Lake Simcoe Protection Plan This e-mail is being sent on behalf of Steve Klose Director, Lake Simcoe Project On December 10, 2008 the Lake Simcoe Protection Act became law. Building on Ontario's watershed- protection approach in the Clean Water Act, the new act requires the province to establish a protection plan for the lake and surrounding areas. The draft Lake Simcoe Protection Plan is the most comprehensive watershed- based legislated plan in Canada. The draft plan is based on advice from the Lake Simcoe science and stakeholder advisory committees and from the people who live and work around Lake Simcoe. The draft Plan sets the priorities and targets for addressing key threats to the health of the Lake Simcoe ecosystem based on science. Key threats to be addressed by the Plan include: • degraded water quality due to pathogens, toxins, and excessive nutrients (e.g., phosphorus), • loss and fragmentation of sensitive natural areas and habitat (e.g., shorelines, wetlands, woodlands, riparian areas), • newly introduced species such as zebra mussels, • emerging threats such as climate change, • changes to the hydrologic cycle (e.g. water quantity changes), and • other human pressures such as recreational activities (e.g. fishing and other resource uses). Your comments and feedback will be important, as the government finalizes the draft Plan. The Protection Plan is being posted for public comment on the Environmental Bill of Rights Registry (www.ebr.gov.on.ca) until March 16, 2009. The posting number is 010-4636. The government is also hosting two open house sessions and four community partner workshops. These sessions will provide interested public and community partners with an opportunity to meet with government policy staff to learn about the plan and tell us what they think. The times and locations for the public information forums and community partner workshops are: Public Open House Sessions (5:00 p.m — 9:00 p.m) Barrie - February 4, 2009 (South Shore Community Centre, 205 Lakeshore Drive) Newmarket — February 25, 2009 (Newmarket Community Centre, 200 Duncan Drive) Community Partner Workshops (9:30 a.rn — 4:30 p.m) Barrie — February 6, 2009 Jackson's Point — February 9, 2009 Newmarket — February 20, 2009 Orillia — March 4, 2009 To register for one of the four community partner workshops, please use the following link: httl2://www.communicor.ca/Ispp once you have registered you will receive venue and location information. There is no registration required for the open houses. Municipalities are important partners in the protection of the lake and the plan recognizes the contributions already made by municipalities to protect the health of Lake Simcoe. In addition to the opportunities to provide input which was described above, we would like to make ourselves available to your municipal council or committee to discuss the draft protection plan. It would be beneficial to understand your specific areas of interest so we can tailor the presentation to your municipality. If this is of interest to your council or committee please contact Jason Niblock at 416-327-9467 to schedule a date before the end of the comment period. We recognize that the health of Lake Simcoe is a common interest to all our community partners and we look forward to working together with you to protect Lake Simcoe. For general information about Lake Simcoe, please visit our website at: http://www.ene.,gov.on.ca/en/water/lakesimcoe/index.php. This site will be updated regularly so please refer to it often for the latest announcements and information. Thank you in advance for your interest and participation. Sincerely, Steve Klose Director Lake Simcoe Project Environmental Programs Division Ontario Ministry of the Environment Ontario Ministry mf the Environment TAKING THE NEXT STEP TO PROTECT LAKE SUMCOE McGuinty Government AksA8OOta/ian8 To Comment OO Protection Plan NEWS January 13, 2009 The province is asking Ontarians to comment on the draft Lake Simcoe Protection Plan. The draft protection plan represents the next step in protecting Lake Simcoe and follows the passage of the Lake Simcoe Protection Act on December 10, 2008. Building on Ontario's watershed -protection approach in the Clean Water Act, the new act naquinae the province to establish a protection plan for the lake and surrounding areas. The draft Lake Simcoe Protection Plan is the most comprehensive watershed-based legislated plan in Canada. The draft plan is based on advice from the Lake Sirnooe science and stakeholder advisory committees and from the people who live and work around Lake Sinnnoe. The draft plan proposes voluntary and mandatory measures to restore and protect the ecological health of Lake Simcoe and its watershed starting with the most critical areas: • Improving water quality by curbing the amount of phosphorus entering the lake and reducing the lake's current excessive phosphorus levels ho44 tonnes ayear • Protecting and rehabilitating fish habitat, wetlands, woodlands and the vegetation that buffer the |aka, rivers and atrenrna • Managing the potential impacts of climate change and invasive species. Going forward the plan would not be applied b existing developments or development proposals that have already obtained significant development approvals. The Ontario government has also committed $20 million over four years to help protect Lake Simcoe through research, monitoring and on-farm stewardship activities. QUOTES "The approach we are taking is intended to ensure the lo health of the lake and its watershed ecosystem," said Environment Minister John Gerretsen. "We need everyone from around the lake toparticipate in this process and make this plan work ao that future generations can continue to enjoy thiGvvondurfu|reeou,Se,^heodded. QUICK FACTS • Human activities have been affecting the Lake Sirncoe ecosystem fOrmnreth8n2UUyn8ra. • Lake Simcoe's watershed crosses 23 municipal boundaries including Barrie, parts of York and Durham regions, Kavvortha Lakes and GirnooeCounty. • Thirty-five rivers flow into Lake Simcoe including the Holland River, Black River, Beaver River, Peffedavv River and Uxbridge Brook. LEARN MORE Learn more about protectinq Lake Simcoe. Ontario � � \ BACKGROUNDER Ministry of the Environment January 13, 2009 The Lake Simcoe Protection Act and the draft Lake Simcoe Protection Plan raise the bar for environmental protection of a watershed in ways that Ontario has never done before. Building on Ontario's watershed-protection approach in the Clean Water Act, the new act requires the province to establish o prntmotknl plan for the lake and surrounding areas. The draft Lake Simcoe Protection Plan is the most comprehensive watershed-based legislated plan in Canada. The draft plan is based on advice from the Lake Simcoe science and stakeholder advisory committees and from the people who live and work around Lake Simcoe. Draft policies work together to meet the objectives in the act of restoring the coldwater fishery and protecting the ecological health of the lake. Protections will apply consistently across the vvatershed, which includes 23 municipalities. The draft plan takes an ecosystem approach. This approach is science-based and considers cumulative impacts. K recognizes that e healthy environment ka the cornerstone ofhealthy communities and a healthy economy. The draft plan is both precautionary and adaptive. It exercises caution in favour of the environment when there is uncertainty about environmental risks. It will evolve and improve over time based on new science, changing conditions of the lake and experience in implementing the The draft plan is the first of its kind in many ways: • It would require the development of a comprehensive phosphorus management strategy based on a phosphorus long-term goal of 44 tonnes per year, an amount much lower than current loading and based on the health of cold water fish communities. • It would require municipalities to prepare master plans to control stnrnnvvote/, which is 8 significant source of contaminants entering the |oha. • |t would require the development ofo comprehensive climate change adaptation strategy. This strategy will be central to helping the vvaiorahad`a capacity to adopt naturally tOfuture climatic changes. • |t would ban the import Of live bait. This is3 key step in tackling invasive species and restoring the ecological health of the lake. * It would protect the Lake Sirnooe shoreline and natural heritage features in the watershed by restricting development and site alteration in key natural heritage and hydrologic features and imposes clear shoreline protection zones: o 100 metres for undeveloped Lake Simcoe shoreline areas o 3O-12U metres in built up shoreline areas * 30 metres in settlement areas, where feasible. Plan policies would not beapplied to development proposals that have already obtained their significant development approvals, for example, decisions made by the Ontario Municipal Board. The draft plan integrates and builds on Ontario's existing hon)evvVrks for environmental protection and land use planning. This would provide protection for the lake where it most needs if without duplicating existing protections. The draft plan provides for ongoing scientific advice on the ecological health of Lake 8imcoe.on policies, programs and regulations being developed, and on the need for new policies. The draft plan builds on the nggu|eb/ry and atevvunjahip no|OS of existing onnnrnunbieS' organizations, businesses, landowners and the public, and seeks to involve these people in the implementation and review of the plan. The draft plan isavailable for public comment until March 10.2009. Read and comment onthe plan at m through the Environmental Registry at www.ontario.ca/environmentalregistry. The posting number is 010-4636. John Karopitu. Minister's Office, 41S-314-G736 Kate Jordan, Communications Branch, 416-314-8666