03 23 2005 COW Agenda
TOWNSHIP OF ORO-MEDONTE
COMMITTEE OF THE WHOLE MEETING AGENDA
COUNCIL CHAMBERS
DATE: WEDNESDAY, MARCH 23, 2005 TIME: 9:00 a.m.
1. NOTICE OF ADDITIONS TO AGENDA
2. ADOPTION OF THE AGENDA
3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE
THEREOF: - "IN ACCORDANCE WITH THE ACT"
4. DEPUTATIONS:
a) 9:00 a.m. Provincial Constable Janet Small, Community Services & Media Relations
Officer, Barrie OPP, re: Crime Prevention Through Environmental Design.
b) 9:30 a.m. Jim Woodford, re: Full-Time Legal Counsel.
c) 9:40 a.m. John Newell, re: Lakefront Property.
5. CORRESPONDENCE:
a) Tiina Nautras, Contracts & Collections Supervisor, The Corporation of the County of
Simcoe, correspondence dated February 23, 2005 re: Waste/Recycling Collection
within the Township of Oro-Medonte.
b) John and Barbara Page, correspondence dated February 14, 2005 re: 24 Myrtle
Avenue, Plan 626, Lots 72 and 73, Roll # 4346-010-011-01700-0000.
c) John Brown, Mayor, Township of Springwater, correspondence dated March 4, 2005 re:
Mayor's Annual Log-Sawing Contest - Elmvale Maple Syrup Festival, April 23, 2005.
d) Judy Kern, Managing Director, Oro-Medonte Chamber of Commerce, correspondence
dated March 17, 2005 re: Annual Business Achievement Awards Presentation and
Dinner, April 4, 2005, The Heights of Horseshoe.
e) Bev Hendry, Ministry of Municipal Affairs and Housing, Press Releases dated March
10,2005 re: Province Helps Simcoe County Plan for the Future and Intergovernmental
Action Plan for Simcoe, Barrie and Orillia.
f) Ann Budge, correspondence dated March 8, 2005 re: Commercial Signage.
g) Nicole Matthews, correspondence received March 11, 2005 re: Mount SI. Louis Road
East; and Petition dated February 16, 2005 re: Mount SI. Louis Road.
6. FINANCE, ADMINISTRATION AND FIRE:
a) Report No. FD 2005-06, Joe Casey, Director of Fire and Emergency Services, re: Fire
Report for Month of January, 2005.
b) Report No. FD 2005-07, Joe Casey, Director of Fire and Emergency Services, re: Back-
Up Emergency Generator for the Township of Oro-Medonte Administration Building
(EMO).
c) Report No. TR 2005-08, Paul Gravelle, Treasurer, re: Treasurer's Statement of
Remuneration.
d) Report No. ADM 2005-009, Marilyn Pennycook, Clerk, re: Proposed Land Transfer and
Exchange with Richard and Janet Hennig, Part Lot 5, Conc. 4 [P.I.N. 74055-0008 (Lt)]
and Part of the Original Road Allowance between Lots 5 and 6, Conc. 4 [P.I.N. 74055-
0002 (Lt)].
e) Report No. ADM 2005-019, Marilyn Pennycook, Clerk, re: Draft Fees and Charges By-
Law.
f) Chris Carter, Manager of Recreation and Community Services, re: Requests to Waive
Rental Fees, Oro Minor Hockey Association.
g) Mayor J. Neil Craig, re: The Ontario Volunteer Service Awards (under separate cover).
h) Deputy Mayor Hughes, re: Job Descriptions (from March 9, 2005 meeting).
7. PUBLIC WORKS:
None.
8. ENGINEERING & ENVIRONMENTAL SERVICES:
a) Keith Mathieson, Director of Engineering and Environmental Services, re: Annual
Compliance Reports - Water Supply and Treatment - 2004.
Report No. EES 2005-05, Canterbury
Report No. EES 2005-06, Cedarbrook
Report No. EES 2005-07, Craighurst
Report No. EES 2005-08, Harbourwood
Report No. EES 2005-09, Horseshoe Highlands
Report No. EES 2005-10, Lake Simcoe Regional Airport
Report No. EES 2005-11, Maplewood
Report No. EES 2005-12, Medonte Hills
Report No. EES 2005-14, Shanty Bay
Report No. EES 2005-15, Sugarbush
2
b) Report No. 2005-17, Keith Mathieson, Director of Engineering and Environmental
Services, re: 1045942 Ontario Inc. (Ken Hewitt) - Site Plan Agreement - Part of the
West Y2 and SE ~ of Lot 1, Concession 14, Being Parts 1, 2 and 3, 51 R-6268 - Being
all of PIN # 58530-0316 (Lt), Township of Oro-Medonte.
9. BUILDING, PLANNING AND DEVELOPMENT:
a) Committee of Adjustment, minutes of March 10, 2005 meeting.
b) Report No. PD 2005-006, Andy Karaiskakis, Junior Planner, re: Zoning By-Law
Amendment for Dale Plant, Concession 9, Part of Lot 10 (Oro), Township of Oro-
Medonte.
c) Report No. PD 2005-010, Andria Leigh, Director of Planning, re: Telecommunications
Tower Siting Protocol.
d) Report No. PD 2005-013, Andria Leigh, Director of Planning, re: New Provincial Policy
Statement (PPS).
e) Report No. PD 2005-022, Andria Leigh, Director of Planning, re: County of Simcoe
Decision on Shoreline Policy Amendment.
f) Report No. PD 2005-023, Andria Leigh, Director of Planning, re: Houben, Development
Application P-1/91, Concession 10, West Part of Lot 10 (Oro), Township of Oro-
Medonte.
g) Planning Advisory Committee, minutes of March 14, 2005 meeting.
10. IN-CAMERA:
a) Deputy Mayor Hughes, re: Legal Matter.
b) Jennifer Zieleniewski, CAO, re: Legal Matter.
c) Jennifer Zieleniewski, CAO, re: Legal Matter.
d) Jennifer Zieleniewski, CAO, re: Personnel Matter.
e) Jennifer Zieleniewski, CAO, re: Personnel Matter.
11. ADJOURNMENT:
3
Co", ,
ADDENDUM
COMMITTEE OF THE WHOLE MEETING
Wednesday, March 23, 2005
5. CORRESPONDENCE:
h) Doug Wilson, correspondence dated March 18, 2005 re: Guthrie Community Centre
Billboard Advertising.
6. FINANCE, ADMINISTRATION AND FIRE:
i) Deputy Mayor Hughes, re: Arena Board Advertising.
9. BUILDING, PLANNING AND DEVELOPMENT:
h) Public Meeting Minutes, Re: Proposed Amendment Zoning By-Law, Application No.
2005-ZBA-05, Concession 11, West Part Lot 8, RP 51 R-33214, Part 1, (formerly
Medonte), Township of Oro-Medonte, (Duddy).
i) Public Meeting Minutes, Re: Proposed Amendment Zoning By-Law, Application No.
2005-ZBA-06, Concession 4, West Part Lot 15, (formerly Oro), Township of Oro-
Medonte, (McLean).
j) Public Meeting Minutes, Re: Proposed Amendment Zoning By-Law, Application No.
2005-ZBA-07, Concession 5, Part Lot 9, RP 51 R-33403, Part 1, (formerly Oro),
Township of Oro-Medonte, (Bidwell).
k) Report No. PD 2005-017, Andy Karaiskakis, Junior Planner, re: Zoning By-law
Amendment for William and Stella Duddy, Concession 11, West Part of Lot 8, RP
51 R-33214, Part 1 (Medonte), Township of Oro-Medonte.
I) Report No. PD 2005-018, Andy Karaiskakis, Junior Planner, re: Zoning By-law
Amendment for Joyce McLean, Concession 4, West Part of Lot 15 (Oro), Township
of Oro-Medonte.
m) Report No. PD 2005-019, Andy Karaiskakis, Junior Planner, re: Zoning By-law
Amendment for Glenn Bidwell, Concession 5, Part of Lot 9, RP 51 R-33403, Part 1
(Oro), Township of Oro-Medonte.
n) Report No. PD 2005-024, Andria Leigh, Director of Planning, re: 2976 Highway 11 -
Concession 7, Lot 20, Plan 1145, Lots 6-8 (Oro), Township of Oro-Medonte Zoning.
CPTED REVIEW
(Crime Prevention Through Environmental Design)
of
The Township of Oro-Medonte
Parks and Recreation
23 April 2004
1
Site:Various park and recreation area throughout the township
Date:23 Apr 04
Description:
The parks and recreation areas in the township vary from size tointended use. All are unique
with their own distinct issues
Some of the sites are within residential areas, while others arequite concealed.
2
ISSUES
•Vandalism
•Break and Enter to vehicles (arena
specifically)
•Safety
•Proposed areas for Tot site
3
4
5
6
7
8
9
10
11
12
13
14
15
CraighurstPark
16
17
18
19
Horseshoe Valley
Pods lane
20
21
22
23
24
VaseyPark
25
26
27
28
29
30
31
32
33
34
35
36
Warminister
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Memorial Park
54
55
56
57
58
59
60
61
62
63
64
Arena
LocationAdvantageDisadvantagePrecautionRecommendation
Front of arena•Good signage•Trees & bushes•Entrapment area•Trim up trees and
continue to keep
bushes low
•Remove it
•Gives coverage
when in bloom and
•Bush
filled with snow
•Entrapment area•Close it off
•Open area ~
purpose?
65
LocationAdvantageDisadvantagePrecautionRecommendation
Parking area for arena•Celebrated Entrance•Carpeted entrance •Replace carpets
damaged
•Remove or fix
•Ashtray hanging ashtray
•Repaint poles
•Wires are accessible•Cover and secure all
•Easy to cut
wires
•Hole in ground ~
purpose?•Cover hole
•Lighting•Metal Halide
•Open and no one •Signage for
•Large door for
aroundauthorized persons
equipment
only
•Deferred
Pop machine
maintenance•Close door when no
one is there
•Repaint
Rear of arena
•Material on sides
•Access to roof
•Accessible for sports
and top to deter
teams
getting up
•Pointing to the sky
•lighting
•Have pointing to pop
machine
66
LocationAdvantageDisadvantagePrecautionRecommendation
Side of arena•Emergency exit?Door, frame and pipe •Shows lack of pride •Repair damage
damaged ~ deferred and ownership
•Signage
maintenance
Old fixture still there
•Challenge to
•Lighting•Remove unused
damage
fixture
Propped open for entry
•Keep closed or have
•Emergency exit?
someone there
Leaves isles were cars •False sense of •Change lighting
Parking lot lighting
are in the darksecurity ~ enough to
keep abnormal users
comfortable
Not used often
•See if window
•Church ~ Natural
All windows are treatments could be
survelliance
coveredchanged
Should it have more
•Protected by ballists
•Close to parking,
Proposed tot lot area
Baseballs coming over
Close to hitting area•Put up extended
pavillion, patrols
netting
67
LocationAdvantageDisadvantagePrecautionRecommendation
Pavilion•Protection from rain Abnormal users will •Check for drug and •Abnormal users will
and sunfeel comfortable here other paraphenaliachoose this instead
as it is very darkof play equipment if
close by
•Trim trees up if any
Trees to the ground
•Lots of room for tot good protection or
Left baseball field
activity with young
lotpedophiles
children is to be
close
•Defined space for Abnormal users •Tots (and others)
Walkway to pavilion•Clean site prior to
purposeleaving remnantscould get hurt
normal usage time
Rear of pavilion
•Defined space for Abnormal users •Tots (and others)
•Clean site prior to
purposeleaving remnantscould get hurt
normal usage time
Door inside of pavilion
•Entry to storageAttempted B&E
•Fix and signage
•Move to inside of rink
Inside of Arena
•Pay phone for Close proximity to •Legitimate reason for
normal usersplayers change pedophiles to be in
rooms and exitarea
68
CraighurstPark
LocationAdvantageDisadvantagePrecautionRecommendation
Park•Lots of NSTrees planted along •Remove trees
fence will block that
NS
Evergreen’s will block
NS, but they are on
private property
•Place pad in front of
Does not look like you
net
•Separate spaces for
really want them to
children•Replace or repair net
play basket ball
•Secure lid
•Can be removed,
•Septic systembroken, cause injury
Lid not secure
69
Horseshoe Valley
LocationAdvantageDisadvantagePrecautionRecommendation
Pod lane tot lot•New equipmentHidden from NS•Entrapment area of •Thin brush area out
normal users
•Good layout
•Magnet for
Fence does not come •Bring fence
adventurous
completely to groundcompletely to ground
children
or below
•Magnet for
•Complete fence
Fence does not
adventurous
around with gate in
completely secure
children
the middle and at the
area
end
70
Ramey Memorial Park
LocationAdvantageDisadvantagePrecautionRecommendation
Rink area/skate park•Activities all season
Lower boards give •Remove plywood
abnormal users and replace with
shelterplexiglassor similar
material
•Remove graffiti, burn
Graffiti, burn marks,
•Leaving legitimizes
marks, and garbage
and garbage
others to do it ~
shows lack of
ownership and pride
•Install proper net
No net•shows lack of
•Basketball hoop
ownership and pride
Stands•Give audience a
•Injury to a child•Clean up any
Sheeting left under
place to watch from
dangers
stands
•Another activity for
Portable skateboard
•Secure materials
Left unattended for •Injury, damage
youth
material
when not in use
abnormal usersand/or theft
71
LocationAdvantageDisadvantagePrecautionRecommendation
Outer area of rinkNails not bent down•Injury•Double check all
areas
•Add signage when
Alternate entrance•Gated off
open, or to use other
entrance
•Shut lights off earlier
Lighting•Very well litKept on later causes
at night
abnormal users
legitimate reasons to
be there
•Remove items that
Items that show
Arena area•Leaving legitimizes
have been damaged
abnormal usage
others to do it ~
shows lack of
ownership and pride
Storage shed•Storage
•Signage on who to
No signage for who
call if damaged
shed belongs or
purpose
Two light fixtures, only •Fill both sockets or
one lightget new fixture
Not authorized•Get rid of and put
Fire pit•Clear area
72
signage
Vasey
LocationAdvantageDisadvantagePrecautionRecommendation
Pavilion•Shelter from rain and Deferred maintenance•Show lack of •Repaint
sun, meeting placeownership and pride
•Warmth, cooking•Invitation to use with
Fire pitNo grill, protection, •Have a fire pit to
wood previously
water source nearcode
placed
•Injury
•Show lack of
•Area for legitimate Deferred maintenance•Repaint
Storage/canteen
ownership and pride
users
Unknown what •Signage
purpose it
•Leaving legitimizes
•Entry/exit Pry marks from
Rear of building
others to do it ~
attempt B&E
shows lack of
ownership and pride
Deferred maintenance
•Repaint
Not safe
•Extra seating for
•injury•Remove or replace
bench
audience
73
LocationAdvantageDisadvantagePrecautionRecommendation
Lighting•Excellent
Fence to pasture•Defining spaceIn disrepair•Injury•Speak with owner to
fix and signage of
Electrified
electricity
Water valve•Easy accessKey in valveLeaving key could
•Remove key
invite abnormal user
to turn on or remove
key
•Tripping factor
Theft or damage
•Remove and place at
Grate left at side
proper location
Washroom wall•Privacy from fieldPrivacy from field
•Entrapment areaRemove wall
Swings area•Far enough away Very close to forested
Easy area for Thin out bush area or
from fieldarea
pedophiles to watch move swings
from
•Link between to Lots of hiding places
Walkway to other field
Entrapment area
Thin out bush area on
areas
sides
74
Warminister
LocationAdvantageDisadvantagePrecautionRecommendation
Storage shed•Store itemsUnknown what •No show of •Signage
purpose isownership
Deferred maintenance•Leaving legitimizes
Paint
others to do it ~
Fix trim work on roof
shows lack of
Replace broken
ownership and pride
windows
Remove unused light
socket or put light in
it
•NS from roadway
park•NS from roadway
•Trees trimmed up
and no bush area
•Easy access to ball
diamond
Put proper slab and
Basket ball hoop
Not concrete slab or
net
net
75
McPhees’Landing
LocationAdvantageDisadvantagePrecautionRecommendation
Shelter•Shelter from rain, Graffiti •Leaving legitimizes •Remove graffiti
sun, rest areaothers to do it ~
shows lack of
ownership and pride
•Not lit
Cannot be seen •Put signage to rest
through bush on patharea at path way
•Gate across
entrance at night
•Not lit
Parking lot
•Ballasts between
grass and parking
area
76
HawkestonePark
LocationAdvantageDisadvantagePrecautionRecommendation
Nature walk area•BeautifulTires being used by •Leaving legitimizes •Remove tires and
abnormal users, others to do it ~ garbage
leaving garbage and shows lack of
drug paraphenaliaownership and pride
Being used for motor •Leaving legitimizes
•Have community
Land•Amazing space
cross type activitiesothers to do it ~
decide a variety of
shows lack of
uses for property so
ownership and pride
normal users are
there frequently
throughout the day
and seasons
•Fix or remove
•Baseball backing Leaving legitimizes
Deferred maintenance
and standsothers to do it ~
and graffiti
shows lack of
ownership and pride
Fix railing or remove
Leaving legitimizes
posts
•Was beautiful path
Walkway to
railings removed
others to do it ~
Hawkestone
shows lack of
ownership and pride
Bridge
Not cared for
fix
77
Memorial Park
LocationAdvantageDisadvantagePrecautionRecommendation
Pavilion•Shelter from rain, Damage to window •Leaving legitimizes •Fix up and put
sun, meeting placearea and wallothers to do it ~ signage of who to
shows lack of call for vandalism
ownership and pride
•Tether tables
together
•Paint and fix
Deferred maintenance
•Remove lighting
•Able to walk in the False sense of security
Lighting
park at night
•Cover with
Light bulbs broken
polycarbonate lenses
•NS from street
•Put other permanent
•Leaving legitimizes
•Peaceful place to
Unilockstone
Memorial
foundation down
others to do it ~
rest and reflect
removeable
shows lack of
ownership and pride
•Open area
Play area
•Leaving legitimizes
•Remove brush and
•Privacy to change
Trees overgrown
others to do it ~
Change areafix interior of change
outside
shows lack of
area
Deferred maintenance ownership and pride
inside
•replace./fix post and
Posts to prevent
Post removed
•safety•Post left at side of
put up signage
vehicular entry
building
78
GowanStation Park
LocationAdvantageDisadvantagePrecautionRecommendation
Rear of Firehall•Signage due to
previous damage
•Tot lot
Green space between Baseball diamond not •Fence in baseball
firehalland basketball fenceddiamond
court
•Lots of NS
Basketball
•Well used by youth
court/hockey surface
•Fence in
Culvert
Injury if child plays •Signage to stay out
there
79
ADDITIONAL COMMENTS
Excellent park lands with minimal
cleanup needed
Have local youth and residents take
ownership and pride in parks
Meet with youth to see what they want
and let them know if abused, it will be
taken away
80
CPTED EVALUATION
This evaluation has been prepared for you by Janet Small, who have been trained and qualified to apply
Principles of CPTED in relation to your industry. In using a combination of CPTED principles we have
provided our comments to you.
This document is not intended to mandate any suggestions or changes, rather it is merely our
recommendations based on acquired knowledge and proven principles that we feel will make your industry
more secure and less vulnerable to attack.
We offer these suggestions and recommendations reminding you that implementing them doesn’t
guarantee that your industry will never come under attack.
If you have any questions or concerns pertaining to this document, please feel free to contact me at the
numbers below;
Name:Janet Small
Agency:Ontario Provincial Police
Address:20 Rose Street, Barrie, Ontario, L4M 2T2
Work Phone:705-726-6484
Cell Phone:705-321-1103
Pager:
Signed:
81
.
.."1 .
.
\
-, ,
THE TIMES THEY ARE A CHANGING
Deputation to Oro-Medonte Council Committee of the Whole
March 23, 2005
Jim Woodford
I have come to praise you - not to berate you. (At least 6 of you)
I would like to highly commend Council for establishing the position of Director of
Planning. The terms of reference for the position put responsibility for planning advice to
the Council on a staff member. They also eliminate the need for day-to-day outside
planning advice.
I have been a critic of the Township planning process since 2001. I thought I should clear
the air before a new era dawns.
The Mayor is probably not too pleased with this move - since 2001 I have suggested this
in 9 deputations to Council and the Oro Moraine Committee and the Mayor usually spoke
in favour of continuing to give major responsibilities to the planning consultant. For
example I told the Oro Moraine Committee that it was improper for Nick MacDonald, a
consultant, to be chair of the Committee. Mayor Craig vigorously defended Nick. In
December, 2003, following criticism of OP A # 16 by the two planners on the Oro
Moraine Committee, the Mayor took over as Chair!
I first suggested an Ecological Advisory Committee in 2002. Mayor Craig strongly
opposed this. If it had been fonned it would have saved tens of thousands of tax dollars
and there would be a scientifically sound plan in place to preserve the Oro Moraine.
I think it is unconscionable for Oro-Medonte to require a developer to do an
Environmental Impact Statement and then not include it in the deeision making process.
This should save hundreds of thousands of tax dollars - between Jan.2003 and Aug.2004
the planning consultant was paid $289,000.00.
The most glaring example of the desperate need for a new direction in planning in Oro-
Medonte is the sad saga of Official Plan Amendment # 16. Work on it started in 2001 - it
is tens of thousands of dollars over budget and years behind schedule. There are not
adequate provisions to proteet the Oro Moraine ecology.
The Azimuth Report on the Natural Features of the Oro Moraine is not completed.Margo
Holt, Pat and I met with Mike and Martha Scott to attempt to correct the scientific errors.
Martha refused to make any changes. Errors such as reporting the Tufted Titmouse as an
. '.
. .
.
~
endangered species on the Oro Moraine - perhaps because it has never been seen there
and botanical taxonomy that is 40 years out-of-date.
I look forward to meeting and fully cooperating with the new Director of Planning.
I would like to suggest an addition to the Director of Planning job Description.
On page 4 under Knowledge a new Section g) Shall not work or consult for any private
company or organization.
Now the other reason I am here.
It is time to establish a Legal Department and hire a full-time lawyer.
For a lot fewer tax dollars that Chris Williams is being paid Council could hire an
experienced and well-qualified lawyer. There are local lawyers who would be delighted
to be a full-time lawyer for the Township for the fee paid for the Oro Lea case.
The Oro Lea (Plan 709) dramatically points this out.
The Toronto lawyer acting for the residents charged $35,000. Chris Williams acting for
the Township billed $147,000. It is alleged that some hours were billed at $650.00.
It is alleged that Chris Williams advised the Township to appeal a court decision on Oro
Lea (Plan 709) - then before the appeal was heard he recommended that the Township
pay the residents legal costs of $35,000 to settle the case out-of-court.
It would be in the best interests of the Oro-Medonte taxpayers if Council sought a legal
opinion if there were grounds to have the Law Society of Upper Canada investigate the
$147,000 billing.
~ ...-c::~.
G .y,riii"y,' q+'
.... KG -, e./'s+'
. "!<~'m .
J ,
"
The Corporation of the (705) 726-9300 Fax: (705) 726-9832
County of
Simcoe
CORPORATE SERVICES DEPARTMENT Administration Centre
ENVIRONMENTAL SERVICES DIVISION 1110 Hwy. 26
Telephone Extension 181 Midhurst. Ontario LOL 1 XO
23rd February 2005
Mayor J. Neil Craig I RECEIVED
Township ofOro Medonte
148 Line 7 South, Box 100, MAR u 1 2005
Oro, On
LOL 2XO ORO'MEDONTE
Dear Mayor Craig: TOWNSHIP
Re: Waste/Recvcling Collection within the Township of Oro Medonte
We thank you for your letter dated the 26th January, providing feedback with concerns and
suggestions, regarding the waste collection service. The responses have been itemized to
respond to your qucstions as follows:
. Weather related cancellations are detennined as follows, Corporate Services Committee
report CS05-058 to February's County Council regarding weather cancellations, is
enclosed for your information:
I. Outright cancellations in morning due to weather conditions,
2. Delayed start time due to weather/road conditions,
3. Partial cancellations during the day.
. Customer Service has outlined their procedure as follows in regards to cancellations or
delays in collections:
I. The County's home page provides a link to waste/recycling delays,
2. An announcement in the Customer Service queue is played to callers waiting to
speak with a representative,
3. Area municipalities are notified by Customer Service staff of any disruption to
service that affects collections,
4. For residents ofOro Medonte, the following radio stations are being used to
communicate any waste and recycling cancellations or delays due to poor weather
conditions:
1. BIOI IV. Rock 95
H. Chay93.1 v. Easy Rock 97.3
HI. Star 107 VI. Jack FM
. Staff at all County waste sites continually monitor contractors' compliance with health
and safety protocol and bring any issues to the attention of their site supervisors, these
concerns are then brought to the attention of the contractors for resolution.
.
r .... (2) -'l
-
..
. The County completed an audit on all the collection contractors last summer, by
monitoring curbside perfonnance in each municipality. The purpose of the audit was to
ensure compliance with the contract. In reviewing the concerns brought forth from the
audit, it does not appear that any safety issues were highlighted at that time. However,
as a follow-up to this audit, the County has budgeted for a Collections Auditor in the
year 2005, and staff hopes to have this position in place by early summer. As well as
monitoring curbside collection practices, any safety aspects and concerns noticed
regarding collection contractors will be brought to the attention of the appropriate
manager. Please note that currently contractors are made aware of any safety issues
brought to the County's attention from residents, municipal staff, or other contractors
for their immediate follow-up.
Customer Service staff has also compiled reported issues for December and January as follows:
I. Excess Speed Complaints 0
2. Christmas Tree collection late 7
3. Blue Boxes not collected Line 13 I
4. Blue Boxes not collected Bass Lake 2
5. Blue Boxes missed - general error 14*
6. Blue Boxes missed - weather related 8
7. Blue Boxes missed - access related 5
8. Blue Boxes out late 4
9. Waste collection driver driving on lawn I
10. Waste driver bitten by dog I
II. Waste missed - general error 22*
12. Waste missed - weather related 9
13. Waste missed - access related I
14. Waste not collected - ineligible 4
15. Waste - partial pick-up 3
16. Waste - out late 4
17. Waste - unit count clarificalion requested 15
Total Issues 101
1.1 issues per 1,000 service events
'General error cannot he further defined as to whether contractor or resident error
We did confinn with the contractor that Christmas Tree collection was completed in the
Township, and any incidental trees have been picked-up by the contractor as they have been
advised. The contractor has also been advised of your general concerns regarding excess speed,
placement of blue boxes, garbage cans and lids.
The comments you have received from small business operators regarding bag tags have been
passed to our Finance Department for consideration and response. We trust the above addresses
the concerns from both the Township and Councillor Hough. Once again we would like to thank
you for your input, which assists us in communicating with the contractor to provide improved
service to our residents.
Yours sincerely,
r----y . vVaudrat. .
Tiina Nautras
Contracts & Collections Supervisor
Copy: Councillor Hough, Township ofOro Medonte
Ene: Corporate Services Item CS05-058
x:\corporate services\environmental services\swm\mun\oromed\05\letter nc concerns waste collection service.doc
- .-'
..
\
\'
COUNTY OF SIMCOE f)<A -
.J ,
ITEM FOR: CORPORATE SERVICES COMMITTEE
SECTION: Environmental
ITEM NO. CS 05-058
MEETING DATE: February 9, 2005
SUBJECT: Waste Collection Weather Cancellations
RECOMMENDATION:
THAT the recommendations for managing weather related waste collection cancellations as noted
within Item No. CS 05-058 be approved and implemented to the extent possible based on current
collection contracts.
BACKGROUND:
Disruptions to waste collection services due to inclement weather are handled in a variety of ways
and staff has listed below some common scenarios and the recommended resolution in each
instance based on current practices, supplemented with better information sharing techniques
between the County and residents and the County and the Municipalities:
Potential weather related Possible Resolutions
sccnarios
Outright cancellation in Staff recommended resolution
morning due to weather . Double collection on next collection day (as advertised in
conditions 2005 Calendar)
. Public Service announcements on local radio stations
. Customer Service Line announcement
. Faxes to the municipal offices in each affected area
. Infonnation posted on County website
. Allow bagging (in clear bags) of properly sorted
recyclables to manage additional storage requirements.
Alternates
. Move all collections ahead one day (not advertised in
calendar, potential for confusion for residents for the
remainder of the collection week)
. Collection in the cancelled area the next day (contractor
requires double equipment and staff for one day, no
guarantee weather will co-operate)
Delayed start time due to Staff recommended resolution
weather/road conditions, . Contractor to directly contact local municipality regarding
salting and sanding if road conditions are delaying
collection
. Contractor returns to uncollected area later in the day if
possible, and the next day until collection completed. If
-" \)C\ -
February 9, 2005 Corporate Services Committee CS 05-058 Page 2
unable to complete collection contractor to collect double
the next collection day. (In these instances contractor to
advise locations missed)
. County staff extends operating hours at waste disposal
sites to accommodate contractors working later, in these
instances. However, Certificate of Approval constraints
may limit extensions to operating hours and health &
safety of site attendants due to limited daylight hours is
also taken into consideration.
Alternates
. Contractor returns to uncollected area on Saturday
(residents may forget to put out, and if missed collection
was on a Monday or Tuesday residents will be getting
collection twice in the space of 3 or 4 days.
Partial cancellation during Staff recommended resolution
the day . Contractor to directly contact local municipality regarding
salting and sanding if cancellation due to road conditions
. Contractor returns to uncollected area later in the day if
possible, and the next day until collection completed. If
unable to complete collection contractor to collect double
the next collection day. (In these instances contractor to
advise locations missed)
Other resolutions
. Contractor returns to uncollected area on Saturday
(residents may forget to put out, and if missed collection
was on a Monday or Tuesday residents will be getting
collection twice in the space of 3 or 4 days.
In the winter months collection is very dependent upon weather conditions, and road class. It is
understood that main arteries and bus/school bus routes take priority, when plowing/salting/sanding
is scheduled. Staff tries to work with the contractor for each weather related occurrence to develop
the most reasonable resolutions in that particular instance. Factors that have to be considered by the
contractor are, the safety of their drivers as well as residents, equipment being out-of-commission
due to vehicles sliding into the ditch etc., property damage issues due to vehicles attempting to
access areas that have not been sanded/salted. The County is also restricted as to operating hours at
its waste disposal sites under the Certificates of Approval issued by the Ministry of the
Environment. Shorter daylight hours during the winter months also restrict operations for site staff.
In areas where collection cannot be undertaken due to roads not being ploughed or salted/sanded the
contractor has made the attempt and in some instances it may not be feasible to return later.
Contractor Guidelines have been developed to cover the above common weather related scenarios,
as well as some other issues, and are attached as Schedule I.
Staff suggests that the contractors be provided a contact name at each local municipality, in order to
directly discuss road conditions should these be hindering collections. Staff will circulate this
report to all municipal Public Works Directors, and request that municipalities submit a contact
name.
Please note that as new contracts are being let, a penalty clause has been inserted for reimbursement
to the County of % of one-day's collection costs, should the contractor detennine that due to
. ......, -
.
February 9, 2005 Corporate Services Committee CS 05-058 Page 3
weather conditions collection is being cancelled outright or partially and as such the contractor
would not be considered to be in a cost saving position with the cancellation of waste collection..
FINANCIAL ANALYSIS:
There is no impact on the County's 2005 Environmental Services budget as a result of this item
with the recommendations as listed.
SCHEDULES:
The following schedule is attached and fonns part of this item.
Schedule I - Contractor Guidelines.
~
"
Schedule I to
C505-058
PREPARED BY: Tiina Nautras I Rob McCullough
APPROVALS: Date:
Mark Aitken, Acting Chief Administrative Officer February 2, 2005
. . . 1)q -\p
.
Schedule 1 Corporate Services Committee Item CS05-058 Page 1 of 2
County of Simcoe
Waste Collection - Contractor Guidelines
January 2005 I
Ba!!/Can Size & Wei!!ht Limit
. If the bag/can is oversize but within the 20 kgs. weight requirement the
material should be taken, (within reason e.g. large bag of Styrofoam not OK.
45 gall. Drum not OK), cans greater than 121 L will he considered as garbage
boxes,
. If the can contains smaJler bags (i.e. kitchen catchers), or loose garbage and
can be lifted and is within the 20 kgs. weight requirement the materiaJ
should be taken, cans greater than 121 L will be considered as garbage hoxes,
and loose garbage should he bagged in standard sized garbage hags.
. CSRs to promote standard can and hag size to caJlers. i.e. jumho bags and
larger cans have potential to be picked-up now if within weight limit.
however if weight limit is exceeded in the future they will be left hehind.
This could cause confusion to resident as they will say they have always used
this bag/can size and it was picked-up before. Residents should be informed
that cans greater than 121 L will be considered as garbage boxcs.
Multi-Unit verification
. If a location requires clarification as to how many eligible units, and it is
determined that they are eligible for multiple units. any bags (within the new
limit) left behind the previous week should be included in the pick-up for the
following week, (this is based on the fact that the location is being charged
for multiple units), this is a one-time concession only.
. Any locations that cannot be identified as multiple units. and where
municipal input is required. and it is going to take some time to get a
response. residents should be nolifled that we are going through the process
and working with the local municipality, and hope to get an answer as soon
as possible. To ensure collection please use tags on additionaJ waste.
. In places like New Tecumseth and Innisfil where the bag limit was 2/week
with any additionaJ bags havIng to have tags. this should not be an issue as
limits have not changed herc and any multi-unit locations should have been
resolved previously. - CSRs should enquire what has prompted this call- as
there has been no change to limits in this area.?
Weather Conditions (Weather related misses/late collection - residents to be advised
as follows)
. Late
. The contractor is running behind due to bad weather and/or road
conditions,
. We cannot guarantee that they will make it to your location, if not
collected by noon tomorrow double will be collected on the next
collection day,
. Contractor to have list of roads for double collection.
. Outright cancellation
. Double will be collected the next collection day.
. Contractor to have list of roads for double collection.
Late/missed collection due to contractor issues
. Any areas missed due to new drivers, illness, etc.. contractor will return
later the same day or the next business day(s) to collect material
.' ~ . ~CA,-
. .
ISchedule 1 Co roo rate Services Committee Item CS05-058 Paoe 2 of 2 I
County of Simcoe
Waste Collection - Contractor Guidelines
January 2005 2
. Any areas missed due to contractor's operational difficulties (equipment
breakdowns etc.) contractor will return later the same day or the next
business day(s).
NOTE:
. Missed Garbage - New Issue since 2-hag limit. Quite often homeowners see
garbage put out on the street and run out with theirs thinking they will
make the collection vehicle. Then when theirs is not picked-up they phone
saying the whole street has been missed. However, these are bags that have
been left behind for a reason (overweight, over limit). CSRs should check
faxed contractor sheets to see if notation has been made of the street name
indicating bags left behInd, or call contractor to clarify if street has been
collected.
THE CORPORA,TION OF THE \=)q =1,
148 Line '/ S.. nox iOO
0 W N F'( 1 n 010. Oni/,do LOt. 2.XO
~
C) 1 ~ P;KH";C oor)) .487.2]"/ j
.L f70S:; 481"0) :3:;
;C'v_
WVV'N .oro--rnedon ic ,Ci"
~
January 26, 2005
County of Simcoe
Administration Centre
1110 Hwy. #26
MIDHURST, Ontario
LOL 1XO
ATTENTION: Ms. Tiina Nautras
Contracts and Collection Supervisor
Re: Waste/Recvclinq Collection within the Township of Oro-Medonte
Dear Ms. Nautras:
I would like to take this opportunity to recognize the efforts the County has made in the provision of
Waste Collection and Recycling services to the residents of Oro-Medonte. In an endeavour to
enhance this service, the following concerns and suggestions are put forward on behalf of Council.
Residents of the Township have made their Council representatives aware of the apparent lack of
information with respect to cancellation protocols and the dissemination of cancellation information to
residents, particularly in circumstances where on-going cancellations occur.
As well, reservations relating to the performance of the contractor in making these collections and the
safety aspects in truck operation (excess speed, placement of blue boxes, garbage cans and lids
after collection) were mentioned.
In an attempt to communicate more effectively with our residents, I would request, on behalf of
Council, that the County
. clarify what determines cancellation of collections,
. clarify what procedures are in place to make residents aware of cancellations (Le. which local
media are made aware of cancellations)
. clarify any monitoring procedures with respect to safety aspects of collection by the contractor
On the matter of tag distribution, several outlets are available in the Township. However, some small
business operators have expressed reservations with the requirement that they must front end the
sale of tags. Reconsideration of this policy and the limits it places on the number of distribution
centres for tags is respectfully requested.
j
)0, -
I would like to mention that Councillor Ralph Hough has had occasion to call the County Service
Centre with respect to this matter and has spoken to Lesley who was most helpful in answering his
queries to the best of her ability. It would be appreciated if Councillor Hough's comments, attached,
could be considered in your response. The Councillor also noted that Christmas Tree collection in his
area has not occurred as yet. For further information, he can be reached at 835-2770 or e-mail
ralph. houqh@oro-medonte.ca.
Thank you for your attention to this matter; your earliest response would be appreciated.
9 ~~
J. Neil Craig
Mayor
Attach.
c.c. Members of Council
Page I of2
. '.
R '" \ tj
J'v'l - \
Main Identity
From: "Ralph & Wendy Hough" <rhtigerman@sprint.ca>
To: "Ruth Fountain" <ruth.fountain@oro-medonte,ca>; "Paul Marahall" <pauLmarshall@oro-
medonte,ca>; "John Crawford" <john,crawford@oro-medonte.ca>: "Dan Buttineau"
<dan.buttineau@oro-medonte,ca>: "Harry Hughes" <harry,hughes@oro-medonte.ca>; "Neil
Craig" <neil.craig@oro-medonte,ca>
cc: <cao@oro-medonte>: <publicworks@oro-medonte>
Sent: Tuesday, January 11,2005 10:23 AM
Subject: Recycling pick-up
Hi everyone. Just for your information, especially Neil and Harry when the
garbage contract comes up for renewal.
On Friday morning January 7th. I received a call from a resident that lives on
Line 13 at Bass Lake complaining that his blue box had not been collected on
Thursday. I advised him that none in our area had been done either. He advised
me he had called the County, The Township and Mid Ontario and had not been
able to get a straight answer.
I called the County and spoke with Lesley, who advised me she would check with
Mid Ontario and call me back. I did advise her that I was a Councilor and had
received complaints. She did call back and advised me that in some areas of our
Township the roads were not safe for the truck to go down. I advised her that the
garbage truck had been and done the pick up on Thursday. She then said that
on some of our roads with hills the truck had picked up the blue boxes on one
side of the road but could not stop on the way down the hills to make the pick
up.
She then told me that one of the recycling trucks had been involved in an
accident earlier in the week and this had put them behind schedule. They would
be doing Warminster on Friday and should have everything cleared up by the
weekend.
I do know that sometime over the weekend Warminster was done as was Line
10, the Eady Station Road and the Mount S1. Louis Road. Ours on Line 11 was
not picked up.
On Monday, January 10th. one of my neighbours came to
the house to complain about this. I was not home but he spoke with Wendy. He
told her he had also phoned the County several times and had been given the
run around by a young guy that answered the phone. I was not able to check
with the County on Monday as the office was closed before I got home.
On Tuesday morning, January 11th. I again called the County and spoke with
Lesley. I told her that J had received another complaint from my neighbour and I
know that the blue boxes had not been picked up on Line 11 North between the
Mount S1. Louis Road and the Eady Station Road. I could not tell her if the rest
of Line 11 had been done as I had not been along the road over the weekend.
She again said she would cal! Mid Ontario and get back to me.
1/11/05
Page 2 of2
. So, - \ \
She did call back a few minutes later and told me that the supervisor, who was
not very familiar with the area had in fact done the route on Saturday and all the
blue boxes that were out had been picked up and they would not come back.
She suggested we either bring it back in till the next scheduled pick up or take it
to the dump on the Old Barrie Road. I told her that I already had two blue boxes
full, one cardboard box full of cardboard and a basket fuff of cans and was
running out of containers and space. I also told her the dump was about a 25
mile round trip for me and even if I took mine, which I wouldn't, it did not solve the
problem for the rest of the neighbours. I asked her to call back to Mid Ontario
and tell the supervisor that it was a Council member that was complaining and I
did not like the inference that our blue boxes had not been put out or they would
have been picked up. I know for a fact that mine and our neighbours were put
out on Thursday and I expected them to honour their contract.
She did call me back and advised that she had spoken with the operations
manager and he would take a drive out this way either today or tomorrow but
could not promise it would be today.
As Keith Matheson knows this is not the first time our area has been missed as f
get complaints about Christmas trees not being picked up along our road almost
every year.
I am not sure why the new policy states that garbage cans must be placed out
with a lid on them. I have not put lids on ours for years. The guy's that do the
pick up seem to just have a ball playing frisbee with them and I got sick on
wading through deep snow to retrieve them in the winter.
I will update you on Wednesday of any developments.
Ralph
1/1 ]/05
-
,- ~
--
JOHN PAGE, 24 MYRTLE AV. RR#2 HAWKESTONE
ONT.,LOL 1 TO
February 14, 2005 RECEIVED
MAR 0 .4 2005
The Corporation of the Township of Ora-Medonte ORO-MEDONTE
P.O. Box tOO Oro, Ont., LOI2XO TOWNSHIP
Dear Mayor & Council Members - Ora-Medonte:
Re: (J(}24 Myrde Ave, Plan 626 Lots 72&:73 RoU# 4346-010-011-017tJ(j..(J()(J(}
It has come to our attention as a result of a recent survey that the original 40 year old structure associated
with 24 Myrtle Ave is encroaching on Promenade/Road AJlowance. From the attached survey (plan-3348) it
can be seen that the original structure is encroaching by up to 11.8 feet of Promenade/Road Allowance lands.
To our knowledge the original structures as well as all other additions have been built with the appropriate
building permit approvals rC9uired at time of construction and were inspected and approved by Oro-Medonte
building officials.
At this time we would ask the Mayor and Council to review- this encroachment issue and determine if the
property being encroached upon could be sold, leased or if some form of minor variance can be approved to
resolve this encroachment. If there is a process or formal application which we need to initiate please let us
know and we will proceed with any official application or approval process.
We look forward to your response to this request.
Sincerely,
~:h
24 MYRTLE AVE HAWKES TONE ONT
487-0411, FAX 416-207.5717
-,- '~
...0.0 I I
-.9 ;;, \ ul
N W \
~ 11' I .
:t 101 t. '- .~, \ '
... :> <{ ul .. '1\ 6 ' '
<<.%..1000 ~"'(f
to"''''',j \II ""I \ ·
> z ~ oS 0 :i :', ',,-" t \ ~
<<\I1"ui _w '(,"J \J
:),..~a.\L.\S'\.J ~~
onl-.I 0..< ,"' '
"Z I- ~ l\. 0 'ill ''0 ~ ~ '
'ao~~i> ,)00 \
~..1.1.\J\r
",to- _1.'-
.( \S.a~j
.J \- 0 (t ~. 0 \
o.<jul~~\)
\Lov
o'i\( u\
o
'"
1.
\1\
'1
!--- _._-- 0
I, . _ <1-
,- ..
~ t""
,I / ui
"I I- ',.I
I'. 0 · ;: <1-
, _,.J . o(~'Q 0 3. ()
'" _ 0 \- '" - ()
0'66 'Mb,",o"'''' N 0( N ~ ~ ~
.\ .. p~_Y,"" ," ,.... . . . 'i ~
Z;>-""",,,,~ ~ ,.
, oj , "
. ; _. _ 1J1\ ," .
,'" wI> ~
,J ,_ It':! Q'
~. ~ " '. ~\ - V It ~. ..\
, "' ~ ,".\0 Q <;\ \I.J
~.'".... \.;,<OC~ci V
",' \ "" -
.,., 0 ~--. <{
,,' J'" '
\ ....... ...... "',' -
~.. ,'~'}:" ~,,~ .
, O.-t_,_Mb"O<ry~" ",' W
~ ~ ~
~ tc\ ~ If
I · ~: ~ \\
o u\
I .J ou} \
~. . _'_ / /,: .J '
~ l-
f> It
~,
\ 2)- \
~ .
TOWNSHIP OF SPRINGWATER 5c
Simcoe County Administration Centre, Midhurst, Ontario LOL 1XO
Phone No. (705) 728-4784 Fax No. (705) 728-6957
Website: www.sprinQwater.ca E-mail: erath@sprinQwater.ca
March 4, 2005
To: Simcoe County Municipalities
Dear Council Members:
RE: Mayor's Annual Log-Sawing Contest - Elmvale Maple Syrup Festival
It is my great pleasure to invite you to the Mayor's Annual Log-Sawing Contest
taking place at the 2005 Elmvale Maple Syrup Festival.
This year's Festival occurs on Saturday, April 23rd, with the Log-Sawing Contest
scheduled to commence at 1 :OOpm. We are asking all participants to meet at the
Main Stage (corner of Yonge and Queen Streets) at 12:30pm in preparation for
the competition.
As in previous years, the invitation has been extended to a number of local
dignitaries, including area MPs, MPPs, and representatives from neighbouring
municipal councils. I hope to see everyone out to support this worthwhile and fun
community event.
Please contact Conor Begley at cbeQlev@sprinQwater.ca or via telephone at
728-4784 ext. 239 to RSVP with the names of your lumberjacks.
Sincerely,
\~\ (h-\.(f(l_vy~
John Brown
Mayor
lcpb
Sci-\
Oro-!vledonte Chamber of Commerce
148 Line 7 5'oulh, Box 100
2XO
705-487-7337
March 17.2005
Mayor and Council
Township of Oro-Mcdontc
148 Line 7 South
Oro, ON
LOL 2XO
Refcrcncc: Annual Awards Dinner
Dcar Mayor and Mcmbers of Council:
The Oro-Medonte Chambcr of Commerce will bc hosting its annual business
achievemcnt awards presentation and dinner Monday, April 4th and wishes to extend a
special invitation to Your Worship and allmcmbers of Council. This ycar's cvent is
bcing held at The Heights of Horseshoe and features a ncw food venue.
We look j()fward to ha ling you and mcmhers of Council attend.
Please RVSP by March 30, 2005.
Sinccrcly,
Judy Kern
Managing Director
RECEIVED
MAR 1 7 2005
ORO-MEDONTE
TOWNSHIP
Oro-:Meaonte Chamber of Commerce 5d-~
2004 'Business .Jtcfiievement .JtwardS
T .Jt5T'E 'EXTRJt Y .Jt0'~.Jt
&
SIL'ENT .Jtl1CTION
:Monday Ayri{ 4, 2005
'llie J{eiglits of J{orseslioe, 1106 J{orseslioe lIa{{ey 'Road
CocktaiCs - 5:30 y.m.
'Dinner - 7 y.m.
Come taste Oro-Medonte's finest cuisine, served 6y the area's most yoyufar esta6[ishments
crudites & cheese Tratter
Craigfiurst I(iA
-~-~
Ayyetizer
:Ffam6e of 'Escargots in jagermeister with Roast (jarac, sha[lOts and Cream
on a :Mini Roesti Totato
Si[k's of Ji() rsesfi oe Resort
----
Butternut Squash Soup & Savory Chicken Safad
Lo06ies Restaurant
----
Boeuf Bourguignonne
:Fresh A[6erta 'lhpfe .J\ Round Steak marinated in RedWine with
Lean Mayfe Cured Bacon ancf Sha[[ots served in a Ii o{-au- Ii ent
Octopuses ~iarden
----
Rosemary Chicken'
(jri[fedBreast of Chicken tossed with a Medfey of Mushrooms ancf :Fresh liegeta6fes
:H()mestead' Sett[ers' (ifiost
----
liegetarian Creye
Jfer6 Creyes fi[fed with MarinatedRoastedliegeta6fes
A660tt's or Craigfiurst
----
:Assorted Jfomemade Tie & Ice Cream
Ayp[e or:My 1'ie
----
1idfJian Chocofates
:Assorted .J\rtisana[7'rufffes & Icewine chocofates
cfieG'ea Cfioco[ales
----
Non-.'Mem6ers We{come - Tickets 011['1 $35
To order tickets carr 487-7337 or emai{: i11fo@oromedontecc.com
Veadune for reservations .March 30, 2005
':Menu items 5UVject to cnanBe
MAH - Province Helps Simcoe County Plan For The Future
.
/)t - \
@ Ontario Minislry of MUJ
Affairs and H
I cen'IY.a1 site I feedb.ack I search I site m
""'I~:at.,~iiT
+ ~ " About the Ministry Related Links" Careers Reference Centre Newsroom SitE
Homf;:. / .!'~tt;~W-$LQgm / i:urreB.LN~~U3el~Q_sj~_~_ / Province Helps Simcoe County...
Province Helps Simcoe County Plan For The Future
Invests In Action Plan To Ensure Sustainable Development
For Immediate Release
March 10, 2005
TORONTO - The Ontario government Is working with iocal governments in Simcoe County and the
surrounding area to address local development pressures, Minister of Municipal Affairs and Housing
Minister John Gerretsen said today.
"Past governments' piecemeal planning has threatened both the environment and the sustainability of
development in Simcoe County," said Gerretsen. "A comprehensive study of Simcoe County's watersh.
capacity and infrastructure will ensure governments make more informed decisions on future
development proposals."
The government is providing $2.25 million toward the development of the action plan, which is support
by all affected municipal councils. The plan will include the study of the Lake Simcoe and Nottawasaga
River watersheds and their ability to handle population growth and development envisioned for the are
It will also examine the capacity of existing infrastructure, an appropriate level of development for the
future and more effective municipal governance structures.
The Province began talks with municipal governments in Simcoe in August 2004 about ways to deal wit
persistent growth pressures experienced by the area. Gerretsen proposed the intergovernmental actio
plan in December, and has since received unanimous support from municipal councils.
"Simcoe's municipal leaders deserve credit for their ability to look to the future needs of their
communities," said Gerretsen. "This plan will help protect the environment in Simcoe County while
ensuring present and future development is fiscally sustainable. We are committed to safe, strong
communities - that means developing long-range planning solutions in cooperation with local
governments to deal with growth and development in central Ontario."
- 30 -
.6ackgrounde,G_lntemovemmental ActionPliJn forSimcoe,6iJrrie And OrllUiJ
Contacts:
Patti Munce
Minister's Office
(416) 585-6333
Bev Hendry
Ministry of Municipal Affairs and Housing
(416) 585-6200
http://www.mah.gov.on.caluserfiles/HTML/nts_I_23551_ I.html 3/14/2005
MAR, - Intergovernmental Action Plan for Simcoe, Barrie and Orillia
-
@ Ontario MinisII)' of Mru
Affairs and H
I c.;:n1:ral site I feedback j search J site m
"'1~u.."iliT
,. ~ "' About the Ministry" Related links Careen, Reference Centre" Newsroom ~ Sit*,
Home / J'~~.w.$.t90m I ~J,![[gntJ~,g~1s.9LQ_!'!D9~L$.1 Intergovernmental Action...
Intergovernmental Action Plan for Simcoe, Barrie and Orillia
March 10, 2005
The Intergovernmental Action Plan involving the Province and Simcoe area municipalities will address
concerns about population growth and development pressures, and help municipalities plan for the
future.
Specifically, the plan will gather information about the Lake Simcoe and Nottawasaga River watershed~
and their ability to accommodate added usage of water and sewer systems that would come with
additional urban development in the area. It will also examine the state of the water and sewer systen
that serve the existing population.
The action plan consists of four formal phases.
Phase I
Assimilative capacity studies of the Lake Simcoe and Nottawasaga River watersheds and their ability to
handle growth and development.
Phase II
Infrastructure studies and the development of a master plan to accommodate approved growth and
development.
Phase III
The assessment of future growth potential, considering water capacity and findings on the capacity of
existing infrastructure.
Phase IV
The implementation of plans deemed necessary following consideration of the information gathered in
the first three phases.
The government will contribute $2.25 million in total for work on action plan studies. The Province will
contribute the total cost of $1.5 million for the assimilative capacity watershed studies in Phase 1. The
government will contribute an additional $750,000 to cover half of the costs of the remaining three
components of the action plan. Partner municipalities will pay any remaining costs.
Discussions on the action plan, led by the Ministry of Municipal Affairs and Housing, began in August
2004. Discussions included representatives from the ministries of Public Infrastructure Renewal,
Environment and Natural Resources.
http://www.mah.gov.on.caluserfiles/HTML/nts I 23549 I.html 3/14/2005
MAH.- Intergovernmental Action Plan for Simcoe, Barrie and Orillia
-
Planning for studies associated with the action plan began in December 2004. All four phases are
expected to be complete by June 2006.
Partner Municipalities
Municipalities involved in the action plan include:
. Simcoe County
. City of Barrie
. Township of Adjala- Tosorontio
. Town of Bradford West Gwillimbury
. Township of Clearview
. Town of Collingwood
. Township of Essa
. Town of Innisfil
. Town of Midland
. Town of New Tecumseth
. Township of Oro-Medonte
. Town of Penetanguishene
. Township of Ramara
. Township of Severn
. Township of Springwater
. Township of Tay
. Township of Tiny
. Town of Wasaga Beach
. City of Ori II ia
Related Initiatives
The Government of Ontario has a number of initiatives underway that address growth and developmen
on a wider scale.
The Provincial Policy Statement provides for appropriate development while protecting resources of
provincial interest, public health and safety, and the quality of the natural environment. The Provincial
Policy Statement supports improved land use planning and management, which contributes to a more
effective and efficient land use planning system.
The proposed Growth Plan for the Greater Golden Horseshoe, including Simcoe County, will realize the
vision for how the region should grow over the next 30 years. The proposed plan will address growth
concerns such as infrastructure needs, and protection for natural heritage and natural resources.
Watershed-based source protection is a key recommendation of the Walkerton inquiry. Draft iegislatio
if passed, would require the development and approval of watershed-based source protection plans.
The Greenbelt will help contain urban sprawl and improve the quality of life in the Golden Horseshoe.
The proposed Greenbelt area represents a focussed approach to protecting the environmentally sensiti'
and agricultural lands in the Golden Horseshoe that are most threatened by urban development.
- 30-
Contact:
Bev Hendry
Ministry of Municipal Affairs and Housing
(416) 585-6200
http://www.mah.gov.on.ca/userfiles/HTML/nts_I _23549 _I.html 3/14/2005
J 5'0
1~ H ~
Ann BUdge iiJJ v o{-.,*, C(;) 2. 0 .') S'
,iJ?
(j
13 ~ck, ~ ((((.it 4
MAR 1 1 2005 (~rA ') I
ORO-MEDONTE
~:1i ~~~~~ ~~~ TOWNSHIP c~~ Lol< 11-:00
I
(0))- ?;..<>$'- 31)'6
Ufo- ~ I~
ili M /:'
c.">! ~-r,,- ~~
, ~ OA-- ~~~ lA.-~ ~ c~ ?cuJ CA- ~ cu~
~I~^\~ICQ~~\J~) ~ ~~~\)~ bolbx.k~-_
,~~) O/VJ. <6)~ ~ s~~~}ttk, ~ -\~(f_~~"~o, ~
,~~ ~ '-V~l- a~ ~0 J:..<L~ ~~<).~~. ,
Th '~ \j~ ii" ~~
" '-0~"~ .~ -<-0~T~ ' ' "
~\J<:J. -\'V~l , ~ s1~~ ~.') ~ 4~~ ~~~l- ~~)
), - ~ ~ 'b NJ. [\
;~~ cL~,~ re~tQ 0~--': ~~~ (. _~ ~))
,~ \~w~\\) 0- (k-v~t \W-0~ c~ ~ ~L..-c\. ~
(J'f \)Q~~ ~ 3 ~J) \t'v\ft.~) ~~ jv:,o' (bJJ1P::d..-I)'
t( *'.
(10fu vtV0 ~ ~ On~ rt~la~'te. ~I t-v ~ ~~'0cvk
f_ ~ - -..
(.~~'oj' ~l ~\\ ~Jet ~~ ~'Vv~ ~A
?6' ~ )., J
_'" . -~' ~)'~ c.L~V'4J ~~(~~ S\b~ ~
+k~~ ~~~ ~~~)) ~::') ~\ ~(~') _~ ~ ~~'), ~ ~~)
~-v.Ul4-\~ ~-~ \aQ ""'~ c~ ~'JCLl~ +-L:. M-- ~~- ~
~t 'oooA v,,^, \)r. <{_Qc~\ () V ~~~' ~ k~ ~ { dx~~
i,r.-..; \ - ""j ~
~~ u1:v, '~~~v*~ bt~~-LR. v~ ~ ~ '~~1~1"'~v~ ~ ,
" ~ ~'~ ~~ \ \) ~~:k "
~, 0'><A,. Q'N'L ',' u,'-C.V.,' / / ,.12 &.ei\A.' ' i ~ ~ /Lu
~I\ 0~ - ~ ~ ~ ~ '; "
, <' ~, ~ ~, 2' _ '~'f' - . o.~~\.-, a,o ~~ 'i4 ~ \~ c'~/N"
. I) +\~~~, ~)"'''~&; ./{, ~
Fit to Eat P d \. b ,s~c S,;""~,~ry(_.",,
Wholesome Recipes for Active PeopJe rocee 5 to eneflt 'oooo't,oo""""",,, I""""","."",..,,
SPORT MEDICINE COUNCIL OF CANADA
. t;;~ _ \
\J
RECEIVED
Feb 25th, 2005 MAR 1 1 2005
Mayor and Members of Council ORO-MEDONTE
Box 100 Oro-Medonte TOWNSHIP
LOL2XO
Dear; Mayor and Members of Council
On February the 8th, 2005 I was travelling west on Mount St. Louis Rd E on my way to
work. I could see that the road was very icy that morning and I was driving particularly
slow. As I approached a very bad section of the road just past Line 12th I could see lights
rrom another vehiele approaching. The ice build up on the road made it very diffieult to
steer and there was not a stitch of sand on the road. As I tried to move more to the right
side of the road my tires got stuck in the ruts of ice (that were approximately 8 inchs
thick) and eaused me to lose control of my vehiele. I went heading straight for the ditch,
where I plunged in and my vehiele came to rest on its side. The lights that I had seen
coming was a truck and the driver quickly came to my aid helping me out of my vehiele
rrom the passenger side door as the whole left side of my vehiele was buried in snow.
I was taken to the Emergency Room by my husband (on the advise of the Firefighters
who showed up that day as someone passing by called 911) where I spent the whole day
under observation (see letter enelosed) as I was 5 months pregnant at the time.
Fortunately the baby was fine after under going a few tests and I was finally able to leave
at 8:30 pm that evening. I cannot explain the fear that I experieneed that morning as I
was heading for the ditch seeing all those trees. Thank goodness I was going slowly and
my vehicle stopped when I hit the deep snow in the ditch.
I had a few questions and concerns about what happened that day, so I called the Oro-
Medonte Township Office the following day, to ask about the roads and inquire about
why they were not better maintained. I was put through to Jerry Ball and I was basically
told by him that it was a bad seetion of the road and not much could be done about it.
Obviously something could be done about it, I said as the road was pretty much fixed
now. I asked him why had the road been grated today and not two weeks ago as it had
been bad for about two weeks. He said something about temperature, which is just not
true because the day the road was grated down; the temperature was -5, which was the
coldest day we had had in a two week period. I feel the road was fixed as someone knew
they were at fault. There was no reason the road should have been in that poor of a
condition other than lack of coneern and poor maintenance. Everyone who stopped that
day (ineluding the Fire Department) could not believe the poor shape ofthe road. It was
not something that happened over night as the ice had been building up for weeks.
s -
My question to you Mayor, and Members of Council is why was the road not better
maintained? Why did someone have to go in to the ditch before the road was grated
down? I feel you are responsible for ensuring the road is properly maintained which was
not the case on February 8th. I feel it will be in your best interest to cover the damages to
my vehicle which are about $1, 200.00 (fonnal quote can be provided) to have my drivers
side door fixed.
Enclosed you will find a letter and petition; as when speaking with my Councilor, Ralph
Hough; he said that he brings our roads up every year at budget time and it comes back
that no one ever complains.. ...well hear us now as we are complaining.
I look forward to your response.
/
,;/<'
-~--~~
!
1608 Mt St. Louis Rd E
RR # 2 Coldwater On
LOK IEO
,....
h
J -
\hl.@@~~([Jm CANAn< "
AWARDS FOR ' ~
SOLDIERS'L MEMORIAL -- DiCEUENCE 17
'"
u
c:
0
so
E
~
0
;;
;;
;;
.
"'
w
""
.,. / ill
.,., liff" t , OC;-'
N
'"
""
0
1"-
.. ~ 'I ~I
x Je V"'A--- I
'" ,
-
. ;1e, 10c-/~, !Ict~,
-
0
N
N 41 . I d,? tIf~ r
""
N
'" IV:~ wM k~ '/,~ 1""511'7' J/~ .
""
0 ?' ~ c!u,U: ja,)J ,;,4:;- J ~ ~M-^7
1"-
..
-
'"
-
. #4 (Iv it 1I,J.wl ,hvr"-'~ fd fl?)J P2 W~
"'
N
N
:>
'"
-' {;' / r J&
0 ' /ZI 1M {v I Vv' j11AV
,-
~
ro
-
c: I /wI f~n
0 (t4d
-
ro . (
,-
- ~
-
.- )} " / "
~
0 0. ft;1i-?
.
-
~ MIJ ;:;u,s (c.)
'"
;3 I .
-
'"
'"
~
-
v'>
'"
c:
-
0
.0
0
U
0
1"-
-
- CREATING A HEALTHIER FUTURE TOGHHEI
.
.
February 16,2005
Dear; Mayor and Members of Council
We are residents ofOro-Medonte Township. We reside or travel on the Mount St. Louis
Road. We write to you today to express our concern of how poorly the Mt. St. Louis Rd.
is maintained through the winter months. We are asking that thereft~more money in the
budget for our area for our local roads so they can be better maintained in the winter
months as well in the summer for repairs and upgrades.
The above mentioned road is very heavily traveled and most times has not been plowed
properly, sanded or salted. There are ruts of ice that build up between the l2'h and II th
Line which make it nearly impossible for vehicles to steer properly which creates a very
deadly hazard.
We hope that this will act as proof that we are concerned and care about the roads we
travel on daily with our families. We are tax payers and do not feel we should accept this
any longer.
If you have any questions or concerns please feel free to contact me on behalf of
everyone at my home at 835-5953.
/) .
,~. /,
,y:>-'^),.--/'------- ~-~-:\:::i_i \
/( ,,~{/~'iJ) \
'< ,/ //, ,,'/J "" /'" ,"-'" ..
~~. Q.'k.Matthews...J
C/'
ADDRESS:
N.. t . 51 . I
'i ~ J (,\)/v'G/l,
. --
.
-",
L ,
Lou (~ Rd
-
I,).:., d<1JiLu<<" ") ~ ":l C~d'~:f.M-&J. -C!~
1
- ----
,
March 18,2005 ~~
D. R. Wilson
2310 Highway 11S
Shanty Bay, ON
LOL 2LO
487-2716
Dear Oro-Medonte Council:
When any sports team makes it to the OMHA Ontario championship finals
it is a credit to all those who worked to achieve this distinction and to the
Township itself.
For years, the OMHA playdown games have been a time when many,
especially seniors like me attend the games to give support and cheer on our
local teams. For years, we had been able to rely on knowing when the games are
scheduled by reading the large billboard sign on the arena. For years, the arena
staff simply used their discretion to post the appropriate games. Coaches have
been informed that the arena staff no longer have this discretion and can only act
if directed by the Township Office.
When contacting the Township Recreation Departmen, coaches have
learned that Oro-Medonte now has a policy where it will not post any games
including the OMHA finals. This has resulted in an arena that was once filled with
fans to low attendance with a significant loss of revenue for Ora Minor Hockey.
OMHA teams travelling across Ontario publicize the names of their
communities and fulfill the role of ambassadors. Teams from Oro travelling to
other centres are recognized by billboard signs on the host community's arena
publicizing the games.
Oro-Medonte needs to reciprocate in kind. Teams from Oro-Medonte have a
strong long history of being outstanding ambassadors for our Township.
The refusal to post the OMHA playdown games on the Arena Board
appears inconsistent with Council inviting the winning teams for special
recognition at a Council meeting. One wonders if Council as a whole is aware of
the change in the once long standing tradition of posting the games on the arena
sign board and has given due consideration the implications of this change?
I request Oro-Medonte Council take measures to immediately rectify this
situation.
Sincerely.
/!\ /je, .. ~/'
'~-C<d~.t0~l
Doug )fiIilson
- \
\
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
F .D. Report 2005 - 06 Committee of the Whole Lynn Burness, F.D.
Secretarv
Subject: Department:
Council Oro-Medonte Fire and
Fire Report for Month of Emergency Services
C.ofW. January, 2005 Date:
March 8, 2005
Motion # R.M. File #:
Date: RolI#:
DATE STATION TIME TYPE LOCATION DAMAGE
Station #5 Chimney Overheat 1750 Line 13 North
Janua ,1, 2005 Warminster 05:40:00
Station #6 Motor Vehicle Highway 400 @
Janua 2,2005 Moonstone 12: 18:05 Accident Line 6 North
Station #2 Motor Vehicle Highway 11 NIB,
Janua 2,2005 Hawkestone 14:04: 01 Roll Over Line 6 South
Station #2 Alarm - No Fire, 110 Line 7 South
Janua 3,2005 Hawkestone 01:07: 00 Nothin Found
Station #2 Vehicle Fell On Line 15 North, at
Janua 3,2005 Hawkestone 13: 20:00 Person, Fuel Leak Sa 'eant Mix Yard
Station #4 Assist Station #2 Line 15 North, at
Janua 3,2005 Ru b 13:20:00 Sar'eant Mix Yard
Station #2 Carbon Monoxide 602 Lakeshore Road
Janua 3,2005 Hawkestone 23:44:00 Call East
Station #4 Medical Assist 19 Tamarack Drive
Janua 4,2005 Ru b 18:22: 16 Call
Station #5 Medical Assist 219 Medonte S.R. #2
Janua 5,2005 Warminster 12: 51: 18 Call
F.D. Report 2005 - 06
DATE STATION TIME TYPE lOCATION DAMAGE
Station #1 Medical Assist 16 Walnut Drive I
January 6, 2005 Shanty Bav 12:07: 00 Call ,
Station #5 Alarm - No Fire 1000 Harvey
Januarv 9, 2005 Warminster 16: 12:06 Accidental Alarm Settlement Road
Station #1 Carbon Monoxide 69 Red Oak
Januarv 12, 2005 Shantv Bav 02: 19: 00 Call
Station #5 Multi Motor Highway 12 and
Januarv 12, 2005 Warminster 18: 30: 00 Vehicle Accident Conder Drive
Station #3 Multi Motor Highway 400 and
January 12, 2005 Horseshoe 22:05: 00 Vehicle Accident HSVR
Station #3 Fire in Wall, 2736 Line 3 North $ 10,000.00 L i
Januarv 13, 2005 Horseshoe 13: 38: 50 Structure Fire $400,000.00 S
Station #3 Multi Motor Highway 400 and
Januarv 13, 2005 Horseshoe 21: 55: 00 Vehicle Accident Hiahwav 93
Station #4 Carbon Monoxide 4 Shelswell Cres.
Januarv 13, 2005 Ruabv 23:35:00 Call
Station #2 Ramara, Mutual Strawberry Island
Januarv 14, 2005 Hawkestone 21:48: 00 Aid, Airboat i
Station #5 Motor Vehicle Highway 12 and Old
Januarv 14, 2005 Warminster 22: 10: 00 Accident, Ditch Coldwater Road
Station #5 Motor Vehicle Highway 12 and I
Januarv 15, 2005 Warminster 01:33:00 Extrication HSVR
Station #5 Motor Vehicle Highway 12, near
Januarv 15, 2005 Warminster 01: 30:00 Accident Warminster S.R.
Station #5 Medical Assist Mt. St. Louis Rd. and
Januarv 16, 2005 Warminster 12: 14: 51 Call Medonte Road 2
Station #5 Motor Vehicle Highway 12, East of
Januarv 16, 2005 Warminster 00: 10: 00 Roll Over Warminster i
Station #1 Motor Vehicle 1503 Ridge Road
Januarv 16, 2005 Shanty Bav 03:28:22 Roll Over West
Station #4 Medical Assist 829 Line 11 North
Januarv 16, 2005 Ruabv 18: 07:00 Call
Station #3 Conveyor Belt, 2065 Line 7 North $ 10,000.00 L i
Januarv 17, 2005 Horseshoe 10:45: 00 On Fire $ .00 S
Station #2 Smell of Smoke, Highway 11 and Line
Januarv 18, 2005 Hawkestone 19:05:00 Nothina Found 15
Station #2 Motor Vehicle Highway 11 NIB @
January 19, 2005 Hawkestone 10:06:28 Roll Over Line 13 ,
Station #2 Motor Vehicle Highway 11 @ Line
January 19, 2005 Hawkestone 11: 45: 00 Accident 9
Station #2 Motor Vehicle Highway 11, near ,
i
Januarv 19, 2005 Hawkestone 15:50:34 Overheat Booth's Road ,
Station #5 Medical Assist 1 Lakeview Drive
Januarv 19, 2005 Warminster 18: 55: 00 Call
F.D. Report 2005.06
DATE STATION TIME TYPE LOCATION DAMAGE
Station #5 Medical Assist 3771 Line 11 North I
Januarv 21, 2005 Warminster 01:47: 00 Call
Station #5 Chimney 1120 Mt. St. Louis I
Januarv 21, 2005 Warminster 07:37:58 Overheat S.R
Station #5 Motor Vehicle Highway 12, East of !
Januarv 22, 2005 Warminster 15: 13:00 Roll Over Prices Corners I
Station #1 Overheat, Furnace 855 Ridge Road I
Januarv 23, 2005 Shantv Bav 16:32:00 Malfunction, Smoke West
Station #2 Medical Assist 2238 Lakeshore Road I
Januarv 24, 2005 Hawkestone 14:03: 54 Call East
Station #$ Motor Vehicle Highway 400 @ i
Januarv 24, 2005 Moonstone 21:49: 59 Roll Over Line 3
Station #4 Overheated Hot 744 Old Barrie Road
Januarv 24, 2005 Ruqbv 23:46: 00 Water Boiler East
Station #$ Multi Motor Highway 400 and
Januarv 25, 2005 Moonstone 09:52: 36 Vehicle Accident Line 4
Station #3 Carbon Monoxide 1933 Line 2 North
Januarv 26, 2005 Horseshoe 19:45: 00 Call
Station #3 Carbon Monoxide 3 Maple Ridge Road
Januarv 27, 2005 Horseshoe 12: 15: 14 Call
Station #2 Multi Motor Highway 11 at Line
Januarv 27, 2005 Hawkestone 16:35: 00 Vehicle Accident 15 South
Station #3 Alarm - No Fire Craighurst Ambulance
Januarv 29, 2005 Horseshoe 15:08:41 (Sorinqwater Carn Buildinq
Station #2 Burning 5287 Highway 11
Januarv 29, 2005 Hawkestone 11:44: 00 Complaint North
Station #3 Carbon Monoxide 17 Sugarbush Road
Januarv 30, 2005 Horseshoe 20:35:00 Call
Station #5 Medical Assist 14 Cahiague Road
Januarv 31, 2005 Warminster 10:35:00 Call
Structure and Vehicle Fire
Dollar Value Lost Dollar Value Saved
$ 20,000.00 $ 400,000.00
Medical Calls
2005 2004
9 6
-
Monthlv Fire Report for Januarv. 2005
Trainina Sessions
Station #1 Shanty Bay 2 Station #3 Horseshoe 2
Station #2 Hawkestone 2 Station #4 Rugby 2
Station #5 Warminster 2 Station #6 Moonstone 2
Inspection Record for the Month (includina Fire Prevention I Public Education)
Commercial Residential/Bed & Breakfast
Industrial I Mercantile 3 Schools / Assembly I Church
Woodstove 6 Daycare / Camps I Hall Tours 1
Comments or Recommendations bv Fire Chief and/or Deputv Fire Chief
Extra trainina / Seminars and Events Attended
Mutual Aid Meeting
Meeting with Ontario Fire Marshal Office
Trainer Facilitator Meeting
DNR Meeting
Meeting with Point to Point Communications, RE: Radio Frequency Change Over
RespectfUlly submitted,
"'
/J,
il"/\ cA.." ~/~
/' -- '-~_..-/
/
Lynn Burness,
Secretary, Fire and Emergency Services
C.A.O. Comments: Date:
C.A.O Dept. I; I@. i~rrj
Head .
V
_I
!
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
FD - 2005 - 07 Committee of the Whole Joe Casey, Director of
Fire & Emergency
Services
Subject: Department:
Council Back-Up Emergency Fire and Emergency
Generator for the Services
C.ofW. Township of Oro- Date: March 11, 2005
Medonte Administration
Building (EMO)
Motion R.M. File #:
#
Date: Roll #:
II BACKGROUND: I
A project planning worksheet was completed for JEPP funding (joint emergency
preparedness planning), applications, for items that would help enhance the
capabilities of the existing Emergency Operations Centre (EOC) and an alternate
EOC, to comply with the recommendations from the Emergency Measures of
Ontario. It would also give the members of the Community Control Group the
necessary tools to effectively, without interruption, manage a major emergency
should one be declared.
On November 24, 2004, report number FD - 2004 - 11 (Motion 17), was
received and adopted. As a result of this report being adopted tenders were
advertised in the Packet and Times and opened on Thursday March 3, 2005,
witnessed by Mayor Neil Craig, CAO Jennifer Zieleniewski, Fire Chief Joe
Casey, Chief Building Official Ron Kolbe and the Clerk Marilyn Pennycook was
the recording secretary.
-
- 2-
~ ANALYSIS: ,
The results of the Tenders received, for this project, are as follows:
CONTRACTOR QUOTE TOTAL G.S.T GRAND TOTAL
WALLWIN
ELECTRIC $ 56,303.40 G.S.T INCLUDED $ 56,303.40
MAZUR ELECTRICAL
& MECHANICAL $ 46,434.00 $ 3,250.38 $ 49,684.38
CONTRACTING L TO.
LIVE WIRE
ELECTRICAL $ 57,492.53 G.S.T. INCLUDED $ 57,492.53
~ RECOMMENDA TlON(S): I
1. THAT Report No. FD - 2005 - 07 be received and adopted.
2. THAT Council commit the necessary funds to commence this project by the
deadline of March 31, 2005.
3. THAT the Tender be awarded to Mazur Electrical and Mechanical Contracting
Ltd. for the total amount of $ 49,684.38
4. AND that the respective contractor is notified accordingly
.
-
- 3-
Respectfully submitted,
Joe Casey, Fire qtj\ef
oro-Medo1te FireJand E rgency Services
C.A.O. COMMENTS: DATE: () ~Av
jCfJ/\ r).JJ'--
J
C.A.O. DEPT. HEAD
-'~
~f-of ORO~ ~ \
j,J ~'/----~--"..-'!t~~.. \De- I
P.~( /-:,,':; ,
I=~O\
00 , '" J
r ,\ ~
'- ,,:_-_:\~~- ~
,,'f{,,~,
'IItS~:V
O;':?.:!;~';;;;;;:'>><< '
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. TR2005-08 To: Committee of the Whole Prepared By: Paul Gravelle
Subject: Treasurer's Department: Treasury
Statement of remuneration
Council
C.ofW. Date: March 16, 2005
Motion # R.M. File #:
Date: RolI#:
II BACKGROUND: II
S. 284 of the Municipal Act stipulates that the Treasurer shall in each year on or before March 31st
provide to Council an itemized statement of remuneration and expenses paid in the previous year to
each member of Council and each person, other than a member of Council, appointed by the
municipality to serve as a member of any body, including a local board.
II ANALYSIS: II
Please find attached the Treasurer's statement of remuneration and expenses for the year 2004.
II RECOMMENDATlON(S): II
1. THAT Report No. TR2005-08 be received and adopted.
Respectfully submitted,
p~ irYt~
Paul Gravelle
Treasurer
-
COCOCOL()I'-CON N ~o)COI'-'<I"'<I"o) 0 O'<l"NOC'? 0)
COO C'?CO 0 C'? CO 0 COCOOOC'?COC'? 0 ~r--f'-~~ I'-
'<I" Oo:ic00o:i'<io:i r--: ..oc0No:iNOo:i C'? NcOcOr--:c0 0)
0 ...I COC0f'..<!)O)-c-(V') 0 I'-rol.()OOCO~ N 1'-0'<1"'<1"1'- '<I"
0 <C o. 0). ~ 1'-_ CO. 1'-. 1'-. CO -c-~~~~(D~q '<1". L()COI'-COI'- C'?
N I- -c-"I:j"O'>O>COO>O '<I" NNNNN C'? C'?
0:: 0 C"?Nr-~-c-~N L() ~
~
<C I-
W -c-l!)c.oN~<OO) 0 ~o)COI'-'<I"'<I"O) 0 O'<l"NOC'? 0)
>- w ~~~c.c>~~1'-: 0) COCOOOC'?COC'? 0 -c-I'-N~~ N
W C) OCOOl'-l'-COo) o:i ..oc0No:iNO'<i CO ~c0~~cci I'-
:t: o)COC'?'<I"O'<l"L() CO NC'?OL()L()C'?O) 0) -q-CO'C"""""<::t(J) CO
I- <C 0). CO C'?'<1". L() C'?I'- N ~N ~N CO ~ C'?
w
0:: ...I ~ ~~ I'-
0 :2:
u..
en I'- C'? 0 C'? CO C'? N
W ~~~~~ 0 '<I"
en en C'?OO)C'?O ~ cO
Z Z Nt'-'C""""CO-- I'- L()
0 COCO I'-CO I'- L() 0)
W C'?
Wa. i=
I-X <C .
Zw O~
00 Ow
Oz :2:cti
W<C 0...1
:ij:z u<C
00 UW
0::- <C:2:
01- 0000000 0 00000 0
u..~ Z c>0c>c>c>c>c> 0 C>C>C>C>C> 0
Ow 0 t-N__ONC'0__ cO L()L()L()L()L() L()
a.Z i=en '<I"COCOL()NN'<I" '<I" 1'-1'-1'-1'-1'- I'-
L()'<I"CO'<l"L()C'?1'- I'- C'?
-::> <Cw C'?
:t::2: o::w
enW I-u..
Zo:: !:Q
$:u.. C)
00 W
1-1- 0::
Z 0000000 0 0000000 0 00000 0
w C)en OOONL()OO I'- 0000000 0 C>C>~C>C> L() It)
. . . . . . . 00..0..0..0..00 0
:2: l!)l.{)l!)__<c-l{)O N 0 L()L()I'-OL() N
~W NNNCO'<l"NL() I'- L()L()I'-I'-I'-I'-L() L() NNC'?OI'- CO 0
W N
I-W 'C""""COONN--t- C'? 'C""""'C""""~'C""""__-q-LO ~ L()L()COCOCO 0)
I- r--:0'..o..o..or--:0' c0' ~ ~ ~ ~ ~ to
<C Wu.. NNNNN N W N ~
I- W '<I" ~ W .c:
:2: I- "
en I- ~
0000000 0 I- ro
en :;:;
i:t:: 0000000 0 Z :2: ~
>- . . . . . . . W :2:
L()L()COCOCOCOCO 0 <D
W :2: ~
0:: (j)f'..______-r-__ CO 0 ::>
0:: <C 1'-00)0)0)0)0) '<I" I- '"
::> ~~~-~~- en u ro
...I O<.D____'C""""'C""""'C"""" CO <D
en <C N____'C""""'C""""'C""""'C"""" 0) ::> >- ~
f-
<C en ""') 0::
W 0 0 ""
0:: <C en OJ
>
I- u.. > ;;: ~
:::J
m 0 .s::: (/) 0 .2Q) (9
(J)(l) -12c o -oC <C ~.s::: :;
Q) C -5, m 0 'cu W en I.... 0 C m 0
W(j)CCC,-CUW ro
..r:::.;::; ..r:::'+-+-, I- Q).- Q) >. Q) ;;: C C)>'~OCOC a..
...IOJOJ'5:::J(/);;:C -..o..::.::::-I+-, Z s... (j) (j) . rn >>
- .- ::1 CO 0 '- CO :J to- 1......0.- +-' "0 ..r:: ::J -.- I +-'
UmI Im~O -~o<C.!!?Owo -1....-- ::1 .D
ZO~<Ct::O '0
Zo >.G5.s:::2:()LL :2:()o:::mQ)D..-o" ~ .>2' C C' 2 () <D
::::> I.... .- Q.. - c ..r:: :2: -0 .s::: C'.- C ro
0== I.... C-::J"C+-, 0Q)CC0 >m -l~..cCDOQ) Q.
Q) m m m m 0 :::J o Q) >..- m m = <D
UZIOO:::D.."O::: U"~...I2:OO<C a.()~I-O:::2: Q.
-
011'- W WOO:> .,j' 000 0 0 0:> to 0:> N
~"": """ qC'j~ N C'j~r--: lD N NNN 0:>
.,j' (")0 ..,f N.,j'O I'- (").,j'o1 I'- cO """:c0~ tD
0 0:> to .,j' lDNtO (") 0:>0:>0 I'- N ct)0:>0:> .,j'
0 """ ..- (") lDWlD 1'-. I'- N 0 N. 1'-. 1.0. 1'-. """
C'I """ """ N ..- """"""""" 1.0
~
UJ 011'- to WOO:> .,j' 000 0 0
>- ~"": ..- ON 01 N qC'j~ I'- 0:>
UJ (")0 ..,f N..,ftD N 0:>1.01'- 0 I'-
:I: (") """ .,j' ON(") W ONe') I'- 0:>
I- ..- """ e') .,j' I'- .,j'
0::
0
U-
If)
UJ
If)
Z
UJ
UJo.
1-:>(
ZUJ
00
Oz
UJ<(
~Z
~Q
~~
OUJ
o.Z
-::)
:I::.IE
If)UJ
Zo::
~U-
00
1-1-
Z 00 0 000 0 000 0 0 0:><.00:> N
UJ UJqq q 000 0 N.,j'N 0:> .,j' C'jC'jC'j <D l()
OOtD tD tDoiN cO 0 tD <:>
:.IE UJOo 0 ",,"e')"- <:>
UJ 1-1.01.0 0 UJLOON I'- 1'-1.01'- 0 .,j' 0:>0:>0:> .,j' N
(") UJ.,j'<.OLO 1.0 .,j' I'- e') I'- 1'-1.01'- ..-
~ 1-"""""" l- . I- . - . rt5
~ """ ..- rx:"r'r~ 1.0 -
~ I- 0 ""
:.IE ~ <.>
0. ~
0 :.IE '"
If) 0:: 2'
a: u 0 ~ ;. :c( ~
~ u '"
\!2 >-~ ~ ..J ~
~ :;J
0 <( '"
::) 0 UJO ro
If) ..J:I: :I: Z '"
If) 0 ~
:; ..JI- I- 0 I-
<( If) <(::) ~ 8 '"
\!2 0 :;
<( ><( UJ Q)
I- ro 0 <(z z 0:: ;>
>- <( '"
Q) C)O UJQ ~
!:: :J Z ~ <(- UJ-o C)
..J 0 0<D e:- If) ~.r. .S o~= O~.r. '5
ii1=0 _-0 <( Q) .;g u (1:1 u~o> '"
_ ro '-' I- (1:1 ~ 0 ~~:JQ)c ~~~ :.IE3::J.r. a.
If)en~ <(~2Q) 0.- :J _roo'-' );
1f)<D<D UJ<Dc~ <(UJ:r:\:!~ If)UJro If)~:r:ro
0:::t:::JC) UJIf)~ o <D -0
UJ .- .- \=If).r.o UJc.c..J '"
u.Qc u<D:r: z 0-_ .c ~z- ~
~.cg.c '"
u.Qc UJcc.Q o 0 ro 'Q) ::; <(o~ a.
<D 0 0:: >- ro 0 <(o(1:l<D '"
<(oen ..J_en zu!:tz!:t ..Juo... ..J.....,!:t..J ~
a.
-
~"''o:t."
,~'~ Of Ollo_~t~"
.. ~'\/------_._<1t{l'~
fit;> '-.__-,.~~(h'~,
,W= ., ~~
,'0 - , - -I'
%'"'" : ,.", \\ ""i&
~tt-I "- - '''^' i;.
~1,\~~,~li/~~!l
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Committee of the Prepared By:
ADM 2005-009 Whole Marilyn Pennycook
Clerk
Subject: Department:
Administration
Council Proposed Land Transfer
and Exchange with
C.ofW. Richard and Janet Date:
Hennig, Part Lot 5, Conc. March 23, 2005
4 [P.I.N. 74055-0008 (Lt)]
Motion and Part of the Original R.M. File #:
# Road Allowance between L07 -014336
Lots 5 and 6, Conc. 4
Date: [P.I.N. 74055-0002 (Lt)] Roll #:4346-010-002-
16600 - 1304 Bass Lake
Sideroad West
II BACKGROUND: ~
Correspondence has been received from Klaus Jacoby, Barrister & Solicitor, on behalf
of Mr. and Mrs. Richard Hennig who acquired Parts 1 and 3 on Plan 51 R-25502 (1304
Bass Lake Side road West). A sketch of the location of the above-noted property is
attached [Attachment #1].
It was noted that:
. Part 2, Plan 51 R-25502 forms part of the original road allowance between Lots 5
and 6, Concession 4; and
. Part 3, Plan 51 R-25502 which is part of Mr. and Ms. Hennig's land is being occupied
by the Township to accommodate the deviation in the original road allowance
[Attachment #2].
In order to correct the matter, Mr. and Ms. Hennig have requested an exchange of lands
between themselves and the Township.
-
II ANALYSIS: I~
Mr. Dino Astri, the surveyor who prepared Plan 51 R.25502 has confirmed that the
northerly limit of Part 3 is completely fenced with access to the Hennig lands by way of
brick gates. The Township would acquire everything to the south of that existing fence
(Part 3,51 R-25502 identified as the Deviation Road on Attachment #2). A further
Reference Plan is therefore not required.
Further, Section 66 of the Municipal Act, 2001, S.O. 2001, c.25, as amended, provides
that:
"If, before January 1, 2003, a highway was opened on land in the place of all
or part of an original road allowance and compensation was not paid for the
land, the owner of the land appropriated for the highway or the successor in
title to the owner is entitled to the following:
(1) If that person owns the land abutting on the allowance, the owner is
entitled to the soil and freehold of the original road allowance and to a
conveyance of the original road allowance."
It is therefore recommended that the land transfer and exchange with Richard and Janet
Hennig proceed accordingly.
As no compensation was received by the landowner for Part 3,51 R-25502, it is
therefore recommended that the land be conveyed at no cost to the applicant other than
those incurred by the Township for the exchange.
II RECOMMENDATION (S): I~
1. That Report No. ADM 2005-009 be received and adopted.
2. That Part 2, Plan 51 R.25502 being part of the original road allowance between
Lots 5 and 6 is not required by the Municipality.
3. That the Township enter into a land exchange as follows:
(a) From Richard and Janet Hennig to the Township:
Part 3, Plan 51 R-25502
(b) From the Township to Richard and Janet Hennig:
Part 2, Plan 51 R-25502
-
4. That staff be authorized to waive the requirements of, By. Law No. 2003-125,
Being a By-law to Establish a Procedure governing the Sale of Land to proceed
with the land exchange of Parts 2 and 3, Plan 51 R-25502.
5. That there be no compensation for land value to/from the Township in the
exchange of lands.
6. That the applicant be responsible for all costs associated with the exchange.
7. And Further That the applicant be notified of Council's decision.
Respectfully submitted,
! D II
~i,! r, ',', I]
/1~+~, en-l
Marilyn Pennycook U
Clerk
C.A.O. Comments: Date:
j:5J iJ,.JJJv
C.A.O. Dept. Head
-
Attachment #1 to
Report No. ADM 2005-009
r-7'1,1"4i/'
r\,\- ---, 0:DJ?~<'," u;;-_ }.,'\<;-
"\' ~-<' ,\ ,-;' "~' " '. ~\
f' I \, ~'\ "\.;;.~' \;...!.-J.._L...... \~ ''\..-)~~,
1\'/" J.,,>; ,D":V \_~:r- _ ~/' ~ ':f-
! \" 't;'1/0.'* ")..Y _'" /- -:L..r--- (.-' '\.:1t,:""
, "\" ~ ;?
,! \/ _.-'/ ~-" v........ /'/ '~; ....... ..
"\ ! ,\, / / '/%,' <', 'F
! '/ .-\' ./"...-' ~<{-Y
i " r-1 // .,/' \, \, ./ ,./ $"
, " " ../ ?
r~~Ir---L_-_.... w"-"/ \ -<..../' /\ A"-
(l... /- \-::/ .f- C d'~'
, ........... /" ,-"" ^"'~
;)''7/7'"' /";;'~<<' "''i/'\:;'4;:'"
~ ./ \
'<J.~ /..-*/, \, _ ...",-
'\;", ,/- ", ,P'k\,:
\, ./ .-,--.. '\
':,' :::/ "--, //' \\
/ . \.
...
\ "
'\ ,./
, /
/.....~~ '"/
(' ,~, ~/ I
~..~';'" \. /(.:c.;,. I
.~ V ~ I
"",,4.,,0'" ,../ '~\\ I
.$',:f::Jj.-'" -, \\~ ...../\ 1
\~/ '< I
i \ ..<
v ~
Subject Property
Attacbment ~Mt~OO5-009 ~
Re,;>O;:t No. ."',
\1 cD
.~UIiI~ "0.1 ~Q ~ .15
\0
~ ~
.::.J
'i i Q
\1~
0..
'! 1W
a "i11 It>
04.1 !, \ 'is
<(ct:
O~ " i~ \0
" Q::':2
!..I J:. t.:> ~1 . ~
;;i 1')- ' .- z. '-'
;.; ~O ct: S~ ~
u .'
tf\ O.b\=C ~ ~-I~ ~
\-,-00<('-'
-,0 c;2,~ 4.1 &. l'L~ ~
-..... ,IX> '> a
4- ~o. UJ 0 ~
..........
....0 0.. -<: S. ,.:;) z i
o"Z- - r" 4-
~ ~,
L
( ':l
0 1
J:. 0\ ~ 0
c..a ....,-
\(! ,1, ex:.
...- -' -~...
o ~
"""" . I) \ \ ,.'
0"
~,~~
",0
0.. '2 ~
","
.
...
.f
..
(
~
~ ,~
~
\
,
Ii
\ 1%
\
,
_,<:>"S'f7~",~
11:<0' O'o_~
",~\'~--'-'--'~~<".o\- I
~.%', -\
~. : \ ~ ~., \l!
~/" "'J
,~~~; ,
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Committee of the Whole Prepared By:
ADM 2005-019 Marilyn Pennycook, Clerk
Subject: Department: Administration
Council
Draft Fees and Charges
C.ofW. By-law Date: March 23, 2005
Motion # R.M. File #:
Date: RolI#:
II BACKGROUND: II
The Municipal Act, 2001 provided authority to municipalities to pass by. laws imposing fees or
charges for services rendered, as did the old Act. However, the new legislation enhances public
accountability and prohibits the use of fees and charges to generate revenue. Fees cannot be
unreasonably high or prohibitive and must be tied to the provision of a service. As well, the
municipality must be able to demonstrate a reasonable connection between the cost of the service
provided and the amount charged for the service. This requirement provides transparency in the
process of implementing such charges. Municipalities must create and maintain a list of all services,
activities and all properties that will be subject to fees and charges, and list the amount of each fee or
charge. This list is required to be made available to the public.
After considering the number of current Township by. laws which address fees and charges, it was
determined that a consolidation of these by-laws would bring these by. laws within the scope of the
new Municipal Act, and would also constitute a list which would be readily available to the public.
The Draft By-law has been circulated to all Department Heads for comment and revised accordingly.
II ANALYSIS: I
The attached Draft By-law consolidates all fees and charges within the Township. The only
exceptions are those fees which are imposed by statute (Le., fees charged under the Freedom of
Information and Protection of Privacy Act). The consolidation also incorporates increases in fees
and the inception of new fees. These changes to the original fees are marked by balloons in the by-
law for ease of reference.
Fees imposed by a municipality respecting waste, water, police or fire must be reviewed within a
legislated time frame and the imposition of these types of fees requires notice to the public that the
Township intends to deliberate such fees at a public meeting.
~
It is therefore recommended that the entire draft fees and charges by-law be brought forward to a
public meeting after the required notice has been served.
II RECOMMENDATIONS: II
f\. --'1
1. THAT Report No. ADM2005-019 be received~ o-.M.-o~~
2. THAT the Draft Fees and Charges By-law be brought forward to a public meeting.
Respectfully submitted,
;1
~2J.
,-_iI, ~
Marilyn Pennycook
Clerk
C.A.O. Comments: Date: I /
rl(w.-. \ 1 O~
(;~~
C.A.O. J Dept. Head
- 2.
. '" ~./Vo~;JJ
DRAFT
~
THE CORPORATION OF THE TOWNSHtP OF ORO-MEDONTE e-
BY-LAW NO.
A By-taw of The Corporation of the Township of Oro-Medonte
to provide for the imposition of fees or charges
WHEREAS Part XII, Section 391 of lhe Municipal Act, 2001, S.O. 2001, c. 25, as amended,
permits a municipality to pass by-laws imposing fees or charges on any class of persons,
for services or activities provided or done by or on behalf of it: for costs payable by it for
services or activities provided or done by or on behalf of any other municipality or local
board; and for the use of ils property including property under its control;
AND WHEREAS Section 11 of lhe Municipal Act. 2001, S.O. 2001, c. 25, as amended.
provides that a municipality may pass by-laws respecting water production, treatment and
storage;
AND WHEREAS Section 11 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended,
provides thai a municipality may pass by-laws respecting matlers relating to waste
management;
AND WHEREAS the Council of The Corporation of the Township of Oro-Medonte deems it
necessary to levy waste management charges to finance the annual estimates for waste
management for the year 2004;
AND WHEREAS Section 11 of the Municipal Act, 2001, SO. 2001, c.25. as amended,
provides thai a municipalily may pass by-laws respecting sewage treatment:
AND WHEREAS The Corporation of the Township of Oro-Medonte operates and maintains
communal tile beds hereinafter referred to as the "sewage works";
AND WHEREAS the Council of The Corporation of the Township of Oro-Medonte deems it
necessary to impose a sewer service charge upon those lands that derive a benefit from
the sewage works;
AND WHEREAS Section 398 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended,
provides lhe Treasurer of a local municipalily may add charges imposed by the municipality
under Part XII of the said Act to the tax roll tor the property to which the public utilily was
supplied and collect them in the same manner as municipal taxes;
AND WHEREAS Section 69 of the Planning Act, R.S.O., 1990, c.P.13, as amended,
provides lhat a municipalily may establish a tariff of tees for the processing of applications:
AND WHEREAS Section 50 of the Condominium Act, R.S.O. 1990, c.C.26, as amended,
provides that a municipalily may establish a tariff of tees for the processing of applications;
AND WHEREAS Seclion 7 of the Building Code Act, 1992, S.O. 1992, c.23, as amended,
authorizes a municipal Council to pass by-laws concerning the issuance of permits and
relaled matlers;
AND WHEREAS Section 5(0.1) of the Fire Protection and Prevention Act, 1997, S.D. 1997,
c.4, as amended, authorizes a municipality to establish, maintain and operate a fire
department tor all or any part of the municipality.
NOW THEREFORE the Council of The Corporation of the Township of Oro-Medonte
enacts as follows:
.
DRAFT
~
1. That this By-law be known as the "Fees and Charges By-law".
2. Thallhe following Schedules, attached herelo, form part of this By-law:
Schedule A Administration
Schedule B Building
Schedule C Fire
Schedule D Parks and Recreation
Schedule E Planning
Schedule F Public Works
Schedule G Sewer Service Charges
Schedule H Treasury
Schedule I Waste Management Charges
Schedule J Water Rates
3. Thai Appendix "1" attached hereto lisls services and fees imposed under separate
by-laws, Acts, Onlario Regulations.
4. Any person desirous of using those services or property of the Township of Oro-
Medonle described in Schedules "A" to and including "J" shall pay the fee set out
opposite the description or name of the particular service or property, as shown in
Schedules "A" to and including "J".
5. Despite lhe provision of Section 4, Councilor its delegated authority may, in its
discretion upon application to ii, waive or reduce the fees set out in Schedules "A" to
and including "J" for any person, on a one time or on a continuing basis.
6. All fees payable under this by-law shall be payable in advance of providing the
service except for:
a) emergency services;
b) actions taken by lhe Township of Oro-Medonte to rectify failures or by-law
infractions on the part of a resident;
c) specific fees prescribed in Schedule "E" (Planning) 10 lhis by-law; in which
case the fee payable will be in arrears and invoiced subsequent to the service
or activity provided.
7. If for any reason fees owing under this by-law remain unpaid after 30 days, same
shall bear interest at the rate of 1,25% per monlh until paid in full. In addition to any
interest owing. each payment thai is not paid when due, shall bear an administrative
penalty of $25.00.
8. Where a deposit is required under this by-law for services rendered by the
Township, and aclual costs exceed the deposited amount, such costs shall be
deemed to be fees owing under lhis by-law and Section 7 of this by-law shall pertain
10 such oulstanding costs.
9. Any fees that are owing to the Township of Oro-Medonte and that are unpaid are a
debl to the Township of Oro-Medonte and, together with all interest and penalties
accrued thereupon, may be collecled by the Township of Oro-Medonte by action or
may be collected by the Township of Oro-Medonle on its behalf or may be collected
in like manner as taxes.
DRAFT
\ ~5
\j)
10. Should any Section, subsection, clause, paragraph or provision of this By-law,
including any part of the Schedules to this By-law, be declared by a court of
competent jurisdiction to be invalid. the same shall not affect the validity of the By-
law as a whole or any part thereof, olher than the provision or part of lhe Schedule
so declared to be invalid.
11. That By-laws No, 97-66, 98-84, 98-96, 98-102, 99-04, 99-70, 99.78, 2002-136,
2003-30, 2004-32, 2004-033, 2004-077 are hereby repealed in their enlirety.
12. Any other By-law or part thereof inconsistent with the provisions of this By-law is
hereby repealed.
13. That this By-law shall take effect and come into force on the day of its final passing.
Read a first and second time lhis day of ,2005.
Read a third time and finally passed lhis day of
2005.
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
Mayor, J. Neil Craig
Clerk, Marilyn Pennycook
DRAFT
~
SCHEDULE "A" TO BY-LAW NO.
ADMINISTRATION
1. Compliance Reports
(subject to 3 day turnaround time)
Building Information $50,Oq -f Comment [PI]: $:25.00 ~
Environmental $50,Oq Corinnent [P2]:previousl'ro? fee -,)
Subdivision Informalion $50,Oq: - - - - - - - - - Conrrnent [P3]: $25.00 1
Zoning Information $50.00 , Comment [P4]: $25 00 I
Oevelopment Charge/Lol Levy Information $20.kJd t~~~.~.~~J~!t:..~_l~:~.._ ....._._,.__._._._ .... ..."....J
2. Documents
Fire and Emergency Services Master Plan $20.00
(Background Material)
Planning
Official Plan $53.50
Zoning By-law $42.80
Official Plan Amendmenls $45,00
Recreation Master Plan $40.00
2. History Association Books
Note: All books are sold on behalf of the Oro.Medonte History Association.
Prices are inclusive of GST.
Bayview Memorial Park $1.50
Hills of Oro $3.00
Kith 'n Kin $37.00 { Comment [P6]: $16.05 )
Knox Presbyterian Church $3.21
Medonte A Township Remembered $37.00 (retail)
$29.91 (wholesale)
Monty Leigh Remembers $8.56
Oro African Church $15.00 (retail)
$9.00 (wholesale)
Recent Past $8.56
Slory of Oro $13.91
Visible Past $18.19
3. Line Fence Dispute Administration Fee $30.00/call
4. Livestock Claims Administralion Fee
151 claim in any calendar year $0.00
2nd or subsequent claim in any calendar year $60.00
Veterinarian's Report Twsp. Cost
5. Maps
Planning
11"x17" $5.00
Oversize $10.00
Plotter $1 O,OOmnear foot
($5.00 minimum)
DRAFT
-
Township Road Map $10,00
Schedule 'A' - Administration (cont'd)
6. Miscellaneous
Assessment Intormation (floppy disk) $300.00
Encroachment Agreements
- Applicalion Fee $700,00
- Annual Fee $60.00
Planning Circulalion Lisls $25.00
Photocopies - for all departments $,30/page
Township Flag $57.00
Township Pins $3,00
7. Municipal Address Signage
Sign Posls $ 7.00
Municipal Address Sign $15.00
DRAFT
\s~
SCHEDULE "B" TO BY-LAW NO.
BUILDING
Per SQ. Ft. Per SQ. M.
1. Building
1.1 Group A & B (Assembly & Institutional Occupancies)
a) New Construction 0.60 6.46
b) Renovation/Alleration 0.25 2.70
c) Interior Floor Layout 0.25 2.70
1.2 Group C (Residential Occupancies)
a) New Construction and 0.73 7.85
Basement illinished 0.24 2.60
Attached Garage n/c n/c
b) Renovation/Alleration 0.24 2,60
c) Garage-Attached 10 House 0.22 2.38
d) Garage-Detached from House FLAT RATE $200,00
(Maximum size 538 sq. ft.)
e) Carport-Attached to House FLAT RATE $150.00
f) Accessory Building
(Garden Shed and/or Storage Shed FLAT RATE $100.00
under 200 sq. ft.)
h) Conversion of Attached Garage FLAT RATE $150.00
into Habitable Space
j) Wood DecklPorchNeranda
(Up 10 200 sq. ft.) FLAT RATE $100.00
(Over 200sq. ft.) FLAT RATE $200,00
k) Model Homes
New Buildings, Additions including interior 0.58 6.30
I nferiar Alterations 0.24 2.60
1.3 Group D & E (Business and Mercantile Occupancies)
a) New Construction 0.60 6.46
b) Restaurants 0.68 7.35
c) Renovalion/Alteration 0.29 3,15
1.4 a) Group F - (Industrial Occupancies)
i) New Construction 0.39 4.20
ii) Renovation/Alteration 0.20 2.16
DRAFT
-
Schedule 'B' - Building (conl'd)
2. Demolition Permit
Class "A" FLAT RATE $50.pq , -rc~;-~;'~t{P7j;"'-'"'""--"-'-'-' ..._m_... .._.m__''''_'''_'''__1
'..,'....'""" ~
Class "B" FLAT RATE $200.IJC\ -- { Comment [P8]:$JOO.OO i
3, Conditional Permit FLAT RATE $200.00 { COmment [P9]: previOus!yilO t1atrate I
Plus full permit fee as calculated under Section 1
Addilional Permit Security may be required.
Designated Struclure Same as Seclion 1.
4, Transfer Permit FLAT RATE $75,OQ t.~~.~.~r.~J,~~,~.I:_..~S.,9:~,",_ M....._.__...___....__..j
5. Provisional Occupancy Certificate FLAT RATE $25.00
6. Change of Use (no construction) FLAT RATE $75.0Q -j Comment [PU]i $5O.{)(J I
7. Reapplication FLAT RATE $75.IJO ~ment [P12]: $50.00 I
8. Plumbing
Fixture - Unit $7.jsOc+___ _n t~~~!t~_~!l:_~'.~.,;__..'- .___ ..m.__.__...._ __...J
(Individual in accordance with building code Table 7.4.9.3) $50.00 basic charge
9, Sewer Connection FLAT RATE $200.00
10. Temporary Structure:
Portable Buildings (School Portable etc.) $300.00, _ _ _ _ _ _ __ {~~~~~~I~~~~i!~~~:~::~~~ mom :~:~.~~::-~~:~~~:~._:J
Placement Permit (min. 6 months) $100.00 plus securily
Tenls - up to 2,420 sq, It, (225 sq. m) FLA TE RATE $50.00
- over 2.420 sq. ft. (225 sq, m) FLATE RATE $100.00
11. Move Permit $100.00 plus security ..r Comment [PIS]: $75.00 1
,
12. Agricultural & Farm Buildings
no Archilect/Engineer 0.20 2.,16 -L~",~.~,~~..t~!.~.~}~~_r.::.3L~!.~_~.~___~_____J
Architect/Engineer 0.25 2.69
13. Provisional Occupancy Deposit FLAT RATE $100.00
Deposit fully refundable if no re-inspeclions
were required or Building Permit was revised.
14. Inspection of wood burning appliance installation FLAT RATE $75.00, '(CrimmeRt [P17]: $50.00 J
15. Pool Enclosure Fence FLAT RATE $50.00 I Comment[P18]:noch.ange .,_,..J
16. Signs I Billboards FLAT RATE $100,00, . Comment [Pig]: $50:00 for sign~ $!OO.OO
billooaros
17. L.L.B.O. inspections & letters for occupant loads FLAT RATE $75.00 .{ Comrnent[P2D]: $50.00 I
._ ..............mm.~."~
18. Residential Care Home FLAT RATE $75.00
19. Re-Inspection Fee (Municipal staff only) FLAT RATE $50.00
For Contract slaff (Consultant) FLAT RATE $100.00
20, Lot Grading Deposit $2000.00 (refundable
(on all new construction and/or renovations) upon satisfactory inspection
minus any applicable charges)
Note: Special Provisions see payment of fees Section 5.
DRAFT
~
Schedule 'B' - Building (cont'd)
Comment [P21J:NOCHANGES TO FEES i
21. Fees Under Part 8 - Ontario Building Code Sewage $ystem~ PREVIOUSLY APPROVED BY BY-LAW I
Change of Use Permit $ 100,00
Consent $ 100.00/10t
File Search Application $ 50.00
Holding Tank (Class 5) $ 250.00
Leaching pit (Class 2) $ 100.00
Minor Variance $ 100,OO/lot
Per - Construction site plans $100.00
Reapplication $100.00
Sewage System Permit $350.00
Septic Bed Replacement $250.00
Septic Tank Replacement $100.00
Severance Application Review $100.00/101
Site Plan $100.00/101
Special Inspection $100.00
Subdivision $100.00/101
Zoning Amendment $100.00
NOTE: Where construction has been commenced for any reason on a building prior
10 the issuance of a permit. there shall be an additional inspection fee equal 10 a sum of
money equivalent to 25% of the normal permit fee for such work, or $ 500.00 whichever is
greater. Where demolition has, for any reason commenced on a building prior to the
issuance of a permil therefore, there shall be an additional inspection fee of $ 200.00.
DRAFT
- \
SCHEDULE "C" TO BY-LAW NO.
FIRE . -{ Comment~P22]: NEW FEE STRUCTURE 1
Request for Fire Report $50.00
Residential Request for Information
(a) Mortgage Clearance Letter $50,00
(b) Change of Ownership $50,00
Non-Residential Inspection
Day Care, Nursery $75,00
Group Homes, Rooming Houses $75.00
Holels $150,00
Inspection of Wood Burning Appliance Installations $75,00
e.g. requested by eilher the home owner or the
home owners insurance company (not including
inspections resulting from building permit
applications), Includes 2 visits
Request Inspection of Premises or Building
(not including inspections resulling from building permit applications)
(a) under 20,000 sq. fi. $75.00
(b) over 20,000 sq, fi. $100.00
Inspeclions Required by L.L.B.O, $75.00
e.g, Inspection of public hall facililies that are
requested by owner, etc.
Fireworks Inspections and Approvals $75.00
e.g, Inspection of the site from which fireworks
will be and have been igniled or inspection of a
fireworks storage site, if located within Oro-Medonte
Apparatus Stand-by $150,00/hour
e,g. Use of Fire Department apparatus tor sland-by
fire protection during shows, exhibition,
demonstrations, etc.
False Alarms - Aulomatic alarm Systems/Detectors FLAT FEE $450.00
After 3 per 12 Month Period:
e,g. non notification to work on system, poor maintenance
Elevator Calls - After First Call $150.00
Response to Open Air Fire Deemed Out at Control MTO RATES/HR.
(where resident is not in attendance or is unwilling
or unable 10 adequalely extinguish the fire)
DRAFT
-,
SCHEDULE "D" TO BY-LAW NO.
PARKS AND 'RECREATION ' Coinment [P23]: NO CHANGE IN FEES I
FROM PREViOOSL Y ADOPTED COUNCIL
1. ICE RENTALS ~~~~_..'."._m..___~___,..__."._.__ ..m._'._.________.__ .J
Prime Time (5:00 p.m. to Close & Weekends) $114.00/hour
Non-Prime Time (before 5:00 p.m. Mon. to Fri.) $68.00/hour
Minor Hockey I AAA IceMen I Figure Skating $83,OO/hour
2. NON-ICE RENTALS (Arena Floor Space)
Adult $49.00lhour
Minor $38.00/hour
Floor $545.00/day
3. PUBLIC SKATING
Adults $2.00
(On admission (pay at the door) - no permit required)
Youlh $1.00
(On admission (pay at the door) - no permit required)
Seniors $0.00
Pre-School $0.00
4. BANQUET HALL RENTALS
Dance $290.00/day
Meetings $25.00/hour
Tournaments $164.00/day
5. BALL DIAMOND RENTALS
Adult wilh Lights $26.00/hour
Adull $13,00 I hour
Minor with Lights $22.00 I hour
Minor $9.00 I hour
6. PARKS AND PAVILLlONS
Large Pavillion $52.00/day
(Hydro - accommodates up to 200 persons)
Small Pavillion
(accommodales up 10100 - 150 persons $39.00/day
7. FACILITIES
Old Town Hall $25.00/hour
$107.00/full day
Ian Beard Community Complex Room $12.00/hour
8. ADVERTISING
Arena:
Large Board $218.00
Olympia - Front Panel $273.00
- Side Panel $436.00
Note: All fees and charges are inclusive of tax.
DRAFT
-
SCHEDULE "E" TO BY-LAW NO.
PLANNING COmment (P24J: NO CHANGE IN FEES j
FROM PREVJOUSL Y ADOPTED BY .LA W
1. PRE.CONSUL T A TION APPLICATION
1.1 Amendment to the Official Plan
(a) Non Refundable Application Fee $500.00
(b) Refundabie Deposit against expenses and actual costs $500.00
1.2 Amendment to the Zoning By-law
(a) Non Refundable Application fee $500.00
(b) Refundable deposil against expenses and aclual costs $500,00
1.3 Plan of Subdivision
(a) Non Refundable Application Fee-
0) Less than or equal to 100 iots $750.00
(ii) Greater than 100 lots but less than 200 lots $1000.00
(Iii) Greater than or equal to 200 lots $1250.00
(b) Refundable Deposit againsl expenses and actual costs $2500,00
2. FORMAL DEVELOPMENT APPLICATION
2.1 Amendment to the Official Plan
(a) Non Refundable Applicalion Fee $1250.00
(b) Refundable Deposit against expenses and actual costs $1200.00
If pre-consultation application was submitted 10 the municipality, the tees shall be
reduced 10 the following:
(c) Non Refundable Application Fee $500.00
(d) Refundable Deposit against expenses and aclual costs $700.00
2.2 Amendment to the Zoning By-law, Amendment to the Zoning By.law as a
Condition of Provisional Consent in the Shoreline Designation as set out in
the Official Plan, and Temporary Use By-laws
(a) Non Refundable Applicalion fee $1250.00
(b) Refundable deposit against expenses and actual costs $1200.00
If pre-consultalion application was submitted 10 the municipality, the fees shall be
reduced to the following:
(c) Non Refundable Application Fee $500.00
(d) Refundable Deposil against expenses and acluai cosls $700.00
2.3 Amendment to the Zoning By-law as a Condition of Provisional Consent in all
Designations in the Official Plan, except the Shoreline Designation
(a) Non Refundable Application Fee $ 600.00
(b) Refundable Deposit against expenses and actual costs $1200.00
DRAFT ~ ".
n "( - ,-;
;
Schedule 'E' - Planning (cont'd)
2.4 Amendment to the Zoning By-law for a "Bed and Breakfast Establishment" in
all Designations in the Official Plan, except the Shoreline Designation
(a) Non Refundable Application Fee $600.00
2,5 Plan of Subdivision
(a) Non Refundable Applicalion Fee -
(i) Less lhan or equall to 100 lots $3000,00
(ii) Grealer than 100 lols but less than 200 lots $3250,00
(iii) Greater than or equal to 200 lols $3500,00
(b) Refundable Deposit against expenses and actual costs $5500,00
If pre-consullation application was submilted 10 the municipality, the fees shall be
reduced to the following:
(c) Non Refundable Application Fee -
(i) Less than or equal to 100 lots $2000.00
(Ii) Greater than 100 lots but less than 200 lots $2000,00
(Hi) Greater than or equal to 200 lots $2000,00
(d) Refundable Deposit against expenses and actual costs $3000,00
2.6 Site Plan Approval
(a) Non Refundable Application Fee
(i) For Site Plan Improvements with an estimated $250.00
value of under $ 50,000.00
(Ii) For Site Plan Improvemenl with an estimated $500.00
value of over $ 50,000.00
(b) Refundable Deposit against expenses and actual costs
(i) For Site Plan Improvements with an estimated $1000.00
value of under $ 50,000.00
(ii) For Site Plan Improvements with an estimated $5000.00
value of over $ 50,000,00
2,7 Site Plan Revision
(a) Non Refundable Application Fee $100.00
(b) Refundable Deposit againsl expenses and actual costs $200.00
2.8 Provisional Consent
(a) Application Fee for a "timeshare establishment" $700.00
as defined in By-law 97-95
(b) Refundable deposit against expenses and actual costs $1000,00
of processing application for Provisional Consent
involving a "timeshare establishment"
(c) Application fee for all other Provisional Consenl $700,00
applications
DRAFT ~
\
- \
Schedule 'E' - Planning (cont'd)
2,9 Minor Variance
(a) Non Refundable Application fee $500.00
2.10 Amendment to Provisional Consent or Minor Variance
(a) Administralion fee on an application which, $250,00
due to amendment has to be recirculated
2.11 Site Plan Agreement and removal of Holding Provision on lands which do not
front on an assumed public street that is maintained year-round by the
Municipality
(a) Non Refundable Combined Application fee $250.00
2.12 Removal of Holding Symbol except lands which do not front on an assumed
public street that is maintained year-round by the Municipality
(a) Non Refundable Application Fee $250.00
(b) Refundable Deposil $1000,00
2.13 Lots to be Deemed (on Plans of Subdivision)
(a) Preparation of By-law and subsequent registration on title $75.00
3. EXPENSES AND ACTUAL COSTS
Expenses incurred by staff (such as mileage. poslage, photocopying, courier costs,
and site inspection fees for sile plan control) associated wllh a projecl and actual
costs incurred for such items as advertising, consulting (planning, Engineering, and
other) and legal will be charged directly to the applicant and deducted from the
refundable deposit The applicant is required to replenish the refundable deposit, to
its full amount, when the expenses and actual costs are submilted by the Township
(see Section 4.2),"
3,1 Any person making appllcalion to the Ontario Municipal Board shall pay the
applicable fees outlined by the Ontario Municipal Board and/or the Planning Act, as
amended. All cheques for such applications are to be made payable to the Minister
of Finance.
3.2 The applicant shall pay all costs associated wilh a planning development application
including Ontario Municipal Board Hearing costs and appeal fees.
3.3 Such costs as they relate to land subject to lhe Township of Oro's Official Plan
Amendment No. 37 and Official Plan Amendment No. 39, include the proportionate
costs of the approval of Official Pian Amendment No, 37 and Official Plan
Amendment No, 39, for those lands which have not contribuled 10 the Township, in
accordance with the Official Plan Amendment No, 37, Cost Recovery Agreement.
daled January 1993 and the Official Plan Amendment No. 39. Cost Recovery
Agreemenl. dated June 1994,
DRAFT
Schedule 'E' - Planning (cont'd)
4. PAYMENT OF FEES
4.1 Total fee is payable upon receipt of completed application form and prior to formal
presentalion to the Planning Advisory Committee, Committee of Adjustmenl,
Council, or the Site Plan Control Committee.
4.2 As expenses and actual costs are incurred on behalf of the application, they will be
submitted 10 the applicant for reimbursemenl so that the inilial refundable deposit will
be replenished to enable lhe Township to pay further costs as they are incurred, In
the event that the applicant does not maintain the application fee and applicable
deposits with the Treasury Department then the application will be considered not
complete with respecl to the payment of fees under lhe Planning Acl
4,3 Application fees are non-refundable and are applicable on a per lot basis,
DRAFT
I
<-: - \
SCHEDULE "F" TO BY-LAW NO.
PUBLIC WORKS
1. Additional Road Signage Requested by Township Cost
Property Owner (e.g, "Hidden Oriveway") (Posl, Sign, Hardware
& Labour)
2. Blue Boxes $6.00: -C~~~~~~JP25]: ~~ '""__.._"'.. J
3. Kitchen Composters $6.'00: t~~.~~.~~._~_~"~~.~~_,~-"~~.m. ,..!
4. Moving Permit (Oversize Equipment or Machinery) $20.00
5. Tile Drainage Inspections $100.00
6, Township Engineering Standards $40.00
7. Entrance Permit Fee $50,Od r......'.,...."._'_....".....,.. J
- - - - ~ - - - - ~- - _ Comment [P27]: $35.00
DRAFT
f'
,
SCHEDULE 'G' TO BY-LAW NO.
TREASURY
Returned Cheque $20.00
Tax Certificales $25.00
DRAFT
SCHEDULE 'H' TO BY-LAW NO.
SEWER . Comment (P28]: No CHANGES FROM
RATES APPROVED BY COUNCIL BY BY.LAW
1, An annual sewer service charge of $170.00 per unit shall be imposed upon those
lands more particularly described In Part 8 of this Schedule. The said charge will be
comprised of the following components:
Operating, repair and maintenance $ 50.00
Capital $120.00
2, An annual sewer service charge of $315,00 per unit shall be imposed upon those
lands more particularly described in Part 9 of this Schedule. The said charge will be
comprised of the following components:
Operating, repair and maintenance $ 25.00
Capital $290.00
3, The Treasurer shall, for each calendar quarter, issue bills to each unit based on the
applicable sewer service charges, Bills shall be due and payable not less than
twenty one (21) days from the date of mailing,
4, Sewage bill payments shall be payable to The Corporation of the Township of Oro-
Medonte and may be paid during office hours in person or by mail at the Oro.
Medonte Administration Office. 148 Line 7 South, Box 100, Oro, Ontario LOL
2XO, or at most financial institutions. Payments made at a financial institution shall
be deemed to be paid on the date shown by the T eller's stamp on the bill stub. The
Township shall not be responsible for any applicable service charge payable to the
bank. Cheques only can be dropped al the drop boxes located at the Adminislration
Office and Moonstone Fire Hall.
5. The Treasurer shall impose a ten (10) percent late charge on all unpaid accounts on
the day after lhe due date.
6. If an account remains unpaid, the municipality may coHect amounts payable
pursuant to Section 398 of the Municipal Act, 2001, c.25, as amended.
7. In the evenl that any owner of lands not described in seclions 8 or 9 (the 'property
owner") wishes to have the sewage works extended so as to service those additional
lands, the following provisions shall apply:
(a) For the purposes of this paragraph, the lerm "municipal engineer" shall mean any
engineer employed by the municipality or any independent engineer appointed
by the municipality from time to time as applicable;
(b) The extension ot the sewage works shall firsl be approved by the Council of lhe
municipalily upon application of the property owner, provided that Council shall
have the right to determine, in its sole discretion, whether there is sufficient
capacity in the sewage works to service the proposed extension;
(c) All engineering drawings relating to the proposed extension must be prepared by
a Consulting Engineer retained by the property owner, at the property owner's
sole COSI. Such engineering drawings are subject to the approval of the Municipal
Engineer;
(d) The property owner shall execute an Agreement with the municipaliiy pursuant to
which the property owner shall agree to be responsible for all engineering, legal
and related fees incurred by the municipality as the resull of the request for
proposed extension of the sewage works by the property owner;
DRAFT
Schedule 'H' - Sewer (cont'd) \.ox-
(e) The Agreement between the property owner and lhe municipality shall also
require the property owner 10 pay the tolal capital cost of the proposed extension,
the municipality's costs as set out in subparagraph (d) above, togelher with a
further sewage service charge in an amount to be determined by by-law of
Council, prior to the commencement of any work.
8. LEGAL DESCRIPTION ASSESSMENT ROLL NUMBER
Tile Field #1
PLAN M-11 LOT 76 434602001005912
PLAN M-11 LOT 77 434602001005913
PLAN M-11 LOT 78 434602001005914
PLAN M-11 LOT 79 434602001005915
PLAN M-11 LOT 81 434602001005917
Tile Field #2
PLAN M-11 LOT 83 434602001005919
PLAN M-11 LOT 84 4346 020 010 05920
PLAN M-11 LOT 86 4346 020 010 05922
PLAN M.11 LOT 88 4346 020 010 05924
PLAN M-11 LOT 89 4346 020 010 05925
PLAN M-11 LOT 90 4346 020 010 05926
Tile Field #3
PLAN M.10 LOT 2 4346 020 010 05504
PLAN M-10 LOT 61 4346 020 010 05563
Tile Field #4
PLAN M-10 LOT 15 434602001005517
PLAN M-10 LOT 18 4346 020 010 05520
PLAN M-10 LOT 19 434602001005521
PLAN M-10 LOT 21 4346 020 010 05523
PLAN M-10 LOT 22 4346 020 010 05524
PLAN M-10 LOT 30 4346 020 010 05532
PLAN M-10 LOT 31 4346 020 01 0 05533
PLAN M-10 LOT 34 4346 020 01 0 05536
PLAN M-10 LOT 38 4346 020 010 05540
PLAN M-10 LOT 39 4346 020 01 0 05541
PLAN M-10 LOT 41 4346 020 010 05543
Tile Field #5
PLAN M-10 LOT 6 4346 020 010 05508
PLAN M-10 LOT 7 4346 020 010 05509
PLAN M-10 LOT 8 434602001005510
PLAN M-10 LOT 9 434602001005511
PLAN M-10 LOT 11 434602001005513
PLAN M.10 LOT 13 434602001005515
PLAN M-10 LOT 42 4346 020 01 0 05544
PLAN M-10 LOT 43 4346 020 01 0 05545
PLAN M-10 LOT 44 4346 020 010 05546
PLAN M-1 0 LOT 45 4346 020 01 0 05547
PLAN M-10 LOT 48 4346 020 01 0 05550
PLAN M-10 LOT 49 4346 020 010 05551
PLAN M.10 LOT 51 4346 020 010 05553
PLAN M-10 LOT 52 4346 020 010 05554
PLAN M-10 LOT 53 4346 020 010 05555
PLAN M-10 LOT 54 4346 020 010 05556
PLAN M-10 LOT 57 4346 020 010 05559
PLAN M-10 LOT 58 4346 020 010 05560
DRAFT
~
Schedule 'H' - Sewer (cont'd)
Section 8. (cont'd)
Tile Field #6
PLAN 1531 LOT 1 4346 020 010 00600
PLAN 1531 LOT 2 4346 020 010 00700
PLAN 1531 LOT 3 4346 020 010 00800
PLAN 1531 LOT 4 4346 020 010 00900
PLAN 1531 LOT 8 434602001001300
PLAN 1531 LOT 9 434602001001301
PLAN 1531 LOT 10 434602001001400
PLAN 1531 LOT 11 434602001001500
PLAN 1531 LOT 12 434602001001600
PLAN 1531 LOT 13 434602001001700
PLAN 1531 LOT 14 434602001001800
PLAN 1531 LOT 15 434602001001900
PLAN 1531 LOT 16 4346 020 01 0 02000
PLAN 1531 LOT 17 434602001002100
PLAN 1531 LOT 18 4346 020 01 0 02200
PLAN 1531 LOT 19 4346 020 010 02300
PLAN 1531 LOT 20 4346 020 010 02400
PLAN 1531 LOT 21 4346 020 010 02500
PLAN 1531 LOT 22 4346 020 010 02600
PLAN 1531 LOT 23 4346 020 010 02700
PLAN 1531 LOT 24 4346 020 010 02800
PLAN 1531 LOT 25 4346 020 010 02900
PLAN 1531 LOT 26 4346 020 010 03000
PLAN 1531 LOT 27 434602001003100
PLAN 1531 LOT 28 4346 020 010 03200
PLAN 1531 LOT 50 4346 020 010 05400
9. LEGAL DESCRIPTION ASSESSMENT ROLL NUMBER
PLAN 1587 LOT 15 434601000212300
PLAN 1587 LOT 16 434601000212400
PLAN 1587 LOT 17 434601000212500
PLAN 1587 LOT 18 434601000212600
PLAN 1587 LOT 19 434601000212700
PLAN 1587 LOT 20 434601000212800
PLAN 1587 LOT 21 4346 010 002 12900
PLAN 1587 LOT 22 4346 010 002 13000
PLAN 1587 LOT 23 434601000213100
PLAN 1587 LOT 24 4346 010 002 13200
PLAN 1587 LOT 25 434601000213300
PLAN 1587 LOT 26 4346 010 002 13400
PLAN 1587 LOT 27 4346 010 002 13500
PLAN 1587 LOT 28 434601000213600
PLAN 1587 LOT 29 4346 010 002 13700
PLAN 1587 LOT 30 434601000213800
DRAFT
SCHEDULE 'I' TO BY-LAW NO. ~
WASTE MANAGEMENT
1. The following wasfe management charges shall be levied on a flat rate basis per
user:
Residential $120.00
Commercial-garbage collection. disposal & recycling $120.00
Commercial - recycling only $ 35.00
2. Waste management charges shall be added to the annual tax levy of each
applicable property and be due and payable in the same manner and at the same
time as the final tax bill.
3. Interest and penalty charges shall be applied in lhe same manner and at the same
time as applicable to non-payment of installments of the final lax bill.
DRAFT
-
SCHEDULE 'J' TO BY-LAW NO.
WATER Comment [P29J: NO CHANGE FROM RATES. J
APPROVED BY COUNCIL BY BY ~LA W
1. DEFINITIONS
For the purpose of this Schedule,
1.1, "Municipal Water Area" shall mean a subdivision within The Corporation of the
Township of Oro-Medonte,
1.2, "Municipal Water Systems" shall include all water works established within the
present Township of Oro-Medonte, and shall further Include any present or fulure
extensions to the water works under any Act or under an agreement between the
Township or its predecessors, bul shall not include any private waler works
which have not been acquired, established, maintained or operated by the
Township or its predecessors;
1.3. "Owner" shall mean lhe assessed owner(s) as Identified on the Assessment Roll
for taxation purposes during the current year, as amended.
1.4, "Treasurer" shall mean the Treasurer of The Corporation of the Township of Oro-
Medonte.
1.5, "Unit" shall mean an assessed or assessable unit within a residential, commercial
or Industrial building, and shall Include an apartment located wilhin a single
family dwelling which Is serviced by lhe Township Waler System, as permitted
under the applicable Zoning By-law.
1.6. ''Water Works" means any works for the collection, production, treatment,
storage, supply and distribution of water, or any part of such works. but does not
include plumbing or other works to which lhe Ontario Building Code Acl and Its
regulations apply.
2. WATER CHARGES, BILLING AND COLLECTION
2,1. As soon as the water connection Installation is approved by the Township
Inspector, he shall forthwilh turn the water on for owner. The owner will then be
charged allhe appropriate water rate, as per Schedule 'J'.
2.2. At the end of September each year, the duly authorized employee shall read, or
cause to be read, all meters connected to the Municipal Water System to
determine the amount of water used during the year.
2.3. The Treasurer shall calculate water charges to be assessed against each unit in
a Municipal Water Area, in accordance with the minimum quarterly charge and
rates per cubic meter as set out in Schedule 'J'.
2.4. The Treasurer shall, for each calendar quarter, Issue bills to each unit based on
lhe applicable water charges. Water bills shall be due and payable not less that
lwenly.one (21) days from the date of mailing.
2.5. Water payments shall be payable to The Corporation of the Township of Oro.
Medonte and may be paid during office hours in person or by mail at the Oro.
Medonte Administration Office, 148 Line 7 South, Box 100, Oro, On LOL 2XO, or
at most financial institutions. Water payments made at a financial institution shall
deemed to be paid on the date shown by the Teller's stamp on the bill stub. The
Township shall not be responsible for any applicable service charge payable to
lhe bank, Cheques only can be dropped at the drop boxes located at the
Administration Office and Moonstone Fire Hall.
.
DRAFT
Schedule 'J' - Water (cont'd)
2.6. The Treasurer shall impose a ten (10) percent lale charge on all unpaid accounts
on the day alier the due date.
2.7. If an account remains unpaid, the Township may collect amounls payable
pursuant to Section 398 of the Municipal Act, 2001, c. 25, as amended,
WATER RATES:
METERED: RESIDENnALORCOMMERC~L
SHANTY BAY. M-66, M-71, M-696
Based on twelve (12) month period $575.00/Unit for twelve (12) Months
Minimum Rate
Up to 365 Cubic Meters
Based on a fhree (3) monlh period
Minimum Rate
Up to 90 Cubic Meters $143.75/Unit for three (3) Months
HARBOURWOOD. M-118
Based on twelve (12) monlh period $575.00/Unit for twelve (12) Monfhs
Minimum Rate
Up to 365 Cubic Meters
Based on a lhree (3) month period
Minimum Rate
Up to 90 Cubic Meters $143,75/Unit for three (3) Months
SUGAR BUSH - M.8, M-9, M-30, M-31, M.367, M-368
Based on twelve (12) monlh period $575.00/Unit for lwelve (12) Months
Minimum Rate
Up to 365 Cubic Meiers
Based on a fhree (3) month period
Minimum Rate
Up to 90 Cubic Meiers $143,75/Unit for three (3) Months
CEDARBROOK - M-157
Based on twelve (12) month period $600.00/Unit for twelve (12) Monlhs
Minimum Rate
Up to 365 Cubic Meters
Based on a three (3) month period
Minimum Rate
Up to 90 Cubic Meiers $150.00/Unit tor fhree (3) Months
DRAFT
Schedule 'J' - Water (conl'd)
CANTERBURY - M-343
Based on lwelve (12) month period $600,OO/Unit for twelve (12) Months
Minimum Rate
Up to 365 Cubic Meters
Based on a three (3) month period
Minimum Rate
Up to 90 Cubic Meters $150,OO/Unit for three (3) Months
MAPLEWOOD
Based on twelve (12) month period $575.00/Unit for twelve (12) Months
Minimum Rate
Up to 365 Cubic Meters
Based on a three (3) month period
Minimum Rate
Up to 90 Cubic Meters $143.75/Unil for three (3) Monlhs
HORSESHOE HIGHLANDS - M-391, M-447. M-456
ZONE II
Based on twelve (12) month period $575,OO/Unit for twelve (12) Months
Minimum Rate
Up to 365 Cubic Meters
Based on a three (3) month period
Minimum Rate
Up to 90 Cubic Meters $143.75/Unit for three (3) Months
CRAIGHURST - M-510
Based on twelve (12) month period $575,OO/Unit for twelve (12) Months
Minimum Rate
Up 10 365 Cubic Meters
Based on a three (3) month period
Minimum Rate
Up to 90 Cubic Meters $143.75/Unit for three (3) Months
WARMINSTER - 309, M-104, M-92
Based on twelve (12) month period
Minimum Rate
Up to 365 Cubic Meters $575,OO/Unit for twelve (12) Months
Based on a three (3) month period
Minimum Rate
Up to 90 Cubic Meters $143.75/Unit for three (3) Monlh Period
.
DRAFT
Schedule 'J' - Water (cont'd)
SURCHARGE BASED ON TWELVE (12) MONTH PERIOD FOR ALL METERED
SYSTEMS EXCEPT CANTERBURY & CEDARBROOK
366-545 Cubic Meters $1.81ICubic Meter
546 + Cubic Meters $1.97ICubic Meter
SURCHARGE BASED ON TWELVE (12) MONTH PERIOD FOR CANTERBURY
& CEDARBROOK
366-545 Cubic Meters $1.89ICubic Meter
546 + Cubic Meters $2.05ICubic Meter
FLAT RATE: REStDENTtAL
MEDONTE HILLS. 1650, M-29, M-174
Based on twelve (12) month period
Flat Rate $575.00IUnit for twelve (12) Months
Based on three (3) month period
Flat Rate $143.75IUnit for three (3) Month Period
ROBINCREST - M-123, M-101, BACHL Y, MOONSTONE PER SCHEDULE "A"
BY-LAW 2002-132
Based on twelve (12) monlh period
Flat Rate $575.00IUnit for lwelve (12) Months
Based on three (3) month period
Flat Rate $143.75IUnit for three (3) Month Period
SCHOOLS
Flat Rate $ 18,OOlClassroomIMonth for twelve (12) Months
HORSESHOE - ORO 1587
Based on lwelve (12) month period
Flat Rale $575,OOIUnit for twelve (12) Months
Based on three (3) month period
Flat Rate $143.75IUnit for three (3) Month Period
HORSESHOE - Medonte 1531, M-10, M-11, M-23
Flat Rate $575.00IUnit for twelve (12) Months
Based on three (3) month period
Flat Rate $143.75IUnit for three (3) Month Period
PINE RIDGE SKI CLUB
Flat Rate (6 unils) $3,450.00 for twelve (12) Months
Flat Rate Commercial $ 862.50 for three (3) Month Period
.
DRAFT
.~
Schedule 'J' - Water (cont'd)
MISCEllANEOUS FEES:
CONNECTION FEE INSPECTION $200,00
DISCONNECTION AND
RECONNECTION CHARGE $ 50.00 Each
. ,
DRAFT
\t -
Appendix "1" to By-law No.
Fees and Charges
imposed under Separate By-law/ActJOntario Regulation
Deveiopmenl Charges Developmenl Charges Act, 1997, S.O. 1997, c.27
Freedom of Information Freedom of Information and Protection of Privacy Act,
R.S.O. 1990, c.F.31, as amended
Ontario Regulation 460, amended to O.Reg. 421/04
Fees are prescribed by the Acl
~'
5' :E -1 -1 'Z -1 tI1 -1 ("') ("') -1 -1 -1 -1 -1 -1 0> ~::;< ~;:; -1 S' S' -1 ~ 8 ("') ,
t:lt\jOO(tlO;O~'::+'OOOOOO :::r<~ <fJ1:::r U)(DO PJ t:I:::r't::
,,' '" :;: :;: :;: :;: 0.. :;: '< '< :;: :;: :;: ~ :;: :;: uo'::: u;" 0' _. '" '" cr' cr' :::to '" 0>
::;;";;; :::::: ::: ""::: 0 0 ::: ::: ::: :3 ::: ::: ::1' 'I 0 " <g cr' ~::: '" 0 ::;- :::
:::..,"^' 0 t/) .....:j t;I.: 0 VJ ~ ~ t:n r..n 0 0 r:n UJ (i) ~ <:: C __ _. () ::: c: ~ 0
~ :;::r'(D::T'-t::r' ::r::r :::::r::r ""1a-~ ..~:::..: __- n' VJ
..., -, r> _. 0.. -, tI1 0 -."". ..., ..., -'''''' ::: = s::: 0.. ::1' eo 0 .., - - (1)
tI1 ("') '" ::: '" :;: '" 0> ., '" IU ." i$: '" IU '" -, 0 - 0.. _, r>:::::: - _. VJ
~ 0 0 S 0 (tI 0 ~ = 0 0 ~ ..... 0 0 g 0:: ::E ~ _ E ~ {JQ~. (tJ g s.
o ::::: ~ 00 "'"Ij rn """Ij"'" ..... "'"+;. """I') ..... 0.. "'"+;. -. = (D t/J t:I.....1 u""' <: __ .-
:::r5'0~~--~(tI=~~~~~~ ~~:.c ~~.] ~]g 8~
(fQ(D::r'VJoa <'""i~t:I~t:I L:~rnVJ (tI:::r'::! ~a-- ~(fQ
~ ~ =~. ~ g ]' 03 0.. "< = ~ 8 0 ~ f1~. 8::+" ~. . ~
0::: '-t .....u........ l' t:lfJQ --~- t:I __ (1)
0.. ",. -S'o> :;: ,,' ... r> r> ::1'., "" - (t>::1' .,s
~ p.;:::r ~ (p- G(D(D !]t"D.-+-
cr' tig 'Z SO> :;::;:~ :;S?5 -
Ei ., '" C'J ~ S S;::1'::1' 12..:::::: 'TI
'-< ...... 0 .............0 PJ UJ ('C
= -'"'1 rOc ---~ (D
~::1'", ::1'_ "'.,< ...,
~ =p.; _.0.. 0..0""1 '-t
~ -- (') {I)::::I""', ::!1 (tI 0
> VJn p.;~ t:I(D~ 3
~ ~~ 8i ~~5. p.;
< S" ~ ~ <: (D -- @ ~ t:C
"!j <ro '" '" '" "'?5 S '" $:0
t!'j.-+-n $lPJ (tIO(tl ~ :::.:
t'I'j ::1' 0 -, ::: 3 0 ::: '" 0-
fJ1 ~ ~ g '$ :=,..' ~ ~ 0.. _.
""'I.-+- ::r' __0 < :::
o t::., 0 -'::1' 0>
(D C -. t:I ~ -.. ........
r/Jr/Jt'r1t'r1r/Jr/Jt'r1t'r1r/Jt'r1t'r1t'r1r/Jt'r1t'r1t'r1::j <~ g.<ro ~o ~ to
D0~~DD~~O~~~O~~~ ~ ~~. ~g ~Q
'TI 'TI 3' 3' 'TI 'TI S 3' 'TI 3' 3' 3' 'TI 3' 3' 3' t'I'j t::::: r> 0.. '" p; 8., ;:;;
-1-1o>o>-1-1~o>-1o>o>o>-1o>o>o> '=' "'< 00 S=L ~ :E
............ ......-- .-+----- ................... i$: 0"" ~....o S
~ G G G n ro ro ro ro ro ~ ~ .
~~ ~~ ~~~ ~~~ ~c g~_ Q~ ~
<< <<<<< <<< ~?5~ ~S']~ ~
~PJ PJPJ ~~~ p.:;p.J~ L, 0 ....::;' \.J.... 0
........ ....... ........................ ............... ...................... - "'t:) '""I ...... 0 0> - ~
c c c c c c c c c c ~ "'1 ........ .- p.:; (D"
(0 (D (D (I) (D (D (D (D ro (D W 2. s:. 0.. ::S ~: :1". (J
"'0 (I) (1) :::.-. '-< 0 --
"h... (')....... ,-"::::p ......::: 0-
~ __ v ::: c :::
t"" :;: (3 0'13 g ~ '"
::; _. ~. -- ....... ..... 0 ('D
-., ........ u, ::: ., th ""'!
..:::~ (D~;:-- 'JJ
t'I'j ::1' 0> r> 0 0 ,.Q
00 (D en ~ ~ ., \.;.)
.-+-.-+- tzI.-+- (0---"" :::::t!
'""1 :::r' ~ ""'t -< ~
~ (D ""'! p.:; .....- c
...... =.:: -< (D ........
:!2.. '< "' :;: '<
0> <ro -
...... 0- p.:; p.:;"
(!) ::::: N
....... -- 0.. 0
~ :;. 0
o '" v.
'--" ~"'-
-V
Administration Buildim! Public Works I
Compliance Municipal Residential Single Blue Boxes Kitchen Add'l Road Signs requested by E.-trance Permit
Reports Address Sign Family Bdg. Permit Com posters Property Owner
Oro-Medonte Building $50 Sign posts $7 Floor area @ ,73/sq, ft. $6 $6 Township cost (post, sign, hardware & $50
(Proposed) Environmental! Municipal Basements @ .25/sq, ft labour)
Engineering $50 address signs $15 Garages Free
. Subdivision $50
Zoning $50
Development
Charge $20
Clearview No listing 911 signs 25 No listing No listing Business signs installed on street sign post $50
- actual sign costs + 100 + GST
911 sign
installation 25
Severn $85 $31.65 each No listing No listing Settlement area 50/50 split $50 driveway entrance permit
Septic only - $25 Trail signage 50/50 split inspecti()o n - no work required
Directional signage 100% Township
Innisfil No listing No listing (Under Review) $5 (I" one No listing No listing Permit - $75
Floor area @ .55/sq.ft. free) Refundable deposit - $500
Basements @ ,15/sq.ft residential
Garages @ .20/sq.ft $750 cOl1l:1mercial
More tha.n 2 inspections
deduct fr<>m deposit at $451
addition~1 inspection
Barrie Floor area @ ,73/sq, ft.
Basements @ .25/sq, ft
Garages Free
Springwater $20 sign only $5,25 Do not sell No fee, in past ratepayers were required to $20, under review
pay signage costs of approved, under
$35 sign and review in road Occupancy By-law,
installation
Essa Standard $25 No listing New home I Do not sell Sign permits $60, ResIdential
I day rush $40 resident Home occup, - $20
No charge Temp 2 mths or < - $25 $90, Cotr1mercial
6 mths or < - $35
Replacement I yr or < - $45
$5
Permanent sign $50
Store front sign $40
Analvsis for Fire Services ~
I Residential request for ' Non.residential inspection Re(luest inspection I
, information of "remises or bid!!.
Rt'quest for Mortgage Change of Day Care, Group I Hotels i Inspections Fireworks Fa Ise ,
Inspect. of Under Over Apparatus Elevator Response to
Fire Report clearance Ownership Nursery Homes. wood 20,000 20,000 req. by Inspections stand-by al~rms calls - after open air
letter Rooming I burning sq ft. sq. ft. LLBO & first call deemed out
Houses appliance approvals of control
installations
Om- 50 50 50 75 75 150 75 75 '00 75 75 I $150 per $4.::50 flat fee After First MTO
Medonte hour Ar~er 3 per Call, $150 RATES/HR.
, , '2 Month
. I Pe..iod:
Clearview $25 $50 $50 No listing No listing No listing No listing No I No LLBO No listing Stand-by Mc::xe than 2 No listing Response to
listing listing approval, after fire- in 12 months open fire I
i occupant one apparatus in .he same Per app. for
I i loads, fire @2fire!f. bu :aIding 1" hr $350 I
routes, stand-by (per $31U0,OO Per app. for
public balls I hour) $75 each V2 hr I
, after $175
$75 ,
Springwater $50 Compliance letter requests $35 $50 No listing Solid fuel Fire request report $75 - Sales I $125 per hr. Af..-.er 2 in a No listing $75-$'00
- residential $30 appliance storage $50 per veh. 12 mth, detailed
- commercial $50 $50 Comm.. bldg under - Fireworks I period $300 listing
'0,000 sq [t $100 site $50 i &
- Re- Current
I i - Each add' I 5,000 sq inspection MTOHwy.
[t $50 (each visit) rates
! $25
Essa (under $75 Letters of I No listing Annual inspect of residential! commercial No listing Residential i LLBO letter Fireworks ' Per hr. $350 I" alarm in I No listing No listing
review) I compliance , bldg - 2-10 units - $100 inspection per unit of permit, - Each add. 1/2 yr - $250
I $75 I $50 compliance private $35 hr. $175 per 2m1 alarm in ,
$50 veh. yr - $350 ,
, ,
I 3" alarm in ,
, ve - $450 !
Severn SSO No listing No listing $30 No listing No listing $60 Insp. of any single 'No listing . $50 Standby at Afaer receipt No listing Emergency
(includes retail! comm.. I public of .:3 to the scene
Re-insp. $25 photos and industrial premise functions - sar11e in I security -
, one - Under 100 m2 - $30 includes 5 cal endar year includes 2
reinspect.) - 101 m2to 1000m"- personnel - $ ::3oo/hour firefighters
$50 and I pumper per-- apparatus and requisite
-> '001 m'-$IOO . $200!hr. ** equipl
and/or fire
Reinsp. - $25 apparatus
$125/hr.
Innisfil 75 75 75 75/insp. 75/insp. 75/insp. 75/insp. 75 75 75 I 75/hr/fire $300 each $300/call $350!veh. 1'1
unit tiu.e. after he
First call in a I 75!veh. ea
cal ~ndar year add. Y2 hr.
min. 1 hr.
per veh.
** indicates that this fee may be waived by a resolution of Council upon written request
- \ \
~ \ \ II
~~
00
NN
",<"
.., ",,,,
c: "
'" ..........
'" ..........
to ..........
~G) ~N
eel) 00
":3$ <q<:!f
o.c ~~
o tI) (j) en .
t.) ._ l' Q)
40 __-r- Q)
00\ ~
--0 0\.0 D
G) .' ......
....~.qt- Q
c. Q) to 5i \~;
tf) ::J:J ..- v~
'" 0 g <Ft
tf. ~o:: \ ;
_ (0
1S E'-
c: (0 0-
~ ~,~
'" 0. i 9
> ;$ (0
._ u- '"
to ..-' G> .s::;
~ ~.g ~
~ E 6 'E
<II (O;Z: J:>
~ ~ ~ ~
~ ~ 0 <II
:1 ou,.,.9
~' t- t\ -0
~ '" $(0 ~
~ 5: (l. *
e- '" \:\ ! ~
::> "'.- '"
Q.. (l.(l.~ ~
""\"" ~
(0 '" (0
:I::I: ,1;:!
~~~ ,~
~ ~ \. ~
E E ~
o 0 <II
>0 t)t) ""
~ ro ro ~
'u c.t: .z
to ~ ~ -
II- .0::.0::, 2-
-
'(3
~
55 t)
'.;:::> -.;::;. 0
(0(0 -
'0'0 -g
00 '0
<II <II c:
~:2.:2. ~
~~ E
~~ 0
coo (..)
o :I::I: ~
';:t \- \- (/)
co 0 0 .-
l ~\~\ :
0') 00 ..-'
\ '-' \,.. \,.. -0
.0 00, ;z:
\ ,.o::l\
,- ~
THE. CORPORATION OF THE. -
~ J<I8llne 7 5.. 110_ ~ 00
TO W N0fI ID Om. Onti\rio LOl z...xo
Phone (7QS)481-2 111
fIX (705) 487-0 I B
r9k-orJ#b~ www.oro.m~ctonre .c.~
APPLlCA TION FOR GRANT/SUBSIDY
NOTE: GRANTStSUBSJDIES ARE NOT AUTOMATICALLY RENEWED EVERY YEAR.
NOTE: ORGANIZATIONS MAYBE REQUIRED TO SUBMIT FINANCIAL STATEMENTS.
NOTE: If .ddilional 'p.te is ,..,quired 10 complele Y01lr i"fo.......,ion, please use the a"ached
sheet.
Grant/Subsidy Request Amo..,t S
PARi:' ~ Oreo;.;;;'ion Name'alld Aidr'es8 i;'''iO;.dd4n
Organizalion O/!-O fYI/d/lL- Hocl'ZV /f,{TC)Ct/fTloH
Name
Address
Cily Provo Poslal Code
Conlac! /!r;rfft 1/;1<- , trJ%~ Telephone _,
E-mail Fax
PARi 11 ':'OrronkanOll,Gett-er.,.iil(;Jm.alUm
Number of OulofTown Membership Fee
Members Residen!s If Applicable
Geographic Area Dale
Served Formed
Om,,," "'" m;".., _"."" """,i_ of,.." "".,,;,.,i~. ~
t/Y! O~ (/;?n:1rL-r HAf...-{... /a~ ue-/ At/Vc1-C
If(jv~'y /J::.J.J'Of:I/ff-/w tYN O/.5.C. --30TIf , -
r12uffI ) jJ I~ - /0 fJ fY\ . \
~ "'1"..1'" ·
......, .....'" ----- --..... -..- . ---
.- \.o~ -
Type of Organization (i.e. Registered Charity, Non-Profit Organization, no status, etc. ) and registration
number if applicable. Nt r? X
, (JpJ -(J2bh1 uM,if/'.lI7.ATltJrI
Other Sources of Revenue (include amounts that bave been received or that are anticipated - ollter
grants/subsidies, private funding, etc.).
----
-----
.
Purpose for which the current gram/subsidy, if approved, would be used. Give complete details - (i.e.
project or event description. time frame, community benefits).
Do you currently receive other grants or subsidies from the Township (facility subsidization,
photocopying, secretarial, etc.). 110
Previous grants/subsidies from the T own.hip?
$ Year of Request:
$ Year of Approval;
Date: Fg 0'3/oS-
t
~l21I2/t<1 <'vJi' Dare:
Name & Position
f 5 / /) /AA;:-
:f~"if!JJi.Ce.'Vse On/p , '" .,',
,;.'.' Approved. DeniCli'"
Amount $ . . Dale '
Co~epts: .
Note:
Personal information contained on this fonn is collected pursuant to tbe Municipal Freedom of
In/ormation and Protection of Privacy Ae., and will be used for lbe purpose of determining eligibility for
grants, Queslions about this collection should be directed 10 tbe Freedom ofJnfom1l!tion Coordinaror,
The Corpl>raljl>n oflhe Township of Or<>-Medonte, ]48 Line 7 South, Box 100, Oro, Ontario, LQL 2XO.
" >f!"EB-25-200S 10:35 ORO MEDONTE TLIP
"' 1 705 487 0133 P.02
THE CORl'ORATION Of THE
-
146 Line 7 S.. &0. 100
T 0 W N 6 Ii I P Oro. OntM!O lOl LXO
/'hone (705)487-2171
r!!J~Of 7I6er:tfJde Fa!< (705) 487-0133
WW>N.oro.mectonte.Ci\
A 71: n-t... J? 6A-7<- e? /;L.~lAJ~
C/2./S c.~J<..?-e/L .
APPLICA nON FOR GRANT/SUBSIDY
NOTE: GJlANTStS\JBSJDIES ARE NOT AUTOMATICALLY RENEWED EVERY YEAR..
NOTE: ORGANIZATIONS MAY BE REQUIRED TO SUBMIT FINANCIAL STATEMENTS.
NOTE: If addil;o".1 space i. required 10 complete your information, please U5. the attaehed
,h<<t.
Grant/Subsidy Requen Amount S~~ - ~
PART A':: O~l!al1ji.;'ri..1t ND;"LDmiAi'jJ,~.s l~i~~;;';;liM
Organiz81ion 0(...(7 't<t , /J v r2. 110<< ki? Y
Name
A ddre.s G~ r/-1"4--1 i? A--~N.<:\
City Provo Po"al Code
Contact /1" h/./ /ffA fA I !J&e Telephone
E.-mail Fax
PA'R j, B,;,c Qr"1I1Iiwlion 'Gn;e,o/ inform ati(Jn ?t?~ /,;..eV/o,-, S
Number of OUlofTown Membership Fee
Members Res idenls If Applicable
Geographic Ares Dale
Served Fonned
OUlline the mission, purpose and objectives of your organization.
RECEIVED
FEB 2 8 2005
ORO-MEDONTE
TOWNSHIP
"I -'FEB-2S-200S 10:35 OR[] MEDUNlt 114-' 1 'It':;> 4t:f( "'J.;I.:I
.' .t-'"t:1.5
Type of Organization (i.e. Registered Charity, Non.Profit Organization, no status, etc. ) and registration
number if applicable.
Other Sources of Revenue (include amounls that have been received or that are anticipated - other
grants/subsidies, privale funding, elc.),
Purpose for which Ihe curren! grant/subsidy, if approved, would be used, Give complete details - (i,e.
project or event description, lime frame, community benefits). ;~/<-( /';7'"
ICe/!>. 2. 7/0 '7 V~.-e o'? 6A-;V~vE7 /z,?'
,:? .II &:> ~t/; c~ /<.-;;Jr' /.fo~- t; tP7 (e71 <-f o /A'1 ,.if A 6Nft<.- 5'-
f'J, J- 2. A .: po/-> ;'1i" /' AD)<. . I;]-D - 3'0f> ~''''''
Do you currently receive other grants or subsidies from the Township (faciJily subsidization,
photocopying, secretarial, elc.).
,../.,.
Previous grants/subsidies from rhe Township?
Amounl Requested: $ Year of Request:
Amounl Approved: $ Year of Approval:
pjji/,i:e:.. Sif!~/lI"re I1fAuih;'i-k~40fficj;'i{51 ( ~O
Ahu. MA c L~oo - ....A-,w.4.5 Ji t'2 Date: r::.0. 1- $/0 <; ~ .
Name & Position
Dale:
Name & Position
'f'p. OjJi~i:'UseO..1y ,
'.. l\P'proved ' , ' Dei1ieil , ! '.,
Amount $ Dale
C.s!iurients:
-
Note:
Personal informDtion conla;ned on this form is collecled pursuant 10 the Municipal Freedom of
In/orma/ion and PrOtection of Privaq Act, and will be used for the purpose of determining eligibility for
grams. Question,; ::tbom this collec1jon should be diJccled to the Freedom of Information Coordinator:
The Corporation of ,he Township of Oro-Medonte, 148 Line 7 South, Bo~ J 00, Oro, Ontario, LtJL 2XO.
\Q~-\
@ Ontario
The Ontario Volunteer Service Awards
NOMINATION FORM
Nominators must certify nominations as outlined on the final page of this form.
Personal information on this form is collected under the authority of the Ministry of Citizenship and Culture Act, R.S.O.1990,
eM.IS, sA and will be used to determine eligibility and notify recipients of the Ontario Volunteer Service Awards. For further
information, please contact the Director, Ontario Honours and Awards Secretariat, 400 University Avenue, Ground Floor, South
Lobby, Toronto ON M7A 2R9, (416) 314-7523.
(Please type or print clearly and complete in full)
NOMINATING GROUP or ORGANIZATION
Name Township of Oro-Medonte
Address P.O. Box 100 Suite/Unit #
STREET OR P. O. BOX NUMBER
City!Town Oro Postal Code LOL 2XO
County Simcoe E-mail info@oro-medonte. ca
Telephone: ( 705) 487-2171 Fax: ( 705) 48 7 -0133
Year group or organization formed 1994 (Amalgamated)
Please indicate below the total number of volunteers in group or organization:
c::=J Senior Citizens (ages 65 years and over) c::=J Adults (over 24) c::=J Youth (24 and under)
HEAD OF GROUPOR ORGANIZATION (CHAIR. PRESIDENT, ETe.)
'!'IMr. 0 Mrs. 0 Ms. 0 Other First Name(s) J. Neil Last Name Craig
Title Mayor
Address POBox 100 Suite/Unit #
STREET OR P. O. BOX NUMBER
City!Town Oro Postal Code LOT no
Telephone: ( 705) 487-2171 E-mail: np; 1 rr~;g@nrn-medonte Cs
CONTACT
_.__.~
ri Mr. 0 Mrs. 0 Ms. First Name Chris Last Name(s) Carter
Title Manager of Recreation & Communi i::Vnail recrea tion@oro-medon te. ca
Telephone: ( 705) 487-2171 Servic~:x:( 705) 487-01 ii
Brief description of objectives and activit s of your group or organization
To rotect the natural h ita e s stem of 0 -M
stewardship of the Township ~ources so that they are available for
,
future generations and to do so''iJ::! a way that has the greatest positive
impact on the quali ty of life in Oro:';M'edoDj;e.
\n i\
\-ct-
o Mr. 0 Mrs. 0 Ms. I Details of volunteer service with nominating group or
First Name(s) George i organization, including items of special interest
L t N B h I Manage the operation of the Craighur t
as ame urn am
R 'd f I Add 12 W dl d C I Community Hall on behalf of the
est enta ress 00 an res.
STAEET OA P. O. BOX NUMBEA Apt./Unit# Township. Responsible for co-
City!Town Barrie Postal CodeL4M 4 Y8 ordinating special events & fundrais
Telephone ( 705) 722-1173 I money to meet the operating & capit 1
AGE CATEGORY (please check one only) i CEREMONY LOCATION costs of the hall.
o Senior Citizen (65 years and over) 0 Adult (over 24) I 0 Invite recipient to ceremony closest to their residential address
o Youth (24 and under) i 0 Invite recipient to ceremony closest to the organization's address
Number of consecutive years as a volunteer in the organization i Preferred language of communication
o Mr. 0 Mrs. 0 Ms. Details of volunteer service with nominating group or
First Name(s) organization, including items of special interest
Last Name
Residential Address
STREET OR ?, O. 80X NUMBER Apt./Unit#
City!Town Postal Code
Telephone ( )
AGE CATEGORY (please check one only) CEREMONY LOCATION
o Senior Citizen (65 years and over) 0 Adult (over 24) o Invite recipient to ceremony closest to their residential address
[J Youth (24 and under) o Invite recipient to ceremony closest to the organization's address
Number of consecutive years as a volunteer in the organization Preferred language of communication
CERTIFICATION CLAUSE
Information for nominators
l\clore signing the certification below, please ensure that you have read the accompanying information sheet entitled the Ontario
Volunteer Service Awards and are satisfied the nominations you have made fit within the parameters of the award program as described
and all of the nominees are, in your opinion, deserving 01 the award.
Nomination Certification
I hereby certify that I have been a member in good standing in the above-named group or organization and to the best 01 my knowledge
I certify that all of the information provided on this lorm is true and assert it is my belief that each of the nominees listed above is
deserving of an Ontario Volunteer Service Award since he/she meets the requirements of the award,
Name (print) Title
Signature . . Date
Completed forms must be received by April 8, 2005. Please submit signed, original forms only.
SEND TO:
Ontario Honours and Awards Secretariat
Ministry of Citizenship and Immigration
400 University Avenue, Ground Floor, South Lobby, Toronto ON M7A 2R9
Tel: (416) 314.7526 Fax: (416) 314.7743
61-544 (02/05)
()
,',-., -:...... "....
Moved by
Seconded by
That the following statements be added to the job description for the CAO
...-.
"The Chief Administrative Officer shall be responsible to the Council and
shall perform his/her duties in conformity with Council decisions."
And...
'J) Administers and manages all policy decisions of Council and regularly '*
___~ort to Council upon actions taken" ~~ 7~
I ~~~
o,~*>'
'-J:o..../..--~~-,~.(: :'14"- ~
q~~~EQO)
o~~
"'" ' !"'I"
~',-:-:..::_m_' ,', ~>;f
.' -::::.:~,
~c.c",~c'm..., ;;'
"'~~
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-05 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Canterbury Water Supply Environmental Services
C.OFW.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~JJACI{G~()IJNI): -
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31,2005 and available for inspection by
any member of the public without charge.
~ttN~f.;YSIS: -
Attached is the Annual Compliance Report for 2004 for the Canterbury Water Supply System, a copy
of which will be submitted to the Ministry of the Environment. This Report is being made available to
Council for information and confirmation that Ontario Regulation #170/03 has been complied with by
the Township of Oro-Medonte, and identifies any non-compliance issues and Provincial Officer's
Orders.
Cf,q-
~ RECOMMENDATION(S)~ -
1. THAT Report #EES2005-05 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Canterbury Water
Supply System.
/) .
Re~ect~lIy submitted,
~
Keith Mathieson
Q
-~
~
THE CORPORATION OF THE
148 Line 7 5.. Box 100
TO WN 8ft IP Ora, Ontario LOL 2XO
Phone (705) 487-2171
Fax (705) 487-0133
-&~Of7#6ecdJde www.oro-medonte.ca
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Canterbury Water Supply and Treatment System
Annual Compliance Report for 2004
Canterbury Water System supplies 17 homes with water from two (2) ground water
source wells.
Permit to Take Water #92-P-3028, issued to the Township of Oro-Medonte, authorizes
the withdrawal of water, expiring December 15, 2011. The volume of water withdrawn
from Well #1 and Well #2 shall not exceed 104 m3 (104,544 litres) per day. The water
treatment plant is to be operated to treat water at a rate not to exceed the maximum
flow rate of 209 m3 per day.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system for the Canterbury system. At no time during 2004 did the
"maximum daily flow" exceed the Permit to Take Water or exceed the maximum flow
rate of treated water to the distribution system, as per Section 1.3 of the Certificate of
Approval.
The highest "daily flow" for the year from Well #1 occurred on July 3rd at 21 m3; Well #2
occurred on July 3rd and July 11th at 25 m3; and to the distribution system, it was 46 m3
on July 3rd.
To ensure accuracy to within + or - 5% of flow within the range of 10% to 100% of the
full scale reading of the magnetic flow meters, Summa Engineering Limited calibrated
them on September 20, 2004.
.. ./2
~
Page Two
Letter to M.O.E.
Re: Canterbury - Annual Compliance Report for 2004
March 9, 2005
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and sixty (260) samples were
tested for "total coliforms" and "fecal coliforms", and one hundred and four (104) tests
for HPC in 2004. There were no detectable results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 80 litres of 12% Sodium
Hypochlorite, or an average of .24 Uday, was used in the Canterbury system in 2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by GeoSpec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by GeoSpec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical results did not reveal any health related reportable exceedences during
2004.
On February 7, 2003, the Ministry of the Environment issued Amended Certificate of
Approval #7433-5J4JHG for the Canterbury Water Supply System.
On August 5, 2004, the Ministry of the Environment issued Certificate of Approval
#2993-62MPY J for the installation of the standby generator set.
.. ./3
Page Three -
Letter to M.O.E.
Re: Canterbury - Annual Compliance Report for 2004
March 9. 2005
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
All required upgrades, as per Section 5.0 of the Certificate of Approval, were completed
by the Township in 2003. The commissioning of the natural gas standby generator was
completed in the Fall of 2004.
PROVINCIAL OFFICER'S ORDER
On June 24, 2004, the Ministry of the Environment inspected the Canterbury Water
System to confirm compliance with current Regulations and to review the Permit to
Take Water and Certificate of Approval. From this inspection, the Ministry issued Order
Number 8761-64CQEE ordering six (6) work orders, attached as Schedule II.
Order #'s 1-4 were satisfied by completion and implementing a "Procedure for Reporting
Adverse Free Chlorine Residuals".
Order #'s 5-6 were satisfied by applying to amend the existing Certificate of Approval on
November 24, 2004.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
From the June 24, 2004 inspection, ten (10) non-compliances with regulatory
requirements and actions required were noted and are attached as Schedule I.
"BEST PRACTICES RECOMMENDATIONS"
From the June 24, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of thirty-two (32)
suggestions for the operation of the Canterbury Water System.
From this list, the Township of Oro-Medonte has presently completed nineteen (19) of
these suggestions.
Any further information required with respect to this Compliance Report for the
Canterbury Water System should be directed to the undersigned at (705) 487-2171.
Sincerely,
S IP OF ORO-MEDONTE
Kei athieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
. S~~r
~ . Ministry of the Environment
~ Of'!t_a,no," ________ ",_____ ..,'________~~i~~~~~~:.t~r~~~t~I11_~~_~~~~~i~~,_R=p~rt
..."-_._,.,.~---,-~, --- ,,-..-.. ---.---.--.--.--..
ACTIONS REQUIRED
1 The Operating Authority failed to sample and test for chlorine free residual in the distribution
system on a daily basis as required by Schedule 7-2(3) of O. Reg. 170103. Samples were not
taken on June 1, 2003.
Action(s) Required: None. The Operating Authority monitored free chlorine residual in the
distribution system thereafter as required.
2 The Operating Authority failed to take the necessary corrective actions in response to observed
adverse conditions at the facility as required by Schedule 18-2(1 ),(2),(3) of O. Reg. 170103.
Incidents occurred on August 29, 30 of 2003, and February 1, 2, 4,5,6,7, March 2, 3, 18, 19,
27, 28, and April 28, of 2004 in which the chlorine free residual analyzer malfunctioned or
recorded a value of less than 0.2 mg/L which is the concentration required by the Canterbury
CofA (7433-5J4JHG) at the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall ensure that alarm situations are promptly
responded to, documented and appropriate corrective actions are carried out and documented
to ensure proper disinfection of drinking water is maintained or restored as soon as possible.
3 The Operating Authority failed to report orally and in written format an observation that indicates
improperly disinfected water may have been directed to the distribution system as required by
Schedule 16-4, 16-6 and 16-7 of O. Reg. 170103. Incidents occurred on August 29,30 of 2003,
and February 1, 2, 4, 5, 6, 7, March 2, 3, 18, 19, 27, 28, and April 28, of 2004 in which the
chlorine free residual analyzer malfunctioned or recorded a value of less than 0.2 mg/L which is
the concentration required by the Canterbury CofA (7433-5J4JHG) at the point of entry to the
distribution system.
Action(s) Required: The Operating Authority shall report orally and in written format as
required if, upon review of the data logger information, or any other observation, it is indicated
that the continuous chlorine free residual analyzer malfunctioned or the chlorine free residual fell
below 0.2 mg/L at the Canterbury pumphouse.
4 The Operating Authority failed to provide a notice of issue resolution including actions taken and
lor results achieved within seven (7) days or otherwise after an adve",e condition was resolved
as required by Schedule 16-9(1 )a,b of O. Reg. 170103. Incidents occurred on August 29, 30 of
2003, and February 1, 2, 4, 5, 6, 7, March 2,3, 18, 19,27,28, and April 28, of 2004 in which the
chlorine free residual analyzer malfunctioned or recorded a value of less than 0.2 mg/L which is
the concentration required by the Canterbury CofA (7433-5J4JHG) at the point of entry to the
distribution system. There were indications on these dates that improperly disinfected water
may have been directed to the distribution system which is a reportable event as per Schedule
16-4 of O. Reg. 170103.
Action(s) Required: The Operating AuthOrity shall provide notice of issue resolution including
actions taken and results achieved to the Spills Action Centre and Simcoe County District Health
Unit within seven (7) days of an adverse condition being resolved.
I) The Operating Authority failed to record the time each Operator spent as Operator in Charge as
required by Section 18 of O. Reg. 435/93.
Action(s) Required: None. The Operating Authority now records the amount of time each
Operator serves as Operator in Charge.
__'M_'_._'_'___"_~'"'____________"___'_"__'_'_________'....___..___m_ __~._.__,..____.,.,,,._....__.__.._____________...______..._"'_'__'n'_..'__" .... __....___._____._. .M.__.._~_____.___._ __'__"'''___
e Generated for sauerph on 10/25/2004 Page 26 of32
- .
tm\ 0 . Ministry of the Environm (i;;
~ ntano Drinking Water System Inspection Rep ~
__.. .,.m.m__ ,..,m..... ......__......_.....__m...mmmm"..._'....__..,.....,.. ..__. ."_ . ._.. _......m.. ._. _.... .........._ _......" ....... ._._ ,_.._, .,_ _ ._,..._ no.. ",__.._._,_ e........ .._..........._,,_.. ..... _'__,_.m..._.._'_...mm............_m.................._..."....__....__.__~_..._
6 The Operating Authority has failed to fully comply with Parts 1.2, 1.3, -Performance - in S U
Certificate of Approval 7433-5J4JHG and Special Condition 14 in Permit to Take Water 92-P-
3028. Flow measuring devices are to be in place at the Canterbury facility which can measure .
and record instantaneous flow rates in Umin and pump run times from each source well into the
treatment facility. This capability is currently not in place.
Action(s) Required: None. The Municipality is currently installing flow measuring and .
recording equipment capable of measuring instantaneous flows at the Canterbury facility. It is
expected this work will be completed in the fall of 2004.
7 The Operating Authority has failed to sample sodium in the correct location. Schedule 6-2 of O.
Reg. 170103 requires sodium to be sampled at the point of entry to the distribution system. The
sample collected on December 18, 2003 was collected in the distribution system.
Action(s) Required: The Operating Authority will resample for sodium at the point of entry to
the distribution system by May 31, 2008.
8 The Operating Authority failed to install the revised Operations and Maintenance Manual in the
Canterbury facility by February 7, 2004 as required by Section 3.9 of CofA 7433-5J4JHG. The
manual was installed in late April or early May 2004.
Action(s) Required: None. The manual is now completed and installed in the facility.
9 The Operating Authority failed to fully document any unusual events, departures from normal
operating procedures, abnormal conditions and the times these event occurred, the lengths of
the events, or the actions taken at the facility as required by Section 20(5) 3, 4, 5 of O. Reg.
435/93.
Action(s) Required: The Operating Authority shall record in the facility iogbooks the approximate
initial time, time at completion, cause of If or, actions taken, date, staff member(s) present, results
achieved, and location of any operational checks, alarms, tests, repairs, unusual andlor
abnormal conditions andlor directions or adjustments made on or within the Canterbury system.
10 The Operating Authority failed to ensure that water treatment equipment is installed at the
Canterbury faciiity in compliance with CofA 7433-5J4JHG. The sample location for the
continuous turbidity analyzer does not correspond to the sample location prescribed in the CofA.
Action(s) Required: The Operating Authority shall comply with the prescribed sample location or
apply for an amendment to the CofA to change the sample location to the current location by
November 30, 2004.
Report Generated for sauerph on 10/25/2004 Page 27, I",!,o
1
St'" '~J'-E. n
@ M'";",,~'" Provincial Officer's Order Order Number
~'. Environment 8761-64CQEE
Environmental. Protection A(.t, R.s.O. 1990, c.E 19 (EP A)
Ministere de Ontario Water Resources Act, R.8.0. 1990, c. Q. 40 (OWRA)
, , ,'I'Environnement Pesticides Act, R.S.O. 1990, c. PH (PA)
Ontario Safe Drinking Water Act, S.D. 2002, c.32 (SDWA)
Nutrient Management Act, 2002, S.O. 2002, c.4
To: The Corporation of the Township ofOro-Medonte
PO Box 100
Oro, Ontario, LOL 2XO
Canada
Site: Lot: 24, Concession: 7
Oro-Medonte, County of Simcoe
Work Ordered
I. Effective immediately, the Operating Authority of the Canterbury Water
System shall make the required notifcations as prescribed by Schedule 16-4 ofO.
Reg. 170/03 in the event of any observation being made which indicates that
improperly disinfected water may have been discharged to the distribution system.
2. Effective immediately, the Operating Authority of the Canterbury Water
System shall take all corrective actions as prescribed by Schedule 18-2 of O. Reg.
170/03 in the event of any observation being made which indicates that
improperly disinfected water may have been discharged to the distribution system.
3. Effective immediately, the Operating Authority of the Canterbury Wa.ter
System shall provide all required Notice(s) ofIssue Resolution within seven days
of the issue being resolved as preseribed by Schedule 16-9 ofO. Reg. 170/03 in
the event of any observation being made which indicates that improperly
disinfected water may have been discharged to the distribution system.
4. Effective immediately, the Operating Authority of the Canterbury Water
System shall ensure that abnonnal conditions, departures from nonnal operating
procedures, equipment taken out of or put in service, or any other unusual event
are all fully documented including times, actions taken and results achieved in the
facility logbooks as prescribed by O. Reg. 435/93, Section 20(5) and O. Reg.
128/04 Section 27(5).
Page 1 - NUMBER 8761-64CQEE
-.
~
5. The Operating Authority shall ensure that the location of the sample point for
the Canterbury facility turbidimeter corresponds to the location in the facility
umber Certificate of Approval (7433-5J4JHG), or, submit a complete application to
ICQEE amend Certificate of Approval 7433-5J4JHG to the Director of the Environmental
Licencing and Approvals Branch, 2 SI. Claire Avenue West, Toronto to reflect the
sample location for the turbidimeter at the end of the contact chamber at the
Canterbury Water System. A copy of this Provincial Officer Order shall be
included with the application. The application shall include the appropriate fees
and be complete to the satisfaction of the Director. Submit the application by
November 30, 2004.
6. Submit written notice to the undersigned that the work required by option I
of the Work Ordered Item #5 has been completed or provide a copy of the
application required by option 2 of Work Ordered Item #5 to the undersigned by
November 30, 2004.
A.
While this Order is in effect, a copy or copies of this order shall be posted in a conspicuous
place.
B.
While this Order is in effect, report in writing, to the District or Area office, any significant
changes of operation, emission, ownership, tenancy or other legal status of the facility or
operation.
This Order is being issued for the reasons set out in the annexed Provincial Officers Report
which forms part of this Order.
Issued at Oro-Medonte this 26th day of October, 2004.
(iJ4 '--------
Phillip Sauer
Badge No:
Barrie District Office
Tel: (705) 739-6441
)EE Page 2. NUMBER 8761-64CQEE
~~ -
O;~/.--'-_.'<~~~\"
Iff itJ~)
~ '1 ~,
~ ~.
'ft,;/ , 'Jt ,
'Q":""'~7"Y
~~~<9
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-06 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report- Engineering and
Cedarbrook Water Supply Environmental Services
C.OFW.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~B~~K~g(:)UNIl: i
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31,2005 and available for inspection by
any member of the public without charge.
~t\'1N't\'Jj\'$t$j i
Attached is the Annual Compliance Report for 2004 for the Cedarbrook Water Supply System, a copy
of which will be submitted to the Ministry of the Environment. This Report is being made available to
Council for information and confirmation that Ontario Regulation #170/03 has been complied with by
the Township of Oro-Medonte, and identifies any non-compliance issues.
'i, \ \
, C\.i"- \
~ RECOMMEND A TION(S)~ -
1. THAT Report #EES2005-06 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Cedarbrook Water
Supply System.
Re,p~=bm","d
Keith Mathieson
~
THE CORPORATION OfTHE
148 Line 7 S., Box tOO
TO WN8II1 P Ora, Ontario LOL 2XO
Phone (705) 487-2171
fax (705) 487~0133
rgmOf7l6~ www,oro-medonte.ca
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Cedarbrook Water Supply and Treatment System
Annual Compliance Report for 2004
Cedarbrook Water System supplies 24 homes with water from two (2) ground water
source wells.
Permit to Take Water #95-P-5036, issued to the Township of Oro-Medonte, authorizes
the withdrawal of water, expiring March 31, 2006 for Well #1 and Well #2. The
withdrawal of water is not to exceed 194 m3 per day, for each well. The water treatment
plant is to be operated to treat water at a rate not to exceed the maximum flow rate of
196 m3 per day.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system for the Cedarbrook system. At no time during 2004 did the
"maximum daily flow" exceed the Permit to Take Water or exceed the maximum flow
rate of treated water to the distribution system, as per Section 4.1 of the Certificate of
Approval.
The highest "daily flow" for the year from Well #1 occurred on June 6th, 13th, and
September 26th at 17 m3; Well #2 occurred on June 13th and September 26th at 20 m3;
and to the distribution system, it was 37 m3 on June 13th and September 26th.
To ensure accuracy to within + or - 5% of flow within the range of 10% to 100% of the
full scale reading of the magnetic flow meters, Summa Engineering Limited calibrated
them on September 20, 2004.
.. ./2
q~-\
Page Two
Letter to M.O.E.
Re: Cedarbrook - Annual Compliance Report for 2004
March 9, 2005
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and sixty (260) samples were
tested for ''total coliforms" and "fecal coli forms", and one hundred and four (104) tests
for HPC in 2004. There were no detectable results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 120 litres of 12% Sodium
Hypochlorite, or an average of .40 Uday, was used in the Cedarbrook system in 2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by GeoSpec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical results did not reveal any health related reportable exceedences during
2004. Samples obtained from the Cedarbrook distribution system were found to have
Sodium results of 18.7 mg/L, which is slightly lower than previous results.
Although the aesthetic objective of Sodium in drinking water is 200 mg/L, the Medical
Officer of Health was notified of the Sodium results.
.. ./3
Page Three
Letter to M.DE ~<
Re: Cedarbrook - Annual Compliance Report for 2004
March 9. 2005
On August 5, 2004, the Ministry of the Environment issued Certificate of Approval
#6366-62MQCE for the installation of the standby power generator, and Amended
Certificate of Approval #5391-645KPK dated August 24,2004, extending the time frame
of the installation of the standby power unit for the Cedarbrook Water Supply System.
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROVAL"
Under Part 8, Upqradinq Requirements, the Certificate of Approval required the
Township to have the standby natural gas generator set installed by September 30,
2004; this work was completed by Mazur Electrical prior to September 30th. All other
required upgrades were completed in 2003.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
On April 21, 2004, the Ministry of the Environment performed an unannounced
inspection of the Cedarbrook Water System to confirm compliance with current
Regulations and to review the Permit to Take Water and Certificate of Approval.
From this inspection, four (4) non-compliance issues and actions required were
identified and are attached as Schedule I.
"BEST PRACTICES RECOMMENDATIONS"
From the April 21, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of twenty-two (22)
suggestions for the operation of the Cedarbrook Water System.
From this list, the Township of Oro-Medonte has presently completed fourteen (14) of
these suggestions.
Any further information required with respect to this Compliance Report for the
Cedarbrook Water System should be directed to the undersigned at (705) 487-2171.
Sincerely,
\
$HIP OF ORO-MEDONTE
K hieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
-
e' .'
~
.i c..~ :t
r~--'
I;
~SECTION 6 - SUMMARY OF NON COMPLIANCE ISSUES & ACTIONS
4
IREQUIRED
tj
II. The Operating Authority failed to sample and test for chlorine free residual in the
d distribution .system on a daily basis as required by Schedule 7-2(3) of O. Reg. 170/03.
i Samples were not taken on June 1 and 2 of 2003.
~
~T Action(s) Required: None. The Operating Authority monitored free chlorine residual in
b
F- the distribution system thereafter as required.
r
r
, Ortkr Number: I Coml1liance ])ate: lmmediatelv
,
s
~.
2. The Operating Authority failed to sample and test for heterotrophic plate count on
. distribution system water bacteriological samples as required by Schedule 11 Section 2(c) of
O. Reg. 170/03. Sample dates in question were June 2, 10, and 17 of 2003.
Action(s) Required: None. The Operating Authority sampled and tested all Cedarbrook
bacteriological distribution water samples for heterotrophic plate count thereafter as
required.
Order Number: I Coml1liance ])ate: lmmediatelv
,
\
j;
~...;
I~; Cedorhrook Water SUDDlv. MOE InsDection 2004/04/21. Paf!e 26 or 38
.
-
@ Ontario Ministry of the Environment
Drinking Water Inspection Report
3. The Operating Authority has failed to fully comply with Section 6.10 (i),(ii), and (iii) -
Well Inspection and Maintenance - in Certificate of Approval 7362-5TVQ94. A well .",
inspection and maintenance plan was to be developed which included scheduled inspection ~ Jt
frequencies by an appropriately qualified professional, defined procedures for the
inspection of the entire well structure and remedial action plans to be implemented ifwells ,II
prove to be noncompliant with regulatory requirements. This was to be completed by April flJ
14, 2004. J, It
".
Action(s) Required: None. The Municipality has produced and implemented a Well d,
Inspection and Maintenance Plan which satisfies the intent and requirements of Certificate .. /1
of Approval 7362-5TVQ94 as of June 24, 2004. d
T Comnliance Date: AUJ!ust 1,2004 . /,
Order Number: ,.
r
..
The Operating Authority has failed to fully comply with Parts 5.1 (i), (ii), and 5.2 - Flow ., /
4.
measuring devices - in Certificate of Approval 7362-5TVQ94. Flow measuring devices are s
.
to be in place at the Cedarbrook facility which can measure daily maximum flow rate (peak
flow) into and out of the treatment facility. This capability is currently not in place. Y. j
I
Action(s) Required: None. The Municipality is currently installing flow measuring and ..
recording equipment capable of measuring instantaneous flows at the Cedarbrook Facility. 111. j
It is expected this work will be completed in the fall of2004. J
I ComDliance Date: II. ,
Order Number: November 30, 2004
I I I J 2.
I I
I
13.
"""'"
~ Of Oll:O~!h
~... .".~---_ -4t.i"~
!RJ~ q
0,' ~ ~ - \
... i! ...
~::,,'iI'"
~~
~:::~,'"
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-07 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Craighurst Water Supply Environmental Services
C.OFW.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~~~~~~~~~'N~: ,
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31, 2005 and available for inspection by
any member of the public without charge.
~1S.~1S.~'\t$)J$); :i
Attached is the Annual Compliance Report for 2004 for the Craighurst Water Supply System, a copy
of which will be submitted to the Ministry of the Environment. This Report is being made available to
Council for information and confirmation that Ontario Regulation #170/03 has been complied with by
the Township of Oro-Medonte, and identifies any non-compliance issues.
~v,- \<t,
~ RECOMMENDATION(S): -
1. THAT Report #EES2005-07 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Craighurst Water
Supply System.
R"E_,"bm;.",
Keith Mathieson
~q -
THE CORPORATION OF THE
148 Line 7 S.. Box 100
TO W N0liI P Ora, Onta.rio LOL 2XO
Phone (705) 487-2171
Fax (705) 487,Of33
r9mOF7#6e?~ w\vw.oro-medonte..cd
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Craighurst Water Supply and Treatment System
Annual Compliance Report for 2004
Craighurst Water System supplies 51 homes with water from three (3) ground water
source wells.
Permit to Take Water Renewal #92-P-3120 for Well #'s 1, 2 and 3 was issued to the
Township of Oro-Medonte on December 14, 2001, expiring December 15, 2011. The
withdrawal of water is not to exceed 64 m3 for Well #1, 229 m3 for Well #2, and 229 m3
for Well #3, per day. The combined total of water taken from the three (3) wells is not to
exceed 229 m3 per day. The water treatment plant is to be operated to treat water at a
rate not to exceed the maximum flow rate of 458 m3 per day.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system, as per Section 1.3 of the Certificate of Approval, for the Craighurst
system. At no time during 2004 did the "maximum daily flow" exceed the Permit to Take
Water or exceed the maximum flow rate of treated water to the distribution system.
The highest "daily flow" for the year is as follows:
. Well #1 was not used in 2004
. Well #2 occurred on June 13lh at 62 m3
. Well #3 occurred on June 13th at 110 m3 , and
. To the distribution system, it was 169 m3 on June 13th.
.. ./2
n
"6 ~
Page Two
Letter to M.O.E.
Re: Craighurst - Annual Compliance Report for 2004
March 9. 2005
To ensure accuracy to within + or - 5% of flow within the range of 10% to 100% of the
full scale reading of the magnetic flow meters, Summa Engineering Limited calibrated
them on September 21, 2004.
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and sixty (260) samples were
tested for "total coliforms" and "fecal coliforms" in 2004. There were no detectable
results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 120 litres of 12% Sodium
Hypochlorite, or an average of .38 Uday, was used in the Craighurst system in 2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by GeoSpec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical results did not reveal any health related reportable exceedences during
2004. Samples obtained from the Craighurst distribution system were found to have a
Sodium level above 20 mg/L; the concentration of Sodium was 29.9 mg/L.
.. ./3
Page Three
Letter to M.O.E. -
Re: Craighurst - Annual Compliance Report for 2004
March 9. 2005
Although the aesthetic objective of Sodium in drinking water is 200 mg/L, the Medical
Officer of Health was notified that the concentration exceeded 20 mg/L.
On October 8. 2002, the Ministry of the Environment issued Amended Certificate of
Approval #7367-5E9RLK for the Craighurst Water Supply System.
On August 5, 2004, the Ministry of the Environment issued Certificate of Approval
#8826-62MNSS for the installation of the 25Kw standby generator.
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
Under Section 5, Upqradinq Requirements, all physical improvements were completed
in 2003.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROVAL"
On September 15, 2004, the Ministry of the Environment inspected the Craighurst
Water System to confirm compliance with current Regulations and to review the Permit
to Take Water and Certificate of Approval.
From this inspection, the Ministry issued nine (9) non-compliances with regulatory
requirements and actions required, which are attached as Schedule I.
"BEST PRACTICES RECOMMENDATIONS"
From the September 15, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of thirty (30)
suggestions for the operation of the Craighurst Water System.
From this list, the Township of Oro-Medonte has presently completed fourteen (14) of
these suggestions.
Any further information required with respect to this Compliance Report for the
Craighurst Water System should be directed to the undersigned at (705) 487-2171.
Sincerely,
T~P OF ORO-MEDONTE
Kei ieson, C.R.S./.
Director of Engineering and Environmental Services
KM/ps
Attachments
S~Ut..E I
Ontario Ministry of the Environment
Drinking Water System Inspection Report
ACTIONS REQUIRED
1 The Operating Authority failed to take the necessary corrective actions in response to
background colony counts greater than 200 cfu on a bacteriological analysis from a sample
collected atthe facility as required by Schedule 18-7(1) of O. Reg. 170103. The prescribed
corrective action is to immediately resample and test which includes a sample from the same
location, one upstream and one downstream. Only one resample was collected from the sample
location. No upstream sample could be collected because this sample was a treated water
sample from within the pumphouse however, no downstream sample was collected.
Action(s) Required: The Operating Authority shall take the required number of resamples in any
future adverse water quality incidents.
2 The Operating Authority has failed to fully comply with Parts 1.2, -Performance - and 2. 1 (c), (d).
Monitoring and Recording - in Certificate of Approval 7367-5E9RLK and Schedule "A" of PTIW
92"P-3120. Flow measuring devices are to be in place at the Craighurst facility which can
measure and record instantaneous flow rates in Umin and pump run times from each source
well into the treatment facility. This capability is currently not in place.
Action(s) Required: None. The Municipality is currently installing flow measuring and
recording equipment capable of measuring instantaneous flows at the Craighurst facility. It is
expected this work will be completed eariy in the new year at the latest (2005).
3 The Operating Authority has failed to sample sodium in the correct location. Schedule 6-2 of O.
Reg. 170/03 requires sodium to be sampled at the point of entry to the distribution system. The
sample collected on December 18, 2003 was collected in the distribution system.
Action(s) Required: The Operating Authority will resample for sodium at the point of entry to
the distribution system by May 31, 2008.
4 The Operating AuthOrity failed to fully document any unusual events, departures from normal
operating procedures, abnormal conditions and the times these event occurred, the lengths of
the evenls, or the actions taken at the facility as required by Section 20(5) 3, 4, 5 of O. Reg.
435/93.
Action(s) Required: The Operating Authority shall record in the facility logbooks the approximate
initial time, time et completion, cause of/for, actions taken, date, staff member(s) present, results
acMwed, and location of any operational checks, alarms, tests, repairs, unusual andlor
abnormal conditions andlor directions or adjustments made on or within the Craighurst system.
5 The Operating Authority has failed to sample for raw water turbidity once per month before any
treatment. Schedule 7-3 of O. Reg. 170/03 requires raw water turbidity to be taken from a point
before any treatment and analysed immediately once per month if the system obtains water from
a ground water source. There is no record of raw water turbidity having been analysed for the
months of June, July and August of 2003.
Action(s) Required: None. The Operating Authority is now collecting and ana lysing a raw
water turbidity sample monthly.
___M"'_'_ ,^"..n_ .,..__._~.." "___.__.... ..... '_'n___ ..._ ______ ....-.--.------..... ------, - .-..."----,-- .......-..---..,..
Report Generated for sauerph on 1/24/2005 Page 31 of36
:
Ministry of the Environment
Drinking Water System Inspection Report
The Operating Authority ha$ failed to collect samples within the time frame prescribed by
Schedule 13-6 of O. Reg. 170/03. The prescribed sampling time frame for Trihalomethanes
(THM's) is at least once every three months. In 2003, samples were taken on May 28,
September 9, and December 18 which were five months and four months apart respectively. In
2004, samples were taken on February 26, May 31 and September 14 which were four and five
rnonths apart respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed.
7 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13-7 of O. Reg. 170/03. The prescribed sampling time frame for nitrates and nitrites is
at least once every three months. In 2003, samples were taken on May 28, September 9, and
Decernber 18 which were five months and four months apart respectively. In 2004, samples
were taken on February 26, May 31 and September 14 which were four and five months apart
respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed.
8 The Operating Authority failed to ensure that water could not collect or pond around the well
casing. Section 11(11) ofO. Reg. 903/90 prescribes that in a well in which the casing extends
above the land surface, the well will not be constructed in such a manner that water can pond or
collect around the casing. Well #1 was constructed in such a way as to allow water to pond
around the ca$ing.
Action(s) Required: None. As of October 14, 2004, the Operating Authority has regraded the
sUrrounding land surface around Well #1 in such a manner that water will no longer collect or
pond around the casing.
9 The Operating Authority has failed to fully comply with Schedule 11-2 (2c) which requires that at
lea$t one distribution sampie be taken each week and tested for heterotrophic plate count.
Bacteriological samples were taken weekly from the distribution system from June 1, 2003 until
February 16, 2004 (38 weeks) which were not tested for helerotrophic plate count as required.
Action(s) Required: None. The Operating Authority now tests all distribution samples collected
from this system for heterotrophic plate count.
___~_~__~______,.___~___^'__ .,.,.,_____.____._______n..__. ______,_____ ._ M'__ ._.....__.._....__...____"._,,__. __ _ .___,m_ _".'.__'n'____________,__.__._._.____ ..m.,' _m._".____"__ __._.____..____.._._"..n.
Report Generated for sauerph on 1/24/2005 Page 32 of36
?~ q
~, ~,.___.__.__~1t.(:
i.f"
o .Ib'
~ ~
tt- ,/ '\ii',
'-'-;"'7''''
-;;;;;~-
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-08 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Harbourwood Water Supply Environmental Services
C.OFW.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~:~i~~~'R.~i.~<"..' a
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31, 2005 and available for inspection by
any member of the public without charge.
~iiNiJ!~$j~jiii:fjf> ii_
Attached is the Annual Compliance Report for 2004 for the Harbourwood Water Supply System, a
copy of which will be submitted to the Ministry of the Environment. This Report is being made
available to Council for information and confirmation that Ontario Regulation #170/03 has been
complied with by the Township of Oro-Medonte, and identifies any non-compliance issues and
Provincial Officer's Orders.
.~
IRECOMMENDATIO~{S): ' ' ,
1. THAT Report #EES2005-08 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Harbourwood Water
Supply System.
\..
Keith Mathieson
~
THE CORPORATION OFTHE
148 Line 7 S.. Box JOO
TOWN 8ft IP Oro, Ontario LOL 2XO
Phone (705) 487-2171
fax (705) 487-0133
r!!J~Of7f6echw w\vw.oro-nledonte.G\
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Harbourwood Water Supply and Treatment System
Annual Compliance Report for 2004
Harbourwood Water System supplies 131 homes with water supplied from two (2)
ground water source wells. (Well #1 has been abandoned, in accordance with Ontario
Regulation #903).
Permit to Take Water #2334-5VKS38 for Well #'s 2 and 3 was issued to the Township
of Oro-Medonte on January 29, 2004, expiring January 31, 2014, permitting 921.6 m3 ,
per day, for Well #2 or 921.6 m3, per day, for Well #3. The water treatment plant is to
be operated to treat water at a rate not to exceed the maximum flow rate of 915.8 m3 ,
per day, in total.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system, as per Section 1.3 of the Certificate of Approval, for the
Harbourwood system. At no time during 2004 did the "maximum daily flow" exceed the
Permit to Take Water or exceed the maximum flow rate of treated water to the
distribution system.
The highest "daily flow" for the year from Well #2 occurred on September 5th at 214 m3;
Well #3 occurred on June 13th at 314 m3; and to the distribution system, it was 312 m3
on June 13th.
New magnetic flow meters have been installed on Well #'s 2 and 3 to record flows from
each well, and flow to the distribution system.
.. ./2
Page Two ~
Letter to M.O.E. Re: Harbourwood - Annual Compliance Report for 2004
March 9, 2005
To ensure accuracy to within + or - 5% of actual rate of flow within the range of 10% to
100% of the full scale reading of these magnetic flow meters, Summa Engineering
Limited calibrated them on September 20, 2004.
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and sixty (260) samples were
tested for "total coliforms" and "fecal coliforms" in 2004. There were no detectable
results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 600 litres of 12% Sodium
Hypochlorite, or an average of 0.57 Uday, was used in the Harbourwood system in
2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by GeoSpec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical analysis results did not reveal any health related reportable exceedences
during 2004.
On September 19, 2002, the Ministry of the Environment issued Amended Certificate of
Approval #0500-5DVHLZ for the Harbourwood Water Supply System.
On September 8, 2004, the Ministry of the Environment issued Certificate of Approval
#7934-64FRUD for the installation of the 100Kw standby power unit.
.. ./3
Page Three
Letter to M.O.E. -
Re: Harbourwood - Annual Compliance Report for 2004
March 9, 2005
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
Under Section 5, Upqradinq Requirements, the Certificate of Approval required the
Township to have physical improvements completed, which were completed prior to the
end of 2002.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
On June 24, 2004, the Ministry of the Environment conducted an unannounced
inspection of the Harbourwood Water System to confirm compliance with current
Regulations and to review the Permit to Take Water and Certificate of Approval.
From this inspection, Provincial Officer's Order #3765-64DMJW was issued and is
attached as Schedule I.
To address this Order, the Township prepared and implemented a "Procedure for
Reporting Adverse Free Chlorine Residuals" and submitted it to the Barrie Office of the
M.O.E. on November 12, 2004.
From this inspection, the Ministry also identified five (5) other non-compliance issues
and actions required, which are attached as Schedule II.
"BEST PRACTICES RECOMMENDATIONS"
From the June 24, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of thirty-six (36)
suggestions for the operation of the Harbourwood Water System.
From this list, the Township of Oro-Medonte has presently completed eighteen (18) of
these suggestions.
Any further information required with respect to this Compliance Report for the
Harbourwood Water System should be directed to the undersigned at (705) 487-2171.
Sincerely,
Keith Mathieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
I Sa.s U\A.
I \
~
ent I
,
;;;
~ort !
! @ .'""m"'''''' Provincial Officer's Order Order Number
I ~ ' . Environment 3765-64DMJW
,
* Envitonm'ental Protection Act, R.S.O.1990, c.t 19 (EPA)
! ',Ministere de
j " ' ,'- l'Environnemeht Ontario Water Resources Act, R.S.O. 1990, Co Q. 40 (OWRA)
Pesticides Act, R.S.O. 1996, c. PH (PA)
I Ontario Safe Drinking Water Act, S.O. 2002, c.32 (SDW A)
Nutrient Management Act, 200~ 8.0. 2002, c.4
To: The Corporation of the Township of Oro- Medonte
PO Box 100
Oro, Ontario, LOL 2XO
Canada
Site: Lot: 26 ,27, Concession: 7
Oro-Medonte, County of Simcoe
Work Ordered
1. Effective immediately, the Operating Authority of the Harbourwood Water
System shall rnake the required notifcations as prescribed by Sehedule 16-4 of O.
Reg. 170/03 in the event of any observation being made which indicates that
improperly disinfected water may have been discharged to the distribution system.
2. Effective immediately, the Operating Authority of the Harbourwood Water
System shall perform all corrective actions as prescribed by Schedule 17-2 of O.
Reg. 170/03 in the event of any observation being made which indicates that
improperly disinfected water may have been discharged to the distribution system.
3. Effective immediately, the Operating Authority of the Harbourwood Water
System shall provide all required Notice(s) ofIssue Resolution within seven days
of the issue being resolved as prescribed by Sehedu1e 16-9 ofO. Reg. 170/03 in
the event of any observation being made which indicates that improperly
disinfected water may have been discharged to the distribution system.
4. Effective immediately, the Operating Authority of the Harbourwood Water
System shall ensure that abnonnal conditions, departures from normal operating
procedures, equipment taken out of or put in service, or any other unusual event
are all fully documented including times, actions taken and results achieved in the
facility logbooks as prescribed by O. Reg. 435/93, Section 20(5) and O. Reg.
128/04 Section 27(5).
Page 1 - NUMBER 3765-64DMJW
.
5 c.uEOuLL , \
SECTION 6 SUMMARY OF NON COMPLIANCE ISSUES & ACTIONS
REQUIRED
1. The Operating Authority failed to sample and test for chlorine free residual in the
distribution system on a daily basis as required by Schedule 7-2(3) ofO. Reg. 170/03.
Samples were not taken on June 1, 2003.
Action(s) Reauired: None. The Operating Authority monitoredfree chlorine residual in .
the distribution system thereafter as required.
Order Number: No Order Issued I Compliance Date: N/A
2. The Operating Authority failed to take the necessary corrective actions in response to
observed adverse conditions at the facility as required by Schedule 17-2(1),(2), of O. Reg.
170/03. Incidents occurred on September 11 and December 13/14 of 2003, and January 21
and March 27, 2004 in which the chlorine free residual analyzer malfunctioned or recorded
a value of less than 0.2 mg/L which is the concentration required by the Harbourwood CofA
(0500-5DVHLZ) at the point of entry to the distribution system.
Action(s) Reauired: The Operating Authority shall ensure that alarm situations are
promptly responded to, documented and appropriate corrective actions are carried out and
documented to ensure proper disinfection of drinking water is maintained or restored as
soon as possible.
Order Number: 3765-64DMJW I Compliance Date: Immediately "
Ii
tr'
"
Harbourwood Water Treatment Plant - MOE Inspection 2004/02/24, Page 45 ,,/fjk
'?
>,~
<:i'"
'i<.
',4'
>'1
"f,
,
,
. @ Ontario Ministry of the Environment
Drinking Water Inspection Report
3. The Operating Authority failed to report an observation that indicates improperly
disinfected water may have been directed to the distribution system as required by Schedule
16-4 ofO. Reg. 170/03. 1ncidents occurred on September 11 and December 13/14 of2003,
and January 21 and March 27, 2004 in which the chlorine free residual analyzer
malfunctioned or recorded a value of less than 0.2 mg/L which is the concentration
required by the Harbourwood CofA (0500-5DVHLZ) at the point of entry to the distribution
system.
Action{sl Required: The Operating Authority shall report as required if, upon review of
the data logger information, or any other observation, it is indicated that the continuous
chlorine free residual analyzer malfunctioned or the chlorine free residual fell below 0.2
mg/L at the Harbourwood pumphouse.
Order Number: 3765-64DMJW I Compliance Date: 1mmediately
.
4. The Operating Authority failed to record the time each Operator spent as Operator in
Charge as required by Section 18 ofO. Reg. 435/93.
Action{sl ReQuired: None. The Operating Authority now records the amount of time each
Operator serves as Operator in Charge.
Order Number: No Order Issued I Compliance Date: N/A
. Harbourwood Water Treatment Plant - MOE Inspection 2004/02/24, Page 46
,"",
@ Ontario Ministry ofthe Environment .
Drinking Water Inspection Report
5. The Operating A uthority has failed to fully comply with Parts 1.2, 1.3, -Performance - in
Certificate of ApprovaI0500-5DVHLZ. Flow measuring devices are to be in place at the
Harbourwood facility which can measure daily maximum flow rate (peak flow) from each
source well into the treatment facility. This capability is currently not in place.
Action(s) RelJuired: None. The Municipality is currently installing flow measuring and
recording equipment capable of measuring instantaneous flows at the Harbourwood
Facility. It is expected this work will be completed in the fall of 2004.
Order Number: No Order Issued I Compliance Date: December 31, 2004
6. The Operating Authority has failed to sample sodium in the correct location. Schedule
6-2 of O. Reg. 170/03 requires sodium to be sampled at the point of entry to the distribution
system. The sample collected on December 18, 2003 was collected in the distribution .
system.
Action(s) ReQuired: The Operating Authority will resample for sodium at the point of
entry to the distribution system within the next four years.
Order Number: No Order Issued I Compliance Date: May 31,2008
7. The Operating Authority failed to install the revised Operations and Maintenance
Manual in the Harbourwoodfacility by September 19,2003 as required by Section 3.9 of
CofA 0500-5DVHLZ. The manual was installed in late April or early May 2004.
Action(s) RelJuired: None. The manual is now completed and installed in the facility.
Order Number: No Order Issued I Compliance Date: N/A
.
Harbourwood Water Treatment Plant - MOE Inspection 2004/02/24, Page 47
"""'-
. @ Ontario Ministry of the Environment
Drinking Water Inspection Report
8. The Operating Authority failed to provide a notice of issue resolution including actions
taken and lor results achieved within seven (7) days or otherwise after an adverse condition
was resolved as required by Schedule 16-9(1)a,b of O. Reg. 170103. Incidents occurred on
September 11 and December 13114 of 2003, and January 21 and March 27, 2004 in which
the chlorine free residual analyzer malfunctioned or recorded a value of less than 0.2 mg/L
which is the concentration required by the Harbourwood CofA (0500-5DVHLZ) at the point
of entry to the distribution system. There were indications on these dates that improperly
disinfected water may have been directed to the distribution system which is a reportable
event as per Schedule 16-4 of O. Reg. 170103.
Action{si Required: The Operating Authority shall provide notice of issue resolution
including actions taken and results achieved to the Spills Action Centre and Simcoe County
District Health Unit within seven (7) days of an adverse condition being resolved.
Order Number: 3765-64DMJW I Compliance Date: Immediately
. 9. The Operating Authority failed to fully document any unusual events, departures from
normal operating procedures, abnormal conditions and the times these event occurred, the
lengths of the events, or the actions taken at the facility as required by Section 20(5) 3, 4, 5
ofO. Reg. 435193.
Action{si Required: The Operating Authority shall record in the facility logbook the
approximate initial time, time at completion, cause oflfor, actions taken, date, staff
member(s) present, results achieved, and location of any operational checks, alarms, tests,
repairs, unusual and/or abnormal conditions and/or directions or adjustments made on or
within the Harbourwood system.
Order Number: 3765-64DMJW I Compliance Date: Immediately
A copy of the Provincial Officer's Order and Report can be found in Appendix G.
.
Harbourwood Water Treatment Plant- MOE Inspection 2004/02/24, Page 48
~~~ q ~34
;/;.;p< ~()
I~BJ ~)
\ti ,,' ~,
~'" '.~w
, ',.-.,..~....' ,5"
~~~~2~<<#
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-09 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Horseshoe Highlands Water Environmental Services
C.OFW.: Supply and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~B1\'(0Ie(;I{Q~~: -
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31,2005 and available for inspection by
any member of the public without charge.
I1\,N~jJ~$I$~ i
Attached is the Annual Compliance Report for 2004 for the Horseshoe Highlands Water Supply
System, a copy of which will be submitted to the Ministry of the Environment. This Report is being
made available to Council for information and confirmation that Ontario Regulation #170/03 has been
complied with by the Township of Oro-Medonte, and identifies any non-compliance issues.
IRECOMMENDATION(S): ' '. -
1. THAT Report #EES2005-09 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Horseshoe
Highlands Water Supply System.
Re'~"bm;"ed
Keith Mathieson
d
THE CORPORATION OF THE
148 Line 7 5., Box 100
TOW N 6Ii IP Ora. Ontario LOL ZXO
Phone (705) 487-2! 71
Fax (705) 487,0133
-&;vOf7l6~ www.oro-mecionte.ca
March 11, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Horseshoe Highlands Water Supply and Treatment System
Annual Compliance Report for 2004
Horseshoe Highlands Water System supplies 501 units with water, which includes the
residents of the Highlands and four phases of Carriage Hills. The Highlands Golf
Course has been disconnected from this system. The water is supplied from two (2)
ground water source wells.
Permit to Take Water #0404-5UHQDN for Well #'s 1 and 2 was issued to the Township
of Oro-Medonte on January 21, 2004, expiring December 31, 2013, permitting 3,371 m3
for Well #1 and 527 m3 for Well #2 of water taking, per day. The water treatment plant
is to be operated to treat water at a rate not to exceed the maximum flow rate of 3,370
m3 per day.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system, as per Section 4.1 of the Certificate of Approval, for the Horseshoe
Highlands system. At no time during 2004 did the "maximum daily flow" exceed the
Permit to Take Water or exceed the maximum flow rate of treated water to the
distribution system.
The highest "daily flow" for the year from Well #1 and to the distribution system occurred
on June 13th at 1,375 m3. Well #2 was not in service during 2004.
On September 5, 2002, the irrigation system for the Highlands Golf Course was
disconnected from the municipal water system. Flows dropped dramatically after this.
.. ./2
-
Page Two
Letter to M.O.E.
Re: Horseshoe Highlands - Annual Compliance Report for 2004
March 11. 2005
To ensure accuracy to within + or - 5% of flow within the range of 10% to 100% of the
full scale reading of these magnetic flow meters, Summa Engineering Limited calibrated
them on September 21, 2004.
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and forty-nine (249) samples were
tested for "total coliforms" and "fecal coliforms" in 2004. There were no detectable
results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 860 litres of 12% Sodium
Hypochlorite, or an average of 2.34 Uday, was used in the Horseshoe Highlands
system in 2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by Geospec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The results of the treated samples did not reveal any health related reportable
exceedences during 2004.
On April 23, 2004, the Ministry of the Environment issued Amended Certificate of
Approval #3693-5YBP9A for the Horseshoe Highlands Water Supply System, for the
installation of pipe work and valves for flow measurement of Well #2.
.. ./3
Page Three
Letter to M.O.E.
Re: Horseshoe Highlands - Annual Compliance Report for 2004
March 11 , 2005
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
Under Section 5, Upqradinq Requirements, of the previous Certificate of Approval, the
Township was required to have physical improvements, which were completed in 2003.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
On October 27, 2004, the Ministry of the Environment inspected the Horseshoe
Highlands Water System to confirm compliance with current Regulations and to review
the Permit to Take Water and Certificate of Approval.
From this inspection, the Ministry identified thirteen (13) non-compliances with
regulatory requirements and actions required, which are attached as Schedule I.
"BEST PRACTICES RECOMMENDATIONS"
From the October 27, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of thirty-two (32)
suggestions for the operation of the Horseshoe Highlands Water System.
From this list, the Township of Oro-Medonte has presently completed seven (7) of these
suggestions.
Any further information required with respect to this Compliance Report for the
Horseshoe Highlands Water System should be directed to the undersigned at (705)
487-2171,
Sincerely,
~rp OF ORO.MEDONTE
Keith Mathieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
; Sc. I I,E/"JU!. 'h
\
@Ontario Ministry of the Environment
Drinking Water System Inspection Report
_.m._ "."__'_'__'. OLO:U:LA-ta-L\(--~ GU.t&MG ~----------
!\lQU c..OM~L.1 A.....c.t:. W 1'1'1-\
. ACTIONS REQUIRED
1 The Operating Authority failed to report orally or in written form an observation that indicates
improperly disinfected water may have been directed to the distribution system as required by
Schedules 16-4, 16-6 and 16-7 of O. Reg. 170/03. Incidents occurred on October 23 and
December 5 of 2003 and May 24 and 25 of 2004 in which the chlorine free residual analyser
recorded a value of less than 0.2 mg/L which is the concentration required by the Horseshoe
Highlands CofA's (9579-5J4R4W, 7461-5SYRLL and 3693-5YBP9A) at the point of entry to the
distribution system.
Action(s) Required: The Operating Authority shall report orally and in written format as
required if, upon review of the data logger information, or any other observation, it is indicated
that the chlorine free residual fell below 0.2 mg/L at the Horseshoe Highlands pumphouse.
2 The Operating Authority failed to take the necessary corrective actions in response to observed
adverse conditions at the facility as required by Schedule 17.2(1),(2) of O. Reg. 170/03.
Incidents occurred on October 23 and December 5 of 2003 and May 24 and 25 of 2004 in which
the chlorine free residual analyser recorded a value of less than 0.2 mg/L which is the
concentration required by the Horseshoe Highlands CofA's (9579-5J4R4W, 7461-5SYRLL and
3693-5YBP9A) at the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall ensure that alarm situations are promptly
responded to, documented and appropriate corrective actions are carried out and documented
to ensure proper disinfection of drinking water is maintained or restored as soon as possible.
. 3 The Operating Authority failed to provide a notice of issue resolution including actions taken and
lor results achieved within seven (7) days or otherwise after an adverse condition was resolved
as required by Schedule 16-9(1 )a,b of O. Reg. 170/03. Incidents occurred on October 23 and
December 5 of 2003 and May 24 and 25 of 2004 in which the chlorine free residual analyser
recorded a value of less than 0.2 mg/L which is the concentration required by the Horseshoe
Highlands CofA's (9579-5J4R4W, 7461-5SYRLL and 3693-5YBP9A) at the point of entry to the
distribution system. There were indications on these dates that improperly disinfected water
may have been directed to the distribution system which is a reportable event as per Schedule
16-4 of O. Reg. 170/03.
Action(s) Required: The Operating Authority shall provide notice of issue resolution including
actions taken and results achieved to the Spills Action Centre and Simcoe County District Health
Unit within seven (7) days of an adverse condition being resolved.
4 The Operating Authority has failed to fully comply with Parts 1.2, 1.3 -Performance - and 2.1(c),
(d) - Monitoring and Recording - in Certificate of Approval 9579-5J4R4W, Sections 4.1, 5.1 and
5.2 of CofA's 7461-5SYRLL and 3693-5YBP9A, Table "A" and Section 4.1 of PTTW 0404-
5UHQDN and Schedule"K of PTTW 94-P-3019. Flow measuring devices are to be in place at
the Horseshoe Highlands facilities which can measure and record instantaneous flow rates in
Umin and pump run times from each source well into the treatment facility. This capability is
currently not in place.
Action(s) Required: None. The Municipality is currently installing flow measuring and
recording equipment capable of measuring instantaneous flows at the Horseshoe Highlands
facility. It is expected this work will be completed early in the new year at the latest (2005),
.
~
.__......,_...__..__._____ .... __..~____,_..._ ....._...m '_'__'_~___' __,_____.._...,. __ __...._,,_._._.0'.______,._________,___.. .... ___n.'."
Report Generated for sauerph on 3/4/2005 Pnvt )~ of A"
, -4
@Ontarip +
Ministry of the Environment
Drinking Water System Inspection Report
. m__.____~"".__ ....._..___ ".______.______~___._^__..____._.__ m_..___.__.,_____.__.,,_.._______",,__,._ _m.______.._____.__.__.~_~________.__~.~_.,__._______....
5 The Operating Authority has failed to sample sodium in the correct location. Schedule 6-2 of O.
Reg. 170/03 requires sodium to be sampled at the point of entry to the distribution system. The .
sample collected on December 18, 2003 was collected in the distribution system.
Action(s) Required: The Operating Authority will resample for sodium at the point of entry to
the distribution system by May 31, 2008.
6 The Operating Authority failed to fully document any unusual events, departures from normal
operating procedures, abnormal conditions and the times these event occurred, the lengths of
the events, or the actions taken at the facility as required by Section 20(5) 3, 4, 5 of O. Reg.
435/93.
Action(s) Required: The Operating Authority shall record in the facility logbooks the approximate
initial time, time at completion, cause of/for, actions taken, date, staff member(s) present, results
achieved, and location of any operational checks, alarms, tests, repairs, unusual and/or
abnormal conditions and/or directions or adjustments made on or within the Horseshoe
Highlands system.
7 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13-6 of O. Reg. 170/03. The prescribed sampling time frame for Trihalomethanes
(THM's) is at least once every three months. In 2003, samples were taken on May 28,
September 9, and December 18 which were five months and four months apart respectively. In
2004, samples were taken on February 26, May 31 and September 14 which were four and five
months apart respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed. .
8 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13-7 of O. Reg. 170/03. The prescribed sampling time frame for nitrates and nitrites is
at least once every three months. In 2003, samples were taken on May 28, September 9, and
December 18 which were five months and four months apart respectively. In 2004, sampies
were taken on February 26, May 31 and September 14 which were four and five months apart
respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed.
9 The Operating Authority has failed to fully comply with Certificate of Approval 9579-5J4R4W.
The Municipality was required to have all required upgrades completed by July 1, 2003. An
inspection on September 2, 2004 revealed that the casing for Well 1 was not raised to O. Reg.
903/90 standards (30cm above the bottom of the pit at that time, now 40 em above ground
surface level), a shielded air vent was not installed on Well 1 and the Well 1 air vent was not
raised to within 0.15 metres of the top of the well pit in which the well is situated.
Action(s) Required: None. The issuance of CofA 7461-5SYRLL on November 12, 2003
revoked these requirements and the subsequent issuance of CofA 3693-5YBP9A did not
reinstate these requirements.
10 The Operating Authority has failed to fully comply with Part 4,1(c)i, Ii - Compliance Report - in
Certificate of Approval 9579-5J4R4W and Section 11(6)e in O. Reg. 170/03. The Municipality
was required to state any major repair expenses during the year and state any non-compliance
issues with the CofA or otherwise, known during the year. The Annual Compliance Report for .
2003 states that all CofA required upgrades were completed by the prescribed date of July 1,
2003. The required upgrades to Well 1 were not completed and have not been completed.
Report Generated for sauerph on 3/4/2005 Page 34 of 4(J
., .'
@.Ontario Ministry of the Environment
Drinking Water System Inspection Report
_____.__.____.__. .n. __.,____.,__._,_._.__'m_______._..._,_.,_._.___~m____..._____.__._______"___"__ .>.______...m._.._.___.__n__..n___._______.______..__..-..-.---...
. Action(s) Required: The Municipality no longer has to complete those CofA required upgrades
at the Horseshoe Highlands Well 1 facility due to the subsequent issuance of CofA amendments
which removed the upgrading requirements. However, The Municipality shall ensure that all
information items prescribed by Section 11(6) of O. Reg. 170103 are included in future annual
reports and are accurately reported.
11 The Operating Authority failed to ensure that a well was not constructed within the minimum
separation distance allowed between it and a sewage system as prescribed by the Building
Code (0. Reg. 403/97) as referred to by O. Reg. 903/90 Section 12(1). This Section of O. Reg.
903/90 and Sections 8.2.1.6B and 8.2.1.6C of O. Reg. 403/97 state that a well cannot be
constructed within 15m of a sewage tank or sewage distribution piping. The sewage tank
adjacent to Well 2 appears to be within 14m, and the sewage distribution piping from this tank is
within 9m of Well 2.
Action(s) Required: The Municipality shall revise the existing remedial action plans and
contingency plan procedures to include potential sewage spills around the wells in this system.
These plans shall include but not be limited to: making cleanup and remediation equipment and
supplies available, procedures for responding to and reporting of sewage spills. overflows or
leaks, procedures for the shut down of the well, remediation or abandonment of the well if
required, monitoring of the sewage tank and system integrity and procedures to correct
problems if discovered.
12 The Operating Authority failed to ensure that a well casing extended the minimum prescribed
distance above the surrounding ground surface. Section 13(14) of O. Reg. 903/90 now
prescribes that the casing must extend at least 40 cm above the highest point of the ground
surface within three metres radially. Well #1 was constructed within a 2.7m deep well pit and
the casing extends only approximately 10cm above the concrete floor of this structure. This well
. was constructed in 1988 and predates the current Well Regulation. A requirement to raise the
casing to the then required height (30cm above the floor) was included in CofA 9579-5J4R4W
issued on February 7, 2003.
Action(s) Required: None. As the well predates legislation and the requirement to raise the
casing was revoked by CofA 7461-5SYRLL, the Municipality is in compliance with their current
CofA.
13 The Operating Authority failed to ensure that a shielded and screened well vent extends above
the covering of a well pit. Sections 18(1)(b,i) and 18(1 )(d) of O. Reg. 903/90 prescribe that a
well vent must be of sufficient length to extend above the covering of a well pit and that it must
be adequately screened and shielded to prevent entry of foreign materials into the well. Well #1
was constructed within a 2.7m deep well pit and the unscreened, unshielded well vent extends
only approximately 50cm above the concrete floor of this structure. This well was constructed in
1988 and predates the current Well Regulation. A requirement to screen and shield the vent and
to raise the vent to the then required height (0.15cm below the top of the well pit) was included
in CofA 9579-5J4R4W issued on February 7,2003.
Action(s) Required: None. As the well predates legislation and the requirement to raise, screen
and shield the vent was revoked by CofA 7461-5SYRLL, the Municipality is in compliance with
their current CofA.
.
Report Generated for sauerph on 3/4/2005 Page 35 of 40
-4~
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-10 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Lake Simcoe Regional Airport Environmental Services
C.OFW.: Water Supply and Treatment
- 2004 DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
litJ~~f{1~j{~~~:/ '-
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31, 2005 and available for inspection by
any member of the public without charge.
~~N~~"~I~; -
Attached is the Annual Compliance Report for 2004 for the Lake Simcoe Regional Airport Water
Supply System, a copy of which will be submitted to the Ministry of the Environment. This Report is
being made available to Council for information and confirmation that Ontario Regulation #170/03 has
been complied with by the Township of Oro-Medonte, on behalf of the Lake Simcoe Regional Airport
Commission.
Lake Simcoe Regional Airport was not inspected by the Ministry of the Environment during 2004, as
they feel it is not within their jurisdiction.
~\J6
~RECOMMENDATION(S): ,
1. THAT Report #EES2005-1 0 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Lake Simcoe
Regional Airport Water Supply System.
,......,
R~ect!iJlly submitted,
I f /
0:t/
Keith Mathieson
c+J
I ./
J j
/
THE CORPORATION OFTHE
148 Line 7 S., Box 100
TOW N 8ft IP Ora, Ontario LOL 2XO
Phone (705) 487,2171
fax (705) 487-0133
(!j~OfJ#6eaivz/e WWW,oro-medonte,ca
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Lake Simcoe Regional Airport Water Supply and Treatment System
Annual Compliance Report for 2004
Lake Simcoe Regional Airport (L.S.A.A.) Water System supplies the Airport terminal
building and two hangers with water from two (2) ground water source wells.
Permit to Take Water #94-P-3027, issued to the Oro-Barrie-Orillia Regional Airport
Commission, authorizes the withdrawal of water, expiring March 31, 2004 for Well #2
and Well #3. A new Permit to Take Water #7458-5VKLNL was issued on January 29,
2004, expiring January 31, 2014. The withdrawal of water is not to exceed a combined
maximum of 36 m3 per day.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system, as per Section 4.1 of the Certificate of Approval, for the L.S.A.A.
system. On September 5, 2004, the Permit to Take Water was exceeded during the
filling of the fire reservoir tank at the new Weatherwise hanger.
The highest "daily flow" for the year from Well #2 occurred on September 5th at 26 m3;
Well #3 occurred on September 5th at 24 m3; and to the distribution system, it was 50 m3
on September 5th.
New magnetic flow meters were installed on Well #'s 2 and 3 to record flows from the
wells and to the distribution system.
To ensure accuracy to within + or - 5% of actual rate of flow within the range of 10% to
100% of the full scale reading of these magnetic flow meters, Summa Engineering
Limited calibrated them on September 22, 2004.
.. ./2
+
Page Two
Letter to M.O.E.
Re: Lake Simcoe Regional Airport - Annual Compliance Report for 2004
March 9. 2005
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and sixty-two (262) samples were
tested for "total coliforms" and "fecal coliforms", and one hundred and four (104) tests
for HPC in 2004. There were no detectable results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 40 litres of 12% Sodium
Hypochlorite, or an average of 0.07 Uday, was used in the L.S.R.A. system in 2004.
Four hundred and nineteen (419) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by Geospec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The results of the treated samples did not reveal any health related reportable
exceedences during 2004.
On November 12, 2003, the Ministry of the Environment issued Amended Certificate of
Approval #0644-5T6RGB for the L.S.RA Water Supply System.
.. ./3
~
Page Three
Letter to M.O.E.
Re: Lake Simcoe Regional Airport - Annual Compliance Report for 2004
March 9, 2005
On June 15, 2004, the Ministry of the Environment issued Certificate of Approval #4676-
5ZXKLS for the installation of the standby power unit
The Ministry of the Environment did not inspect the L.S.A.A. Water Supply System in
2004.
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
Under Section 5, Upqradinq Requirements, the Certificate of Approval required the
Township to have physical improvements (a list of which may be received upon request)
completed by December 31, 2002. The Tender for these upgrades was awarded to
Midland Mechanical in August, 2002. All upgrades were completed prior to December
31,2002.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROVAL"
The L.S.R.A. Water Supply System was not inspected in 2004.
Any further information required with respect to this Compliance Report for the Lake
Simcoe Regional Airport Water System should be directed to the undersigned at (705)
487-2171.
Sincerely,
TO~ OF ORO-MEDONTE
Keith Mathieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
~
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-11 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Maplewood Water Supply Environmental Services
C.OFW.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~tJ~Cl{(;!I{()PNI): -
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31, 2005 and available for inspection by
any member of the public without charge.
tA.NA.~}r$~$: -
Attached is the Annual Compliance Report for 2004 for the Maplewood Water Supply System, a copy
of which will be submitted to the Ministry of the Environment. This Report is being made available to
Council for information and confirmation that Ontario Regulation #170/03 has been complied with by
the Township of Oro-Medonte, and identifies any non-compliance issues and Provincial Officer's
Orders.
~RECOMMENDATION(S): -
1. THAT Report #EES2005-11 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Maplewood Water
Supply System.
Re~':submitted,
W
Keith Mathieson
(\~
I
I
~
THE CORPORATION OF THE
148 Line 7 S.. Box 100
TOWN8Ii IP Ora, Ontario LOL 2XO
Phone (705) 487~2! 7 J
Fax (7051487,0133
r!!JmOF7I6~t/e www.oro-medonte.ca
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Maplewood Water Supply and Treatment System
Annual Compliance Report for 2004
Maplewood Water System supplies 47 homes with water from one (1) ground water
source well.
Permit to Take Water #02-P-1314, issued to the Township of Oro-Medonte for Well #1,
authorizes the withdrawal of water, expiring October 31,2012. The withdrawal of water
is not to exceed 163 m3 per day.
Certificate of Approval #1546-5E4L9F, Section 1.3, requires that the water treatment
plant is operated to treat water at a rate not to exceed the maximum flow rate of 163.7
m3 per day.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system for the Maplewood system. At no time during 2004 did the
"maximum daily flow" exceed the Permit to Take Water or exceed the maximum flow
rate of treated water to the distribution system.
The highest "daily flow" for the year from Well #1 occurred on July 26th at 76 m3, and to
the distribution system, it was 150 m3 on June 13th.
New magnetic flow meters were installed to measure flow from Well #1, and flow to the
distribution system.
.. ./2
Page Two ~
Letter to M.O.E.
Re: Maplewood - Annual Compliance Report for 2004
March 9, 2005
To ensure accuracy to within + or - 5% of flow within the range of 10% to 100% of the
full scale reading of these magnetic flow meters, Summa Engineering Limited calibrated
them on September 20, 2004.
WATER QUALITY
Bacteriological samples were taken weekly from the well, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in OrilJia. Two hundred and ten (210) samples Were
tested for "total coliforms" and "fecal coliforms", and one hundred and nine (109) tests
for HPC in 2004. There were no detectable results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was avaifable in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 205 litres of 12% Sodium
Hypochlorite, or an average of 0.59 Uday, was used in the Maplewood system in 2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ASS 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by Geospec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical analysis results did not reveal any health related reportable exceedences
during 2004.
On September 23, 2002, the Ministry of the Environment issued Amended Certificate of
Approval #1546-5E4L9F for the Maplewood Water Supply System.
On August 5, 2004, the Ministry of the Environment issued Certificate of Approval
#9306-62LPAJ for the installation of the standby power unit.
.. ./3
Page Three
Letter to M.O.E.
Re: Maplewood - Annual Compliance Report for 2004
March 9, 2005
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROVAL"
Under Section 5, Uparadina Reauirements, the Certificate of Approval required the
Township to have physical improvements (a list of which may be received upon request)
completed by June 30, 2003. The final improvement was completed on April 2, 2004
(all required upgrades have been completed).
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
On August 1 0, 2004, the Ministry of the Environment conducted an unannounced
inspection of the Maplewood Water System to confirm compliance with current
Regulations and to review the Permit to Take Water and Certificate of Approval.
From this inspection, Provincial Officer's Order #8434-66ZS7Z was issued and is
attached as Schedule I.
The required additional flow meter was installed by Township staff on January 20, 2005
and written notification was sent to the M.O.E. Barrie Office on January 20, 2005 to
satisfy this Order.
From this inspection, fourteen (14) non-compliances with regulatory requirements and
actions required were identified and are attached as Schedule II.
"BEST PRACTICES RECOMMENDATIONS"
From the August 10, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of thirty-eight (38)
suggestions for the operation of the Maplewood Water System.
From this list, the Township of Oro-Medonte has presently completed fourteen (14) of
these suggestions.
Any further information required with respect to this Compliance Report for the
Maplewood Water System should be directed to the undersigned at (705) 487-2171.
Sincerely,
T~HIP OF ORD-MEOONTE
Kel athleson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
Sc.uE.Cu&.L t
.
@..."MinistryOfthe..",orderNumber
Environment PrOVInCIal Officer s Order 8434-66Z87Z
'CO M',' . d EnVironmental Protection Act, R.S.O.199Q, c.E 19 (EPA)
...'1. .... mlstere e Ontario Water Resources Ac4 R.S.O.1990, c. O. 40 (OWRA)
l'Env;ronnement Pesticides Act, R.S.O. 1990, c. Pll (P A)
o nta ri 0 Sare Drinldng Water Act, S.Q. 2002, c.32 (SDW A)
Nutrient Management Act, 2002, 8.0. 2002, c.4
To: The Corporation of the Township of Oro-Medonte
PO Box 100
Oro, Ontario, LOL 2XO
Canada
Site: Lot: 20, 21, Concession: 1
Oro- Medonte, County of Simcoe
Work Ordered
. I, The Operating Authority of the Maplewood Wate'r System shall ensure that
the treated water flow measuring device(s) at the Maplewood facility provides an
accurate representation of the flow directed to the distribution system as
prescribed by Certificate of Approval (1546-5E4L9F) by February 28,2005, or,
submit a complete application to amend Certificate of Approval 1546-5E4L9F to
the Director of Environmental Licencing and Approvals Branch, 2 St. Clair
Avenue West, Toronto to have the requirement for a treated water flow meter
removed ftorn Certificate of Approval I 546-5E4L9F for the Maplewood Water
System. A copy of this Provincial Officer Order shall be included with the
application. The application shall include the appropriate fees and be complete to
the satisfaction of the Director. Submit the application by February 15, 2005.
2. Submit written notice to the undersigned that the work required by option I
of Work Ordered Item #1 has been completed or provide a copy of the application
required by option 2 of Work Ordered Item #1 to the undersigned by March 15,
2005.
A.
While this Order is in effect, a copy or copies of this order shall be posted in a conspicuous
place.
. B.
While this Order is in effect, report in writing, to the District or Area office, any significant
Page 1 - NUMBER 8434-66Z512
. changes of operation, emission, ownership, tenancy or other legal status of the facility or
operation.
This Order is being issued for the reasons set out in the annexed Provincial Officers Report
which forms part of this Order.
Issued at Oro- Medonte this 17th day of January, 2005.
1ilJL---,
Phillip Sauer. 10
Badge No: 10
Barrie District Office
Tel: (705) 739-6441
.
.
Page 2 - NUMBER 8434-66ZS7Z
. APPEALIREVIEW INFORMATION
REQ1JEST FOR REVIEW
You may request that this order be reviewed by the Director. Your request must be made in 'Writing (or ora]ly with vnitten
confmnation) within seven days of service of this order and sent by mail or fax to the Director at the address below. In the
'Written request or written confirmation yoli must,
. specify the portions of this order that you wish to be reviewed;
. incJude any submissions to be considered by the Director with respect to issuance of the order to you or any other person
and with respect to the contents of the order;
. apply for a slay of !his order, if necessary; and provide an address for service by one of !he fo!lowing means:
Lman 2. fax
The Director may confirm, alter or revoke this order. If this order is revoked by the Director, you will be notified in writing. If
this order is confinned or amended by order of the Director, the Director's order will be served upon you. The Director's order
will include instructions for requiring a hearing before the Environmental Review Tribunal.
DEEMED CONFIRMATION OF TillS ORDER
If you do not receive ora] or written notice of the Director's decision within seven days of receipt of your request, this order is
deemed to be confmned by order of the Director and deemed to be served upon you.
You may require a hearing before the En:vironmental Review Tribunal if, within 15 days of service of the confinning order
deemed to have been made by the Director, you serve written notice of your appeal on the Environmental Review Tribunal and
the Director. Your notice must state the portions of the order for which a heariDg is required and the grounds on which you
intend to rely at the bearing. Except by leave of the Environmental Review Tribunal, you are not entitled to appeal a portion of
the order or to rely on grounds of appeal that are not sta.ted in the notice requiring the hearing. Unless stayed by the
EnvironmentaJ Review Tribunal. the order is effective from the date of service.
. Written notice requiring a hearing must be served personally or by mail upon:
Tbe Secretary and Director (provincial Officer Orders)
Environmental Review Tribunal Ministry of the Environment
P.O. Box 2382 Barrie District Office
2300 Yonge Streel, Suite 120! 1203-54 Cedar Poinle Dr
Toronto, ON M4P 1E4 Barrie ON IAN 5R 7
Fax: (705)739-6440
Te1: (705)739-6441
VVhere service is made by mail, it is deemed to be made on the fIfth day after the date of mailing and the time for requiring a
hearing is not extended by choosing service by mail.
Further infonnarion on the Environmental Review Tribunal's requirements for an appeal can be obtained directly from the
TribunaJ by:
Tel: (416) 314-4600 Fax: (4]6) 3!4-4506 www.ert.Qov.on.ca
FOR YOUR INFORMA noN
. Un)ess stayed by the Director or the Environmental Review Tribunal> this order is effective from the date of service.
Non-compliance with the requirements of this order constitutes an offence.
. The requirements of thjs order are minimum requirements only and do not relieve you from complying with the following:
. any app1icab!e federaJ1egis!ation;
. any appHcable provincial requirements that are not addressed in the order; and
. any applicable municipal law.
. The requirements of this order are severable. If any requirement of this order or the application of any requirement to any
circumstance is held invalid, the application of such requirement to other circumstances and the remainder of the order are
not affected.
. Further orders may be issued in accordance with the legislation as circumstances require.
. The procedures to request a review by the Director and other information provided above are intended as a guide. The
. legislation should be consulted for additional details and accurate reference.
Page 3 - NUMBER 8434-66ZS7Z
, SClMbu\E. \\
@ Ontario Ministry of the Environment
Drinking Water System Inspection Report
..._._.___.__,.___~_,._.._,_._,,________.___."_.._"..,_.._.' .__m...._ m._'_. ... ... ...__._.. . .....a m.__.'_...._..._._.._._._ mo. ..._......__. .....om__. . ......__._.___ .. ......_.om_m._______._.______..__.__....__......._m......_
. ACTIONS REQUIRED
1 The Operating Authority failed to sample and test for chlorine free residual in the distribution
system on a daily basis as required by Schedule 7-2(3) of O. Reg. 170/03. Samples were not
taken on June 1, 2003 and April 2, 2004.
Action(s) Required: None. The Operating Authority monitored free chlorine residual in the
distribution system thereafter as required.
2 The Operating Authority failed to report orally or in written form an observation that indicates
improperly disinfected water may have been directed to the distribution system as required by
Schedules 16-4, 16-6 and 16-7 of O. Reg. 170/03. Incidents occurred on July 8, 9 and August 8
of 2003, and March 28, April 15, 16, May 11, 12, 25, 26, 27, and 29, of 2004 in which the
chlorine free residual analyzer recorded a value of less than 0.2 mg/L which is the concentration
required by the Maplewood CofA (1546-5E4L9F) at the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall report orally and in written format as
required if, upon review of the data logger information, or any other observation, it is indicated
that the chlorine free residual fell below 0.2 mg/L at the Maplewood pumphouse.
3 The Operating Authority failed to take the necessary corrective actions in response to observed
adverse conditions at the facility as required by Schedule 18-2(1 ),(2),(3) of O. Reg. 170/03.
Incidents occurred on JUly 8, 9 and August 8 of 2003, and March 28, April 15, 16, May 11, 12,
25, 26, 27, and 29 of 2004 in which the chlorine free residual analyzer recorded a value of less
than 0.2 mg/L which is the concentration required by the Maplewood CofA (1546-5E4L9F) at the
. point of entry to the distribution system.
Action(s) Required: The Operating Authority shall ensure lhat alarm situations are promptly
responded to, documenled and appropriate corrective actions are carried out and documented
to ensure proper disinfection of drinking water is maintained or restored as soon as possible.
4 The Operating Authority failed to provide a notice of issue resolution including actions taken and
lor results achieved within seven (7) days or otherwise after an adverse condition was resolved
as required by Schedule 16-9(1 )a,b of O. Reg. 170/03. Incidents occurred on July 8, 9 and
August 8 of 2003, and March 28, April 15, 16, May 11, 12,25,26,27, and 29 of 2004 in which
the chlorine free residual analyzer recorded a value of less than 0.2 mglL which is the
concentration required by the Maplewood CofA (1546-5E4L9F) at the point of entry to the
distribution system. There were indications on these dates that improperly disinfected water
may have been directed to the distribution system which is a reportable event as per Schedule
16-4 of O. Reg. 170/03.
ACtion(s) Required: The Operating Authority shall provide notice of issue resolution including
actions taken and results achieved to the Spills Action Centre and Simcoe' County District Health
Unit within seven (7) days of an adverse condition being resolved.
.
__._._.........____.__,_............ ""H .... ...._. _.___ _"U"_'_n'_'__'____'_ -....--.'-.-.-..-.--- ._m_____ -.-----.. ...'.- .--....--,,-.-- .'.--.--- ---_.'--
Report Generated for sauerph on 1/17/2005 Page 29 of36
~
tG7\ 0 . Ministry of the Environment
~ ntano Drinking Water System Inspection Report
.._..__..... ..__...__...._..___......_____..____..........._..__......._n.__.......__,__._ ...._...._.~'..'....m.._...._..__.._ .m .....m........_ ..............__..__........._.._....___............._.._m....__.........,._.._'.....m__._~_.,.._...._._,.....____..._.._......__.__. ..-...........
5 The Operating Authority has failed to fully comply with Parts 1.2, -Performance - and 2.1(c), (d)-
. Monitoring and Recording - in Certificate of Approval 1546-5E4L9F and Schedule "A" of PTIW
02"P-1314. Flow measuring devices are to be in place at the Maplewood facility which can
measure and record instantaneous flow rates in Umin and pump run times from each source
well into the treatment facility. This capability is currently not in place.
Action(s) Required: None. The Municipality is currently installing flow measuring and
recording equipment capable of measuring instantaneous flows at the Maplewood facility. It is
expected this work will be completed in early 2005.
6 The Operating Authority has failed to fully comply with Part 2.1 a(lI) - Monitoring and Recording -
in Certificate of Approval 1546-5E4L9F. Flow measuring devices are to be in place at the
, Maplewood facility which can measure and record instantaneous flow rates in Umin of treated
water supplied to the distribution system. Currently, the treated water flow meter records flows
to the distribution system, water wasted to the outside of the facility and any water returned to
the reservoir through the pressure relief valve.
Action(s) Required: The Operatin9 Authority shall install the treated water flow meter in such a
manner that only water entering the distribution system is measured. This work shall be
completed by February 28, .2005. Provincial Officer's Order #8434-662S72 has been issued for
this item.
7 The Operating Authority has failed to sample sodium in the correct location. Schedule 6-2 of O.
Reg. 170/03 requires sodium to be sampled at the point of entry to the distribution system. The
sample collected on December 18, 2003 was collected in the distribution system.
. Action(s) Required: The Operating Authority will resample for sodium at the point of entry to
the distribution system by May 31,2008.
8 The Operating Authority failed to fully document any unusual events, departures from normal
operating procedures, abnormal conditions and the times these event occurred, the lengths of
the events, or the actions taken at the facility as required by Section 20(5) 3, 4, 5 of O. Reg.
435/93.
Action(s) Required: The Operating Authority shall record in the facility logbooks the approximate
initial time, time at completion, cause of/for, actions taken, date, staff member(s) present, results
achieved, and location of any operational checks, alarms, tests, repairs, unusual andlor
abnormal conditions and/or directions or adjustments made on or within the Maplewood system.
9 The Operating Authority has failed to sample for raw water turbidity once per month before any
treatment. Schedule 7-3 of O. Reg. 170103 requires raw water turbidity to be taken from a point
before any treatment and analyzed immediately once per month if the system obtains water from
a ground water source. There is no record of raw water turbidity having been analyzed for the
months of June, July and August of 2003.
Action(s) Required: None. The Operating Authority is now collecting and analysing a raw
water turbidity sample monthly.
.
._,__..__.._..__..,__.._.___...,__._....,....,,__...__.__'~..._... ....__.._..____.,........__.__.._~_._ ............ .,_,n_..__' ...._m_n__ ...._n.. m.._._....___........._._...._ n. . ..... ........_.. ....m.........._. ....... .... ....- .". . .-.....
Report Generated for sauerph on 1/17/2005 Page 30 of 36
@ 0 . Ministry of the Environment
,.,!."..._~!~~I.~_. ",.'...,."",..,.......,., ..""", .'", ,.,~r~~ki~~~~~~r~!.':~~~.'I1.':~~~tio.n~~~~rt
. 10 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13.6 of O. Reg. 170103. The prescribed sampling time frame for Trihalomethanes
(THM's) is at least once every three months. In 2003, samples were taken on May 28,
September g, and December 18 which were five months and four months apart respectively. In
2004, samples were taken on February 26 and May 31 which were four months apart.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed. The sampling program has been modified to
meet this requirement.
11 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13-7 of O. Reg. 170103. The prescribed sampling time frame for nitrates and nitrites is
at least once every three months. In 2003, samples were taken on May 28, September 9, and
December 18 which were five months and four months apart respectively. In 2004, samples
were taken on February 26 and May 31 which were four months apart.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed. The sampling program has been modified to
mE>et this requirement.
12 The Operating Authority has failed to fully comply with Certificate of Approval 1546-5E4L9F. The
Municipality was required to have all required upgrades completed by June 30, 2003.
Documents revealed that the High Lift Pump lockout controls were only installed on April 2,
2004.
. Action(s) Required: None. The Municipality has now completed all of the CofA required
upgrades at the Maplewood facility.
13 The Operating Authority has failed to fully comply with Part 4.1 (c)i, Ii - Compliance Report - in
Certificate of Approval 1546-5E4L9F and Section 11(6)e in O. Reg. 170103. The Municipality
was required to state and major repair expenses during the year and state any non-compliance
issues known during lhe year. The Annual Compliance Report for 2003 states that all CofA
required upgrades were completed by the prescribed date of June 30, 2003. The required
upgrades were completed on April 2, 2004.
Action(s) RE>quired: The Municipality has now completed all of the CofA required upgrades at
the Maplewood facility but shall ensure that all information items prescribed by Section 11 (6) of
O. Reg. 170103 are included in future annual reports.
14 The Operating Authority has failE>d to fully comply with Schedule 11-2 (2c) which requires that at
least one distribution sample be taken each week and tesled for heterotrophic plate count.
Bacteriological samplE>s were taken from the distribution system on the dates of June 2, 11 and
17 of 2003 but were not tested for heterotrophic plate count as required.
Action(s) Required: None. The Operating Authority now lests all distribution samples collected
from this system for heterotrophic plate count.
.
.... .' "-~-_._.._.-----.._-.._".- """ ._...___'.... h',_ .___,__________..m..._"'"_... ______.."._.,_, ______._......m.._.___.....-.______. .....-".---.
Report Generated for sauerph on 1/17/2005 Page 31 of36
~~~
'i"2:-:R1~ ~~"%
)No - '. ...
.....', ,,,,' -@
!,'f \__~ _ ~,_
l~ U70'CC=) ,
",' S::c:c'..#
~3:'i~
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-12 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Medonte Hills Water Supply Environmental Services
C. OF W.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~~~~~G:~~\'.iNJ:j;md"
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31,2005 and available for inspection by
any member of the public without charge.
1~l'1~tB'\"$t$; ,
Attached is the Annual Compliance Report for 2004 for the Medonte Hills Water Supply System, a
copy of which will be submitted to the Ministry of the Environment. This Report is being made
available to Council for information and confirmation that Ontario Regulation #170/03 has been
complied with by the Township of Oro-Medonte, and identifies any non-compliance issues.
I RECOMMENDA TION(S): .;"..,.,>.<>".,;.,.".;.,.;,...>;.;:-:,.....,>:.......c., -
....... .......<.<>......,."..(/.
1. THAT Report #EES2005-12 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Medonte Hills Water
Supply System.
Resp~ submitted,
/' j
/ \ /
/ \ /
K~ieson
THE CORPORATION OFTHE
148 Line 7 S.. Box 100
TO WN 8Ii IP Oro. Ontario LOL 2XO
Phone (705) 487-2171
fax 1705) 487,0133
r!!J~OfJ#6eafu/e www.oro-medonte.ca
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Medonte Hills Water Supply and Treatment System
Annual Compliance Report for 2004
Medonte Hills Water System supplies 136 homes with water from two (2) ground water
source wells.
Permit to Take Water #92-P-3029 was issued to the Township of Oro-Medonte
authorizing the withdrawal of water, expiring December 15, 2011, for Well #1 and Well
#2. The withdrawal of water is not to exceed 327 m3from Well #1 and 393 m3 from Well
#2 per day.
The water treatment plant is to be operated to treat water at a rate not to exceed the
maximum flow rate of 393 m3, per day, as per Section 1.4 of the Certificate of Approval.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system for the Medonte Hills system. At no time during 2004 did the
"maximum daily flow" exceed the Permit to Take Water or exceed the maximum flow
rate of treated water to the distribution system.
The highest "daily flow" for the year from Well #1 occurred on April 15th at 110m3; Well
#2 occurred on June 13th at 143 m3; and to the distribution system, it was 232 m3 on
June 13th
To ensure accuracy to within + or - 5% of flow within the range of 10% to 100% of the
full scale reading of these magnetic flow meters, Summa Engineering Limited calibrated
them on September 20th, 2004.
.. ./2
~~ \
Page Two
Letter to M.O.E.
Re: Medonte Hills - Annual Compliance Report for 2004
March 9, 2005
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and fifty-eight (258) samples were
tested for "total coliforms" and "fecal coliforms" in 2004. There were no detectable
results in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 220 litres of 12% Sodium
Hypochlorite, or an average of 0.68 Uday, was used in the Medonte Hills system in
2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by Geospec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical analysis results did not reveal any health related reportable exceedences
during 2004.
On October 23, 2002, the Ministry of the Environment issued Amended Certificate of
Approval #9463-5F5N9K for the Medonte Hills Water Supply System.
.. ./3
-
Page Three
Letter to M.O.E.
Re: Medonte Hills - Annual Compliance Report for 2004
March 9. 2005
On August 5, 2004, the Ministry of the Environment issued Certificate of Approval
#7566-62MPJJ for the installation of the standby power unit.
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
Under Section 5, Upqradinq Requirements, the Certificate of Approval required the
Township to have physical improvements completed, which were completed prior to the
end of 2003.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
On October 27, 2004, the Ministry of the Environment conducted an announced
inspection of the Medonte Hills Water System to confirm compliance with current
Regulations and to review the Permit to Take Water and Certificate of Approval.
From this inspection, eleven (11) non-compliances with regulatory requirements and
actions required were noted and are attached as Schedule I.
"BEST PRACTICES RECOMMENDATIONS"
From the October 27, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of twenty-five (25)
suggestions for the operation of the Medonte Hills Water System.
From this list, the Township of Oro-Medonte has presently completed nine (9) of these
suggestions.
Any further information required with respect to this Compliance Report for the Medonte
Hills Water System should be directed to the undersigned at (705) 487-2171.
TO
Keith athieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
r\
. 't
~011 . ,'>" , Ministry of the Environment
...~"'. · '. ," ,;tartc> Drinking Water System Inspection Report
.____,_,..__.__....__"._.__.__..__......_.__...__._".______.__,__._...__......_..._m...____..._m........__.____."'.,.__...._.,_.__...__.__.._,__._....__.._._.__u__...___m__n_.._....______..__._.__._n.._.___..._.m..n......_._..m__.__.._..._.....
. ACTIONS REQUIRED Se4W~ \
1 The Operating Authority failed to report orally or in written form an observation that indicates
improperly disinfected water may have been directed to the distribution system as required by
Schedules 16-4, 16-6 and 16-7 of O. Reg. 170103. Incidents occurred on November 10,16,
December 7,17,19,20 and 29 of 2003, and January 1, 3, 7, 8, 10, 17,20,21,23,24,26,27,
April 1 and August 1 of 2004, in which the chlorine free residual, analyser recorded a value of
less than 0.2 mg/L which is the concentration required by the Medonte Hills CofA (9463-
5F5N9K) at the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall report orally and in written format as
required if, upon review of the data logger information, or any other observation, it is indicated
that the chlorine free residual fell below 0.2 mg/L at the Medonte Hills pumphouse.
2 The Operating Authority failed to take the necessary corrective actions in response to observed
adverse conditions at the facility as required by Schedule 17-2(1),(2) of O. Reg. 170103.
Incidents occurred on November 10, 16, December 7,17,19,20 and 29 of 2003, and January 1,
3, 7, 8, 10, 17, 20, 21, 23, 24, 26, 27, April 1 and August 1 of 2004, in which the chlorine free
residual analyser recorded a value of less than 0.2 mg/L which is the concentration required by
the Medonte Hills CofA (9463-5F5N9K) at the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall ensure that alarm situations are promptly
responded to, documented and appropriate corrective actions are carried out and documented
as per Schedule 17-2 of O. Reg. 170103 to ensure proper disinfection of drinking water is
maintained or restored as soon as possible.
. 3 The Operating Authority failed to provide a notice of issue resolution including actions taken and
lor results achieved within seven (7) days or otherwise after an adverse condition was resolved
as required by Schedule 16-9(1)a,b ofO. Reg. 170/03. Incidents occurred on November 10,16,
December 7,17,19,20 and 29 of 2003, and January 1, 3, 7, 8, 10, 17, 20, 21, 23, 24, 26, 27,
April 1 and August 1 of 2004 in Which the chlorine free residual analyser malfunctioned or
recorded a vaiue of less than 0.2 mg/L which is the concentration required by the Medonte Hills
CofA (9463-5F5N9K) at the point of entry to the distribution system. There were indications on
these dates that improperly disinfected water may have been directed to the distribution system
which is a reportable event as per Schedule 16-4 of O. Re9. 170103.
Action(s) Required: The Operating Authority shall provide notice of issue resolution including
actions taken and results achieved to the Spills Action Centre and Simcoe County District Health
Unit within seven (7) days of an adverse condition being resolved.
4 The Operating Authority failed to take the necessary corrective actions in response to total
coliform counts greater than 0 cfu on a bacteriological analysis from a sample collected in the
system as required by Schedule 17-6 ofO. Reg. 170103. The prescribed corrective action is to
immediately resample and test which includes a sample from the same location, one upstream
and one downstream. The resample which was supposed to be from the location was taken
from a different location. This resample also produced a positive result which requires two
further consecutive clear resample sets taken 24 to 48 hours apart. Only one set of resamples
was taken and it was again taken from a different location than the original.
Action(s) Required: The Operating Authority shall take the required number of resamples from
the required locations in any future adverse water quality incidents.
.
____..___._.__._____n...___________._____...___m._________.__....._.._._________".__.__....____.___.___..m.__n_....,._._..__.____..__,__..__,_._._...__.,_.___..__.,__~.-,--,---."-,--,----,,-..
Report Generated for sauerph on 217/2005 Page 31 of37
-------------.----------------- - -- -- -- - ----~---- ~--- -
(1
au, -
[1~ ' ' " '. ,',' ",. ,'" , " Ministry of tne Environment
)~,__91}!~f!f' ________________________ ,___~r!~~~~_~_~~t~~~~~~~_I~~~~c:tion_Re~~~
5 ljIe =tinJ~haity l>~ ~d to fully comply with Parts 1.2, 1.3 -Performance - and 2.1 (d) -
loni I ~.cGertificate of Approval 9463-5F5N9K and Schedule "A" of PTIW .
92-P-3029. Flow measurin9 devices are to be in place at the Medonte Hills facilities which can
measure and record instantaneous flow rates in Umin and pump run times from each source
well into the treatment facility. This capability is currently not in place.
Action(s) Required: None. The Municipality is currently installing flow measurin9 and
recording equipment capable of measurin9 instantaneous flows at the Medonte Hills facility. It is
expected this work will be completed early in the new year at the latest (2005).
6 The Operating Authority has failed to sample sodium in the correct location. Schedule 6-2 of O.
Reg. 170/03 requires sodium to be sampled at the point of entry to the distribution system. The
sample collected on December 18, 2003 was collected in the distribution system.
Action(s) Required: The Operating Authority will resample for sodium at the point of entry to
the distribution system by May 31, 2008.
7 The Operating Authority failed to fully document any unusual events, departures from normal
operating procedures, abnormal conditions and the times these events occurred, the lengths of
the events, or the actions taken at the facility as required by Section 20(5) 3, 4, 5 of O. Reg.
435/93.
Action(s) Required: The Operating Authority shall record in the facility logbooks the approximate
initial time, time at completion, cause of/for, actions taken, date, staff member(s) present, results
achieved, and location of any operational checks, alarms, tests, repairs, unusual and/or
abnormal conditions and/or directions or adjustments made on or within the Medonte Hills
system. .
8 The Operating Authority has failed to sample for raw water turbidity once per month before any
treatment. Schedule 7-3 of O. Reg. 170/03 requires raw water turbidity to be taken from a point
before any treatment and analysed immediately once per month if the system obtains water from
a ground water source. There is no record of raw water turbidity having been analysed for the
month of August of 2003.
Action(s) Required: None. The Operating Authority is now collecting and analysing a raw
water turbidity sample monthly.
9 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13-6 of O. Reg. 170/03. The prescribed sampling time frame for Trihalomethanes
(THM's) is at least once every three months. In 2003, samples were taken on May 28,
September 9, and December 18 which were five months and four months apart respectively. In
2004, samples were taken on February 26, May 31 and September 14 which were four and five
months apart respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed.
.
_._-_.._-_._---,._--,----_.._----~-----'_._---_.._----._.._.,._.~----- ._----------------~--_._--_._-,-----_..._-_.
Report Generated for sauerph on 2/7/2005 Page 32 of37
. -
(~i!Jo ...' ,," ,. ,.. .j;."... Ministry of the Environment
~> .'., ,." .". ntql"'tP Drinking Water System Inspection Report
_.......__.N.._...___..________.._._.".__..______.._________.___....._.....__...__....__.____._._.._____.....______........_.____..,_~____._.._..__.__.._._"____..___,._,_____,..___.__n__m...
10 The Operating Authority has failed to collect samples within the time frame>prrscribed by
. Schedule 13-7 of O. Reg. 170103. The prescribed sampling time frame for nitrates and nitrites is
at least once every three months. In 2003, samples were taken on May 28. September 9, and
December 18 which were five months and four months apart respectively. In 2004, samples
were taken on February 26, May 31 and September 14 which were four and five months apart
respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed.
11 The Operating Authority has failed to fully comply with Special Condition 16 of PTTW 92-P-3029.
Static water levels are to be taken and recorded monthly for each well. No static water levels
were taken for either Well 1 or 2 in August of 2003.
Action(s) Required: None. The Municipality has taken all required static water levels since that
date.
.
.
..---.-.-.--.---.--,-------.----.--.---.---.--.-----..--.--...-----...-.-----....-.--.---.--.-----.---..-----..-......-.-...---.--.....-----.-...--.
Report Generated for sauerph on 2f71200S Page 33 Df3?
~~
('rJ~)
:!}'v-/, ~
" ~~7
'-;~"'~~"'-'''~'--'
~3j:~~
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-14 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Shanty Bay Water Supply Environmental Services
C.OFW.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
li~~GIe~I{OUN~: ,
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31, 2005 and available for inspection by
any member of the public without charge.
~~N~Is\"$~S; . -
Attached is the Annual Compliance Report for 2004 for the Shanty Bay Water Supply System, a copy
of which will be submitted to the Ministry of the Environment. This Report is being made available to
Council for information and confirmation that Ontario Regulation #170/03 has been complied with by
the Township of Oro-Medonte, and identifies any non-compliance issues and Provincial Officer's
Orders.
Four (4) days during the year of 2004, the Township exceeded their Permit to Take Water. Two days
was a result of watering sod and hydro seeding in the ditches of the new Arbourwood Subdivision.
I RECOMMENDA TJON(S): ,
1. THAT Report #EES2005-14 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Shanty Bay Water
Supply System.
Re~~lIy submitted,
/ \ )
~cY/
~ ~athieSOn
\
THE CORPORA liON OF THE
148 Line 7 S., Box 100
TO WN C) Ii I P Ora. Ontario LOL ZXO
Phone (705) 487-2171
Fa.x (705) 487-0133
(!!t~Of J~~ www.oro-medonte.ca.
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Shanty Bay Water Supply and Treatment System
Annual Compliance Report for 2004
Shanty Say Water System supplies 112 homes and the Shanty Bay Public School with
water from three (3) ground water source wells.
Permit to Take Water #03-P-1050 was issued to the Township of Oro-Medonte on June
9,2003, expiring June 15, 2013, for Well #'s 1, 2 and 3, authorizing the withdrawal of
water. The withdrawal of water is not to exceed 305 m3 for Well #'s 1 and 2, and 610
m3 for Well #3, per day. The water treatment plant is to be operated to treat water at a
rate not to exceed the maximum flow rate of 610 m3 per day.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system, as per Section 1.3 of the Certificate of Approval, for the Shanty Say
system. On four (4) occasions durin~ 2004, the Permit to Take Water was exceeded for
Well #2, being June 13th at 317 m , August 23rd at 306 m3, August 24lh at 370 m3
(contractor using water for sodding and hydro seeding of ditches in the new Arbour.'Vood
subdivision) and September 5th at 308 m3.
The highest "daily flow" from Well #1 occurred on May 19th at 136 m3; Well #3 occurred
on September 30th at 248 m3.
The highest "daily flow" into the distribution system occurred on August 24th at 357 m3.
.. ./2
Page Two
Letter to M.O.E.
Re: Shanty Say - Annual Compliance Report for 2004
March 9. 2005
New magnetic flow meters have been installed on Well #'s 1, 2 and 3 to record flows
from each well and flow to the distribution system, as part of the upgrades to the
pumphouse.
To ensure accuracy to within + or - 5% of actual rate of flow within the range of 10% to
100% of the full scale reading of these magnetic flow meters, Summa Engineering
Limited calibrated them on September 20, 2004.
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Three hundred and twelve (312) samples were
tested for "total coliforms" and "fecal coliforms" in 2004. There were no results
indicating any reportable counts in 2004.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 860 litres of 12% Sodium
Hypochlorite, or an average of 1.95 Uday, was used in the Shanty Bay system in 2004.
Four hundred and seventeen (417) daily tests for free chlorine in the distribution system
were performed by certified Township Operators using a "Hack Pocket Colorimeter"
during 2004. These tests were performed to ensure chlorine residual was above 0.2
mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack pocket
Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by Geospec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical analysis results did not reveal any health related reportable exceedences
during 2004.
.. ./3
Page Three
Letter to M.O.E. ~
Re: Shanty Bay - Annual Compliance Report for 2004
March 9, 2005
On May 26, 2003, the Ministry of the Environment issued Amended Certificate of
Approval #2379-5M3KSC to Arbourwood Estates Ltd. and the Township of Oro-
Medonte. This Certificate was issued in order to complete the necessary upgrades to
the pumphouse and construction of the standpipe.
On August 5, 2004, the Ministry of the Environment issued Certificate of Approval
#2544-62MP7P for the installation of the standby power unit.
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
Under Section 5, UP9radinq Requirements, the Certificate of Approval required the
Township to have physical improvements, which were completed in 2003.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
On August 10, 2004, the Ministry of the Environment conducted an announced
inspection of the Shanty Say Water System to confirm compliance with current
Regulations and to review the Permit to Take Water and Certificate of Approval.
From this inspection, Provincial Officer's Order #2550-664M82 was issued and is
attached as Schedule I. All required works were completed prior to the November 30,
2004 deadline.
From this inspection, the Ministry issued fifteen (15) non-compliances with regulatory
requirements and actions required, attached as Schedule If.
"BEST PRACTICES RECOMMENDATIONS"
From the August 10, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of thirty-one (31)
suggestions for the operation of the Shanty Say Water System.
From this list, the Township of Oro-Medonte has presently completed sixteen (16) of
these suggestions.
Any further information required with respect to this Compliance Report for the Shanty
Say Water System should be directed to the undersigned at (705) 487-2171.
TO
Keit a ieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
.. '..
Sc..u1!f)\Jt,.L , _
.
@MinistryOfthe. .' '0' Order Number'.
.' " Environment PrOVInCIal Officer s rder 2550-664M82.
. " Environmental Protection Act, R.S.O.1990, t.E 19 (EPA)
~.. M.",~." ~~o woo. ._~.... ....."". 0.. ~~,
l'Environnement Pesticides Act, R.S.O.1990, c. Pl1 (PA)
Ontario Safe Drinking Water Act, S.O. 2002, ..32 (SDWA)
Nutrient Man'agement Act, 2002, 8.0. 2002, <:.4
To: The Corporation of the Township ofOro-Medonte
PO Box 100
Oro, Ontario, LOL 2XO
Canada
Site: Lot: 27, Concession: 3
Oro-Medonte, County of Simcoe
Work Ordered
. 1. Effective immediately, the Operating Authority of the Shanty Bay Water
System shall make the required notifications as prescribed by Schedule 16-4 of O.
Reg. 170/03 in the event of any observation being made which indicates that
improperly disinfected water may have been discharged to the distribution system.
2. Effective immediately, the Operating Authority of the Shanty Bay Water
System shall take all corrective actions as prescribed by Schedule 17-2 ofO. Reg.
170/03 in the event of any observation being made which indicates that
improperly disinfected water may have been discharged to the distribution system.
3. Effective immediately, the Operating Authority of the Shanty Bay Water
System shall provide all required Notice(s) ofIssue Resolution within seVen days
of the issue being resolved as prescribed by Schedule 16-9 of O. Reg. 170/03 in
the event of any observation being made which indicates that improperly
disinfected water may have been discharged to the distribution system.
4. Effective immediately, the Operating Authority of the Shanty Bay Water
System shall ensure that abnonnal conditions, departures from nonnal operating
procedures, equipment taken out of or put in service, or any other unusual event
are fully documented including times, actions taken and results achieved in the
. facility logbooks as prescribed by Section 20(5) of O. Reg. 435/93, and O. Reg.
128/04 Section 27(5).
Page 1 - NUMBER 2550-664M82
. ~_' "'0'>
'!IJf O:SJ" -"
-"-''1. ~- ~,
" ,': .."': . ",J!...,.~.
5. Effective immediately, the Operating Authority of the Shanty Bay Water .
System shaH ensure that samples required by Schedules 13-6 and 13-7 of O. Reg.
170/03 are taken at least once every three months as prescribed.
6. The Operating Authority of the Shanty Bay Water System shall ensure that
the location of the sample point for the Shanty Bay facility turbidimeter
corresponds to the location in the facility Certificate of Approval
(2379~SM3KBC), or, submit a complete application to amend Certificate of
Approval 2379-5M3KBC to the Director of Environmental Licencing and
Approvals Branch, 2 St. Claire Avenue West, Toronto to reflect the sample
location for the turbidmeter at the end of the contact chamber at the Shanty Bay
Water System. A copy of this Provincial Officer Order shaH be included with the
application. The application shaH include the appropriate fees and be complete to
the satisfaction of the Director. Submit the application by November 30, 2004.
7. Submit written notice to the undersigned that the work required by option 1
of Work Ordered Item #6 has been completed or provide a copy of the application
required by option 2 of Work Ordered Item #6 to the undersigned by November
30,2004.
A. .
While this Order is in effect, a copy or copies of this order shaH he posted in a conspicuous
place.
B.
While this Order is in effect, report in writing, to the District or Area office, any significant
changes of operation, emission, ownership, tenancy or other legal status of the facility or
operation.
This Order is being issued for the reasons set out in the annexed Provincial Officers Report
which fonns part of this Order.
Issued at Oro-Medonte this 26th day of October, 2004.
!IA~
Phillip Sauer
Badge No:
Barrie District Office .
Tel: (705) 739-6441
Page 2 - NUMBER 2550-664M82
q -
. APPEALIREVIEW. INFORMATION,
REQUEST FOR REVIEW
You may request that this order be reviewed by the Director. Your request must be made in writing (or orally with written
confirmation) within seven days of service of this order and sent by mail or fax to the Director at the address beloW. In the
'Written request or writtetl confinnation you must,
. specify the portions of this order that you wish to be reviewed;
. include any submissions to be considered by the Director with respect to issuance of the order to you or any other person
and with respect to the contents of the order;
. apply for a stay of this order, if necessary; and provide an address for service by one of the following means:
I. mail 2. fax
The Director may confirm, alter or "revoke this order, If this order is revoked by the Director, you win be notified in writing. If
this order is confirmed or amended by order of the Director, the Director's. order will be served upon you. The Director's order
will include instructions for requiring a hearing before the Environmental Review Tribunal.
DEEMED CONFIRMATION OF TillS ORDER
If you do not receive oral or vnitten notice of the Director's decision within seven days of receipt of your request, this order is
deemed to be confirmed by order of the Director and deemed to be served upon you.
You may require a hearing before the Environmental Review Tribunal if, within 15 days of service of the confirming order
deemed to have been made by the Director, you serve written notice of your appeal on the Environmental Review Tribunal and
the Director. Your notice must state the portions of the order for which a hearing is required and the grdunds on which you
intend to rely at the hearing. Except by leave of the Environmental Review Tribunal, you are not entitled to appeal a portion of
the order or to rely on grounds. of appeal that are not stated in the notice requiring the hearing. Unless stayed by the
Environmental Review Tribunal, the order is effective from the date of service.
. Written notice requiring a hearing must be served personally or by mail upon:
The Secretary and Director (provincial Officer Orders)
Environmental Review Tribunal Ministry of ihe Environment
P.O. Box 2382 Banie District Office
2300 Yonge SITeet, Suite 1201 1203-54 Cedar Pointe Dr
Toronto, ON M4P IE4 Banie ON LAN 5R7
Fax: (705)739-6440
Tel: (705)739-6441
\\There service is made by mail, it is deemed to be made on the :fifth day after the date of mailing and the time for requiring a
hearing is not extended by choosing service by mail.
Further information on the Environrtlental Review Tribunal's requirements for an appeal can be obtained directly from the
Tribunal by:
Tel: (416) 314-4600 Fax: (416) 3t4-4506 WWW.ert.!2:ov.on.ca
FOR YOUR INFORMATlON
. Unless stayed by the Director or the Environmental Review Tribunal, this order is effective from the date of service.
Non-compliance with the requirements of this order constitutes an offence.
. The requirements of this order are minimurnrequirements only and do not relieve you from complying with the following:
. any applicable federal legislation;
. any applicable provincial requirements that are not addressed in the order; and
. any applicable municipal law.
. The requirements of this order are severable. If any requirement of this order or the application of any requirement to any
circumstance is held invalid, the application of such requirement to other circumstances and the remainder of the order are
not affected.
. Further orders may be issued in accordance with the legislation as circumstances require.
. The procedures to request a review by the Director and other information provided above are intended as a guide. The
. legislation should be consulted for additional details and accurate reference.
Page 3 - NUMBER 2550-664M82
, SL..t-\i:O uu:. \1
@ Ontario Ministry of the Environment
Drinking Water System Inspection Report
_....._...n........_"_......-O..........., .........".___...m...__._....m "_M"" .................-,,-....-......-..... ......m.__..m..___mm......__..__...........__.m......_..__ .............__....__._ ...._..,_.._......_.....m_ m','__.._"'.
.' ACTIONS REQUIRED
1 The Operating Authority failed to sample and test for chlorine free residual in the distribution
system on a daily basis as required by Schedule 7-2(3) of O. Reg. 170103. Samples were not
taken on March 19, 2004.
Action(s) Required: None. The Operating Authority monitored free chlorine residual in the
distribution system thereafter as required.
2 The Operating Authority failed to take the necessary corrective actions in response to observed
adverse conditions at the facility as required by Schedule 17-2(1),(2) of O. Reg. 170103.
Incidents occurred on August 13, 21, 22, 23, October 2 through 19, October 23 through
November 2, November 14,15, December 15,16,25,26,27 of 2003 in which the chlorine free
residual analyzer malfunctioned or recorded a value of less than 0.2 mg/L which is the
concentration required by the Shanty Bay CofA (2379.5M3KBC) at the point of entry to the
distribution system.
Action(s) Required: The Operating Authority shall ensure that alarm situations are promptly
responded to, documented and appropriate corrective actions are carried out and documented
to ensure proper disinfection of drinking water is maintained or restored as soon as possible.
3 The Operating Authority failed to report orally or in written form an observation that indicates
improperiy disinfected water may have been directed to the distribution system as required by
Schedules 16-4, 16-6 and 16-7 of O. Reg. 170103. Incidents occurred on August 13, 21, 22, 23,
October 2 through 19, October 23 through November 2, November 14, 15, December 15, 16,
. 25, 26, 27 of 2003 in which the chlorine free residual analyzer malfunctioned or recorded a value
of less than 0.2 mg/L which is the concentration required by the Shanty Bay CofA (2379-
5M3KBC) at the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall report orally and in written format as
required if, upon review of the data logger information, or any other observation, it is indicated
that the chlorine free residual fell below 0.2 mg/L at the Shanty Bay pumphouse.
4 The Operating Authority failed to provide a notice of issue resolution including actions taken and
lor results achieved within seven (7) days or otherwise after an adverse condition was resolved
as required by Schedule 16-9(1)a,b of O. Reg. 170103. Incidents occurred on August 13, 21, 22,
23, October 2 through 19, October 23 through November 2, November 14,15, December 15,
16, 25, 26, 27 of 2003 in which the chlorine free residual analyzer malfunctioned or recorded a
value of less than 0.2 mg/L which is the concentration required by the Shanty Bay CofA (2379-
5M3KBC) at the point of entry to the distribution system. There were indications on these dates
that improperly disinfected water may have been directed to the distribution system which is a
reportable event as per Schedule 16-4 of O. Reg. 170103.
Action(s) Required: The Operating Authority shall provide notice of issue resolution including
actions taken and results achieved to the Spills Action Centre and Simcoe County District Health
Unit within seven (7) days of an adverse condition being resolved.
5 The Operating Authority failed to record the time each Operator spent as Operator in Charge as
required by Section 18 of O. Reg. 435/93.
. Action(s) Required: None. The Operating Authority now records the amount of time each
Operator serves as Operator in Charge.
. ...______.___n....._...n..__...______......_.....___..._____.__._..____.__._m_..___'___._____...__..___ _...__,._.._.___m____..__n_._.....__......___'_m.______ ._.._._._.__..____.__.___m"_'__'___..,_.__,_.~._____'_._.....---..-..--- ..-.------ -- ---""----.- "
Report Generated for sauerph on 10/25/2004 Page 300f38
. ! 0;..... ~
.3.J. · a~ · r"';;'
. . ,.,.1 _, ~,,_"'.,.
@ 0 . Ministry of the Environment
Y ntano Drinking Water System Inspection Report
."_""~_" .._,~__m__.__.._..,__._'''__''_"_''_''__'__ ..___..._ '__,"'__"_' ..............___ .........................._._... .. ,...__._ n...___,_m m..__m__ ...........mm........._.m... ................. ..m...._..__. __,,"._.__ ""..m m....._.. ........_ .. ....__ ... _._
6 The Operating Authority has failed to fully comply with Parts 1.3, -Performance - and 2.1(c), (d)- .
Monitoring and Recording - in Certificate of Approval 2379-5M3KBC and Special Condition 15 in
Permit to Take Water 03-P-1 050. Flow measuring devices are to be in place at the Shanty Bay
facility which can measure and record instantaneous fiow rates in Usec, Umin and pump run
times from each source well into the treatment facility. This capability is currently not in place.
Action(s) Required: None. The Municipality is currently installing fiow measuring and
recording equipment capable of measuring instantaneous flows at the Shanty Bay facility. It is
expected this work will be completed in the fall of 2004.
7 The Operating Authority has failed to fully comply with Schedule "A" in Permit to Take Water 03-
P-1050. Limits on the maximum number of hours a day the various well pumps can be run have
been prescribed. Wells 1 and 2 can be run for 12 hours per day each or Well 3 can be run for
10 hours per day. The maximum run time for Well #1 was confirmed to have exceeded 12 hours
on June 22, 23, 25, 26, July 2, and September 30, of 2003 with potentially more days in
exceedance but the readings were taken more than 24 hours apart.
Action(s) Required: None. All of the recorded pump run time exceedances were the result of
operationai practices including fiushing or water mains for residual maintenance and the filling of
the stand-pipe.
8 The Operating Authority has failed to fully comply with Schedule "A" in Permit to Take Water 03-
P-1050. Limits on the maximum takings in m3/day the various well pumps can draw have been
prescribed. Wells 1 and 2 can draw 305 m3/day each or Well 3 can draw 610 m3/day. The
maximum taking for Well #1 was confirmed to have exceeded 305 m3/day on June 22, 23, 25,
26, and July 2, of 2003 with one potential exceedance for Well #2 on June 13, 2004 but the
readings were taken more than 24 hours apart. .
Action(s) Required: None. All of the recorded pump run time exceedances were the result of
operational practices including fiushing or water mains for chlorine free residual maintenance
and the filling of the stand-pipe.
9 The Operating Authority has failed to sample sodium in the correct location. Schedule 6-2 of O.
Reg. 170/03 requires sodium to be sampled at the point of entry to the distribution system. The
sample collected on December 18, 2003 was collected in the distribution system.
Action(s) Required: The Operating Authority will resample for sodium at the point of entry to
the distribution system by May 31, 2008.
10 The Operating Authority failed to fully document any unusual events, departures from normal
operating procedures, abnormal conditions and the times these event occurred, the lengths of
the events, or the actions taken at the facility as required by Section 20(5) 3, 4, 5 of O. Reg.
435/93.
Action(s) Required: The Operating Authority shall record in the facility logbooks the approximate
initial time, time at completion, cause of/for, actions taken, date, staff member(s) present, results
achieved, and location of any operational checks, alarms, tests, repairs, unusual and/or
abnormal conditions and/or directions or adjustments made on or within the Shanty Bay system.
.
--_._~--------_.._-_._._------_._-----_.__._,..__._--_.-.-.---..-..--...-. ,.-.-.---.-"--.--.---..--....-...-- _.__..._---~-.~._._-----_._,---,._,,_._._-.._,,--_.,_._-_.._,_._,_._~--_.".,.
Report Generated for sauerph on 10/25/2004 Page 31 of38
, -1
.
@ 0 . Ministry of the Environment
,1?. ntano Drinking Water System Inspection Report
. _....._._ .......__ m.....___...._____..'_..__ .....m.'_"'_ .......___'.._._ ...............m._..___..._._____....._... ...._.._.__._m...__._._"_" . ............m....___._._.....m_.....___..._..._.......__..._..___. no_ ...__.__.__......_.___.__._._.__.....__,.,__._..._n. .m_...__m.._.".._,__ ...
. 11 The Operating Authority failed to ensure that water treatment equipment is installed at the
Shanty Bay facility in compliance with CofA 2379-5M3KBC. The sample location for the
continuous turbidity analyzer does not correspond to the sample location prescribed in the CofA.
Action(s) Required: The Operating Authority shall comply with the prescribed sample location or
apply for an amendment to the CofA to change the sample location to the current location by
November 30, 2004.
12 The Operating Authority has failed to sample for raw water turbidity once per month before any
treatment. Schedule 7-3 of O. Reg. 170/03 requires raw water turbidity to be taken from a point
before any treatment and analyzed immediately once per month if the system obtains water from
a ground water source. There is no record of raw water turbidity having been analyzed for the
months of June, July and August of 2003.
Action(s) Required: None. The Operating Authority is now collecting and analyzing a raw
water turbidity sample monthly.
13 The Operating Authority has failed to collect 'quarterly' samples within the time frame prescribed
by Schedules 13-6 and 13-7 of O. Reg. 170/03. The prescribed sampling time frames for
Trihalomethanes (THM's), nitrates and nitrites is at least once every three months. In 2003,
samples were taken on May 28, September 9, and December 18 which were five months and
four months apart respectively. In 2004, samples were taken on February 26 and May 31 which
were four months apart.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
. than three calendar months apart as prescribed.
14 The Operating Authority failed to ensure that water could not collect or pond around the well
casing. Section 11(11) of O. Reg. 903/90 prescribes that in a well in which the casing extends
above the land surface. the well will not be constructed in such a manner that water can pond or
collect around the casing. Well #3 was constructed in such a way as to allow water to pond
around the casing.
Action(s) Required: None. As of October 14, 2004, the Operating Authority has regraded the
surrounding land surface around Well #3 in such a manner that water will no longer collect or
pond around the casing.
15 The Operating Authority failed to ensure that a well pit was not constructed. Section 12(7) of O.
Reg. 903/90 prescribes that no well pit shall be constructed at any area. Well #3 was
surrounded by a well crock and the soil regraded when constructed. This formed a well pit.
Action(s) Required: None. As of October 14, 2004, the Operating Authority has regraded the
surrounding land surface around Well #3 in such a manner that the crock is no longer a well pit.
.
___._.m_.__.__n___..._._..._..___n___.______..__.__________.________.m_._ __._m._.___.._....,.__.._______..._.__ . ...._.._,..._.__.,__...._._m__...___'_ .---------.-----....----,..........--.'
Report Generated for sauerph on 10/25/2004 Page 32 of 38
~ . Ministry of the Environment
.~",. Q~~~~I~, """" """,."",.,.,.""., ".. ",'"".",_.. """"""'" "",,~ri~~i.n?'JII~t~~~~~,t':.~I~~~~~tio~~~port
16 The Operating Authority failed to ensure that a well casing extended the minimum prescribed .
distance above the surrounding ground surface. Section 13(8) of O. Reg. 903/90 prescribes that
the casing must extend at least 40 cm above the highest point of the ground surface within three
metres radially. Well #3 was surrounded by a well crock and the soil regraded when
constructed. This construction lowered the well casing below 40 cm to the surrounding ground
surface.
Action(s) Required: None. As of October 14, 2004, the Operating Authority has regraded the
surrounding land surface around Well #3 in such a manner that the casing extends 40 cm above
it.
17 The Operating Authority failed to ensure that a well cover was secured sufficiently to prevent
entry of surface water or foreign material into the well. Section 11(3) of O. Reg. 903/90
prescribes that the upper end of the well casing must have a cover which is sufficiently securely
attached to prevent the entry of surface water or foreign material into the well. Well #3 was
equipped with a venled steel cap but it was left unsecured upon completion of the well.
Action(s) Required: None. As of July 14, 2004, the Operating Authority secured the well cap in
such a manner that foreign material and surface water can no longer enter the well.
.
.
--.- ..-.----.-----.~----_.__..----..--.--.----,-.--.-..,--...-.---------,--,--.. ...__........______......_._____.......___._n.________._._._...__._...____,___,_____._..__n_ m__..... .___ .. __........_.____,__
Report Generated for sauerph on 10/25/2004 Page 33 of38
otOR:O \ih
g:.'~ ,------__... '4t't";\'-
/~.f) ~
0" ~, ~
~ I ~
t7-\.,----'" '1:,
~. </
",crc,.,,'''=L
'%.~;.,,;;-:;::';;,,,,#-
,..~Z'"
TOWNSHIP OF ORO-MEDONTE
REPORT
DEPT. REPORT NO.: TO: COMMITTEE OF THE PREPARED BY:
EES2005-15 WHOLE Keith Mathieson
SUBJECT: DEPARTMENT:
COUNCIL:
Annual Compliance Report - Engineering and
Sugarbush Water Supply Environmental Services
C.OFW.: and Treatment - 2004
DATE:
MOTION #: March 15, 2005
DATE: R. M. FILE NO.:
E05-14518
~J3:~(;l{G~()tJ~: ,
Section 4 of the Certificate of Approval issued to the Township of Oro-Medonte requires a written
report detailing compliance with all terms and conditions of the approval to be completed annually.
This Report is to be signed by a person designated by Council of the municipality that owns the works
and a resolution is to be presented to Council that the Compliance Report has been received.
The Compliance Report was due to be completed by March 31, 2005 and available for inspection by
any member of the public without charge.
~~I'4~IDX$J:$; -
Attached is the Annual Compliance Report for 2004 for the Sugarbush Water Supply System, a copy
of which will be submitted to the Ministry of the Environment. This Report is being made available to
Council for information and confirmation that Ontario Regulation #170/03 has been complied with by
the Township of Oro-Medonte, and identifies any non-compliance issues.
~RECOMMENDATION(S}: -
1. THAT Report #EES2005-15 be received and adopted.
2. AND THAT Council receives the Annual Compliance Report for 2004 for the Sugarbush Water
Supply System.
Respectfully submitted,
/lJ
Kei~eson
"
THE CORPORATION OF THE
148Line7S" Box !OO
TOW N8 Ii I P Ora. Ontario LOL 2XO
Phone (705) 487-2171
Fax (705) 487-0133
r9~OfJl6~ae
www.oro-rnedonte.G\
March 9, 2005
Ministry of the Environment
54 Cedar Pointe Drive
Unit #1201
BARRIE, Ontario
L4N 5R7
Re: Sugarbush Water Supply and Treatment System
Annual Compliance Report for 2004
Sugarbush Water System supplies 322 homes with water from two (2) ground water
source wells.
Permit to Take Water #1483-5MYQ36 was issued to the Township of Oro-Medonte on
June 27, 2003 for Sugarbush Well #'s 1 and 2, and Diamond Valley/Forest Hill
Developments. Well #3, which was not in service in 2004, expires May 31, 2013.
Sugarbush Well #1 is permitted 851 m3 per day, Well #2 is permitted 1,635 m3 per day,
and Well #3 is permitted 1,635 m3 per day. The water treatment plant is to be operated
to treat water at a rate not to exceed the maximum flow rate of 851 m3, per day, for Well
#1 and 1,635 m3, per day, for Well #2.
WATER QUANTITY
Schedules have been attached showing the "average daily flow" per month and the
"maximum daily flow" per month, and the maximum flow of treated water to the
distribution system, as per Section 1.3 of the Certificate of Approval, for the Sugarbush
system. During 2004, Well #2 was the only Well in use. Upgrades to Well #1 are
planned for the Spring of 2005, which will allow Well #1 to be put back in service. At no
time during 2004 did the "maximum daily flow" exceed the Permit to Take Water for Well
#2.
The highest "daily flow" for the year occurred on May 24th at 1,008 m3, at which time the
well pump failed to shut down as a result of an electrical storm. The next highest "daily
flow" occurred on June 13th and July 11 th at 636 m3.
New magnetic flow meters were installed on Well #'s 1 and 2 to record well flows and
flows to the distribution system.
.. ./2
Page Two
Letter to M.O.E.
Re: Sugarbush - Annual Compliance Report for 2004
March 9. 2005
To ensure accuracy to within + or - 5% of flow within the range of 10% to 100% of the
full scale reading of these magnetic flow meters. Summa Engineering Limited calibrated
them on September 21, 2004.
WATER QUALITY
Bacteriological samples were taken weekly from the wells, pumphouse and distribution
system, by certified Operators employed by the Township and submitted to Central
Ontario Analytical Laboratory in Orillia. Two hundred and sixty-two (262) samples were
tested for "total coliforms" and "fecal coliforms" in 2004. Two (2) test results during the
year had a reportable count of "total coliforms". M.O.E.E. Spills Action Centre and the
Simcoe County District Health Unit were notified, resamples were taken and returned
negative. No further actions were required.
To ensure that the chlorine residual was maintained above 0.2 mg/L in the distribution
system, and a free chlorine residual was available in the distribution system, 12%
Sodium Hypochlorite was pumped into the system. A total of 750 litres of 12% Sodium
Hypochlorite, or an average of 2.05 Uday, was used in the Sugarbush system in 2004.
Four hundred and twenty-three (423) daily tests for free chlorine in the distribution
system were performed by certified Township Operators using a "Hack Pocket
Colorimeter" during 2004. These tests were performed to ensure chlorine residual was
above 0.2 mg/L in the distribution system.
A Prominent Dulcometer analyses the chlorine residual continuously after the 15 minute
contact time and is recorded by a data logger.
An On-Line ABB 4670 Series Turbidity Meter measures turbidity continuously after the
15 minute contact time and is recorded by a data logger.
Raw water turbidity tests are performed monthly by Township staff using a "Hack
Pocket Turbidity Meter" and recorded in the daily log book.
Quarterly water quality analyses sampling was performed by Geospec Engineering Ltd.
in order to satisfy testing parameters for treated water, as per Ontario Regulation
#170/03 dated June, 2003. Samples were taken by Geospec Engineering Ltd. and
forwarded to Lakefield Research Limited for chemical testing.
The chemical analysis results did not reveal any health related reportable exceedences
during 2004.
On October 17, 2002, the Ministry of the Environment issued Amended Certificate of
Approval #6268-SEJRBX for the Sugarbush Water Supply System.
.. ./3
Page Three
Letter to M.O.E.
Re: Sugarbush - Annual Compliance Report for 2004
March 9. 2005
"COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
Under Section 5, Upqradinq Requirements, the Certificate of Approval required the
Township to have physical improvements (a list of which may be received upon request)
completed by July 1, 2003. A Tender for upgrades, 5.1 (b), was awarded to Midland
Mechanical in August, 2002 and this work was completed prior to December 31, 2002.
The Tender for the construction of the 15 minute contact chamber was awarded to
Arnott Construction and completed in the Spring of 2003. The upgrades to pumphouse
#1 have not been completed and the Township has applied for an extension until July,
2005 to have these works completed.
"NON-COMPLIANCE WITH TERMS AND CONDITIONS OF THE CERTIFICATE OF
APPROV AL"
On September 15, 2004, the Ministry of the Environment inspected the Sugarbush
Water System to confirm compliance with current Regulations and to review the Permit
to Take Water and Certificate of Approval.
From this inspection, the Ministry of the Environment identified fourteen (14) non-
compliances with regulatory requirements and actions required, which are attached as
Schedule I.
"BEST PRACTICES RECOMMENDATIONS"
From the September 15, 2004 inspection, the Ministry, in the interest of continuous
improvement, provided the Township of Oro-Medonte with a list of twenty-five (25)
suggestions for the operation of the Sugarbush Water System.
From this list, the Township of Oro-Medonte has presently completed eleven (11) of
these suggestions.
Any further information required with respect to this Compliance Report for the
Sugarbush Water System should be directed to the undersigned at (705) 487-2171.
Sincerely,
TOITP OF OAO-MEOONTE
Keith Mathieson, C.R.S.I.
Director of Engineering and Environmental Services
KM/ps
Attachments
. . SuJmUL.t:. I
@ .. " ' .' ,,'...... Ministry of the Environment
....~..,ontarlO Drinking Water System Inspection Report
_'"_"_~__'_____'_'____'__'_""____'_'_'_ __._._,___,_" m_.__.."._____.._._'"_.._.,...~__.._._._._u_._,.,.~___ ........._ n...___...______.mo._...._,___..._._ m...._'.___......_____._______"_...m.._....._..___,__._.^_..
. ACTIONS REQUIRED
1 The Operating Authority failed to report orally or in written form an observation that indicates
improperly di$infected water may have been directed to the distribution system as required by
Schedules 16-4, 16-6 and 16-7 of O. Reg. 170/03. Incidents occurred on July 17, August 5,11,
16, September 21, November 10, 13 and December 6 of 2003 in which the chlorine free residual
analyser malfunctioned or recorded a value of less than 0.2 mg/L which is the concentration
required by the Sugar Bush CofA (6268.5EJRBX) at the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall report orally and in written format as
required if, upon review of the data logger information, or any other observation, it is indicated
that the chlorine free residual fell below 0.2 mg/L at the Sugar Bush pumphouses.
2 The Operating Authority failed to take the necessary corrective actions in response to observed
adverse conditions at the facility as required by Schedule 17-2(1),(2) of O. Reg. 170/03.
Incidents occurred on July 17, August 5,11, 16, September 21, November 10, 13 and December
6 of 2003 in which the chlorine free residual analyser malfunctioned or recorded a value of less
than 0.2 mg/L which is the concentration required by the Sugar Bush CofA (626B-5EJRBX) at
the point of entry to the distribution system.
Action(s) Required: The Operating Authority shall ensure that alarm situations are promptly
responded to, documented and appropriate corrective actions are carried out and documented
to ensure proper disinfection of drinking water is maintained or restored as soon as possible.
3 The Operating Authority failed to provide a notice of issue resolution including actions taken and
lor results achieved within seven (7) days or othelWise after an adverse condition was resolved
. as required by Schedule 16-9(1 )a,b of O. Reg. 170103. Incidents occurred on July 17, August 5,
11,16, September 21, November 10,13 and December 6 of 2003 in which the chlorine free
residual analyser malfunctioned or recorded a value of less than 0.2 mg/L which is the
concentration required by the Sugar Bush CofA (6268-5EJRBX) at the point of entry to the
distribution system. There were indications on these dates that improperly disinfected water
may have been directed to the distribution system which is a reportable event as per Schedule
16-4 of O. Reg. 170/03.
Action(s) Required: The Operating Authority shall provide notice of issue resolution including
actions taken and results achieved to the Spills Action Centre and Simcoe County District Health
Unit within seven (7) days of an adverse condition being resolved.
4 The Operating Authority has failed to sample sodium in the correct location. Schedule 6-2 of O.
Reg. 170/03 requires sodium to be sampled at the point of entry to the distribution system. The
sample collected on December 18, 2003 was collected in the distribution system.
Action(s) Required: The Operating Authority will resample for sodium at the point of entry to
the distribution system by May 31, 2008.
.
_."._.._~_.____'__..__m___.___.__._.,_ .m_~__~__~._.,____.._ ....".._......________..__._ __.._.__ _. .. _. _._ .._..__,_____...___._____..... .. ._.___"_"',_'"___ ___ ____...__.~_.___"._..__.m....
Report Generated for sauerph on 2/3/2005 Page 33 of39
~ ~~~
~t;ll_t;.,C. Ministry of the Environment
.' .", ...','.,. ,. ,...' .'.l1tQrIP Drinking Water System Inspection Report
._______________________n__._...__..__..._....,.."_.......... m_.n......___n____....n____n____'_..' ...__.__.._..__.___,.__...___ .._...__..._._._____._.____~__~_._.__.__.___.._'.__m_....-.-.-.--'.
5 The Operating Authority has failed to sample and record a chlorine free residual at the time of
microbiological sample collection. Schedule 6-3(1)a of O. Reg. 170/03 requires a sample be .
taken and tested for chlorine free residual at the same time as a sample taken for
microbiological parameters. There is no record of chlorine free sampling at the time three
resamples for microbiological parameters were collected on August 5, 2004.
Action(s) Required: The Operating Authority will immediately ensure that a chlorine free
residual sample is taken, tested and a value recorded at the same time and location as any
samples collected for microbiological parameters.
6 The Operating Authority has failed to sample for raw water turbidity once per month before any
treatment. Schedule 7-3 of O. Reg. 170/03 requires raw water turbidity to be taken from a point
before any treatment and analysed immediately once per month if the system obtains water from
a ground water source. There is no record of raw water turbidity having been ana lysed for the
months of June, July and August of 2003.
Action(s) Required: None. The Operating Authority is now collecting and analysing a raw
water turbidity sample monthly.
7 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13-6 of O. Reg. 170/03. The prescribed sampling time frame for Trihalomethanes
(THM's) is at least once every three months. In 2003, samples were taken on May 28,
September 9, and December 18 which were five months and four months apart respectively. In
2004, samples were taken on February 26, May 31 and September 14 which were four and five
months apart respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more .
than three calendar months apart as prescribed.
8 The Operating Authority has failed to collect samples within the time frame prescribed by
Schedule 13-7 of O. Reg. 170/03. The prescribed sampling time frame for nitrates and nitrites is
at least once every three months. In 2003, samples were taken on May 28, September 9, and
December 18 which were five months and four months apart respectively. In 2004, samples
were taken on February 26, May 31 and September 14 which were four and five months apart
respectively.
Action(s) Required: The Operating Authority will ensure that sampling is conducted not more
than three calendar months apart as prescribed.
9 The Operating Authority failed to ensure that a well cover was secured sufficiently to prevent
entry of surface water or foreign material into the well. Section 11(3) of O. Reg. 903/90
prescribes that the upper end of the well casing must have a cover which is sufficiently securely
attached to prevent the entry of surface water or foreign material into the well. Well #3 was
equipped with a broken cap which was unsecured at the time of the physical facility inspection
on September 15, 2004.
Action(s) Required: None. Written notification was received on September 27, 2004 by the
MOE that the Operating Authority had secured the well cap in such a manner that foreign
material and surface water can no longer enter the well.
.
------~~,.__._-,._._-------_.__.__.--------'-_.__._------....-.--------------....----.---.--------.---.-------------.---.-.--.-....,--
Report Generated for sauerph on 2/3/2005 Page 34 of39
~,() .'., '" '.', .~. ", Ministry of the Environment
,.~., .' ,..,' .'., ntlAinc::J Drinking Water System Inspection Report
m.__..'_"--'._"_____..._._.......;........__~__..._._......__._.._.".___.._.....__c___m~_.___.___.._.__..__...__,___.__..___'...__.,.".._.'m__....u......_......__._......___..._._e._.........__.____...._,__....
10 The Operating Authority failed to ensure that water treatment equipment is installed at the Sugar
Bush facilities in compliance with CofA 6268-5EJRBX. The sample location for the continuous
turbidity analyser does not correspond to the sample location prescribed in the ColA.
Action(s) Required: The Operating Authority shall comply with the prescribed sample location or
apply for an amendment to the CofA to change the sample location to the current location or the
prescribed use for this instrumentation by March 31,2005.
11 The Operating Authority failed to ensure that water treatment equipment is installed at the Sugar
Bush Pumphouse 1 lacility in compliance with CofA 6268-5EJRBX. The prescribed upgrade
installation deadline of July 1, 2003 for treatment equipment has not been met. The pumphouse
is not complete and not operational.
Action(s) Required: The Operating Authority shall immediately install the prescribed treatment
equipment in Pumphouse 1 or, by March 31, 2005, apply for an amendment to the CofA to
extend the upgrade deadline until July 31, 2005.
12 The Operating Authority has failed to fully comply with Parts 1.2, 1.3 -Performance. and 2.1(c),
(d) - Monitoring and Recording - in Certificate of Approval 6268-5EJRBX and Table A of PTTW
1483-5MYQ36. Flow measuring devices are to be in place at the Sugar Bush facilities which
can measure and record instantaneous flow rates in Umin and pump run times from each
source well into the treatment facilities. This capability is currently not in place.
Action(s) Required: None. The Municipality is currently installing flow measuring and
recording equipment capable of measuring instantaneous flows at the Sugar Bush facilities. It is
expected this work will be completed early in the new year at the latest (2005).
13 The Operating Authority failed to fully document any unusual events, departures from normal
operating procedures, abnormal conditions and the times these event occurred, the lengths 01
the events, or the actions taken at the facility as required by Section 20(5) 3, 4, 5 of O. Reg.
435193.
Action(s) Required: The Operating Authority shall record in the facility logbooks the approximate
initial time, time at completion, cause of/for, actions taken, date, staff member(s) present, results
achieved, and location of any operational checks, alarms, tests, repairs, unusual and/or
abnormal conditions and/or directions or adjustments made on or within the Sugar Bush system.
14 The Operating Authority failed to ensure that the person with overall responsibility for the Sugar
Bush system and the person supervising those operators working within and on the system had
certification level equal to or above the classification level of the system as required by O. Reg.
435 Section 13(1) under the OWRAand Section 11(5) under the SDWA. The Operator in
Overall Responsibility (OIOR) or now Overall Responsible Operator (ORO) for the Sugar Bush
system, Mr. Fred MacGregor, holds a Class 2 Water Distribution license where as the Sugar
Bush system is a Class 3 Water Distribution system.
Action(s) Required: The Operating Authority shall designate an Operator with the appropriate
qualifications (Class 3 WD) for the Sugar Bush system to act as ORO and supervisor at least
until the system reclassification under O. Reg. 128/04 is complete. It is expected the system will
be reclassified as a Class 2 Treatment and Distribution system.
__.______...~__.._.__._._.__._.,_.. ____n.___'..._. n__..___.______n__.______ ,_.... ._._..__.....___..__,__.__._..........._.._...._..___...___ .__m___..__.___,___.____~_..._,.._,..._.__.,_._.__...,.__-~-,-------".
Report Generated for salJerph on 2/3/2005 Page 35 of39
~o( o~o_ ~
~",-,--,<.,<, ~
.; ~( ',~ $.. - \
, t! iIJ ~\
... '.' ,.,lij
"'It / ,,)
~" ,", ",
"~~
"-~,.,," .
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: COMMITTEE OF THE Prepared By:
WHOLE
EES2005-17 Keith Mathieson
Subject: Department:
Council
1045942 Ontario Inc. (Ken Engineering and
Hewitt) - Site Plan Agreement Environmental Services
C.ofW. - Part of the West Yo and SE 'A Date:
of Lot 1, Concession 14, March 15, 2005
Motion # Being Parts 1, 2 and 3, 51 R- R.M. File #:
6268 - Being all of PIN L04-13680
Date: #58530-0316 (Lt) RolI#:
020-004-23200
II BACKGROUND: II
Mr. Hewitt is proposing to construct a 12 m x 24 m shop located on Hwy. #12 at Price's Corners.
II ANALYSIS: II
Mr. Hewitt's Site Plan application was presented to the Site Plan Committee on May 14, 2004. The
only outstanding issue from the meeting was Mr. Hewitt requiring a "building and land use permit"
from the Ministry of Transportation and Highways. This permit was issued on February 7,2005.
Township staff have no concerns with this proposal.
II RECOMMENDATION(S): II
1. THAT Report No. EES2005-17 be received and adopted.
2. THAT the Township of Oro-Medonte enters into a Site Plan Agreement with 1045942 Ontario Inc.
to construct a 12 m x 24 m shop.
3. THAT the Clerk prepares a By-law for Council's consideration.
4. AND THAT Mr. Hewitt be notified of Council's decision.
-~
'0 /
f' fJS'J '-
jV '" f>O \u:-'
<- V1~
Keith at leson
Director of Engineering and Environmental Services
APPENDIX "A" ~
SITE PLAN AGREEMENT
- between -
1045942 ONTARIO INC.
(KEN HEWITT)
- and -
THE CORPORATION OF THE
TOWNSHIP OF ORO-MEDONTE
DESCRIPTION OF LANDS
Part of the West Y, and SE 14 of Lot 1, Concession 14
Being Parts 1, 2 and 3, 51R-6268
Being all of PIN #58530-0316 (LI)
Roll # 4346.020-004-23200-0000
TOWNSHIP OF ORO-MEDONTE
COUNTY OF SIMCOE
March, 2005
By-Law No. 2005-
-
THE TOWNSHIP OF ORO-MEDONTE
SITE PLAN AGREEMENT
TABLE OF CONTENTS
Section 1 Covenants by the Owner
Section 2 Covenants by the Township
Section 3 Developmenl Restrictions
Section 4 Development Changes
Section 5 Security
Section 6 Compliance
Section 7 Co-operation
Section 8 Binding Effect
Section 9 Severability of Clauses
Section 10 Save Harmless
SCHEDULES
Schedule "A" Legal Description of Lands
Schedule "B" Sile Plan
Schedule "C" Deeds and Easemenls to be Conveyed
Schedule "D" Itemized Eslimate of Cosl of Construction
2
-
SITE PLAN CONTROL AGREEMENT
This Agreement made, in quadruplicate, this day of 2005, in
accordance with Section 41 of the Planninq Act.
BETWEEN: 1045942 ONTARIO INC. (KEN HEWITT)
Hereinafter called the "Owner"
PARTY OF THE FIRST PART
-and-
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
Hereinafter called the "Township"
PARTY OF THE SECOND PART
WHEREAS the Owner has applied to the Township of Oro-Medonte to permit a
12 m x 24 m shop on lands described in Schedule "A", attached hereto:
AND WHEREAS the Township has enacted a By-law to provide for the designation of the
lands as a "Site Plan Control Area";
AND WHEREAS the Owner intends to develop the lands in accordance with the Site Plan
attached hereto as Schedule "B";
NOW THEREFORE This Agreement Wilnesseth THAT in consideration of the mutual
covenanls hereinafter contained, lhe parties hereto hereby covenant and agree as
follows:
3
1. COVENANTS BY THE OWNER
The Owner covenants and agrees as follows:
a) The Owner owns the subjecllands described in Schedule "A", attached hereto,
and has provided the Township with a Registered Deed containing the legal
description of the subject lands,
b) This Agreement may be regislered against title to lhese subject lands and shall
take priority over any subsequent registrations against the tille to the subject lands.
c) No work shall be performed on the lands. nor any use made of the subject lands
with respect to the proposed development. except in conformity with all the
provisions of this Agreement.
d) The Owner shall, prior to the execution of lhis Agreement, obtain all necessary
permits and approvals from the Township and from all Ministries and Agencies,
including. but not limited to, the County of Simcoe.
e) The Owner shall, prior to the execution of this Agreement, pay all municipal taxes
and charges related to obtaining the approval of these lands for the intended use,
f) The Owner shall pay a refundable deposit for such reasonable cosls as may be
involved 10 lhe Township in having its solicitor, engineer, planner and staff, perform
any work in connection with this Agreement, including the preparation, drafting,
execution, and registration of this Agreement. The Owner acknowledges and
agrees that the Owner shall be responsible for the cosl of performance of all the
Owner's obligations hereunder, unless the contexi otherwise requires. Every
provision of this Agreement. by which the Owner is obligated in any way, shall be
deemed to include the words "at lhe expense of the Owner". unless specifically
stated olherwise, The refundable deposit for expenses and actual cost shall be
$1,000.00, The Owner shall replenish the refundable deposit, to ils full amounl,
when the expenses and actual costs are submitted by the Township.
g) The Owner shall have delivered to the Township, all Transfers/Deeds, Discharges
and Easements, or other documents required by Schedule "C", as well as
certification from the Owner's solicitor that the Transfer/Deeds and Easements
shall provide lhe Township with good title, free and clear from all encumbrances.
2. COVENANTS BY THE TOWNSHIP
The Township covenanls and agrees as follows:
a) Thai the Township has enacted a By-law to permit a 12 m x 24 m shop described
on the Site Plan.
b) That the Township agrees that subject to compliance by the Owner with all
relevant Municipal By-laws and Provincial Statutes and Regulations, the Owner
may proceed to develop the subject lands, as indicated on the Site Plan attached
hereto as Schedule "B", subject to the development restrictions contained herein.
3. DEVELOPMENT RESTRICTIONS
The Parties hereto acknowledge and agree that any use of the subject lands by the
Owner shall be on and subject to the following terms and conditions:
4
a) Site Plan
The use and development of the subject lands shall be in accordance wilh and as
set out on the Site Plan, attached hereto as Schedule "B",
b) liqhtinq
All lighting systems installed outside, such as floodlights, shall be directed away
from any adjacent residential use andlor roadway. not to cause interference in any
way.
c) Parkinq Areas and Driveways
All parking areas and driveways shall be constructed in conformity with Sections
5,19 and 5,20 of By-law No. 97-95, as amended, and the Ontario Building Code
Regulation #419186, and such parking areas, loading, and access areas shall be
kept free and clear of snow and ice and kept adequately drained, All entrances
shall be conslructed, as in Schedule "B" attached. The Owner agrees to obtain
all necessary approvals from lhe Ministry of Transportation, County of Simcoe and
Township of Oro-Medonte.
d) Outside Storaqe
No outside storage shall be permitted between any buildings on the premises and
any street. Any other outside storage shall be contained in the fenced compound,
as identified on Schedule "B".
e) Garbaqe Storaqe
The Owner agrees to provide suitable storage areas for garbage and waste, as
shown on the Site Plan, and to install and maintain litter containers in and around
development on the lands, All metal scrap and associated refuse contained in the
fenced compound shail be removed on a weekly basis,
f) Landscapinq
The Owner shall complete all landscaping and landscaped areas shown on the
Site Plan, attached as Schedule "B", as soon as weather permits. and all grading
and sodding required, according to any Engineering drawings submitted, shall be
done on all lawn areas,
g) Erosion and Siltation Control
The Owner must take all necessary precautions to prevent erosion and
sedimentation of ditches and culverts, slopes, etc., within the Site Plan, and
downstream prior to and during construction. The Owner agrees 10 maintain all
erosion and siltation control devices in good repair until vegetative cover has been
successfully established,
4. DEVELOPMENT CHANGES
The parties acknowledge and agree that there shall be no changes to this Agreement or
lhe Schedules attached hereto, unless and until such changes have been approved by all
parties. It is the intention of the parties that material amendments to this Agreemenl be
properly recorded. Such amendments may take the form of a regislered Amending
Agreement, an unregistered Agreement, exchange of correspondence, Memorandum of
Confirmation, or notations on Engineering drawings. The nature of such record of
amendment shall depend on circumslances.
5
q, Ie-
5. SECURITY
Prior to signing the Agreement, the Owner will deposit. with the Treasurer of the
Township. to cover the faithful pertormance of the obligations of the Owner arising under
this Agreement. including but not limited to the construction of the works and services
identified in Schedule "0" to this Agreement (the "said Work"), the following securities:
a) Cash in the amount of one hundred percent (100%) of the estimated cost of the
said work, as approved by the Township Engineer and Township Council, or:
b) An irrevocable Letter of Credit from a chartered bank. issued in accordance with
lhe requirements of Schedule "E". with an automatic renewal clause in the amount
of one hundred percent (100%) of the estimated costs of the said works, and as
approved by lhe Township Engineer. The Letter of Credit shall be for a minimum
guaranteed period of one (1) year, or such time as the Township decides, and
shall be renewed automatically, as necessary. thirty (30) days prior to expiration,
c) The Township reserves the right to accept or reject any of these altemative
methods of providing securities. Prior to depositing the securities, the Owner's
Engineer shall submit an estimate of the cost of lhe works to the Township
Engineer for approval. When the cost estimate has been approved, it will be set
out in Schedule "0" of this Agreement and will become the basis for the limits of
the securities.
d) Any Letter of Credit or security filed wilh the Township is based upon the estimated
cost of compleling the various matters prescribed by this Agreement. However, all
Letters of Credit and security received by the Township may be used as security
for any item or any other matter which. under the lerms of this Agreement, is the
responsibility of the Owner. including without limiting the generality of the
foregoing, payment of engineering, legal, planning or other cosls incurred by the
Township, which are lhe responsibility of the Owner, under the lerms of this
Agreement.
e) Upon written notification by the Owner's agent. certifying that all required works
for which the Letter of Credit was submitted have been completed in accordance
with the plans submitted and upon confirmation by lhe Township or its agenllhat
the Owner's obligations under this Agreemenl have been completed, the
Township will return said Letter of Credit.
f) If in the event of default of the Owner under any of the provisions at this
Agreement. it becomes necessary for the Township to realize on its security or
deposits. then lhe Township shall give, by registered mail, twenty-one (21) day's
notice. its intent to draw down on the security or deposit.
6. COMPLIANCE
Any action taken by the Township or on its behalt, pursuant to this Agreement, shall be in
addition to and without prejudice to any security or other guarantee given on behalf of the
Owner for the pertormance of its covenants and agreements herein, and upon default on
the part of the Owner hereunder, lhe Township shall, in addition to any other remedy
available to it, be at liberty to utilize the provisions of Section 325 of the Municipal Act,
R,S.O, 1980, Chapter 302, as amended.
7. t~-~II~RATI~N
The Owner consents to the registration of this Agreement by the Township, upon the title
of lhe subject lands, at the expense of the Owner and agrees to execute such further and
other documents, consents or applications, as required, for the purpose of securing
registration and giving effect to the provisions of this Agreement.
6
8. BINDING EFFECT
This Agreement. and everyihing contained herein, shall be binding upon the successors
and assigns of the parties hereto, and upon the lands described in Schedule "A", attached
hereto, such Schedule being a legal description of the lands, and it is further agreed that
this Agreement shall be prepared, approved and registered on title,
9. SEVERABILITY OF CLAUSES
Should any section, subsection, clause, paragraph. or provision of this Agreemenl be
declared by a Court of competent jurisdiction to be invalid, the same shall not affect the
validily of the Agreement as a whole or any part thereof, other than lhe provision so
declared to be invalid,
10. SAVE HARMLESS
The Owner, on behalf of itself, its successors and assigns, agrees to indemnify and save
harmless, lhe Township from and against any and all claims, suits, actions and demands
whatsoever, which may arise either directly or indirectly by reason of any work or service
performed by the Township, its servants or sub-contractors in order to complete the work
or services required to be compleled under this Agreement, provided the subject matter
of such action, suits, claims or demands was not caused intentionally or through gross
negligence on the part of the Township, ils servants or agents or sub-contractors.
IN WtTNESS WHEREOF, the Parties hereunto have affixed their respective seals
under the hands of their proper officers duly authorized in that behalf.
// z:;i..
SIGNED, SEALED AND DELIVERED ) "/7;,,;,,,","; ,
) Owner: 1045942 Ontario Inc.
) Ken Hewitt
) Has the Authority to Bind the Corporation
)
)
)
)
)
)
)
) The Corporation of the
) Township of Oro-Medonte
)
) per:
)
)
)
) J. Neil Craig, Mayor
)
\
)
) Marilyn Pennycook, Clerk
)
7
SCHEDULE "A" ~
NOTE: It is understood and agreed that this Schedule forms part of the Site Plan
Agreement between the Township of Oro-Medonte and 1045942 Ontario
Inc. (Ken Hewitt).
LEGAL DESCRIPTION OF LANDS
Part of the West y, and SE V. of Lot 1, Concession 14, being Parts 1, 2 and 3, 51R-
6268, being all of PIN #58530-0316 (Lt), Roll # 4346-020-004-23200-0000.
8
SCHEDULE"B"
NOTE: It is understood and agreed that this Schedule forms part of the Site Plan
Agreement between the Township of Oro-Medonte and 1045942 Ontario
Inc. (Ken Hewitt),
SITE PLAN
Site Plan is not in a registerable form and is available from the Township of Oro-Medonte.
Drawing #E-1332 prepared by Dearden & Stanton Ltd. daled May 3, 2004.
9
SCHEDULE "C"
NOTE: It is understood and agreed that this Schedule forms part of the Site Plan
Agreement between the T own?hip of Oro-Medonte and 1045942 Ontario
Inc. (Ken Hewitt).
DEEDS AND EASEMENTS TO BE CONVEYED
All title documents shall be properly drawn and execuled by lhe parties, with the
appropriate Lot or Block Number inserted in the description of the document, and the
registered Plan Number shall be left blank, to be inserted by lhe solicitors for the parties
after lhe Plan is registered and a Plan Number assigned.
The consideration for all conveyances shall be the sum of Two Dollars ($2.00) and the
cost of preparation, execution and registration thereof, shall be borne by the Owner.
All documents to be registered shall be prior approved by the solicitor for lhe Township.
The following land and easement shall be conveyed:
1.0 LANDS TO BE CONVEYED TO THE TOWNSHIP
N/A
2.0 DRAINAGE EASEMENTS TO BE CONVEYED TO THE TOWNSHIP
N/A
10
SCHEDULE "D"
NOTE: It is understood and agreed that this Schedule forms part of the Site Plan
Agreement between lhe Township of Oro-Medonte and 1045942 Ontario
Inc, (Ken Hewitt),
ITEMIZED ESTIMATE OF COST OF CONSTRUCTION
1. ITEMIZE CONSTRUCTION ESTIMATE AMOUNT
2. LETTERS OF CREDIT AMOUNT
Letter of Credit to be provided by the Owner $1,000.00
to ensure completion of all works required (refundable deposit)
under the terms of this Agreement, as noted
in Sections 5 and 1 f) herein.
II
- \
Committee of Adiustment Minutes
Thursdav March 10.2005.9:30 a.m.
In Attendance: Chairman Allan Johnson, Member Lynda Aiken, Member Dave
Edwards, Member Michelle Lynch, and Director of Planning Andria Leigh.
Absent Member: Garry Potter
Absent Staff: Junior Planner/Acting Secretary-Treasurer Andy Karaiskakis
1. Communications and Correspondence
Correspondence to be addressed at the time of the specific hearing.
2. Disclosure of Pecuniary Interest
None declared
3. Hearinas:
9:30 Robert Marchessault & Teresa Cullen 2005-A-04
Cone. 5, West Part Lot 16 (Oro)
108815/16 Sideroad West
In Attendance: Mr. Robert Marchessault & Ms. Teresa Cullen, applicants
BE IT RESOLVED that:
Moved by Dave Edwards, seconded by Michelle Lynch
"That the Committee hereby Approve Minor Variance Application 2005-A-04,
subject to the following conditions:
1. That an Ontario Land Surveyor provide verification to the Township of
compliance with the Committee's decision by 1) pinning the footing and 2)
verifying in writing prior to pouring of the foundation so that the addition be
no larger than 48.5 m2 (522 ft2) and the addition be located no closer than
2.0 metres (6.5 feet) from the interior side yard;
2. That the setbacks be in conformity with the dimensions as set out in the
application and on the sketches submitted with the application and
approved by the Committee; and,
3. That the appropriate building permit be obtained from the Township's Chief
Building Official only after the Committee's decision becomes final and
binding, as provided for within the Planning Act R.S.O. 1990, c. P. 13.
.. ...Carried."
Committee of Adjustment-March 1 0, 2005
Page 1
-
9:40 Roger Oatley 2005-A-05
Conc.1, Plan 1561, Lot 5, Part of Lot 6 (Oro)
15 Georgina Drive
In Attendance: Mr. Ted Handy, architect, and Mr. Roger Oatley, applicant
BE IT RESOLVED that:
Moved by Dave Edwards, seconded by Lynda Aiken
"That the Committee hereby Approve Minor Variance Application 2005-A-05
subject to the following conditions:
1. The proposed dwelling shall be setback no closer than 10 metres (32.8
feet) from the slope crest;
2. That the vegetative cover be maintained on the slope and that the slope
not be steepened and fill materials should not be placed on the slope, as
per the Geotechnical Slope Stability Analysis prepared by Terraprobe
Limited dated February 17, 2005;
3. That the setbacks be in conformity with the dimensions as set out in the
application and on the sketches submitted with the application and
approved by the Committee;
4. That an Ontario Land Surveyor provide verification to the Township of
compliance with the Committee's decision by 1) pinning the footing and 2)
verifying in writing prior to pouring of the foundation that the proposed
dwelling be no closer than 10 metres (32.8 feet) from the slope crest; and,
5. That the appropriate building permit be obtained from the Township's
Chief Building Official only after the Committee's decision becomes final
and binding, as provided for within the Planning Act R.S.O. 1990, c.P. 13.
.. ...Carried."
Committee of Adjustment-March 10, 2005
Page 2
""""'
9:50 1267866 Ontario Ltd 2005-B-04
Cone. 8, Part Lot 16
757 Line 7 N. (Oro)
In Attendance: Ms. Josephine Martensson-Hemsted and Mr. John
Martensson, applicants, Mr. Doug McBride, neighbour
BE IT RESOLVED that:
Moved by Lynda Aiken, seconded by Dave Edwards
"That the Committee hereby Grant Provisional Consent regarding Application
2005-B-04 subject to the following list of conditions:
1. That three copies of a Reference Plan for the subject lands indicating the
severed parcel be prepared by an Ontario Land Surveyor be submitted to
the Secretary-Treasurer;
2. That the applicant prepare and submit a copy of the proposed
conveyance for the parcel severed, for review by the Municipality;
3. That all municipal taxes be paid to the Township of Oro-Medonte; and,
4. That the conditions of consent imposed by the Committee be fulfilled
within one year from the date of the giving of the notice.
.. ...Carried."
Committee of Adjustment-March 10, 2005
Page 3
10:00 Crescent Construction Limited 2005-B-05
Cone. 11, Part Lots 10 & 11 (Medonte)
1160 Mount St. Louis Road E.
In Attendance: Mr. Murray George Vivian, neighbour, and Robert Gray,
neighbour
BE IT RESOLVED that:
Moved by Dave Edwards, seconded by Michelle Lynch
"That the Committee hereby Grant Provisional Consent regarding Application
2005-B-05 subject to the following conditions:
1. That three copies of a Reference Plan for the subject land indicating the
severed parcel be prepared by an Ontario Land Surveyor be submitted to
the Secretary-Treasurer;
2. That the applicant's solicitor prepare and submit a copy of the proposed
conveyance for the parcel severed, for review by the Municipality;
3. That the severed lands be merged in title with Part 1 on RP 51 R022304
and that the provisions of Subsection 3 or 5 of Section 50 of The Planning
Act apply to any subsequent conveyance or transaction involving the
subject lands;
4. That the applicants solicitor provide an undertaking that the severed lands
and the lands to be enhanced will merge in title;
5. That all. municipal taxes be paid to the Township of Oro-Medonte; and,
6. That the conditions of consent imposed by the Committee be fulfilled
within one year from the date of the giving of the notice.
.....Carried."
Committee of Adjustment-March 1 0, 2005
Page 4
10:10 Horseshoe Valley Resort 2005-B-06
Conc.3, Part East Half Lots 1 & 2, being Parts 2, 10, 11, 12, 13,
15,18,21 & 31 on RP 51R-32830 (Medonte)
In Attendance: Ms. Ellen Dunn, representing Horseshoe Valley Resort
BE IT RESOLVED that:
Moved by Michelle Lynch. seconded by Dave Edwards
"That the Committee hereby Grant Provisional Consent regarding Application
2005-B-06 for the proposed easement to the New Millennium Homes
Condominium Project subject to the following conditions:
1. That the applicant prepare and submit a copy of the proposed
conveyance for the parcel severed, for review by the Municipality; and
2. That the conditions of consent imposed by the Committee be fulfilled
within one year from the date of the giving of the notice.
.....Carried."
Committee of Adjustment.March 10, 2005
Page 5
10:20 Carl Campitelli & Giovanni Campitelli 2005-8-07
Cone. 6, Part Lot 7, Part 1 on RP 51R-15836 (Medonte)
In Attendance: Mr. Carl Campitelli, applicant, Mr. Robert Shannon,
neighbour, Mr. Mark Phillips, neighbour, and Mr. Ed Balko, neighbour
BE IT RESOLVED that:
Moved by Dave Edwards, seconded by Lynda Aiken
"That the Committee hereby Grant Provisional Consent regarding Application
2005-B-07 subject to the following list of conditions:
1. That three copies of a Reference Plan for the subject lands indicating the
severed parcel be prepared by an Ontario Land Surveyor be submitted to
the Secretary-Treasurer;
2. That the applicant prepare and submit a copy of the proposed
conveyance for the parcel severed, for review by the Municipality;
3. That all municipal taxes be paid to the Township of Oro-Medonte;
4. That the applicant pay a cash-in-lieu of parkland levy in the amount of $
2000.00 in accordance with By-law 2004-076;
5. That the applicants obtain an entrance permit from the Roads
Department;
6. That the applicants prepare an Environmental Impact Study (EIS)
required under Section 3.7.6 of the County Official Plan, to the
satisfaction of the County and Township;
7. That the applicant pay a Development Charges Fee to the Township in
the amount determined by Council as of the date the fee is received by
the Township; and;
8. That the conditions of consent imposed by the Committee be fulfilled
within one year from the date of the giving of the notice.
.. ...Carried."
Committee of Adjustment-March 10,2005
Page 6
C\ -
10:30 Tim & Shelley Pierce 2005-A-06
Plan 1464, Lot 76 (Oro)
3 Mazepa Place
In Attendance: Mr. Tim Pierce and Ms. Shelley Pierce, applicants
BE IT RESOLVED that:
Moved by Lynda Aiken, seconded by Michelle Lynch
"That the Committee hereby Approve Minor Variance Application 2005-A-06 as
follows:
THAT PERMISSION TO EXPAND A LEGAL NON-COMPL YING
STRUCTURE IS GRANTED FOR 3 MAZEPA PLACE FOR A 148.6 M2
(1600 FT2) TWO STOREY ADDITION ONTO AN EXISTING DWELLING
and subject to the following conditions:
1. That the setbacks be in conformity with the dimensions as set out in the
application and on the sketch submitted and approved by the Committee;
2. That the proposed addition be located no closer than 1.7 metres (5.6 feet)
from the interior side lot line,
3. That the applicants apply for and obtain approval for the combined
application for Site Plan Control/Removal of the Holding Provision;
4. That the applicants satisfy the comments from the Building Department
regarding sewage system approvals;
5. That an Ontario Land Surveyor provide verification to the Township of
compliance with the Committee's decision by 1) pinning the footing and 2)
verifying in writing prior to pouring of the foundation by way of survey/real
property report so that the proposed addition be no closer than 1.7 metres
(5.6 feet) from the interior side lot line; and,
6. That the appropriate building permit be obtained from the Township's Chief
Building Official only after the Committee's decision becomes final and
binding, as provided for within the Planning Act R.S.O. 1990, c.P. 13.
.....Carried."
Committee of Adjustment-March 10, 2005
Page 7
-
10:40 Donald & Sherry Hubbert 2005-B-08
Cone. 6, Part Lot 7, Part 1 on RP 51R-15836 (Medonte)
In Attendance: Mr. Don Hubbert and Ms. Sherry Hubbert, applicants
BE IT RESOLVED that:
Moved by Lynda Aiken, seconded by Michelle Lynch
"That the Committee hereby Grant Provisional Consent regarding Application
2005-B-08 subject to the following list of conditions:
1. That three copies of a Reference Plan for the subject lands indicating the
severed parcel be prepared by an Ontario Land Surveyor be submitted to
the Secretary-Treasurer;
2. That the applicant prepare and submit a copy of the proposed
conveyance for the parcel severed, for review by the Municipality;
3. That all municipal taxes be paid to the Township of Oro-Medonte; and,
4. That the conditions of consent imposed by the Committee be fulfilled
within one year from the date of the giving of the notice.
.. ...Carried."
Committee of Adjustment-March 1 0, 2005
Page 8
6. Other Business
i. Revise decision for 2005-A-01 (Vandergeest)
COMMITTEE OF ADJUSTMENT DECISION to MODIFY CONDITIONS OF
APPROVAL
WHEREAS Committee deems it necessary to clarify the conditions of the
minor variance and finds the modifications to be minor and of a technical
nature, and
WHEREAS Committee deems the changes to the conditions to be minor
and therefore no Notice of the change to conditions is required;
NOW THEREFORE BE IT RESOLVED that:
Moved by Dave Edwards, seconded by Michelle Lynch
"That the Conditions to Minor Variance Application 2005-A-01 be modified to
state:
THAT PERMISSION TO EXPAND A LEGAL NON-COMPLYING
STRUCTURE IS GRANTED FOR 847 LINE 3 NORTH FOR A 74.4 M2
(801 FT2) SINGLE STOREY ADDITION ONTO AN EXISTING DWELLING
and subject to the following conditions:
1. That the setbacks be in conformity with the dimensions as set out in the
application and on the sketch dated December 14, 2004 and approved by
the Committee;
2. That an Ontario Land Surveyor provide verification to the Township of
compliance with the Committee's decision by 1) pinning the footing and 2)
verifying in writing prior to pouring of the foundation so that the addition be
no larger than 74.4 m2 (801 fe); and,
3. That the appropriate building permit be obtained from the Township's
Chief Building Official only after the Committee's decision becomes final
and binding, as provided for within the Planning Act R.S.O. 1990, c.P. 13.
.....Carried."
Committee of AdjustmentMMarch 10,2005
Page 9
ii. Adoption of minutes for February 10, 2005 Meeting -
Moved by Dave Edwards, Seconded by Lynda Aiken
"That the minutes for the February 10th 2005 Meeting be adopted as
printed and circulated
.. .Carried."
iii. Appointment of Secretary-Treasurer
Moved by Lynda Aiken, Seconded by Dave Edwards
"That the Committee hereby appoints Andy Karaiskakis as Secretary-
Treasurer for the Committee of Adjustment.
...Carried."
7. Adiournment
Moved by Michelle Lynch, Seconded by Lynda Aiken
"We do now adjourn at 11 :55 a.m."
... Carried."
(NOTE: A tape of this meeting is available for review.)
Chairperson, Secretary-Treasurer,
Allan Johnson Andy Karaiskakis
Committee of Adjustment.March 10, 2005
Page 10
,
-
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD 2005-006 Committee of the Whole Andy Karaiskakis, Junior
Planner
Subject: Department:
Council
Zoning By-law Amendment for Planning
C.ofW. Dale Plant
Concession 9, Part of Lot 10
(Oro)
Date:
Motion # 11~
A.M. File No.
Date: D14014161
II BACKGROUND: 1-
The purpose of this report is to consider the proposed Zoning By-law Amendment application submitted
by Dale Plant. The intent of this application was to rezone a parcel of land that was severed by the
Committee of Adjustment for institutional purposes in September 2004.
The application applies to lands legally described as Concession 9, Part of Lot 10, in the Township of
Oro-Medonte (formerly Oro). The intent of the proposed Zoning By-law Amendment is to rezone the
subject lands from the Agricultural/Rural (A/RU) Zone to the Institutional (I) Zone.
II ANALYSIS: I'
In September 2004, the Committee of Adjustment granted a consent application to sever and convey a
portion of the agricultural land to the lands directly to the east having an area of approximately 1
hectares (2.5 acres) which was intended to be utilized for institutional purposes. As the parcel was
currently zoned Agricultural/Rural (A/RU), the Committee of Adjustment included a condition in their
decision that required the severed lot to be rezoned to an institutional zone to reflect the intended usage.
, -
The applicant submitted the application for rezoning and a public meeting as required by the Planning
Act was held on February 21, 2005. Written comments were received from Simcoe County District
School Board indicating that they had no objection to the approval of the proposed re-zoning.
The proposed Zoning By-law Amendment would conform with the intent and policies of the Oro-Medonte
Official Plan and the County of Simcoe Official Plan. On this basis, it is recommended that a Zoning By-
law Amendment be given favorable consideration by Council.
II RECOMMENDATION (S): I~
1. THAT this report be received and adopted; and
2. That a zoning by-law amendment for Dale Plant, that would rezone the lands described as Part
of Lot 10, Concession 9 (Oro), on Schedule A13 of Zoning By-law 97-95, as amended from the
Agricultural/Rural (A/RU) Zone to the Institutional (I) Zone be given favorable consideration; and
3. That the Clerk bring forward the appropriate by-law for Council's consideration.
Respectfully submitted,
A~~;'
Junior Planner
Reviewed and approved by,
--1~ ~
Andria Leigh, MCIP, RPP
Director of Planning
/
C.A.O. Comments: Date: ~\o..Aj II 0,,':,
\
" ()~" (\~
I \
IU. U
\ /
C.A.O. Dept. Jead
2
. .
THE CORPORATION OF THE MUNICIPALITY OF ORO-MEDONTE
BY-LAW NO. 2005-
Being a By-law to change the zoning on lands within Concession 9, Part of
Lot 10 (Oro) now in the Township of Oro-Medonte (Plant - Roll # 43-46-010-
004-05500-0000).
WHEREAS the Council of the Corporation of the Township of Oro-Medonte is empowered to pass
By-laws to regulate the use of land pursuant to Section 34 of the Planning Act, R.S.O. 1990,
c.P.13.
AND WHEREAS Council deems it appropriate to re-zone the lands to permit the development of
institutional uses, in accordance with Section 02 of the Official Plan
AND WHEREAS Council deems it appropriate to place the subject land in a zone with permitted
uses that are better suited for the subject lot:
NOW THEREFORE the Council of the Corporation of the Township of Oro-Medonte enacts as
follows:
1. Schedule 'A13' to Zoning By-law No. 97-95 as amended, is hereby further amended by
changing the zone symbol applying to the lands located in Concession 9, Part of Lot 10, in
the former geographic Township of Oro, now in the Township of Oro-Medonte, from the
Agricultural/Rural (A/RU) Zone to the Institutional (I) Zone as shown on Schedule 'A-1'
attached hereto and forming part of this By-law.
2. This By-law shall come into effect upon the date of passage hereof, subject to the
provisions of the Planning Act, as amended.
READ A FIRST AND SECOND TIME on the 6th day of April, 2005.
READ A THIRD TIME and finally passed this day of April, 2005.
J. Neil Craig, Mayor
Marilyn Pennycook, Clerk
. .
~
Schedule 'A-11 to By-Law
This Is Schedule 'A-1' to By-Law 2005-
passed the day of
Mayor
J. Neil Craig
Clerk
Marilyn Pennycook
1
CON IX
lOT 10
LANDS SUBJECT TO
THE RE-lONING
O~O
~<(;. '"
'C~0'"
O\"O
100 0
1111,1
"""'-
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Council Prepared By:
PD 2005-010 Wesley R. Crown,
MCIP, RPP
Subject: Department:
Planning
Council Telecommunications
Tower Siting Protocol
C.ofW. Date:
February 9, 2005
Motion R.M. File #:
#
Date: Roll #:
II PURPOSE II
To obtain Council approval of the "Oro-Medonte Telecommunications Siting Protocol" as the
guideline for providing municipal comments on proposals for the construction of new
telecommunications facilities within the Township.
II BACKGROUND II
All telecommunications facilities, including cellular/wireless towers, are federally regulated
installations and require approval from Industry Canada. As a federally regulated industry local
municipalities, including the Township of Oro-Medonte, have no approval authority with respect to
the location and construction of telecommunications facilities.
Industry Canada does require, as part of its review and approval process, that the
telecommunications provider obtain comments from the local land use planning authority.
1
( -
Generally, the Municipality's comments with respect to proposed telecommunications facilities is
limited to a determination of concurrence or non-concurrence with the proposed facility based on
land use impacts. While Industry Canada will take into consideration the Township's comments
with respect to the proposed facility, approval by the Township is not required for Industry
Canada approval of the telecommunications facility.
Historically, the Township of Oro-Medonte, has been receiving and commenting on applications
for telecommunications facilities without a formal policy or guideline with respect to how
applications will be evaluated or how comments will be provided. In addition, there is no Council
policy whether or not public consultation is required as part of the local review process. Many
municipalities have been establishing formal "protocols" with respect to how they would receive,
review, evaluate and provide comments with respect to telecommunications facilities. The main
objectives of the Siting Protocols are as follows:
. Provide a clear description of the Township's preferences for the siting of telecommunications
facilities:
. Establish an administrative process for the provision of Municipal comments on proposed
new telecommunications facilities;
. Establish a clear process for proponents of telecommunications facilities with respect to
obtaining written comments from the Township; and,
. Establish a requirement for a public consultation meeting as part of the consideration of
requests for comment on significant telecommunication facilities.
The Township has been working in a co-operative manner with the three major cellular providers
in reviewing and drafting the proposed Protocol. The intent of this co-operation is to achieve a
Siting Protocol that is acceptable to not only the Township, but also the proponents of the majority
of new telecommunication tower facilities in the Township. It is through this co-operative process
that the Municipality will best achieve its land use objectives as they relate to the construction and
location of telecommunications facilities in the Municipality.
Attached to this report is the proposed Telecommunications Siting Protocol prepared by Meridian
Planning Consultants. A draft of the protocol was circulated to Mr. Stephen D'Agostino of
Thomson Rogers, Solicitor for Bell Mobility, Rogers Cellular, and Telus Incorporated. The
cellular providers are in substantial agreement with the Protocol as currently drafted.
II PROPOSED PROTOCOL II
The proposed Protocol balances the requirements of Industry Canada for consultation with the
land use authority, the requirements of the proponents of telecommunication tower facilities for
certainty in the consultation process, with the Municipality's need to protect those land use
principles that are contained in its approved and adopted Official Plan and Zoning By-law. In
addition, the Protocol establishes a requirement for public consultation for all new major facilities.
The proposed Protocol balances these objectives in a manner that each of the parties to the
process will have a clear understanding of their roles and responsibilities at various stages of the
process.
2
t'
"""'"
The Telecommunications Siting Protocol establishes a process whereby requests for comments
on proposed telecommunications facilities are received by the Municipality and directed to one of
two streams. Insignificant telecommunication facilities, which are defined in the Protocol, are
permitted to proceed by way of a fast track review process and the provision of comments by staff
in response to the requests. Significant telecommunication facilities, which include all those
facilities which are not exempted under the proposed Protocol, will require a more detailed review
and evaluation by the Township, including a mandatory public consultation process conducted by
the proponent, and the submission of reports to Council for their final consideration with respect
to the proposed telecommunication facility.
Attached as Figure 1 to this report is a flow chart which illustrates the two stream approach to the
consideration of applications for comment for new telecommunication facilities. The flow chart
illustrates the various roles and responsibilities of staff and Council concerning the two types of
applications and the timelines within which the Municipality would commit to the processing of
both types of applications.
The Protocol, like many Municipal Policy documents, provides both locations where the
Municipality would support and encourage the establishment of telecommunications facilities, and
locations that the Municipality would discourage the location of telecommunications towers and
facilities. The Siting Protocol is very much based on the land use structure and principles that the
Municipality has established in its Official Plan and Zoning By-law. For example, the Municipality
has expended considerable effort in researching, evaluating and identifying the core natural
heritage features of the significant Oro Moraine in the Township. The Township has identified
this major land form feature as well as the major environmental functions that are supported by it
as critical components of the Municipality. The proposed Siting Protocol discourages the location
of telecommunications facilities within all significant natural heritage features, including the Oro
Moraine, as designated by the Township Official Plan. In addition, the Siting Protocol
discourages the location of telecommunications towers on prime agricultural land as designated
by the Municipality's Official Plan. Again, the objective is to support the major policies in the
Township's Official Plan to protect and preserve the agricultural resource base of the Municipality.
The Siting Protocol, in Section 3.1, establishes a series of locations in the Municipality where
telecommunications facilities are deemed to either be insignificant or to have limited land use
impacts as a result of the context within which it would be located. For example, the location of
telecommunications towers on existing buildings would be deemed to have little if any land use
impacts and as such would be exempt from the formal public consultation and review process as
set out in the Protocol. Additional areas that the Municipality would direct the location of
telecommunications facilities, and thus exempt from the detailed consultation and evaluation
process under the Protocol, include locations within 200 metres of the established haul routes in
the Municipality, locations within 200 metres of Provincial highways but more than 200 metres
away from existing residential uses, locations on existing aggregate sites, towers of less than
16.6 metres in height, new facilities co-located on existing towers, and facilities utilizing stealth
design. In all of these instances land use impacts will be limited, and as such will be exempt from
the full evaluation and consultation process as set out in the Protocol. Exempt facilities will be
reviewed internally by staff and comments would be provided within a two week timeframe. The
intent of the Protocol is to encourage the telecommunications proponents to find locations or
approaches that would meet the exemptions in the Protocol thereby limiting the land use impacts
and resulting in a quicker commenting process.
3
Significant facilities would be those telecommunications towers which would not meet the
definition of insignificant and exempt under the proposed Protocol. Significant facilities would
require a more detailed evaluation and consultation process prior to a determination of the
Township's position under the Protocol. The proposed Protocol would require the proponent to
submit a series of detailed drawings in support of the request for comments and would also
require the proponent to conduct at least one public consultation meeting with those landowners
immediately adjacent to the proposed telecommunications facility site. The Protocol establishes
notice and signage requirements and a series of very specific tasks that must be undertaken by
the proponent as part of the completion of the consultation meeting and the reporting to the
Municipality on the results of the meeting. The Municipal staff assigned to undertake the work
would prepare a detailed staff report along with the results of the consultation meeting for review
and consideration by Council at the next available meeting. Where significant facilities are
proposed, Council would be responsible for making the final determination with respect to the
Municipal position regarding its concurrence or non-concurrence with the proposed location. This
ensures that Council is directly involved in determining the Municipal position regarding those
telecommunications facilities which have the potential to have land use impacts on adjacent and
surrounding property owners.
Through the establishment of a two stream process the proposed Telecommunications Siting
Protocol will encourage proponents to locate their facilities on sites that meet the locational
criteria as established by Council, and also ensure that significant facilities which do not meet the
exemption criteria in the Protocol will receive a thorough evaluation and determination by Council.
The Protocol also makes it clear that the Director of Engineering and Environmental
Services will be responsible for the administration of the protocol.
II CONCLUSIONS I
The Township of Oro-Medonte is served by two major north/south provincial transportation
routes, Highway 400 and Highway 11, which are significant corridors for the location of
telecommunication facilities serving the broader Ontario region. In addition, significant settlement
areas in the Township also require telecommunication facilities to meet their cellular and wireless
needs both now and in the future. While the Township has seen a significant number of
telecommunication facilities in the past, it is very likely that the Township will continue to see
additional telecommunications facilities as all three major cellular and wireless providers continue
to expand their service networks both for the public travelling through the Township and for the
residents and visitors to the Municipality.
The proposed Telecommunications Siting Protocol provides a clear policy framework within which
the Municipality can receive, consider, evaluate, and determine a position with respect to all
future proposals for telecommunications facilities within the Municipality. The Siting Protocol will
be a tool that can be used by staff, Council and telecommunication carriers in determining the
appropriate location for telecommunication facilities and towers such that land use impacts may
be eliminated and/or mitigated. The proposed Protocol attempts to achieve most of the land use
objectives of the Municipality as currently enunciated in its Official Plan and Zoning By-law and in
particular, attempts to protect the environment first principle as set out in the Municipality's Official
Plan.
4
II RECOMMENDATION II
It is therefore recommended to Council:
1. That Report PO 2005-010 be received and adopted;
2. That the Telecommunications Siting Protocol for the Township for Oro-Medonte dated
February 2005 by Meridian Planning Consultants be approved: and
3. That the approved Protocol be provided to all telecommunications proponents for their use in
submission of telecommunications proposals.
Respectfully submitted,
---1 J -tV
Wesley R. Crown MCIP, RPP
Associate
C.A.O. Comments: Date:
C 010 culL vv 1\ 11 fl.,t ~<:Jf:L-;
-'+-( '1 j !7105
C.A.O. Dept. Head
C~
(1ttO f1J#J 17/0{-
~)?
\~
. v-
I
5
'" - \..D
Draft
Township of Oro-Medonte
Telecommunication Facilities
and Structures Siting Policy
Prepared by:
Meridian Planning MERIDIAN
Consultants Inc.
File: 2534 PlANNING CONSUlTANTS INC.
February, 2005
-
Throughout this document "telecommunications tower or facilily" will refer to any tower, guy wire.
or structure facility associated with the sending or receiving of airwave (cellular) information.
PART 1 - INTRODUCTION
1.0 PURPOSE
The purpose of this document is to outline the process to be tollowed to tacilitate the
establishment of new telecommunication towers or facilities in the Township of Oro-Medonte,
This document will outline the areas of the municipality where telecommunication towers or
facilities are encouraged as well as where they should not be directed, In addition, it will outline
the procedures to be followed by telecommunications carriers when establishing significant new
or significantly expanding existing facilities,
1.2 BACKGROUND
Residents of Oro-Medonte and Ontario are becoming increasingly dependent on wireless
communications to enhance their daily lives from both a business and personal perspective,
Emergency response services such as 911, police, fire and ambulance services also rely on
wireless communication to reduce response times and ultimately keep the municipality's
residents safe,
In order to increase the level of service that telecommunication carriers provide, there must also
be an increase in the associated infrastructure, In anticipation of this increased demand. this
policy has been developed by the municipality to not only mitigate the potential land-use conflicts
between new large-scale telecommunication towers but also to encourage co-location, the use of
existing structures (buildings, water towers, barns) and stealth design and unobtrusive design, In
the future, as service providers scope-down and localize their networks, it is anticipated that
stealth design in telecommunication towers will be the vehicle of choice for carriers, As a result,
this policy encourages stealth applications in all areas of the municipality, Before stealth design
becomes viable throughout the municipality, the municipality will promote co-location and
unobtrusive design', It must be noted that co-location and unobtrusive design are mutually
exclusive, Co-location towers are more bulky in order to support increased load and therefore a
more obtrusive design, The municipality will work with service providers to determine which
option is best suits each location, Emphasis will be placed on co-location,
1.3 ROLE OF THE MUNICIPALITY
Telecommunications and telecommunication infrastructure in Canada fall under the jurisdiction of
the federal government and as such. is regulated by Industry Canada, Through CPC-2-0-03,
(Environmental Process, Radio frequency Fields and Land-Use Consultation), Industry Canada
has recognized that local land-use authorities should have an opportunity to influence the location
of telecommunication towers and facilities, Although Industry Canada requires consultation with
land-use planning authorities, it is not obligated to act upon the recommendations of these
authorities. It is therefore imperative that this policy establish a cooperative approach in its
attempt to direct the siting of telecommunication structures and facilities to desired locations
within the Township of Oro-Medonte,
J Stealth Design refers to transmitters that are hidden within existing structures or designed to look like
something else (i.e. flag pole or a tree) or designed to mirror the surrounding landscape.
r\
TownshipofOro-Medonte ( ~I1ERIDIAN Page 1
Telecommunications Siting Protocol V ...-....~"""- February 2005
(
The Township of Oro-Medonte realizes the need for wireless communication infrastructure in the
municipality and is excited about the opportunity to work in cooperation with the wireless service
providers to develop site locations within the municipality,
The Director of Engineering and Environmental Services for the Township shall administer this
Protocol.
1.4 OBJECTIVES OF THE POLICY
The placement of towers in most rural municipalities is the subject of much debate,
particularly in areas where new services are being introduced, However, appropriate locations
can be found in most instances when the municipality establishes a set of location objectives,
On this basis and on the basis of Oro-Medonte's location in the County of Simcoe it is the
objective of the Township to:
. Encourage the review of all alternatives such as co-location and unobtrusive design and
to only support the construction of new towers when all other possibilities have been
exhausted,
. Ensure that new towers are sited in a manner that respects the environmentally
significant features, and significant sightlines of Oro-Medonte,
. Locate towers as far away as possible from the existing dwellings
. Ensure that new towers are sited to provide a high level of service, whenever possible
and in keeping with the objectives of the Township Official Plan,
. Encourage consultation between telecommunications carriers and the Township. Key
items for discussion will include; optimal site location. the possibility of co-location,
unobtrusive site design, and details of structure design,
. Provide a forum that will inform the public as to the intentions of telecommunication
providers in their community,
. Provide telecommunication providers with a better understanding of the positive and
negative site locating factors throughout the municipality,
. Provide applicants with the Township's opinion of proposals (concurrence or non-
concurrence) within 60 days of receiving an application, In addition, when a consultation
process is required, complete the process within 120 days,
PART 2 - IDENTIFYING OPTIMUM SITES LOCATIONS
2.0 LOCATIONAL OPPORTUNITIES
The municipality has identified areas of the Township where telecommunication towers or
facilities would be best located to satisfy both consumer needs and have limited land use
impacts, These areas include the Highway 400. and 11 corridors, areas zoned Mineral
Aggregate Resource and existing tower locations,
2.1 LOCATIONAL CONSTRAINTS
2.1.1 Environmental - Directing Development Away From Environmentally
Sensitive Features
There are a variety of environmental constraints within Oro-Medonte including numerous
wetlands, the Oro Moraine, Copelands Forest, Bass Lake and Lake Simcoe,
Environmentally Sensitive Features are generally those lands designated Environmental
//"0.,\
Township of Ora-Medonte (J !illlillAM Page 2
Telecommunications Siting Protocol February 2005
C
Protection in the Township Official Plan or "Core Areas" in the Oro Moraine. It is the
desire of the Township to direct the development of telecommunications towers away
from these areas and lands zoned Environmental Protection in the Township's
Comprehensive Zoning By-law.
Over the past two years the Township has worked hard to develop policy to protect the
natural heritage of the Oro-Moraine, In all possible cases. Oro-Medonte would like to
direct the development of telecommunications towers outside the Moraine, The
Township realizes that the Moraine covers an extensive portion of the Township and that
Moraine features are prime locations for telecommunication structures and facilities.
However, when a tower must be placed on the Moraine, carriers are encouraged to seek
a location listed in Section 3.1,
2.1.2 Aeronautics - directing development away from Lake Simcoe Regional
Airport
Telecommunications towers and facilities must be situated in a manner that they are not
disruptive to the ftight paths of the Lake Simcoe Regional Airport.
2.1.3 Agricultural - Discouraged within existing agricultural lands
Agricultural lands are important to the Township and new telecommunication towers and
facilities are directed away from actively cultivated agricultural lands. If towers and
facilities must be located in agricultural areas, they are encouraged to explore options
such as locating on barn tops, silos, windmills or other existing structures, Where new
towers must be developed on prime agricultural land, a tower structure which causes a
minimal loss of actively cultivated lands should be used,
PART 3 - PROCEDURES
3.0 SUBMISSION REQUIREMENTS FOR CARRIERS
All proposals for new telecommunication towers and modifications to existing towers where
municipal consultation is required by Industry Canada. will require the submission of an
application to the Township which shall include the following:
1, Written documentation from the Proponent (carrier) outlining the steps taken by the
Proponent to investigate all non-tower options and why a tower option is the only viable
alternative, A pre-consultation meeting with Oro-Medonte staff is strongly encouraged in
conjunction with this exercise to provide guidance on process matters, siting
opportunities and to provide direction on the appropriate balance between unobtrusive
design and co-locatable design,
2, A full concept plan and elevation plan drawn to scale and dimensioned showing the
subject property (or leased area if the property is not owned by the Proponent), site
grading, the location of existing property lines. setback distances from existing or
proposed buildings, property lines, fences, buffering, existing and proposed landscaping.
access, parking, and type and height of the proposed tower structure, Any significant
vegetation on a particular site should be inventoried on the plan, This is not a site plan
as required by Section 41 of the Planning Act.
Township of Oro-Medonte MERIDIAN Page 3
Telecommunications Siting Protocol IVN<NCcow.t.T.....,.."", February 2005
c ~ \
3. Two sets of stamped engineered drawings of the tower design, In the case of roof
mounted towers, a structural engineer's report may also be required to address the
structural effects on the building.
4. A statement from the Proponent to indicate the need for the proposed tower height.
5, A map showing the horizontal distance between the tower installation and the nearest
residential zone and/or residential dwellings.
6, A description of the proposed lighting scheme for the tower
7. Application for building permit, to address the following matters:
a) Equipment shelters that exceed 10 square metres of gross floor area,
b) Towers that are to be mounted or attached to an existing building,
c) Towers that exceed 16,6 metres above ground level.
(It is recognized that that antenna support structure and equipment buildings
must comply with the National Building Code and that there is no jurisdiction on
the municipalities part to issue a building permit, however, the carrier and the
Township will cooperate with respect to this matter to the mutual benefit of both.)
3.1 EXEMPTIONS FROM PUBLIC PROCESS - PREFERRED DESIGN
CHARACTERISTICS AND SITE LOCATIONS
In an attempt to direct the siting of telecommunication towers and facilities and to encourage
alternatives to tower structures, Oro-Medonte has developed the following list of site locations
and structures that are exempted from the public process under this protocol. Carriers will benefit
from selecting one of the following sites or facilities by a quicker municipal commenting process,
. Stealth Design in existing structures of any size and new structures such as flag poles
and street lights under 20m,
. Co-location on existing sites or structures (Le, water towers) is encouraged and will be
exempt from a public process provided that the proposed telecommunications facility or
tower is not more than 8m above the upper most portion of the structure or more than
25% of the height of the original structure or tower, whichever is less,
. Sites adjacent (within 200m of the right-of-way) to a designated haul route as defined in
the Official Plan or Township By-law and located more than 200m from a residential
dwelling,
. In order to be exempted, sites in the following three locations must be located a minimum
of the tower height plus 25% of its height away from any roadway (excluding guy wires
which must be located no closer than 8m). All towers or facilities must be located 8m
from the interior or rear lot line,
. Sites zoned Mineral Aggregate Resource (MAR1),(Locations for facilities shall not impact
the extraction or potential extraction of aggregate from the MAR1 zoned sites)
. Locations adjacent to Highway 400 and Highway 11 corridors (within 200m of the right-of-
way of either highway) and situated more than 200m from a residential dwelling
Township of Oro-Medonte MERIDIAN Page 4
Telecommunications Siting Protocol ~-= February 2005
~~ \
(locations within the highway right-of-way are under the jurisdiction of the Ministry of
Transportation,)
. Ground support towers less than 16.6 metres in height and located more than 200m from
a residential dwelling,
. Locations on municipal buildings or lands,
In cases where no public consultation is required, a letter of concurrence shall be provided by the
Township within two weeks of receiving an application from the proponent to advise that the
Township's requirements have been satisfied,
3.2 PUBLIC CONSULTATION PROCESS - OPEN HOUSE
Public consultation will be required when proposed telecommunications structures do not meet
the criteria for exemption listed in Section 3.1
When public consultation is required, the Township and the applicant will work together to ensure
the public is made aware of the proposal and given and opportunity to voice any concerns, The
format for public consultation will be an Open House meeting, The Open House will provide an
opportunity to inform the public about the proposal, solicit their views on matters related to site
impact mitigation and address any other concerns residents might have with the technology that
is being used.
3.2.1 Roles of the Participants - the municipality and the carrier, a shared
responsibility
The Proponent shall erect a sign on the property notifying the pUblic of a proposal to
establish a telecommunication facility on the property. The sign shall be erected on the
property so that it is clearly visible and legible from the roadway and shall be a minimum
1,5m wide by 1,5m high and located a minimum 0.6m from the ground, Each sign shall
be professionally prepared and contain the following wording:
Figure 1 . Sign Wording
Name of Applicant proposes to locate a telecommunications tower or facility, being
(height) metres in height. on this property.
Public Comment is invited
An Open House information session is scheduled on (Date of meeting) from _to
at the (location)
For filrther information, contact proponent name and contact numher.
The Township will post notice of the Open House on the municipal website,
/++\
Township of Oro-Medonte (J t!lRJ!!!A~ Page 5
Telecommunications Siting Protocol February 2005
~c. - \
The Township will provide the applicant with a list of land owners within a radius of 120m of the
proposed telecommunication structure, The applicant will be required to prepare and distribute
the notice which will include:
1. A location map of the proposed site,
2, Physical details of the tower including height, colour. lighting, type and design and the
dimensions of property to be leased.
3. Name and telephone number of a contact person employed by the Proponent.
3.2.2 Open House - Procedural Requirements
1, The Open House will be convened by the Proponent and the municipality will be invited
to attend,
2, The Open House shall occur no sooner lhan 20 days, and no later than 40 days, from the
date that the notices are mailed and the sign erected,
3, The Proponent shall provide 4 colour photographs of the subject property (no smaller
than 11"X 1 7") with a superimposed image of the proposed structure, The pictures shall
face each of the north, south. east and west directions and be taken from a distance,
from the base of the tower as specified by the municipality,
4, Following the meeting the Proponent shall:
a) Provide a record of names, addresses and phone numbers of attendees;
b) Provide a record of the meeting to identify the issues and concerns that were
raised: and,
c) Provide a follow-up letter to the Township to indicate their formal response to
concerns raised during the public meeting. Should any modifications to the
proposed structure be agreed to. then further details (revised plans or drawings)
will be provided as soon as possible,
5, After the Proponent has satisfied the Open House requirements. the following procedure
shall be followed:
a) The proponent shall submit the results and a record of the Open House to the
Township,
b) A copy of the application, a municipal staff report, and record of the Open House
will be provided to Council by municipal staff,
c) Council will provide a Letter of Comment to Industry Canada which will;
i) Indicate whether in the opinion of the Township, adequate public
consultation has been conducted by the Proponent:
ii) Indicate the Township's concurrence/non-concurrence based on
probable land use impacts; and,
Township of Ora-Medonie MERIDIAN Page 6
Telecommunications Siting Protocol ~~OM'$'NC February 2005
( ~ \ ')
iii) Where it is clear that the carrier has exhausted all attempts to resolve
local concerns and disagreement still exists. provide formal notification of
the impasse to Industry Canada.
Note: This Protocol does not exempt any Proponent from obtaining other approvals as required
by other federal, provincial, or municipal authorities,
Township of OrowMedonte MERIDIAN Page 7
Telecommunications Siting Protocol ~-~ February 2005
FIGURE #1 -"4
ORO-MEDONE SITING PROTOCOL PROCESS
STAFF REVIEW
Determination if application meets
exemption criteria of Section 3.1
Application circulated to all Application circulated to all
Departments Departments and Notice to Council
en
~
w
W Proponent holds
~ Public Open House
N Comments reviewed and assessed as per Section 3.2
(X)
-i
0
....
Proponent submits record of I\)
Open House to Township :E
m
Letter drafted and sent to Applicant m
;:II;
en
Summary' Report prepared by Staff
for Council
Council consideration
Letter provided to Applicant either
In concurrence or non-concurrence
wllh proposed facility and location
- \
CPC-2-0-03
Issue 3
June 24, 1995
Spectrum Management and Telecommunications Policy
Client Procedures Circular
Environmental Process, Radiofrequency
Fields and Land-Use Consultation
CanadaJ Aussi disponible en frangais - CPC-2-0-03
c\ c- \
Client Procedures Circulars describe the various procedures or processes
to be followed by the public when dealing with Industry Canada. The
information contained in these circulars is subject to change without
notice. It is therefore suggested that interested persons consult the nearest
district office of Industry Canada for additional details. While every
reasonable effort has been made to ensure accuracy, no warranty is
expressed or implied. As well, these circulars have no status in law.
Comments and suggestions may be directed to the following address:
Industry Canada
Radiocommunications and
Broadcasting Regulatory Branch
300 Slater Street
Ottawa, Ontario
KIA OC8
Attention: DOSP
via e-mail: spectrum_pubs@ic.gc.ca
All spectrum publications are available on the Intemet at:
http://strategis.ic.gc.ca/spectrum
c\ \
- I
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
Introduction
Industry Canada recognizes the importance of considering the potential impact of antennas
and their supporting structures on their surroundings. As such, the Department has instituted
procedures for users of the radio frequency spectrum which give consideration to the following
three areas: (i) the environment; (ii) Health Canada's Limits of Exposure to Radiofrequency
Fields at Frequenciesfrom 10 kHz to 300 GHz, Safety Code 6 (referred to as Safety Code 6 from
hereon); and (iii) land-use consultation.
In January 1995, the Parliament of Canada proclaimed the Canadian Environmental
Assessment Act (CEAA). This Act requires that federal government departments take into
account environmental effects in the exercise of their mandate. Separate from this legislative
requirement, Industry Canada has incorporated procedures to evaluate the radio frequency fields
associated with radio transmitters. Tbe Department also requires that applicants meet the
standards contained in Safety Code 6. Further, Industry Canada recognizes that land-use
authorities may have an interest in the location of significant antenna structures proposed within
their jurisdiction and may have legitimate concerns that should be considered in the exercise of
authority under the Radiocommunication Act.
These procedures were developed in consultation with the Canadian Environmental
Assessment Agency and take into consideration comments received from our request for public
comment published in notice SMRR-001-92 of the Canada Gazette on
February 15, 1992.
Principle
Industry Canada must exercise its spectrum management functions with due regard for the
environment.
Mandate
Section 5 of the Radiocommunication Act states that the Minister may take into account all
matters relevant to radiocommunication authorizations. The requirement for an environmental
assessment is contained in section 5(1)(d) of the Canadian Environmental Assessment Act.
Policy
Industry Canada will consider environmental effects and Safety Code 6, and will ensure that
land-use authority consultation has been taken into consideration before issuing a site-specific
radio authorization for significant antenna structures.
1
~ -\i
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
Process Overview
Applicants for site-specific radio authorizations are required to follow the procedures set out
in this document before Industry Canada will issue an authorization. Technical information
conceming specific issues related to broadcast applicants only, such as radio frequency exposure
analysis, may be found in the Broadcast Procedures and Rules, Part I (BPR-I) and the appropriate
BPR or BP for the specific service in which the broadcast station is operating.
Owners of those stations that do not require site-specific radio authorizations are not required
to file documentation, but have responsibilities as described in this document.
Filing Requirements
This table lists the minimum environmental and consultation information that must be
submitted to Industry Canada.
TYPE OF STATION SUBMISSION
REQUIREMENTS
Type I
Land, coast or earth stations that Preliminary Environmental
require a site-specific radio station Information and Municipal/Land-
authorization, including broadcast use Consultation Attestation
undertaking stations to which the (Annex I). Broadcasting
Broadcasting Act applies - undertakings also require a Radio
site-specific Frequency Exposure Analysis.
Type 2
Stations that do not require a site No specific filing procedure.
specific authorization, e.g., Responsibilities are as described
amateur, general radio service herein.
(GRS) and satellite receiving
stations - non-site-specific
2
C\( - \
Environmental Process. Radiofrequency fields and Land-Use Consultation CPC-2-0-03
General Procedures
Environment
This subsection applies only to Type I applicants as Industry Canada does not issue
site-specific authority to Type 2 radio station owners. Both types are required to comply with the
general procedures under the subsections entitled Radiofrequency Fields and Land-Use
Consultation.
Industry Canada expects that the installation or modification of radio stations will be done in
a manner that complies with the CEAA. Most stations will have an insignificant environmental
effect and will be excluded from the CEAA process.
Applicants for site-specific radio stations are required to include a Preliminary Environmental
Information and Municipal/Land-Use Consultation Attestation (Annex I) with each application.
Where the applicant or Industry Canada identifies that the station does not meet the exclusion
criteria established under the CEAA, further examination will be required. Should there be the
potential for an adverse environmental effect, site-specific applicants will be required tu describe
the effect and, where possible, propose mitigation measures, in compliance with the requirements
ofthe CEAA and in consultation with Industry Canada. As well, an indication is required of
whether the effect will occur during the construction, operation or modification phase.
Industry Canada will ensure that the environmental assessment process is applied as early as
is practicable in the planning stages so that environmental factors are considered in any decisions
that may be made. We expect users of the radio frequency spectrum to give due consideration to
potential environmental impacts.
Examples of Adverse Environmental Effects
The following are some examples of what may be considered adverse environmental effects:
- detrimental effects on water bodies, ground water or soil;
_ adverse effects on legislated protected areas such as national parks, historic canals or other
protected areas;
_ alteration, disruption or destruction of terrestrial and aquatic habitat for wildlife and
fisheries;
_ changes to current use oflands and/or quality oflands and natural resources for traditional
purposes by aboriginal persons;
- alteration of historical, archaeological, paleontological or heritage resources resulting from
a change in the environment.
3
( -
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
Radiofrequency Fields
Published by the Department of Health and Welfare in 1991, Safety Code 6 contains
recommended safety procedures for the installation and use of radiofrequency-emitting devices.
Maximum exposure levels and durations of exposure are used to determine whether the signal
emitted can be considered safe. We suggest that those considering a radio installation refer to
Safety Code 6 for guidance.
Industry Canada requires that radio stations be installed and operated in a manner that
complies with Safety Code 6.
Land-Use Consultation
The purpose of this procedure is to ensure that land-use authorities are aware of significant
antennas proposed within their boundaries. Industry Canada believes lhat local concerns related
to land-use are important to the community, and that municipal and other land-use authorities
should have the opportunity to make their views known with regard to radiocommunication
antenna towers within their boundaries. Therefore, we have instituted procedures to ensure that
municipalities and other land-use authorities are consulted prior to the building of significant
antenna structures.
In notice SMRR-002-90 published in the Canada Gazette on June 16, 1990, we published the
requirement that applicants intending to install significant antenna structures notifY and consult
with appropriate authorities. This consultation is intended to provide an opportunity to have
land-use concerns addressed while respecting federal jurisdiction for the installation and
operation of radiocommunication systems. However, federal jurisdiction in matters of
radiocommunications cannot provide immunity from any action that may be taken by a land-use
authority.
When Industry Canada becomes aware of a land-use authority objection to a site-specific
station, issuance of the licence will be delayed for a period of time sufficient for negotiations
between the parties. While individual circumstances will vary, Industry Canada generally
cunsiders that once a participating land-use authority is contacted, it should make its views
known to the applicant within 60 days. Further, the consultation process should be completed
within 120 days.
The siting of antennas and their supporting structures is best dealt with in a spirit of
co-operation, based on disclosure of the details to the land-use authority by those intending to
install or modifY a significant antenna structure. Early cuntact ensures an opportunity for full
consultation.
To maximize the benefits of the consultation process, the parties should consider each other's
requirements and work toward solutions that minimize the impact on the surroundings, including
considering existing sites, while not unduly prohibiting the development of the radio facility.
4
( ~ \
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
Roles of the Parties Involved
Introduction
The Canadian Environmental Assessment Agency, Industry Canada, the land-use authority
and the applicant or radio station owner all have an important role to play. Full consultation can
only be achieved through early contact by the applicant or owner with the other parties, and with
the co-operation of everyone involved.
The Canadian Environmental Assessment Agency
The role of the Canadian Environmental Assessment Agency includes:
- administering the environmental assessment process;
- providing advice to federal authorities;
- promoting uniformity and hannony in the assessment of environmental effects; and
_ promoting or conducting research in matters of environmental assessment and encouraging
the development of environmental assessment techniques and practices.
Industry Canada
The role of Industry Canada is to implement the provisions of the Canadian Environmental
Assessment Act and ensure that applicants for radio authorizations involving significant antenna
structures disclose their plans to land-use authorities and that the process operates in a timely
fashion. Industry Canada will provide information to both our clients and land-use authorities.
This may include providing observations on the validity of land-use by-laws as they relate to
radio installations.
Industry Canada does not playa direct role in the consultation. The responsibility remains
with the radio station applicant or owner and the land-use authority to work toward a mutually
acceptable agreement. Applicanls for radio stations as well as owners of stations that do not
require a site-specific radio authorization must disclose their plans for significant antenna
structures to their land-use authority. Where required, it is expected that the parties will propose
and examine alternatives and in so doing, will give consideration to each other's needs.
Land-Use Authority
Industry Canada does not require, nor does it have the power to require, the participation in
this process by any land-use authority.
The procedure does not have the effect of conferring any federal power on a land-use
authority. Nor does it confer any right of veto.
5
(
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
In the event that a proposal is opposed, the land-use authority may provide Industry Canada
with a statement should it wish to do so. There is no specified form for statements of either
concurrence or opposition.
Clients
The role of owners of Type I and Type 2 stations, as it relates to the environment,
radiofrequency fields and land-use consultation, is contained in the sections which follow. These
address specific procedures for each type of station.
More generally, experience to date and industry market forecasts indicate considerable
growth in the provision of spectrum-based telecommunication services. For the most part, the
consumers of these services are concentrated in urban areas and along transportation corridors.
Consequently, the providers of these services must, of necessity, locate their facilities in
proximity to these concentrations and thus in proximity to each other and with largely coincident
coverage areas. If all service providers were to act independently to establish separate antenna
structures, the potential would exist for justifiable concem that the number of such structures
within an area would be excessive. To avoid such a situation, Industry Canada expects applicants
and antenna structure owners, along with industry associations, to work cooperatively in reaching
agreements which allow for and encourage the sharing of antenna structures so as to minimize
their number.
Specific Procedures - Type 1 Site-Specific Stations
Environment
Type I applicants must submit a Preliminary Environmental Information Attestation
(Annex I) with their application. Where the proposal is not excluded from CEAA assessment,
the applicant must either (i) alter the proposal so as to minimize the potential for environmental
impact to the point where the exclusion requirements are met, or (ii) participate in the CEAA
assessment process as required by Industry Canada. The installation of a station must be stopped
should any unforeseen adverse environmental effect become apparent.
Radiofrequency Fields
Part of ensuring that the station complies with Safety Code 6 includes determining the
radiofrequency (RF) field that the station produces. The authorization process for Type I stations
includes an initial analysis that considers the potential effect of the proposed station within the
existing radio environment. Where the analysis indicates that the maximum RF field level
permitted by Safety Code 6 may be exceeded, the applicant may be required to undertake
mitigation measures. These measures may include reducing the transmitter power or duration of
transmission, changing the type, direction or height of the antenna, or restricting access to areas
near to the antenna. Where the calculation indicates that the proposed station will meet Safety
Code 6, Industry Canada will continue the normal authorization process.
6
~
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
In installations where there may not be compliance with Safety Code 6, the applicant may be
required to provide additional information to facilitate Industry Canada's analysis. Where this
initial analysis is inconclusive, the applicant may be required to provide measurements or
calculations to support the proposed station's compliance.
Broadcasting undertakings are required to provide a radiofrequency exposure analysis with
each application. Specific technical requirements are contained in Broadcast Procedures and
Rules, Part I (BPR-I) and the BPR appropriate for the service in which the broadcast station is
proposed.
Land-Use Consultation
All applicants for Type I stations must complete and submit a signed Municipal/Land-Use
Consultation Attestation for new or modified antenna structures (Annex I). Applicants must
consult with the municipal/land-use authority when proposing the installation of a significant
antenna structure. In the event the applicant believes that the antenna structure is not significant
and chooses not to cunsult, it will be with the acceptance of any consequences of this decision.
The Municipal/Land-Use Consultation Attestation covers the following cases: agreement by both
parties, non-response by land-use authorities, inconsequential installations and non-concurrence.
Where Industry Canada receives proof of land-use authority concurrence, or an attestation
that the proposed antenna is inconsequential (not applicable to broadcast undertakings), Industry
Canada will continue to process the application. If the attestation indicates that the land-use
authority has been consulted but has not yet made its views known, issuance of a licence may be
delayed until the views of the land-use authority are known or a sufficient time has elapsed for it
to have commented. Should the applicant attest to believing that the structure or change
proposed to it is insignificant, and accepts the consequences of this decision, Industry Canada
will continue to process the application. If an application is opposed by a land-use authority,
Industry Canada will ensure that both parties have had sufficient opportunity to negotiate before
entertaining a petition to issue the authorization.
If the land-use authority and the applicant are unable to come to an agreement, it is the
responsibility of the applicant to provide Industry Canada with a written submission detailing all
actions taken to address the concerns of the land-use authority. The information required should
include, but not necessarily be limited to: a chronological summary of all events (letters,
meetings, consultations, etc.); the requirement for the establishment of the specific site in
question; reasons for the proposed location; and a review of alternative locations considered and
reasons for their rejection, including associated costs and technical analysis. This analysis may
include pattern coverage maps, Safety Code 6 analysis or any other engineering study that may be
deemed appropriate.
7
~c-1'\
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
Applicants for broadcast undertakings shall consult with the local municipality or land-use
authority regarding the location of all proposed antenna towers. The following publications give
further information about broadcast undertaking municipal consultation:
Broadcast Procedures and Rules, Part II (BPR-II) Section C-IOA.2
Broadcast Procedures and Rules, Part III (BPR-III) Sections C-5.5.2, 0-1.3 and F-1.3
Broadcast Procedures and Rules, Part IV (BPR -IV) Sections C-5.5.2, 0-1.3, F-1.3 and
H-2.2
Broadcast Procedure 23 (BP-23) Section 6.11
Specific Procedures - Type 2 Non-Site-Specific Stations
Environment
Type 2 stations are either exempted from the requirement to hold a radio station licence or
are not issued a site-specific authority. For this type of station, Industry Canada does not approve
the siting of the installation within the existing radio environment. As such, they are not captured
by the requirements of the CEAA.
Radiofrequency Fields
Type 2 stations must comply with Safety Code 6. Where it is expected that the operation of
the proposed station will result in non-compliance with Safety Code 6, mitigation measures as
described for Type I must be pursued by the owner of the station.
Land-Use Consultation
Prior to the installation of an antenna structure for which it is felt that community concerns
could be raised, owners of Type 2 stations must consult with their land-use authority. There is no
specific procedure for this consultation, nor is there any requirement tu receive the prior approval
from Industry Canada to construct the antenna or its supporting structure. Where the land-use
authority concurs with the proposal, installation of the structure may proceed. Should the owner
of the Type 2 station believe that the proposed structure or change proposed thereto is
insignificant, and decide to proceed with the installation without consulting with the land-use
authority, it must be with the acceptance of any consequences of this decision.
Where the owner of a Type 2 station has consulted with the land-use authority but has not
received a response, the owner may decide to either:
- continue to pursue a decision from the land-use authority, or
- proceed with the installation of the structure and accept any consequences of this decision.
8
c -
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
Industry Canada expects Type 2 radio station owners to address the concerns of the
community in a responsible manner, and to consider seriously all requests put forward by the
land-use authority. Where Industry Canada believes that the installation of an antenna structure is
not appropriate within its surroundings, it may request submissions explaining why the structure
should not be altered or removed.
9
( -
Environmental Process, Radiofrequency Fields and Land-Use Consultation CPC-2-0-03
Annex 1
Preliminary Environmental Information and
Municipal/Land-Use Consultation Attestation
Part A - Identification
I, (the applicant), propose to install or modify the antenna(s) or
antenna-supporting structure described herein:
new structure, or modified structure,
(address, description ofiocation),
with the following coordinates: _0_'_" north latitude and _0_'_" west longitude.
Part B - Preliminary Environmental Information Attestation
The proposed antenna installation and supporting structure are:
Yes No
G G Within 30 metres of a water body including a wetland.
G G Likely to release a polluting substance into a water body.
G G In a national park or other federally protected area.
G G A significant modification to an existing antenna installation.
G G Attached to, or within 15 metres of, an existing building.
G G Independent of an existing building and, individual1y, they or any supporting line have a footprint greater
than 25m2.
G G Located on Territorial Crown land requiring a pennit under the Territorial Land Use Regulations.
I note that further study may be required where the proposed structure is not exc1uded from the Canadian Environmental
Assessment Act and may have significant adverse environmental effects.
Part C - Municipal/Land-Use Consultation Attestation
(1)_ I have consulted with the municipal/land-use authority and have obtained their concurrence;
(2)_ I have consulted, or will consult, the municipal!land~use authority on (date) and will
forward any comments when received. I understand that this may delay the issuance of a radio authorization;
(3)_ * I have not consulted with the appropriate municipal/land-use authority, as I believe that the structure or the change
proposed thereto is insignificant. I accept any consequences of this decision; or,
(4)_ I have consulted with the appropriate municipal/land-use authority and they do not concur. I now petition Industry
Canada to consider the application based on the attached details of my consultation.
* Not applicable to a broadcast undertaking.
"1 dec1are that this infonnation is true, complete and correct to the best of my knowledge."
Applicant's signature Title (if on behalf of a Company) Date
10
-
~~ - \
r'ie"
i!t~,.- '-z.,'
~_' \:', ~ 4 <=;;'N
~ 1dJ
' ~ "',,'
,_,,,",_.~.,~~_~-,,.i_; _
~~~4Po/
>".-~.,,"
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD 2005-013 Committee of the Whole Andria Leigh, MCIP, RPP
Subject: Department:
Council Planning
New Provincial Policy
C.ofW. Statement (PPS) Date:
March 3, 2005
Motion R.M. File #:
#
Date: RolI#:
J BACKGROUND/ANALYSIS: II
In 2004, the Province gave Royal Assent to amendments to the Planning Act to change how
the Provincial Policy Statements (PPS) are considered by planning authorities. The Province
also released a draft PPS that significantly changes how planning authorities are supposed to
plan for future growth. On March 1, 2005 the new PPS came into force and effect and applies
to all applications commenced on or after that date. The purpose of this report is to
summarize the impacts of the PPS on Oro-Medonte.
The revised wording in the Planning Act now requires that all planning decisions are to "be
consistent with", rather than "have regard for" the PPS.
The PPS is intended to be read in its entirety with relevant policies being applied to each
individual application. The PPS is also intended to reflect the diversity of all Ontario
municipalities and is based on good planning principles. The Province is required to ensure
that its resources (Natural heritage, Water, Agriculture, Minerals and Petroleum, Mineral
Aggregate, and Cultural Heritage and Archeology) are managed in a sustainable way to meet
the long term needs of its residents.
.
~J -J
There are a number of specific policies that will have an effect on Oro-Medonte and these are
discussed below:
1. Expansions to settlement area only to be considered_at time of a comprehensive
review (i.e. Official Plan review) therefore no Official Plan Amendments will be allowed
for expansions.
2. Rural areas are now defined/policies have been established for the types of uses to be
encouraged. The PPS is discouraging rural development and makes it more difficult to
develop on private or partial services which could impact long term growth potential in
the Township.
3. The co-ordination of planning matters which have potential cross boundary
implications (i.e. Oro Moraine, watershed and groundwater) has now been
incorporated into the policy statement.
4. New policies for population and employment projections that require the County in
consultation with the lower tier municipalities to identify and allocate population,
housing, and employment projections for lower tier municipalities and also to identify
and provide policy direction to lower tier for cross boundary matters. Therefore not all
municipal OP's will have a 20 year supply of land designated for growth as previously
required.
5. Improved policies for employment areas which allow for the promotion of economic
development within a municipality.
6. The promotion of public spaces, parks, and open space and the healthy communities
that they can provide for are encouraged within the new policy statement.
7. Revised infrastructure policies that require planning for infrastructure to be integrated
into the plan for growth review. Partial services will only be permitted to occur for
infilling of settlement areas. Individual services only permitted for limited forms of rural
development, generally maximum of 5 lots.
8. Policies that promote planning for lands uses in the vicinity of an airport to ensure the
long term operation and economic role of the airport is protected have been added.
9. The promotion of alternative energy systems (i.e. (wind energy) in settlements, rural
and prime agricultural areas in now incorporated into policies.
10. Improved policies for water resources including maintaining linkages between natural
heritage, surface water, groundwater, and hydrologic functions and using the
watershed as a means for planning reviews/ growth plans.
11. Lot creation in prime agricultural areas is further restricted as infilling lots and bona fide
farm retirement lots are not longer permitted. The intent is to protect and promote
these areas for agriculture and agriculture related uses.
12. New Mineral Aggregate Resources policies that indicate the demonstration of need for
the resource (i.e. supply and demand analysis) is not to be considered in evaluating
the establishment of a new aggregate operation.
While the new policies highlight the importance of a number of provincial matters including the
environment and aggregate, there continues to be no clear direction on how these policies
should be balanced and prioritized when in conflict. It is clearly identified in the document that
there is no implied priority in the order in which the policies appear. As Council will recall, this
has long been of concern to the Township and was highlighted during the Oro Moraine Land
Use Strategy and the Aggregate Management Plan exercises that were implemented through
Official Plan Amendment No. 16.
- 2 -
.
-
II RECOMMENDATION(S): I
1. THAT Report No. PO 2005-013 regarding the new Provincial Policy Statement be received
for information purposes.
Respectfully submitted,
--1J --(~
Andria Leigh, MC/P, RPP
Director of Planning
C.A.O. Comments: Date:
). ~~;;).)/O
C.A.O. Dept. Head--~"~
- 3 -
~e-\
~~
tOfOltO
;? ~~~/~~-,<"!~ ~
~;;~( ~C,i
(~ ~~'
~A~ '" - ~,
"'V" "~>"J
".-""..,.,. ,
4",&~$\"
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD 2005-022 Committee of the Whole Andria Leigh, MCIP, RPP
Subject: Department:
Council Planning
County of Simcoe
C.ofW. Decision on Shoreline Date:
Policy Amendment March 14, 2005
Motion R.M. File #:
#
Date: RolI#:
II BACKGROUND/ANALYSIS: I
On December 1, 2004 Council adopted Motion No. which endorsed policy amendments to the
Shoreline designation specifically related to Section D1 0.3.8 - Limits of Shoreline
Development of the current Official Plan. On February 9, 2005 the Corporate Services
Committee at the County adopted a report from the Planning Department that recommended
the shoreline policies for the Township of Oro-Medonte, identified as Non-Decision #1 for
Official Plan Amendment #17 be approved and that a Notice of Decision be provided for in
accordance with the Planning Act.
A copy of the Notice of Decision is attached for the Committee's reference. The last date of
appeal identified in the Notice was Monday March 7, 2005. It has been confirmed by the
County that no appeals of these policies were received and therefore the amendments to
Section D1 0.3.8 are now in force and effect. These amendments have been incorporated into
the Township's Official Plan document.
-
II RECOMMENDATION(S): II
1. THAT Report No. PO 2005-022 regarding the Notice of Decision for amendment to the
Shoreline policies of the Township's Official Plan be received for information purposes.
Respectfully submitted,
-1J -f,0
Andria Leigh, MCIP, R'PP
Director of Planning
C.A.O. Comments: Date: (~~ \1 \0';-
~"-c~
C.A.O. Dept. Head
- 2 -
~"M"_._
'A~
Mf
FileNo: OM-OPA-0317 Date of Decision: February 9, 2005
Municipality: Township of Oro-Medonte Date of Notice: February 15, 2005
Location: All of Oro-Medonte Last Date of Appeal: March 7, 2005
NOTICE OF DECISION
With Respect to an Official Plan Amendment
Subsection 17(35) and 21 of the Planninq Act
A decision was made on the date noted above to approve the shoreline policies for the Township of Oro-
Medonte, formerly identified as Non-Decision #1 for Official Plan Amendment 17, and recently ratified by
Township of Oro-Medonte Council on December 1, 2004.
Purpose and Effect of the Official Plan Amendment
The purpose of this amendment is to update the Official Plan policies of the Township of Oro-Medonte
with respect to development in Shoreline areas.
The effect of this amendment is these policies will be incorporated into the local Official Plan policies
already in effect.
A copy of the decision is attached.
A copy of Item No. CS 05-043 is attached.
When and How to File An Appeal When the Decision is Final
Anv appeal to the Ontario Municipal Board musl The decision of the County of Simcoe is final if a
be filed with the Clerk of the Countv of Simcoe Notice of Appeal is not received on or before the
no later than 20 davs from the date of this notice last date of appeal noted above.
as shown above as the last date of appeal.
Getting Additional Information
The notice of appeal should be sent to the Additional Information about the application is
attention of Glen R. Knox, County Clerk, at the available for public inspection during regular
address shown below and it must: office hours at the County of Simcoe at the
(1) set out the specific part of the proposed address noted below, from the office of the
official plan amendment to which the appeal municipality noted above, or by contacting the
applies, County of Simcoe Planning Department at (705)
(2) set out the reasons for the request for the 735-6901.
appeal, and
(3) be accompanied by the fee prescribed under Mailing address for Filing a Notice of Appeal
the Ontario Municipal Board Act in the County of Simcoe
amount of $125.00, payable by certified Administration Centre,
cheque to the Minister of Finance, Province 1110 Highway 26,
of Ontario, Midhurst, ON
LOL IXO
Who Can File An Appeal
Only individuals, corporations or public bodies Attention: Glen R. Knox, County Clerk
may appeal the decision of the County of Telephone: (705) 726-9300 - Ext. 246
Simcoe to the Ontario Municipal Board. An
appeal may not be filed by an unincorporated
association or group. However, a notice of
appeal may be filed in the name of an individual RtCEIVED I
who is a member of the association or group.
FEe 1 B 2005 I
,
ORO-MEDONTE
I TOWNSHIP
Ole. - '4
M February 9, 2005
COUNTY OF SIMCOE
CORPORATE SERVICES COMMITTEE
RESOLUTION
Delegated under the Authority of the Planninq Act
MOVED BY: Councillor {, f-pOf,iN ~
,
SECONDED BY: Councillor -' . uJ~
THAT the shoreline policies for the Township of Oro-Medonte, formerly identified as
Non-Decision #1 for Official Plan Amendment 17, and recently ratified by Township of
Oro-Medonte Council on December 1, 2004 be approved;
AND THAT Notice of Decision be provided in accord nce with the Planning Act.
Carried ~)
Defeat tI p
I
v"d
Q -
h
COUNTY OF SIMCOE \~~' J
ITEM FOR: CORPORATE SERVICES COMMITTEE
SECTION: Planning - Delegated Authority
ITEM NO. CS 05-043
MEETING DATE: February 9,2005
SUBJECT: Oro-Medonte Official Plan Amendment 17 Non-Decision #1 (Shoreline
Policies)
RECOMMENDATION:
THAT the shoreline policies for the Township of Oro-Medonte, fonnerly identified as Non-
Decision #1 for Official Plan Amendment 17, and recently ratified by Township of Oro-Medonte
Council on December I, 2004 be approved;
AND THAT Notice of Decision be provided in accordance with the Planning Act.
BACKGROUND:
Issues Summary
Over the past 2 years, the County has been working with the Township of Oro-Medonte as well
as various agencies and stakeholders to work towards appropriate general updates and
housekeeping policies for the Township's Official Plan. These policy changes were part of local
Official Plan Amendment (OPA) 17. On November 10, 2004 the County's Corporate Services
Committee approved OP A 17, as amended by County staff. The Committee also made two Non-
Decisions, upon the request of the Township's Council. These Non-Decisions related to the
following sections of policy:
1. Section DI0.3.8 (Section C5.3.4 in the consolidated Official Plan) "Limits of Shoreline
Development"
2. Section D4 (Section D4 in the consolidated Official Plan) - "Water Taking"
On December 1, 2004, the Shoreline policies were ratified by Township Council. These proposed
policies were then submitted to the County for review (Schedule 1). During the review, County
staff has consulted with the Township Planning Department and have proposed minor
modifications to ensure confonnity with County policies and the intent of the County of Simcoe
Official Plan (Schedule 2).
FINANCIAL ANALYSIS:
There are no financial implications to this item.
. .
February 9,2004 Corporate Services Committee CS 05-043 Page 2
SCHEDULES:
The following schedules are attached and fonn part of this item.
Schedule I _ Shoreline Policies as submitted to the County by Oro-Medonte.
Schedule 2 _ Shoreline Policy Modifications as Proposed by the County.
~ ~
~ ~
Schedule I to Schedule 2 to
CS05~43 CS05-043
PREPARED BY: Nathan Westendorp
APPROVALS: Date:
Mark Aitken, Acting Chief Administrative Officer February 2, 2005
,',
Schedule 1 Corporate Services Committee CS 05-043 Page 1
SECTION D10.3.8 (Section C5.3.4 in consolidated OP) as ratified by Township of Oro-
Medonte Council resolution and as submitted to the County of Simcoe for approval
"The further expansion of the shoreline development area onto lands that are not
designated Shoreline is not permitted by this Plan. Exceptions may be granted
through the approval of an Official Plan Amendment if the expansion is small in
scale and is focused on the shoreline or is considered to be infilling. Infilling is
defined as development that abuts a developed area on two sides and/or is
located within a block of land that is surrounded by public roads on at least three
sides. The creation of strip development across from existing development on
existing public roads is not contemplated by this Plan.
Council may consider such minor amendments to the Official Plan to redesignate
lands for such limited shoreline development, provided Council is satisfied that:
a) The lots will have an area of 0.6 hectares or greater;
b) The majority of the existing tree cover on the proposed lots is retained and
protected as part of the approvals process;
c) The development is compatible, in terms of scale, density and character, with
existing development;
d) The proposed lots, if located on the shoreline, have a water frontage of no
less than 45 metres; and,
e) The lots would conform to the general subdivision and consent policies of this
Plan.
For Plans of Subdivision that involve the creation of lots with water frontage, only
a single tier of lots shall be created, all with water frontage, as set out in Section
D10.3.6 of this Plan. In addition, no new lots with direct access to County Roads
are permitted.
If major development is proposed (which is defined as development that does not
meet the above criteria), a detailed review of the entire shoreline area shall be
carried out to determine if the proposed location is suitable and appropriate from
a growth management perspective."
.
Schedule 2 Corporate Services Commillee CS 05-043 Page I
SECTION D10.3.8 (Section C5.3.4 in consolidated OP) as ratified by Township of Oro-Medonte
Council resolution and as submitted to the County of Simcoe for approval, is modified by the
County of Simcoe to read as follows:
"The further expansion of the shoreline development area onto lands that are not
designated Shoreline is not permitted by this Plan. Exceptions may be granted through
the approval of an Official Plan Amendment if the expansion is small in scale, and is
either focused on the shoreline or is considered to be infilling. Infilling is defined as
development that abuts a developed area on two sides and/or is located within a ~
parcel of land that is SII!'f@blF}€!@€I abuts,"" public roads on at least three sides. The
creation of strip development across from existing development on existing public roads
is not contemplated by this Plan.
Council may consider such minor amendments to the Official Plan to redesignate lands
for such limited shoreline development, provided Council is satisfied that:
a) The lots will have aFt area €If g.~ J;;Js€taras @r €)fB@ter a minimum area of 0.6
hectares to a maximum area of approximately 1.0 hectare, except where larger
sizes may be suitable because of environmental constraints or design
considerations;
b) The majority of the existing tree cover on the proposed lots is retained and protected
as part of the approvals process;
c) The development is compatible, in terms of scale, density and character, with existing
development;
d) The proposed lots, if located on the shoreline, have a water frontage of no less than
45 metres; and,
e) The lots would conform to the general subdivision and consent policies of this Plan.
For Plans of Subdivision that involve the creation of lots with water frontage, only a
single tier of lots shall be created, all with water frontage, as set out in Section D10.3.6
of this Plan. In addition, no new lots with direct access to County Roads are permitted.
If major development is proposed (which is defined as development that does not meet
the above criteria), a detailed review of the entire shoreline area shall be carried out to
determine if the proposed location is suitable and appropriate from a growth
management perspective."
*NOTE* All references to specific section/policy numbers as stated above may be
modified for formatting purposes.
~~~ ~
",~~-,,,------:.~~ ~" - \
i1 ~.r~\
~o _, " 'ZJ...w,
rJ!r- '''. _ ,.,~
~,/" C;:J
"'~"-~ Lr;;;~:c~";':~'_i:~-ijr
''''':;jt:~''''
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD2005-23 Committee of the Whole Andria Leigh, RPP
Subject: Department:
Council Planning
Houben, Development
C.ofW. Application P-1/91 Date:
Concession 10, West Part March 14, 2005
Motion # of Lot 10 (Oro) R.M. File #:
D09 002901
Date: RolI#:
010-004-08700-0000
II BACKGROUND/ANALYSIS: I
The purpose of this report is to consider a request to proceed with a proposed Zoning By-law
Amendment on the above noted property. This subject property is located north of the Old Barrie
Road and east of Line 9 North and has an area of 46 acres.
Development Application P-1/91 was submitted to the Township of Oro on December 31, 1991 for
consideration of an Official Plan Amendment, Zoning By-law Amendment, and proposed plan of
subdivision. The applications for the Official Plan and Zoning By-law Amendments proceeded to a
Public Meeting in accordance with the requirements of the Planning Act on April 7, 1993. The
proposed plan of subdivision has not been substantially altered since that public meeting.
The Official Plan Amendment (OPA #64) that redesignated the lands from the Agricultural
designation to the Rural Residential designation was adopted by the Township of Oro by By-law
1993-046 on May 19,1993 and was approved by the Ministry of Municipal Affairs in March 1997. The
intent of the OPA was to allow for the development of a 26 lot estate residential subdivision.
The Plan of Subdivision was Draft Plan Approved by the Ministry of Municipal Affairs on March 10,
1997. The draft plan approval was subject to a number of conditions that are required to be satisfied
prior to the plan being registered. One of the conditions required the rezoning of the subject property
to ensure that the property is appropriately zoned to reflect the intended usage of the property for
residential purposes. The proposed zoning by-law amendment (attached) would rezone the subject
property from the Agricultural/Rural (A/RU) Zone to the Rural Residential One (RUR1) and Open
Space (OS) Zones and therefore satisfy this draft plan condition. The Open Space zone will be
applied to the Park, Walkway, Storm Water Management, and Fire Protection Blocks.
-
,The Rural Residential One (RUR1) zone is the appropriate zoning for an estate residential subdivision
as it requires minimum lot frontages of 45 metres (147.6 feet) and a minimum lot area of 0.4 hectares
(0.98 acres) to recognize the larger lot frontages and lot areas provided on estate residential lots.
The proposed M-Plan as prepared by the applicant's surveyor was reviewed to ensure that no
exceptions to the standard zone requirements were necessary. All of the lots within the subdivision
will comply with the minimum lot frontage and lot area requirements of the Rural Residential One
(RUR 1) zone.
The proposed Zoning By-law Amendment conforms with the policies of the Official Plan, as amended
by OPA #64 and would satisfy Condition #9 of the draft plan approval received from the Ministry. It is
not recommended that an additional public meeting be held on this proposal; as the required public
meeting was held in accordance with the requirements of the Planning Act and the proposal has not
been significantly altered since that time. On this basis, it is recommended that Council support the
adoption of the attached Zoning By-law Amendment that would rezone the subject property from the
Agricultural/Rural (AlRU) zone to the Rural Residential One (RUR1) and Open Space (OS) Zones.
JI RECOMMENDATIONS: II
It is recommended to Council:
1. THAT Report No. PD 2005-23 be received and adopted; and
2. That Council support the by-law to rezone lands located at Concession 10, West Part of Lot 10
(Oro) from the Agricultural/Rural (AlRU) zone to the Rural Residential One (RUR1) and Open
Space (OS) Zones; and
3. That the Clerk bring forward the appropriate by-law for Council's consideration.
Respectfully Submitted,
--4~,- '~
Andria Leigh, MCIP, RPP
Director of Planning
C.A.O. Comments: Date: {V~\\(O~
,
.QjDf\- C.)JJ--
C.A.O. I .J Dept. Head
- 2 -
C;\-\~3
THE CORPORATION OF THE MUNICIPALITY OF ORO-MEDONTE
BY-LAW NO. 2005-
Being a By-law to change the zoning on lands within Concession 10, West
Part Lot 10 (Ora) now in the Township of Oro-Medonte (Houben - Roll # 43-
46-010-004-08700-0000).
WHEREAS Zoning By-law 1997-95 was enacted to regulate the use of land and the character,
location, and use of buildings and structures within the Township of Oro-Medonte;
AND WHEREAS the Council of the Corporation of the Township of Oro-Medonte deems it
appropriate to further amend By-law 1997-95, as amended:
AND WHEREAS this By-law is in conformity with Section 09 of the Official Plan of the Township
of Oro-Medonte:
AND WHEREAS the Council of the Corporation of the Township of Oro-Medonte is empowered to
pass By-laws to regulate the use of land pursuant to Section 34 of the Planning Act, R.S.O. 1990,
c.P.13.
NOW THEREFORE the Council of the Corporation of the Township of Oro-Medonte enacts as
follows:
1. Schedule 'A13' to Zoning By-law No. 97-95 as amended, is hereby further amended by
changing the zone symbol applying to the lands located in Concession 10, West Part Lot
10, in the former geographic Township of Oro, now in the Township of Oro-Medonte, from
the Agricultural/Rural (A/RU) Zone to the Rural Residential One (RUR1) and Open Space
(OS) Zones as shown on Schedule 'A-1' attached hereto and forming part of this By-law.
2. This By-law shall come into effect upon the date of passage hereof, subject to the
provisions of the Planning Act, as amended.
READ A FIRST AND SECOND TIME on the day of April, 2005.
READ A THIRD TIME and finally passed this day of ,2005.
J. Neil Craig, Mayor
Marilyn Pennycook, Clerk
. ~{'-~
Schedule IA_11 10 By-Law
This is Schedule 'A-1' to By-Law 2005-
passed the day of
Mayor
J. Neil Craig
Clerk
Marilyn Pennycook
I I
I
1______
~~~ I
~~~ II
~ ~ .--'
~ ~ .--' -r..m I
~ ~ .--' \ /;--
. ~ ~ .--'
Z ~ ~ .--' \ !.,,"---.....,
~~~ "
._--"~- ""... ~ ~ .--' .--'
~ ~ .--'
~ .--' .--'
.~".
.
Z
OLD BARRIE RO ,
!
, ~
~
Z
..-- ".>, -
, H
I =] LANDS TO BE REZONED FROM THE ,
:=:= AGRICULTURAl/RURAL (AlRU) ZONE TO TH
RURAL RESIDENTIAL ONE (RUR1) ZONE
~ LANDS TO BE REZONED FROM THE - ............-.-.-..-.
AGRICULTURAl/RURAL (A/RU) ZONE TO TH
OPEN SPACE (OS) ZONE
......-- - ...._e _~__,_.._.._.
\
TOWNSHIP OF ORO-MEDONTE
PLANNING ADVISORY COMMITTEE MINUTES
2003-2006 TERM
March 14, 2005 @ 7:04 p.m.
Robinson Room / Council Chambers
Present: Council Representatives Public Representatives
Mayor J, Neil Craig Robert Barlow
Deputy Mayor Harry Hughes Mel Coutanche
Councillor Ralph Hough John Miller
Councillor John Crawford
Councillor Ruth Fountain
Regrets: Councillor Paul Marshall Terry Allison
Councillor Dan Buttineau Craig Drury
Staff Present: Andria Leigh, Director of Planning; Janette Teeter, Clerk's Assistant
Also Present: George Arnold, James Hayes, Eric Wormsbecker, Ian Watson,
Cathy Underhill, George Anderson, Lester and Cristina Cooke
1. Opening of Meeting by Chair
Mayor J. Neil Craig assumed the chair and called the meeting to order.
2. Adoption of Agenda
Motion No. PAC-1
Moved by John Miller, Seconded by Robert Barlow
It is recommended that the agenda for the Planning Advisory Committee meeting of
Monday, March 14,2005 be received and adopted.
Carried.
3. Declaration of Pecuniary Interest and the General Nature Thereof - in
Accordance with the Act.
None declared.
-
4. Minutes of Previous Meetings - February 21, 2005.
Motion No. P AC-2
Moved by Robert Barlow, Seconded by John Miller
It is recommended that the minutes of the Planning Advisory Committee Meeting held
on February 21 , 2005 be received and adopted.
Carried.
5. Correspondence and Communication
None.
6. Planning Applications
(a) Planning Report presented by Andria Leigh, Director of Planning, Re: Helen
Anderson - Part of Lot 9, Concession 14 (Oro), Application 2005-0PA-01
Motion No. PAC-3
Moved by Robert Barlow, Seconded by John Miller
It is recommended that
1. Report PD 2005-015, Andria Leigh, Director of Planning, re: Helen Anderson,
Development Application 2005-0P A-01 , Concession 14, Part of East Half of Lot 9
(Oro), Township of Oro-Medonte be received and adopted;
2. And Further That Official Plan Amendment Application 2005-0PA-01, Part of the
East Half of Lot 9, Concession 14 (Oro), Township of Oro-Medonte be deferred until
such time as favorable comments are received from the Ministry of Natural
Resources that sufficient technical basis is available for the proposal.
Carried.
Planning Advisory Committee Meeting
March 14. 2005, Page 2
~
(b) Planning Report presented by Andria Leigh, Director of Planning, Re: Lester
Cooke - South Part of Lot 17, Concession 3 (Orillia), Application P-159/03
Motion No. PAC-4
Moved by Mel Coutanche, Seconded by John Miller
It is recommended that
1. Report PD 2005-014, Andria Leigh, Director of Planning, re: Lester and Cristina
Cooke, Development Application P-159/03, Concession 3, South Part of Lot 17
(Orillia), Township of Oro-Medonte be received and adopted;
2. That the Planning Advisory Committee recommend to Council that Official Plan
Amendment No. 19, Concession 3, South Part of Lot 17 (Orillia), Township of Oro-
Medonte, submitted by Lester and Cristina Cooke be considered favorably for
adoption;
3. And Further That the Planning Advisory Committee recommend to Council the
favorable consideration of a by-law to designate Concession 3, South Part of Lot 17
(Orillia), Township of Oro-Medonte, as an Area of the Township subject to Site Plan
Control.
Carried.
(c) Planning Report presented by Andria Leigh, Director of Planning, Re:
1071118 Ontario Limited (Robert DeRosa) - East Part of Lot 21, Concession
7, RP 51 R-15045, Parts 1 to 4 pt Part 5 Parts 8 to 10 (Oro), Application 2005-
ZBA-03
Motion No. P AC-5
Moved by Mel Coutanche, Seconded by Robert Barlow
It is recommended that
1. Report PD 2005-016, Andria Leigh, Director of Planning, re: Application 2005-ZBA-
03, 1071118 Ontario Limited (DeRosa), Concession 7, Part of Lot 21, 51 R-15045,
Parts 1-4, Part 5, Parts 8-10 (Oro), Township of Oro-Medonte, be received and
adopted;
2. And Further That the Planning Advisory Committee recommend to Council that
Zoning By-law Amendment Application 2005-ZBA-03, Concession 7, Part of Lot 21,
51 R-15045, Parts 1-4, Part 5, Parts 8-10 (Oro), Township of Oro-Medonte proceed
to a Public Meeting in accordance with the requirements of Section 34 of the
Planning Act R.S.O. 1990 c.P. 13.
Carried.
Planning Advisory Committee Meeting
March 14, 2005, Page 3
7. Other Business
a) Public Meetings, March 21, 2005
7:00 p.m. 1) 2005-ZBA-05 [Duddy]
2) 2005-ZBA-06 [McLean]
3) 2005-ZBA-07 [Bidwell]
7:05 p.m. 4) 2004-0PA-02, 2004-ZBA-09, 2004-SUB-01 [Moon Point Corporation]
b) PAC Meeting - April 11 ,2005
c) Public Meeting - April 18, 2005
8. Adjournment
Motion No. PAC-6
Moved by John Miller, Seconded by Mel Coutanche
It is recommended that we do now adjourn at 7:37 p.m.
Carried.
Chair, Mayor J. Neil Craig Director of Planning, Andria Leigh
Planning Advisory Committee Meeting
March 14,2005, Page 4
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE q
\
PUBLIC MEETING MINUTES
Re: Proposed Amendment Zoning By-Law
Application No. 2005-ZBA-05, Concession 11,
West Part Lot 8, RP 51 R-33214, Part 1
(formerly Medonte), Township of Oro-Medonte, (Duddy)
March 21, 2005 @ 7:05 p.m. at the
Municipal Council Chambers of the Township of Oro-Medonte
Present: Mayor J. Neil Craig
Deputy Mayor Harry Hughes
Councillor Dan Buttineau
Councillor Paul Marshall
Councillor Ralph Hough
Councillor John Crawford
Councillor Ruth Fountain
Staff Present: Andria Leigh, Director of Planning; Janette Teeter, Clerk's Assistant
Also Present: John Miller, Bob Barlow, Terry Allison, Mel Coutanche, Craig Drury,
Stella Duddy
Mayor J. Neil Craig called the meeting to order and explained the public meeting is to
obtain public comments on proposed amendment to the Zoning By-Law.
Notice of the Public Meeting was mailed to landowners within 120m of the specified site
on February 23, 2005 and posted on a sign on the subject property on February 23,
2005.
The following correspondence was received at the meeting: Nottawasaga Valley
Conservation Authority dated March 2, 2005.
Andria Leigh, Director of Planning, provided an overview of the proposed amendment to
the Zoning By-Law.
The following persons offered verbal comments with respect to the proposed
amendment to the Zoning By-Law: None.
The Mayor advised that written submission will be received at the Township office until
March 22, 2005.
There being no further comments or questions, the meeting adjourned at 7:07 p.m.
A tape of the meeting is available for review at the Township Administration Centre, 148
Line 7 South.
.
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
PUBLIC MEETING MINUTES
Re: Proposed Amendment Zoning By-Law
Application No. 2005-ZBA-06, Concession 4, West Part Lot 15
(formerly Oro), Township of Oro-Medonte, (McLean>
March 21, 2005 @ 7:07 p.m. at the
Municipal Council Chambers of the Township of Oro-Medonte
Present: Mayor J. Neil Craig
Deputy Mayor Harry Hughes
Councillor Dan Buttineau
Councillor Paul Marshall
Councillor Ralph Hough
Councillor John Crawford
Councillor Ruth Fountain
Staff Present: Andria Leigh, Director of Planning; Janette Teeter, Clerk's Assistant
Also Present: John Miller, Bob Barlow, Terry Allison, Mel Coutanche, Craig Drury,
John Vandrie
Mayor J. Neil Craig called the meeting to order and explained the public meeting is to
obtain public comments on proposed amendment to the Zoning By-Law.
Notice of the Public Meeting was mailed to landowners within 120m of the specified site
on February 23, 2005 and posted on a sign on the subject property on February 23,
2005.
The following correspondence was received at the meeting: Nottawasaga Valley
Conservation Authority dated March 2, 2005.
Andria Leigh, Director of Planning, provided an overview of the proposed amendment to
the Zoning By-Law.
The following persons offered verbal comments with respect to the proposed
amendment to the Zoning By-Law: John Vandrie.
The Mayor advised that written submission will be received at the Township office until
March 22, 2005.
There being no further comments or questions, the meeting adjourned at 7:15 p.m.
A tape of the meeting is available for review at the Township Administration Centre, 148
Line 7 South.
,
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE \
PUBLIC MEETING MINUTES
Re: Proposed Amendment Zoning By-Law
Application No. 2005-ZBA-07, Concession 5, Part Lot 9, RP 51 R-33403, Part 1
(formerly Oro), Township of Oro-Medonte, (Bidwell)
March 21, 2005 @ 7:15 p.m. at the
Municipal Council Chambers of the Township of Oro-Medonte
Present: Mayor J. Neil Craig
Deputy Mayor Harry Hughes
Councillor Dan Buttineau
Councillor Paul Marshall
Councillor Ralph Hough
Councillor John Crawford
Councillor Ruth Fountain
Staff Present: Andria Leigh, Director of Planning; Janette Teeter, Clerk's Assistant
Also Present: John Miller, Bob Barlow, Terry Allison, Mel Coutanche, Craig Drury
Mayor J. Neil Craig called the meeting to order and explained the public meeting is to
obtain public comments on proposed amendment to the Zoning By-Law.
Notice of the Public Meeting was mailed to landowners within 120m of the specified site
on February 23, 2005 and posted on a sign on the subject property on February 23,
2005.
The following correspondence was received at the meeting: Nottawasaga Valley
Conservation Authority dated March 2, 2005.
Andria Leigh, Director of Planning, provided an overview of the proposed amendment to
the Zoning By-Law.
The following persons offered verbal comments with respect to the proposed
amendment to the Zoning By-Law: None.
The Mayor advised that written submission will be received at the Township office until
March 22, 2005.
There being no further comments or questions, the meeting adjourned at 7:19 p.m.
A tape of the meeting is available for review at the Township Administration Centre, 148
Line 7 South.
~~- \
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD 2005-0017 Committee of the Whole Andy Karaiskakis, Junior
Planner
Subject: Department:
Council
Zoning By-law Amendment for Planning
C.ofW. William and Stella Duddy
Concession 11, West Part of
Lot 8, RP 51 R-33214, Part 1
(Medonte)
Date:
Motion # 22.?nn..
R.M. File No.
Date: D14014339
II BACKGROUND: 1-
The purpose of this report is to consider the proposed Zoning By-law Amendment application submitted
by William and Stella Duddy. The intent of this application was to rezone a parcel of land that was
severed by the Committee of Adjustment for residential purposes in July 2004.
The application applies to lands legally described as Concession 11, West Part of Lot 8, RP 51 R-33214,
Part 1 in the Township of Oro-Medonte (formerly Medonte). The intent of the proposed Zoning By-law
Amendment is to rezone the subject lands from the Agricultural/Rural (A/RU) Zone to the Rural
Residential Two (RUR2) Zone to reflect the intended residential usage.
II ANALYSIS: 1-
In July 2004, the Committee of Adjustment granted a consent application for a new lot of approximately
0.52 hectares (1.28 acres) in total land area which was intended to be utilized for residential purposes.
As the parcel was currently zoned Agricultural/Rural (A/RU), the Committee of Adjustment included a
condition in their decision that required the severed lot to be rezoned to a residential zone to reflect the
intended usage.
~
The applicant submitted the application for rezoning and a public meeting as required by the Planning
Act was held on March 21, 2005. No concerns were raised at the public meeting and favorable written
comments were received from the Nottawasaga Valley Conservation Authority, the Simcoe County
District School Board, and Department Heads.
The proposed Zoning By-law Amendment would conform with the intent and policies of the Oro-Medonte
Official Plan and the County of Simcoe Official Plan. On this basis, it is recommended that a Zoning By-
law Amendment be given favorable consideration by Council.
II RECOMMENDATION (S): I'
1. THAT this report be received and adopted; and
2. That a zoning by-law amendment for William and Stella Duddy, that would rezone the lands
described as Concession 11, West Part of Lot 8, being RP 51 R-33214, Part 1 (Medonte), on
Schedule A21 of Zoning By-law 97-95, as amended from the Agricultural/Rural (A/RU) Zone to
the Rural Residential Two (RUR2) Zone be given favorable consideration; and
3. That the Clerk bring forward the appropriate by-law for Council's consideration.
Respectfully submitted,
A~akis
Junior Planner
Reviewed by,
~.J~ -t-yt
Andria Leigh, MCIP, RPP
Director of Planning
C.A.O. Comments: Date: 0\~1*1
J ~~
C.A.O. Dept. Head
2
<1k-3
THE CORPORATION OF THE MUNICIPALITY OF ORO-MEDONTE
BY-LAW NO. 2005-
Being a By-law to change the zoning on lands within Concession 11, West
Part of Lot 8, RP 51R-33214, Part 1 (Medonte) now in the Township of Ora.
Medonte (Duddy - Roll # 43-46-020-003-13201-0000).
WHEREAS the Council of the Corporation of the Township of Oro-Medonte is empowered to pass
By-laws to regulate the use of land pursuant to Section 34 of the Planning Act, R.S.O. 1990,
c.P.13.
AND WHEREAS Council deems it appropriate to re-zone the lands to permit the development of
rural residential uses, in accordance with Section D2 of the Official Plan
AND WHEREAS Council deems it appropriate to place the subject land in a zone with yard
requirements that are better suited for the subject lot;
NOW THEREFORE the Council of the Corporation of the Township of Oro-Medonte enacts as
follows:
1- Schedule 'A21' to Zoning By-law No, 97-95 as amended, is hereby further amended by
changing the zone symbol applying to the lands located in Concession 11, West Part of
Lot 8, RP 51R-33214, Part 1, in the former geographic Township of Medonte, now in the
Township of Oro-Medonte, from the Agricultural/Rural (AIRU) Zone to the Rural
Residential Two (RUR2) Zone as shown on Schedule 'A-1' attached hereto and forming
part of this By-law.
2. This By-law shall come into effect upon the date of passage hereof, subject to the
provisions of the Planning Act, as amended,
READ A FIRST AND SECOND TIME on the 6th day 01 April. 2005.
READ A THIRD TIME and finally passed this ~ day of April, 2005.
J. Neil Craig, Mayor
Marilyn Pennycook, Clerk
C\k-LI
Schedule 'A-11 to By-Law
This is Schedule 'A-1' to By-Law 2005-
passed the day of /J
Mayor
J. Neil Craig
~
N
Clerk
Marilyn Pennycook
1
"
" ",,$'
-....0'"
,,\1- ~'<> cP"
'<;.1>"," ~ ,fI..\-O
c.'
,0
,:,d'
c"
0"'
'00 0 '"""'"'''''
I .. I ,
Township of Oro-Medonte
I q ~ \
, TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD 2005-0018 Committee of the Whole Andy Karaiskakis, Junior
Planner
Subject: Department:
Council
Zoning By-law Amendment for Planning
C.ofW. Joyce McLean
Concession 4, West Part of
Lot 15 (Oro)
Date:
Motion # M,.."h?? ?nnr;
A.M. File No.
Date: D14014406
II BACKGROUND: 1-
The purpose of this report is to consider the proposed Zoning By-law Amendment application submitted
by Joyce McLean. The intent of this application was to rezone a parcel of land that was severed by the
Committee of Adjustment for residential purposes in November 2004.
The application applies to lands legally described as Concession 4, West Part of Lot 15 in the Township
of Oro-Medonte (formerly Oro). The intent of the proposed Zoning By-law Amendment is to rezone the
subject lands from the Agricultural/Rural (A/RU) Zone to the Rural Residential Two (RUR2) Zone to
reflect the intended residential usage.
II ANALYSIS: ~
In November 2004, the Committee of Adjustment granted a consent application for a new lot of
approximately 0.97 hectares (2.4 acres) in total land area which was intended to be utilized for
residential purposes. As the parcel was currently zoned Agricultural/Rural (A/RU), the Committee of
Adjustment included a condition in their decision that required the severed lot to be rezoned to a
residential zone to reflect the intended usage.
,J - J-
The applicant submitted the application for rezoning and a public meeting as required by the Planning
Act was held on March 21, 2005_ Verbal comments were made by a neighbour and addressed at the
time of the public meeting. Favorable written comments were received from the Nottawasaga Valley
Conservation Authority, Simcoe County District School Board, and Department Heads.
The proposed Zoning By-law Amendment would conform with the intent and policies of the Oro-Medonte
Official Plan and the County of Simcoe Official Plan. On this basis, it is recommended that a Zoning By-
law Amendment be given favorable consideration by Council.
II RECOMMENDATION (S): I'
1. THAT this report be received and adopted; and
2. That a zoning by-law amendment for Joyce McLean, that would rezone the lands described as
Concession 4, West Part of Lot 15 (Oro), on Schedule A12 of Zoning By-law 97-95, as amended
from the Agricultural/Rural (A/RU) Zone to the Rural Residential Two (RUR2) Zone be given
favorable consideration; and
3. That the Clerk bring forward the appropriate by-law for Council's consideration.
Respectfully submitted,
Reviewed by,
-~J .-eyt
Andria Leigh, MCIP, RPP
Director of Planning
C.A.O. Comments: Date: 11. 11-.< ,1 /l.a./o5: '
vv-A rJ
C.A.O. De t. Head
2
~~-)
THE CORPORATION OF THE MUNICIPALITY OF ORO-MEDONTE
BY-LAW NO. 2005-
Being a By-law to change the zoning on lands within Concession 4, West
Part of Lot 15 (Oro) now in the Township of Oro-Medonte (McLean - Roll #
43-46-010-002-084-0000).
WHEREAS the Council of the Corporation of the Township of Ora-Medonte is empowered to pass
By-laws to regulate the use of land pursuant to Section 34 of the Planning Act, A.B.O. 1990,
c.P.13.
AND WHEREAS Council deems it appropriate to fe-zone the lands to permit the development of
rural residential uses, in accordance with Section 02 of the Official Plan
AND WHEREAS Council deems it appropriate to place the subject !and in a zone with yard
requirements that are better suited for the subject lot;
NOW THEREFORE the Council of the Corporation of the Township of Ora-Medonle enacts as
follows:
1. Schedule 'A12' to Zoning By.!aw No. 97.95 as amended, is hereby further amended by
changing the zone symbol applying to the lands located in Concession 11, West Part of
Lot 15, in the former geographic Township of Medonte, now in the Township of Ora.
Medonte, from the Agricultural/Rural (AlAU) Zone to the Aural Residential Two (AUA2)
Zone as shown on Schedule 'A.1' attached hereto and forming part of this By.law.
2. This By.law shall come into effect upon the date of passage hereof, subject to the
provisions of the Planning Act, as amended.
READ A FIRST AND SECOND TIME on the 6th day of April, 2005.
READ A THIRD TIME and finally passed this ~ day of April, 2005.
J. Neil Craig, Mayor
Marilyn Pennycook, Clerk
1J - Lf
Schedule 'A-11 to By-Law
This is Schedule 'A-1' to By-Law 2005-
passed the day of !
Mayor
J. Neil Craig 'OS
N
Clerk
Marilyn Pennycook
1
'?,\Q'i>
~,,,,
,<0
"'" 0 looM","rs
,,",' ,
Township of Oro-Medonte
n
M%i~ "-\~-\
"~'.--'---"--'_,'!!.~~~
l~i\
1- .,.. -J
~~'5"Y
~
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD 2005-0019 Committee of the Whole Andy Karaiskakis, Junior
Planner
Subject: Department:
Council
Zoning By-law Amendment for Planning
C.ofW. Glenn Bidwell
Concession 5, Part of Lot 9,
RP 51 R-33403, Part 1 (Oro)
Date:
Motion # ~??
R.M. File No.
Date: D14 014407
II BACKGROUND: I~
The purpose of this report is to consider the proposed Zoning By-law Amendment application submitted
by Glenn Bidwell. The intent of this application was to rezone a parcel of land that was severed by the
Committee of Adjustment for residential purposes in November 2004.
The application applies to lands legally described as Concession 5, Part of Lot 9, RP 51R-33403, Part 1
in the Township of Oro-Medonte (formerly Oro). The intent of the proposed Zoning By-law Amendment
is to rezone the subject lands from the Agricultural/Rural (A/RU) Zone to the Rural Residential Two
(RUR2) Zone to reflect the intended residential usage_
II ANALYSIS: ,
In November 2004, the Committee of Adjustment granted a consent application for a new lot of
approximately 0.55 hectares (1.37 acres) in total land area which was intended to be utilized for
residential purposes. As the parcel was currently zoned Agricultural/Rural (A/RU), the Committee of
Adjustment included a condition in their decision that required the severed lot to be rezoned to a
residential zone to reflect the intended usage.
~t'n-d-
The applicant submitted the application for rezoning and a public meeting as required by the Planning
Act was held on March 21, 2005. No concerns were raised at the public meeting and favorable written
comments were received from the Nottawasaga Valley Conservation Authority, the Simcoe County
District School Board, and Department Heads.
The proposed Zoning By-law Amendment would conform with the intent and policies of the Oro-Medonte
Official Plan and the County of Simcoe Official Plan. On this basis, it is recommended that a Zoning By-
law Amendment be given favorable consideration by Council.
II RECOMMENDATION (S): ,
1. THAT this report be received and adopted; and
2. That a zoning by-law amendment for Glenn Bidwell, that would rezone the lands described as
Concession 5, Part of Lot 9, being RP 51 R-33403, Part 1 (Oro), on Schedule A12 of Zoning By-
law 97-95, as amended from the Agricultural/Rural (A/RU) Zone to the Rural Residential Two
(RUR2) Zone be given favorable consideration; and
3. That the Clerk bring forward the appropriate by-law for Council's consideration.
Respectfully submitted,
A~S
Junior Planner
Reviewed by,
---1J;'~
Andria Leigh, MCIP, RPP
Director of Planning
C.A.O. Comments: Date: r'L~'--' ',)..... .s,
~
C.A.O. V De t. Head
2
1",-)
THE CORPORATION OF THE MUNICIPALITY OF ORO-MEDONTE
BY-LAW NO. 2005-
Being a By.law to change the zoning on lands within Concession 5, Part of
lot 9, RP 51R.33403, Part 1 (Ora) now in the Township of Oro~Medonte
(Bidwell- Roll # 43-46-010-002-287-0000).
WHEREAS the Council of the Corporation of the Township of Oro-Medonte is empowered to pass
By-laws to regulate the use of land pursuant to Section 34 of the Planning Act, R.S.O. 1990,
c.P.13.
AND WHEREAS Council deems it appropriate to re-zone the lands to permit the development of
rural residential uses, in accordance with Section 02 of the Official Plan
AND WHEREAS Council deems it appropriate to place the subject land in a zone with yard
requirements that are better suited for the subject lot;
NOW THEREFORE the Council of the Corporation of the Township of Oro-Medonte enacts as
follows:
1. Schedule 'A12' to Zoning By-law No. 97-95 as amended, is hereby further amended by
changing the zone symbol applying to the lands located in Concession 11, West Part of
Lot 15, in the former geographic Township of Medonte, now in the Township of Oro-
Medonte, from the Agricultural/Rural (AlRU) Zone to the Rural Residential Two (RUR2)
Zone as shown on Schedule 'A-1' attached hereto and forming part of this By-law.
2. This By-law shall come into effect upon the date of passage hereof, subject to the
provisions of the Planning Act, as amended.
READ A FIRST AND SECOND TIME on the 6th day of April, 2005.
READ A THIRD TIME and finally passed this _ day of April, 2005.
J. Neil Craig, Mayor
Marilyn Pennycook, Clerk
.
~ "",-Y-
Schedule 'A-11 to By-Law
This is Schedule 'A-1' to By-Law 2005-
passed the day of U
Mayor
J. Neil Craig ~
N
Clerk
Marilyn Pennycook
,,'
(:p~f?J
,.0
'00 100 MatefS
TOwnship of Oro-Medonte
~~~~~
",~/' ~~',-,(c " ,
'\J'~ r ~ ~ 1\-\
It BJ %,
I- :, _ ._..'''~
\~/ , t"J
~ -"<::~-:'
,~
TOWNSHIP OF ORO-MEDONTE
REPORT
Dept. Report No. To: Prepared By:
PD2005-024 Committee of the Whole Andria Leigh, RPP
Subject: Department:
Council Planning
2976 Highway 11 -
C.ofW. Concession 7, Lot 20, Date:
Plan 1145, Lots 6-8 (Oro) March 22, 2005
Motion Zoning R.M. File #:
#
Date: RolI#:
010-003-31500-0000
II BACKGROUND/ANALYSIS: I
As requested by the CAO. this report is being presented to Council regarding the zoning of the
above noted property related to permitted uses and prohibited uses identified in the Township's
Zoning By-law 97-95, as amended.
The property is located within the Oro Centre Secondary Plan Area and was designated
primarily Highway 11 Special Policy Area and Oro Centre - Office/Industrial by OPA # 15. The
property is zoned General Commercial Exception 32(GC*32) in the Township's Zoning By-law
97-95, as amended. The exception zone does not permit the development of new buildings or
the construction of additions to buildings that existed on the effective date of the By-law
(November 5,1997). Table A2 - identifies the permitted uses in the General Commercial (GC)
zone and is attached for the Committee's reference. One of the permitted uses on Table A2 is a
marine sales and service establishment which can include outdoor storage, display and sales
areas.
On December 17, 2004 a site visit was conducted and confirmed that the existing building was
being utilized for a marine sales and service business. As this is a permitted use under the
zoning by-law the outdoor storage related to that business would be permitted under the by-law.
Site Plan Control, although applicable to commercial properties, is only effective when a
building permit is being requested and one is not required at this time.
On March 22, 2005 a subsequent site visit was conducted more specifically related to Section
5.25 - Prohibited Uses of Zoning By-law 97-95. A copy of this section which outlines the uses
that are prohibited in any zone within the Township is also attached for the Committee's
reference. This site visit confirmed that the outdoor storage of partially dismantled motor
ve'hicles and trailers is occurring and the owner has been requested to remove ~e:e within 30
days in accordance with Township policies. Once removed, the property would comply with the
provisions of the Township's Zoning By-law.
II RECOMMENDATIONS: II
It is recommended to Council:
1. THAT Report No. PD 2005-24 be received for information purposes.
Respectfully Submitted,
--1J ~~
Andria Leigh, MC ,RPP
Director of Planning
C.A.O. Comments: Date:
C.A.O. Dept. Head
- 2 -
-
\ \
, \
'<
U \
;:;:
W
~
U~ ,
",8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-'
<<
;:;:
w
z
w
'"
-
if) \
'" I
Z \
0
N
-'if)
<~
-if)
U;;>
;:;: -'
;.;::~
_w << I
". u \
~!""
O!: ;:;:
U~ '"
\~ ~
U~ . . . . . . . . . . . . . . . .1.
'::t... -'0 . . . .
~ U
'" -'
<<
<< U
,... 3
'"
w \j
"5 ~
~ '" \
'5 ~ \j
~ E' w
w w if ~ " ~
z ~ '" :(j c "
0 if) " :g -.g -;;
;;;J ~ ~ :(j .~ ~ " ~
N " B ~ u ~ to ~ ~ u
1) ~ :g ~ .~ g g
g " ~ ~ .g ~ g-
~ -" ! i5 :(j .~ ~
~ c '" '~ ~ {ii 0 -"
:?:' ~ " .'" -;; :(j ~ ~,
j'j E "5 .., "5 ~ "0 11 " u
E: ~ '6 ~ " ~ ~ ~ ~ ." ~ '.S
u .;: "" ~ ~ " '" u ~ ~ 'S' -0 :> '" ,;;
:(j ~ ;;, "" " " "" ~ ~ g :(j ~s c; 15 -;; w g- c;
-;; ~ -;; -;; -;; u <5 -Ii " .E' ~ '" ~ -% g- '" ,;; 11 E
.~ -" " '~ .~ '0 Ii .~ -;; c; ~ .~ .9- g ~ " % 1:'
~ ~ ~ ~ p. <i -" S c; " -" ~ ~ -" ~
.., "" j'j , '5 .E ~ -;; ? > <i ~ .~ ", ~ " "
" E '0 -e " ~ "" Jk " 11 "
-;; :> ~ ~ E' " c; ~ " u ~ B ~ " g ~ :> E ~
"" <T .S " ? S ~ g " ;; ." '6 ;; S :.;; " ! '" 1S 'a '~ 'Ii
" w " ~ ?i " -0 ~ ? > ~ 11. .~
to " ~ :> <5 " " 8 g " ~ -0 " " " " :> ;a ." g. ~ ;). ~ "
<- to '" U U U U '" ;.;: ;:!: :;: :;: :;: ::;: :;: :;: ~ ;.-
I'- I'- 0.- ... ... if) ,...
\ <- to U '" '" u. 0 :t - ~ '" .-J :;: 7- 0\'" Cf '" if) f-- :0 >- 3< x 'r N <- '" U (:> G3 u. o \ r-
<- to U (:> u. o \
\ ~
i\-
5.22 PARKING OF SCHOOL BUSES
A maximum of two school buses are pem1itted to be stored on a lot that is the site of a
dwelling unit, provided the school bus is normaJJy driven by an occupant of the dwelling
unit.
5.23 PARKING OF UNLICENSED MOTOR VEHICLES IN THE RI, R2, RURI, RUR2,
SR AND RLS ZONES
A maximum of one unlicensed mOlOr vehicle is permitted to be parked on a lot in the
Residential One (Rl), Residential Two (R2), Rural Residential One (RURl), Rural
Residential Two (RUR2), Shoreline Residential (SR) and Residential Limited Service (RLS)
Zones.
5.24 PARKING OF UNLICENSED MOTOR VEHICLES IN THE AIRU ZONE
A maximum of two unlicensed motor vehicles are permitted to be parked on_a lot in the
Agricultural!Rural (AlRU) Zone. For the purposes of this By-law, farm vehicles are exempt
from this provision.
5.25 PROHIBITED USES
The foJJowing uses are prohibited in any Zone:
a) The use of any Irailer for human habitation, except where such Irailer is located in a
camping establishment, in a trailer park or in a mobile home park.
b) The use of any motor vehicle for human habitation,
c) The use of any accessOlY building or strncture or boalhouse for human habitation.
d) The use of a truck, bus or coach body for human habitation.
e) The storage of disused rail cars, streetcars, truck bodies or trailers without wheels.
f) The parking or storage of trailers or commercial motor vehicles on a vacant lot.
g) The outdoor storage of partia]]y dismantled molOr vehicles or Irailers or motor
vehicle or trailer parts.
h) Obnoxious uses.
i) The manufacturing, refming, rendering or distilJation of add, ammonia, chlorine,
coal, creosote, explosives, fIreworks, glue, petroleum or tar.
j) The bulk storage of industrial chemicals, hazardous waste or liquid industrial waste
as defIned under the Environmental Protection Act, as amended.
41