Loading...
09 22 2008 Site Plan Control AgendaTC)WNSHIP CAF C~RO-MEI~C~NTE AGENDA SITE PLAN CONTROL -TECHNICAL SUPPORT GROUP TO BE HELD AT THE ADMINISTRATION OFFICE ROBINSON ROOM MONDAY, SEPTEMBER 22, 2008 C~ 1:00 P.M. 1. 1:00 p.m. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF: - "IN ACCORDANCE WITH THE ACT". 2. 1:05 p.m. ANTONIO AND PAUL RIBEIRO -SITE PLAN APPLICATION MOON POINT ESTATES -LOT 3 -TOWNSHIP OF ORO- MEDONTE WARBLER WAY ROLL #030-012-42724 The owner is proposing to construct a single detached dwelling, to have a gross floor area of 317 square metres {3412 square feet). The property is zoned Shoreline Residential (SR*162 and SR*171) Zone, and is subject to a Holding Provision requires completion of a Site Plan Approval and Execution of the appropriate Site Plan Agreement before removal of the Holding Provision by Council and subsequent issuance of a building permit. Township staff and LSRCA have been circulated the Site Plan and comments will be circulated at the meeting. rli~; CORPt~I;<a~1~loN ~» ~l'1IT~ ~~owNSI~IP vl~ t)RO-~9I~DON'rE SIT>~ PLAN APPLICATIC)N SUBMISSICJN NC). 2008-SPA-~' ~i ASSESSMENT#: ~'.~` ~ ~..~~ - 1 `! ?- ~~ ' '~ MUNICIPAL, ADDRESS: MAILING ADDRESS: Township of Oro-Medonte P.O. Box 100 Oro, Ontario LOL 2X0 LOCATION: 148 LINE 7 South PHONE: (705} 487-2I 71 F"AX: (705} 487-0133 Application for Site Plan Approval [~] I/We enclose herewith application and processing fees in the amount of X1250.00 far a Site Plan Approval with Site Improvements having an estimated value of under $ 50,000.00 $ 1000.00 of which is potentially refundable). [ ] IIWe enclose herewith application and processing fees in the amount of $5500.00 for a Site Plan Approval with Site Improvements having an estimate value of over $ SO,000AO ($5000.00 of which is potentially refundable}. Application for Site Plan Revision [ ] I1We enclose herewith application and processing fees in the amount of $300.00 for a Site Plan Revision ($200.00 of which is potentially refundable}. Application for Site Plan Agreement & Removal of Holding Provision regarding Private or Unassumed Roads [ ] IIWe enclose herewith application and processing fees in the amount of $250.00 for a Site Plan Approval & Removal of Holding Provision regarding Private or Unassumed Roads (none of which is potentially refundable}. Application for Site Plan Agreement & Removal of Holding Provision Assumed Public Roads [ ] I/We enclose herewith application and processing fees in the amount of $250.00 for a Site Plan Approval & Removal of Holding Provision Assumed Public Roads (none of which is potentially refundable). To be completed by the owner or authorized ~~ent Please pl-int or type: 1, Name Of C?Wner ANTONIO RIBEIRO & PAUL RIBEIRO FUII Malling Address TONAR CEMENT FINISHING INC. 1357 DUNDAS ST WEST, TORONTO, ON M6J lY3 Telephone NUmber OFFICE (416} 251-6200 CELL {416) 896-0350 BRANDS L. CLEMENT, MURP, AICP, MCIP, RPP 2. Name Of AUthorlZed Agent (If applicable) PARTNER, SENIOR PLANNER FUII Ma~hng AddreSS THE JONES CONSULTING GROUP LTD. SUITE 100-300 LAKESHORE DRIVE BARRIE, ON L4N OB4 Telephone Number (705) 734-2538 EXT. 224 3. Please specify to which of the following all communications should be sent: [ x] owner [X] agent [ ]solicitor 4. Full legal description of the property which is the land subject of this application including name of former municipality in which it was located. E.g. Lot 1, Concession 1, Township of Orillia. (Note: a copy of the Land Transfer or Deed to the satisfaction of the Township is required to verify legal description at the time of the initial application being submitted) LOT 3, PLAN 51M-881, GEOGRAPHIC TOWNSHIP OF ORILLIA, TOWNSHIP OF ORO-MEDONTE, COUNTY OF SIMCOE 5. To be answered by the Applicant: 5.1 Are you the registered owner of the subject lands? Yes No x 5.2 Do you act on behalf of the registered owner? Yes x No 5.3 Do you have an option to purchase the subject lands? Yes No x. 2 5.4 If applicable, Gvhat is the expiry date o1` the Qpiion as r~~entioned in 5.~"? Id, A 5.5 I Lave you made an offer to Purchase or Agreement of Sale in respect of the subject lands, or any portion thereof with the Registered Owner? Yes No x 5.6 If applicable, what is the expiry date of any Offer or Agreement as mentioned in 5.~? NlA 5.7 1f applicable, is the Offer or Agreement as mentioned in 5.5 conditional on the success or failure of this Application? Yes No NiA 5.8 Do you have an offer to lease the subject lands? Ycs No x 6. Present C)fficial Plan designation(s) sxoRELINE 7. Present Zone CIaSS]flCatlOn(S~ SHORELINE RESIDENTIAL (SP*162 AND SP*171) 8. Present Use of subject lands vACANT 9. Proposed L1Se Of SUbaeCt lands SINGLE FAMILY RESIDENTIAL 10. Applicants reasons, argument andJar justification for requiring the proposed Site Plan Approval (attach a supplementary schedule if necessary). SITE PLAN APPROVAL FOR LOT 3 REQUIRED PRIOR TO ISSUANCE OF BUIDING PERMIT FOR A SINGLE FAMILY DWELLING. 11. Has a site plan sketch, adhering to Site Plan Review Guidelines, been included with this submission? Yes x No 12. What other Provincial Ministries or other Agencies or individuals have been consulted prior to the submission or Application? (e.g. Ministry of Municipal Affairs, School Boards, District Health Unit, County Engineer, etc.) LAKE SIMCOE REGION CONSERVATION AUTHORITY 3 Please note only fully completed applications accompanied by the necessary supporting materials and fees will be processed and are considered complete applications. Please refer to the Site Plan Guidelines for a complete list of information requirements. Uwe r~1jt C ~~~ of the ~.'.,- t~~ of ~a~~-~tC in the ~,oy~-;..,~ of_ S; r~-~ t~s~~.~ hereby apply, as previously specified, to the Corporation of the Township of Oro-Medonte. It is expressly understood that this application is in regard only to the lands described, and is made pursuant to the provision of The Planning Act, 1990. I understand that the personal infannation on this form is being collected pursuant to the Planning Act, R.S.O., 1990 e.P. l3 and will be used in relation to the processing of this development application. I solemnly declare that all the statements contained in this application are true, and I make this solemn declaration conscientiously believing it to be true and knowing that it is of the same force and effect as if made under oath and by virtue of the Canada Evidence Act. DATED at the ~ ~~ ~ ~ of _ '~t..n.,~,,~ this ~ ~ day of ~ ~ ~ . T , 20~. ~~ (Si Solicitor, or Authorized Agent) DECLARED before rpe at the ) ~: ~ z~ ~ ~ ~ of f.. ~~ti_ ~., in the ,, ~, of , -.,~i ~~ {x~~ ) this ~ s4~ day of r~~,~~,-.a-t 20c ~~ ) re ,` {. _ z A Commissioner, etc. Applicant, Solicitor, or Agent} The pers al information on this form is being collected ursuant to the Planning Act, R.S.O., 1990 and will be used in relation to the procession of this consent application. If you have any questions, please ask at the Oro-Medonte Township Office. ~andre Lee MecArtdtnvw, ~ C~t~~ile~it#ttet, ate., County of tae, tar ~6 6unwoody LLP Chartered Accountants and 8t)0 Q!~nwoody ~rmtted, Trus#ee in Bankruptcy. expires December 4, 2409. 4 r. ,_ , 1N6rTE~Ski1Gh ~~~~~.~~ n~,~i~ nom: ~ ~l ~ ~\ 1>~poc~~` s, `~\~, y V ~ ~ ~ . ~-~' 2/~~of~../L/~J`../~../~~../~JA.iA/~./~./~.h ~~ ~, o° WD>£ nc oELCLLVUVII ENAflOP[ 1aKAITD Ru1a5 ro Mr AREA ar nsf l0i MIpp1 YAY EE U71117m fOW EUD810. SEPiC $T$I(y /y1pF]N~~ APPROAWIIA7k1~Y IFAOI tApf~NT@~ AAE~T[~ H4 Of C~AO7I~pIAT X SIAM AE T~F~~A/ O A~PPA t0 m Td7l[A~ IgA77~~BY~LDi 9A96 iNE CCga~Td K P~IfApE µ1LRA~110M9Y~ IWtlLOE nr AAEAS [sfxclm Er qwu, SEPnG smw, ousrAAr. SW/AI CONSiRUCTOW ANO MSIA/91pIQ1[ ACCFIl Aru NANwN~iolx~>~j° txRaeRl >K srz PLAW ----y -~ ~, -', ",y~./~/~~/µ ~c~/!,~. ~6. ,~ ~~ ) ` ` ) \I ~~~ r~ P° \~~ ~ ~ ~'~yR~~~ ° ~ ~. i) t~p.O4r `"'Lake Simcoe "' AVERAGE HIGH LAKE LEVEL (219~t5rn) ~ n ~ 12 aRILLU .t~ r '~- - si Jo'` sa uKlar~a Pmnl Ingle Bay ~ ~y_ n vaM oarrc uesl 'b TE ^~ ~~ t L~'" ~, s Moon ach ~'~&, LANE SIMCOE KEY PLAN sue i wmo SHORELINE RESIDENTIAL (SR• 162` REDUIRED PROYgED LOT AREA Min. 2000m2 7241m2 FRONTAGE Mm. 18.8m 18.Bm FRONT YARD Min.75m 15lkn AproA. EXTERIOR SIDE YARD MIn.15m WA INTERIOR SIDE YARD Min.3m 3.25m REAR YARD Min. 7.5m 37.Im LOT COVERAGE Max. AO% 4%(317m2) ~t9au LEGEND DEmw auEE .sIW2u Fx EWSiW GWA9[ -1/~•" 9AiFAQ DAAIU¢ LSx - ndr DRxalarl Alo snPE alxc ~All'A- E7ISIIMI CpIIOM/FlEYA1KN • - • • • • • - PRW. 7 : I YAx 9-0PE EROSgI NATAID S 79ACx E 70Are igM4P / NATUUL NFPoIACC SEIEAL% _..-.- 190 KM - WAA[ UPI11S1 iLDOD I11T _~..__ PIIOP. lARAWJI iDll llIEE PW01ECIpN --------- Pa DETN. DEIxLauL>t1 olwoPE u1rs \ - - - - - - `.. v `• PROP. 1EWONIRY Raac aErx Dw ~4~? ~~N~ PEW L91fa slD. 3ro7-oe-m ® PRaPGeED OPnE18AY !1115 ~. /`/\~ ~ ama~ uooinaA~iEC~nayi~ ah. ~ ~~,~~,;~. ~ ~,,~,~. '~ WOKS t. ~j~~l //~ All AMP PUPS u+D RAWAAIpe ttADms SVAL pswARa ---~"~"~~. ~~ i / OWTO ~LAA1 PADS AT OWOUtl IF1EL (\ _ FA<601e ! 1RII PWQ OfTl1 NOpIATON BUILDING ELEVATI ~` ^^^^ ~ m ''~'°°"'~ "` AND'b" p ONS ME51;p FIRST FLDgi 211.70 ~ 1lU]gl q AEY011lE1f W A0.USe AE UMfASEE Of ` ioP U FOUNDA710N WALL 220.95 e001WC ajYATA1N N iNF fE1D 70 ENA1S m05T COgI \h7' 11NMIfR SIDE OF f001NC 2147E ~~M~^ NLtgSTMISEO A1EA5 1pN REWtf YIMY a~ fIWIS1Ep GAMGE F100R 220.E0 IOOnni 70PSG- ANp 500. TOP U FOUgAl10N WALL (GARAGE) 220.95 _.,__~ uNOEn suE a FooTwc )GARAGE) 219.7E e -__='~, ~' ' wNrRACroR ro EN7LwE I.27m NIL slaWn s1E capllDNS AT nc 71r a S~ COVEA OVFR FOOTAWS COIISiRIIC9DN OWFFR FRW 11gY W15RLAim ql iNq PLAN CR 11F OMAILL LOT ORIDIIC PLAIA 1tC FW011Efl1 SWLL R D9WSA.ITD y 1.1M1}~ ~./~_/~ PRgW 70 PRODFEg1C IAA1 CWSWAIOIMIN. 6 _ __ _ rv M1 ~ "--`\\ ~ ~'~ DIfRA11 l0i ORA011G PLAN, DE IDAl191P STAIDAROS r n ~ E. % k~ \ ~~ 410X~ WA1ER El~f1~AIIgL~F007P105 910L1D BEkuO a ABME n[ SEASONAL fIGX fA011gWA18R pEYADOtK /RT ~` ~ ~ ~ a r \c• ~ '! ` aroullONS A ilE GRADES PROPO¢D 10 AI10P65 A wa ry N3~. r - ; ` \ a+aWOwArFR aWdnaW awl x APPAOI(p eY INF OYJIEfl1 ~.,~~ a y ~ ~ ~.. « ADVAWCF. ROBIN SMITH ENGINEERING ~®aC""--~~ MOON POINT ESTATES ConSALtech Engineering Solutions Box 35, Moonstone, OnLatio eo. slcnp°n~sL C.wmaa o°,a.p, lot tro Pn. f?o51 e9s-isse ~.D host 7e1-secs P.R.P. SLR1H • °®° SITE GRADING PLAN a°a: rosoTl-sue car msauiele va. cos alzssic 6~. It05) 896-68P1 e~ ° OESRPI SL SfJlE: 1:400 DAIS AN[, 200E LOT 3 -MOON POINT ROAD DRAW GEN. No. REHS~oNS oATE INrnaL PLAN No. 51M-881 LNECI(m RP5 DWG. NQ LOT-3 r r TREE INVENTORY mew r+e OlniRe Mbre! RmLa OekmJeelw b h ._ ~_ % ~ SEED Mix TYPE ^x.ta~ao to mr un am.uro wAm[ waf mnAt . 1al YfMgIL~aOM iw aoMSg6 , mD IM5 YdA mUW1l6 Nq wY MSn lYr0. . M1AR WNV,T (1p6 M4T pM%S NW wdlR) wao. »mn «nw .w rrGSavC rw nwc wr x~nc rc mmw eroa • zc wtwwu . ~~ .sue a 9D°0iom~.c u~ arat runic tmrnmc moms r% ro a uu dbWli tgq/m} IOf 41E LOemil011k iow-rwnnr, ao, ar-u[ ,va awr sou YgpNl+ a ~ooout[rr utr aou ocarutt xur mro wmrwr taawrc att to ewe fw mns u2 x 4A~ Pon: ar[ oataarr~t macat®~ a r uar u n ro as a s .uvaoxwtar iea a opf ~uwrm«c ~ m rawawi a me.wmq~/~,r ~ rrrAO~RD a ~. a1r(~pelraOMa~ywWm~~" ~1Hy 1~M~a5 V1T~C't07 tY~ 30'M MW4 pm[M.rY. n R Rnlam R~WfFN4~1015 ~riimur~ mal cmdrw o[ an n.rrr ~Ittou r rwr.~ra ~o ~rraar u!,ras PART 5 ~4 ~?.~RT 4 r. ~`ti . i WATER'S EDGE l -WET POCKET ~~ ,~ ,, ~?4 . ;t~P J 1\ "~ ~; Q~ t"a+ ,tam ~ SILT FENCJ: .-f'ERLSRCA ST0201)3.08 29 '~ Pl TEMPORARY fie, ~.ar ~ ,~ .. ROCK CHECK DAM r . PER LSRCA ST02003-08-29 ~tre7 ~~~ o ~' . ~ ~jTYP) t, ~ ~T3 ~ s ,~: d' 4 ~t~ s,~8° ~e* ~ _ ~ ~.. ~,~ j--27.bM®0.5%SWALE A~u;~ ~~. srk'r ~ ~ ~ ' - ~ ' ~ , . 1 t ~~~~ ~ t' ~ ~ OUTLET O2 ~h °4 ~ r t~ ' ~f~~,~. e~° r ~ ,. ~~+~rrr ~~ ~ ~~` d,. °4+. ~ROP, SWALE i~ } 1 k I ' ~ WATER'S EDGE ~a ~~~ ~ ~• v r '`~ rpV~~. ~ ~'" ~.r• ,: ? ' ~ ~ ~ , - ~~ . ~,, y~ ,, ,~ `~~~~ ` ~ ~`.~~ Lake Simeoe ~~ (AVERAGE ii1GH LAKE LEVEL 219.15uA - ~ ._ ~ =-.-~ ~ - \ \,\ . ~`~ O.. x ~ a ~` ,' ~ -,• .' -- w i ,.. i ~ w i { ? ~( - , f i e ~~~, ~ F ~/~ i'~~',{r its ,f ~ .. ~" ~ 114,~~ ~~,.- r' v q ~ ~ ~ f~ MOON POINT \'`' ~~ ~~ ~ ESTATES - LOT 3 TOWNSHIP OF ORO MEDONTE ZONING SHORELINE RESIDENTIAL (SR`162) REOUtRm PRO1flDEp lOT AREA ANn. 2000m~ TY17n' FRONTAGE Mln 18.Bm IB.Bm FRONT YARD Aen 75m t/tm apptml EXTERpR SSE YARD MUr.7.5m N!A INTERIOR SDE YARD Rtin 3m 1.7im REAR YARD Mm ).Sm 35,7&n l0i CO4B7AOE Mar. /a% 7%(S10m'} SHORELINE RESIDENTIAL ~SR'171J BIILMNGS ~ STRUCTURES ARE PROHIBti&J. THE AlAIUMlNA 1Y~TH OF AN ACCESS7V~W CORRDOR ExrENOa+c FaoM THE WATERS EDGE To THE zoNE BOUNDARY BETWEENSR't6t AND SR'177 ZONES IS77A~XtiES j ,t~' ~`~tl a rt.: nay i 7 \'i ti-' VI I .. 1 ^l . _.,,(Sr R~ ~ ~ _ ~ Pci o roe. ' ~*' ~ U ~~~ ~ .co a+ri [.~ o s1 Xmnc ~\ % ,L f = ~-'"` ;gyp, e:; ~, ~~ ~ ~ ~s Sroa~ \b ~ ti ~ `.: r5r ~ b "~ _.~ i. _.. f \s ~~\~~~„ KEY PLAN SCALE 1:10,000 Site Plan Moon Pdrd Estates Lot 3, Plan 61M~881 (0eopraphic Township O(Oritia Sou~em D'rvrvision) Townstnp of Oro Madonla, County of Simcoe 2008 u~ .. fmwGaxrnAflevauae :. enenawic T raor ~ i wa aore ,.~. naroxaaae _ _ [RRt,eNIMtXmeEtabc 10,x tOYMW -M~rUVL~BGr~t@5[ra~0~ mcrteatme~ar rmrwr~rMceawmrAOOOUm raa ntr~»xvuwwnoamaa ~_ rrur w,uEawanrenroacna radeY/0. ~'-' exrnce,um munre i xgrowoleplo awmrteeuare ivxn oF¢ax+umemaarc uauoerc for muneaamcaxnurwwnur cmcr®toaYE~ercwwma rnauwiw uorc+mew wRauwioru+ rroxuuraanm uqu rnorfft YE A'An reroeier~ Q usxcaouvsmm~art wxne*o urwx mwn*m «rxruxuwnxo v[~tramcran exaeY roaar raa.,USOrwn aawaca our ~~~ raowaeowrenar rutte mameorrowcwommrtNrrxwa+rcc+ rota. ut mwruerawgwMwnaunoEp mrui os wmE ouro mva~ r+w er nwao reva. 3 EROPMftIEE rPa. ai4 AFOIOA~Iiel, unau~u wn~waxnfmc. r ~sarranuroeeaawco erouu rcoocsiarea ascurta SCALE 1 '. 400 (Ai) 's :`t sp Hens MOON POINT ESTATES -LOT 3 51TE PLAN Ode Wum1: AUDUSf It, CheckeE 8y: BC ProjM NO.: RIB-Oatp6 ~ ~ mss. y do•bg Norta: RIB-08106-SPid.dt ~E ~~~lf JONES :G ~ ~R~ caxvxmmwrairiro. ~ n,uxea's.ewuas~wacraxs ~~f ~~E ~~>»~ ~ N ru.~nmr r uru i I' r j .~ _,j ~y i ~ i, ._ E; i - . .. ~ - ~.n{ ~.i;3:. i l ~~ e~? CONSU LTING GROUP LTD. PLANtJ FFtS, ENGINE€R5, SURVEYORS r F,. ~.-i `. ~ I ~ f i~_ ~ ~ ~"t i ~ ~ ~ f ~ f i To Site Plan Committee Firm Township of Oro-Medante Copy Andria Leigh, MCIP, RPP, Director of Planning Township of Oro-Medonte From Brandi L, Clement, MURP, AICP, MCIP, RPP Tei: 705-734-2538 Ext 224 Partner, Senior Planner Fax: 705-734-1056 Date September 22, 2008 Our File RIB-08106 Re: Cleared Site Area vs. Non-Manicured Vegetated State Area in Square Metres Percenta e of Site Area Total Site Area 7234 s .m. 100% Proposed Area of Non- 4375.25 sq,m. 60.5°/a Manicured Ve etated State Proposed Cleared Area 2858.75 sq.m, 39.5% {includes driveway, house, construction footprint, septic bed, well, drainage swale, vistaishareline access} Head Office: Barrie Suite 100 • 300 Lakeshore Drive, Barrie, ON L4N OB4 705-734-2538 • 705-734-1056 fax Collingwood 243 Ste. Marie Street Collingwood, ON L4V 3K6 705-446-3230 • 705-446-3240 fax F,,,m,gRa,,, ISO 4001:2000Certifled www.ionesconsulting.com ~~: ~ c ~..~' Site Plan Agreement with the Townshi The approval and registration of the Moon Point Estates subdivision required that Moonpoint Corporation adhere to a number of conditions and obligations as set out by the Township of Oro-Medonte. These conditions control the building of the subdivision and the development of the lots. As a result, you, as a property owner in Moon Point Estates, will enter into a Site Plan Agreement with the Township of Oro- Medonte pursuant to Section 41 of the Planning Act, R.S.O. 1990. c. P 13, prior to a building permit being issued by the Township. The Site Plan Agreement insures that the conditions of approval for the subdivision are carried out and maintained by the individual lot owners of Moon Point Estates. The following conditions form the basis of the Site Plan Agreement between you and the Township: At least 60% of the trees and vegetative cover will be retained on each lot. • Lot development includes four components as shown in Appendix C - (Sample Site Plans): 1) The driveway leading to your home. 2) The houseldwelling footprint including garage structure (built-in or stand-alone). 3) The septic field/tile bed. 4) The lake vistalaccess corridor. Page 21 A Tree Preservation Plan has identified specific trees on each lot that should be ~ _~. retained. The services of a registered E professional forester, arborist or landscape ~~~~~~- architectwill be required to determine protection measures for the identified trees. The maximum building size, as identified in the zoning by-law, is 557.°4 square metres for each lot. Specific to Moon Point Estates, the Lake Simcoe Regional Conservation Authority (LSRCA) is one of the main commenting agencies. Please note that the approval of the Moon Point Estates subdivision did not include predetermined approvals for docks on individual lots. (Please refer to the Subdivision Agreement in Appendix D). No permanent shoreline structures will be approved. LSRCA will consider applications for temporary structures and other shoreline alterations on an individual basis. Once the review is complete, the Township and individual lot owner enter into a Site Plan Agreement which obligates the lot owner to comply with the approvals given by the Township and commenting agencies, including the LSRCA. If you are planning to begin construction of your home upon acquiring your lot, you should begin Moon Point Estates Landowner Manual Natural Areas as Neighbours I~ ~°" =- kip, . rk: ..{. _. I i 1 ~ . . _~a~e ~:~m= ri~;ip~~ui e...~~ ~~ ~ dale process: ® review the sample site plans shown in Appendix C in order to get some basic design ideas for your individual lot. Make an appointment with the township ~ Planning ®epartment to review the Site Plan process with you to insure that you are designing your fot in accordance with the ~ Zaning Sy-Law specific to the Moon Point Estates Subdivision. 1 :~- y ,t-~ Moon Point Estafes Landowner Manual Natural Areas as Neighbours ;;I;:,~utions, if you are c.,, ~ ,~ , ~ in ~ ~ ~ t ~ ~: ~ ~ . Consider hiring a land use ~~1~_nner and/c~ architect to assist you with the process. ® review the Site Plan Agreement with your lawyer to ensure you fully understand your obligations under the agreement. Consider that tree and vegetation removal from the end of April through to mid-July will generally not be permitted, in accordance with the requirements of the Migratory Bird Convention Act. Page 22 I "~ na.s~ ~ sx W .o-.e ~" .s~.e -a" ~ ___ aP _ _ ~ Y W W I ~ Q W~ .r.z U N I ---- ~ - I I - vw.o-s i' 11~ ----- I I - _ 'g~ 1 I .o-,> a~,E I I \ _ ~ II ~ r ~~ ~ ~ II N I ~ ~ I it _P , ® ~ ~ 11 11 11 `w ~ 11 II 1 ~, I 1 I 11 II ® 11 11 ~ ~ 11 i ~. . I 11 11 II II --- - ---- t.~t II 11 i Ifr =i- _ -~ i ~ ~'^ = 1~~ ~_ J ~ I 1 ___ I I ~ -- - ~ -- ~ - -1-I N p ._ _, ,.. ,.e . , -- , - __u ~ - --- II . it rl - - ^ 11 II ¢5 a,e _~J N{~ ~ ___ t4 "' i I I I II II O 11 ~ ~ {I ~ II ~ II - I II II -----~ II O ~ y~ I I I II II II .e. ~~ ~~ ~~ O I I ~ ~ II 1 ~ o I I I k ~ ` II II ~ i I~ 0 11 O N Y. // \ // f i i Z y O A .e .z-,s ~ o~ I i Q ~ 1 ~ ~£ II F rv II _ -----I-I W ~-.... Ij ~ u o 'wu, .0-,6 t17 U ~8~ W ~ u _ --. LL N . - .Z .~-S .?Z Q .0-.6 ,.S-.E i .9-.6 N .9'~ ~_ ' ~ m ~, ~~~ ~ ,,,,°. ,, LOT ,895 .- .-~ ," :--, .-r ,- , kA~~--S-I-MCO~,~ .\ i 0 O.5R SWALE 9.00 ~ ~ OUTLET 02 ,~e.,s 219.47 SITE STATISTICS LOT 3, #5 WARBLER WAY TOTAL LOT AREA, (sq.m) 7234 TOTAL CLEARING AREA, (sq.m) 2796 PERCENTAGE OF LOT RETAINED IN NON-MANICURED VEGETATED STATE 619 ~~q~es Cole Engine®ring Group Ltd9 ~~ 100 Ranireva Drive - Suife 100 -Markham -Ontario - L3R 9R6 Phone: (416)967-6961, (9051940-6961 fax: (905)940-2064 LEGEND 'i CLEARED AREA I AREA RETAINED IN A NON-MANICURED VEGETATED STATE EX. TREE AND DRIPLINE RESTRICTED AREAS OF SHORELINE ACCESS TO REMAIN UNALTERED IN ANON-MANICURED VEGETATED STATE EX. WET POCKET -°----- EROSION HAZARD SETBACK m ° 20m+ TDWNSHIP /NATURAL HEP,ITAGE SETBACK LIMIT LOT 3 -CONCEPTUAL DEVELOPMENT PLAN TOWNSHIP OF ORO-MEDONTE MOON POINT ESTATES DATE: JUNE 2007 PROJECT No.: M06.619 SCALE; ':750 FIGURE Na.: 3 EROSION AND SEDIMENT CONTROL NOTES 1. TEMPORARY EROSION AND SEDVAENi CONTROLS (SILT FCNCE, ROCK GHECN DAMS, AND STRAW BALES) i0 B[ INSTALLED PRIOR TO THE S1ARr OF CONSIRUCRON, INSPECTED ON A ftEQ1Ufl BA515 (MEEKLY) ANp AE1ER EVERY RAINFALL, AND MAINTAINED AS RCOUIRED i0 KEEP Slll FRDM !FRYING THE LUJSiNUCiION SIZE, 2. A 'MUD MAT TO DE PRONGED Ai 1HE ENTHANCE i0 ME SITE. J. ALL VEGE1AlE0 AREAS DISNPBEO BY GONSIRUL110.Y SHALL BE AESipRED BY iOPSUL k SEEDING (REFER TO SEED NI% ME ON THIS SHEET) 4. ROCK CHECK DAMS SHALL BE PLACED INININ 1HE ROADSIDE DITCH Ai AEg1LAft z` MTERYALS, AS DIRECTED BY ME ENGINEER. 5. SEDIMENT AND EROSION CONTROLS AT OUREi 3 GNALL BE CONSiHUC1ED TO THE SARSFACRON OF THE ENgNEEA PRIOR i0 WURKS BEING UNDEATANEN IN THE LOT 7/B DRAINAGE OEUCAHON AND IN 1HE RIGHT-OF-WAY. ~~ NN ~P` Gw. O~sW I ~ N~ SEED MIX TYPE s ~~~~e ~~~I~ •NANAEPRO LOW NI%' TOW CROWING NARVE GAA55 MI%NRE SOIL STABIUZARON FOR ROAOSIOES ,OLD FIELDS, MOIST MEADOWS AND DRY WAS1E LAND. • MILOUFE HABITAT (SONG 91P05 WCKS ANp GROUSE) • FOOD, WINTER CDVER ANO NESRNG FOR WILDLIFE LOW NARVE NI%: • BROOM SEDGE • SIDE OAICRANA • U11LE BLUESTEM • SANpOROP SLENDER YMEATGRASS GROWTH LNARACTFAISRCS: • SHORT NAl1YE MI%NRE GROWS 1h' TO /' TALL DROUGHT TOLERANT MI% sl,E caemnons: • LOW-FEAPUTY, ACID, CLAY-W(E ANO LDAMY SDILS • TOLERANT OF MOpERA1ELY WET SOILS • EXCELLENT HEAT AND DROUGHT TOLERANCE FULL TO PARBAL SUN SEEDING RAZE: IS kg/Nect3re TREE INVENTORY mx spPE (nP) ~Dnmm nncK or spmm cLPAfl srpNE MUD MAT DETAIL N.i.S. WATER'S EDGE OUT'L~E}rT O4 fl' - ~ ~ ~ wa¢T DLY• 91 p ~ ML ~4 ~ ~ ' •y\ 'J` `` ` C1 ~~ 'c'am !\ b::,..\~ `~ o `` 1 LEGEND ENISRNC GONTpUR/ELEVAlION \ -._'~: ~'._-- ENISPNG GRADE O \ ~r PROP. 3 : 1 MA%. SLOPE px 2 ~ _ _ pROPOSE05WAlE -~-~~-~~-~-- EADSIUJ HAZARD SETBACK 20m+ i0WJ5HIP / NATURAL HERITAGE SETBACK ---- 100 YEAH -WAVE UPRUSH FLOOD LIMIT ~ l / / l ® MUNICIPAL ADDRESS /_ - ._ ~- ~ ~ _ i Y _. _._% ,, . __J . _ i _ ~ E%. WEi PoCKEi /''~ [ ~ I ( LAKE SIMC~E j A13N EX TREE ORIPUNE ANU 1REE NUMBER -v iJ AVEAgGE RICH LA~LEVEI (219.15m) ~ ~J , _ ~ _ J ~-' ~N ~~ EX. TREE 70 BE REMOVED (REFER i0 SCHEWLEJ PROP. 7EMPORgRY ROCK LHEU( DAM i , _ ~ - PER LSRCA SiO. 20DJ-09-29 - $E - PRpP. 4li FENCE PER LSRCA S1D.20p3-OB-29 PROP. BARAIEfl FOR TREE PROIECRON PEP DETAIL. PRW. MUO MAi PER DETAIL WATERS EOCE PocxEr AESIAICTEp AREAS Of SHORELINE ACCESS i0 ~ REMAIN UNALTERED W AN NON-MANICURED -.,~,~Lp VEGETATED STATE OT SEIB~AL1(_~ EVEIOPNENi ENVELOPE UMII$ i1/ c ---- - ..... "" . ~ r AREAS WHERE E%. VEGETARON 15 i0 BE RETAINED . ... 7m-waPmm a Dsx CuLYERr `---- ' DEYELOPMENT ENVELOPE OUTLET O7 NOTE: THE OEVEIOPMENi ENVELOPE INOICAIEp REFERS HJ THE ANEA OF THE LOT WHICN MAY BE UTIU2ED FOR BUILDING SEPRC SYSTEM AND • DRIVEWAY LONSRiUCHON SUBJECT TO hiE RESYRICTON OF ALTERING APPRO%IMATEL7 40R OF EACH LOT AND RETAINING 60x OF v' WATER'S EDGE EACH LOi IN ANON-MANIWAED STALE. THE PERCENTAGE AL1ERAilON/REIENPON SH E \ ALL B OEIEAMINEp ANO APPROVED pN A TOT BY LO B0.51S IHRWCH THE 70MNB IP F R E ' ` H O O O-M DONIE S SITE PLAN APPRWAL PflOCE55. THE CALCUGR0.4 OF PERCENTAGE PLTERARON SHALL \ INCLUDE hIE AREAS EFFECTED BY BUILDING, SEPDC SYSTEM, DRIVEWAY, SWALE CONSTAUCBON AND NSTA/SHOREDNE ACCESS. SAMPLE SITE ~ _ PLANS ON SHEETS 1001 1HRWC 1005 DEMONSTRATE HOW THE L015 MICHi BE DEVELOPED MEERNC 1NE flEOUIREp CRI1EflIA. ~ ~ \ SHOREUNE ACCESS/NSTA i0 BE DEIENMINED 1HR000N ME SITE PLAN APPROVAL PROCESS (MA%IMUM WpiH 12m) .. ~ i pISCHARCE FROM FOUNDATION DflAINS SUMP PUMPS AND ROOF LEADERS ~rl 0`" \ SHALL DISCHARGE ONTO SPLASH PADS AT GROUND LEVEL /~ ~ ) .rcT PooaT P~o~. vn ~xw~ ~nv~.rc~ m.raan ca~•~n:w ' ~ ~ ~~ _F i .~ ' ~ t ,, rya. sxuc - ` GbuGn•p edY.APP tl wnenne niE Iw Po ma o ` `• \ - I , LIMIT DE GRADING 1 DlsruRRnNCE `'" ~, , ~f ` T ` , `, I - +s \ ~• ~ ~ 'IT I ~F' PROP. BARRIER FOR ` ~ 1A ` TTT ~ ~• ` ' m ~ ~ TREE PROIECigN. REFER TO DETNL ~ ~ ` - . ~ v ~P') ~ ~ 1 1 PROP. I A ~ :-l ~ ! Tm-caommP ow.fwAr awmr ~`~ i AND FNDAN A ~ \ L s Pw a4- DTP) 21e ~YS I P0'~' s Y . J ...• ru '~.• - ~/ 131 i \ Em .naen fr G Dina - u •m.m m vupea :n 'mom n a M a G FG +~.om v ~N/f - Q \ ti\v / ~ ~ rs •m•m m m.a N a c 9q +ima . TREE INVENTORY I ~, / 1 \ _ - _ b KK - - ~~ I G C~ GZ Geaed%RGF DO a en Eedapy am w.u lu M' N o oa ~ ~\0 _ - - \ ~ \\ - m +na.m a I » G Y T s am. a •bnil NIM c ~ omm x b,. . w.m rv rom,fl z 1 i0 aw, t ,m~~~ ~, Y .na aoNbm• ° ~ , I `rte •s ~• zu pmm n +aam ` r re Im gem wnem a«mnm w Pm -_ tx .Gmam w G md.G~mnenol iN ML.W tbM~om a Fm Gw ssoeewpnawon, _ _______________ / , x ` n ~Nnxn w G ~a Mm, is v u rv.Gma ; `\~ `s ` u+ .Nn un m m+a m x t imuveuzramn mmem G ~ aosn ~ ~ ~R iW .n vnb A mn X v td w D r v / I~ x 4 m mzn m . G ~ iN e naammN it o Oou r ` .\ / ., ~ , o, in,ao w ,~waawv ` ~ % ~ ' . s UMR 1 ~ + e,or o ~u .nom x G ~am~.asm, oex G <.a.e rm x x i f„ v6mm 6 6 a n 6ml x A ~ ~ / 7 gSNRBWCE -___-_______ f , . % ~+Y .uoza a.s.a.k i caOimsrm,xmenan+IOm G mx.~ wwu¶ u K 3I Gme mmn Mwav Y ` + G n odb~Nn ] y ~ G~ G~ 1 ~P ~` noa Giwn06ei 0 13m 0 1x ' A SOdnmP CSP LUL 1 iG ~ + r 1 1 1 / rq.mm v m xfi Fm } 1 Iw ~ f6 nw y E Gan % PROP. 7EMPORARf MUD MAT. P O EI ~ ~ t n 4 GmE Fu REFER TO DE1Nl. ,AIF ....../ r le 11 ~ \~ / J) 1 P 300030 OETNL / / ~~ p N ~r / / ` -/ ~ ' a9 „ .,a< n c u wb is ¢ P9 m E..Gma NO ffNtt yn OP50 Mtl,Wq 305010, 'PROP. DRY HFDRANT 1 REF as nm~wd IDo .nm,A u.sP a.v rN c ~ + 19 1a .iao •~om rgoam 39 n is fl Gxn Gmn x ER t0 DWC 103 - OETNLS. J ~ n vlve 'e fG eanm.ie r iE xM1nn9 tloMLeen u Jr ~Gwn AA~~ ~~ C~ ~NT ~~1. ~ ` -~ '._.. , tlns is plot mNe W1 >, 3 ~ .P, .N.,N X - ~ W r ~ r y -v 05rR1r ~- - "'X-- 2a .ra,rm marmw 4 a w m vu c ¢ rbon . m. __ ,.ORm 30dD1 $ ~'~~--6 _ / w¢mu + - +-S , oae, n cw s G 129 xMeiA tpb~tm S fi 1 L2oE - / _ ~ \ ; fe 9mmem God -- p OUTLET 05 WH mx£ i ~`k} c fm "n° J x 0l N J9 n 66 lo' Goof FvA m+momn ~ YWN PINT COURT STA 0X767.19 a / MOON PUNT DRfrE SFA 10X000 - 9 ~ k' im a ~K yp ~/ ~ INFMV NE PER G FG FG rN vM1V e9 S ]S ~d God omI . Y fLLW 3M51 ~ / :,~,. ~ m 912.3)2 ~ e4 ~ LCT AYp W9-0 SICX ~ F4 r5 . m E ~ , .F_ N0.9+0 Tm-330mm1 NL4FM ~ R ' 2rz ond.~ o N n.a c c W ~, vl b Gmn NIOP Nlp ENDWNI A3 PER W-0X7 3 Yn ~"r . .M~ x+r a m + A9 2[ rG G + .v .ma 'W al Gwa ~ o In a.~ _ ' / BULL AIG Y C ~\ 011 I F / G ~ 3I Gwn i STNAHG NSI ev ti4+ rm a Gw, ., . eu.•~ O~ r~ z e ~m Ntda itl ~~ : N Graf Gmi Gw1 / ~ ... / cq ~ Comma xvv `amry hu n G~n o~~/ nr 2nnp'xshn ,I e •~. uS n ]t Gmn Kid f a~Y~ma ~ a~yprp a,no bmminvvNnn+ I<6 0 it Gmn % .4, .Lmae a~~ m~ am~p~. naom. ~ (gvdo, c s _. .,..... .. ,: fm v,esM ~, u+,.v7o Goer amo _. .,. _`..-~ ~., 6 m~Mii,urcrn+ T' 1 ..,.c, L. ho o ' a~ m,,~w,,.~ ; . _- C? 1 SILT FENCE ER ISRG 5'Tp.2003-0B-29 (TYP) 7EMPOAARf ROCK CHECK pAM ER LSRG 510.200]-08-29 ~) ;~ aLmET pz ,~~ ROP. SWNE WA1FA'S EDGE • J /-Y ;- UTLFT O1 SWALE ~~ ~J ~~ ,- ~~ ~ i ~ LAKE SIMCOE ~..._..._.AVEAAGE HIGH W(E LEVEL (21915m) / "'~' ~~ ~ ~~ ~ DR ~ i-~ ~ ~~ ~.._/ ~_._... /.._._._J ~.. ~- !~ ~J N.T.S. NorE wets sxo»n ax TK 9 wx AvL 3n~uemre Ana ar 9E NxU ~~r ~o w6t abau o' u~nm~ Ovv'6° m'P Aauwn w TM[ w ~ remwi.N w3~R lxi"aN~~roa~uixros~A ~xc .Wr4F~u~rtvnurc ron vxvs ro mFU. "~ Ruu 6. REV. PEA 79H COMMENTS. STN SUBMISSION 06/19/07 N.C. 7. REV. PEA ISRG/ISN CDMNENIS, 4TH SIIAMISgON 05/07/07 N.G. 6 AENSED PER LSRG COMMENTS. JAO SUBMISSION OJ/13/07 W.L 5 AENSED PER LSRG CWMENTS. 2ND SUBMISSIDN 02/02/07 V.Z. 4 AMSED PER 15H COMMENTS. 01/02/07 V.2. 3. REY6ED PER ISAG COMMENTS. SUBMISSION 1]/01/06 V.Z. 4P. REVISIONS GATE ]RK fAOM NOV.27, 2006 PERfORMEO BT CDLF ENGINEERING GROUP LN. 2 1st SUBMISSION SEPi 27, 2006 I ISSUED FOR DISCV5510N SEPT 7, 200fi BENCHMARK BFlA71U6 Ni[ [fANED fAOU GEODETIC aIUA AND AR[ RDEAAN TO MNBTXf U NANAN. I9.SOURC6 D]NRgL NOYVYENF N0. 010&1275, &lNG 0. ~A6 GP OM 15m LCNC ROUND NmN BA4 LOGIEO DN i0P OF NICK &NN IN OAI1N N~ANRIP FS p BpNC 5A&n ~'JM OF A//q BETWEFNNLD6 15 MYI 16 M'D 9 6n EAST DF ~A BfiWSFlI CpN Z M'0 7 CENFAELINE A6PECMFLY. BFMIgN = 241.912 SITE BENCHMARKS AS MtlVa1E0 DN PVN ® MITCHELL HATT&ASSDCIATESINC. CONSULTING ENGINEERS ai rAr+as m.' Icml iifal~o Two wM QMpFE5510N, •Atteplee far CnnalrucUon' "( iotNn Sims Nu6in%i AvsoclcUs ~~~ry fownsM1lp Erglneem ~~~Pp pate TOWNSHIP OF ORO-MEDONTE MOON POINT ESTATES PART OF LOT 15 ,CONCESSION 3 SD (GEOGRAPHIC TDWNSHIP OF DRILLIA SOUTHERN DIVISION) SHORELINE ACCESS SEDIMENT & EROSION CONTROL PLAN DESIGNED Bf: SCALE VZ CHECKED BY: 1 :1000 GH JUNE 19, 2007 iDT Ne.: 801 MO6-619 (MHA 03045) ~~~ vIc m PART 5 G BWDDd TIIIR Rmad~ and ma le ALer sacs SEED MIX TYPE 'xA7Alvno lolr lu1' 1011 apwp NAfiE a7AS7 wom~[ • !4. erra7An71 ~ norms . as rsssa Hoar 1~AOOu NO pIT Nltlf IAIO. • SAR W1rAT (1710 407 7177 NO OA71>q mm, Isms 7191 wo 7ES71o RR SDIEE La lumc 1u: sax 7D10E as aiwwA umc auesRn 7weoeoR aaos IIUW1A77 471M auRACmesDCs s17n NA7d 14nA[ oso7s 1r m P TALL sauaxr Taswlr 1cL ~ law-/D1IIIr1; Im, QAY~10: ND IAWY 74E lglA/llr V Y7kRA1RY R 771E DasuFwr fur Alo 4717rt tolael¢ • RAL m KARATE aux ><melo RAre 1a ry1.*Qe ~~R/107 /1T 40.10 lE1~L1107' ~~ aee~ i •, ~,~ e~I, w ~~ ,' w (\_. ~~ ~, ,•~ 04111 ~',`® •e ~i0 ~~ ?11 // ~= 115 t, ,/ . , / \ / / ~ ~ /i v/ 1 :- \ o ~ // 22.15x..1 Y G~/ - -!~ ~ / / ~.. ` T Af0 \Y ~\ 1, ~~ ~~. MOON POINT ESTATES - LOT 3 TOWNSHIP OF ORO MBDONTE 4 war \ 11).]m~001PN NI r0 O a ( ,., q ,'~ a° P `~ 'I, Q ~~i. ~~'' o 1 J 1 i 1 1 Lake Simeoe (AVERAGE HIGH LAKE LEVEL 219.15m) ZONING SHORELINE RESIDENTIAL (SR*162) REQUIRED PROVIDED LOT AREA Min. 2000m2 7241 m' FRONTAGE Min. 18.Bm 18.Bm FRONT YARD Min. 7.Sm 141m approx EXTERIOR SIDE YARD Min. 7.6m NIA INTERIOR SIDE YARD Min. 3m 1.72m REAR YARD Min. 7.6m 35.19m LOT COVERAGE Max. 40% 7% (610m°) SHORELINE RESIDENTIAL (SR*171) BUILDINGS OR STRUCTURES ARE PROHIBITED. THE MAXIMUM WIDTH OF AN ACCESS 1 VIEW CORRIDOR EXTENDING FROM THE WATER'S EDGE TO THE ZONE 80UNDARY BETWEEN SR'162 AND SR'171 ZONES IS 12 METRES. ~ 11 k,92 ~ORILLI (~ __ =_ ~ c~ - _- 1 ~T1CI _____ _ _c____Yctona PDinl=_~__ =-_ ' Ingle Bay=--c~ss~ = =~= __ _ITE ~-~ =~^~'~ ~~ _ __ - orest Nom __: - Gb E ~_~~_~~~~~~._~=~_~ f / J' Uaan _ Lh~~~~~~~~_-______ Y5~,6 G~f ----== W(E SIMCOE"y _ _ ___ __ s _______ \ CarUww ay:~~=~~_~~~ =~ =~~~~ KEY PLAN SCALE 1:10,000 Site Plan Moon Point Estates Lot 3, Plan 51M-861 (geographic Township Of Orillia Southern Division) Township of Oro Medonle, County of Simcoe 2008 u~ ~. EpeiiNGfAMWPIELEVATIW Je. E%ISiINGGPADE T PgOP.a:t MA%. EIODE ~~ PPOPoSED SWALE -~~-~--~~- EROSION HAIMD SEIBAC% zam~ioWrvswPrxnnmuRERTAC~sEmAac ®el SS il40p loo VEAR~WAVE UPRUBN FLODD LIMIT ~~~~~~~~ PFOP.SILTFENLE PER LGRC0.5TD]WMB19 PROP, BARRIER fORIPF.E PROIECIION PEA DETAL IXa1EEANDDRIPLiNE ® PROPOSED HYOPA EVELOPMEM ENVELOPE LIMITS DEVELOPMEM FM~ELOPE INQLOING LOi SE1dAG( BInIDINGSEPYIC SVSiEM aDPoVEWAY. iRCTEDT041hFlNG APPROX 10°b OF EACH LOTANO RETAINING WM aF Enar LonnA NOflMANfLUPFD 6TAlEII PAEAS WLIEPE EX VEGEiAPON IS TO BE PETAmED Q PEGiRIC1EDAAEAS CR SNOFELINEACCE55 TO REMAIN L4ULYEREO IN AN NONMANICRPFD VEGETATED 9TAn: ® E%. WET POCXEi PROP.IEMPOPARY ROCK CHECK DkA PERLSRCASrt1.ZW3C0-t9 PROPOSED DRIMEwnvuMlis PROPOSED VgUSE FOOiPNMA$PC71ARG11LECf NaiES, 1. AIISUMP PUMPS ANORAWWAn:RlFA-FA56NALL DIBCWWGE OMO SPLASH PAl)a Ai G ROIRO LEV1. z. EROBIONB TPEE PRES. DETAIL IXFOUWIION ABPER MITCHELL, H4ii d ASSOCIATES INC, 3. SEPIICBYETEIA T00EOESIGNEDBY OVALIFlFD DESIGNERI INBYAMER s C SCALE 1:400 (A1) A la a la 20 30 MEiRf$ L E S MOON POINT ESTATES -LOT 3 SITE PLAN Date leeaed: AUGUST 11, 2008 Checked By: BC Protect No.: RI8-081 Dfi Drawn 8y: m.c.r. / ep Drawln9 Nama RIB-08106-SP1 d.dwg e JoNEs ~ wNSULnNGGADGPLm. ~ PWINERB. ENGINEERS, SURVEYORS 8 10o LakaaNOm DAy5uBe 100 &15le. Marie SbeM Barre, QPLM, UN O& CaIlMgmk,ON LBY 3Kfi E PM1Vre:105131~3530 P~ane'.1O5s4W11a ~~~~ r ~ ~~ ~ ~~~