2004-140 To Authorize the Issuance of a Certificate of Substantial Completion and Acceptance (Aboveground Works) for Sugarbush Development, Phase III, Stage IV - Sections A and B
4
, "
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
BY-LAW NO. 2004-140
Being a By-Law to Authorize the Issuance of a
Certificate of Substantial Completion and Acceptance
(Aboveground Works) for Sugarbush Development,
Phase III, Stage IV - Sections A and B
WHEREAS Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter
P.13, as amended, provides that municipalities may enter into agreements imposed as
a condition to the approval of a plan of subdivision and such agreements may be
registered against the land to which the subdivision plan applies;
AND WHEREAS Council for the Corporation of the Township of Oro-Medonte entered
into a Subdivision Agreement with Monica Interior Design Ltd. and Modco Investments
Ltd. in June, 2002.
AND WHEREAS the requirements of this Subdivision Agreement with respect to the
aboveground works have now been met;
NOW THEREFORE the Corporation of the Township of Oro-Medonte hereby enacts as
follows:
1. That the Certificate of Substantial Completion and Acceptance (Aboveground
Works) for Sugarbush Development, Phase III, Stage IV, Sections A and B, may
now be issued by the Township Engineer (R.G. Robinson & Associates) in
compliance with the Subdivision Agreement between the Corporation of the
Township of Oro-Medonte and Monica Interior Design Ltd. and Modco
Investments Ltd.
2. That the attached Schedule "A", Certificate of Substantial Completion and
Acceptance (Aboveground Works), shall form part of this By-Law.
3. That this By-law shall come into force and take effect on the final date of passing
thereof.
By-law read a first and second time this 15th day of December, 2004.
By-law read a third time and finally passed this 15th day of December, 2004.
THE CORPORATION OF THE TOWNSHIP OF ORO-MEDONTE
..
M~r,~.~iM
;
<, .
"
Schedule "A" to By-Law 2004-140
~
R.G. ROBINSON AND ASSOCIATES (BARRIE) LTD.
TOWNsmp ENGINEERS
CERTIFICATE OF
SUBSTANTIAL COMPLETION AND ACCEPTANCE
(ABOVEGROUND WORKS)
MUNICIPALITY
Township of Oro-Medonte
PROJECT
SU2arbush Phase III, Sta2e IV - Sections "A" and liB"
DEVELOPER
Monica Interior Design Ltd. and
Modco Investments Ltd.
FILE NO.
12-8847-50
Description ofthe Works:
Roadways in Sections "A" and "B" of Sugarbush, Phase III, Stage IV Subdivision consisting of:
Section "A" - Road ditching and driveway entrance works along the west side of the 6th Line of Oro-
Medonte between Huron Woods Drive and Ash Court.
Section "B"- Ironwood Trail from Huron Woods Drive, northerly to Station 0 + 250; a distance of 490
metres (1608 feet).
We, R.G. Robinson and Associates (Barrie) Ltd., notify the Municipality that the above mentioned works
were inspected on November 15, 2004 and to the best of our knowledge and judgement, are complete in
accordance with the Subdivision Agreement except for the deficiencies below:
· Install hydrant access culverts and end protection;
· Place sod in ditch where rip rap check dams have been removed;
· Block 89, Regrade slope to direct drainage to swale.
We hereby accept these works for use and operation by the Municipality subject to the rectification of the
above noted deficiencies and to the rectification of any further deficiencies that may become apparent
during the maintenance period and to the maintenance that is require by the Subdivision Agreement and its
Amendment.
The date of Substantial Completion and Acceptance (Aboveground Works) is established by the Certificate
as of November 15,2004.
File #12-8847-50 Nov. 15#2