Loading...
2016-021 Authorize (Underground) Certificate of Substantial Completion and Acceptance South Shore Isabella EstatesThe Corporation of the Township of Oro-Medonte By-law No. 2016-021 A By-law to Authorize the Issuance of the Certificate of Substantial Completion and Acceptance (Homire Stormwater Management Pond expansion Works —Block 29, Plan M-947) for South Shore Isabella Estates, Plan 51 M-1015 Whereas Section 51, Subsection (26) of the Planning Act, R.S.O. 1990, Chapter P. 13, as amended, provides that municipalities may enter into agreements imposed as a condition to the approval of a plan of subdivision and such agreements may be registered against the land to which the subdivision plan applies; And Whereas Council for the Corporation of the Township of Oro-Medonte entered into a Subdivision Agreement with South Shore Isabella Estates Inc. (Isabella Estates subdivision- Warminster) in July 2013 for twenty two (22) residential lots on Merrington Avenue. And Whereas the requirements of this Subdivision Agreement with respect to the aboveground services have now been met; Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows: That the Certificate of Substantial Completion and Acceptance (Homire Stormwater Management Pond expansion Works —Block 29, Plan M-947) for South Shore Isabella Estates Inc., Registered Plan M-1015, recommended by AECOM may now be issued in compliance with the Subdivision Agreement between the Corporation of the Township of Oro-Medonte and South Shore Isabella Estates Inc. 2. That the attached Schedule "A", Certificate of Substantial Completion and Acceptance (Homire Stormwater Management Pond expansion Works —Block 29, Plan M-947) shall form part of this By -Law. 3. This by-law shall take effect on the final passing thereof. By-law read a First, Second and Third time, and Passed this 10th day of February, 2016. The Corporation of the Township of Oro-Medonte r, H.J. Hgbhes Cl Schedule "A" to By-law No. 2016-021 for The Corporation of the Township of Oro-Medonte MMMM AECOM 55CaarFb1n1arhimSui0620 77057219222 r1 Bamc.ON. Canada LANS117 705 7340764. rax WWW aawmwm TOWNSHIP ENGINEERS CERTIFICATE OF SUBSTANTIAL COMPLETION AND ACCEPTANCE (HOMIRE S'TORMWATER MANAGEMENT POND EXPANSION WORKS) MUNICIPALRY Township of Oro-Medonte PROJECT Isabella Estates Plan SIM -1015 DEVELOPER South Share_ Isabella Estates FILE NO. 60118176 (2000 UB -01) Description of the Works: Stormwater Management Pond in the Homire Subdivision (Block 29, Plan 51 M-947) consisting of: • Expanding Forebay and Pond southwest including tree clearing, rip rap spillway and fencing; We, AECOM notify the Municipality that the above mentioned works were inspected on December 14, 2015, and to the best of our knowledge and judgment, are complete in accordance with the Subdivision Agreement except for the deficiencies below: As per the attached Construction Status Report dated January 13, 2016. We hereby accept these works for use and operation by the Municipality subject to the rectification of the above noted deficiencies and to the rectification of any further deficiencies that may become apparent during the maintenance period and to the maintenance that is required by the Subdivision Agreement. The date of Substantial Completion and Acceptance (Homire Stormwater Management Pond Expansion Works) Is established by Certificate as of J 2016. [late: 4Att4Y �� AGO Signature: 3%MP.As.c bAdxc Township of Oro-Medonte - File Number. 00118178 —.___ _ _ Engineer. C C. Tatham 8 Associates Ltd Contractor Rumbte Gonslrrictiriri, Oate•:Janua 13,2M8 _ _�__ ;i,TART OF UNDERGROUF(D WORKS "`" `"- _ _.._ Yea No Date Com leted and Comments iSlltatlon Cuniruls� 1) IsiR Fence Installed and - 2) ;rock nd2);rock check dams Installed and maintained �. Pond { oandinn tlomfre SWM Poiidt SWM Pond works rsaparate.oemikiiiiiiipi e asr B A ,Seclfpn 714 , i(Btoek29 Plan 81M19471 1 ! nd earth works completed y the _ ?° f:xpanelon of ;Homire Subdivision -SWM Pond , 2) storm outfall works completed 3) ,access road constnrcted __. � _ _ _.. 4) nd fen eom leled with gate m X Fance_ab south side Hent to Farm field fo be reinstated. Po _9 _ 6} .pondtopso(1/seesdtng __ ._._. Ins ectad on November 27 2016 P 6) landacaI @g_q5rPLOt(t __ . _ Inspected on November 27 2015. _ 8} pond survey su6mflted --.- 9) pond volume calculations submitted _. y�) pond cerlifiratlon by Engineer ___ ........_ Certificate of S G 8 A. (HomireStonmwater Management Pond �� Jitttuat'y 14, 20113. Expansion Works issued _ SanftarvSewar _ 1) ptpe frtslalled ._ . _. _ _ Individual SePda.Systems _ _ 2)Pipe bedding summarylacceptanea report 3} ,backfill test summary/accapbnca rePgrt_ _ _4) makrlenance hales Inspededfapproveit._ _ - _. ?) . bencMng tnspecfed - __• _ B) top _of Precast 9 3m below finish grade_ _ _ • _ ... _ 7) _video Inspecdsubmitted for review .._8)wideo�on inspactlonreviewed%approved._.. .. _._ 1) Pipe installed _ Open ditch, _._ _2) Pipe bedding summarylacoeptaace, report.. _ _3) ,backfill test summarylacceptancereport.... _ 4} :maintenance holes inspected(approval _ 6} benching Inspected 8) top ofpreeast 0 3m below flntsh grado _ 7} video krspacdon ubmitted fbr,review_ e) video Irmpecttogreviewed/approved___ _.._....._ Yes 1 No loste Completed and Comments Wafsnna _2} pipe bedding acceptance report Recewe4 in email from C C Tatham data Dec 62012 _ 3) backfill testing acceptance report Received in email i{om C C,Telhem date Deo. 6 2012. ` J by -Pecs Installed and inspected r _- 6) pressure testlng mnflnned by Twp, r Completed Oclober4 2012 (Report #005j and September24 2013 6} system chbdnated by Twp. _ r Completed October 9.2012 (Report#OWT; Inspectors Name: 1 " 5 t ata Township of Oro-Medonte -tit ki iiaA'asoolA"s ua. f3—,2016 _-. Storm Sewer _ ... 1) flushing of sewer _2) video inspecibn submitted for ieview 3) ldeo inspectlon revii we pproved 1) Zrbstop Inspection by AECOM 2) r WA hydrant ihepection CartiBra-e o! M 8 F A {Munklpal Underground Services) Isaued ------- Certificate --_.. Certificate of M & F A (Homire Stom water Management Pond Expansion works) issued Inspectors Name: 2 of 3 ie Colii cdon Dh3,mmmentsent to Eng, Mey 24!13, separate cartl(ioate as per b.—A: Seattan Y.-14 Completed dY Townstsp Staff _ . Completed by Township Staff_ � ;— I - te-IN 9� IL Township of Oro-Medonte _ File Number: ti8118176 _ t, Contractor. Rumble Gonstructlon _ _ Raplstered Plan 61M•1015 -'- _ $TART OF ABOVEGROUND WORKS ..7 ! .n r.w y ua w a min v 'een9 emafi tlaled OBeemtier 5 2012. "" 5) granular 8 cwnpaction re , ns co AECOtuu1 See Tatham_emails dated November 16 2012 & pecemGer 16 2012- .J) 8) granular A confpactlan reports to AECOM„ ✓ See Tatham emelis dated November 16, 20t2 8 Dersmher 16, 2012 7) concrete curbs completed .. B) I concrete tested by Sotls Consuitent _. _g) base esph_ placed Complete November 18 2012 Report At00tl 10) signage street Identification �_. Stop,... _ -mad not assumed -no exit 11) dead end barricades and signage 12) ,driveway aprons paved 13) boulevard and ditchesIOPSMI and sodded/seeded Inspected on November 27.201 S. 14 base asphaR Ms ed b AECOM - -- } , P Y See AECQM enrafidated November 2, 21)15. 15) top Iifl asphalt completed ._ ✓ Completed by November -5. 2015. rMlasellaniss.Ntgrks _ 1) iwapcways wmpleted (Bock 25) _ ✓ 2) parkworka completed 3 8 i fencing completed boundery(Lols 72 13j Berm Installed, replarang lancing. walkways (Block 25)... ✓ Y 4) Boundary Marker Post AstConstructed (Aboveoround Works) i} as consWGed Information suhm{ked andX _ aptuoved by AECOM _ X 2) service record sheets (stage 2) . Gertiftcate of S. C. 8 A. (Aboveground services)) issued � January 14, 2016. _ ENQ OF MAINTENANCE PERtOd FOR ABOVE FOOk Wdift ___... _ .. Yes No Data com Ieted and Comments General Works 1) tree planting in boulevard X Mintmum two trees per lot for lot which has less_lhan three trees. , ..2) Pondlandscaping irupeefion by AECQM X 3)f"ng;inspactlpn.§y AECPIVI roX 4) final lot gding,cerfiflcafion.._... X _ 51 OLS,cerbfic�Uon for rnonumeMs X 6) curb box Inspactbrt by AECOM__ X 7) valve 8 p-ecllorhydrantinspedbn biAECOM X "' 8j finalinei Ilghtslandard's - transformers X 9) ;top IIR asphak inspection try AECOM X 74) curb inspec0on !iy AECOM .__ t t) boulevards/d(tches Inspectbtt, Iry AECpM onstructed 7Abovearpund Nlorksl 1) as7con9tructed information submitted and X _ , , approved by AECtj(YI X Eertiftcate of M & F A Abo ) ( veground Services lasued x' Inspectors Name- 2r f �_ 300 3 Project